Air Pollution Control (2022)

Tribal code

Ask Donna

What actually matters in this document.

Text

Air Pollution Control

Title V Permit to Operate

Statement of Basis for Permit No V-SUIT-0027-2022.00

February 1, 2023

Harvest Four Corners, LLC

Ignacio Gas Plant

Southern Ute Indian Reservation

La Plata County, Colorado

1. Facility Information

a. Location

The Ignacio Gas Plant, owned and operated by Harvest Four Corners, LLC (Harvest), is located within the

exterior boundary of the Southern Ute Indian Reservation. The exact location is SE ¼ Section 35, SW ¼

Section 36, T34N, R9W, in La Plata County, at latitude North 37.145278 and longitude West -107.784444.

The Mailing address is:

Harvest Four Corners, LLC

Ignacio Gas Plant

3746 County Road 307

Durango, CO 81303

b. Contacts

Facility Contact:

Oakley Hayes

Environmental Specialist

Harvest Four Corners, LLC

3746 County Road 307

Durango, CO 81303

505-632-4421

Responsible Official:

Travis Jones

EH&S Manager

Harvest Four Corners , LLC

1755 Arroyo Drive

Bloomfield, NM 87413

713-289-2630

c. Description of Operations

The Ignacio Gas Plant provides compression, dehydration, sweetening, and natural gas liquids (NGL)

recovery for the San Juan Gathering Systems, an approximately 5,300 mile pipeline system gathering gas

from the San Juan Basin. The San Juan Basin spans the southwest corner of Colorado and the northwest

corner of New Mexico.

The Ignacio Gas Plant has the ability to condition approximately 500 to 650 million standard cubic feet

(MMscfd) of field gas per day into saleable NGL and residue gas. The primary plant operations include

inlet compression, dehydration, carbon dioxide removal, NGL removal, fractionation, and storage.

There are two primary incoming pipelines to the plant, Trunk S and Trunk C:

1

•

The 30” Trunk S line from the San Juan Basin area of primarily New Mexico brings hydrocarbon liquidrich gas for processing. In July 2011, the Four Corners Area Consolidation Project was approved for

construction of a pipeline (S-87 lateral) from the Dogie Compressor Station to Trunk S. The Trunk S

line now transfers what were historically Lybrook Gas Plant volumes to the Ignacio Gas Plant. A filter

separator and slug catcher recover free liquids from the inlet stream, which serves to protect the

compressor turbines from foreign material and free liquids.

•

The 16” Trunk C pipeline brings in gas with a lower content of recoverable hydrocarbon liquids that

contains about 6% carbon dioxide. The Trunk C gas is treated or blended with the cryogenic process

reside stream for the entire outlet stream to meet interstate pipeline quality specifications. The gas may

also be processed in the amine treater and/or cryogenic plant if necessary to achieve interstate pipeline

gas quality specifications.

The facility includes a Turbo-Expander Plant [cryogenic] nominally rated at 450 MMscfd and one NGL

fractionation plant. The present total gas throughput averages close to 500 MMscfd. Approximately 380

MMscfd is natural gas from the Trunk S inlet that is processed in the cryogenic plant. About 90 MMscfd is

Trunk C inlet gas that is dehydrated, and then normally bypasses other plant processes including amine

treatment and the cryogenic plant.

Primary plant operations include inlet compression turbines, the east glycol dehydration unit, the amine

plant, the west glycol dehydration unit, the molecular sieve dehydrator, the turbo-expander plant (cryogenic

removal of NGL), the fractionation plant, and recompression. The plant operations are described below.

Inlet Compression

Inlet compression at the facility is accomplished through an arrangement of compressors driven by

stationary natural gas turbines. The inlet compression turbines include one (1) Solar Titan 130 natural gasfired turbine (Trunk S), one (1) Solar Mars 100 natural gas-fired turbine (Trunk S), and one (1) Solar Taurus

70 natural gas-fired turbine (Trunk C) equipped with a heat recovery steam generator (HRSG).

Dehydration

Dehydration of Trunk C field gas is accomplished at the East Dehydrator. The East Dehydrator is equipped

with a natural gas-fired reboiler rated at 0.75 million British thermal units per hour (MMBtu/hr). The East

dehydration unit regenerator vent gas is routed to the Callidus Thermal Oxidizer for emission control.

Applicable emission limits and operating requirements for the Callidus Thermal Oxidizer (ThOx) are

dictated by Prevention of Significant Deterioration (PSD) Permit No. PSD-SU-00027-01.00, issued

December 22, 2010.

Initial dehydration of Trunk S field gas is accomplished at the West Dehydrator, which removes excess

moisture to decrease the burden on the downstream molecular sieve dehydrator. The West Dehydrator is

equipped with a steam-heated glycol reboiler. The regenerator vent hydrocarbon slip emissions are

controlled by the Plant Flare. Emission limits and operating requirements in PSD-SU-00027-01.00 issued

December 22, 2010 may be applicable.

