Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.21s
Federal Register · Notice · Jan 27, 1998
In accordance with the February 8, 1996, staff position paper, the draft EA and finding of no significant impact is being published in the Federal Register for a 30-day comment period. … DATES: Comment period expires February 26, 1998.
63 FR 3929Nuclear Regulatory CommissionFederal Register · Notice · Jan 30, 2018
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
83 FR 4289Nuclear Regulatory CommissionFederal Register · Uncategorized Document · Aug 19, 1994
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
Nuclear Regulatory CommissionFederal Register · Notice · Jul 8, 1997
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period, such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the
62 FR 36580Nuclear Regulatory CommissionFederal Register · Notice · Apr 18, 2005
Therefore, no further consultation is required under Section 7 of the Endangered Species Act. … On February 14, 2005, several comments were received from the State of Idaho Department of Environmental Quality.
70 FR 20184Nuclear Regulatory CommissionAmerican Society of Mechanical Engineers 2015-2017 Code Editions Incorporation by Reference
Federal Register · Rule · May 4, 2020
actuators or combined air/hydraulic actuators. … The proposed rule was published on November 9, 2018, for a 75-day comment period (83 FR 56156). The public comment period closed on January 23, 2019. IV.
85 FR 26540Nuclear Regulatory CommissionFederal Register · Notice · Aug 21, 1995
(PTI), acting on behalf of legal counsel for SMC and CFMC, submitted a Preliminary Draft Feasibility Study (FS) for the SMC, Cambridge, site to OEPA. … EIS Development Schedule NRC intends to prepare and issue for public comment a draft EIS in March 1996. The comment period would be for 90 days.
60 FR 43477Nuclear Regulatory CommissionFederal Register · Notice · Dec 8, 2004
A license issued for an ISFSI under 10 CFR part 72 is issued for a fixed period not to exceed 20 years. … The Illinois Emergency Management Agency, provided comments by letter dated May 14, 2004. These comments have been addressed in the Environmental Assessment. II.
69 FR 71082Nuclear Regulatory CommissionExceptions From Foreign Ownership, Control, or Domination
Federal Register · Rule · Jun 5, 2026
Energy Act of 2024. … Energy Act of 2024.
91 FR 34143Nuclear Regulatory CommissionFederal Register · Notice · Dec 16, 1998
of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
63 FR 69332Nuclear Regulatory CommissionUnion of Concerned Scientists and Mothers for Peace; Receipt of Petition for Rulemaking
Federal Register · Proposed Rule · Jun 16, 2003
DATES: Submit comments by September 2, 2003. … The petitioners state that the NRC's design basis threat is supposed to consider both an act of malice perpetuated by an insider acting alone and an act by an insider aided by several outsiders.
68 FR 35585Nuclear Regulatory CommissionShutdown and Low-Power Operations for Nuclear Power Reactors
Federal Register · Uncategorized Document · Oct 19, 1994
DATES: The comment period expires January 3, 1995. … The comment period on the draft NUREG-1449 ended on April 30, 1992, and a large number of comments were received from utilities and industry organizations.
Nuclear Regulatory CommissionFederal Register · Notice · Sep 27, 2013
The 120-day public comment period ended on January 18, 2013. … Appendix B of the Final Report presents all of the comments received and the staff's response to each of those comments.
78 FR 59729Nuclear Regulatory CommissionFederal Register · Notice · Oct 15, 2010
Please note that comments do not have to be provided at the public meeting and may be submitted at any time during the comment period, as described in the DATES section of this notice. … Air Quality SMALL SMALL SMALL. Water Resources—Surface Water SMALL SMALL SMALL to MODERATE.
75 FR 63519Nuclear Regulatory CommissionFederal Register · Notice · Aug 29, 2001
The State official had no comments. … Tam, Acting Chief, Section 1, Project Directorate, Division of Licensing Project Management, Office of Nuclear Reactor Regulation.
66 FR 45704Nuclear Regulatory CommissionFederal Register · Notice · Feb 26, 1997
provision of section 189 of the Act. … Milano, Acting Director.
62 FR 8790Nuclear Regulatory CommissionGE-Hitachi Nuclear Energy Americas, LLC; Nuclear Test Reactor
Federal Register · Notice · Mar 22, 2023
that are derived from other environmental laws, which include the Endangered Species Act (ESA), Coastal Zone Management Act (CZMA), Fish and Wildlife Coordination Act (FWCA), National Historic Preservation … Chu indicated that the State of California Department of Public had no comments. Finding of No Significant Impact The NRC is considering renewal of Facility License No.
88 FR 17274Nuclear Regulatory CommissionFederal Register · Notice · Mar 6, 1998
conditioner; and (2) verifying that the emergency Control Room air conditioners maintain the air temperature [less than or equal to] 104 deg.F for at least 12 hours when in the recirculation mode. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
63 FR 11312Nuclear Regulatory CommissionFederal Register · Notice · Sep 22, 2006
The NRC staff will then address any stakeholder comments received during the 45-day comment period, and any changes from the proposed Part 52 rule that are adopted in the final rule, before issuing the … The NRC staff will then address any stakeholder comments received during the 45-day comment period, and any changes from the proposed Part 52 rule that are adopted in the final rule, before issuing the
71 FR 55517Nuclear Regulatory CommissionFederal Register · Notice · Oct 1, 1999
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period, such that failure to act in a timely way would [[Page 53422]] result, for example, in derating or shutdown of the facility, the Commission
64 FR 53421Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.