Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.30s
Federal Register · Notice · Jan 22, 2013
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
78 FR 4469Nuclear Regulatory CommissionFederal Register · Notice · Aug 29, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
71 FR 51222Nuclear Regulatory CommissionFederal Register · Notice · May 12, 1997
Division, Air and Radiation Technical Branch were also contacted. … Prior to renewing the license, NRC will determine that GE has satisfied the requirements of the Atomic Energy Act of 1954, et seq., and NRC requirements.
62 FR 25975Nuclear Regulatory CommissionHearings on Challenges to the Immediate Effectiveness of Orders
Federal Register · Rule · Oct 20, 2015
Opportunities for Public Participation The proposed rule was published on February 11, 2014, for a 90-day public comment period that ended on May 12, 2014. 41 41 79 FR 8097. IV. … Yi, 704 F.3d 800 (9th Cir. 2013) (upholding a deliberate ignorance jury instruction in a case involving a charge of conspiracy to violate the Clean Air Act); United States v.
80 FR 63409Nuclear Regulatory CommissionFederal Register · Notice · Mar 29, 1995
provision of section 189 of the Act. … NRC Acting Project Director: John N.
60 FR 16181Nuclear Regulatory CommissionFederal Register · Notice · Dec 19, 1997
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
62 FR 66699Nuclear Regulatory CommissionFederal Register · Notice · Apr 20, 2001
The State official had no comment. … Even this will be kept as low as practicable by using gases other than air for supporting experiments.
66 FR 20339Nuclear Regulatory CommissionFederal Register · Notice · Mar 15, 1995
provision of section 189 of the Act. … The loss of both air handling units would cause the control building chillers to stop running due to a logic tie requiring air flow through the air handling equipment for the chilled water system to operate
60 FR 14015Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Aug 3, 2004
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
69 FR 46582Nuclear Regulatory CommissionWestinghouse Electric Company, LLC; Columbia Fuel Fabrication Facility
Federal Register · Notice · Aug 5, 2022
The public comment period on the draft EIS closed on September 20, 2021. … On September 28, 2021, the NRC re-opened the public comment period until November 19, 2021 to allow more time for the public to submit comments (86 FR 53694).
87 FR 48044Nuclear Regulatory CommissionFederal Register · Uncategorized Document · May 3, 1994
The State had no comments. Finding of No Significant Impact The Commission has determined not to prepare an environmental impact statement for the proposed exemption. … Hickman, Acting Director, Project Directorate III-1, Division of Reactor Projects--III/IV, Office of Nuclear Reactor Regulation. [FR Doc. 94-10527 Filed 5-2-94; 8:45 am] BILLING CODE 7590-01-M
Nuclear Regulatory CommissionFederal Register · Notice · Aug 4, 2020
Impact levels (small, moderate, or large) have been determined for most NEPA issues ( e.g., land use, air, water) evaluated in the LR GEIS. … At the conclusion of the scoping period, the NRC will consider the results of its review and public comments to determine whether to proceed with the update.
85 FR 47252Nuclear Regulatory CommissionFederal Register · Notice · Feb 19, 2002
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
67 FR 7410Nuclear Regulatory CommissionFederal Register · Notice · Dec 5, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
71 FR 70553Nuclear Regulatory CommissionFederal Register · Notice · Jan 20, 2015
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
80 FR 2747Nuclear Regulatory CommissionFederal Register · Notice · Jul 28, 2008
The public scoping comment period for the GEIS closed on November 30, 2007. … Following the end of the public comment period, the NRC staff will publish a Final GEIS that addresses, as appropriate, the public comments on the Draft GEIS.
73 FR 43795Nuclear Regulatory CommissionFederal Register · Notice · Jan 15, 2013
In addition, all direct current electrical power was lost early in the event on Units 1 and 2, and after some period of time at the other units. Unit 6 retained the function of one air-cooled EDG. … Congressional Review Act This interim staff guidance is a rule as designated in the Congressional Review Act (5 U.S.C. 801-808).
78 FR 3039Nuclear Regulatory CommissionCharles T. Gallagher, Gammatron, Inc.; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Apr 19, 2001
The letter also disagrees with the petitioner's belief that financial assurance should be provided by a small business licensee over a longer period of time, rather than all at one time upon licensing. … The licensee must have funding available to clean up a site and package the waste for disposal.
66 FR 20099Nuclear Regulatory CommissionMaryland Safe Energy Coalition; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Jul 26, 1995
DOE is required by the Nuclear Waste Policy Act of 1982 to accept spent fuel for ultimate disposal. … The petitioner cited additional references during the comment period. Section 72.104(a) does not incorporate exposure limits that are unique to ISFSI operation.
60 FR 38286Nuclear Regulatory CommissionFederal Register · Notice · Feb 13, 2002
Also, in accordance with the February 8, 1996, staff position paper, the draft EA and finding of no significant impact is being published in the Federal Register with a 30-day public comment period … DATES: The comment period expires March 15, 2002.
67 FR 6758Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.