2

The molecular sieve dehydrator consists of four beds. The mole sieve beds are cycled such that three of the

beds are operating while the fourth bed undergoes regeneration. Regeneration is accomplished by a natural

gas-fired regeneration gas heater which is designated at 18.5 MMBtu/hr. The standby regeneration gas

heater, which is also natural gas fired, is design-rated at 13.02 MMBtu/hr.

Carbon Dioxide Removal

Carbon dioxide removal occurs within the Amine Treatment System. Therefore, the amine reboiler utilizes

heat from plant steam, it is not a source of combustion emissions. However, hydrocarbons are released from

the process during amine regeneration. The entrained hydrocarbons in the vent stream are controlled by

combustion in the ThOx. Emission limits and operating requirements in permit PSD-SU-00027-01.00

issued December 22, 2010 are applicable.

NGL Removal, Fractionation and Storage

At the Turbo-Expander Plant, the demethanizer separates methane from the NGL. The NGL is then

sequentially separated into ethane, propane, butane and natural gasoline at the Fractionation Plant. Variation

in fractionation operations can occur based on market conditions. The demethanizer, deethanizer,

depropanizer, and debutanizer reboilers utilize plant steam.

The facility is equipped with 25 storage tanks of various types and capacities. Storage facilities are located

within the facility and include:

Product

Y-Grade Bullets

Propane Bullets

Butane Spheres

Natural Gasoline Spheres

Condensate Bullets

LNG Bullet

LNG Bullet

Propane Bullet

Condensate Bullet

No. of Vessels

5

10

2

2

2

1

1

1

1

Vessel Size (Gallons)

25,200

42,000

260,232

214,900

41,581

38,500

55,000

90,000

90,000

Pressure Rating (psig)

700

250

85

30

85

185

90

240

240

Loading of NGL

NGL are transported off-site via pipelines and tanker trucks. “Y-grade” (demethanized mix of NGL

composition of which depends on a number of plant operating variables), is transported off-site via a NGL

pipeline. The loading of the remaining NGL occurs through loading racks - two (2)-propane loading racks,

one (l)-butane loading rack, two (2)-natural gasoline loading racks, and one (1) liquified natural gas (LNG)

loading rack. These liquids can also be sent to pipeline when excess at the plant is available.

Re-Compression

The methane stream leaving the Turbo-Expander Plant (TXP) is recompressed by two (2) Solar Titan 130

natural gas-fired turbine driven compressors equipped with HRSGs.

3

Utilities

The following combustion sources at the Ignacio Plant are equipped with waste heat recovery units:

•

Trunk C Inlet - Solar Taurus 70 natural gas-fired turbine

•

Recompression - Two (2)-Solar Titan 130 natural gas-fired turbines

•

The Thermal Oxidizer

These waste heat recovery units provide the Ignacio Plant with high pressure steam (600 psig) to drive a

steam turbine generator set to produce plant electricity, as well as low pressure steam (60 psig).

Supplemental low pressure steam is produced by the Vogt CL.VV-22.5 boilers. These units generally

operate only when the recompressors are not in operation. The plant includes a two-cell cooling tower.

The following combustion sources located at the La Plata B Compressor Station provide steam for the

Ignacio Gas Plant, and are included in the facility’s Title V permit:

•

Two (2) Deltak Delta 3S6-347 boilers

Emission Control Equipment

Emissions of volatile organic compounds (VOC) may be released from various process units, storage tanks

and leaking components. Such releases occur throughout the plant and may be controlled or uncontrolled

(fugitive). Controlled releases are collected and routed through a header to the smokeless flare or the flash

gas system.

Releases from the following sources are controlled through the flare system:

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

Inlet separator (Trunk C)

Inlet Gas Cooler

West Dehydration Unit

Fuel Gas Line and Filter

Various Process Scrubbers and Blow Down Vents

Booster Compressor CG-8104 Suction Line (TXP)

Deethanizer Reflux Condenser, Overhead Off Gas, Reflux Accumulator, Reboiler and Feed Pre-Heater

Depropanizer and Depropanizer Reflux Accumulator

Debutanizer, Debutanizer Reflux Pumps and Accumulator

Ethane/Propane Product Accumulator

Vent from Y-Grade Storage

Propane Storage and Loading

Butane Storage and Loading

Natural Gasoline Loading and Storage

Condensate Storage

Closed Drain System

4

•

•

Chromatography Vent

Emergency Releases

The Flash Gas System takes various streams for re-compression by two electric driven reciprocating

compressors prior to being sent to the facility inlet for re-processing. The flash gas system controls

emissions from the following sources:

•

•

•

West glycol dehydrator flash tank

Amine Treatment flash tank

LNG flashing

The Thermal Oxidizer operated at the Ignacio Gas Plant is a Callidus Technologies unit, installed in 1999

and equipped with a forced draft combustion air blower and vent stack. The Thermal Oxidizer controls

emissions from the East Dehydration Unit and the Amine Treatment System. Applicable Thermal Oxidizer

emission limits and operating requirements are set by the PSD permit PSD-SU-00027-01.00 issued

December 22, 2010.

