Air Pollution Control
Title V Permit to Operate
Statement of Basis for Permit No V-SUIT-0027-2022.00
February 1, 2023
Harvest Four Corners, LLC
Ignacio Gas Plant
Southern Ute Indian Reservation
La Plata County, Colorado
1. Facility Information
a. Location
The Ignacio Gas Plant, owned and operated by Harvest Four Corners, LLC (Harvest), is located within the
exterior boundary of the Southern Ute Indian Reservation. The exact location is SE ¼ Section 35, SW ¼
Section 36, T34N, R9W, in La Plata County, at latitude North 37.145278 and longitude West -107.784444.
The Mailing address is:
Harvest Four Corners, LLC
Ignacio Gas Plant
3746 County Road 307
Durango, CO 81303
b. Contacts
Facility Contact:
Oakley Hayes
Environmental Specialist
Harvest Four Corners, LLC
3746 County Road 307
Durango, CO 81303
505-632-4421
Responsible Official:
Travis Jones
EH&S Manager
Harvest Four Corners , LLC
1755 Arroyo Drive
Bloomfield, NM 87413
713-289-2630
c. Description of Operations
The Ignacio Gas Plant provides compression, dehydration, sweetening, and natural gas liquids (NGL)
recovery for the San Juan Gathering Systems, an approximately 5,300 mile pipeline system gathering gas
from the San Juan Basin. The San Juan Basin spans the southwest corner of Colorado and the northwest
corner of New Mexico.
The Ignacio Gas Plant has the ability to condition approximately 500 to 650 million standard cubic feet
(MMscfd) of field gas per day into saleable NGL and residue gas. The primary plant operations include
inlet compression, dehydration, carbon dioxide removal, NGL removal, fractionation, and storage.
There are two primary incoming pipelines to the plant, Trunk S and Trunk C:
1
•
The 30” Trunk S line from the San Juan Basin area of primarily New Mexico brings hydrocarbon liquidrich gas for processing. In July 2011, the Four Corners Area Consolidation Project was approved for
construction of a pipeline (S-87 lateral) from the Dogie Compressor Station to Trunk S. The Trunk S
line now transfers what were historically Lybrook Gas Plant volumes to the Ignacio Gas Plant. A filter
separator and slug catcher recover free liquids from the inlet stream, which serves to protect the
compressor turbines from foreign material and free liquids.
•
The 16” Trunk C pipeline brings in gas with a lower content of recoverable hydrocarbon liquids that
contains about 6% carbon dioxide. The Trunk C gas is treated or blended with the cryogenic process
reside stream for the entire outlet stream to meet interstate pipeline quality specifications. The gas may
also be processed in the amine treater and/or cryogenic plant if necessary to achieve interstate pipeline
gas quality specifications.
The facility includes a Turbo-Expander Plant [cryogenic] nominally rated at 450 MMscfd and one NGL
fractionation plant. The present total gas throughput averages close to 500 MMscfd. Approximately 380
MMscfd is natural gas from the Trunk S inlet that is processed in the cryogenic plant. About 90 MMscfd is
Trunk C inlet gas that is dehydrated, and then normally bypasses other plant processes including amine
treatment and the cryogenic plant.
Primary plant operations include inlet compression turbines, the east glycol dehydration unit, the amine
plant, the west glycol dehydration unit, the molecular sieve dehydrator, the turbo-expander plant (cryogenic
removal of NGL), the fractionation plant, and recompression. The plant operations are described below.
Inlet Compression
Inlet compression at the facility is accomplished through an arrangement of compressors driven by
stationary natural gas turbines. The inlet compression turbines include one (1) Solar Titan 130 natural gasfired turbine (Trunk S), one (1) Solar Mars 100 natural gas-fired turbine (Trunk S), and one (1) Solar Taurus
70 natural gas-fired turbine (Trunk C) equipped with a heat recovery steam generator (HRSG).
Dehydration
Dehydration of Trunk C field gas is accomplished at the East Dehydrator. The East Dehydrator is equipped
with a natural gas-fired reboiler rated at 0.75 million British thermal units per hour (MMBtu/hr). The East
dehydration unit regenerator vent gas is routed to the Callidus Thermal Oxidizer for emission control.
Applicable emission limits and operating requirements for the Callidus Thermal Oxidizer (ThOx) are
dictated by Prevention of Significant Deterioration (PSD) Permit No. PSD-SU-00027-01.00, issued
December 22, 2010.
Initial dehydration of Trunk S field gas is accomplished at the West Dehydrator, which removes excess
moisture to decrease the burden on the downstream molecular sieve dehydrator. The West Dehydrator is
equipped with a steam-heated glycol reboiler. The regenerator vent hydrocarbon slip emissions are
controlled by the Plant Flare. Emission limits and operating requirements in PSD-SU-00027-01.00 issued
December 22, 2010 may be applicable.
2
The molecular sieve dehydrator consists of four beds. The mole sieve beds are cycled such that three of the
beds are operating while the fourth bed undergoes regeneration. Regeneration is accomplished by a natural
gas-fired regeneration gas heater which is designated at 18.5 MMBtu/hr. The standby regeneration gas
heater, which is also natural gas fired, is design-rated at 13.02 MMBtu/hr.
Carbon Dioxide Removal
Carbon dioxide removal occurs within the Amine Treatment System. Therefore, the amine reboiler utilizes
heat from plant steam, it is not a source of combustion emissions. However, hydrocarbons are released from
the process during amine regeneration. The entrained hydrocarbons in the vent stream are controlled by
combustion in the ThOx. Emission limits and operating requirements in permit PSD-SU-00027-01.00
issued December 22, 2010 are applicable.
NGL Removal, Fractionation and Storage
At the Turbo-Expander Plant, the demethanizer separates methane from the NGL. The NGL is then
sequentially separated into ethane, propane, butane and natural gasoline at the Fractionation Plant. Variation
in fractionation operations can occur based on market conditions. The demethanizer, deethanizer,
depropanizer, and debutanizer reboilers utilize plant steam.
The facility is equipped with 25 storage tanks of various types and capacities. Storage facilities are located
within the facility and include:
Product
Y-Grade Bullets
Propane Bullets
Butane Spheres
Natural Gasoline Spheres
Condensate Bullets
LNG Bullet
LNG Bullet
Propane Bullet
Condensate Bullet
No. of Vessels
5
10
2
2
2
1
1
1
1
Vessel Size (Gallons)
25,200
42,000
260,232
214,900
41,581
38,500
55,000
90,000
90,000
Pressure Rating (psig)
700
250
85
30
85
185
90
240
240
Loading of NGL
NGL are transported off-site via pipelines and tanker trucks. “Y-grade” (demethanized mix of NGL
composition of which depends on a number of plant operating variables), is transported off-site via a NGL
pipeline. The loading of the remaining NGL occurs through loading racks - two (2)-propane loading racks,
one (l)-butane loading rack, two (2)-natural gasoline loading racks, and one (1) liquified natural gas (LNG)
loading rack. These liquids can also be sent to pipeline when excess at the plant is available.
Re-Compression
The methane stream leaving the Turbo-Expander Plant (TXP) is recompressed by two (2) Solar Titan 130
natural gas-fired turbine driven compressors equipped with HRSGs.
3
Utilities
The following combustion sources at the Ignacio Plant are equipped with waste heat recovery units:
•
Trunk C Inlet - Solar Taurus 70 natural gas-fired turbine
•
Recompression - Two (2)-Solar Titan 130 natural gas-fired turbines
•
The Thermal Oxidizer
These waste heat recovery units provide the Ignacio Plant with high pressure steam (600 psig) to drive a
steam turbine generator set to produce plant electricity, as well as low pressure steam (60 psig).
Supplemental low pressure steam is produced by the Vogt CL.VV-22.5 boilers. These units generally
operate only when the recompressors are not in operation. The plant includes a two-cell cooling tower.
The following combustion sources located at the La Plata B Compressor Station provide steam for the
Ignacio Gas Plant, and are included in the facility’s Title V permit:
•
Two (2) Deltak Delta 3S6-347 boilers
Emission Control Equipment
Emissions of volatile organic compounds (VOC) may be released from various process units, storage tanks
and leaking components. Such releases occur throughout the plant and may be controlled or uncontrolled
(fugitive). Controlled releases are collected and routed through a header to the smokeless flare or the flash
gas system.
Releases from the following sources are controlled through the flare system:
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
Inlet separator (Trunk C)
Inlet Gas Cooler
West Dehydration Unit
Fuel Gas Line and Filter
Various Process Scrubbers and Blow Down Vents
Booster Compressor CG-8104 Suction Line (TXP)
Deethanizer Reflux Condenser, Overhead Off Gas, Reflux Accumulator, Reboiler and Feed Pre-Heater
Depropanizer and Depropanizer Reflux Accumulator
Debutanizer, Debutanizer Reflux Pumps and Accumulator
Ethane/Propane Product Accumulator
Vent from Y-Grade Storage
Propane Storage and Loading
Butane Storage and Loading
Natural Gasoline Loading and Storage
Condensate Storage
Closed Drain System
4
•
•
Chromatography Vent
Emergency Releases
The Flash Gas System takes various streams for re-compression by two electric driven reciprocating
compressors prior to being sent to the facility inlet for re-processing. The flash gas system controls
emissions from the following sources:
•
•
•
West glycol dehydrator flash tank
Amine Treatment flash tank
LNG flashing
The Thermal Oxidizer operated at the Ignacio Gas Plant is a Callidus Technologies unit, installed in 1999
and equipped with a forced draft combustion air blower and vent stack. The Thermal Oxidizer controls
emissions from the East Dehydration Unit and the Amine Treatment System. Applicable Thermal Oxidizer
emission limits and operating requirements are set by the PSD permit PSD-SU-00027-01.00 issued
December 22, 2010.
