Documents

Briefs, oral arguments, agency decisions and the Federal Register.

2,244 results

0.54s

  • Amendments to Brake System Maintenance and Inspection Requirements

    Federal Register · Proposed Rule · Jul 1, 2025

    Section 238.309 Periodic Brake Equipment Maintenance FRA proposes to extend brake equipment service life and maintenance intervals for periodic cleaning, repairing, and testing of air brake equipment, … period for older equipment fitted with air dryers.

    90 FR 28660Transportation DepartmentFederal Railroad Administration
  • Amendments to Brake System Maintenance and Inspection Requirements

    Federal Register · Rule · Aug 31, 2026

    inspection period interval for electronic air brake (EAB) systems manufactured by New York Air Brake (NYAB) and Wabtec from 1,472 days to 3,680 days, based on BLET's assertion that there is insufficient … Regulatory Flexibility Act The Regulatory Flexibility Act (5 U.S.C. 601 et seq. ), as amended by the Small Business Regulatory Enforcement Fairness Act of 1996, 16 requires Federal agencies

    91 FR 55779Transportation DepartmentFederal Railroad Administration
  • Notice of Availability of a Final General Conformity Determination for the California High-Speed Rail System, Bakersfield to Palmdale Section

    Federal Register · Notice · Jul 29, 2021

    However, under Section 327, FRA remains responsible for compliance with the Clean Air Act General Conformity requirements. … The comment period of the Draft Conformity Determination closed on June 14, 2021.

    86 FR 40897Transportation DepartmentFederal Railroad Administration
  • Notice of Availability of a Final General Conformity Determination for the California High-Speed Rail System, San Jose to Merced Section

    Federal Register · Notice · Mar 30, 2022

    However, under Section 327, FRA remains responsible for compliance with the Clean Air Act General Conformity requirements. … The comment period of the Draft Conformity Determination closed on December 30, 2021. FRA received two comments expressing support for the project and Draft General Conformity Determination.

    87 FR 18461Transportation DepartmentFederal Railroad Administration
  • Notice of Availability of a Final General Conformity Determination for the California High-Speed Rail System, Palmdale to Burbank Project Section

    Federal Register · Notice · Jun 10, 2024

    However, under section 327, FRA remains responsible for compliance with the Clean Air Act General Conformity requirements. … The comment period of the Draft Conformity Determination closed on May 2, 2024.

    89 FR 48952Transportation DepartmentFederal Railroad Administration
  • Notice of Availability of a Final General Conformity Determination for the California High-Speed Rail System, Burbank to Los Angeles Section

    Federal Register · Notice · Dec 10, 2021

    However, under Section 327, FRA remains responsible for compliance with the Clean Air Act General Conformity requirements. … FRA prepared a Draft General Conformity Determination, pursuant to 40 CFR part 93, subpart B, which establishes the process for complying with the General Conformity requirements of the Clean Air Act.

    86 FR 70582Transportation DepartmentFederal Railroad Administration
  • Notice of Availability of a Final General Conformity Determination for the California High-Speed Rail System, San Francisco to San Jose Section

    Federal Register · Notice · Jul 28, 2022

    However, under Section 327, FRA remains responsible for compliance with the Clean Air Act General Conformity requirements. … FRA prepared a Draft General Conformity Determination, pursuant to 40 CFR part 93, subpart B, which establishes the process for complying with the General Conformity requirements of the Clean Air Act.

    87 FR 45389Transportation DepartmentFederal Railroad Administration
  • Petition for Waiver of Compliance

    Federal Register · Notice · Feb 10, 2011

    If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before the end of the comment period and specify the basis for their request. … You may review DOT's complete Privacy Act Statement in the Federal Register published on April 11, 2000 (Volume 65, Number 70; Pages 19477-78).

    76 FR 7627Transportation DepartmentFederal Railroad Administration
  • Signal and Train Control; Miscellaneous Amendments

    Federal Register · Rule · Jul 1, 1996

    A record of the parts of the air brake system that are cleaned, repaired, and tested are required to be kept in the railroad' s files or in the cab of the locomotive. … Thus railroads have been able to perform periodic testing and maintenance of air brake and train control pneumatic valves on locomotive 26L brake equipment at the same time.

