Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
0.78s
Energy Conservation Program: Test Procedures for Cooking Products
Federal Register · Rule · Dec 16, 2016
30-day comment period does not provide sufficient time for interested parties to comment. … had extended the comment period.
81 FR 91418Energy DepartmentPinnacle West Energy Corporation, et al. Electric Rate and Corporate Regulation Filings
Federal Register · Notice · May 10, 2001
NES states that the NES Facility will employ an innovative technology that will allow NES to “store” electric energy produced in one period for delivery, resale and use during a later period, much as a … NES will maintain the injected air at high pressure until its controlled release through gas-fired turbine generators during peak electric demand periods.
66 FR 23909Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Direct Expansion-Dedicated Outdoor Air Systems
Federal Register · Rule · Jul 27, 2022
Break-in Period 5. Ventilation Energy Recovery Systems 6. Defrost Energy Use for Air-Source Heat Pump 7. Return External Static Pressures 8. … dew point over the average of a time period.
87 FR 45164Energy DepartmentFederal Register · Notice · Jun 6, 2012
According to BSH, a dishwasher equipped with a water softener will minimize pre-rinsing and rewashing, and consumers will have less reason to periodically run their dishwasher through a clean-up cycle. … Timothy Unruh, Acting Deputy Assistant Secretary, Energy Efficiency and Renewable Energy. March 27, 2012 The Honorable Dr. Henry C.
77 FR 33450Energy DepartmentEnergy Efficiency and Renewable Energy OfficeFederal Register · Proposed Rule · Nov 1, 2016
Life-Cycle Cost and Payback Period Analyses H. National Impact Analysis IV. Issues on Which DOE Seeks Public Comment I. … The December 2014 NODA comment period was originally scheduled to close on January 26, 2015.
81 FR 75742Energy DepartmentFederal Register · Rule · Aug 24, 2011
A public comment period of at least 110 days must be provided. 42 U.S.C. 6295(p)(4). … and room air conditioners that, in the commenters' view, would satisfy the EPCA requirements in 42 U.S.C. 6295(o).
76 FR 52852Energy DepartmentUnified Agenda of Federal Regulatory and Deregulatory Actions
Federal Register · Proposed Rule · Jun 9, 2016
Analysis Comment Period End 01/20/15 Withdrawal of NOPD 08/25/15 80 FR 51487 NPRM 03/24/16 81 FR 15836 NPRM Comment Period End 05/23/16 NPRM Comment Period Extended … Preliminary Analysis Comment Period End 02/09/15 Preliminary Analysis Comment Period Extended 01/30/15 80 FR 5052 Preliminary Analysis Comment Period Extended End 02/23/15
81 FR 37288Energy DepartmentFederal Register · Proposed Rule · Nov 24, 2010
DOE analyzed the shipments data provided by ARI during the Framework comment period of the 2009 rulemaking. … After the public meeting, interested parties may submit further comments on the proceedings as well as on any aspect of the rulemaking until the end of the comment period.
75 FR 71596Energy DepartmentFederal Register · Proposed Rule · Feb 22, 2013
After the public meeting and the close of the comment period on the framework document, DOE will collect data, conduct the analyses as discussed in the framework document and at the public meeting, and … DOE actively encourages participation and interaction of the public during the comment period in each stage of the rulemaking process.
78 FR 12252Energy DepartmentFederal Register · Notice · May 27, 2026
The condenser-side condensate pan must be dry during performance measurement test periods. 3.1.8. … The condenser-side condensate pan must be dry during performance measurement test periods. 3.1.8.
91 FR 31435Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Microwave Ovens
Federal Register · Proposed Rule · Aug 24, 2022
As stated previously, DOE requested comment on the analytical approach taken in the August 2021 NOPD and provided stakeholders with a 60-day comment period. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (D.C.). (42 U.S.C. 7651 et seq. ) SO 2 emissions
87 FR 52282Energy DepartmentDistrigas of Massachusetts Corporation; Notice of Application
Federal Register · Notice · Feb 16, 2000
DOMAC further requests that the limited-term certificate be granted for a period through March 31, 2000, the end of the winter heating season. … The additional air injection equipment, which consists of two natural gas-fired, truck-mounted air compressors and appurtentant facilities for air stabilization, is said to be necessary to permit more
65 FR 7861Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Oct 27, 2016
DOE is amending its energy conservation standards for central air conditioners pursuant to 42 U.S.C. 6295(m)(1), which requires DOE to periodically review its already established energy conservation standards … As DOE's last final rule for residential central air conditioners and heat pumps energy conservation standards was issued on June 27, 2011, DOE must act by June 27, 2017.
81 FR 74727Energy DepartmentMulti-Agency Radiation Survey and Site Investigation Manual, Revision 1
Federal Register · Notice · Oct 18, 2000
Members of the public are invited to submit written comments to EITHER the U.S. Environmental Protection Agency, ATTN: Air and Radiation Docket, Mail Stop 6102, Air Docket No. … Copies of all comments received by one agency will be periodically copies and sent to the others.
65 FR 62532Defense DepartmentEnergy DepartmentFederal Register · Notice · Apr 29, 2009
DOE will address these comments, as well as those submitted during the public comment period for this Amended NOI, in the Abengoa Biorefinery EIS. … Local and regional air quality: changes in air quality. 6.
74 FR 19543Energy DepartmentFederal Register · Notice · Jun 24, 2011
Department of the Air Force and the U.S. … This list is presented to facilitate public comment during the scoping period and will be revisited as DOE/NNSA considers all scoping comments.
76 FR 37100Energy DepartmentFederal Register · Notice · Jan 22, 2025
The EA may be issued for an allotted public comment period. The Commission would consider timely comments on the EA before making its decision regarding the proposed project. … Commission staff will consider all timely comments received during the comment period on the draft EIS and revise the document, as necessary, before issuing a final EIS.
90 FR 7682Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Air Cleaners
Federal Register · Proposed Rule · Oct 31, 2022
After the webinar and until the end of the comment period, interested parties may submit further comments on the proceedings and any aspect of the rulemaking. … After the closing of the comment period, DOE will consider all timely-submitted comments and additional information obtained from interested parties, as well as information obtained through further analyses
87 FR 65533Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Ceiling Fans
Federal Register · Proposed Rule · Jun 3, 2021
DOE received a request from the Air Movement and Control Association (AMCA) and the American Light Association (ALA) for a comment period extension of 45 additional days. … On May 19, 2021, interested parties in the matter the Air Movement and Control Association (AMCA) and the American Light Association (ALA) jointly requested an extension of the comment period extension
86 FR 29704Energy DepartmentFederal Register · Proposed Rule · Nov 23, 2021
Life-Cycle Cost and Payback Period Analysis 2. Manufacturer Impact Analysis III. Submission of Comments I. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
86 FR 66465Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.