Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.24s
Labeling Requirements for Commercial and Industrial Equipment
Federal Register · Proposed Rule · Dec 20, 2012
conditioning and heating equipment, packaged terminal air conditioners and packaged terminal heat pumps, warm air furnaces packaged boilers, storage water heaters, instantaneous water heaters, and unfired … EPCA requires that DOE provide a public comment period of at least 45 days and allow interested parties to present oral and written data, views and arguments on any proposed labeling rule. 42 U.S.C. 6315
77 FR 75400Energy DepartmentIssuance of a Loan Guarantee to First Solar, Inc., for the Desert Sunlight Solar Farm Project
Federal Register · Notice · Oct 6, 2011
The Draft EIS was available for a 90-day public comment period, which closed on November 26, 2010. … Army Corps of Engineers, which determined that the project site does not impact waters of the United States and that a Clean Water Act permit will not be required, and the State of California and Riverside
76 FR 62052Energy DepartmentRevision To Power Marketing Policy Cumberland System of Projects
Federal Register · Notice · Nov 6, 2023
A virtual web based public information and comment forum was held on June 29, 2023, with written comments due on or before July 14, 2023. … Southeastern held a web-based information and comment forum on June 29, 2023. Southeastern received no comments.
88 FR 76207Energy DepartmentSoutheastern Power AdministrationFederal Register · Notice · Nov 16, 2012
Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r). h. … Comments due on EA February 2014.
77 FR 68757Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 4, 2013
River Power MR-6, LLC, Clean River Power MR-7, LLC; Notice of Scoping Meetings and Environmental Site Reviews and Soliciting Scoping Comments a. … Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r). h.
78 FR 33406Energy DepartmentFederal Energy Regulatory CommissionPacifiCorp; Notice of Reasonable Period of Time for Water Quality Certification Application
Federal Register · Notice · Apr 7, 2022
or refuses to act on a certification request within a reasonable period of time, which is one year after the date the certification request was received. … to section 401(a)(1) of the Clean Water Act, 33 U.S.C. 1341(a)(1).
87 FR 20397Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Nov 9, 2007
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … Other than air emissions and noise, all impacts would occur within existing EPNG property.
72 FR 63567Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Sep 26, 2014
Review Under Unfunded Mandates Reform Act of 1995 The Unfunded Mandates Reform Act of 1995 (Pub. … Review Under the Treasury and General Government Appropriations Act of 1999 Section 654 of the Treasury and General Government Appropriations Act of 1999 (Pub.
79 FR 57915Energy DepartmentEnergy Efficiency and Renewable Energy OfficeIssuance of Loan Guarantee to Genesis Solar, LLC, for the Genesis Solar Energy Project
Federal Register · Notice · Sep 1, 2011
The Draft EIS was available for a 90-day public comment period, which closed on July 8, 2010. … BLM made the Final EIS available for an additional 30-day public review and comment period from August 27 to September 27, 2010.
76 FR 54454Energy DepartmentFederal Register · Proposed Rule · May 16, 2006
Comment Procedures 41. … (4) Boilers, furnaces, piping, wiring, fixtures, and machinery for heating, lighting, signaling, ventilating, and air-conditioning systems, plumbing, vacuum cleaning systems, incinerator and smoke pipe
71 FR 28464Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · May 15, 2009
Please note that the scoping period will close on June 8, 2009. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
74 FR 22917Energy DepartmentFederal Energy Regulatory CommissionOccupational Radiation Protection
Federal Register · Rule · Aug 11, 2017
The amendment to appendix C corrects the air immersion derived air concentration value for any single radionuclide not listed in the appendix C table with a decay mode other than alpha emission or spontaneous … DOE did not receive any comments on the proposed amendment to this appendix, which remains unchanged in the final rule. B.
82 FR 37512Energy DepartmentFederal Register · Notice · Nov 8, 2004
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … • Decrease in air quality due to emissions from the two new compressor stations as well as increased levels of Hazardous Air Pollutant (formaldehyde) emissions from the existing Amber Compressor Station
69 FR 64748Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 19, 2006
Impacts on air, soil, and water resources (including air quality, surface water impacts, and ground water impacts); 8. Visual impacts; and 9. … Comments on the proposed project may, however, be submitted at any time during the consultation and comment period of the EIS process. Dated: June 13, 2006. Michael S.
71 FR 35266Energy DepartmentWestern Area Power AdministrationFederal Register · Notice · Feb 11, 2009
Please note that the scoping period will close on March 6, 2009. … A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission.
74 FR 6868Energy DepartmentFederal Energy Regulatory CommissionCompliance With Floodplain and Wetland Environmental Review Requirements
Federal Register · Rule · Aug 27, 2003
Publication of the Notice of Proposed Rulemaking began a 60-day public comment period, ending January 17, 2003. … Comments Received and DOE's Responses We have considered and evaluated the comments received during the public comment period.
68 FR 51429Energy DepartmentFederal Register · Notice · Apr 26, 2001
A comment period will be allotted for review if the EA is published. We will consider all comments on the EA before we make our recommendations to the Commission. … This preliminary list of issues may be changed based on your comments and our analysis. The two issues are: • Effects of the increased compression on noise and air quality.
66 FR 20980Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jun 30, 2006
However, comments received during the public comment period will be considered as input in the risk assessment process. … We will provide the Coast Guard with copies of all comments received by the FERC during the scoping period.
71 FR 37564Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 14, 2022
or refuses to act on a certification request within a reasonable period of time, which is one year after the date the certification request was received. … Clean Water Act, 33 U.S.C. 1341(a)(1).
87 FR 22201Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Apr 14, 2022
or refuses to act on a certification request within a reasonable period of time, which is one year after the date the certification request was received. … Clean Water Act, 33 U.S.C. 1341(a)(1).
87 FR 22202Energy DepartmentFederal Energy Regulatory Commission
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.