Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
1.86s
Federal Register · Notice · Feb 25, 2005
Army Corps of Engineers (COE) has agreed to participate as a cooperating agency in the preparation of the EIS to satisfy its NEPA responsibilities under section 404 of the Clean Water Act and section 10 … of the Rivers and Harbors Act.
70 FR 9299Energy DepartmentFederal Energy Regulatory CommissionApplications for Permits To Site Interstate Electric Transmission Facilities
Federal Register · Rule · May 29, 2024
Air Act obligations. … Clean Air Task Force CATF. Clean Energy Buyers Association Clean Energy Buyers. ClearPath, Inc ClearPath. Conservation Law Foundation CLF.
89 FR 46682Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Aug 11, 2023
and demonstrate and deploy clean energy technologies. 1 Infrastructure Investment and Jobs Act, Public Law 117-58 (November 15, 2021). … And the 2022 Inflation Reduction Act (IRA, Pub.
88 FR 54608Energy DepartmentEnergy Conservation Program: Test Procedure for Dishwashers
Federal Register · Proposed Rule · Dec 22, 2021
(2020), implies the repeal of E.O. 12889 and its 75-day comment period requirement for technical regulations. Thus, the controlling laws are EPCA and the USMCA Implementation Act. … Consistent with EPCA's public comment period requirements for consumer products, the USMCA only requires a minimum comment period of 60 days.
86 FR 72738Energy DepartmentFederal Register · Notice · Aug 10, 2020
Section 3 of the Final EA analyzed the following resource areas in detail: (1) Air quality, (2) human health (normal operations), (3) human health (accidents and intentional destructive acts), (4) … External Review and Comments Nineteen comment documents were received during the public comment period on the Draft EA.
85 FR 48236Energy DepartmentFederal Register · Notice · Jan 20, 2026
The primary issues raised by the commenters are concerns regarding groundwater, waterbodies, wildlife, traffic, air emissions, noise and vibration effects, compressor station site and facility alternatives … , pipeline safety associated with the increased capacity, human health, climate change, segmentation, and the length of the scoping comment period.
91 FR 2341Energy DepartmentFederal Energy Regulatory CommissionTranscontinental Gas Pipe Line Corporation; Notice of Application
Federal Register · Notice · Mar 29, 2000
Transco proposes to modify several of its existing reciprocating engines at Compressor Station No. 120 (Station 120) in order to comply with the State of Georgia plan to implement the Clean Air Act Amendments … Transco states that it needs to commence the work at Station 120 on May 15, 2000 in order to complete the work on a timely basis with respect to the requirements of the Clean Air Act Amendments of 1990
65 FR 16581Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Jan 6, 2017
at least 110 days on this proposal. (42 U.S.C. 6295(p)(4)(A)-(B)) While DOE typically provides a comment period of 60 days on proposed standards, in this case, DOE provides a comment period of the same … length as the comment period on the direct final rule— i.e. 110 days.
82 FR 1608Energy DepartmentClean Energy for New Federal Buildings and Major Renovations of Federal Buildings
Federal Register · Rule · May 1, 2024
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“D.C.”). 42 U.S.C. 7651 et seq. … Sensitivity Analysis Using Updated 2023 SC-GHG Estimates In December 2023, EPA issued a new set of SC-GHG estimates (2023 SC-GHG) in connection with a final rulemaking under the Clean Air Act. 40
89 FR 35384Energy DepartmentEnergy Conservation Program: Test Procedure for Dishwashers
Federal Register · Rule · Jan 18, 2023
(Whirlpool, No. 16 at p. 3) AHAM also commented that the 60-day December 2021 NOPR comment period and the comment period for the preliminary analysis evaluating amended energy conservation standards … DOE's testing experience suggests that ambient relative humidity could potentially impact the adherence of the applied soils to the test load during the 2-hour air-dry period specified in AHAM DW-2-2020
88 FR 3234Energy DepartmentFederal Register · Notice · Dec 29, 2014
This notice corrects the date of the public comment period. … Department of Energy, NNSA, PO Box 391 Building 401, Kirtland Air Force Base East, Albuquerque, NM 87185; email at Jane.Summerson01@nnsa.doe.gov; or phone (505) 845-4091.
79 FR 78079Energy DepartmentCoulonge Power & Company, Limited, et al.; Electric Rate and Corporate Regulation Filings
Federal Register · Notice · Jan 19, 1995
Air Act Amendment of 1990. … Air Act Amendment of 1990.
60 FR 3847Energy DepartmentFederal Energy Regulatory CommissionProposed Agency Information Collection
Federal Register · Notice · Jul 15, 2010
If you anticipate that you will be submitting comments, but find it difficult to do so within the period of time allowed by this notice, please advise the DOE Desk Officer at OMB of your intention to make … Statutory Authority: Section 211(o)(9)(A)(ii) of the Clean Air Act, as amended by the Energy Policy Act of 2005 (EPACT 2005), requires that DOE conduct a study for the Administrator of the Environmental
75 FR 41165Energy DepartmentAuthorizations for Certain Activities at Liquefied Natural Gas Plants
Federal Register · Proposed Rule · Nov 25, 2025
certificate activities be consistent with all applicable laws, including the Endangered Species Act, National Historic Preservation Act, Clean Water Act, Clean Air Act, and other applicable statutes relating … Conservation and Management Act • National Historic Preservation Act • Farmland Protection Policy Act • Coastal Zone Management Act • Clean Air Act • Natural Gas Pipeline Safety Act • Ports and
90 FR 53251Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 23, 2013
The public scoping period ended on December 15, 2011, after a 30-day opportunity to submit comments. … During the 45-day public comment period, which ended November 5, 2012, DOE received comment letters from the Department of Interior, EPA, and the Texas Parks and Wildlife Department.
78 FR 30901Energy DepartmentFederal Register · Notice · Jul 26, 2004
Army Corps of Engineers (COE) has also agreed to participate as a cooperating agency in the preparation of the EIS to satisfy its NEPA responsibilities under section 404 of the Clean Water Act and section … • Air Quality and Noise: —Effects on local air quality and noise environment from construction and operation of the proposed facilities.
69 FR 44530Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Rule · Jan 6, 2011
of its fan or blower, with or without energizing active air-cleaning components or devices such as ultraviolet (UV) radiation, electrostatic filters, ozone generators, or other air-cleaning devices; … Whirlpool commented that, if needed, the condenser unit should be cleaned prior to the first test run so it does not need to be cleaned during the test procedure.
76 FR 972Energy DepartmentFederal Register · Notice · Apr 5, 2001
The public comment period for the Draft NIF SEIS began on November 5, 1999, and ended on December 20, 1999. … Comments on the Final SEIS. During the 30-day period following notice that the Final SEIS had been filed on February 23, 2001, the NNSA received no comments on the Final SEIS.
66 FR 18078Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Miscellaneous Refrigeration Products
Federal Register · Rule · Oct 28, 2016
Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (DC). (42 U.S.C. 7651 et seq. ) SO 2 emissions from … Air Act provision that provides statutory authority for CSAPR. 56 See Georgia v.
81 FR 75194Energy DepartmentEnergy Conservation Program: Test Procedure for Dishwashers
Federal Register · Proposed Rule · Aug 20, 2019
The comment period on a proposed rule to amend a test procedure shall be at least 60 days and may not exceed 270 days. … In that rulemaking, interested parties commented that detergent dosing impacts a consumer dishwasher's cleaning performance but not energy consumption. Id.
84 FR 43071Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.