    61 FR 33870Transportation DepartmentFederal Railroad Administration
  • Notice of Availability of a Final General Conformity Determination for the California High-Speed Train System Merced to Fresno Section

    Federal Register · Notice · Oct 18, 2012

    complying with the Clean Air Act General Conformity requirements. … Air Act.

    77 FR 64183Transportation DepartmentFederal Railroad Administration
  • Petition for Waiver of Compliance

    Federal Register · Notice · Oct 27, 2004

    and filters) shall be cleaned, repaired, and tested at intervals that do not exceed 736 calendar days. … If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before the end of the comment period and specify the basis for their request.

    69 FR 62744Transportation DepartmentFederal Railroad Administration
  • Petition for Waiver of Compliance

    Federal Register · Notice · Apr 16, 2008

    AAR recognizes that the CN waiver retains the requirement for cleaning air brake filtering devices every 368 days and agrees to this restriction. … If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before the end of the comment period and specify the basis for their request.

    73 FR 20740Transportation DepartmentFederal Railroad Administration
  • Inspection and Maintenance Standards for Steam Locomotives

    Federal Register · Rule · Nov 17, 1999

    Air gauges shall be tested using an accurate test gauge or dead weight tester designed for this purpose. Sec. 230.74 Time of cleaning. … (c) Failure to properly test air gauge(s). 1,000 1,500 230.74 Failure to properly clean and/or test 1,000 1,500 all air brake valves, related dirt collectors, filters when

    64 FR 62828Transportation DepartmentFederal Railroad Administration
  • Draft General Conformity Determination for the California High-Speed Train System Bakersfield to Palmdale Section

    Federal Register · Notice · May 13, 2021

    However, under Section 327, FRA remains responsible for making General Conformity Determinations under the Clean Air Act. … This draft General Conformity Determination documents FRA's evaluation of the Bakersfield to Palmdale Section, consistent with the relevant section of the Clean Air Act, and implementing regulations.

    86 FR 26254Transportation DepartmentFederal Railroad Administration
  • Locomotive Cab Sanitation Standards

    Federal Register · Rule · Apr 4, 2002

    However, sanitation compartments are expected to be clean and orderly following periodic servicing and cleaning. … Regulatory Flexibility Act The Regulatory Flexibility Act of 1980 (the Act) (5 U.S.C. 601 et seq. ) requires a review of proposed and final rules to assess their impact on small entities.

    67 FR 16032Transportation DepartmentFederal Railroad Administration
  • Petition for Waiver of Compliance

    Federal Register · Notice · Feb 25, 2016

    The program required that each air brake system be periodically evaluated by a joint committee involving a railroad, the air brake manufacturer, labor organizations (both operating and maintenance crafts … If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before the end of the comment period and specify the basis for their request.

    81 FR 9583Transportation DepartmentFederal Railroad Administration
  • Locomotive Cab Sanitation Standards

    Federal Register · Proposed Rule · Jan 2, 2001

    (the “Safety Act”). … However, sanitation compartments are expected to be clean and tidy following periodic servicing and cleaning.

    66 FR 136Transportation DepartmentFederal Railroad Administration
  • Miscellaneous Amendments to Brake System Safety Standards and Codification of Waivers

    Federal Register · Proposed Rule · Jan 15, 2020

    and oil and contaminant separators to keep the compressed air clean. … inspection requirements for air brake cleaning, repairing, lubricating, and testing (known in the industry as “clean, oil, test, and stencil” or “COT&S”).

    85 FR 2494Transportation DepartmentFederal Railroad Administration
  • Petition for Waiver of Compliance

    Federal Register · Notice · Jan 2, 1997

    Their passenger locomotive fleet is equipped with Graham-White Air Dryers which provide a source of clean, dry air to the brake system. … If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before the end of the comment period and specify the basis for their request.

    62 FR 145Transportation DepartmentFederal Railroad Administration
  • Petition for Waiver of Compliance

    Federal Register · Notice · Dec 11, 2003

    and filters) shall be cleaned, repaired, and tested at intervals that do not exceed 736 calendar days.” … If any interested party desires an opportunity for oral comment, they should notify FRA, in writing, before the end of the comment period and specify the basis for their request.

    68 FR 69123Transportation DepartmentFederal Railroad Administration

Ask Donna what matters in the record.

She can read the source against your case and show you exactly where the answer came from.

Ask Donna

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.