Advisory Committee on Nuclear Waste; Notice of Meeting
Federal Register · Notice · Nov 5, 1997
Preparation of ACNW Reports--The Committee will discuss planned reports, including comments on the Standard Review Plan for Spent Fuel Dry Storage Facilities, comments on NRC Waste Related Research, ACNW … Hoyle, Acting, Advisory Committee Management Officer. [FR Doc. 97-29241 Filed 11-4-97; 8:45 am] BILLING CODE 7590-01-P
62 FR 59909Nuclear Regulatory CommissionList of Approved Spent Fuel Storage Casks: TN-68 Addition
Federal Register · Rule · Apr 28, 2000
The comment period ended on November 8, 1999. Three comment letters were received on the proposed rule. … The commenter also asked if the air-helium mixture will really work.
65 FR 24855Nuclear Regulatory CommissionFee Schedules; Fee Recovery for Fiscal Year 2026
Federal Register · Rule · Jun 16, 2026
Additionally, on July 9, 2024, the Accelerating Deployment of Versatile, Advanced Nuclear for Clean Energy Act of 2024 (ADVANCE Act) was signed into law, and, among other things, it amended fee-related … Public Comment Analysis The public comment period for the proposed rule closed on April 13, 2026. By the close of the comment period, the NRC received 10 comment submittals.
91 FR 36470Nuclear Regulatory CommissionDonald A. Barbour, Philotechnics; Denial of Petition for Rulemaking
Federal Register · Proposed Rule · Jan 12, 2005
Public Comments on the Petition The notice of receipt of the petition for rulemaking invited interested persons to submit comments. The comment period closed on April 5, 2000. … The NRC received two comment letters from individuals (one of which was from the petitioner himself). Both comment letters supported the petition.
70 FR 2053Nuclear Regulatory CommissionDominion Energy Nuclear Connecticut, Inc.; Millstone Power Station
Federal Register · Notice · Dec 1, 2017
The report shall specify the dates on which each weapon was last test-fired, cleaned, serviced, and inspected. … The report shall specify the dates on which each weapon was last test-fired, cleaned, serviced, and inspected.
82 FR 57004Nuclear Regulatory CommissionFederal Register · Notice · Jan 17, 2006
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
71 FR 2586Nuclear Regulatory CommissionFederal Register · Notice · Nov 6, 2007
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
72 FR 62685Nuclear Regulatory CommissionFederal Register · Rule · Jan 27, 2006
Comment Analysis The period for submitting comments on the proposed DCR, AP1000 DCD, or draft environmental assessment (EA) expired on July 5, 2005. … The NRC disagrees with these comments. The site parameters for the AP1000 design include minimum and maximum air temperatures (see DCD Table 2-1).
71 FR 4464Nuclear Regulatory CommissionFederal Register · Notice · Apr 25, 2011
DATES: The public comment period on the draft Environmental Assessment and Finding of No Significant Impact (FONSI) closes on May 25, 2011. … • Fax comments to: RADB at 301-492-3446.
76 FR 22926Nuclear Regulatory CommissionFlorida Power and Light Company Turkey Point Plant, Units 3 and 4; Exemption
Federal Register · Notice · Dec 19, 2001
The post-accident containment vent system is provided to facilitate controlled venting through adding air (Service Air backed by Instrument Air) to the reactor containment and venting air from the containment … However, NUREG/CR-4551 states that hydrogen combustion in the period before containment failure is considered to present no threat to large, dry containments.
66 FR 65521Nuclear Regulatory CommissionFederal Register · Notice · Aug 12, 2025
Additionally, the proposed AO criteria were published in the Federal Register (FR) on May 19, 2023 (88 FR 32144), for a 90-day public comment period. No comments were received. III. … The NRC staff did not make any changes in response to this comment. V. Congressional Review Act This policy statement is not a rule as defined in the Congressional Review Act (5 U.S.C. 801-808).
90 FR 38828Nuclear Regulatory CommissionFederal Register · Notice · Jul 25, 2011
The MDE agreed with the conclusions of the EA and otherwise had no technical comments. … Therefore, no further consultation is required under Section 7 of the Endangered Species Act.
76 FR 44374Nuclear Regulatory CommissionFederal Register · Notice · Aug 18, 2026
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
91 FR 53427Nuclear Regulatory CommissionFederal Register · Notice · Apr 20, 2010
In addition, the Commission may issue the amendment prior to the expiration of the 30-day comment period should circumstances change during the 30-day comment period such that failure to act in a timely … Should the Commission take action prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
75 FR 20627Nuclear Regulatory CommissionFederal Register · Notice · Apr 18, 2023
In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a … If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish in the Federal Register a notice of issuance.
88 FR 23695Nuclear Regulatory CommissionFederal Register · Notice · Oct 2, 2017
The proposed AO criteria was published in the Federal Register (FR) on August 17, 2015 (80 FR 49177), for a 90-day public comment period. … period. 80 FR 49177 11/16/2015 OAS letter to NRC, RE: Opportunity to Comment on Proposed Revision to Abnormal Occurrence Policy Statement ML16209A194 11/17/2015 State of Washington
82 FR 45907Nuclear Regulatory CommissionRevision of Fee Schedules; Fee Recovery for FY 2002
Federal Register · Rule · Jun 24, 2002
No inquiries of this nature were received during the comment period. B. Specific Part 170 Issues 1. Hourly Rates Comment. … tailings impoundments, and groundwater clean-up.
67 FR 42612Nuclear Regulatory CommissionFederal Register · Notice · Dec 4, 2012
The proposed action does not affect non-radiological plant effluents, air quality, or noise. … The State had no comments. The NRC staff has determined that the proposed action is of a procedural nature and will not affect Endangered Species Act (ESA) listed species or their critical habitat.
77 FR 71842Nuclear Regulatory CommissionNotice of Issuance of Director's Decision Under 10 CFR 2.206
Federal Register · Notice · Jan 9, 2006
Petitioner responded with comments on October 19, 2005, and the licensees responded on October 12, 2005 (Army), and October 17, 2005 (Air Force). … The comments are addressed in the Director's Decision.
71 FR 1456Nuclear Regulatory CommissionFederal Register · Proposed Rule · Dec 8, 2011
If the tubes in the exit signs are severely damaged, tritium may escape and disperse by diffusion in the air. … The comment period closed on March 29, 2010. The NRC received responses from 13 commenters including 2 manufacturers, 6 Agreement States, 1 Federal agency, and other industry representatives.
76 FR 76625Nuclear Regulatory Commission