The uncontrolled releases of VOC are minimized through the implementation of a Leak Detection and
Repair (LDAR) program.
d. List of All Units and Emission-Generating Activities
Harvest provided the information contained in Tables 1 and 2 in its part 70 permit renewal application.
Table 1 lists emission units and emission generating activities, including any air pollution control devices.
Emission units identified as “insignificant” emitting units (IEUs) are listed separately in Table 2.
Table 1 – Emission Units
Emission
Unit ID
Control
Equipment
Description
C.E. Natco MN620740009020 Molecular Sieve Regeneration Heater
18.5 MMBtu/hr
12
Serial No.
IJ052
Install Date:
1/1/1984
Struthers IF – 10 Back-Up Molecular Sieve Regeneration Heater
13.02 MMBtu/hr
12a
Serial No.
NM085347/M050102
Install Date:
None
None
1/1/1984
Vogt CL. VV – 22.5 Industrial Boiler
18.0 MMBtu/hr
13
14
Serial No.
1425
Install Date:
1426
5
1/1/1956
1/1/1956
None
Sivalls 500 MMscfd TEG Dehydrator Regenerator (West), 3.0 (Steam Heat)
MMBtu/hr Glycol Regenerator Reboiler
15
Serial No.
26461
Install Date:
1992
Sivalls 120 MMscfd SB – 18-18H TEG Dehydrator Regenerator (East) 0.75
MMBtu/hr Natural Gas – Fired Glycol Regenerator Reboiler
16
Serial No.
9004-174
Install Date:
1/1/1991
Thermal Oxidizer
(Emission Unit
22)
1/1/1984
Thermal Oxidizer
(Emission Unit
22)
Amine Unit Regenerator Vent
17
Serial No.
N/A
Install Date:
Plant Flare
(Emission Unit
23)
Piping Component Fugitives: pumps, pressure relief devices, open ended
valve lines, compressors, and flanges or other connectors that are in VOC or
wet gas service
18
19
N/A
Serial No.
20
N/A
Install Date:
N/A
Pre-1971
2011 Enhanced
LDAR
1984 / PSD
LDAR Program
1998 NSPS
KKK
LDAR Program
Natural Gas Liquids Loadout System (one pipeline and five loading racks)
21
Serial No.
N/A
Install Date:
Pre-1972
Callidus Technologies 203313-00 Thermal Oxidizer
22
Serial No.
203313-000
Install Date:
1/1/1999
Zecco Plant Flare
23
Serial No.
17790
Install Date:
2009
Fluor Company Cooling Tower
24
Serial No.
N/A
Install Date:
1/1/1956
Waukesha H866D Diesel Fired Water Pump Engine
384 Nameplate Rated Horsepower
25
Serial No.
909602
Install Date:
6
Plant Flare
(Emission Unit
23)
None
None
None
None
1/1/1978
Caterpillar 4W-3798 Diesel Fired Water Pump Engine
305 Nameplate Rated Horsepower
26
Serial No.
6TB04260
Install Date:
None
1/1/1985
Solar Mars 100 Natural Gas Fired Turbine (Trunk S)
27
Serial No.
OHK19-M3865
Install Date:
2/1/2013
SoLoNOx
Solar Titan 130 Natural Gas Fired Turbine
28
30
OHB19-L6137
Serial No.
31
OHC22-L2539
Install Date:
OHC22-L0090
2/1/2013
SoLoNOx
4/29/2022
SoLoNOx
3/28/2022
SoLoNOx
Solar Taurus 70 Natural Gas Fired Turbine (Trunk C)
29
Serial No.
OHH21-B0605
Install Date:
9/29/2021
SoLoNOx
Horton 42,000 Gallon Produced Water Storage Tank
32
33
Serial No.
N/A
Install Date:
N/A
1956
None
1956
None
Deltak Delta 3S6-347 Natural Gas Fired Waste Heat Recovery Boiler
29 MMBtu/hr
B001
B002
Serial No.
G92001A
Install Date:
G92001B
1992
None
1992
None
1984
None
1984
None
General Electric M3142J A/T Natural Gas Fired Turbine
*10
*11
Serial No.
282514
Install Date:
282515
*According to Harvest, these units have been permanently removed from the facility. However, these units remain listed in the Part
70 permit as they are still listed in the PSD permit for this facility.
The Southern Ute Indian Tribe/State of Colorado Environmental Commission’s Reservation Air Code
allows sources to separately list in the permit application units or activities that qualify as “insignificant”
7
based on potential emissions below 2 tpy for all regulated pollutants that are not listed as hazardous air
pollutants (HAPs) under Section 112(b) of the Clean Air Act (CAA) and below 1,000 lbs per year or the de
minimis level established under Section 112(g), whichever is lower, for HAP emissions
[RAC 2-106(4)(f); RAC 1-103(36) and (37)]. However, the application may not omit information needed
to determine the applicability of, or to impose, any applicable requirement, or to calculate the fee
[RAC 2-106(4)(f)]. Units that qualify as “insignificant” for the purposes of the Part 70 application are in
no way exempt from applicable requirements or any requirements of the Part 70 permit.
Harvest stated in its Part 70 permit renewal application that the emission units in Table 2, below, are
insignificant. Harvest provided sufficient information, including EPA Tanks 4.0.9d calculations, to verify
any emissions from liquids in the tanks were insignificant. This data supports Harvest’s claim that these
units qualify as insignificant.
Table 2 – Insignificant Emission Units
Emission
Amount
Unit ID
N/A
2
N/A
1
N/A
N/A
N/A
N/A
TK1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
1
1
1
1
1
1
2
2
1
1
1
2
5
10
1
1
1
Description
Size
Units
Lube oil storage tank
Diesel tank (river water pump building & fire water pump
generators)
Diesel tank (river water pump building & fire water pump
generators)
Spent lube oil storage tank
Lube oil storage tank
Diesel storage tank
Diesel storage tank
Gasoline storage tank
Petroleum solvent storage tank
Lube oil storage tank
Spent lube oil storage tank
Turbine 32 oil storage tank
Natural gasoline sphere – 30 psig
Natural gas liquid rundown pressurized tank – 85 psig
Recovery oil tank (T9103)
Recovery oil tank (T9104)
Ambitrol storage tank
Butane sphere – 85 psig
Y-Grade bullet – 700 psig
Propane bullet – 250 psig
Sulfuric acid storage tank
Sulfuric acid storage tank
TEG storage tank
2,060
gal
290
gal
322
gal
33,694
11,653
517
1,028
582
509
6,300
2,000
8,820
214,924
41,581
504
500
748
260,232
22,321
40,805
4,200
294
2,910
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
8
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
1
2
1
1
1
1
1
1
1
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
2
1
1
3
Raw water storage tank (West tank)
Raw water storage tank (East tank)
Optisphere HP55441 tank
Ambitrol storage tank
DI water storage tank
Raw water storage tank
Salt water storage tank
Depositrol PY5206 tank
Biomate MBC2881 tank
Cooling tower blend tank
Klaraid IC1172 tank
Cortol OS2001 tank
Steammate NA0120 tank
Gas spec (amine) storage tank – 1 fresh, 1 mixed, and 1
regenerated
Gas Spec (amine) storage tank
Gas spec (amine) storage tank
Methanol storage tank
Turbine 32 oil storage tank
Gengard GN7110 tank
Bleach tank
Waste oil tank
TEG storage tank
Turbine 32 oil storage tank (steam turbine)
Klaraid IC1172 tank
Polyfloc AE1115 tank (inside clear water building)
Diesel storage tank
LNG pressurized bullet – 185 psig
LNG pressurized bullet – 90 psig
Waste water frac tank
Slop oil tank
Odorant storage tank
Propane bullet – 240 psig
Condensate bullet – 240 psig
Sodium Hydroxide tank
Lube oil storage tank
Lube oil storage tank
Lube oil/water storage tank
Sodium Hydroxide tank
9
215,904
200,000
400
2,300
215,977
21,000
4,300
400
55
2,970
400
400
400
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
16,800
gal
4,200
20,000
24,240
300
550
330
630
719
850
500
120
564
38,513
55,000
16,800
4,200
796
90,000
90,000
35
6,300
2,000
1,000
300
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
gal
e. Facility Construction and/or Permitting History
The Ignacio Gas Plant began initial construction in 1956. The plant had additional construction between
1957 and the present.