The uncontrolled releases of VOC are minimized through the implementation of a Leak Detection and

Repair (LDAR) program.

d. List of All Units and Emission-Generating Activities

Harvest provided the information contained in Tables 1 and 2 in its part 70 permit renewal application.

Table 1 lists emission units and emission generating activities, including any air pollution control devices.

Emission units identified as “insignificant” emitting units (IEUs) are listed separately in Table 2.

Table 1 – Emission Units

Emission

Unit ID

Control

Equipment

Description

C.E. Natco MN620740009020 Molecular Sieve Regeneration Heater

18.5 MMBtu/hr

12

Serial No.

IJ052

Install Date:

1/1/1984

Struthers IF – 10 Back-Up Molecular Sieve Regeneration Heater

13.02 MMBtu/hr

12a

Serial No.

NM085347/M050102

Install Date:

None

None

1/1/1984

Vogt CL. VV – 22.5 Industrial Boiler

18.0 MMBtu/hr

13

14

Serial No.

1425

Install Date:

1426

5

1/1/1956

1/1/1956

None

Sivalls 500 MMscfd TEG Dehydrator Regenerator (West), 3.0 (Steam Heat)

MMBtu/hr Glycol Regenerator Reboiler

15

Serial No.

26461

Install Date:

1992

Sivalls 120 MMscfd SB – 18-18H TEG Dehydrator Regenerator (East) 0.75

MMBtu/hr Natural Gas – Fired Glycol Regenerator Reboiler

16

Serial No.

9004-174

Install Date:

1/1/1991

Thermal Oxidizer

(Emission Unit

22)

1/1/1984

Thermal Oxidizer

(Emission Unit

22)

Amine Unit Regenerator Vent

17

Serial No.

N/A

Install Date:

Plant Flare

(Emission Unit

23)

Piping Component Fugitives: pumps, pressure relief devices, open ended

valve lines, compressors, and flanges or other connectors that are in VOC or

wet gas service

18

19

N/A

Serial No.

20

N/A

Install Date:

N/A

Pre-1971

2011 Enhanced

LDAR

1984 / PSD

LDAR Program

1998 NSPS

KKK

LDAR Program

Natural Gas Liquids Loadout System (one pipeline and five loading racks)

21

Serial No.

N/A

Install Date:

Pre-1972

Callidus Technologies 203313-00 Thermal Oxidizer

22

Serial No.

203313-000

Install Date:

1/1/1999

Zecco Plant Flare

23

Serial No.

17790

Install Date:

2009

Fluor Company Cooling Tower

24

Serial No.

N/A

Install Date:

1/1/1956

Waukesha H866D Diesel Fired Water Pump Engine

384 Nameplate Rated Horsepower

25

Serial No.

909602

Install Date:

6

Plant Flare

(Emission Unit

23)

None

None

None

None

1/1/1978

Caterpillar 4W-3798 Diesel Fired Water Pump Engine

305 Nameplate Rated Horsepower

26

Serial No.

6TB04260

Install Date:

None

1/1/1985

Solar Mars 100 Natural Gas Fired Turbine (Trunk S)

27

Serial No.

OHK19-M3865

Install Date:

2/1/2013

SoLoNOx

Solar Titan 130 Natural Gas Fired Turbine

28

30

OHB19-L6137

Serial No.

31

OHC22-L2539

Install Date:

OHC22-L0090

2/1/2013

SoLoNOx

4/29/2022

SoLoNOx

3/28/2022

SoLoNOx

Solar Taurus 70 Natural Gas Fired Turbine (Trunk C)

29

Serial No.

OHH21-B0605

Install Date:

9/29/2021

SoLoNOx

Horton 42,000 Gallon Produced Water Storage Tank

32

33

Serial No.

N/A

Install Date:

N/A

1956

None

1956

None

Deltak Delta 3S6-347 Natural Gas Fired Waste Heat Recovery Boiler

29 MMBtu/hr

B001

B002

Serial No.

G92001A

Install Date:

G92001B

1992

None

1992

None

1984

None

1984

None

General Electric M3142J A/T Natural Gas Fired Turbine

*10

*11

Serial No.

282514

Install Date:

282515

*According to Harvest, these units have been permanently removed from the facility. However, these units remain listed in the Part

70 permit as they are still listed in the PSD permit for this facility.

