Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.28s
Kansas State University; Exemption
Federal Register · Notice · Dec 17, 2024
This program shall be conducted for a continuous period not to exceed 24 months in duration. (2) Pass a comprehensive requalification written examination and an annual operating test. … The regulations in 10 CFR part 55 implement Section 107 of the Atomic Energy Act of 1954, as amended (AEA), which states, in part, that the Commission shall (1) prescribe uniform conditions for licensing
89 FR 102167Nuclear Regulatory CommissionIn the Matter of the Department of the Air Force; Confirmatory Order Modifying License
Federal Register · Notice · Sep 24, 2026
Attached—Confirmatory Order United States of America Nuclear Regulatory Commission In the Matter of: Department of the Air Force, Air Force Medical Command Docket No. 030-28641 License No. … V Accordingly, pursuant to Sections 81, 161b, 161i, 161o, 182, and 187 of the Atomic Energy Act of 1954, as amended, and the Commission's regulations in 10 CFR 2.202 and 10 CFR part 30, it is hereby
91 FR 60656Nuclear Regulatory CommissionFederal Register · Notice · Nov 17, 1999
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
64 FR 62704Nuclear Regulatory CommissionFederal Register · Notice · Dec 9, 2014
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
79 FR 73106Nuclear Regulatory CommissionFederal Register · Notice · Jul 22, 2003
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
68 FR 43382Nuclear Regulatory CommissionFederal Register · Notice · Apr 4, 2003
Attachment 3 provides revised (clean) TS pages. Attachment 4 provides a summary of the regulatory commitments made in this submittal. … specified condition in the Applicability with the LCO not met based on a Note in the Specification, which is typically applied to Specifications which describe values and parameters ( e.g., [Containment Air
68 FR 16579Nuclear Regulatory CommissionFederal Register · Notice · Jan 12, 2017
SUB-348 was issued on July 13, 1961, pursuant to 10 CFR part 40, and has been amended periodically since that time. … Air sampling and analysis will be conducted to ensure regulatory criteria are met for air effluents. No liquid effluents are expected to be generated during decommissioning.
82 FR 3816Nuclear Regulatory CommissionNew England Coalition on Nuclear Pollution; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Mar 20, 2008
The notice of receipt invited interested persons to submit written comments on the petition. Comments were received from 10 organizations. … The June 5, 1996 final rule provided for an additional 30 day comment period, requesting that commenters give “specific attention” to a number of issues, including “the cumulative radiological effects
73 FR 14946Nuclear Regulatory CommissionSander C. Perle, ICN Worldwide Dosimetry; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Jan 14, 2005
The petition was published in the Federal Register on May 5, 2003 (68 FR 23618), for a 75-day comment period. The comment period closed on July 21, 2003. … There are many devices used to show compliance, such as alarming ratemeters, chirpers, and lapel air samplers.
70 FR 2577Nuclear Regulatory CommissionCompliance With Information Request, Flooding Hazard Reevaluation
Federal Register · Notice · Apr 25, 2013
In addition, all direct current electrical power was lost early in the event on Units 1 and 2 and, after some period of time, at the other units. Unit 6 retained the function of one air-cooled EDG. … In addition to Commission direction, the Consolidated Appropriations Act, Public Law 112-074, was signed into law on December 23, 2011.
78 FR 24439Nuclear Regulatory CommissionEntergy Operations, Inc., Arkansas Nuclear One, Unit 2
Federal Register · Notice · Jan 22, 2015
In addition, granting the exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, or the Commission's regulations. Therefore, the exemption is authorized by law. C. … The seal will remain in this compressed condition for the entire test period, causing the seal to take a set in the seal groove of the air lock bulkhead.
80 FR 3260Nuclear Regulatory CommissionFederal Register · Notice · Jul 28, 2016
The Commission has determined for these amendments that the application complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and … No comments were received during the 30-day comment period. The Commission has determined that these amendments satisfy the criteria for categorical exclusion in accordance with 10 CFR 51.22.
81 FR 49690Nuclear Regulatory CommissionFederal Register · Rule · Sep 3, 1999
Extensive public comments were received, including concerns by some commentors about the length of the comment period. … In addition, some comments were received after the close of the comment period.
64 FR 48496Changes to Requirements for Environmental Review for Renewal of NuclearNuclear Regulatory CommissionRaymond A. Crandall; Receipt of Petition for Rulemaking
Federal Register · Proposed Rule · Jul 12, 2007
The petitioner states that control room dose models do not model dispersion as a period during the day with higher concentrations while the plume is blowing towards the control room and then a period of … Samuel Walker, Acting Secretary of the Commission. [FR Doc. E7-13539 Filed 7-11-07; 8:45 am] BILLING CODE 7590-01-P
72 FR 38030Nuclear Regulatory CommissionFederal Register · Notice · Jul 18, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
71 FR 40742Nuclear Regulatory CommissionFederal Register · Notice · Aug 26, 1998
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
63 FR 45521Nuclear Regulatory CommissionFederal Register · Notice · Jul 11, 2005
Blair, NRC Memorandum, “Notice of Consideration of Amendment Request for Department of the Air Force, Eglin Air Force Base, Florida, and Opportunity for Providing Comments and Requesting a Hearing,” January … Fish & Wildlife Service's Response to NRC's Letter “Request for Comments Regarding Department of Air Force's Determination of No Effect,” February 25, 2004 (ML040690296). 20.
70 FR 39804Nuclear Regulatory CommissionFederal Register · Notice · Mar 5, 1997
Ambient air concentrations (at or beyond the site boundary) resulting from the primary sources of nonradiological air emissions were estimated using the Industrial Source Complex--Version 2 (ISC2) air … Long-term emission rates, calculated using the maximum annual fuel usage rates, were used in ISC2 for the annual time period.
62 FR 10093Nuclear Regulatory CommissionAirworthiness Directives; Fairchild Aircraft SA226 and SA227 Series Airplanes
Federal Register · Rule · Mar 27, 1995
List of Subjects in 14 CFR Part 39 Air transportation, Aircraft, Aviation safety, Incorporation by reference, Safety. … Young, Acting Manager, Small Airplane Directorate, Aircraft Certification Service. [FR Doc. 95-7113 Filed 3-24-95; 8:45 am] BILLING CODE 4910-13-U
60 FR 15667Nuclear Regulatory CommissionTransportation DepartmentRegulatory Issue Summary: Combined License Review Performance and Reporting
Federal Register · Notice · May 12, 2026
Energy Act of 2024 (ADVANCE Act). … The agency received comments from one commenter. The evaluation of these comments did not result in changes to the RIS as discussed in a publicly available document in ADAMS under Accession No.
91 FR 25926Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.