1984 EPA Issued a PSD Permit for Two Natural Gas Fired Turbines
In July 1983, Northwest Pipeline (previous owners of the gas plant) submitted a Prevention of Significant
Deterioration (PSD) permit application to the EPA to replace the Gasoline Plant Oil Absorption Process
with a more efficient Cryogenic Turbo-Expansion Process. The Turbo-Expansion Process increased the
recovery of liquids from 156,000 to 692,000 gallons per day and recovered a greater level of propane and
ethane. The construction for this new Turbo-Expansion Process included a Turbo-Expansion Unit, Amine
Treatment System, and two natural gas-fired turbines. However, the PSD application for this modification
only discussed the two natural gas-fired turbines and potential NOx emission. According to the applicant,
the VOC emissions from the Amine Treatment System were insignificant. The application stated that all
other pollutants were below significant emission rates for major modification and not subject to PSD
review. On February 24, 1984, the EPA issued a PSD permit approving controlled NOx emissions from the
two turbines.
1986 EPA approval of the Colorado Department of Health and Environment (CDPHE) PSD
Permitting Program
In 1986, the EPA approved CDPHE’s State Implementation Plan (SIP) for the implementation of the PSD
Permitting Program and the attainment and maintenance of National Ambient Air Quality Standards,
pursuant to 40 CFR 52.343. In approving the SIP, the EPA did not delegate, but rather reserved to the EPA
as a federal program, PSD permitting authority with respect to sources on Indian lands and Reservations,
and further stated in 51 FR 31325 (September 2, 1986) that the EPA’s PSD regulations will also remain in
effect for sources located on Indian Reservations and for sources that have received earlier PSD permits
from the EPA.
However, there was an ongoing disagreement between the CDPHE, the EPA, and the Southern Ute Indian
Tribe regarding who had jurisdiction over air pollution sources located on fee lands; the Ignacio Gas Plant
is located on fee lands. Fee lands are defined as lands located within the exterior boundaries of the
reservation but are privately owned (by either Indians or non-Indians), nonpublic lands. During the
resolution of this dispute, CDPHE continued to issue pre-construction permits to the Ignacio Gas Plant.
1991 Construction of the East Glycol Dehydration Unit – No Permit Issued
In March 1991, Williams Field Services installed and began operation of an East Dehydrator. VOC
emissions were thought by the State to be insignificant at that time. In 1992, a notice submitted to the State
of Colorado indicated that the VOC emissions from the East Dehydrator were 25 tons/year, below the 40
ton/year significant level for PSD. The VOC emissions from the East Dehydrator were uncontrolled, vented
10
directly to the atmosphere. The EPA Region 8 was not notified by Williams about the construction of the
dehydrator.
1992 Construction of the West Glycol Dehydration Unit – No Permit Issued
In November 1992, the West Dehydrator was added to the facility. Again, VOC emissions were thought by
the State to be insignificant at that time. The EPA Region 8 was not notified by Williams about the
construction of the dehydrator.
1997 Construction Permit for East Glycol Dehydration and West Glycol Dehydration Unit (CDPHE
Issued - #96-LP-506 and #96-LP-505, respectively)
On August 31, 1995 construction permit applications for the East and West Dehydrators were sent to
CDPHE. In 1997, CDPHE issued both construction permits. The permit for the West Dehydration Unit
required that VOC emissions be controlled by a flare. The permit for the East Dehydration Unit required
that VOC emissions be controlled by a thermal oxidizer.
1998 Construction Permit for the Amine Treatment System and Turbo-Expansion Unit Fugitive
Emissions (CDPHE Issued - #97-LP-0315 & #97-LP-0316)
In March 1996, CDPHE received a permit modification request from Williams that indicated the Ignacio
Gas Plant’s amine regeneration unit built in 1984 emits approximately 995 tpy of VOC emissions. On July
18, 1996, CDPHE notified Williams that these were previous unreported emissions that may have triggered
PSD requirements during the modification in 1984 and requested additional information. On January 27,
1997, Williams provided CDPHE with a summary of annual VOC emissions from the Amine Treatment
System, turbines and Turbo-Expansion Unit. The VOC emissions were determined by the State to be
significant, verifying that Williams should have gone through PSD review for VOCs in addition to the PSD
review for NOx that was conducted in 1984.
CDPHE issued construction permits 97-LP-0315 and 97-LP-0316 which defined requirements for the
Amine Treatment System and the fugitive emissions from the Turbo-Expansion Unit. The permits required
that VOC emissions from the Amine Treatment System be controlled by a thermal oxidizer and a leak
detection and repair program as stringent as that found in 40 CFR Part 60, Subpart KKK be developed and
implemented for the fugitive emissions from the Turbo-Expansion Unit.
August 17, 1999 – the EPA determines La Plata A Compressor Station, La Plata B Compressor
Station, and Ignacio Gas Plant are single stationary source.
Northwest Pipeline Corporation’s La Plata B Compressor Station, Transwestern Pipeline Company’s La
Plata A Compressor Station, and Williams Field Services Ignacio Gas Plant are all owned by the same
parent company, Williams Company, and thus are under common control. Additionally, the three sources
are located on adjacent properties and possess the same two-digit SIC code. Therefore, the three sources
are a single stationary source for Title V and PSD permitting purposes.
11
March 28, 2001, Consent Decree (CD) Entered into the United States District Court
Civil Action No. 01-S-0113: The EPA determined that the Turbo-Expansion Unit and the Amine Treatment
System constructed in 1984 should have been subject to PSD review for VOC emissions. On February 8,
2001, the EPA published a Notice of Lodging of Consent Decree under the Clean Air Act (66 FR 9597).
The CD was entered in the United States District Court on Denver, Colorado on March 28, 2001. The CD
required that Williams meet emission standards and other terms and conditions set forth on the CD
regarding emissions of VOCs until such time that a PSD permit has been issued by the EPA or other duly
authorized State or Tribal agency or commission to which the EPA has delegated Federal PSD permitting
authority. The CD required that Williams submit a PSD application to the EPA no later than 30 days after
the effective date of the CD.
May 22, 2001, PSD application submitted by Williams as required by Consent Decree
January 18, 2002, PSD application submitted by Williams as required by Consent Decree
April 22, 2002, Consent Decree Entered into the United States District Court
Civil Action No. 02-B-0199: The EPA determined that the East and West Dehydrators constructed in 1991
and 1992, respectively, should have been subject to PSD review for VOC emissions. On March 11, 2002,
the EPA published a Notice of Lodging of Consent Decree under the Clean Air Act (67 FR 10933). The
CD was entered in the United States District Court on Denver, Colorado on April 22, 2002. The CD required
that Williams meet emission standards and other terms and conditions set forth on the CD regarding
emissions of VOCs until such time that a PSD permit has been issued by the EPA or other duly authorized
State or Tribal agency or commission to which the EPA has delegated Federal PSD permitting authority.
The CD required that Williams submit a PSD application to the EPA no later than 30 days after the effective
date of the CD.
September 15, 2003, amended application to modify SO2 and VOC emission limits in PSD and Title
V applications submitted by Williams
November 19, 2003, EPA issued the initial Part 71 operating permit for Ignacio Gas Plant
April 4, 2008, Part 71 renewal application submitted by Williams
December 22, 2010, PSD Permit #PSD-SU-0027-01.00 was issued to Williams to incorporate all
requirements from the 1984 PSD permit and the two Consent Decrees
November 1, 2011, Consent Decree Entered into the United States District Court
Civil Action No. 1:11-cv-02846: The EPA determined that Williams failed to timely repair four leaks at the
Ignacio Gas Plant in violation of the New Source Performance Standard at 40 CFR Part 60, Subpart KKK.
12
On November 1, 2011, the EPA published a notice of Lodging of Consent Decree under the CAA. This
Consent Decree, effective on December 15, 2011, required Williams to implement an enhanced leak
detection and repair program at the Ignacio Gas Plant service using optical gas imaging, for a period of five
years from the effective date of the Consent Decree. The affected sources are the components in Williams’
current New Source Performance Standards KKK leak detection and repair program as well as previously
grandfathered components in VOC and wet gas service.
January 28, 2013, EPA issued the renewal Part 71 operating permit for Ignacio Gas Plant
June 5, 2017, SUIT issued an initial Part 70 operating permit (V-SUIT 0027-2017.00) to Williams
Four Corners, LLC for the Ignacio Gas Plant, replacing V-SU-00027-2008.00.
December 7, 2018, SUIT issued an administrative permit revision (V-SUIT-0027-2017.01) to change
the facility ownership from Williams Four Corners, LLC to Harvest Four Corners, LLC.
November 23, 2020, SUIT issued an administrative permit revision (V-SUIT-0027-2017.02) to correct
emission unit IDs and the CAM plan.
November 15, 2021, SUIT issued a significant permit revision (V-SUIT-0027-2017.03) to incorporate
emission units and reclassify the facility from a major source to an area source of HAPs.
February 1, 2023, SUIT issued a renewal Part 70 operating permit for the Ignacio Gas Plant.
f. Potential to Emit
Under RAC 1-103(51), potential to emit (PTE) is defined as the maximum capacity of a stationary source
to emit a pollutant under its physical and operational design. Any physical or operational limitation on the
capacity of the source to emit a pollutant, including air pollution control equipment and restrictions on hours
of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part
of its design if the limitation, or the effect it would have on emissions, is federally enforceable.
