Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.29s
Federal Register · Proposed Rule · May 15, 2019
Amendment No. 7 would also revise the basis for technical specification A3.1.6 to clarify that the surveillance requirements for technical specification A3.1.6 require a minimum of two outlet air temperature … Absent significant modifications to the proposed revisions requiring republication, the NRC will not initiate a second comment period on this action in the event the direct final rule is withdrawn.
84 FR 21728Nuclear Regulatory CommissionReduction of Reporting Requirements Imposed on NRC Licensees
Federal Register · Rule · Mar 14, 1995
The public comment period expired December 19, 1994. … and promulgated pursuant to Sections 161b, 161i, or 161o of the Act.
60 FR 13615Nuclear Regulatory CommissionFederal Register · Notice · Aug 28, 2006
TVA would continue to conduct periodic site inspections to ensure that none of the equipment or materials are causing environmental, health, or safety problems. … The State official had no comments.
71 FR 50948Nuclear Regulatory CommissionFederal Register · Notice · Jul 3, 2018
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register .
83 FR 31190Nuclear Regulatory CommissionFederal Register · Notice · Mar 15, 1995
provision of section 189 of the Act. … The loss of both air handling units would cause the control building chillers to stop running due to a logic tie requiring air flow through the air handling equipment for the chilled water system to operate
60 FR 14015Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Dec 15, 2006
The State agreed with the conclusions of the EA, and provided editorial comments. … Therefore, no further consultation is required under Section 7 of the Endangered Species Act.
71 FR 75586Nuclear Regulatory CommissionFederal Register · Notice · Feb 19, 2002
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
67 FR 7410Nuclear Regulatory CommissionNotice of Public Meeting and Request for Comment on Blending of Low-Level Radioactive Waste
Federal Register · Notice · Nov 30, 2009
ADDRESSES: You may submit comments by any one of the following methods. Please include Docket ID NRC-2009-0520 in the subject line of your comments. … Suber, Acting Deputy Director, Environmental Protection, and Performance Assessment Directorate, Division of Waste Management, and Environmental Protection, Office of Federal and State Materials, and
74 FR 62606Nuclear Regulatory CommissionFederal Register · Notice · Jul 3, 1996
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
61 FR 34884Nuclear Regulatory CommissionBiweekly NoticeFederal Register · Notice · Mar 24, 1999
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
64 FR 14278Nuclear Regulatory CommissionFederal Register · Notice · Apr 20, 2001
The State official had no comment. … Even this will be kept as low as practicable by using gases other than air for supporting experiments.
66 FR 20339Nuclear Regulatory CommissionFederal Register · Notice · Aug 4, 2020
Impact levels (small, moderate, or large) have been determined for most NEPA issues ( e.g., land use, air, water) evaluated in the LR GEIS. … At the conclusion of the scoping period, the NRC will consider the results of its review and public comments to determine whether to proceed with the update.
85 FR 47252Nuclear Regulatory CommissionMulti-Agency Radiation Survey and Assessment of Materials and Equipment Manual
Federal Register · Notice · Jan 16, 2009
Comments will be reviewed periodically by the author agencies, resolved as appropriate, and incorporated into future revisions of the MARSAME. … Copies of all comments received by one agency will be periodically copied and sent to the others.
74 FR 2998Defense DepartmentEnergy DepartmentNorthern States Power Company; Monticello Nuclear Generating Plant
Federal Register · Notice · Feb 22, 2019
Reg. at 76608): Several commenters made a number of suggestions of an editorial nature. … have been acted upon by the staff and the requirement, as it had affected these items, was deleted.
84 FR 5726Nuclear Regulatory CommissionSouthern Nuclear Company, Inc.; Joseph M. Farley Nuclear Plant, Units 1 and 2
Federal Register · Notice · Feb 17, 2017
changes in ambient air quality would be expected. … The state official had no comments. III.
82 FR 11070Nuclear Regulatory CommissionFederal Register · Notice · Jul 28, 2008
The public scoping comment period for the GEIS closed on November 30, 2007. … Following the end of the public comment period, the NRC staff will publish a Final GEIS that addresses, as appropriate, the public comments on the Draft GEIS.
73 FR 43795Nuclear Regulatory CommissionInterim Storage Partners Consolidated Interim Storage Facility Project
Federal Register · Notice · Aug 6, 2021
The public comment period on the draft EIS ended on November 3, 2020, and the comments received are addressed in the FEIS. … Appendix D of the FEIS summarizes the public comments received and the NRC's responses.
86 FR 43277Nuclear Regulatory CommissionFederal Register · Notice · Aug 20, 2002
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
67 FR 53983Nuclear Regulatory CommissionDISA Technologies, Inc.; Environmental Assessment and Finding of No Significant Impact
Federal Register · Notice · Sep 29, 2025
The public comment period on the draft EA ended on September 8, 2025, and the comments received on the draft EA are addressed in appendix B of the final EA. … and Section 7 of the Endangered Species Act.
90 FR 46663Nuclear Regulatory CommissionFederal Register · Notice · May 12, 1997
Division, Air and Radiation Technical Branch were also contacted. … Prior to renewing the license, NRC will determine that GE has satisfied the requirements of the Atomic Energy Act of 1954, et seq., and NRC requirements.
62 FR 25975Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.