Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,846 results
0.28s
Federal Register · Notice · Jan 22, 2013
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
78 FR 4469Nuclear Regulatory CommissionFederal Register · Proposed Rule · May 15, 2019
Amendment No. 7 would also revise the basis for technical specification A3.1.6 to clarify that the surveillance requirements for technical specification A3.1.6 require a minimum of two outlet air temperature … Absent significant modifications to the proposed revisions requiring republication, the NRC will not initiate a second comment period on this action in the event the direct final rule is withdrawn.
84 FR 21728Nuclear Regulatory CommissionFederal Register · Notice · Aug 28, 2006
TVA would continue to conduct periodic site inspections to ensure that none of the equipment or materials are causing environmental, health, or safety problems. … The State official had no comments.
71 FR 50948Nuclear Regulatory CommissionFederal Register · Notice · Oct 6, 2009
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
74 FR 51326Nuclear Regulatory CommissionFederal Register · Notice · Jan 15, 2013
In addition, all direct current electrical power was lost early in the event on Units 1 and 2, and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG. … Congressional Review Act This interim staff guidance is a rule as designated in the Congressional Review Act (5 U.S.C. 801-808).
78 FR 3039Nuclear Regulatory CommissionFederal Register · Notice · Mar 15, 1995
provision of section 189 of the Act. … The loss of both air handling units would cause the control building chillers to stop running due to a logic tie requiring air flow through the air handling equipment for the chilled water system to operate
60 FR 14015Nuclear Regulatory CommissionBiweekly NoticeWestinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility
Federal Register · Notice · Aug 5, 2022
The public comment period on the draft EIS closed on September 20, 2021. … On September 28, 2021, the NRC re-opened the public comment period until November 19, 2021 to allow more time for the public to submit comments (86 FR 53694).
87 FR 48044Nuclear Regulatory CommissionFederal Register · Notice · Feb 19, 2002
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
67 FR 7410Nuclear Regulatory CommissionNotice of Public Meeting and Request for Comment on Blending of Low-Level Radioactive Waste
Federal Register · Notice · Nov 30, 2009
ADDRESSES: You may submit comments by any one of the following methods. Please include Docket ID NRC-2009-0520 in the subject line of your comments. … Suber, Acting Deputy Director, Environmental Protection, and Performance Assessment Directorate, Division of Waste Management, and Environmental Protection, Office of Federal and State Materials, and
74 FR 62606Nuclear Regulatory CommissionFederal Register · Notice · Apr 20, 2001
The State official had no comment. … Even this will be kept as low as practicable by using gases other than air for supporting experiments.
66 FR 20339Nuclear Regulatory CommissionFederal Register · Notice · Aug 4, 2020
Impact levels (small, moderate, or large) have been determined for most NEPA issues ( e.g., land use, air, water) evaluated in the LR GEIS. … At the conclusion of the scoping period, the NRC will consider the results of its review and public comments to determine whether to proceed with the update.
85 FR 47252Nuclear Regulatory CommissionFederal Register · Notice · Aug 20, 2002
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
67 FR 53983Nuclear Regulatory CommissionDISA Technologies, Inc.; Environmental Assessment and Finding of No Significant Impact
Federal Register · Notice · Sep 29, 2025
The public comment period on the draft EA ended on September 8, 2025, and the comments received on the draft EA are addressed in appendix B of the final EA. … and Section 7 of the Endangered Species Act.
90 FR 46663Nuclear Regulatory CommissionHoneywell, International, Inc.; Metropolis Works Uranium Conversion Facility
Federal Register · Notice · Oct 31, 2018
Honeywell would continue operating for a period of less than 40 years, resulting in potential impacts that would be similar to or less than the impacts of the proposed action. IV. … Smith, Acting Director, Division of Fuel Cycle Safety, Safeguards, and Environmental Review, Office of Nuclear Material Safety and Safeguards.
83 FR 54787Nuclear Regulatory CommissionFederal Register · Notice · Jul 28, 2008
The public scoping comment period for the GEIS closed on November 30, 2007. … Following the end of the public comment period, the NRC staff will publish a Final GEIS that addresses, as appropriate, the public comments on the Draft GEIS.
73 FR 43795Nuclear Regulatory CommissionReplacement Energy Cost Estimates for Nuclear Power Plants: 2020-2030
Federal Register · Notice · Dec 18, 2020
Factors that affect replacement energy costs, such as load growth, replacement sources of generation, fuel prices, air emission requirement outlooks, and seasonal variations were treated in the analysis … The NRC appreciates feedback received from the November 18, 2020 public meeting and will consider comments received during the public comment period when developing the final NUREG-2242.
85 FR 82528Nuclear Regulatory CommissionFederal Register · Notice · Dec 5, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
71 FR 70553Nuclear Regulatory CommissionRevision of Fee Schedules; Fee Recovery for FY 2005
Federal Register · Rule · May 26, 2005
The NRC received 13 comments dated on or before the close of the comment period (March 24, 2005) and 3 additional comments thereafter, for a total of 16 comments that were considered in this fee rulemaking … tailings impoundments, and groundwater clean-up.
70 FR 30526Nuclear Regulatory CommissionFederal Register · Notice · May 12, 1997
Division, Air and Radiation Technical Branch were also contacted. … Prior to renewing the license, NRC will determine that GE has satisfied the requirements of the Atomic Energy Act of 1954, et seq., and NRC requirements.
62 FR 25975Nuclear Regulatory CommissionFederal Register · Notice · Dec 28, 2010
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
75 FR 81667Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.