The PTE for Ignacio Gas Plant was listed by Harvest in Forms “GIS”, “PTE”, and the various forms
“EMISS” of the Part 70 operating permit renewal application. Table 3 shows PTE data broken down by
each individual emission unit, as well as the total facility-wide PTE.
13
Table 3 - Potential to Emit
Harvest Four Corners LLC, Ignacio Gas Plant
Regulated Air Pollutants in tons per year (with required controls)
Emission
Unit ID
NOX
VOC
SO2
PM10
CO
Lead
Total
HAPs
Largest
Single
HAP
(Hexane)
12
11.4
0.4
0.1
0.6
6.7
0.0
0.2
0.1
9,589.6
12a
13
14
5.6
7.7
7.7
0.3
0.4
0.4
0.0
0.1
0.1
0.4
0.6
0.6
4.7
6.5
6.5
0.0
0.0
0.0
0.1
0.9
0.9
0.1
0.1
0.1
6,745.8
9,326.0
9,326.0
151
162
172
18
19
20
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
70.4
0.7
10.7
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.0
211
22
23
24
25
26
0.0
38.5
5.8
0.0
3.0
2.4
0.0
5.1
11.6
10.5
0.2
0.2
0.0
37.1
0.0
0.0
0.2
0.2
0.0
0.0
0.0
33.4
0.2
0.2
0.0
23.5
41.7
0.0
0.6
0.5
0.0
0.0
0.0
0.0
0.0
0.0
0.0
1.2
3.0
0.0
0.0
0.0
0.0
0.0
0.8
0.0
0.0
0.0
0.0
236,122.4
582.1
0.0
110.4
87.7
27
28
29
30
31
32
44.7
54.1
30.6
54.1
54.1
0.0
18.2
22.1
12.5
22.1
22.1
9.7
1.4
1.7
0.9
1.7
1.7
0.0
2.6
3.2
1.7
3.2
3.2
0.0
40.8
49.4
27.9
49.4
49.4
0.0
0.0
0.0
0.0
0.0
0.0
0.0
0.4
0.5
0.3
0.5
0.5
0.3
0.0
0.0
0.0
0.0
0.0
0.3
44,357.3
54,261.2
28,398.5
54,261.2
54,261.2
0.0
33
B001
B002
Total IEUs
0.0
12.5
12.5
0.0
9.7
0.7
0.7
0.0
0.0
0.1
0.1
0.0
0.0
1.0
1.0
0.0
0.0
10.5
10.5
0.0
0.0
0.0
0.0
0.0
0.3
1.4
1.4
0.0
0.3
0.2
0.2
0.0
0.0
15,025.2
15,025.2
0.0
Total
344.7
228.7
45.4
51.9
328.6
0.0
11.5
2.3
537,479.8
1Emissions are routed to emission unit 23 – Zecco Plant Flare.
GHGs
(CO2e mtpy)
2Emissions are routed to emission unit 22 – Callidus Technologies 203313-00 Thermal Oxidizer.
2. Tribal Authority
The Ignacio Gas Plant is located within the exterior boundaries of the Southern Ute Indian Reservation and
is thus within Indian Country as defined at 18 U.S.C. §1151. On March 2, 2012, the EPA determined that
the Southern Ute Indian Tribe of the Southern Ute Indian Reservation had met the requirements of 40 CFR
§70.4(b) for full approval to administer its Clean Air Act Title V, Part 70 Permitting Program (Program).
14
In concert with that Program approval, the EPA also found that the Tribe met the requirements of Section
301(d)(2) of the CAA and 40 CFR §49.6 for treatment “in the same manner as a state” for the purposes of
issuing CAA Title V, Part 70 operating permits. The EPA promulgated its approval of the Tribe’s
applications on March 15, 2012 (77 FR 15267). The requirements of the Clean Air Act Title V, Part 70
Permitting Program (Program) have been incorporated at Article II, Part 1 of the Reservation Air Code.
Therefore, the Southern Ute Indian Tribe is the appropriate governmental entity to issue the Title V permit
to this facility.
The Reservation Air Code: The Reservation Air Code was adopted pursuant to the authority vested in the
Southern Ute Indian Tribe/State of Colorado Environmental Commission by (1) the Intergovernmental
Agreement Between the Southern Ute Indian Tribe and the State of Colorado Concerning Air Quality
Control on the Southern Ute Indian Reservation dated December 13, 1999, (2) tribal law (Resolution of the
Council of the Southern Ute Indian Tribe No. 00-09), (3) State law (C.R.S. § 24- 62-101), and (4) as
recognized in federal law (Act of October 18, 2004, Pub. L. No. 108-336, 118 Stat.1354).
NSPS and NESHAP Delegation: On September 6, 2013, the Southern Ute Indian Tribe received delegation
from the EPA to incorporate by reference into the Reservation Air Code and enforce certain subparts of the
new source performance standards (NSPS) and national emission standards for hazardous air pollutants
(NESHAP) under Sections 111 and 112 of the Clean Air Act, respectively (78 FR 40635). These NSPS
and NESHAP subparts generally apply to oil and gas operations within the exterior boundaries of the
Southern Ute Indian Reservation and were adopted, unchanged, into the Reservation Air Code as Parts 2
and 3.
Tribal Minor New Source Review Program: Minor sources of air pollution located within the Southern Ute
Indian Reservation exterior boundaries must comply with either the “Federal Implementation Plan for
Managing Air Emissions From True Minor Sources In Indian Country In The Oil And Natural Gas
Production And Natural Gas Processing Segments Of The Oil And Natural Gas Sector” listed at 40 CFR
§49.101 – 105 or the “Federal Minor New Source Review Program In Indian Country” listed at 40 CFR
§49.151 – 164.
3. Applicable Requirements
The following discussion addresses a selection of the regulations from the Code of Federal Regulations
(CFR) at Title 40. Note that this discussion does not include the full spectrum of potentially applicable
regulations and is not intended to represent official applicability determinations. These discussions are
based on the information provided by Harvest in its Part 70 permit renewal application and are only
intended to present the information certified to be true and accurate by the Responsible Official of this
facility.
Tribal Minor New Source Review (TMNSR) – 40 CFR Part 49
EPA promulgated the federal rule “Review of New Sources and Modifications in Indian Country,”
otherwise known as the Tribal Minor New Source Review Rule (TMNSR), on July 1, 2011 (76 FR 38748).
15
The TMNSR rule applies to all new or modified industrial facilities in Indian country with a potential to
emit equal to or greater than the minor NSR thresholds, but less than the major source thresholds, which
are generally 100 to 250 tons per year (tpy). The minor NSR thresholds for attainment/unclassifiable areas
are displayed in the table below:
40 CFR 49.153 Minor NSR Thresholds
Minor NSR Thresholds for
Regulated NSR Pollutant
Attainment/Unclassifiable Areas in Tons Per
Year (TPY)
Carbon Monoxide (CO)
10
Nitrogen Oxides (NOx)
10
Sulfur Dioxide (SO2)
10
Volatile Organic Compounds (VOC)
5
PM10
5
PM2.5
3
Lead
0.1
Fluorides
1
Sulfuric Acid Mist
2
Hydrogen Sulfide (H2S)
2
Total Reduced Sulfur (including H2S)
2
Reduced Sulfur Compounds (including H2S)
2
Municipal Waste Combustor Emissions
10
Municipal Solid Waste Landfill Emissions
10
(measured as nonmethane organic compounds)
Starting August 30, 2011, all minor modifications at existing major NSR sources, requests for synthetic
minor limitations, and the transferring of synthetic minor limits from Part 71 permits into minor NSR
permits became subject to the TMNSR rule. All true minor sources and minor modifications at existing
major sources constructed after August 30, 2011 were required to submit a registration form within 90 days
of beginning operation and obtain a permit if a general permit was available for that source category. No
general permit was available for sources in the oil and gas sector constructed or modified between August
30, 2011 and October 2, 2016 and these sources were only required to register with EPA.
On May 12, 2016, EPA finalized a Federal Implementation Plan (FIP) for true minor oil and gas sources in
Indian County. Beginning on October 3, 2016, all new and modified true minor oil and gas sources are
required to register with the EPA to obtain coverage under the FIP. Owners/operators also have the option
of apply to EPA for a source-specific permit instead of complying with the FIP, or EPA may determine that
a source-specific permit is necessary due to local or reservation-specific air quality concerns.
Future modifications at the Ignacio Gas Plant will be subject to the TMNSR rule; however, no TMNSR
permits have been issued to this facility at this time.
Prevention of Significant Deterioration (PSD) - 40 CFR 52.21
PSD is a preconstruction review requirement of the CAA that applies to proposed projects that are
16
sufficiently large (in terms of emissions) to be a “major” stationary source or “major” modification of an
existing stationary source. A new stationary source, or a modification to an existing minor stationary
source, is major if the proposed project has the potential to emit any pollutant regulated under the CAA
in amounts equal to or exceeding specified major source thresholds, which are 100 tpy for 28 listed
industrial source categories and 250 tpy for all other sources. PSD also applies to modifications at
existing major sources that cause a “significant net emissions increase” at that source. Significance
levels for each pollutant are defined in the PSD regulations at 40 CFR 52.21. A modification is a
physical change or change in the method of operation.
