Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.24s
Entergy Operations Inc., (Grand Gulf Nuclear Station, Unit No. 1); Exemption
Federal Register · Notice · May 3, 1995
During a period of frequent opening of air lock doors, the air locks shall be tested at least every 30 days. … If an air [[Page 21835]] lock fails a leakage rate test during a period of frequent opening, the air lock shall be required to pass two consecutive leakage rate tests at a test interval of 72 hours prior
60 FR 21833Nuclear Regulatory CommissionFederal Register · Notice · Sep 17, 2004
The comment period on this DEIS will be 45 days from the date the U.S. Environmental Protection Agency publishes the notice of availability in the Federal Register . … by the staff of the NRC and its contractor, Advanced Technologies and Laboratories, International, Inc. and Pacific Northwest National Laboratory, in compliance with the National Environmental Policy Act
69 FR 56104Nuclear Regulatory CommissionFederal Register · Notice · Jun 17, 1998
provision of section 189 of the Act. … rather than primary containment air temperature.
63 FR 33103Nuclear Regulatory CommissionFederal Register · Notice · Oct 12, 2004
The draft environmental assessment and finding of no significant impact is being published in the Federal Register with a 30-day public comment period. … DATES: The comment period expires November 12, 2004.
69 FR 60672Nuclear Regulatory CommissionFederal Register · Notice · Oct 11, 2000
pursuant to the Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and NRC regulations (10 CFR Part 51) which implement the requirements of the National Environmental Policy Act … The State had no comments. 6.0 References Nuclear Fuel Services, Inc., December, 1999, “Environmental Report for Renewal of Special Nuclear Material License No. SNM-124.” U.S.
65 FR 60472Nuclear Regulatory CommissionPetition for Rulemaking Submitted by C-10 Research and Education Foundation, Inc.
Federal Register · Proposed Rule · Oct 16, 2012
Public Comments on the Petition The notice of receipt for PRM-72-6 invited interested persons to submit comments. The comment period closed on May 18, 2009. … Other Comments In a comment dated May 4, 2009 (ADAMS Accession No.
77 FR 63254Nuclear Regulatory CommissionFederal Register · Uncategorized Document · Aug 29, 1994
Before issuance of the proposed license amendments, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
Nuclear Regulatory CommissionNotice of Public Meeting and Request for Comment on Blending of Low-Level Radioactive Waste
Federal Register · Notice · Nov 30, 2009
ADDRESSES: You may submit comments by any one of the following methods. Please include Docket ID NRC-2009-0520 in the subject line of your comments. … Suber, Acting Deputy Director, Environmental Protection, and Performance Assessment Directorate, Division of Waste Management, and Environmental Protection, Office of Federal and State Materials, and
74 FR 62606Nuclear Regulatory CommissionFederal Register · Notice · Apr 14, 2004
Normally, the Commission will not issue the amendments until the expiration of the 30-day comment period. … amendments before the expiration of the 30-day comment period, provided that its final determination is that the amendments involve no significant hazards consideration.
69 FR 19880Nuclear Regulatory CommissionTennessee Valley AuthorityFederal Register · Notice · Nov 1, 2007
This is the 3rd extension of the comment period, which originally was to end on September 4, 2007. … With this current extension, the comment period will be approximately 130 days and greatly exceeds the typical length of NRC scoping comment periods.
72 FR 61912Nuclear Regulatory CommissionFederal Register · Notice · Nov 2, 1998
Before issuance of the proposed license amendments, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
63 FR 58794Nuclear Regulatory CommissionRevision of Fee Schedules; Fee Recovery for FY 2006
Federal Register · Proposed Rule · Feb 10, 2006
DATES: The comment period expires March 13, 2006. … tailings impoundments, and groundwater clean-up.
71 FR 7350Nuclear Regulatory CommissionFederal Register · Notice · Feb 2, 2001
On May 24, 1999 (64 FR 28014), the NRC published a notice in the Federal Register (FR) that requested stakeholders' comment on the proposed grant program for Agreement States for formerly NRC licensed … Any economic impact of not cleaning up the site immediately; u. The funding needed for each year and the amount of time needed to complete site cleanup activities; v.
66 FR 8814Nuclear Regulatory CommissionFederal Register · Notice · Mar 25, 1999
DATES: The comment period expires April 26, 1999. … The Commission shall periodically review actions taken by the State under this Agreement to ensure compliance with Section 274 of the Act which requires a State program to be adequate to protect public
64 FR 14473Nuclear Regulatory CommissionDale Miller; Order Prohibiting Involvement in NRC-Licensed Activities (Effective Immediately)
Federal Register · Notice · Jan 17, 2006
Miller is required to notify the NRC of his first employment in NRC-licensed activities for a period of five years following the prohibition period. … For a period of five years after the five-year period of prohibition has expired, Mr.
71 FR 2579Nuclear Regulatory CommissionReplacement Energy Cost Estimates for Nuclear Power Plants: 2020-2030
Federal Register · Notice · Jul 7, 2021
Public Outreach Following development of the updated report, the NRC posted the draft NUREG-2242 to the Federal Rulemaking website at https://www.regulations.gov for a 60-day public comment period … The comment period closed on February 16, 2021. The NRC received no comments on the draft NUREG.
86 FR 35837Nuclear Regulatory CommissionNotice of Intent to Prepare a Generic Environmental Impact Statement for Uranium Milling Facilities
Federal Register · Notice · Jul 24, 2007
A 45-day comment period on the draft GEIS is planned, and a public meeting(s) to receive comments will be held approximately three weeks after publication of the draft GEIS. … Availability of the draft GEIS, the dates of the public comment period, and information about the public meeting will be announced in the Federal Register , on NRC's Web page, and in the local news
72 FR 40344Nuclear Regulatory CommissionFederal Register · Notice · Jul 3, 2018
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register .
83 FR 31190Nuclear Regulatory CommissionProposed License Renewal of the Prairie Island Independent Spent Fuel Storage Installation
Federal Register · Notice · Nov 19, 2013
The NRC's regulations at 10 CFR 72.42 authorize the renewal of ISFSI-specific licenses for a period not to exceed 40 years. … affected environment and evaluates the potential environmental impacts from the proposed 40-year renewal of license SNM-2506 on land use; transportation; socioeconomics; climatology, meteorology and air
78 FR 69460Nuclear Regulatory CommissionFederal Register · Notice · Jun 13, 2023
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
88 FR 38547Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.