Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
1.34s
Federal Register · Notice · Aug 3, 1998
This Notice opens another environmental scoping comment period (see below). … Four comments were received during the public scoping period.
63 FR 41248Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Water-Source Heat Pumps
Federal Register · Proposed Rule · Aug 30, 2022
(2020), implies the repeal of E.O. 12889 and its 75-day comment period requirement for technical regulations. Thus, the controlling laws are EPCA and the USMCA Implementation Act. … Consistent with EPCA's public comment period requirements for consumer products, the USMCA only requires a minimum comment period of 60 days.
87 FR 53302Energy DepartmentFederal Register · Proposed Rule · Mar 13, 2008
The Clean Air Act Amendments of 1990 68 set an SO 2 emissions cap on all power generation. … Since the impact of any one standard on the allowance price is likely small and highly uncertain, DOE does not plan to monetize the SO 2 benefit. 68 The Clean Air Act Amendments of 1990 were
73 FR 13620Energy DepartmentFederal Register · Notice · Mar 2, 2020
The EA may be issued for an allotted public comment period. Commission staff will consider all comments on the EA before making recommendations to the Commission. … If the Commission issues the EA for an allotted public comment period, a Notice of Availability of the EA will be sent to the environmental mailing list and will provide instructions to access the
85 FR 12280Energy DepartmentFederal Energy Regulatory CommissionProduction of Tritium in Commercial Light Water Reactors
Federal Register · Notice · Jun 22, 2016
The 45-day public comment period on the Draft CLWR SEIS began on August 8, 2014, and ended on September 22, 2014. … During the comment period, public hearings were held to allow the public to comment on the Draft CLWR SEIS in Athens, Tennessee, on September 9, 2014; and Chattanooga, Tennessee, on September 10, 2014.
81 FR 40685Energy DepartmentRevision to Power Marketing Policy Cumberland System of Projects
Federal Register · Notice · Apr 25, 2023
Act (5 U.S.C. 552). … Transfers to each customer will be based on the customer's monthly invoices during the same three-month period (quarter).
88 FR 24981Energy DepartmentSoutheastern Power AdministrationFederal Register · Notice · Feb 29, 2012
The replacement is required to eliminate exposed pipeline sections caused by periodic flooding. … The EA assesses the potential environmental effects of the construction and operation of the Mainline 103 Extension Project in accordance with the requirements of the National Environmental Policy Act
77 FR 12278Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 14, 2021
Background and Authority The Energy Policy and Conservation Act, as amended (“EPCA”), 1 authorizes the U.S. … AWEF is calculated on the basis that walk-in box load is equal to half of the system net capacity, without variation according to high and low load periods and without variation with outdoor air temperature
86 FR 26504Energy DepartmentFederal Register · Rule · Jul 10, 2013
; and (2) has post-purge periods of less than 5 seconds. … and has post-purge period(s) of less than 5 seconds.
78 FR 41265Energy DepartmentFederal Register · Proposed Rule · Sep 1, 2015
Any comments submitted must identify the NOPR for Test Procedures for Small, Large, and Very Large Air-Cooled Commercial Package Air Conditioning and Heating Equipment, and provide docket number EERE-2015 … Interested parties may submit comments on the proceedings and any aspect of the rulemaking at any point until the end of the comment period.
80 FR 52676Energy DepartmentCommission Information Collection Activities (FERC-500); Comment Request; Extension
Federal Register · Notice · Nov 20, 2018
to request additional studies and provide comments and recommendations. 2 Statutes include the Electric Consumers Protection Act (ECPA), the National Environmental Policy Act (NEPA), the Endangered … Species Act, the Federal Water Pollution Control Amendments of 1972 (the Clean Water Act), and the Coastal Zone Management Act.
83 FR 58557Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Circulator Pumps
Federal Register · Proposed Rule · Dec 20, 2021
the definition of clean water pump. … After the webinar/public meeting and until the end of the comment period, interested parties may submit further comments on the proceedings and any aspect of the rulemaking.
86 FR 72096Energy DepartmentEnergy Conservation Program: Test Procedure for Walk-In Coolers and Walk-In Freezers
Federal Register · Rule · Mar 26, 2021
Table III.1—September 2020 NOPR Written Comments Commenter(s) Reference in this final rule Commenter type Air-Conditioning, Heating & Refrigeration Institute AHRI Trade Association. … to the cooler imposing air resistance.
86 FR 16027Energy DepartmentFederal Register · Notice · Apr 29, 2010
DOE received no comments on the Daikin petition. … Commenters responding to that prior notice generally agreed that an alternate test procedure is appropriate for an interim period while a final test procedure for these products is being developed.
75 FR 22581Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Jun 28, 2023
Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r. h. Applicant Contact: Mark Fendig, Managing Partner, Cushaw Hydro, LLC, P.O. … As proposed, the licensee would conduct the work during the low flow period between August and November 2023. l.
88 FR 41955Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · May 27, 2004
SUPPLEMENTARY INFORMATION: Title III of the Energy Policy and Conservation Act (EPCA) sets forth a variety of provisions concerning energy efficiency. … This Interim Waiver shall remain in effect for a period of 180 days after issuance or until DOE acts on the Petition for Waiver, whichever is sooner, and may be extended for an additional 180-day period
69 FR 30162Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Rule · May 27, 2004
SUPPLEMENTARY INFORMATION: Title III of the Energy Policy and Conservation Act (EPCA) sets forth a variety of provisions concerning energy efficiency. … This Interim Waiver shall remain in effect for a period of 180 days after issuance or until DOE acts on the Petition for Waiver, whichever is sooner, and may be extended for an additional 180-day period
69 FR 30182Energy DepartmentEnergy Efficiency and Renewable Energy OfficeProposed Agency Information Collection
Federal Register · Notice · Oct 26, 2015
Paperwork Reduction Act of 1995. … If you anticipate difficulty in submitting comments within that period, contact the person listed in ADDRESSES as soon as possible. ADDRESSES: Written comments may be sent to Mr.
80 FR 65222Energy DepartmentEnergy Efficiency and Renewable Energy OfficeEnergy Conservation Program: Energy Conservation Standards for Room Air Conditioners
Federal Register · Proposed Rule · Aug 25, 2020
ACTION: Reopening of public comment period. SUMMARY: The U.S. … Department of Energy (“DOE”) is reopening the public comment period for the preliminary analysis it has conducted for purposes of evaluating energy conservation standards for room air conditioners (ACs
85 FR 52280Energy DepartmentRevisions to Forms, Statements and Reporting Requirements for Electric Utilities and Licensees
Federal Register · Rule · Oct 7, 2008
Air Act Amendments, and adopted corresponding reporting schedules for Forms 1 and 1-F. 8 7 Amendments to FERC Form Nos. 1 and 1-F, and Annual Charges, and Fuel Cost and Purchased Economic … Power Adjustment Clauses, Order No. 529, FERC Stats. & Regs. ¶ 30,904 (1990). 8 Revisions to Uniform System of Accounts to Account for Allowances under the Clean Air Act Amendments of 1990
73 FR 58720Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.