Federal Register · Notice · Dec 3, 1997
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
62 FR 63970Nuclear Regulatory CommissionExpand Applicability of Part 72 to Holders of, and Applicants for, Certificates of Compliance
Federal Register · Rule · Oct 15, 1999
The comment period ended on October 6, 1998, and four comment letters were received on the proposed rule. … Response: The NRC disagrees with the comment. The definition of ``person'' in the rule has the same meaning as ``person'' defined in section 11s. of the Atomic Energy Act of 1954.
64 FR 56114Nuclear Regulatory CommissionFederal Register · Uncategorized Document · Jul 6, 1994
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
Nuclear Regulatory CommissionSouthern California Edison Company; San Onofre Nuclear Generating Station, Units 1, 2, and 3
Federal Register · Notice · Jan 18, 2018
The NRC confirmed its review of the SONGS, Units 2 and 3, PSDAR and addressed public comments in a letter dated August 20, 2015 (ADAMS Accession No. ML15204A383). … the cladding would be undamaged for an unlimited period.
83 FR 2680Nuclear Regulatory CommissionFederal Register · Rule · Oct 3, 2019
Absent significant modifications to the proposed revisions requiring republication, the NRC will not initiate a second comment period on this action. … Congressional Review Act This direct final rule is not a rule as defined in the Congressional Review Act. XIV.
84 FR 52747Nuclear Regulatory CommissionFederal Register · Notice · Mar 5, 1997
Ambient air concentrations (at or beyond the site boundary) resulting from the primary sources of nonradiological air emissions were estimated using the Industrial Source Complex--Version 2 (ISC2) air … Long-term emission rates, calculated using the maximum annual fuel usage rates, were used in ISC2 for the annual time period.
62 FR 10093Nuclear Regulatory CommissionFederal Register · Notice · Aug 3, 2006
As defined in the Clean Water Act (CWA), wetlands are, “those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances … PADEP agreed with the conclusions of the EA, and otherwise had no comments.
71 FR 44049Nuclear Regulatory CommissionConsideration of License Renewal Request for Nuclear Fuel Services, Inc.
Federal Register · Notice · Feb 4, 1999
Therefore, these parameters are expected to remain below the discharge limits during the license renewal period. … Emeigh, Acting Chief, Licensing Branch, Division of Fuel Cycle Safety and Safeguards, NMSS. [FR Doc. 99-2628 Filed 2-3-99; 8:45 am] BILLING CODE 7590-01-P
64 FR 5681Nuclear Regulatory CommissionCompliance With Information Request, Flooding Hazard Reevaluation
Federal Register · Notice · Apr 25, 2013
In addition, all direct current electrical power was lost early in the event on Units 1 and 2 and, after some period of time, at the other units. Unit 6 retained the function of one air-cooled EDG. … In addition to Commission direction, the Consolidated Appropriations Act, Public Law 112-074, was signed into law on December 23, 2011.
78 FR 24439Nuclear Regulatory CommissionNew England Coalition on Nuclear Pollution; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Mar 20, 2008
The notice of receipt invited interested persons to submit written comments on the petition. Comments were received from 10 organizations. … The June 5, 1996 final rule provided for an additional 30 day comment period, requesting that commenters give “specific attention” to a number of issues, including “the cumulative radiological effects
73 FR 14946Nuclear Regulatory CommissionFederal Register · Notice · Jun 12, 2015
The SCE's analysis of a beyond-design-basis accident involving a complete loss of SFP water inventory, where adequate fuel handling building air exchange with the environment and air cooling of the stored … This time period is based on a heat-up calculation which uses several simplifying assumptions.
80 FR 33558Nuclear Regulatory CommissionGeologic Repository Operations Area Security and Material Control and Accounting Requirements
Federal Register · Proposed Rule · Dec 20, 2007
DATES: The comment period expires March 4, 2008. … Make sure to submit your comments by the comment period deadline identified. viii.
72 FR 72522Nuclear Regulatory CommissionFederal Register · Notice · Oct 28, 2003
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
68 FR 61475Nuclear Regulatory CommissionFederal Register · Notice · Dec 9, 2014
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
79 FR 73106Nuclear Regulatory CommissionFederal Register · Notice · Apr 26, 2024
The staff will consider comments received on the draft EA and draft FONSI over a 30-day public comment period from Federal, State, local, and Tribal officials, and members of the public. … Before making a final determination, the NRC staff also will consider comments received on the draft EA and draft FONSI over a 30-day public comment period from Federal, State, local, and Tribal officials
89 FR 32462Nuclear Regulatory CommissionFederal Register · Notice · Oct 3, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register .
82 FR 46094Nuclear Regulatory CommissionFederal Register · Rule · Jun 17, 2011
contamination to be cleaned up and placed on the tailings impoundment. … However, the commenter stated that a small leak or spill inside a building that is promptly cleaned up is not a decommissioning issue.
76 FR 35512Nuclear Regulatory CommissionFederal Register · Uncategorized Document · Dec 7, 1994
provision of section 189 of the Act. … Extension of the operating cycle by several months only serves to extend the period of time when the pumps are in standby status. Any deterioration under these circumstances will be slow acting.
Nuclear Regulatory CommissionCompliance With Information Request, Flooding Hazard Reevaluation
Federal Register · Notice · Oct 26, 2012
In addition, all direct current electrical power was lost early in the event on Units 1 and 2 and after some period of time at the other units. … In addition to Commission direction, the Consolidated Appropriations Act, Public Law 112-074, was signed into law on December 23, 2011.
77 FR 65417Nuclear Regulatory CommissionFederal Register · Notice · Aug 1, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register notice of issuance.
71 FR 43528Nuclear Regulatory Commission
Ask Donna what matters in the record.