Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.50s
Energy Conservation Program: Energy Conservation Standards for Unfired Hot Water Storage Tanks
Federal Register · Proposed Rule · Jun 10, 2021
, and very large commercial package air conditioning and heating equipment, packaged terminal air conditioners and packaged terminal heat pumps, warm-air furnaces, packaged boilers, storage water heaters … After the webinar and until the end of the comment period, interested parties may submit further comments on the proceedings and any aspect of the proposed determination.
86 FR 30796Energy DepartmentFederal Register · Proposed Rule · May 16, 2006
Comment Procedures 41. … (4) Boilers, furnaces, piping, wiring, fixtures, and machinery for heating, lighting, signaling, ventilating, and air-conditioning systems, plumbing, vacuum cleaning systems, incinerator and smoke pipe
71 FR 28464Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Mar 7, 2002
that none of the alternative locations were environmentally preferable to the original location. 2 The draft EIS was issued by the Commission in April 2001 for a 45-day comment period. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
67 FR 10398Energy DepartmentFederal Energy Regulatory CommissionNotice of Waiver Period for Water Quality Certification Applications
Federal Register · Notice · Sep 29, 2023
or refuses to act on a certification request within a reasonable period of time, which is one year after the date the certification request was received. … )(1) of the Clean Water Act, 33 U.S.C. 1341(a)(1).
88 FR 67271Energy DepartmentFederal Energy Regulatory CommissionBrookfield White Pine Hydro LLC; Notice of Waiver Period for Water Quality Certification Application
Federal Register · Notice · Jun 24, 2021
Reasonable Period of Time to Act on the Certification Request: One year. … to section 401(a)(1) of the Clean Water Act, 33 U.S.C. 1341(a)(1).
86 FR 33261Energy DepartmentFederal Energy Regulatory CommissionCoastal Carolina Clean Power LLC, et al.; Electric Rate and Corporate Filings
Federal Register · Notice · Apr 19, 2006
of the Federal Power Act for authorization of a disposition of jurisdictional facilities, whereby United Cogen Fuel LLC proposes to transfer to Coastal Carolina Clean Power LLC an undivided 100 percent … Comment Date: 5 p.m. Eastern Time on April 17, 2006.
71 FR 20081Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 27, 2010
As part of its processing of the license application, the Texas CEQ is reviewing the application under Section 401 of the Clean Water Act (CWA), and in accordance with Title 30, Texas Administrative Code … The public comment period extends 30 days from the date of publication of this notice.
75 FR 22123Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 25, 2006
This draft EIS was prepared to satisfy the requirements of the National Environmental Policy Act. … The general purpose of the LNG Clean Energy Project is to provide up to 1.5 billion cubic feet per day of natural gas to markets in the United States.
71 FR 30130Energy DepartmentFederal Energy Regulatory CommissionCommission Information Collection Activities (FERC-500 and FERC-542); Consolidated Comment Request
Federal Register · Notice · Mar 22, 2016
to request additional studies and provide comments and recommendations. 5 Statutes include the Electric Consumers Protection Act (ECPA), the National Environmental Policy Act (NEPA), the Endangered … Species Act, the Federal Water Pollution Control Amendments of 1972 (the Clean Water Act), and the Coastal Zone Management Act.
81 FR 15300Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 21, 2004
The documents will satisfy the requirements of the National Environmental Policy Act (NEPA). … A 45-day comment period will be allotted for review of the draft EISs. We will consider all comments on the draft EISs and revise the documents, as necessary, before issuing final EISs.
69 FR 29296Energy DepartmentFederal Energy Regulatory CommissionLabeling Requirements for Commercial and Industrial Equipment
Federal Register · Proposed Rule · Dec 20, 2012
conditioning and heating equipment, packaged terminal air conditioners and packaged terminal heat pumps, warm air furnaces packaged boilers, storage water heaters, instantaneous water heaters, and unfired … EPCA requires that DOE provide a public comment period of at least 45 days and allow interested parties to present oral and written data, views and arguments on any proposed labeling rule. 42 U.S.C. 6315
77 FR 75400Energy DepartmentPublic Hearing and Opportunities for Public Review and Comment
Federal Register · Notice · Nov 8, 2012
Bureau) must take all reasonable actions to avoid excess spill in order to protect endangered fish and other aquatic species in accordance with the Clean Water Act, Endangered Species Act, and court orders … Environmental Policy Act (NEPA).
77 FR 66963Energy DepartmentBonneville Power AdministrationEnergy Conservation Program: Energy Conservation Standards for Electric Motors
Federal Register · Proposed Rule · Jun 1, 2023
The Energy Policy Act of 1992 (“EPACT 1992”) (Pub. … period of at least 110 days on this proposal. (42 U.S.C. 6295(p)(4)(A)-(B)) Based on the comments received during this period, the direct final rule will either become effective, or DOE will withdraw
88 FR 35765Energy DepartmentFederal Register · Proposed Rule · Feb 7, 2022
connections between the appliance and the vent-air intake terminal; (3) flue gas connections between the appliance and the vent-air intake terminal; and (4) a vent-air intake terminal for installation … After the expiration of the period for submitting written statements, DOE will consider all comments and additional information that is obtained from interested parties or through further analyses, and
87 FR 6786Energy DepartmentFederal Register · Rule · Jul 11, 2014
Review Under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … standby period.
79 FR 40542Energy DepartmentFederal Register · Proposed Rule · May 4, 2022
Regulatory Flexibility Act [Analysis or Certification] 452 XIV. Comment Procedures 460 XV. … In this regard, I strongly object to our 75- and 30-day comment and reply periods.
87 FR 26504Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 7, 2008
The scoping period will close on April 30, 2008. WEEK 1 April 15, 2008—Elko, Nevada, Hilton Garden Inn, 3650 East Idaho St., (775) 777-1200. … A comment period will be allotted for review of the draft EIS. We will consider all timely comments on the draft EIS and revise the document, as necessary, before issuing a final EIS.
73 FR 18788Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Oct 25, 1996
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we recommend that the Commission approve or not approve the project. … Effect the proposed compressor station would have on air quality in the vicinity. Alternative siting feasibility.
61 FR 55287Energy DepartmentFederal Register · Notice · Dec 1, 2021
In the Consolidated Appropriations Act, 2021, Congress appropriated funds to the Department for interim storage activities. … DOE plans to post all comment documents received in their entirety at following the close of the public comment period.
86 FR 68244Energy DepartmentFederal Register · Notice · Jun 8, 2017
The 45-day comment period on the Draft Addendum closed on July 21, 2014. … DOE/FE received 40,745 comments in 18 separate submissions, and considered those comments in issuing the final Addendum on August 15, 2014.
82 FR 26672Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.