The Southern Ute Indian Tribe/State of Colorado Environmental Commission’s Reservation Air Code

allows sources to separately list in the permit application units or activities that qualify as “insignificant”

7

based on potential emissions below 2 tpy for all regulated pollutants that are not listed as hazardous air

pollutants (HAPs) under Section 112(b) of the Clean Air Act (CAA) and below 1,000 lbs per year or the de

minimis level established under Section 112(g), whichever is lower, for HAP emissions

[RAC 2-106(4)(f); RAC 1-103(36) and (37)]. However, the application may not omit information needed

to determine the applicability of, or to impose, any applicable requirement, or to calculate the fee

[RAC 2-106(4)(f)]. Units that qualify as “insignificant” for the purposes of the Part 70 application are in

no way exempt from applicable requirements or any requirements of the Part 70 permit.

Harvest stated in its Part 70 permit renewal application that the emission units in Table 2, below, are

insignificant. Harvest provided sufficient information, including EPA Tanks 4.0.9d calculations, to verify

any emissions from liquids in the tanks were insignificant. This data supports Harvest’s claim that these

units qualify as insignificant.

Table 2 – Insignificant Emission Units

Emission

Amount

Unit ID

N/A

2

N/A

1

N/A

N/A

N/A

N/A

TK1

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

1

1

1

1

1

1

1

1

1

1

2

2

1

1

1

2

5

10

1

1

1

Description

Size

Units

Lube oil storage tank

Diesel tank (river water pump building & fire water pump

generators)

Diesel tank (river water pump building & fire water pump

generators)

Spent lube oil storage tank

Lube oil storage tank

Diesel storage tank

Diesel storage tank

Gasoline storage tank

Petroleum solvent storage tank

Lube oil storage tank

Spent lube oil storage tank

Turbine 32 oil storage tank

Natural gasoline sphere – 30 psig

Natural gas liquid rundown pressurized tank – 85 psig

Recovery oil tank (T9103)

Recovery oil tank (T9104)

Ambitrol storage tank

Butane sphere – 85 psig

Y-Grade bullet – 700 psig

Propane bullet – 250 psig

Sulfuric acid storage tank

Sulfuric acid storage tank

TEG storage tank

2,060

gal

290

gal

322

gal

33,694

11,653

517

1,028

582

509

6,300

2,000

8,820

214,924

41,581

504

500

748

260,232

22,321

40,805

4,200

294

2,910

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

8

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

1

1

1

1

1

2

1

1

1

1

1

1

1

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

2

1

1

3

Raw water storage tank (West tank)

Raw water storage tank (East tank)

Optisphere HP55441 tank

Ambitrol storage tank

DI water storage tank

Raw water storage tank

Salt water storage tank

Depositrol PY5206 tank

Biomate MBC2881 tank

Cooling tower blend tank

Klaraid IC1172 tank

Cortol OS2001 tank

Steammate NA0120 tank

Gas spec (amine) storage tank – 1 fresh, 1 mixed, and 1

regenerated

Gas Spec (amine) storage tank

Gas spec (amine) storage tank

Methanol storage tank

Turbine 32 oil storage tank

Gengard GN7110 tank

Bleach tank

Waste oil tank

TEG storage tank

Turbine 32 oil storage tank (steam turbine)

Klaraid IC1172 tank

Polyfloc AE1115 tank (inside clear water building)

Diesel storage tank

LNG pressurized bullet – 185 psig

LNG pressurized bullet – 90 psig

Waste water frac tank

Slop oil tank

Odorant storage tank

Propane bullet – 240 psig

Condensate bullet – 240 psig

Sodium Hydroxide tank

Lube oil storage tank

Lube oil storage tank

Lube oil/water storage tank

Sodium Hydroxide tank

9

215,904

200,000

400

2,300

215,977

21,000

4,300

400

55

2,970

400

400

400

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

16,800

gal

4,200

20,000

24,240

300

550

330

630

719

850

500

120

564

38,513

55,000

16,800

4,200

796

90,000

90,000

35

6,300

2,000

1,000

300

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

gal

e. Facility Construction and/or Permitting History

The Ignacio Gas Plant began initial construction in 1956. The plant had additional construction between

1957 and the present.

1984 EPA Issued a PSD Permit for Two Natural Gas Fired Turbines

In July 1983, Northwest Pipeline (previous owners of the gas plant) submitted a Prevention of Significant

Deterioration (PSD) permit application to the EPA to replace the Gasoline Plant Oil Absorption Process

with a more efficient Cryogenic Turbo-Expansion Process. The Turbo-Expansion Process increased the

recovery of liquids from 156,000 to 692,000 gallons per day and recovered a greater level of propane and

ethane. The construction for this new Turbo-Expansion Process included a Turbo-Expansion Unit, Amine

Treatment System, and two natural gas-fired turbines. However, the PSD application for this modification

only discussed the two natural gas-fired turbines and potential NOx emission. According to the applicant,

the VOC emissions from the Amine Treatment System were insignificant. The application stated that all

other pollutants were below significant emission rates for major modification and not subject to PSD

review. On February 24, 1984, the EPA issued a PSD permit approving controlled NOx emissions from the

two turbines.

