Documents
Briefs, oral arguments, agency decisions and the Federal Register.
866 results
0.20s
Revisions to Civil Penalty Amounts, 2024
Federal Register · Rule · Dec 28, 2023
Section 4(b)(2) of the 2015 Act specifically directs that the annual adjustment be accomplished through final rule without notice and comment. This rule is effective immediately. … notice of and a 60-day comment period on, and otherwise consult with members of the public and affected agencies concerning, each proposed collection of information.
88 FR 89551Transportation DepartmentFederal Aviation AdministrationRevisions to Civil Penalty Amounts
Federal Register · Rule · Nov 27, 2018
notice of and a 60-day comment period on, and otherwise consult with members of the public and affected agencies concerning, each proposed collection of information. … (b) Periodic Adjustment.
83 FR 60732Transportation DepartmentFederal Aviation AdministrationRevisions to Civil Penalty Amounts
Federal Register · Rule · Jan 11, 2021
Dispensing With Notice and Comment This final rule is being published without notice and comment and with an immediate effective date. … notice of and a 60-day comment period on, and otherwise consult with members of the public and affected agencies concerning, each proposed collection of information.
86 FR 1745Transportation DepartmentFederal Aviation AdministrationPipeline Safety: Safety of On-Shore Hazardous Liquid Pipelines
Federal Register · Proposed Rule · Oct 18, 2010
B.3 Should the phrase “commercially navigable waterways”, as used in the definition of an HCA, be revised to “navigable waters” or “waters of the United States” consistent with the Clean Water Act? … Privacy Act Statement Anyone can search the electronic form of comments received in response to any of our dockets by the name of the individual submitting the comment (or signing the comment, if submitted
75 FR 63774Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationFederal Register · Notice · Sep 9, 2026
PHMSA-2025-0777). 15 PHMSA subsequently published a notice on February 10, 2026, extending the initial comment period to March 10, 2026, and the rebuttal comment period to March 23, 2026. 16 … charged with maintaining systems to move hazardous materials in commerce safely. 82 The State Attorneys General led by New York also argue these historic police powers include the power to prevent air
91 FR 57439Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationFederal Register · Proposed Rule · Jan 15, 2021
• Privacy Act: In accordance with 5 U.S.C. 553(c), DOT solicits comments from the public to better inform its rulemaking process. … Privacy Act Statement Anyone may search the electronic form of comments received in response to any of our dockets by the name of the individual submitting the comment (or signing the comment if submitted
86 FR 3938Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationRevisions to Civil Penalty Amounts
Federal Register · Rule · Mar 21, 2022
Section 4(b)(2) of the 2015 Act specifically directs that the annual adjustment be accomplished through final rule without notice and comment. This rule is effective immediately. … notice of and a 60-day comment period on, and otherwise consult with members of the public and affected agencies concerning, each proposed collection of information.
87 FR 15839Transportation DepartmentFederal Aviation AdministrationHazardous Materials: Requirements for Lighters and Lighter Refills
Federal Register · Rule · Apr 25, 2006
The Lighter Association was the only commenter to address the consumer commodity exception in its comments to the NPRM. … Privacy Act Anyone is able to search the electronic form of all comments received into any of our dockets by the name of the individual submitting the comment (or signing the comment, if submitted on
71 FR 23869Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationPipeline Safety: Enhanced Emergency Order Procedures
Federal Register · Rule · Oct 1, 2019
Additional Public Comment After the comment period had closed, AFPM filed a supplemental comment as part of its larger response to DOT's Transportation Infrastructure docket, see DOT-OST-2017-0057, … or of any other act, event or default from which the designated period of time begins to run will not be included.
84 FR 52015Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationHazardous Materials: FAST Act Requirements for Flammable Liquids and Rail Tank Cars
Federal Register · Rule · Aug 15, 2016
without advance notice and opportunity for public comment. … The FAST Act does not provide PHMSA the flexibility to withdraw, change or revise this rule in response to adverse public comment.
