Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,846 results
0.74s
Department of the Navy; Naval Air Warfare Center Weapons Division China Lake
Federal Register · Notice · Mar 17, 2014
Approval of the request would extend the time period for the Navy to submit a decommissioning plan and initiate decommissioning activities at China Lake. … Approval of the request would extend the time period for the Navy to submit a decommissioning plan and initiate decommissioning activities at China Lake.
79 FR 14753Nuclear Regulatory CommissionFederal Register · Notice · Oct 24, 2013
The Commission has determined for these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and … No comments were received during the 60-day comment period. The Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22.
78 FR 63504Nuclear Regulatory CommissionFederal Register · Notice · Nov 8, 1995
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
60 FR 56361Nuclear Regulatory CommissionBiweekly NoticeList of Approved Spent Fuel Storage Casks: NAC-MPC Revision 5
Federal Register · Proposed Rule · May 10, 2007
The NRC will not initiate a second comment period on this action. … For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and 5 U.S.C. 553; the NRC is proposing to
72 FR 26568Nuclear Regulatory CommissionFederal Register · Notice · Dec 12, 2001
Laufer, Acting. … No new accident or event initiators are created by allowing multiple air conditioning systems to be unavailable for the limited time period of 12 hours.
66 FR 64284Nuclear Regulatory CommissionJefferson Proving Ground License Amendment Application for Source Materials License
Federal Register · Notice · Nov 3, 2014
There will be a 45-day comment period on the draft EIS and a public meeting to receive comments. … Availability of the draft EIS, the dates of the public comment period, and information about the public meeting will be announced in the Federal Register , the local news media, and the NRC Web site
79 FR 65256Nuclear Regulatory CommissionMinor Corrections, Clarifying Changes, and a Minor Policy Change
Federal Register · Proposed Rule · Oct 7, 1996
This proposed rule is necessary to inform the public of these minor changes to the NRC's regulations and invite comments. DATES: Comment period expires December 23, 1996. … This proposed change is consistent with the Paperwork Reduction Act.
61 FR 52388Nuclear Regulatory CommissionFederal Register · Notice · Sep 4, 1997
existing radiological criteria for decommissioning for unrestricted release, approval of the licensee's proposal requires the preparation of an EIS in accordance with the National Environmental Policy Act … NRC is also arranging a public meeting on the DEIS to be held in the vicinity of Parks Township, Pennsylvania, during the public comment period in the fall of 1997.
62 FR 46780Nuclear Regulatory CommissionFederal Register · Notice · Oct 20, 2022
R-130 for a period of 20 years from the date of issuance of the renewed license. … The Sacramento Air Depot Historic District, located on McClellan Air Force Base, consisting of original buildings and structures, was the first of six bases authorized by the Wilcox Act of 1935 and was
87 FR 63820Nuclear Regulatory CommissionLaCrosse Solutions, LLC; Dairyland Power Cooperative La Crosse Boiling Water Reactor
Federal Register · Notice · Aug 1, 2018
a nuclear reactor operating at power, resulting in a large fission product release and requiring significant resource expenditures to stabilize the reactor conditions and ultimately decontaminate and clean … The NRC staff has determined that granting of the licensee's proposed exemption will not result in a violation of the Atomic Energy Act of 1954, or other laws, as amended.
83 FR 37532Nuclear Regulatory CommissionExceptions From Foreign Ownership, Control, or Domination
Federal Register · Rule · Apr 23, 2026
Absent significant modifications to the revisions requiring republication, the NRC will not initiate a second comment period on this action. … Background In July 2024, the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024 (ADVANCE Act) was signed into law.
91 FR 21719Nuclear Regulatory CommissionFederal Register · Notice · Jun 19, 1996
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
61 FR 31171Nuclear Regulatory CommissionFederal Register · Notice · May 2, 2017
The Commission has determined for these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and … No comments were received during the 30-day comment period. The Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22.
82 FR 20500Nuclear Regulatory CommissionFederal Register · Notice · Jan 29, 2018
The Commission has determined for these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and … No comments were received during the 30-day comment period. The Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22.
83 FR 4078Nuclear Regulatory CommissionLicense Renewal for the Dow Chemical TRIGA Research Reactor
Federal Register · Notice · Jul 20, 2012
R-108 for a period of 20 years from the date of issuance of the renewed license. … Zone Management Act (CZMA), National Historic Preservation Act (NHPA), Fish and Wildlife Coordination Act (FWCA), and Executive Order 12898 Environmental Justice.
77 FR 42771Nuclear Regulatory CommissionWestinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility
Federal Register · Notice · Jul 31, 2020
The NRC staff plans to have a public comment period for the draft EIS. … Availability of the draft EIS and the dates of the public comment period will be announced in a future Federal Register notice.
85 FR 46193Nuclear Regulatory CommissionCost Expenditure Criteria for Research and Development Utilization Facilities
Federal Register · Rule · Apr 24, 2026
Nuclear for Clean Energy Act of 2024, enacted on July 9, 2024. … L. 115-439; 132 Stat. 5565), and the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024 (ADVANCE Act), enacted on July 9, 2024 (Pub. L. 118-67, div.
91 FR 21937Nuclear Regulatory CommissionList of Approved Spent Fuel Storage Casks: Standardized Advanced NUHOMS®-24PT1; Addition
Federal Register · Rule · Jan 6, 2003
The comment period ended on April 29, 2002. Seven comment letters were received on the proposed rule. … Comment 37: One commenter stated that the design basis threat must encompass not only a 9/11 air assault, but a ground-based assault for more than 10 people, a truck-bomb assault, or weapons launched
68 FR 463Nuclear Regulatory CommissionRhode Island Atomic Energy Commission
Federal Register · Notice · Jan 5, 2017
The proposed action would not result in any land use changes or increase in noise or air emissions, and would not have a significant impact on air quality, noise or visual, terrestrial or aquatic resources … that are derived from other environmental laws, which include the Endangered Species Act, Coastal Zone Management Act, Fish and Wildlife Coordination Act, National Historic Preservation Act, and Executive
82 FR 1364Nuclear Regulatory CommissionFederal Register · Notice · Jul 25, 1996
Consistent with its past commitments, NRC is extending the comment period 45 days beyond the required minimum of 45 days. … NRC is also arranging a public meeting on the DEIS to be held in the vicinity of Cambridge, Ohio, during the public comment period in the early Fall of 1996.
61 FR 38789Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.