1986 EPA approval of the Colorado Department of Health and Environment (CDPHE) PSD

Permitting Program

In 1986, the EPA approved CDPHE’s State Implementation Plan (SIP) for the implementation of the PSD

Permitting Program and the attainment and maintenance of National Ambient Air Quality Standards,

pursuant to 40 CFR 52.343. In approving the SIP, the EPA did not delegate, but rather reserved to the EPA

as a federal program, PSD permitting authority with respect to sources on Indian lands and Reservations,

and further stated in 51 FR 31325 (September 2, 1986) that the EPA’s PSD regulations will also remain in

effect for sources located on Indian Reservations and for sources that have received earlier PSD permits

from the EPA.

However, there was an ongoing disagreement between the CDPHE, the EPA, and the Southern Ute Indian

Tribe regarding who had jurisdiction over air pollution sources located on fee lands; the Ignacio Gas Plant

is located on fee lands. Fee lands are defined as lands located within the exterior boundaries of the

reservation but are privately owned (by either Indians or non-Indians), nonpublic lands. During the

resolution of this dispute, CDPHE continued to issue pre-construction permits to the Ignacio Gas Plant.

1991 Construction of the East Glycol Dehydration Unit – No Permit Issued

In March 1991, Williams Field Services installed and began operation of an East Dehydrator. VOC

emissions were thought by the State to be insignificant at that time. In 1992, a notice submitted to the State

of Colorado indicated that the VOC emissions from the East Dehydrator were 25 tons/year, below the 40

ton/year significant level for PSD. The VOC emissions from the East Dehydrator were uncontrolled, vented

10

directly to the atmosphere. The EPA Region 8 was not notified by Williams about the construction of the

dehydrator.

1992 Construction of the West Glycol Dehydration Unit – No Permit Issued

In November 1992, the West Dehydrator was added to the facility. Again, VOC emissions were thought by

the State to be insignificant at that time. The EPA Region 8 was not notified by Williams about the

construction of the dehydrator.

1997 Construction Permit for East Glycol Dehydration and West Glycol Dehydration Unit (CDPHE

Issued - #96-LP-506 and #96-LP-505, respectively)

On August 31, 1995 construction permit applications for the East and West Dehydrators were sent to

CDPHE. In 1997, CDPHE issued both construction permits. The permit for the West Dehydration Unit

required that VOC emissions be controlled by a flare. The permit for the East Dehydration Unit required

that VOC emissions be controlled by a thermal oxidizer.

1998 Construction Permit for the Amine Treatment System and Turbo-Expansion Unit Fugitive

Emissions (CDPHE Issued - #97-LP-0315 & #97-LP-0316)

In March 1996, CDPHE received a permit modification request from Williams that indicated the Ignacio

Gas Plant’s amine regeneration unit built in 1984 emits approximately 995 tpy of VOC emissions. On July

18, 1996, CDPHE notified Williams that these were previous unreported emissions that may have triggered

PSD requirements during the modification in 1984 and requested additional information. On January 27,

1997, Williams provided CDPHE with a summary of annual VOC emissions from the Amine Treatment

System, turbines and Turbo-Expansion Unit. The VOC emissions were determined by the State to be

significant, verifying that Williams should have gone through PSD review for VOCs in addition to the PSD

review for NOx that was conducted in 1984.

CDPHE issued construction permits 97-LP-0315 and 97-LP-0316 which defined requirements for the

Amine Treatment System and the fugitive emissions from the Turbo-Expansion Unit. The permits required

that VOC emissions from the Amine Treatment System be controlled by a thermal oxidizer and a leak

detection and repair program as stringent as that found in 40 CFR Part 60, Subpart KKK be developed and

implemented for the fugitive emissions from the Turbo-Expansion Unit.

August 17, 1999 – the EPA determines La Plata A Compressor Station, La Plata B Compressor

Station, and Ignacio Gas Plant are single stationary source.

Northwest Pipeline Corporation’s La Plata B Compressor Station, Transwestern Pipeline Company’s La

Plata A Compressor Station, and Williams Field Services Ignacio Gas Plant are all owned by the same

parent company, Williams Company, and thus are under common control. Additionally, the three sources

are located on adjacent properties and possess the same two-digit SIC code. Therefore, the three sources

are a single stationary source for Title V and PSD permitting purposes.

11

March 28, 2001, Consent Decree (CD) Entered into the United States District Court

Civil Action No. 01-S-0113: The EPA determined that the Turbo-Expansion Unit and the Amine Treatment

System constructed in 1984 should have been subject to PSD review for VOC emissions. On February 8,

2001, the EPA published a Notice of Lodging of Consent Decree under the Clean Air Act (66 FR 9597).

