Documents
Briefs, oral arguments, agency decisions and the Federal Register.
10,000+ results
1.53s
Federal Register · Proposed Rule · Feb 23, 2010
Life-Cycle Cost and Payback Period Analyses E. National Impact Analysis I. … After the public meeting and the expiration of the period for submitting written statements, the Department will consider all comments and additional information that is obtained from interested parties
75 FR 7987Energy DepartmentFederal Register · Proposed Rule · Feb 4, 2013
and has post-purge period(s) of less than 5 seconds. … After the public meeting, interested parties may submit further comments on the proceedings, as well as on any aspect of the rulemaking, until the end of the comment period.
78 FR 7681Energy DepartmentFederal Register · Rule · Oct 27, 2006
Baker Botts and INGAA call attention to difficulties that may be presented by compelling a project sponsor to file a permit under the Clean Air Act contemporaneously with an NGA section 3 or 7 application … (CZMA) consistency determination or a water quality certification under section 401 of the Clean Water Act (CWA).
71 FR 62912Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Oct 31, 2014
Adverse Comments Under EPCA, the Secretary shall withdraw a DFR no later than 120 days after publication (110 days for comment submittal, 10 days for comment review period) if (1) “the Secretary receives … After the close of the comment period, DOE will begin collecting data and reviewing the public comments.
79 FR 64705Energy DepartmentFederal Register · Notice · Aug 8, 2005
Army Corps of Engineers (COE) is participating as a cooperating agency in the preparation of the EIS because the project would require permits pursuant to section 404 of the Clean Water Act (33 United … States Code (U.S.C.) 1344) and section 10 of the Rivers and Harbors Act (33 U.S.C. 403).
70 FR 45717Energy DepartmentFederal Energy Regulatory CommissionEnergy Conservation Program: Test Procedure for Portable Electric Spas
Federal Register · Rule · Jun 13, 2023
This ambient temperature requirement applies to each individual ambient air temperature measurement taken for the duration of the stabilization period and test period, as proposed in the October 2022 NOPR … This requirement applies to each individual ambient air temperature measurement taken for the duration of the stabilization period and test period. 3.2.2.
88 FR 38600Energy DepartmentFederal Register · Proposed Rule · Jun 30, 2022
rather than the test load, allowing for more internal air to exchange with warm ambient air during the test procedure's door opening period. … reduced efficiency compared to a clean coil.
87 FR 39164Energy DepartmentFinding of No Significant Impact; Energy Conservation Program for Consumer Products
Federal Register · Notice · Jan 12, 2001
SUMMARY: The Energy Policy and Conservation Act, as amended by the National Energy Conservation Policy Act and the National Appliance Energy Conservation Act, and the National Appliance Energy Conservation … Because emissions of SO 2 from power plants are capped by clean air legislation, physical emissions of this pollutant from electricity generation will be only minimally affected by possible clothes
66 FR 3334Energy DepartmentEnergy Efficiency and Renewable Energy OfficeUnified Agenda of Federal Regulatory and Deregulatory Actions
Federal Register · Proposed Rule · Aug 24, 2017
Period End 08/01/16 NPRM Comment Period Reopened 08/05/16 81 FR 51812 Comment Period End 08/30/16 Notice of Data Availability (NODA) 12/23/16 81 FR 94234 Comment Period … FR 8022 NPRM Comment Period Reopened End 02/29/16 2nd NPRM Comment Period Reopened 03/07/16 81 FR 11686 2nd NPRM Comment Period Reopened End 03/14/16 3rd NPRM Comment Period
82 FR 40269Energy DepartmentFederal Register · Proposed Rule · Sep 15, 2020
Trane commented generally about the cumulative regulatory burden that manufacturers face, stressing that increased Federal efficiency standards for air-cooled commercial unitary air conditioners (“ACUACs … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
85 FR 57149Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Consumer Clothes Dryers
Federal Register · Proposed Rule · Aug 23, 2022
DOE provided a 45-day comment period for the RFI. Id. … Title IV of the Clean Air Act sets an annual emissions cap on SO 2 for affected EGUs in the 48 contiguous States and the District of Columbia (“DC”). (42 U.S.C. 7651 et seq. ) SO 2 emissions
87 FR 51734Energy DepartmentEnergy Conservation Program: Energy Conservation Standards for Consumer Furnaces
Federal Register · Proposed Rule · Jan 28, 2022
Life-Cycle Cost and Payback Period Analysis 2. Manufacturer Impact Analysis III. Submission of Comments I. Introduction A. … After the close of the comment period, DOE will review the public comments received and may begin collecting data and conducting the analyses discussed in this document.
