Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.58s
Federal Register · Proposed Rule · Oct 21, 2014
After the close of the comment period, DOE will begin collecting data, conducting the analyses, and reviewing the public comments. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
79 FR 62899Energy DepartmentFederal Register · Notice · Apr 18, 2016
According to Northern, its project would meet the firm transportation service elected during an October 2015 open season by Xcel Energy Inc., CenterPoint Energy, Al-Corn Clean Fuel, and Midwest Natural … Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period.
81 FR 22590Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 6, 1998
DATES: The public scoping period starts with the publication of this Notice in the Federal Register and will continue until June 30, 1998. … Another alternative, the Partial Conveyance and Transfer of Tracts Alternative, would involve the conveyance and transfer of most of the tracts with the retention by DOE of any land that cannot be cleaned
63 FR 25022Energy DepartmentFederal Register · Notice · Jul 8, 2022
DATES: DOE invites public comment on this Draft Mercury Storage SEIS-II during a 45-day public comment period, which commences with the publication of this Notice in the Federal Register and continues … Background The Mercury Export Ban Act of 2008 (Pub. L. 110-414) and the 2016 Frank R. Lautenberg Chemical Safety for the 21st Century Act (Pub.
87 FR 40830Energy DepartmentEnergy Conservation Program for Consumer Products: Clothes Washer Energy Conservation Standards
Federal Register · Rule · Jan 12, 2001
DOE published an ANOPR on November 14, 1994 with a 75 day comment period. 59 FR 56423. … air legislation.
66 FR 3314Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Rule · Aug 12, 2024
the 30-year period are retired. 89 FR 11434, 11499. … Air Regul. Grp., 573 U.S. at 324).
89 FR 65520Energy DepartmentFederal Register · Proposed Rule · Jul 20, 1995
The Joint Comments proposed that new classes be established for any product employing non- ozone-depleting foam blowing agent which EPA approves under the Safe Alternatives Program of the Clean Air Act … Standards are expected to result in some decreases in nitrogen dioxide (NO2) emissions, although here too the Clean Air Act Amendments established new requirements that may lead to regional caps (and floors
60 FR 37388Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Sep 22, 2023
Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS. … Army Corps of Engineers, Nashville District Authorization under Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Act; Permission under Section 14 of the Rivers and Harbors
88 FR 65383Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 8, 2018
The EA may be issued for an allotted public comment period. Commission staff will consider all comments on the EA before making recommendations to the Commission. … If the Commission issues the EA for an allotted public comment period, a Notice of Availability of the EA will be sent to the environmental mailing list and will provide instructions to access the
83 FR 55883Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 23, 2022
Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS. … Army Corps of Engineers (delegated to Texas Commission on Environmental Quality) Clean Water Act, water quality certification.
87 FR 71596Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 19, 2010
Please note that the scoping period will close on November 12, 2010. Comments may be submitted in written form or verbally. … A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission.
75 FR 64303Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Energy Conservation Standards for Clothes Washers and Clothes Dryers
Federal Register · Proposed Rule · Aug 13, 2020
After the close of the comment period, DOE will review the public comments received and begin collecting data and conducting the analyses necessary to consider appropriate energy conservation standard … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
85 FR 49297Energy DepartmentFederal Register · Notice · Feb 12, 2001
construction and operation of the proposed project under these general headings: • geology and soils • water resources • vegetation and wildlife • threatened and endangered species • land use • air … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
66 FR 9839Energy DepartmentFederal Energy Regulatory CommissionNotice of Availability of a Financial Assistance Solicitation
Federal Register · Notice · Sep 26, 2003
Novel CO 2 and/or Hydrogen Separation Technology One vision of clean energy in the future is to make hydrogen from coal in an ultra-clean production plant. … The EPA has developed new regulations under the Clean Water Act, section 316(b), to reduce once through cooling usage of water and improve cooling water intake structures.
68 FR 55599Energy DepartmentFederal Register · Notice · Jul 30, 2020
The EA may be issued for an allotted public comment period. Commission staff will consider all comments on the EA before making recommendations to the Commission. … If the Commission issues the EA for an allotted public comment period, a Notice of Availability of the EA will be sent to the environmental mailing list and will provide instructions to access the
85 FR 45869Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Feb 14, 2024
Submission of Comments B. Public Meeting V. Procedural Issues and Regulatory Review A. Review Under the Regulatory Flexibility Act 1. Description of Reasons Why Action Is Being Considered 2. … of gas self-clean oven (freestanding) shipments, and 77 percent of gas self-clean oven (built-in) shipments would already meet or exceed the efficiency levels required at TSL 2 in 2027.
89 FR 11548Energy DepartmentFederal Register · Notice · Feb 11, 2009
Please note that the scoping period will close on March 6, 2009. Comments may be submitted in written or verbal form. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
74 FR 6870Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program for Consumer Products: Test Procedure for Dishwashers
Federal Register · Proposed Rule · Sep 3, 2002
if clean dishes were used. … Following the hearing, we will provide an additional comment period, during which interested parties will have an opportunity to comment on the proceedings at the hearing, as well as on any aspect
67 FR 56232Energy DepartmentEnergy Efficiency and Renewable Energy OfficeCoordination of Federal Authorizations for Electric Transmission Facilities
Federal Register · Proposed Rule · Aug 16, 2023
of 1966 (54 U.S.C. 306108) (NHPA), section 10 of the Rivers and Harbors Act (33 U.S.C. 403), section 404 of the Clean Water Act (33 U.S.C. 1344) (CWA), and the Endangered Species Act (16 U.S.C. 1531 … Resource Report 10 must: (1) Describe the existing air quality in the project area, indicate if any project facilities are located within a designated nonattainment or maintenance area under the Clean
88 FR 55826Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Portable Air Conditioners
Federal Register · Proposed Rule · Jun 13, 2016
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (D.C.). (42 U.S.C. 7651 et seq. ) SO 2 emissions … from 28 eastern States and D.C. were also limited under the Clean Air Interstate Rule (CAIR). 70 FR 25162 (May 12, 2005).
81 FR 38398Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.