The Ignacio Gas Plant is an existing source that does not belong to any of the 28 listed source
categories. The facility-wide PTE for NOx, CO, and VOCs is greater than 250 tpy and the PTE for
CO2e is greater than 100,000 tpy. Consequently, the PTE for NOx, CO, VOC, and CO2e at the
Ignacio Gas Plant exceeds the major source PSD thresholds and the source is classified as major
for PSD permitting purposes. Therefore, potential emissions from any newly proposed
construction must be compared to the PSD significance levels rather than major source thresholds
when determining PSD applicability.
The EPA issued an initial PSD permit in 1984 for the Ignacio Gas Plant. In December 2010, the
EPA issued another PSD permit to incorporate the requirements of the 1984 PSD permit and the
two consent decrees.
New Source Performance Standards (NSPS)
40 CFR Part 60, Subpart A: General Provisions. This subpart applies to the owner or operator of any
stationary source that contains an affected facility, the construction or modification of which is
commenced after the date of publication of any standard in Part 60. The general provisions under Subpart
A apply to sources that are subject to the specific subparts of Part 60.
As explained below, the Ignacio Gas Plant is subject to specific subparts under 40 CFR Part 60.
Therefore, the General Provisions of Part 60 apply.
40 CFR Part 60, Subpart Db: Standards of Performance for Industrial-Commercial-Institutional Steam
Generating Units. This rule applies to each steam generating unit that commences construction,
modification, or reconstruction after June 19, 1984, and that has a heat input capacity from fuels
combusted in the steam generating unit of greater than 29 megawatts (MW) (100 million British thermal
units per hour (MMBtu/her)).
According to the information provided by Harvest, units 13 and 14 were constructed prior to the
regulatory applicability date and have a heat input capacity less than 29 MW. Units B001 and
B002 were constructed after the regulatory applicability date but have a heat input capacity less
than 29 MW. Therefore, Subpart Db does not apply.
17
40 CFR Part 60, Subpart Dc: Standards of Performance for Small Industrial-Commercial-Institutional
Steam Generating Units. This rule applies to steam generating units with a maximum design heat capacity
of 100 MMBtu/hr or less, but greater than or equal to 10 MMBtu/hr and commenced construction,
modification, or reconstruction after June 9, 1989.
According to information provided by Harvest, units 13 and 14, located at the Ignacio Gas Plant,
are affected sources under this subpart with a maximum design heat input capacity of between 10
and 100 MMBtu/hr. However, these units commenced construction before June 9, 1989 and have
not been reconstructed or modified. This subpart applies to units B001 and B002 because they
have a maximum design heat input capacity of 29 MMBtu/hr each and were constructed after June
9, 1989. Since the boilers burn natural gas, there are no emission limit requirements for particulate
matter or sulfur dioxide. However, the Ignacio Gas Plant is subject to the recordkeeping and
notification requirements of Subpart Dc. Therefore, Subpart Dc does apply.
40 CFR Part 60, Subpart K: Standards of performance for Storage Vessels for Petroleum Liquids for
which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May
19, 1978. This rule applies to storage vessels for petroleum liquids with a storage capacity greater than
40,000 gallons. 40 CFR Part 60, Subpart K does not apply to storage vessels for petroleum or condensate
stored, processed, and/or treated at a drilling and production facility prior to custody transfer.
According to information provided by Harvest, the Ignacio Gas Plant has 19 pressurized storage
tanks with a storage capacity greater than 40,000 gallons which store petroleum liquids. However,
these tanks are designed to operate in excess of 15 pounds per square inch gauge without
emissions to the atmosphere and thus, do not meet the definition of a storage vessel in this subpart.
Therefore, Subpart K does not apply.
40 CFR Part 60, Subpart Ka: Standards of Performance for Storage Vessels for Petroleum Liquids for
which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to
June 23, 1984. This rule applies to storage vessels for petroleum liquids with a storage capacity greater
than 40,000 gallons. Subpart Ka does not apply to petroleum storage vessels with a capacity of less than
420,000 gallons used for petroleum or condensate stored, processed, or treated prior to custody transfer.
According to information provided by Harvest, the Ignacio Gas Plant has 19 pressurized storage
tanks with a storage capacity greater than 40,000 gallons which store petroleum liquids. However,
these tanks are designed to operate in excess of 204.9 kPa (15 psig) without emissions to the
atmosphere and thus, do not meet the definition of a storage vessel in this subpart. Therefore,
Subpart Ka does not apply.
40 CFR Part 60, Subpart Kb: Standards of Performance for Volatile Organic Liquid Storage Vessels
(Including Petroleum Liquid Storage Vessels) for which Construction, Reconstruction, or Modification
Commenced After July 23, 1984. This rule applies to storage vessels with a capacity greater than or equal
to 75 cubic meters (~629 bbl). The subpart does not apply to storage vessels with a capacity greater than
or equal to 151 cubic meters storing a liquid with a maximum true vapor pressure less than 3.5 kPa or
18
with a capacity greater than or equal to 75 cubic meters but less than 151 cubic meters storing a liquid
with a maximum true vapor pressure less than 15.0 kPa.
According to Harvest, the Ignacio Gas Plant has tanks with a capacity greater than 75 m3 (~629
bbl or 19,813 gal), but less than 151 m3 with a vapor pressure less than 15 kPa that commenced
construction after July 23, 1984, including a 33,684 gallon spent lube oil storage tank, two (2)
21,000 gallon spent lube oil/water storage tanks, and two (2) 42,000 gallon produced water tanks.
These tanks meet the exemption criteria specified in §60.110b(b) and are subject to limited
requirements of Subpart Kb.
40 CFR Part 60, Subpart KKK: Standards of Performance for Equipment Leaks of VOC from Onshore
Natural Gas Processing Plants for which construction, reconstruction, or modification commenced after
January 20, 1984, and on or before August 23, 2011. This rule applies to compressors and other
equipment at onshore natural gas processing facilities. As defined in this subpart, a natural gas processing
plant is any processing site engaged in the extraction of natural gas liquids (NGLs) from field gas,
fractionation of mixed NGLs to natural gas products, or both. NGLs are defined as the hydrocarbons,
such as ethane, propane, butane, and pentane that are extracted from field gas.
Subpart KKK requires a source to comply with several requirements of 40 CFR 60, Subpart VV,
Standards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals
Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After
January 5, 1981 and on or Before November 7, 2006. Both Subpart VV and Subpart KKK regulate
fugitive emissions of VOC at onshore natural gas processing plants. The regulations for Subpart VV are
found at 40 CFR 60 §§60.480 through 60.489.
Natural Gas Processing Plant
Pursuant to the definitions at 40 CFR 60.631, a natural gas processing plant “means any processing site
engaged in the extraction of natural gas liquids from field gas, fractionation of mixed natural gas liquids
to natural gas products, or both.”
Natural Gas Liquids
Pursuant to the definitions at 40 CFR 60.631, natural gas liquids “means the hydrocarbons, such as
ethane, propane, butane, and pentane that are extracted from field gas.”
Process Unit
Process units are defined as equipment assembled for the extraction of natural gas liquids from field gas,
the fractionation of the liquids into natural gas products, or other operations associated with the
processing of natural gas products. A process unit can operate independently if supplied with sufficient
feed or raw materials and sufficient storage facilities for the products.
19
Applicability and Designation of Affected Facilities
The provisions of this subpart apply to the following components at onshore natural gas processing plants
that commenced construction, reconstruction, or modification after January 20, 1984 and on or before
August 23, 2011.
1. Compressors in VOC service or wet gas service are subject to this rule. A compressor is in VOC
service if it contains or contacts a process fluid that is at least 10% VOC by weight. In wet gas
service means that a piece of equipment contains or contacts the field gas before the extraction
step in the process.
2. All equipment except compressors within a process unit.
A compressor station, dehydration unit, sweetening unit, underground storage tank, field gas gathering
system, or liquefied natural gas unit is covered by this subpart if it is located at an onshore natural gas
processing plant. If the unit is not located at the plant site, then it is exempt from the provisions of this
subpart.
Equipment
Equipment means each pump, pressure relief device, open-ended valve or line, valve, compressor, and
flange or other connector that is in VOC service or in wet gas service, and any device or system required
by this subpart.
Subpart KKK establishes monitoring/testing requirements, recordkeeping requirements,
recordkeeping requirements and reporting requirements for the following components that may be
located at an onshore natural gas processing plant:
• Pumps in light liquid service
• Compressors in VOC service or wet gas service
• Pressure relief devices in gas vapor service
• Sampling connection systems
• Open-ended valves or lines
• Valves in gas/vapor or light liquid service
• Pumps and valves in heavy liquid service, pressure relief devices in light or heavy liquid
service, and flanges and other connectors
• Closed vent systems and control devices
• Vapor recovery systems
• Enclosed combustion devices
• Flares
In addition, the rule establishes separate requirements for the following:
•
Delay of repair of equipment for which leaks have been detected;
20
•
•
Alternative means of emissions limitation for components subject to the rule; and
Determining components that are not in VOC or wet gas service.
The Ignacio Gas Plant operates a fractionation plant to extract NGLs from the field gas, and thus
meets the definition of a natural gas processing plant under this subpart. According to Harvest,
Emission Units 19 and 20 were installed after January 20, 1984, and before August 23, 2011, and
contain components in VOC or wet gas service. Therefore, Subpart KKK does apply.
