Federal Register · Proposed Rule · Jun 6, 2024
Regulatory Flexibility Act—11 D. Comment Procedures—13 E. Document Availability—14 I. Background A. Clean Water Act Section 401 1. … (3) Section 401 of the Clean Water Act.
89 FR 48351Energy DepartmentFederal Energy Regulatory CommissionImplementation of Dynamic Line Ratings
Federal Register · Proposed Rule · Jul 15, 2024
Clean Energy Parties assert that DLR sensors serve reliability by detecting potential fire danger during high wind periods and detecting real-time transmission line capacity. 26 25 PJM Comments … We seek comment on this proposed approach. We specifically seek comment on the duration of the data collection period, and implementation period.
89 FR 57690Energy DepartmentFederal Energy Regulatory CommissionAuthorizations for Certain Activities at Liquefied Natural Gas Plants
Federal Register · Proposed Rule · Nov 25, 2025
certificate activities be consistent with all applicable laws, including the Endangered Species Act, National Historic Preservation Act, Clean Water Act, Clean Air Act, and other applicable statutes relating … Conservation and Management Act • National Historic Preservation Act • Farmland Protection Policy Act • Coastal Zone Management Act • Clean Air Act • Natural Gas Pipeline Safety Act • Ports and
90 FR 53251Energy DepartmentFederal Energy Regulatory CommissionAccounting and Reporting Treatment of Certain Renewable Energy Assets
Federal Register · Proposed Rule · Oct 3, 2022
In Part A, we propose to remove the reference to the Clean Air Act to make the instruction less restrictive. … Compressed air and vacuum cleaning systems, including tanks, compressors, exhausters, air filters, piping, etc. 2.
87 FR 59870Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · May 30, 2006
(2005); the Clean Air Act, 42 U.S.C. 1801 et seq. … The Commission has previously had cause to consider when a federally specified time period starts to run with respect to a request for a water quality certification under section 401 of the Clean Water
71 FR 30632Energy DepartmentFederal Energy Regulatory CommissionWaiver of the Water Quality Certification Requirements of Section 401(a)(1) of the Clean Water Act
Federal Register · Proposed Rule · Oct 19, 2020
RM20-18-000] Waiver of the Water Quality Certification Requirements of Section 401(a)(1) of the Clean Water Act AGENCY: Federal Energy Regulatory Commission. … (b) For requests for a water quality certification submitted pursuant to section 401(a)(1) of the Federal Water Pollution Control Act (Clean Water Act) in connection with a project for which authorization
85 FR 66287Energy DepartmentFederal Energy Regulatory CommissionApplications for Permits To Site Interstate Electric Transmission Facilities
Federal Register · Proposed Rule · Jan 17, 2023
Regulatory Flexibility Act 99 VI. Comment Procedures 103 VII. … a designated nonattainment or maintenance area under the Clean Air Act, 82 and provide the distance from the project facilities to any Class I area in the project vicinity.
88 FR 2770Energy DepartmentFederal Energy Regulatory CommissionElectric Transmission Incentives Policy Under Section 219 of the Federal Power Act
Federal Register · Proposed Rule · Apr 26, 2021
Regulatory Flexibility Act 24 VII. Comment Procedures 25 VIII. Document Availability 26 I. Introduction 1. … Regulatory Flexibility Act 37.
86 FR 21972Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Sep 18, 2002
In addition, Section 401(a)(1) of the Clean Water Act 5 requires a license applicant to obtain from the state in which any project discharge into navigable waters originates, certification that such … Integration of these parallel authorities such as the Clean Water Act, Endangered Species Act, and the National Historic Preservation Act is difficult.
67 FR 58739Energy DepartmentFederal Energy Regulatory CommissionManaging Transmission Line Ratings
Federal Register · Proposed Rule · Jan 21, 2021
Regulatory Flexibility Act 154 X. Comment Procedures 163 XI. … Regulatory Flexibility Act 153.
