List of Approved Spent Fuel Storage Casks: HI-STORM 100 Revision 3
Federal Register · Rule · Apr 26, 2007
The comment period ended on November 15, 2006. One comment letter was received on the proposed rule. … The commenters believed that such cracking is also why forced cooling, such as immersion in water baths or forced air fan cooling, is not allowed by NRC regulations and applicable ASME and ANSI codes.
72 FR 20712Nuclear Regulatory CommissionFederal Register · Notice · Jul 5, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 31089Nuclear Regulatory CommissionThe National Institutes of Health Issuance of Director's Decision Under 10 C.F.R. 2.206 (DD-95-05)
Federal Register · Notice · Mar 20, 1995
The radiation dose to a member of the public resulting from air effluents depends on the concentration of radioactive materials in the air at the location of that person. … This is due to the fact that dispersion of the effluent air from the stack will reduce the average concentration of radioactive materials in the air at the location of an exposed individual to a small
60 FR 14800Nuclear Regulatory CommissionFederal Register · Notice · May 19, 1995
The licensee proposed to extend the suppression pool spray header air test from once per 5 years to once per 10 years (proposed surveillance requirement 3.6.2.4.2). … Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations.
60 FR 26905Nuclear Regulatory CommissionConstellation Energy Generation LLC; Limerick Generating Station, Units 1 and 2; Exemption
Federal Register · Notice · Nov 12, 2024
The NRC staff has determined that granting the exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, NRC regulations, or any other laws. … from the scram valve pilot air header on low water level or high dome pressure in the reactor pressure vessel when detected by the RRCS to increase the reliability of control rod insertion.
89 FR 89052Nuclear Regulatory CommissionNotice of License Amendment for the Sequoyah Fuels Corporation's Facility at Gore, OK
Federal Register · Notice · Apr 28, 2009
However, implementation of the Reclamation Plan will facilitate the subsequent clean-up of the site's ground water. … No comments or request for a hearing were received.
74 FR 19240Nuclear Regulatory CommissionFederal Register · Notice · Apr 25, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 19095Nuclear Regulatory CommissionFederal Register · Notice · May 29, 2007
SUB-1382 was issued on September 9, 1980, pursuant to 10 CFR Part 40, and has been amended periodically since that time. … Therefore, no further consultation is required under Section 7 of the Endangered Species Act.
72 FR 29552Nuclear Regulatory CommissionEntergy Nuclear Operations, Inc.; Vermont Yankee Nuclear Power Station
Federal Register · Notice · Apr 25, 2016
ML14255A365), ENO's analysis of a beyond-design-basis accident involving a complete loss of SFP water inventory, where adequate fuel handling building air exchange with the environment and air cooling … The reduced overall risk to the public at decommissioning power plants does not warrant that ENO be required to carry full operating reactor insurance coverage, after the requisite spent fuel cooling period
81 FR 24141Nuclear Regulatory CommissionFederal Register · Notice · Dec 28, 2021
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
86 FR 73815Nuclear Regulatory CommissionNational Institutes of Health Issuance of Director's Decision Under 10 CFR Sec. 2.206
Federal Register · Notice · Sep 24, 1997
Glenn's comment was made before full information was available regarding sample collection after the NIH event. … Thadani, Acting Deputy Executive Director for Regulatory Effectiveness, to Michael M.
62 FR 50018Nuclear Regulatory CommissionFederal Register · Notice · Jun 28, 2005
Verification of the LCO is performed by a surveillance performed on a 5 year period. … Therefore, no consultation is required under section 106 of the National Historic Preservation Act.
70 FR 37124Nuclear Regulatory CommissionRequirements for Certain Generally Licensed Industrial Devices Containing Byproduct Material
Federal Register · Proposed Rule · Jul 26, 1999
The provision proposed in this action would require that the general licensee propose to the Commission how it will be shown that the premises are or will be adequately cleaned up. … Paperwork Reduction Act Statement This proposed rule amends information collection requirements that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq).
64 FR 40295Nuclear Regulatory CommissionCommonwealth Edison Company (Dresden Nuclear Power Station, Units 2 and 3); Exemption
Federal Register · Notice · Jan 6, 2000
In addition, such hand-held lights would be available for use during an 8-hour period as required by the regulation. … Black, Acting Director, Division of Licensing Project Management, Office of Nuclear Reactor Regulation. [FR Doc. 00-254 Filed 1-5-00; 8:45 am] BILLING CODE 7590-01-P
65 FR 793Nuclear Regulatory CommissionFederal Register · Notice · Jun 6, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 26128Nuclear Regulatory CommissionFederal Register · Notice · Jul 5, 2005
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
70 FR 38712Nuclear Regulatory CommissionFederal Register · Notice · Jun 28, 2010
For the same reasons, there are no impacts to the air or ambient air quality, nor are there impacts to historical and cultural resources. … The State official had no comments.
75 FR 36700Nuclear Regulatory CommissionFinancial Assurance Requirements for Decommissioning Nuclear Power Reactors
Federal Register · Proposed Rule · Sep 10, 1997
Two commenters opposed the use of positive earnings assumptions during any period, arguing that earnings assumptions could be manipulated and that earnings could otherwise act as a hedge against increases … Another commenter stated that NRC should sponsor technical conferences on decommissioning so the pace of technological resolutions for cleaning up and decommissioning plants could be increased.
62 FR 47588Nuclear Regulatory CommissionFederal Register · Notice · Apr 26, 2005
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
70 FR 21449Nuclear Regulatory CommissionPrimary Reactor Containment Leakage Testing for Water-Cooled Power Reactors
Federal Register · Rule · Sep 26, 1995
The public comment period for the proposed rule closed May 8, 1995. … Leaks may be detected during the positive or negative pressure periods in the containment by evaluating the air mass balance in the containment.