40 CFR Part 60, Subpart LLL: Standards of Performance for SO2 emissions from Onshore Natural Gas
Processing for which construction, reconstruction, or modification commenced after January 20, 1984,
and on or before August 23, 2011. This rule applies to sweetening units and sulfur recovery units at
onshore natural gas processing facilities. As defined in this subpart, sweetening units are process devices
that separate hydrogen sulfide (H2S) and carbon dioxide (CO2) from a sour natural gas stream. Sulfur
recovery units are defined as process devices that recover sulfur from the acid gas (consisting of H2S and
CO2) removed by a sweetening unit.
According to Harvest, the Ignacio Gas Plant has an amine sweetening unit that was constructed or
modified after the applicability date of January 20, 1984, and on or before August 23, 2011.
However, the Ignacio Gas Plant has a design capacity less than 2 long tons per day (LT/D) of
hydrogen sulfide (H2S) in the acid gas (expressed as sulfur). Per §60.640, the facility is required
to comply with the recordkeeping requirements of §60.647(c) but is not required to comply
with §§60.642 through 60.646.
40 CFR Part 60, Subpart IIII: Standards of Performance for Stationary Compression Ignition Internal
Combustion Engines. This subpart establishes emission standards and compliance requirements for that
control of emissions from stationary compression ignition (CI) internal combustion engines (ICE) that
commenced construction, modification, or reconstruction after July 11, 2005, where the CI ICE are
manufactured on or after specified manufacture trigger dates. The manufacture trigger dates are based on
the engine type and displacement liter per horsepower (hp). For the purposes of this subpart, the date that
construction commences is the date the engine is ordered by the owner or operator.
Harvest provided the following information:
NSPS Subpart IIII Applicability Determination
Harvest Four Corners, LLC, Ignacio Gas Plant
Unit
Serial No
25
909602
26
6TB04260
Unit Description
Waukesha H886D CI
Emergency Pump
Engine
Caterpillar W4-3798 CI
Emergency Pump
Engine
Fuel
Maximu
m HP
Commence
Construction,
Modification, or
Reconstruction
Date
Diesel
384
Prior to
07/11/2005
07/01/2006
No
Diesel
305
Prior to
07/11/2005
07/01/2006
No
21
Trigger Date
for
ApplicabilityManufactured
on or after
Subject
to NSPS
IIII
According to Harvest, units 25 and 26 were manufactured prior to July 1, 2006 and have not been
modified or reconstructed after July 11, 2005 (the trigger dates for fire pump engines) and have
not been reconstructed or modified (as defined in §60.15). Therefore, the requirements of
Subpart IIII do not apply.
Should Harvest propose to install a replacement engine for unit 25 or 26, which is subject to
Subpart IIII, Harvest will not be allowed to use the off permit changes provision, and will be
required to submit a minor permit revision application to incorporate Subpart IIII requirements
into the permit.
40 CFR Part 60, Subpart KKKK: Standards of Performance for Stationary Combustion Turbines. This
subpart establishes emission standards and compliance schedules for the control of emissions from
stationary combustion turbines that commenced construction, modification, or reconstruction after
February 18, 2005.
According to Harvest, emission units 27, 28, 29, 30, and 31 have a heat input at peak load equal to
or greater than 10.7 gigajoules (10 MMBtu) per hour and commenced construction, modification,
or reconstruction after February 18, 2005. Therefore, Subpart KKKK does apply.
40 CFR Part 60, Subpart OOOO: Standards of Performance for Crude Oil and Natural Gas Production,
Transmission and Distribution. This subpart establishes emission standards and compliance schedules for
the control of VOC and SO2 emissions from affected facilities that commence construction, modification
or reconstruction after August 23, 2011and on or before September 18, 2015. Affected facilities under
this subpart include gas wells, compressors, pneumatic controllers, storage vessels, process unit
equipment, and sweetening units.
According to Harvest, the Ignacio Gas Plant has compression equipment associated with units 27,
28, and 29 and reciprocating compressors (driven by units 30 and 31) in VOC/wet gas service and
process units that commenced construction or were modified after August 23, 2011. Therefore,
Subpart OOOO does apply.
40 CFR Part 60, Subpart OOOOa: Standards of Performance for Crude Oil and Natural Gas Facilities.
This subpart establishes emission standards and compliance schedules for the control of greenhouse gases
(GHG), volatile organic compounds (VOC), and sulfur dioxide (SO2). The standards in this subpart apply
to affected facilities in the crude oil and natural gas source category that commence construction,
modification, or reconstruction after September 18, 2015.
On January 29, 2016, a change to the West Dehydrator/Mol Sieve process unit increased the
emission rate and required a capital expenditure as defined in 40 CFR 60.5430a. This change is
considered a modification in accordance with §60.14. As such, the West Dehydrator/Mol Sieve
process unit and Amine Unit are considered an affected facility subject to the standards of
OOOOa.
22
National Emission Standards for Hazardous Air Pollutants (NESHAP)
40 CFR Part 63, Subpart A: General Provisions. This subpart contains national emissions standards for
HAPs that regulate specific categories of sources that emit one or more HAP regulated pollutants under
the CAA. The general provisions under subpart A apply to sources that are subject to the specific
subparts of Part 63.
As explained below, the Ignacio Gas Plant is subject to specific subparts under 40 CFR Part 63.
Therefore, the General Provisions of Part 63 does apply as specified in the relevant subparts.
40 CFR Part 63, Subpart HH: National Emission Standards for Hazardous Air Pollutants from Oil and
Natural Gas Production Facilities. This subpart applies to the owners and operators of affected units
located at natural gas production facilities that are area or major sources of HAPs, and that process,
upgrade, or store natural gas prior to the point of custody transfer, or that process, upgrade, or store
natural gas prior to the point at which natural gas enters the natural gas transmission and storage source
category or is delivered to a final end user. The affected units are glycol dehydration units, storage vessels
with the potential for flash emissions, and the group of ancillary equipment, and compressors intended to
operate in volatile hazardous air pollutant service, which are located at natural gas processing plants.
Throughput Exemption
Those sources whose maximum natural gas throughput, as appropriately calculated per §63.760(a)(1)(i)
through (a)(1)(iii), is less than 18,400 standard cubic meters per day are exempt from the requirements of
this subpart.
Source Aggregation
Major source, as used in this subpart, has the same meaning as in §63.2, except that:
1)
Emissions from any oil and gas production well with its associated equipment and emissions from
any pipeline compressor station or pump station shall not be aggregated with emissions from other
similar units.
2)
Emissions from processes, operations, or equipment that are not part of the same facility shall not
be aggregated.
3)
For facilities that are production field facilities, only HAP emissions from glycol dehydration units
and storage vessels with the potential for flash emissions shall be aggregated for a major source
determination.
Facility
For the purpose of a major source determination, facility means oil and natural gas production and
processing equipment that is located within the boundaries of an individual surface site as defined in
23
Subpart HH. Examples of facilities in the oil and natural gas production category include, but are not
limited to: well sites, satellite tank batteries, central tank batteries, a compressor station that transports
natural gas to a natural gas processing plant, and natural gas processing plants.
Production Field Facility
Production field facilities are those located prior to the point of custody transfer. The definition of
custody transfer (40 CFR 63.761) means the point of transfer after the processing/treating in the
producing operation, except for the case of a natural gas processing plant, in which case the point of
custody transfer is the inlet to the plant.
Natural Gas Processing Plant
A natural gas processing plant is defined in 40 CFR 63.761 as any processing site engaged in the
extraction of NGLs from field gas, or the fractionation of mixed NGLs to natural gas products, or a
combination of both. A treating plant or gas plant that does not engage in these activities is considered to
be a production field facility.
Major Source Determination for Production Field Facilities
The definition of major source in subpart HH (at 40 CFR 63.761) states, in part, that only emissions from
the dehydration units and storage vessels at production field facilities shall be aggregated when comparing
to the major source thresholds.
For facilities that are not production field facilities, HAP emissions from all HAP emission units shall be
aggregated.
Area Source Applicability
40 CFR Part 63, Subpart HH also applies to area sources of HAPs. An area source is a HAP source
whose total HAP emissions are less than 10 tpy of any single HAP or 25 tpy for all HAPs in aggregate.
This subpart requires different emission reduction requirements for glycol dehydration units found at oil
and gas production facilities based on their geographical location.
Units located in densely populated areas (determined by the Bureau of Census) and known as urbanized
areas with an added 2-mile offset and urban clusters of 10,000 people or more, are required to have
emission controls. Units located outside these areas will be required to have the glycol recirculation
pump rate optimized or operators must document that uncontrolled annual actual benzene emissions are
less than 0.9 megagrams (1,984 lbs.).
Any source that determines that it is not a major source but has actual emissions of 5 tons per year of a
single HAP or 12.5 tons per year of a combination of HAP (i.e., 50 percent of the major source
24
thresholds), shall update its major source determination within 1 year of the prior determination and each
year thereafter, using gas composition data measured during the preceding 12 months.
