Documents
Briefs, oral arguments, agency decisions and the Federal Register.
5,874 results
0.19s
Federal Register · Notice · Jan 16, 2009
emissions granted to States by the Clean Air Act. … NRC will conduct periodic tests of licensee ERDS data links.
74 FR 3105Nuclear Regulatory CommissionUranium Mill Tailings Regulations; Conforming NRC Requirements to EPA Standards
Federal Register · Uncategorized Document · Jun 1, 1994
In response to the separate requirements of the Clean Air Act (CAA), EPA promulgated additional standards in 40 CFR part 61 (subpart T for non-operational sites) to ensure that the piles would be closed … implementing the settlement agreement and in order that the ``duplicative'' Clean Air Act requirements in 40 CFR part 61, subpart T, would be rescinded.
Nuclear Regulatory CommissionFederal Register · Notice · Jan 16, 2009
emissions granted to States by the Clean Air Act. … NRC will conduct periodic tests of licensee ERDS data links.
74 FR 3107Nuclear Regulatory CommissionFederal Register · Notice · Jun 27, 1995
Under accident conditions, the facility could release higher concentrations over a short period of time. … In addressing how the requestor's interest may be affected by the proceeding, the request should describe the nature of the requestor's right under the Atomic Energy Act of 1954, as amended, to be made
60 FR 33243Nuclear Regulatory CommissionReactor Safety Chapter of the Strategic Plan Workshop
Federal Register · Notice · Aug 12, 1999
The revision, however, did not fully consider the issues raised during the NRC's July 30, 1998, hearing before the Senate Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety; the … Act.
64 FR 44061Nuclear Regulatory CommissionFederal Register · Notice · Apr 3, 2012
Since these comments were received after the comment period deadline of December 19, 2011, the NRC will address these comments using separate correspondence. II. … through a permitting process (e.g., NPDES and 401/404 permits under the Clean Water Act) under State or Federal authority.
77 FR 20059Nuclear Regulatory CommissionFederal Register · Notice · Jan 13, 2009
The State agreed with the conclusions of the Environmental Assessment, and otherwise had no comments. … Therefore, no further consultation is required under Section 7 of the Endangered Species Act.
74 FR 1710Nuclear Regulatory CommissionConstellation Energy Generation, LLC; Braidwood Station, Units 1 and 2
Federal Register · Notice · Jul 20, 2022
Under this definition, the cooling pond is not considered waters of the State under Illinois Administrative Code (35 IAC 301.440) or waters of the United States under the Federal Clean Water Act (40 CFR … Water Act.
87 FR 43301Nuclear Regulatory CommissionFederal Register · Notice · Aug 25, 2000
Before issuance of the proposed license amendment, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Commission's regulations. … However, should circumstances change during the notice period such that failure to act in a timely way would result, for example, in derating or shutdown of the facility, the Commission may issue the license
65 FR 51860Nuclear Regulatory CommissionFederal Register · Notice · Jan 17, 2007
[Attachment 3 provides revised (clean) TS pages.] [Attachment [4] provides a summary of the regulatory commitments made in this submittal.] … (b) The first performance of the periodic assessment of CRE habitability, Specification 5.5.[18].c.
72 FR 2022Nuclear Regulatory CommissionRobert H. Leyse; Receipt of Petition for Rulemaking
Federal Register · Proposed Rule · Oct 31, 2002
DATES: Submit comments by December 16, 2002. … The petitioner cites another instance when one nuclear power plant continued to operate at power, the need for repeated cleaning of an air cooling heat exchanger was not recognized as a key indicator
67 FR 66347Nuclear Regulatory CommissionCodes and Standards; IEEE National Consensus Standard
Federal Register · Rule · Oct 17, 1997
Any significant adverse comments will be addressed in a subsequent final rule. The NRC will not initiate a second comment period on this action in the event the direct final rule is withdrawn. … cleaning.
62 FR 53932Nuclear Regulatory CommissionFederal Register · Notice · Jul 20, 2006
DATES: The comment period expires August 21, 2006. … Condition Requiring Entry into Shutdown Required Action: Containment is declared to be inoperable due to excessive leakage, including leakage from air locks and isolation valves, for a time period greater
71 FR 41264Nuclear Regulatory CommissionRevisions to Environmental Review for Renewal of Nuclear Power Plant Operating Licenses
Federal Register · Proposed Rule · Jul 31, 2009
The original comment period began in June 2003 and ended in September 2003. In October 2005 the scoping period was reopened until December 30, 2005 (70 FR 57628). III. … No comments were received during the 2005 public comment period.
74 FR 38117Nuclear Regulatory CommissionImplementation of the National Environmental Policy Act
Federal Register · Proposed Rule · Jul 7, 2026
, Magnuson-Stevens Fishery Conservation and Management Act, National Historic Preservation Act, Clean Air Act, Clean Water Act, National Marine Sanctuaries Act, and Marine Mammal Protection Act. … Conservation and Management Act, National Historic Preservation Act, Clean Air Act, Clean Water Act, National Marine Sanctuaries Act, and Marine Mammal Protection Act.
91 FR 42086Nuclear Regulatory CommissionCompatibility With the International Atomic Energy Agency (IAEA)
Federal Register · Rule · Sep 28, 1995
The public comment period was subsequently extended to February 9, 1990. … NRC agrees with the thrust of this comment and has established the exemption period at 3 years.
60 FR 50248RuleNuclear Regulatory CommissionExelon Generation Company, LLC; Braidwood Station, Units 1 and 2
Federal Register · Notice · Jul 7, 2021
Under this definition, the cooling pond is not considered waters of the State under Illinois Administrative Code (35 IAC 301.440) or waters of the United States under the Federal Clean Water Act (40 CFR … Water Act.
86 FR 35831Nuclear Regulatory CommissionFederal Register · Notice · Sep 22, 1997
The radiation doses resulting from atmospheric releases were estimated using the CAP88-PC (Clean Air Assessment Package 1988) Version 1.0 computer code. … Anyone with questions or comments about this proposed action should contact Ms. Heather Astwood, NRC's Project Manager for the facility, at Mail Stop T-8D-14, U.S.
62 FR 49538Nuclear Regulatory CommissionFederal Register · Notice · Apr 12, 2002
C-T project buildings and equipment remaining on-site will be cleaned and released for unrestricted use. … Craig, Acting Chief, Decommissioning Branch, Division of Waste Management, Office of Nuclear Material Safety, and Safeguards.
67 FR 18041Nuclear Regulatory CommissionFederal Register · Notice · Jul 31, 2024
Under this definition, the cooling pond is not considered waters of the State under Illinois Administrative Code (35 IAC 301.440) or waters of the United States under the Federal Clean Water Act (40 CFR … Water Act.
89 FR 61500Nuclear Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.