81 FR 53935Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationHazardous Material; Miscellaneous Packaging Amendments
Federal Register · Proposed Rule · Sep 1, 2006
We must receive your comments prior to the close of the comment period identified in the DATES section of this rulemaking. … Privacy Act Anyone is able to search the electronic form for all comments received into any of our dockets by the name of the individual submitting the comments (or signing the comment, if submitted
71 FR 52017Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationPipeline Safety: Safety of Gas Transmission Pipelines
Federal Register · Proposed Rule · Aug 25, 2011
If the commenter proposes a time period for updating, what is the basis for this recommendation? F.4. … Should this include required cleaning on a periodic basis? O.8. Should PHMSA apply its Gas Integrity Management Requirements to onshore gas gathering lines?
76 FR 53086Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationHazardous Materials; Transportation of Lithium Batteries
Federal Register · Proposed Rule · Jun 15, 2005
Please see the Privacy Act section of this document. … Require that small batteries be shipped as Class 9 hazmat but not require testing unless they are being shipped internationally by air.
70 FR 34729Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationPipeline Safety: Information Collection Activities
Federal Register · Notice · Dec 27, 2016
During the 60-day comment period, PHMSA received 10 comments from stakeholders in response to the proposed form revisions. … API/AOPL also noted that operators may remove soil that was not contaminated as precautionary measure during spill response and clean up.
81 FR 95294Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationHazardous Materials: FAST Act Requirements for Real-Time Train Consist Information
Federal Register · Rule · Jun 24, 2024
to extend the comment period by 60 days, which was granted, and two sets of comments submitted by NENA/NASNA. … Additional Notice and Opportunity to Comment NENA/NASNA, in supplemental comments filed on March 18, 2024, requested that PHMSA re-open the comment period of the rulemaking to allow additional time for
89 FR 52956Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationHazardous Materials Regulations: Minor Editorial Corrections and Clarifications
Federal Register · Rule · Oct 1, 2007
Because these amendments do not impose new requirements, notice and public comment procedures are unnecessary. … Unfunded Mandates Reform Act of 1995 This rule does not impose unfunded mandates under the Unfunded Mandates Reform Act of 1995.
72 FR 55678Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationHazardous Materials: Improving the Safety of Railroad Tank Car Transportation of Hazardous Materials
Federal Register · Notice · May 24, 2006
Property damage and environmental clean-up costs exceeded $7 million. … the Transportation Security Administration on developing proposed regulations to enhance the security of rail shipments of hazardous materials; these regulatory proposals should be issued for public comment
71 FR 30019Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationPipeline Safety: Adjust Annual Report Deadlines
Federal Register · Proposed Rule · Apr 24, 2026
PHMSA received three comments from the public in response to the DFR. The Interstate Natural Gas Association of America (INGAA) and Air Liquide Large Industries US, L.P. … /comment/PHMSA-2025-0108-0003 . 2 Air Liquide Large Industries, “Comment on Pipeline Safety: Annual Report Filing Timelines” (Aug 29, 2025), https://www.regulations.gov/comment/PHMSA-2025-0108
91 FR 22087Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationFederal Register · Proposed Rule · Aug 6, 2019
Privacy Act: In accordance with 5 U.S.C. 553(c), DOT solicits comments from the public to better inform its rulemaking process. … under the Administrative Procedure Act (APA). 6 Therefore, PHMSA solicits comment on the revised requalification periods for DOT 4-series specification cylinders as proposed in § 180.209(e).
84 FR 38180Transportation DepartmentPipeline and Hazardous Materials Safety AdministrationHazardous Materials: Incorporation of ASME Code Section XII and the National Board Inspection Code
Federal Register · Proposed Rule · Apr 29, 2016
The ANPRM generated comments from 32 stakeholders, many of whom submitted multiple comments—some on the length of the comment period and most on the substance of the ANPRM. … Privacy Act Anyone is able to search the electronic form of all comments received into any of our dockets by the name of the individual submitting the comment (or signing the comment, if submitted on
81 FR 25627Transportation DepartmentPipeline and Hazardous Materials Safety Administration
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.