Federal Register · Uncategorized Document · Dec 14, 1994
The public comment period expired November 29, 1993. … For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; the Nuclear Waste Policy Act of 1982, as
Nuclear Regulatory CommissionFiling a Renewed License Application
Federal Register · Proposed Rule · May 14, 2012
Environmental Protection Agency or designated State agency that permits operations under Sections 316(a) and (b) of the Clean Water Act could modify those permits to account for the change in conditions … Regardless of whether these permitting authorities amend the National Pollutant Discharge Elimination System (NPDES) permits, Section 511(c)(2) of the Clean Water Act precludes the NRC from either second-guessing
77 FR 28316Nuclear Regulatory CommissionFederal Register · Notice · Oct 11, 2016
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
81 FR 70175Nuclear Regulatory CommissionFederal Register · Notice · Jun 5, 2007
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
72 FR 31097Nuclear Regulatory CommissionFederal Register · Notice · May 29, 1997
DATES: The comment period expires August 27, 1997. ADDRESSES: Send comments to Chief, Rules Review and Directives Branch, Division of Freedom of Information and Publications Services, U.S. … Bell, Acting Chief, Performance Assessment and High-Level Waste Integration Branch, Division of Waste Management, Office of Nuclear Material Safety and Safeguards.
62 FR 29164Nuclear Regulatory CommissionFederal Register · Notice · Jan 31, 2011
covered by the Magnuson-Stevens Act are expected. … The Louisiana State official had no comments.
76 FR 5408Nuclear Regulatory CommissionFederal Register · Notice · Jun 6, 1996
NRC received formal comments from ODH and CCBH, and informal comments from OEPA. … On July 7, 1994, the Presiding Officer granted a three week period for Earth Day Coalition to supplement a deficient hearing request.
61 FR 28906Nuclear Regulatory CommissionFederal Register · Notice · Jan 21, 2014
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
79 FR 3412Nuclear Regulatory CommissionFederal Register · Proposed Rule · Jun 5, 2008
• Periodic audit by NRC and CNSC of each other's review process. • Periodic full review by both NRC and CNSC of packages that are part of the bi-lateral agreement. … Edwin Hackett, Acting Director, Division of Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards. [FR Doc.
73 FR 31946Nuclear Regulatory CommissionFederal Register · Notice · Aug 19, 2009
The State agreed with the conclusions of the EA, and otherwise had no comments. … Therefore, no further consultation is required under Section 7 of the Endangered Species Act.
74 FR 41944Nuclear Regulatory CommissionExceptions From Foreign Ownership, Control, or Domination
Federal Register · Rule · Jun 5, 2026
Energy Act of 2024. … Energy Act of 2024.
91 FR 34143Nuclear Regulatory CommissionFederal Register · Notice · Aug 24, 1998
It is necessary for station personnel to periodically enter containments while the units are operating in order to perform inspection or maintenance. … Foldesi had no comments on behalf of the Commonwealth of Virginia.
63 FR 45097Nuclear Regulatory CommissionFederal Register · Proposed Rule · Oct 17, 2000
These criteria were expressed in terms of an integrated air dose that could be received by an individual over a 24-hour period in excess of 10 rads, or radioactive contamination levels offsite at which … For example, one of the thresholds in Option 3 is that if the integrated air dose to an individual over any 24-hour period exceeds 10 rads, the Commission would find that “substantial releases” and “substantial
65 FR 61283Nuclear Regulatory CommissionFederal Register · Notice · Feb 23, 2000
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
65 FR 9000Nuclear Regulatory CommissionFederal Register · Notice · May 22, 1995
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period, such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the
60 FR 27144Nuclear Regulatory CommissionFederal Register · Notice · Dec 31, 2007
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
72 FR 74354Nuclear Regulatory CommissionFederal Register · Notice · Jul 23, 2002
provision of section 189 of the Act. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
67 FR 48213Nuclear Regulatory CommissionFederal Register · Notice · Nov 30, 2010
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
75 FR 74091Nuclear Regulatory CommissionFederal Register · Notice · Dec 28, 2006
A 45-day comment period on the draft EIS is planned, and public meetings to receive comments will be held approximately three weeks after distribution of the draft EIS. … Availability of the draft EIS, the dates of the public comment period, and information about the public meetings will be announced in the Federal Register , on NRC's SMC Web page, and in the local
71 FR 78232Nuclear Regulatory CommissionFederal Register · Notice · Jul 6, 2009
Comment: “Attachment 3 of the model application includes the revised (clean) Technical Specification (TS) pages. … The proposed change relocates the specified frequencies for periodic surveillance requirements to licensee control under a new Surveillance Frequency Control Program.
74 FR 31996Nuclear Regulatory Commission
Ask Donna what matters in the record.