Documents
Briefs, oral arguments, agency decisions and the Federal Register.
8,191 results
0.51s
Federal Register · Notice · Feb 26, 2016
EPA's Role in the EIS Process In addition to this notice of the draft SEIS, EPA is publishing a Federal Register notice announcing the draft SEIS, as required under section 309 of the Clean Air … The publication of EPA's notice is the official start of the minimum requirement for a 45-day public comment period for an EIS.
81 FR 9877Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Jul 22, 2010
SUMMARY: Under the National Environmental Policy Act (NEPA), we, the U.S. … Over time, it will be necessary to clean or repaint the blades and towers and periodically exchange lubricants and hydraulic fluids in the mechanisms of the wind turbines.
75 FR 42767Interior DepartmentFish and Wildlife ServiceFederal Register · Proposed Rule · Mar 25, 2013
comment period … We have invited these peer reviewers to comment during this public comment period.
78 FR 18000Interior DepartmentFish and Wildlife ServiceFederal Register · Uncategorized Document · Dec 19, 1994
Army Corps of Engineers under section 404 of the Clean Water Act. The Clean Water Act regulates discharge of fill material into wetlands but does not itself protect the plants. … Water Act, the Environmental Protection Agency through the Clean Water Act's provisions for pesticide registration and waste management actions, and proposed activities on Travis Air Force Base.
Interior DepartmentFish and Wildlife ServiceFederal Register · Rule · Jun 16, 2021
Federal Clean Water Act: The Clean Water Act (CWA) was designed, in part, to protect surface waters of the United States from unregulated pollution from point sources. … All substantive information provided during the comment period was either incorporated directly into this final rule or is addressed below.
86 FR 31955Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · May 19, 2000
The company seeks Nationwide Permit No. 12 authorizations by the Army Corps of Engineers, pursuant to Section 404 of the Clean Water Act, for pipeline crossings of waters of the United States. … Five comment letters, totaling 16 individual comments, were received on the Draft Environmental Impact Statement.
65 FR 31925Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Apr 15, 2016
DATES: To ensure consideration, please submit your comments on or before July 14, 2016. The Service will host two online webinars during the public comment period. … EPA's Role in the EIS Process The EPA is charged under section 309 of the Clean Air Act to review all Federal agencies' environmental impact statements (EISs) and to comment on the adequacy and the acceptability
81 FR 22299Interior DepartmentFish and Wildlife ServiceFederal Register · Rule · Jan 27, 1998
This emergency rule provides Federal protection pursuant to the Act for this subspecies for a period of 240 days. … Department of the Air Force 1993).
63 FR 3835Interior DepartmentFish and Wildlife ServiceFederal Register · Uncategorized Document · Dec 15, 1994
Under section 404 of the Clean Water Act, the U.S. … The Service will consider these impacts and all additional relevant information obtained during the public comment period or otherwise developed by the Service before finalizing this proposed action.
Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Feb 1, 2013
Once the draft EIS and draft GCP are completed, there will be further opportunities for public comment on the content of these documents through additional public meetings and a 90-day public comment period … If take cannot be avoided and there is Federal involvement in the project (for example a Federal permit such as a Corps of Engineers 404 Clean Water Act permit, authorization, or funding exists) an operator
78 FR 7445Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Mar 31, 2016
We subsequently extended the public comment period on the draft document in another notice in the Federal Register (79 FR 36553) on June 27, 2014. … Air Act (42 U.S.C. 7401 et seq. ).
81 FR 18637Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Dec 26, 2023
Final stages of cleanup and trail inspection will occur by air (see Equipment Mobilization, Demobilization, and Summer Clean-up ). … The Service will consider all comments that are received before the close of the comment period (see DATES ).
88 FR 88943Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Nov 1, 2019
Therefore, EPA is publishing a notice in the Federal Register announcing this draft EIS, as required under section 309 of the Clean Air Act. … The publication date of EPA's notice of availability is the official beginning of the public comment period. EPA's notices are published on Fridays.
84 FR 58733Interior DepartmentFish and Wildlife ServiceReview of Existing Significant Regulations
Federal Register · Uncategorized Document · Jul 15, 1994
Act. … Air Monitoring Program (Sections 780.15/784.26) A commenter noted that fugitive and other emissions at mines fall within EPA's authority under the Clean Air Act and should not be regulated by OSM.
Interior DepartmentIndian Affairs BureauFederal Register · Proposed Rule · Oct 19, 2012
Once the public comment period is closed and any substantive comments are addressed, the Service will make a decision on the issuance of an Incidental Take Permit under section 10 of the Act. … We have invited these peer reviewers to comment during this public comment period.
77 FR 64272Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Aug 29, 2017
In 2009, we provided comment periods totaling 105 days for the public to review DNRC's permit application package, which included the draft HCP and draft EIS (74 FR 30617). … Environmental Protection Agency (EPA) is charged under section 309 of the Clean Air Act to review all Federal agencies' environmental impact statements (EISs) and to comment on the adequacy and acceptability
82 FR 41047Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Mar 31, 2023
Pursuant to section 309 of the Clean Air Act (CAA; 42 U.S.C. 7401 et seq. ), NEPA, and the CEQ NEPA Regulations (40 CFR 1503.2), the EPA also reviewed and publicly commented on anticipated environmental … A total of six comment letters were received during the public comment period for draft EIS/EIR.
88 FR 19320Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Nov 17, 2023
EPA's Role in the EIS Process The EPA is charged under section 309 of the Clean Air Act with reviewing all Federal agencies' EISs and commenting on the adequacy and acceptability of the environmental … The publication date of EPA's notice of availability is the official beginning of the public comment period. EPA serves as the repository (EIS database) for EISs prepared by Federal agencies.
88 FR 80329Interior DepartmentFish and Wildlife ServiceFederal Register · Notice · Sep 27, 2019
A Federal Register notice of availability (83 FR 45458) for the RDEIS for the LTCS was published for a 60-day comment period on September 7, 2018. … Therefore, EPA is publishing a notice in the Federal Register announcing this EIS, as required under section 309 of the Clean Air Act (42 U.S.C. 7401). EPA's notices are published on Fridays.
84 FR 51172Interior DepartmentFish and Wildlife ServiceTijuana Estuary Tidal Restoration Program II, Phase I (TETRP II Phase I)
Federal Register · Notice · May 27, 2021
We are providing this notice to open a public scoping period and announce our intent to conduct public scoping meetings in accordance with the requirements of the National Environmental Policy Act, … Army Corps of Engineers Clean Water Act (CWA) section 404 Nationwide Permit 27 and others, if appropriate; • San Diego Regional Water Quality Control Board CWA section 401 water quality certification;
86 FR 28638Interior DepartmentFish and Wildlife Service
Ask Donna what matters in the record.