Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.16s
Federal Register · Notice · Jul 24, 2012
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
77 FR 43374Nuclear Regulatory CommissionFederal Register · Notice · Dec 18, 2008
The Commonwealth agreed with the conclusions of the Environmental Assessment, and otherwise had no comments. … Therefore, no further consultation is required under Section 7 of the Endangered Species Act.
73 FR 77078Nuclear Regulatory CommissionConstellation Energy Generation LLC; Limerick Generating Station, Units 1 and 2; Exemption
Federal Register · Notice · Nov 12, 2024
The NRC staff has determined that granting the exemption will not result in a violation of the Atomic Energy Act of 1954, as amended, NRC regulations, or any other laws. … from the scram valve pilot air header on low water level or high dome pressure in the reactor pressure vessel when detected by the RRCS to increase the reliability of control rod insertion.
89 FR 89052Nuclear Regulatory CommissionFederal Register · Notice · Oct 1, 2002
Jabbour, Acting. … Andersen, Acting.
67 FR 61674Nuclear Regulatory CommissionFederal Register · Rule · Apr 2, 2026
In general, absent significant modifications to the proposed revisions requiring republication, the NRC will not initiate a second comment period on this action. … compliance to include two new versions of the HI-STORM UMAX design (Version B1 and B2) with new lid features designed to enhance the safety of the cask system by minimizing exposure of the canisters to air
91 FR 16541Nuclear Regulatory CommissionFederal Register · Notice · Jun 28, 2005
Verification of the LCO is performed by a surveillance performed on a 5 year period. … Therefore, no consultation is required under section 106 of the National Historic Preservation Act.
70 FR 37124Nuclear Regulatory CommissionFederal Register · Notice · May 14, 2025
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
90 FR 20513Nuclear Regulatory CommissionFederal Register · Notice · Oct 23, 2014
ML102650247) to the NRC to renew NRC License SNM-2505 for the Calvert Cliffs ISFSI in Calvert County, Maryland, for a period of 40 years. … the NRC's requirements in meeting the provisions of Section 307 of the Coastal Zone Management Act of 1972, as amended; and (3) provide the designated state liaison agencies the opportunity to comment
79 FR 63444Nuclear Regulatory CommissionFederal Register · Notice · Jun 28, 2010
For the same reasons, there are no impacts to the air or ambient air quality, nor are there impacts to historical and cultural resources. … The State official had no comments.
75 FR 36700Nuclear Regulatory CommissionFederal Register · Notice · Feb 5, 1999
The disposal will be in lined Closure Cell No. 2, designed and constructed according to the Resource Conservation and Recovery Act (RCRA) criteria. … Review comments were solicited on the draft EA from the Ohio Department of Health, the Ohio Environmental Protection Agency, and the Allen County Combined Health District, Lima, Ohio.
64 FR 5841Nuclear Regulatory CommissionFederal Register · Notice · Jun 18, 1997
provision of section 189 of the Act. … Dromerick, Acting Director.
62 FR 33117Nuclear Regulatory CommissionFederal Register · Notice · Jul 5, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 31089Nuclear Regulatory CommissionInternational Uranium (USA) Corporation; Notice of Opportunity for Hearing
Federal Register · Notice · Aug 23, 2001
The material is currently located in three pits and is also being cleaned up from off-site properties. … IUSA states that hazardous wastes regulated under the Resource Conservation and Recovery Act (RCRA) have not been identified in this material.
66 FR 44384Nuclear Regulatory CommissionFederal Register · Notice · Sep 28, 2000
Finally, air quality and noise levels remain the same as before the power uprate. … The State official had no comments.
65 FR 58298Nuclear Regulatory CommissionPrimary Reactor Containment Leakage Testing for Water-Cooled Power Reactors
Federal Register · Proposed Rule · Feb 21, 1995
10-year service period. … Leaks may be detected during the positive or negative pressure periods in the containment by evaluating the air mass balance in the containment.
60 FR 9634Nuclear Regulatory CommissionFederal Register · Notice · Jul 1, 2010
This volume of waste will require less than 50 rail cars over an 18-month time period. Therefore, the impact of transporting waste from the site will be insignificant. … Chang, Acting Deputy Director, Decommissioning and Uranium Recovery Licensing Directorate, Division of Waste Management and Environmental Protection, Office of Federal and State Materials and Environmental
75 FR 38148Nuclear Regulatory CommissionFederal Register · Rule · Apr 30, 2020
Absent significant modifications to the proposed revisions requiring republication, the NRC will not initiate a second comment period on this action. … Adds a cautionary note in FSAR Section 9.2.1 that states fuel cladding is not exposed to air during loading operations. 5.
85 FR 23904Nuclear Regulatory CommissionList of Approved Spent Fuel Storage Casks: HI-STORM 100 Revision 3
Federal Register · Rule · Apr 26, 2007
The comment period ended on November 15, 2006. One comment letter was received on the proposed rule. … The commenters believed that such cracking is also why forced cooling, such as immersion in water baths or forced air fan cooling, is not allowed by NRC regulations and applicable ASME and ANSI codes.
72 FR 20712Nuclear Regulatory CommissionFederal Register · Notice · Jun 6, 2017
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way … If the Commission takes action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
82 FR 26128Nuclear Regulatory CommissionNotice of License Amendment for the Sequoyah Fuels Corporation's Facility at Gore, OK
Federal Register · Notice · Apr 28, 2009
However, implementation of the Reclamation Plan will facilitate the subsequent clean-up of the site's ground water. … No comments or request for a hearing were received.
74 FR 19240Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.