Applicability of Subpart HH to the Ignacio Gas Plant
The Ignacio Gas Plant extracts Natural Gas Liquids (NGLs) from field gas, and therefore, is
considered a natural gas processing plant. NGLs and natural gas are transported to the local market
via pipeline and truck loading from the plant, hence, the point of custody transfer, as defined in
Subpart HH, occurs at the facility. For facilities that are not production field facilities, HAP
emissions from all HAP emission units shall be aggregated for a major source determination. On
June 11, 2011, Harvest submitted a request to reclassify the facility from a major source to an area
source of HAP. The permit was revised and the Ignacio Gas Plant classified as an Area Source.
Therefore, the Ignacio Gas Plant is subject to the area source requirements of Subpart HH.
Harvest determined that actual average benzene emissions from the TEG dehydration units at the
facility are less than 0.90 megagrams per year. Per 40 CFR 63.764(e)(1)(ii), the Ignacio Gas Plant
is exempt from the general standards of 40 CFR 63.764(d). Therefore, only the recordkeeping
requirements of 40 CFR 63.774(d)(1) apply to the facility.
40 CFR Part 63, Subpart HHH: National Emission Standards for Hazardous Air Pollutants from Natural
Gas Transmission and Storage Facilities. This subpart applies to natural gas transmission and storage
facilities that transport or store natural gas prior to entering the pipeline to a local distribution company or
to a final end user, and that are a major source of hazardous air pollutant (HAP) emissions. Natural gas
transmission means the pipelines are used for long distance transport (excluding processing).
According to information provided by Harvest, the Ignacio Gas Plant is not part of the natural gas
transmission and storage source category. Therefore, Subpart HHH does not apply.
40 CFR Part 63, Subpart YYYY: National Emission Standards for Hazardous Air Pollutants from
Stationary Combustion Turbines. This rule establishes national emission limitations and work practice
standards for HAPs emitted from stationary combustion turbines. An affected source includes any
stationary combustion turbine located at a major source of HAP emissions. Affected sources under this
rule are any existing, new, or reconstructed stationary combustion turbine located at a major source of
HAP emissions. For the purpose of this rule, existing is defined as a stationary combustion turbine that
commenced construction prior to January 14, 2003.
Stationary Combustion Turbine:
Stationary combustion turbines are defined in §63.6175 as all equipment, including but not limited to the
turbine, the fuel, air, lubrication and exhaust gas systems, control systems (except emissions control
equipment), and any ancillary components and sub-components comprising any simple cycle stationary
combustion turbine, any regenerative/recuperative cycle stationary combustion turbine, the combustion
turbine portion of any stationary combined cycle steam/electric generating system. Stationary means that
25
the combustion turbine is not self-propelled or intended to be propelled while performing its function.
Stationary combustion turbines do not include turbines located at a research or laboratory facility, if
research is conducted on the turbine itself and the turbine is not being used to power other applications at
the research or laboratory facility.
Major Source:
Major Source for purposes of this subpart has the same meaning as provided in 40 CFR 63.2 with the
exception that emissions from any oil or gas exploration or production well (with its associated
equipment) and emissions from any pipeline compressor station or pump station shall not be aggregated
with emissions from other similar units, to determine whether such emission points or station are major
sources, even when emission points are in a contiguous are or under common control.
Applicability of Subpart YYYY to the Ignacio Gas Plant
According to information provided by Harvest, the Ignacio Gas Plant is an area source of HAPs
Therefore, Subpart YYYY does not apply.
40 CFR Part 63, Subpart ZZZZ (RICE MACT): National Emission Standards for Hazardous Air
Pollutants for Stationary Reciprocating Internal Combustion Engines. This rule establishes national
emission limitations and operating limitations for HAPs emitted from stationary spark ignition internal
combustion engines (SI ICE) and stationary compression ignition internal combustion engines (CI ICE).
For the purposes of this standard, construction or reconstruction is as defined in §63.2.
Engine Type
Summary of Applicability to Engines at Major HAP Sources
Major HAP Sources
Horse Power Rating
New / Existing
Applicability Trigger Date
SI ICE – All1
≥ 500 HP
New
On or After:
12/19/2002
SI ICE – 4SRB
> 500 HP
Existing
Before:
12/19/2002
SI ICE – All1
≤ 500 HP
New
On or After:
6/12/2006
SI ICE – All1
≤ 500 HP
Existing
Before:
6/12/2006
CI ICE – All2
≥ 500 HP
New
On or After:
12/19/2002
CI ICE – Non Emergency
> 500 HP
Existing
Before:
12/19/2002
CI ICE – All2
≤ 500 HP
New
On or After:
6/12/2006
CI ICE – All2
≤ 500 HP
Existing
Before:
6/12/2006
1. All includes emergency ICE, limited use ICE, ICE that burn land fill or digester gas, 4SLB, 2SLB, and 4SRB.
2. All includes emergency ICE and limited use ICE
Engine Type
Summary of Applicability to Engines at Area Hap Sources
Area HAP Sources
Horse Power Rating
New / Existing
Applicability Trigger Date
SI ICE – All1
All HP
New
On or After:
6/12/2006
SI ICE – All1
All HP
Existing
Before:
6/12/2006
CI ICE – All2
All HP
New
On or After:
6/12/2006
CI ICE – All2
All HP
Existing
Before:
6/12/2006
1. All includes emergency ICE, limited use ICE, ICE that burn land fill or digester gas, 4SLB, 2SLB, and 4SRB.
2. All includes emergency ICE and limited use ICE
26
Applicability of 40 CFR 63, Subpart ZZZZ to the Ignacio Gas Plant:
Unit
Serial
Number
25
909602
26
6TB04260
Unit Description
Waukesha H886D CI
Emergency Pump Engine
Caterpillar W4-3798 CI
Emergency Pump Engine
Fuel
Site Rated
HP
Commenced Construction or
Reconstruction Date
Subject to
MACT
ZZZZ?
Diesel
384
Prior to 06/12/2006
Yes
Diesel
305
Prior to 06/12/2006
Yes
According to Harvest the Ignacio Gas Plant was a area source of HAPS on the Subpart ZZZZ
compliance date of June 12, 2006. Units 25 and 26 are emergency compression ignition (CI)
stationary RICE less than 500 site-rated HP constructed prior to June 12, 2006 and have not been
reconstructed since this date. Therefore, Units 25 and 26 are considered existing stationary
RICE, and are subject to the Subpart ZZZZ area source requirements for existing
emergency CI engines.
40 CFR Part 63, Subpart DDDDD (Boiler MACT (for major sources)): National Emission Standards for
Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and
Process Heaters. This rule establishes national emission limitations and operating limitations for HAPs
emitted from new and existing industrial boilers, institutional boilers, commercial boilers, and process
heaters that are located at major sources of HAPs. Boilers or process heaters that combust natural gas for
fuel or have a maximum designed heat input capacity less than 10 MMBtu/hr are subject to work practice
standards in lieu of emission limits. For the purposes of this subpart, an affected unit is an existing unit if
it was constructed prior to June 4, 2010.
According to Harvest, the Ignacio Gas Plant is an area source of HAPs as defined by §63.7575.
Therefore, Subpart DDDDD does not apply.
40 CFR Part 63, Subpart CCCCCC: National Emission Standards for Hazardous Air Pollutants for
Source Category: Gasoline Dispensing Facilities. The rule establishes national emission limitations and
management practices for HAP emitted from the loading of gasoline storage tanks, at gasoline dispensing
facilities (GDF) at area sources of HAP, including requirements for compliance demonstration. The
affected sources include, each GDF, each gasoline cargo tank during the delivery of product to a GDF,
and each gasoline storage tank.
The Ignacio Gas Plant is an area source of HAP’s as defined by §63.2 for Subpart CCCCCC and
performs loading operations of gasoline into a gasoline storage tank, Unit TK1. Therefore,
Subpart CCCCCC does apply.
40 CFR Part 63, Subpart JJJJJJ: National Emission Standards for Hazardous Air Pollutants for Industrial,
Commercial, and Institutional Boilers Area Sources. The rule establishes emission standards to reduce
emissions of toxic air pollutants from industrial, commercial, and industrial boilers located at area
sources. The final rule covers boilers located at area source facilities that burn coal, oil, or biomass, but
not boilers that burn only gaseous fuels or any solid waste.
27
According to information provided by Harvest, the Ignacio Gas Plant uses regeneration heaters
and not boilers as defined by (§63.11237) and the regulation does not apply to gas fired boilers as
defined by (§63.11195(e)), Subpart JJJJJJ therefore does not apply.
Compliance Assurance Monitoring (CAM) Rule
40 CFR Part 64: Compliance Assurance Monitoring Provisions. According to 40 CFR 64.2(a), the CAM
rule applies to each Pollutant Specific Emission Unit (PSEU) at a major source that is required to obtain a
Part 70 or Part 71 permit if the unit satisfies all of the following criteria:
1)
The unit is subject to an emission limitation or standard for the applicable regulated air pollutant
other than an emissions limitation or standard that is exempt under §64.2(b)(1);
“§64.2(b)(1): Exempt emission limitations or standards. The requirements of this part shall not
apply to any of the following emission limitations or standards:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
Emission limitations or standards proposed by the Administrator after November 15, 1990
pursuant to Section 111 or 112 of the Act;
Stratospheric ozone protection requirements under Title VI of the Act;
Acid Rain Program requirements pursuant to Sections 404, 405, 406, 407(a), 407(b) or
410 of the Act;
Emissions limitations or standards or other applicable requirements that apply solely
under an emissions trading program approved or promulgated by the Administrator under
the Act that allows for trading emissions with a source or between sources;
An emissions cap that meets the requirements specified in §70.4(b)(12) or §71.6(a)(13)(iii)
of this chapter;
Emission limitations or standards for which a Part 70 or 71 permit specifies a continuous
compliance determination method, as defined in §64.1.”