The CD was entered in the United States District Court on Denver, Colorado on March 28, 2001. The CD

required that Williams meet emission standards and other terms and conditions set forth on the CD

regarding emissions of VOCs until such time that a PSD permit has been issued by the EPA or other duly

authorized State or Tribal agency or commission to which the EPA has delegated Federal PSD permitting

authority. The CD required that Williams submit a PSD application to the EPA no later than 30 days after

the effective date of the CD.

May 22, 2001, PSD application submitted by Williams as required by Consent Decree

January 18, 2002, PSD application submitted by Williams as required by Consent Decree

April 22, 2002, Consent Decree Entered into the United States District Court

Civil Action No. 02-B-0199: The EPA determined that the East and West Dehydrators constructed in 1991

and 1992, respectively, should have been subject to PSD review for VOC emissions. On March 11, 2002,

the EPA published a Notice of Lodging of Consent Decree under the Clean Air Act (67 FR 10933). The

CD was entered in the United States District Court on Denver, Colorado on April 22, 2002. The CD required

that Williams meet emission standards and other terms and conditions set forth on the CD regarding

emissions of VOCs until such time that a PSD permit has been issued by the EPA or other duly authorized

State or Tribal agency or commission to which the EPA has delegated Federal PSD permitting authority.

The CD required that Williams submit a PSD application to the EPA no later than 30 days after the effective

date of the CD.

September 15, 2003, amended application to modify SO2 and VOC emission limits in PSD and Title

V applications submitted by Williams

November 19, 2003, EPA issued the initial Part 71 operating permit for Ignacio Gas Plant

April 4, 2008, Part 71 renewal application submitted by Williams

December 22, 2010, PSD Permit #PSD-SU-0027-01.00 was issued to Williams to incorporate all

requirements from the 1984 PSD permit and the two Consent Decrees

November 1, 2011, Consent Decree Entered into the United States District Court

Civil Action No. 1:11-cv-02846: The EPA determined that Williams failed to timely repair four leaks at the

Ignacio Gas Plant in violation of the New Source Performance Standard at 40 CFR Part 60, Subpart KKK.

12

On November 1, 2011, the EPA published a notice of Lodging of Consent Decree under the CAA. This

Consent Decree, effective on December 15, 2011, required Williams to implement an enhanced leak

detection and repair program at the Ignacio Gas Plant service using optical gas imaging, for a period of five

years from the effective date of the Consent Decree. The affected sources are the components in Williams’

current New Source Performance Standards KKK leak detection and repair program as well as previously

grandfathered components in VOC and wet gas service.

January 28, 2013, EPA issued the renewal Part 71 operating permit for Ignacio Gas Plant

June 5, 2017, SUIT issued an initial Part 70 operating permit (V-SUIT 0027-2017.00) to Williams

Four Corners, LLC for the Ignacio Gas Plant, replacing V-SU-00027-2008.00.

December 7, 2018, SUIT issued an administrative permit revision (V-SUIT-0027-2017.01) to change

the facility ownership from Williams Four Corners, LLC to Harvest Four Corners, LLC.

November 23, 2020, SUIT issued an administrative permit revision (V-SUIT-0027-2017.02) to correct

emission unit IDs and the CAM plan.

November 15, 2021, SUIT issued a significant permit revision (V-SUIT-0027-2017.03) to incorporate

emission units and reclassify the facility from a major source to an area source of HAPs.

February 1, 2023, SUIT issued a renewal Part 70 operating permit for the Ignacio Gas Plant.

f. Potential to Emit

Under RAC 1-103(51), potential to emit (PTE) is defined as the maximum capacity of a stationary source

to emit a pollutant under its physical and operational design. Any physical or operational limitation on the

capacity of the source to emit a pollutant, including air pollution control equipment and restrictions on hours

of operation or on the type or amount of material combusted, stored, or processed, shall be treated as part

of its design if the limitation, or the effect it would have on emissions, is federally enforceable.

The PTE for Ignacio Gas Plant was listed by Harvest in Forms “GIS”, “PTE”, and the various forms

“EMISS” of the Part 70 operating permit renewal application. Table 3 shows PTE data broken down by

each individual emission unit, as well as the total facility-wide PTE.

13

Table 3 - Potential to Emit

Harvest Four Corners LLC, Ignacio Gas Plant

Regulated Air Pollutants in tons per year (with required controls)

Emission

Unit ID

NOX

VOC

SO2

PM10

CO

Lead

Total

HAPs

Largest

Single

HAP

(Hexane)

