Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
1.73s
Federal Register · Notice · Dec 18, 2018
The environmental document may be issued for an allotted public comment period. … When the Commission issues the environmental document for an allotted public comment period, a Notice of Availability of the environmental document will be sent to the environmental mailing list and
83 FR 64815Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 27, 2017
these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • vegetation and wildlife; • endangered and threatened species; • cultural resources; • air … Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period.
82 FR 29068Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Room Air Conditioners
Federal Register · Rule · Mar 29, 2021
The comment period on a proposed rule to amend a test procedure shall be at least 60 days and may not exceed 270 days. … the conditioned space, or circulating air through activation of its fan or blower, with or without energizing active air-cleaning components or devices such as ultra-violet (UV) radiation, electrostatic
86 FR 16446Energy DepartmentEnergy Conservation Program: Test Procedures for Residential and Commercial Clothes Washers
Federal Register · Rule · Jun 1, 2022
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … , and maximum current ratio may be measured and recorded immediately before and after the test measurement period. 2.5.4 Water and air temperature measuring devices.
87 FR 33316Energy DepartmentEnergy Conservation Program: Test Procedure for Portable Air Conditioners
Federal Register · Rule · May 15, 2023
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … The comment period on a proposed rule to amend a test procedure shall be at least 60 days and may not exceed 270 days.
88 FR 31102Energy DepartmentCritical Energy Infrastructure Information
Federal Register · Rule · Apr 13, 2007
Cir. 1984) (finding interpretive a rule that restated consistent agency practice based on the Environmental Protection Agency's understanding of the recall provision of the Clean Air Act), cert. denied … Posey, Acting Secretary. [FR Doc. E7-7005 Filed 4-12-07; 8:45 am] BILLING CODE 6717-01-P
72 FR 18572Energy DepartmentFederal Energy Regulatory CommissionRecord of Decision for the Final Versatile Test Reactor Environmental Impact Statement
Federal Register · Notice · Aug 3, 2022
The Energy Act of 2020, within the Consolidated Appropriations Act (Pub. … Unlike the INL Site, the ORNL location abuts wetlands that would have to be avoided or managed in accordance with Clean Water Act and State of Tennessee regulations.
87 FR 47400Energy DepartmentNational Environmental Policy Act Implementing Procedures
Federal Register · Proposed Rule · Jan 3, 2011
After the public hearing, interested persons may submit further comments until the end of the comment period. … period.
76 FR 214Energy DepartmentEnergy Conservation Program: Test Procedures for Residential and Commercial Clothes Washers
Federal Register · Proposed Rule · Sep 1, 2021
-day public comment period for test procedure NOPRs. … , and maximum current ratio may be measured and recorded immediately before and after the test measurement period. 2.5.4 Water and air temperature measuring devices.
86 FR 49140Energy DepartmentWisconsin Public Service Corporation, et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Jan 3, 1995
in particular how the net revenues expected to be received from NEP's sale of sulfur dioxide allowances produced by the involvement of NEP's generating stations in the acid rain program of the Federal Clean … Air Act would be treated under NEP's filing.
60 FR 102Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · Jan 22, 2001
Comments received during the most recent comment period are addressed below, and some previous comments are revisited. A. … In the case of SO 2 , the Clean Air Act Amendments of 1990 set an emissions cap on all power generation.
66 FR 7170Energy DepartmentEnergy Efficiency and Renewable Energy OfficeTennessee Gas Pipeline Company; Notice of Application
Federal Register · Notice · Jan 12, 2005
centrifugal compressors at its Compressor Station 325 in Liberty County, New Jersey, and replace them with two Solar Centaur 40-4700S (Centaur 40) turbines that drive centrifugal compressors to comply with the Clean … Air Act Amendments of 1990, all as more fully set forth in the application which is on file with the Commission and open to public inspection.
70 FR 2146Energy DepartmentFederal Energy Regulatory CommissionThe Detroit Edison Company, et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Sep 26, 1997
Comment date: October 3, 1997, in accordance with Standard Paragraph E at the end of this notice. 24. Clean Air Capital Markets Corporation [Docket No. … ER97-4434-000] Take notice that on September 2, 1997, Clean Air Capital Markets Corporation (CACM) petitioned the Commission for acceptance of CACM Rate Schedule FERC No. 1; the granting of certain
62 FR 50569Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Energy Conservation Standards for Commercial Water Heating Equipment
Federal Register · Rule · Oct 6, 2023
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions … Suburban Propane added that traditional propane is an abundant, domestically produced energy source and is defined as a clean alternative fuel under the 1990 Clean Air Act. Id.
88 FR 69686Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Commercial Refrigeration Equipment
Federal Register · Rule · Mar 28, 2014
Air-Curtain Design In its written comment, Traulsen expressed concern over the use of advanced air curtain designs. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States (42 U.S.C. 7651 et seq. ) and the District of Columbia (D.C.).
79 FR 17726Energy DepartmentCNG Power Services Corporation, et al. Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Feb 27, 1995
Under the federal Clean Air Act (42 U.S.C. Section 7401 et seq.), Wisconsin Electric would assume liability for the costs of procurement of these emission allowances. … The submittal also explains Wisconsin Electric's least cost plan that incorporates the Clean Air Act's reduced utilization provisions for Phase 1 affected units may cause the Company's cost recovery to
60 FR 10578Energy DepartmentEnergy Conservation Program: Test Procedures for Central Air Conditioners and Heat Pumps
Federal Register · Proposed Rule · Jan 24, 2023
The comment period on a proposed rule to amend a test procedure shall be at least 60 days and may not exceed 270 days. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
88 FR 4091Energy DepartmentFederal Register · Rule · May 20, 2024
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions … Sensitivity Analysis Using EPA's New SC-GHG Estimates In December 2023, EPA issued an updated set of SC-GHG estimates (2023 SC-GHG) in connection with a final rulemaking under the Clean Air Act.
89 FR 44052Energy DepartmentWestern Technical College; Notice of Availability of Environmental Assessment
Federal Register · Notice · Aug 28, 2012
4 1.3.2 Clean Water Act 4 1.3.3 Endangered Species Act 5 1.3.4 Coastal Zone Management Act 5 1.3.5 National Historic Preservation Act 5 1.4 PUBLIC REVIEW AND CONSULTATION … No federal or state fish and wildlife agency filed recommendations pursuant to section 10(j) of the FPA. 1.3.2 Clean Water Act Under section 401(a) of the Clean Water Act (CWA), 33 U.S.C. 1341(a)(1
77 FR 51993Energy DepartmentFederal Energy Regulatory CommissionTranscontinental Gas Pipe Line Corporation; Notice of Application
Federal Register · Notice · Dec 30, 2004
CP05-37-000 pursuant to section 7(c) of the Natural Gas Act (NGA) and part 157(A) of the Commission's Regulations, for a certificate of public convenience and necessity authorizing Transco's construction … and operation of certain facilities at Compressor Station No. 170 (Station 170) in Appomattox County, Virginia to comply with the Clean Air Act Amendments of 1990, all as more fully set forth in the application
69 FR 78404Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.