Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
2.30s
Energy Conservation Standards for Manufactured Housing
Federal Register · Proposed Rule · Jun 17, 2016
Regulatory Flexibility Act D. Paperwork Reduction Act E. National Environmental Policy Act F. Executive Order 13132 G. Executive Order 12988 H. Unfunded Mandates Reform Act I. … After the public meeting, interested parties may submit further comments on the proceedings as well as on any aspect of the rulemaking until the end of the comment period.
81 FR 39756Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Ceiling Fan Light Kits
Federal Register · Proposed Rule · Aug 13, 2015
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (DC). (42 U.S.C. 7651 et seq. ) SO 2 emissions from … 28 eastern states and DC were also limited under the Clean Air Interstate Rule (CAIR). 70 FR 25162 (May 12, 2005).
80 FR 48624Energy DepartmentEnergy Conservation Program: Test Procedure for Consumer Furnace Fans
Federal Register · Proposed Rule · May 13, 2022
(2020), implies the repeal of E.O. 12889 and its 75-day comment period requirement for technical regulations. Thus, the controlling laws are EPCA and the USMCA Implementation Act. … Consistent with EPCA's public comment period requirements for consumer products, the USMCA only requires a minimum comment period of 60 days.
87 FR 29576Energy DepartmentFederal Register · Proposed Rule · Oct 31, 2014
Adverse Comments Under EPCA, the Secretary shall withdraw a DFR no later than 120 days after publication (110 days for comment submittal, 10 days for comment review period) if (1) “the Secretary receives … After the close of the comment period, DOE will begin collecting data and reviewing the public comments.
79 FR 64705Energy DepartmentFederal Register · Proposed Rule · Mar 13, 2006
The docket will also be posted to the Federal Docket Management System through the Federal eRulemaking Portal ( http://www.regulations.gov ) after the comment period closes. … Electric resistance backup heat is needed to meet the heating load at low temperatures and provides space heating during periods when the heat pump acts to defrost the outdoor coil.
71 FR 12634Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFall 2021 Unified Agenda of Regulatory and Deregulatory Actions
Federal Register · Proposed Rule · Jan 31, 2022
RFI Comment Period Extended End 04/14/14 NPRM and Public Meeting 06/10/15 80 FR 33030 NPRM Comment Period Extended 07/30/15 80 FR 45452 NPRM Comment Period Extended End … 05/20/15 80 FR 28851 NPRM Comment Period Extended End 07/10/15 Notice of Data Availability (NODA) 09/14/15 80 FR 55038 NODA Comment Period End 10/14/15 NODA Comment
87 FR 5222Energy DepartmentFederal Register · Rule · Dec 16, 2010
period. 2.10 Exterior Air for Externally Vented Refrigerator or Refrigerator-Freezer. … period. 2.10 Exterior air for externally vented refrigerator or refrigerator-freezer.
75 FR 78810Energy DepartmentState Energy Conservation Program
Federal Register · Rule · Jul 8, 1996
No comments were received by the end of the 14-day comment period. This programmatic environmental assessment resulted in a finding of no significant impact (FONSI). … HVAC means heating, ventilating and air-conditioning. IBR means incorporation by reference.
61 FR 35890Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · May 15, 2023
SUMMARY: Pursuant to the Federal Power Act (“FPA”), the U.S. … How long should defined request periods be open? 8.
88 FR 30956Energy DepartmentFederal Register · Rule · Oct 27, 2006
Baker Botts and INGAA call attention to difficulties that may be presented by compelling a project sponsor to file a permit under the Clean Air Act contemporaneously with an NGA section 3 or 7 application … (CZMA) consistency determination or a water quality certification under section 401 of the Clean Water Act (CWA).
71 FR 62912Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Feb 4, 2013
and has post-purge period(s) of less than 5 seconds. … After the public meeting, interested parties may submit further comments on the proceedings, as well as on any aspect of the rulemaking, until the end of the comment period.
78 FR 7681Energy DepartmentUnified Agenda of Federal Regulatory and Deregulatory Actions
Federal Register · Proposed Rule · Aug 24, 2017
Period End 08/01/16 NPRM Comment Period Reopened 08/05/16 81 FR 51812 Comment Period End 08/30/16 Notice of Data Availability (NODA) 12/23/16 81 FR 94234 Comment Period … FR 8022 NPRM Comment Period Reopened End 02/29/16 2nd NPRM Comment Period Reopened 03/07/16 81 FR 11686 2nd NPRM Comment Period Reopened End 03/14/16 3rd NPRM Comment Period
82 FR 40269Energy DepartmentFederal Register · Proposed Rule · Jun 30, 2022
rather than the test load, allowing for more internal air to exchange with warm ambient air during the test procedure's door opening period. … reduced efficiency compared to a clean coil.
87 FR 39164Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Ceiling Fans
Federal Register · Proposed Rule · Jun 22, 2023
DOE is opting to deviate from this step by providing a 60-day comment period. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (DC). (42 U.S.C. 7651 et seq. ) SO 2 emissions from
88 FR 40932Energy DepartmentFederal Register · Notice · Jun 10, 2019
Other components of the recycle wastewater include process samples, sample line flushes, sump flushes, and cleaning solutions from the decontamination and filter dissolution processes. … • Impacts of emissions on air and water quality, including impacts of greenhouse gas emissions. • Impacts on ecological systems and threatened and endangered species.
84 FR 26847Energy DepartmentFederal Register · Proposed Rule · May 8, 2015
After the close of the comment period, DOE will begin collecting data, conducting the analyses, and reviewing the public comments. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
80 FR 26475Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Consumer Furnaces
Federal Register · Proposed Rule · Jan 28, 2022
Life-Cycle Cost and Payback Period Analysis 2. Manufacturer Impact Analysis III. Submission of Comments I. Introduction A. … After the close of the comment period, DOE will review the public comments received and may begin collecting data and conducting the analyses discussed in this document.
87 FR 4513Energy DepartmentFederal Register · Proposed Rule · Jul 20, 2018
Paragraph (c) of 10 CFR 431.96 provides the method for an optional break-in period. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
83 FR 34499Energy DepartmentFederal Register · Notice · Oct 7, 2024
These products include air cleaners, the subject of this document. (42 U.S.C. 6292(a)(20)) 1 All references to EPCA in this document refer to the statute as amended through the Energy Act of 2020 … manufacturer if DOE finds that the annual gross revenues of such manufacturer from all its operations (including the manufacture and sale of covered products) does not exceed $8,000,000 for the 12-month period
89 FR 81059Energy DepartmentFederal Register · Proposed Rule · Feb 5, 2014
After the public meeting and the close of the comment period on the Framework Document, DOE will collect data, conduct the analyses as discussed in the Framework Document and at the public meeting, and … DOE actively encourages the participation and interaction of the public during the comment period at each stage of its process.
79 FR 6839Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.