12

11.4

0.4

0.1

0.6

6.7

0.0

0.2

0.1

9,589.6

12a

13

14

5.6

7.7

7.7

0.3

0.4

0.4

0.0

0.1

0.1

0.4

0.6

0.6

4.7

6.5

6.5

0.0

0.0

0.0

0.1

0.9

0.9

0.1

0.1

0.1

6,745.8

9,326.0

9,326.0

151

162

172

18

19

20

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

70.4

0.7

10.7

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.0

211

22

23

24

25

26

0.0

38.5

5.8

0.0

3.0

2.4

0.0

5.1

11.6

10.5

0.2

0.2

0.0

37.1

0.0

0.0

0.2

0.2

0.0

0.0

0.0

33.4

0.2

0.2

0.0

23.5

41.7

0.0

0.6

0.5

0.0

0.0

0.0

0.0

0.0

0.0

0.0

1.2

3.0

0.0

0.0

0.0

0.0

0.0

0.8

0.0

0.0

0.0

0.0

236,122.4

582.1

0.0

110.4

87.7

27

28

29

30

31

32

44.7

54.1

30.6

54.1

54.1

0.0

18.2

22.1

12.5

22.1

22.1

9.7

1.4

1.7

0.9

1.7

1.7

0.0

2.6

3.2

1.7

3.2

3.2

0.0

40.8

49.4

27.9

49.4

49.4

0.0

0.0

0.0

0.0

0.0

0.0

0.0

0.4

0.5

0.3

0.5

0.5

0.3

0.0

0.0

0.0

0.0

0.0

0.3

44,357.3

54,261.2

28,398.5

54,261.2

54,261.2

0.0

33

B001

B002

Total IEUs

0.0

12.5

12.5

0.0

9.7

0.7

0.7

0.0

0.0

0.1

0.1

0.0

0.0

1.0

1.0

0.0

0.0

10.5

10.5

0.0

0.0

0.0

0.0

0.0

0.3

1.4

1.4

0.0

0.3

0.2

0.2

0.0

0.0

15,025.2

15,025.2

0.0

Total

344.7

228.7

45.4

51.9

328.6

0.0

11.5

2.3

537,479.8

1Emissions are routed to emission unit 23 – Zecco Plant Flare.

GHGs

(CO2e mtpy)

2Emissions are routed to emission unit 22 – Callidus Technologies 203313-00 Thermal Oxidizer.

2. Tribal Authority

The Ignacio Gas Plant is located within the exterior boundaries of the Southern Ute Indian Reservation and

is thus within Indian Country as defined at 18 U.S.C. §1151. On March 2, 2012, the EPA determined that

the Southern Ute Indian Tribe of the Southern Ute Indian Reservation had met the requirements of 40 CFR

§70.4(b) for full approval to administer its Clean Air Act Title V, Part 70 Permitting Program (Program).

14

In concert with that Program approval, the EPA also found that the Tribe met the requirements of Section

301(d)(2) of the CAA and 40 CFR §49.6 for treatment “in the same manner as a state” for the purposes of

issuing CAA Title V, Part 70 operating permits. The EPA promulgated its approval of the Tribe’s

applications on March 15, 2012 (77 FR 15267). The requirements of the Clean Air Act Title V, Part 70

Permitting Program (Program) have been incorporated at Article II, Part 1 of the Reservation Air Code.

Therefore, the Southern Ute Indian Tribe is the appropriate governmental entity to issue the Title V permit

to this facility.

The Reservation Air Code: The Reservation Air Code was adopted pursuant to the authority vested in the

Southern Ute Indian Tribe/State of Colorado Environmental Commission by (1) the Intergovernmental

Agreement Between the Southern Ute Indian Tribe and the State of Colorado Concerning Air Quality

Control on the Southern Ute Indian Reservation dated December 13, 1999, (2) tribal law (Resolution of the

Council of the Southern Ute Indian Tribe No. 00-09), (3) State law (C.R.S. § 24- 62-101), and (4) as

recognized in federal law (Act of October 18, 2004, Pub. L. No. 108-336, 118 Stat.1354).

NSPS and NESHAP Delegation: On September 6, 2013, the Southern Ute Indian Tribe received delegation

from the EPA to incorporate by reference into the Reservation Air Code and enforce certain subparts of the

new source performance standards (NSPS) and national emission standards for hazardous air pollutants

(NESHAP) under Sections 111 and 112 of the Clean Air Act, respectively (78 FR 40635). These NSPS

and NESHAP subparts generally apply to oil and gas operations within the exterior boundaries of the

Southern Ute Indian Reservation and were adopted, unchanged, into the Reservation Air Code as Parts 2

and 3.

Tribal Minor New Source Review Program: Minor sources of air pollution located within the Southern Ute

Indian Reservation exterior boundaries must comply with either the “Federal Implementation Plan for

Managing Air Emissions From True Minor Sources In Indian Country In The Oil And Natural Gas

Production And Natural Gas Processing Segments Of The Oil And Natural Gas Sector” listed at 40 CFR

§49.101 – 105 or the “Federal Minor New Source Review Program In Indian Country” listed at 40 CFR

§49.151 – 164.

3. Applicable Requirements

The following discussion addresses a selection of the regulations from the Code of Federal Regulations

(CFR) at Title 40. Note that this discussion does not include the full spectrum of potentially applicable

regulations and is not intended to represent official applicability determinations. These discussions are

based on the information provided by Harvest in its Part 70 permit renewal application and are only

intended to present the information certified to be true and accurate by the Responsible Official of this

facility.