“§64.1: Continuous compliance method means a method, specified by the applicable standard or
an applicable permit condition, which:
(1) Is used to determine compliance with an emission limitation or standard on a continuous
basis, consistent with the averaging period established for the emission limitation or standard;
and
(2) Provides data either in units of the standard or correlated directly with the compliance limit.”
2)
The unit uses a control device to achieve compliance with any such limit or standard; and
3)
The unit has pre-control device emissions of the applicable regulated pollutant that are equal to or
greater than 100% of the amount, in tons per year, required for a source to be classified as a major
source.
28
According to Harvest, the CAM requirements specified at 40 CFR Part 64 apply to Units 15, 16,
and 17 with respect to the VOC emission limits identified in PSD Permit #PSD-SU-0027-01.00.
Chemical Accident Prevention Program
40 CFR Part 68: Chemical Accident Prevention Provisions. This rule applies to stationary sources that
manufacture, process, use, store, or otherwise handle more than the threshold quantity of a regulated
substance in a process. Regulated substances include 77 toxic and 63 flammable substances which are
potentially present in the natural gas stream entering the facility and in the storage vessels located at the
facility. The quantity of a regulated substance in a process is determined according to the procedures
presented under §68.115. §68.115(b)(l) and (2)(i) indicate that toxic and flammable substances in a
mixture do not need to be considered when determining whether more than a threshold quantity is present
at a stationary source if the concentration of the substance is below one percent by weight of the mixture.
§68.115(b)(2)(iii) indicates that prior to entry into a natural gas processing plant, regulated substances in
naturally occurring hydrocarbon mixtures need not be considered when determining whether more than a
threshold quantity is present at a stationary source. Naturally occurring hydrocarbon mixtures include
condensate, field gas, and produced water.
According to Harvest, the Ignacio Gas Plant does have regulated substances above the threshold
quantities in this rule. Therefore, the facility is subject to the requirement to develop and
submit a risk management plan.
Stratospheric Ozone and Climate Protection
40 CFR Part 82, Subpart F: Air Conditioning Units. According to information provided by Harvest, no
maintenance, service, repair or disposal of any equipment containing Class I or Class II refrigerants
chlorofluorocarbons (CFCs)) occurs at Ignacio Gas Plant. However, if Harvest was to engage in any of
the afore mentioned activities it must comply with the standards of part 82, Subpart F for recycling and
emissions reduction if they service, maintain, or repair the air conditioning units in any way or if they
dispose of the units.
40 CFR Part 82, Subpart H: Halon Fire Extinguishers. According to information provided by Harvest,
there are no halon fire extinguishers at Ignacio Gas Plant. However, should Harvest obtain any halon fire
extinguishers, then it must comply with the standards of 40 CFR Part 82, Subpart H for halon emissions
reduction, if it services, maintains, tests, repairs, or disposes of equipment that contains halon or uses such
equipment during technician training. Specifically, Harvest would be required to comply with 40 CFR
Part 82 and submit an application for a modification to this Title V permit.
Mandatory Greenhouse Gas Reporting
40 CFR Part 98: Mandatory Greenhouse Gas Reporting. This rule requires sources above certain
emission thresholds to calculate, monitor, and report greenhouse gas emissions. The requirements of 40
29
CFR Part 98 and CAA §307(d)(1)(V), the CAA authority under which 40 CFR Part 98 was promulgated,
however, need not be included in a tribal-issued part 70 permit because those requirements are not
included in the definition of “applicable requirement” in either 40 CFR part 70 or RAC 1-103(11).
Although the rule is not an applicable requirement under 40 CFR Part 70 or the RAC, the source is not
relieved from the requirement to comply with the rule separately from compliance with its Part 70
operating permit. It is the responsibility of each source to determine whether Part 98 is applicable and to
comply, if necessary.
4. Public Participation
a. Public Notice
Per RAC § 2-109, all Part 70 draft operating permits shall be publicly noticed and made available for
public comment. Public notice is given by publication in a newspaper of general circulation in the area
where the source is located or in a state publication designed to give general public notice, to persons on a
mailing list developed by the Tribe, including those who request in writing to be on the list, and by other
means if necessary to assure adequate notice to the affected public. If an interested person would like to
be added to the Tribe’s mailing list to be informed of future actions on permits issued by the Tribe, please
send your name and address:
by United State Postal Service to:
by any other delivery service to:
Southern Ute Indian Tribe
Air Quality Program
PO Box 737 MS #84
Ignacio, Colorado 81137
Southern Ute Indian Tribe
Air Quality Program
Part 70 Program
398 Ouray Drive
Ignacio, Colorado 81137
Public notice for the draft permit was published in the Southern Ute Drum on September 23, 2022, and
the Durango Herald on September 21, 2022, in order to provide opportunity for public comment on the
draft permit and the opportunity to request a public hearing.
b. Opportunity for Comment
Members of the public were given an opportunity to review a copy of the draft permit prepared by the
Tribe, the application, this statement of basis for the draft permit, and all supporting materials for the draft
permit. Copies of these documents were available at:
Southern Ute Indian Tribe
Environmental Programs Division
Air Quality Program
71 Mike Frost Way
Ignacio, Colorado 81137
30
Electronic copies of draft permits and statement of basis were available on the Tribe’s Air Quality
Webpages at: https://www.southernute-nsn.gov/justice-and-regulatory/epd/public-comments/
All documents were available for review at the Southern Ute Indian Tribe’s Environmental Programs
Division office Monday through Friday from 8:00 a.m. to 4:00 p.m. (excluding holidays).
Any interested person could have submitted written comments on the draft operating permit during the
public comment period at the address specified in the public notice. The Tribe considered and addressed
all comments in making a final decision on the permit. The Tribe keeps a record of the commenters and
of the issues raised during the public participation process.
Anyone, including the applicant, who believed any condition of the draft permit was inappropriate could
have raised all reasonably ascertainable issues and submitted all arguments supporting his or her position
by the close of the public comment period. Any supporting materials submitted must have been included
in full and could not be incorporated by reference, unless the material was already submitted as part of the
administrative record in the same proceeding or consisted of Environmental Commission, tribal, state or
Federal statutes and regulations, EPA documents of general applicability, or other generally available
reference material.
c. Opportunity to Request a Hearing
A person may submit a written request for a public hearing to the Part 70 Permit Contact at the addresses
listed above, by stating the nature of the issues to be raised at the public hearing. Based on the number of
hearing requests received, the Tribe will hold a public hearing whenever it finds there is a significant
degree of public interest in a draft operating permit. The Tribe will provide public notice of the public
hearing. If a public hearing is held, any person may submit oral or written statements and data concerning
the draft permit.
d. Public Petitions to the Administrator
In the event the Administrator of the United States Environmental Protection Agency does not object to
issuance of the permit, on the basis that it would not be in compliance with applicable requirements,
within its 45-day review period, any person may then petition the Administrator within 60 days after the
expiration of the Administrator’s 45-day review period to make such objection. Any such petition must
be based only on objections to the permit that were raised with reasonable specificity during the public
comment period unless the petitioner demonstrates that it was impracticable to raise such objections
within such period, or unless the grounds for such objections arose after such period. If the administrator
objects to a permit as a result of this petition, the Tribe shall not issue the permit until the Administrator’s
objection has been resolved, except that a petition for review does not stay the effectiveness of a permit or
its requirements if the permit was issued after the end of the 45-day review period and before the
Administrator’s objection.
31
e. Appeal of Permits
Within 60 days after the Tribe’s final permit action, an applicant, any person who filed comments on the
draft permit or participated in the public hearing, and any other person who could obtain judicial review
of that action under applicable law, may appeal to the Environmental Commission in accordance with
RAC 2-109(8) and the Commission’s Procedural Rules.
Petitions for administrative review of final permit actions can be filed after the deadline designated by the
Commission only if they are based solely on grounds arising after the deadline for administrative review
has passed. Such petitions shall be filed no later than 60 days after the new grounds for review arise. If
the final permit action being challenged is the Tribe’s failure to take final action, a petition for
administrative review may be filed any time before the Tribe denies or issues the final permit.
f. Notice to Affected States/Tribes
As described in RAC § 2-109(3), public notice of the draft operating permit was given to all affected
programs.
The following entities were notified:
•
•
•
•
•
•
•
State of Colorado, Department of Public Health and Environment
State of New Mexico, Environment Department
Ute Mountain Ute Tribe, Environmental Programs Department
Navajo Tribe, Navajo Nation EPA
Jicarilla Apache Tribe, Environmental Protection Office
National Park Service, Air Resources Division, Denver, CO
U.S. Department of Agriculture, United States Forest Service, Rocky Mountain
Region
32