Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
1.67s
Alternative Fuel Transportation Program; P-series fuels
Federal Register · Proposed Rule · Jul 28, 1998
Air Act (CAA). … Opportunity for Public Comment A.
63 FR 40202Energy DepartmentEnergy Efficiency and Renewable Energy OfficeHome Energy Rating System Guidelines
Federal Register · Proposed Rule · Apr 9, 1996
271 of the National Energy Conservation Policy Act (Act), as amended by the Energy Policy Act of 1992. 42 U.S.C. 8236. … Since the close of the 60-day comment period on the notice of proposed rulemaking, DOE has been reviewing the comments.
61 FR 15735Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Notice · Mar 23, 2018
Specifically, stakeholders commented that a break-in period of 16 to 20 hours would generally be appropriate for testing of commercial air-conditioners with capacity less than 65,000 Btu/h. 77 FR 28928 … Following close of the comment period, DOE received a comment from Goodman Global, Inc.
83 FR 12735Energy DepartmentFederal Register · Rule · Aug 24, 2011
Comment Period Commenters also suggested that DOE extend the comment period on the NOPR published simultaneous with the direct final rule. … For the NOPR proposing energy conservation standards for residential clothes dryers and room air conditioners, however, DOE provided for a longer comment period to match the 110-day comment period provided
76 FR 52854Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Dehumidifiers
Federal Register · Proposed Rule · Nov 6, 2023
DOE requested comment in the June 2021 RFI on the technical and economic analyses and provided stakeholders a 45-day comment period, after granting a 15-day comment period extension. 86 FR 29964 and 86 … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
88 FR 76510Energy DepartmentEnergy Conservation Program: Test Procedure for Central Air Conditioners and Heat Pumps
Federal Register · Rule · Jan 7, 2025
The comment period on a proposed rule to amend a test procedure shall be at least 60 days and may not exceed 270 days. … test period sub-intervals.
90 FR 1224Energy DepartmentFederal Register · Proposed Rule · Nov 5, 2024
(2020), implies the repeal of E.O. 12889 and its 75-day comment period requirement for technical regulations. Thus, the controlling laws are EPCA and the USMCA Implementation Act. … Consistent with EPCA's public comment period requirements for consumer products, the USMCA only requires a minimum comment period of 60 days.
89 FR 87803Energy DepartmentAcquisition Regulation; Department of Energy Management and Operating Contracts
Federal Register · Rule · Sep 26, 1995
Disposition of Comments. III. Procedural Requirements. A. Review Under Executive Order 12866. B. Review Under the National Environmental Policy Act. C. … (1) Air Transportation by U.S.-Flag Carriers. Clause at FAR 52.247-63. (2) Anti-Kickback Act of 1986. Clause at FAR 52.203-7. (3) Clean Air and Water.
60 FR 49512Energy DepartmentFederal Register · Rule · Jan 15, 2021
package air conditioning and heating equipment, packaged terminal air conditioners (PTACs), packaged terminal heat pumps (PTHPs), warm-air furnaces, packaged boilers, storage water heaters, instantaneous … consumers act irrationally.
86 FR 4776Energy DepartmentFederal Register · Notice · Jan 16, 2001
This site is now in the process of cleaning the storage tanks and preparing for closure. … The working tools and removal devices being developed include suction devices, rubblizing devices, water and air jets, waste conditioning devices, grit blasting devices, transport and conveyance devices
66 FR 3564Energy DepartmentFederal Register · Proposed Rule · Jun 27, 2011
The Energy Independence and Security Act of 2007 (EISA 2007; Pub. … For split-system air conditioners (coil-only), the median payback period is 1 year. For split-system air conditioners (blower-coil), the median payback period is 6 years.
76 FR 37549Energy DepartmentEnergy Conservation Program: Test Procedure for Dehumidifiers
Federal Register · Rule · Jul 26, 2023
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … The comment period on a proposed rule to amend a test procedure shall be at least 60 days and may not exceed 270 days.
88 FR 48035Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Consumer Furnaces
Federal Register · Proposed Rule · Jul 7, 2022
www.aqmd.gov/home/air-quality/clean-air-plans/air-quality-mgt-plan/final-2016-aqmp ) (Last accessed Feb. 15, 2022). 2. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
87 FR 40590Energy DepartmentPuget Sound Energy, Inc., et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Dec 7, 1999
(the Company), tendered for filing an application, under Section 203 of the Federal Power Act and Part 33 of the Commission's Rules and Regulations, for authority to effect a ``disposition of facilities … Entergy requests an effective date of January 1, 2000, for the filing, to coincide with the commencement of Phase II of the Title IV (the acid rain control title) of the Clean Air Act Amendments.
64 FR 68348Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 18, 2025
(Fall River) submitted to the Federal Energy Regulatory Commission (Commission) a copy of its application for a Clean Water Act section 401(a)(1) water quality certification filed with the Idaho Department … Reasonable Period of Time to Act on the Certification Request: One year [December 5, 2026].
90 FR 59104Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Jun 6, 2008
After the public meeting and the close of the comment period on the Framework Document, DOE will begin collecting data, conducting the analyses as discussed in the Framework Document and at the public … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
73 FR 32243Energy DepartmentFederal Register · Proposed Rule · Mar 25, 2010
Policy Act of 1992, Pub. … air-conditioning heat pumps (hereafter referred to as central air conditioners and heat pumps). (42 U.S.C. 6292(3)) The National Appliance Energy Conservation Act of 1987 (NAECA), Pub.
75 FR 14368Energy DepartmentEnergy Conservation Program: Commercial Warm Air Furnaces; Final Determination
Federal Register · Rule · Jan 17, 2025
Comment Period Length Several commenters expressed concerns about the length of the comment period provided in the December 2024 NOTD. … AHRI stated that the comment period fell short of the minimum 45-day comment period required for proposed test procedures under 42 U.S.C. 6314(b).
90 FR 5560Energy DepartmentFederal Register · Proposed Rule · Jul 29, 2019
After the close of the comment period, DOE will review the public comments received and may begin collecting data and conducting the analyses discussed in this RFI. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
84 FR 36480Energy DepartmentFederal Register · Notice · Aug 24, 2006
The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared a Final General Conformity Determination to assess the potential air quality impacts associated with the construction … This Final General Conformity Determination was prepared to satisfy the requirements of the Clean Air Act.
71 FR 50055Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.