87 FR 4513Energy DepartmentFederal Register · Proposed Rule · May 8, 2015
After the close of the comment period, DOE will begin collecting data, conducting the analyses, and reviewing the public comments. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of the rulemaking process.
80 FR 26475Energy DepartmentFederal Register · Notice · Oct 7, 2024
These products include air cleaners, the subject of this document. (42 U.S.C. 6292(a)(20)) 1 All references to EPCA in this document refer to the statute as amended through the Energy Act of 2020 … manufacturer if DOE finds that the annual gross revenues of such manufacturer from all its operations (including the manufacture and sale of covered products) does not exceed $8,000,000 for the 12-month period
89 FR 81059Energy DepartmentEnergy Conservation Program: Test Procedures for Cooking Products
Federal Register · Proposed Rule · Aug 22, 2016
Review under the Regulatory Flexibility Act C. Review Under the Paperwork Reduction Act of 1995 D. Review Under the National Environmental Policy Act of 1969 E. … 2.5.1 Active mode ambient room air temperature.
81 FR 57374Energy DepartmentFederal Register · Notice · Jun 10, 2019
Other components of the recycle wastewater include process samples, sample line flushes, sump flushes, and cleaning solutions from the decontamination and filter dissolution processes. … • Impacts of emissions on air and water quality, including impacts of greenhouse gas emissions. • Impacts on ecological systems and threatened and endangered species.
84 FR 26847Energy DepartmentProduction Incentives for Cellulosic Biofuels; Reverse Auction Procedures and Standards
Federal Register · Rule · Oct 15, 2009
Discussion of Comments and Modifications of Proposed Rule A. Comments of Dupont Danisco Cellulosic Ethanol, LLC B. Energy Independence and Security Act of 2007 C. Heating Value D. … L. 110-140 (December 19, 2007) (EISA), directs the Administrator of the Environmental Protection Agency (EPA) to revise that agency's regulations implementing section 211(o)(1) of the Clean Air Act, 42
74 FR 52867Energy DepartmentEnergy Efficiency and Renewable Energy OfficeElectric Transmission Incentives Policy Under Section 219 of the Federal Power Act
Federal Register · Proposed Rule · Apr 26, 2021
Regulatory Flexibility Act 24 VII. Comment Procedures 25 VIII. Document Availability 26 I. Introduction 1. … Regulatory Flexibility Act 37.
86 FR 21972Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Notice · Jan 27, 2025
Comment Date: 5 p.m. ET 2/7/25. Docket Numbers: ER25-973-000. Applicants: RWE Clean Energy Development, LLC. … Description: Request for Limited Waiver, Shortened Comment Period, and Expedited Consideration of RWE Clean Energy Development, LLC. Filed Date: 1/17/25.
90 FR 8207Energy DepartmentFederal Energy Regulatory CommissionFederal Register · Proposed Rule · Jul 20, 2018
Paragraph (c) of 10 CFR 431.96 provides the method for an optional break-in period. … DOE actively encourages the participation and interaction of the public during the comment period in each stage of this process.
83 FR 34499Energy Department
Ask Donna what matters in the record.
She can read the source against your case and show you exactly where the answer came from.