Federal Register · Notice · May 27, 2008
A 45-day comment period will be allotted for review of the draft EIS. We will consider all timely comments on the draft EIS and revise the document, as necessary, before issuing a final EIS. … • Air Quality and Noise: —Effect on local air quality and noise environment from construction and operation of the proposed facilities.
73 FR 30386Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Jan 17, 2012
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (DC). … In addition, EPA's 2008 Advance Notice of Proposed Rulemaking on Regulating Greenhouse Gas Emissions Under the Clean Air Act identified what it described as “very preliminary” SCC estimates subject to
77 FR 2356Energy DepartmentRichmond Power Enterprises, L.P., et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Feb 24, 1995
Air Act Amendment of 1990. … In order to optimize the economic advantage to both PECO and Con Edison, PECO requests that the Commission waive its customary notice period and permit the agreement to become effective on February 8,
60 FR 10380Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Dec 23, 2021
As a result, the supplemental EIS will include a reevaluation of the operational impacts previously analyzed in the EA, including environmental justice, air emissions, and noise levels. … Commission staff will consider all timely comments received during the comment period on the draft supplemental EIS and revise the document, as necessary, before issuing a final supplemental EIS.
86 FR 72943Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Energy Conservation Standards for Commercial Refrigeration Equipment
Federal Register · Proposed Rule · Sep 11, 2013
Air Act. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States (42 U.S.C. 7651 et seq. ) and the District of Columbia (DC).
78 FR 55890Energy DepartmentFederal Register · Notice · Jan 10, 2022
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its determination on the proposed project. … Commission staff will consider all timely comments received during the comment period on the draft EIS, and revise the document, as necessary, before issuing a final EIS.
87 FR 1135Energy DepartmentFederal Energy Regulatory CommissionWestern Area Power Administration; Grapevine Canyon Wind Project Record of Decision (DOE/EIS-0427)
Federal Register · Notice · Sep 11, 2012
The NOA also announced a 45-day comment period for receipt of comments on the Draft EIS. … Foresight will continue to pursue a final determination by the Corps and intends to obtain the appropriate Clean Water Act Section 404 permits once the size of the initial development and final infrastructure
77 FR 55829Energy DepartmentFederal Register · Notice · Nov 30, 2021
Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS. … Permit Agency Clean Water Act Section 401 Water Quality Certification Maine Department of Environmental Protection.
86 FR 67931Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 22, 2010
Please note that the scoping period for this Project will close on August 16, 2010. … A comment period will be allotted if the EA is published for review. We will consider all comments on the EA before we make our recommendations to the Commission.
75 FR 42740Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program for Consumer Products: Test Procedure for Microwave Ovens
Federal Register · Rule · Mar 9, 2011
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … temperature. 2.5.1 Active mode ambient room air temperature.
76 FR 12825Energy DepartmentFederal Register · Notice · Apr 4, 2019
), proposing to study the feasibility of the Integrated Pumped Hydroelectric Reverse Osmosis Clean Energy System at the Vandenberg Air Force Base (IPHROCES at Vandenberg AFB Project or project) to be located … on coast of the Pacific Ocean, near Vandenberg Air Force, Santa Barbara County, California.
84 FR 13281Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 28, 2015
Please note that the scoping period will close on February 19, 2015. You may submit comments in written form or verbally. … We will publish and distribute the draft EIS for public comment. After the comment period, we will consider all timely comments and revise the document, as necessary, before issuing a final EIS.
80 FR 4558Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Feb 6, 2009
Please note that the scoping period will close on March 2, 2009. Comments regarding this project may be submitted in written form or verbally. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
74 FR 6279Energy DepartmentFederal Energy Regulatory CommissionRestricted Eligibility in Support of Advanced Coal Research at U.S. Colleges and Universities
Federal Register · Notice · Oct 3, 1997
UCR Core Program Focus Areas Mercury Detection and Control Concern over mercury emissions from power plant stack gas has increased since the 1990 Amendments to the Clean Air Act, where mercury was … The synthesis gas must be cleaned of sulfur compounds and particulates before use.
62 FR 51839Energy DepartmentFederal Register · Notice · Aug 15, 2025
The Final GCD Reevaluation was prepared to satisfy the requirements of the Clean Air Act. … For public inquiries and assistance with making filings such as interventions, comments, or requests for rehearing, the public is encouraged to contact OPP at (202)502-6595 or OPP@ferc.gov.
90 FR 39388Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jul 27, 2010
Please note that the scoping period will close on August 20, 2010. This notice is being sent to the Commission's current environmental mailing list for this project. … Bayonne and Jersey City, New Jersey; and a block valve and flange in an underground vault in the Borough of Manhattan, New York to accommodate a receiver. 2 A pig is a tool that can be used to clean
75 FR 43965Energy DepartmentFederal Energy Regulatory CommissionCertification of New Interstate Natural Gas Facilities
Federal Register · Notice · Mar 1, 2022
Cir. 2015) (“the Commission's power to preempt state and local law is circumscribed by the Natural Gas Act's savings clause, which saves from preemption the `rights of States' under the Clean Air Act and … Ahlers, Origins of the Clean Air Act: A New Interpretation, 45 Envtl. L. 75 (2015). Nor were the effects of GHG emissions unknown at that time.
87 FR 11548Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 25, 2015
and operation of the proposed project under these general headings: • Geology and soils; • land use; • water resources, fisheries, and wetlands; • cultural resources; • vegetation and wildlife; • air … Depending on the comments received during the scoping process, we may also publish and distribute the EA to the public for an allotted comment period.
80 FR 51551Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Sep 30, 2014
Policy Act (Pub. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (D.C.).
79 FR 58948Energy DepartmentAlternative Fuel Transportation Program; Biodiesel Fuel Use Credit
Federal Register · Rule · May 19, 1999
Air Act. … At the close of the 60-day comment period, DOE will review the comments received, revise the information collection as necessary, and submit these provisions to OMB for review.
64 FR 27169Energy DepartmentEnergy Efficiency and Renewable Energy Office