Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
2.11s
Federal Register · Rule · Nov 10, 2016
Therefore, DOE is not adopting a maximum air draft requirement for the soak-in period. 5. … Review Under the Regulatory Flexibility Act The Regulatory Flexibility Act (5 U.S.C. 601 et seq., as amended by the Small Business Regulatory Enforcement Fairness Act of 1996) requires preparation
81 FR 79261Energy DepartmentEnvironmental Management Site-Specific Advisory Board, Paducah
Federal Register · Notice · Apr 24, 2023
Tentative Agenda: • Review of Agenda • Administrative Issues • Public Comment Period Public Participation: The meeting is open to the public. … The EM SSAB, Paducah, will hear public comments pertaining to its scope (clean-up standards and environmental restoration; waste management and disposition; stabilization and disposition of non-stockpile
88 FR 24785Energy DepartmentFederal Register · Proposed Rule · Nov 5, 2020
DOE seeks comment on what constitutes a representative average period of use for portable ACs. C. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
85 FR 70508Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Expanded Scope Electric Motors
Federal Register · Proposed Rule · Dec 15, 2023
Public Comment Period Section 6(f)(2) of the Process Rule specifies that the length of the public comment period for a NOPR will be not less than 75 calendar days. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
88 FR 87062Energy DepartmentEnergy Conservation Program: Test Procedure for Uninterruptible Power Supplies
Federal Register · Proposed Rule · May 19, 2016
After the public meeting and until the end of the comment period, interested parties may submit further comments on the proceedings and any aspect of the rulemaking. … All tests, battery conditioning, and battery rest periods shall be carried out in a room with an air speed immediately surrounding the UUT of ≤0.5 m/s.
81 FR 31542Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Consumer Water Heaters
Federal Register · Proposed Rule · Jul 28, 2023
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (DC). (42 U.S.C. 7651 et seq. ) SO 2 emissions from … to support the clean energy transition.
88 FR 49058Energy DepartmentFederal Register · Proposed Rule · Jul 29, 2019
After the close of the comment period, DOE will review the public comments received and may begin collecting data and conducting the analyses discussed in this RFI. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
84 FR 36480Energy DepartmentEnergy Conservation Program: Test Procedure for Central Air Conditioners and Heat Pumps
Federal Register · Rule · Sep 9, 2025
Table I.1—List of Commenters With Written Submissions in Response to the May 2025 NOPR Commenter(s) Reference in this final rule Comment No. in the docket Commenter type Air-Conditioning … transition period, P.R.
90 FR 43367Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Fluorescent Lamp Ballasts
Federal Register · Proposed Rule · Apr 11, 2011
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (DC). … See Regulating Greenhouse Gas Emissions Under the Clean Air Act, 73 FR 44354 (July 30, 2008).
76 FR 20090Energy DepartmentEnergy Conservation Program: Commercial Warm Air Furnaces; Final Determination
Federal Register · Rule · Jan 17, 2025
Comment Period Length Several commenters expressed concerns about the length of the comment period provided in the December 2024 NOTD. … AHRI stated that the comment period fell short of the minimum 45-day comment period required for proposed test procedures under 42 U.S.C. 6314(b).
90 FR 5560Energy DepartmentFederal Register · Proposed Rule · Mar 25, 2010
Policy Act of 1992, Pub. … air-conditioning heat pumps (hereafter referred to as central air conditioners and heat pumps). (42 U.S.C. 6292(3)) The National Appliance Energy Conservation Act of 1987 (NAECA), Pub.
75 FR 14368Energy DepartmentFederal Register · Notice · Sep 21, 2015
Description: Application of South Central MCN LLC for Authorization under Section 203 to Acquire Transmission Facilities and Request for Expedited Consideration, Shortened Comment Period and Certain … Description: Application for Authorization Under Section 203 of the Federal Power Act and Request for Waivers, Expedited Action, Confidential Treatment and Shortened Comment Period of Eel River Power
80 FR 56974Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Electric Motors
Federal Register · Rule · Oct 19, 2022
On February 4, 2022, DOE published a notice granting an extension of the public comment period to allow public comments to be submitted until February 28, 2022. 87 FR 6436. … They are typically used to overcome heat dissipation difficulties and when air surrounding the motor is not clean ( e.g., dust).
87 FR 63588Energy DepartmentFederal Register · Proposed Rule · Jun 6, 2008
After the public meeting and the close of the comment period on the Framework Document, DOE will begin collecting data, conducting the analyses as discussed in the Framework Document and at the public … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
73 FR 32243Energy DepartmentFederal Register · Notice · Dec 12, 2012
the public comment period which starts with the publication of the Notice of Availability in the Federal Register and extends for 30 days until January 11, 2013. … Following the end of the public comment period, DOE will consider all comments received while completing the PEA, and as appropriate, issue a Finding of No Significant Impact (FONSI) or prepare a PEIS
77 FR 73996Energy DepartmentFederal Register · Notice · Sep 20, 2017
Background and Authority Title III, Part B 1 of the Energy Policy and Conservation Act of 1975 (EPCA), Public Law 94-163 (42 U.S.C. 6291-6309, as codified) established the Energy Conservation … Pursuant to 10 CFR 430.27(d), any person submitting written comments to DOE must also send a copy of such comments to the petitioner.
82 FR 43952Energy DepartmentEnergy Efficiency and Renewable Energy OfficeChicago Energy Exchange of Chicago, Inc., et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Uncategorized Document · Nov 29, 1994
Filing requirements were submitted pursuant to Section 203 of the Federal Power Act and Part 33 of the Commission's Rules and Regulations. … Air Act Amendment of 1990.
Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Energy Conservation Standards for Consumer Clothes Dryers
Federal Register · Proposed Rule · Aug 23, 2022
DOE provided a 45-day comment period for the RFI. Id. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
87 FR 51734Energy DepartmentFederal Register · Proposed Rule · May 2, 2013
After the close of the comment period, DOE will begin collecting data, conducting the analyses, and reviewing the public comments. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
78 FR 25627Energy DepartmentFederal Register · Notice · May 2, 2022
Applicants: EnergyMark, LLC, Marina Energy, LLC, Annadale Community Clean Energy Projects, LLC, Bronx Community Clean Energy Project, LLC, NJ Boardwalk Holdings LLC. … Description: Motion of Tampa Electric Company for Waiver of Rate Schedule Provisions, and for Shortened Comment Period. Filed Date: 4/26/22. Accession Number: 20220426-5127.
87 FR 25633Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.