Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.36s
Federal Register · Notice · Oct 31, 2001
Laufer, Acting. … Laufer, Acting.
66 FR 55007Nuclear Regulatory CommissionDominion Energy Kewaunee, Inc.; Kewaunee Power Station
Federal Register · Notice · Nov 5, 2014
This time period is based on a heat-up calculation which uses several simplifying assumptions. … Among the changes, the definition of “hostile action” was added as an act directed toward a nuclear power plant or its personnel.
79 FR 65715Nuclear Regulatory CommissionFederal Register · Notice · Mar 30, 2000
Routine activities which generate waste oil and cleanup materials include periodic PCP oil changes, pumpdown of oil collection tanks, PCP oil system piping and equipment repairs, and cleaning of equipment … The State official had no comments.
65 FR 16971Nuclear Regulatory CommissionFederal Register · Notice · Apr 11, 1995
The NRC will consider comments received from interested parties in the final evaluation of the proposed contract action. DATES: Comment period expires May 26, 1995. … NRC-licensed facilities are under strict NRC requirements to monitor and control the release of radioactive materials to the air, water and ground around their facilities.
60 FR 18428Nuclear Regulatory CommissionRevision of Fee Schedules; Fee Recovery for FY 2006
Federal Register · Rule · May 30, 2006
The NRC received three comments dated on or before the close of the comment period (March 13, 2006) and four additional comments thereafter, for a total of seven comments that were considered in this fee … tailings impoundments, and groundwater clean-up.
71 FR 30722Nuclear Regulatory CommissionFederal Register · Notice · May 2, 2001
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
66 FR 22021Nuclear Regulatory CommissionFederal Register · Notice · Dec 28, 2010
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
75 FR 81667Nuclear Regulatory CommissionFederal Register · Notice · Jul 28, 1998
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
63 FR 40321Nuclear Regulatory CommissionRadiation Protection Regulations and Guidance; Public Meetings and Request for Comments
Federal Register · Proposed Rule · Sep 27, 2010
period for the proposed rule. … Currently, the dose limit to the embryo/fetus of a declared pregnant worker is 0.5 rem (5 mSv) for the gestation period with 0.05 rem (0.5 mSv) additional dose during the gestation period if the dose to
75 FR 59160Nuclear Regulatory CommissionFederal Register · Notice · Aug 15, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 38714Nuclear Regulatory CommissionFederal Register · Notice · Oct 27, 2003
Under accident conditions, higher concentrations of materials could be released to the environment over a short period of time. … On August 22, 2003, the Director responded that they had reviewed the draft EA and had no comments.
68 FR 61235Nuclear Regulatory CommissionFederal Register · Notice · Sep 29, 2004
requirement to verify that each CRAC train can maintain control room air temperature < 85 °F every 31 days, and add requirements to verify control room air temperature. … (ITS 3.5.5, JFD 4) Before issuance of the proposed license amendments, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the commission's regulations
69 FR 58205Nuclear Regulatory CommissionFederal Register · Notice · May 5, 1999
provision of section 189 of the Act. … Dick, Jr., Acting.
64 FR 24192Nuclear Regulatory CommissionFederal Register · Notice · Jun 5, 1996
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
61 FR 28604Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Rule · Feb 27, 2004
for the proposed Idaho Spent Fuel Facility was prepared by the staff of the NRC and its contractor, Center for Nuclear Waste Regulatory Analyses, in compliance with the National Environmental Policy Act … The NRC published a Notice of Intent to prepare an environmental impact statement (EIS) for the proposed Idaho Spent Fuel Facility and to hold a public scoping period in the Federal Register on July
69 FR 9387Nuclear Regulatory CommissionFederal Register · Proposed Rule · Mar 14, 2016
Absent significant modifications to the proposed revisions requiring republication, the NRC will not initiate a second comment period on this action in the event the direct final rule is withdrawn. … For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; the Nuclear Waste Policy Act of 1982, as
81 FR 13295Nuclear Regulatory CommissionFederal Register · Notice · Jan 16, 1997
This approach would include monitoring and reporting for the duration of a safe storage period until the TRIGA is decommissioned. … The State official had no comments.
62 FR 2400Nuclear Regulatory CommissionRevision of Fee Schedules; Fee Recovery for FY 2003
Federal Register · Proposed Rule · Apr 3, 2003
DATES: The comment period expires May 5, 2003. … tailings impoundments, and groundwater clean-up.
68 FR 16374Nuclear Regulatory CommissionFederal Register · Notice · May 16, 2008
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
73 FR 28534Nuclear Regulatory CommissionFederal Register · Notice · Jun 11, 2002
However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license … for Primary Containment and the Personnel Airlocks seal air systems.
67 FR 40019Nuclear Regulatory Commission