86 FR 6420Energy DepartmentFederal Energy Regulatory CommissionRevisions to Forms, Statements, and Reporting Requirements for Electric Utilities and Licensees
Federal Register · Proposed Rule · Jan 29, 2008
Air Act Amendments, and adopted corresponding reporting schedules for Form 1. 10 9 Amendments to FERC Form Nos. 1 and 1-F, and Annual Charges, and Fuel Cost and Purchased Economic Power … Adjustment Clauses, Order No. 529, 55 FR 47311, FERC Stats. & Regs. ¶ 30,904 (1990). 10 Revisions to Uniform System of Accounts to Account for Allowances under the Clean Air Act Amendments
73 FR 5136Energy DepartmentFederal Energy Regulatory CommissionRevisions to the Blanket Certificate Program
Federal Register · Proposed Rule · May 27, 2026
period. … Air Act); see also id. 380.12 (requiring submission of an environmental report consisting of thirteen resource reports and related material, including Resource Report 9—Air and noise quality).
91 FR 31371Energy DepartmentFederal Energy Regulatory CommissionHydroelectric Licensing Regulations Under the America's Water Infrastructure Act of 2018
Federal Register · Proposed Rule · Feb 7, 2019
Clean Water Act 15. … (3) Section 401 of the Clean Water Act.
84 FR 2469Energy DepartmentFederal Energy Regulatory CommissionHydroelectric Licensing Under the Federal Power Act
Federal Register · Proposed Rule · Mar 21, 2003
(Clean Water Act), 33 U.S.C. 1341(c)(1)), any Indian tribe that may be affected by the project, and members of the public. … (1) With regard to certification requirements for a license applicant under section 401(a)(1) of the Federal Water Pollution Control Act (Clean Water Act), the license application must include: (
68 FR 13988Energy DepartmentFederal Energy Regulatory CommissionRevision of the Commission's Regulations Under the Natural Gas Act
Federal Register · Proposed Rule · Oct 16, 1998
In accordance with that section, such intervention will be deemed timely as long it is filed within the comment period for the draft environmental impact statement. … Summarize anticipated air quality impacts for the project.
63 FR 55682Proposed RuleLandowner Notification, Residential Area Designation, and OtherCompensation for Reactive Power Within the Standard Power Factor Range
Federal Register · Proposed Rule · Mar 28, 2024
Providers Initial Comments at 2-4; Renewable Generation Companies Initial Comments at 6-7, 11-15; Renewable Generation Companies Reply Comments at 2-5, 10-11; Clean Energy Coalition Initial Comments at … • Clean Energy Coalition 3 3 Clean Energy Coalition consists of the Solar Energy Industries Association, the American Clean Power Association, Earthjustice, and the Natural Resources
89 FR 21454Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Apr 29, 2008
Regulatory Flexibility Act Certification 73 VI. Comment Procedures 74 VII. Document Availability 78 1. … Federal Power Act (FPA), the Interstate Commerce Act (ICA), the Flood Control Act, the Bonneville Power Act, the Northwest Power Planning Act, any other relevant statutes.
73 FR 23137Energy DepartmentFederal Energy Regulatory CommissionSmall Generator Interconnection Agreements and Procedures
Federal Register · Proposed Rule · Feb 1, 2013
The workshop is to be held before the end of the comment period. DATES: Comments are due June 3, 2013. … at 6; EEI Post-Technical Conference Comments at 11-13. 60 Clean Coalition Post-Technical Conference Comments at 3-4; IREC Post-Technical Conference Comments at 14; SEIA May 8, 2012 Comments
78 FR 7524Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · May 16, 2006
Comment Procedures 41. … (4) Boilers, furnaces, piping, wiring, fixtures, and machinery for heating, lighting, signaling, ventilating, and air-conditioning systems, plumbing, vacuum cleaning systems, incinerator and smoke pipe
71 FR 28464Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · May 4, 2022
Regulatory Flexibility Act [Analysis or Certification] 452 XIV. Comment Procedures 460 XV. … In this regard, I strongly object to our 75- and 30-day comment and reply periods.
87 FR 26504Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.