Tribal Minor New Source Review (TMNSR) – 40 CFR Part 49

EPA promulgated the federal rule “Review of New Sources and Modifications in Indian Country,”

otherwise known as the Tribal Minor New Source Review Rule (TMNSR), on July 1, 2011 (76 FR 38748).

15

The TMNSR rule applies to all new or modified industrial facilities in Indian country with a potential to

emit equal to or greater than the minor NSR thresholds, but less than the major source thresholds, which

are generally 100 to 250 tons per year (tpy). The minor NSR thresholds for attainment/unclassifiable areas

are displayed in the table below:

40 CFR 49.153 Minor NSR Thresholds

Minor NSR Thresholds for

Regulated NSR Pollutant

Attainment/Unclassifiable Areas in Tons Per

Year (TPY)

Carbon Monoxide (CO)

10

Nitrogen Oxides (NOx)

10

Sulfur Dioxide (SO2)

10

Volatile Organic Compounds (VOC)

5

PM10

5

PM2.5

3

Lead

0.1

Fluorides

1

Sulfuric Acid Mist

2

Hydrogen Sulfide (H2S)

2

Total Reduced Sulfur (including H2S)

2

Reduced Sulfur Compounds (including H2S)

2

Municipal Waste Combustor Emissions

10

Municipal Solid Waste Landfill Emissions

10

(measured as nonmethane organic compounds)

Starting August 30, 2011, all minor modifications at existing major NSR sources, requests for synthetic

minor limitations, and the transferring of synthetic minor limits from Part 71 permits into minor NSR

permits became subject to the TMNSR rule. All true minor sources and minor modifications at existing

major sources constructed after August 30, 2011 were required to submit a registration form within 90 days

of beginning operation and obtain a permit if a general permit was available for that source category. No

general permit was available for sources in the oil and gas sector constructed or modified between August

30, 2011 and October 2, 2016 and these sources were only required to register with EPA.

On May 12, 2016, EPA finalized a Federal Implementation Plan (FIP) for true minor oil and gas sources in

Indian County. Beginning on October 3, 2016, all new and modified true minor oil and gas sources are

required to register with the EPA to obtain coverage under the FIP. Owners/operators also have the option

of apply to EPA for a source-specific permit instead of complying with the FIP, or EPA may determine that

a source-specific permit is necessary due to local or reservation-specific air quality concerns.

Future modifications at the Ignacio Gas Plant will be subject to the TMNSR rule; however, no TMNSR

permits have been issued to this facility at this time.

Prevention of Significant Deterioration (PSD) - 40 CFR 52.21

PSD is a preconstruction review requirement of the CAA that applies to proposed projects that are

16

sufficiently large (in terms of emissions) to be a “major” stationary source or “major” modification of an

existing stationary source. A new stationary source, or a modification to an existing minor stationary

source, is major if the proposed project has the potential to emit any pollutant regulated under the CAA

in amounts equal to or exceeding specified major source thresholds, which are 100 tpy for 28 listed

industrial source categories and 250 tpy for all other sources. PSD also applies to modifications at

existing major sources that cause a “significant net emissions increase” at that source. Significance

levels for each pollutant are defined in the PSD regulations at 40 CFR 52.21. A modification is a

physical change or change in the method of operation.

The Ignacio Gas Plant is an existing source that does not belong to any of the 28 listed source

categories. The facility-wide PTE for NOx, CO, and VOCs is greater than 250 tpy and the PTE for

CO2e is greater than 100,000 tpy. Consequently, the PTE for NOx, CO, VOC, and CO2e at the

Ignacio Gas Plant exceeds the major source PSD thresholds and the source is classified as major

for PSD permitting purposes. Therefore, potential emissions from any newly proposed

construction must be compared to the PSD significance levels rather than major source thresholds

when determining PSD applicability.

The EPA issued an initial PSD permit in 1984 for the Ignacio Gas Plant. In December 2010, the

EPA issued another PSD permit to incorporate the requirements of the 1984 PSD permit and the

two consent decrees.

New Source Performance Standards (NSPS)

40 CFR Part 60, Subpart A: General Provisions. This subpart applies to the owner or operator of any

stationary source that contains an affected facility, the construction or modification of which is

commenced after the date of publication of any standard in Part 60. The general provisions under Subpart

A apply to sources that are subject to the specific subparts of Part 60.

As explained below, the Ignacio Gas Plant is subject to specific subparts under 40 CFR Part 60.

Therefore, the General Provisions of Part 60 apply.

40 CFR Part 60, Subpart Db: Standards of Performance for Industrial-Commercial-Institutional Steam

Generating Units. This rule applies to each steam generating unit that commences construction,

modification, or reconstruction after June 19, 1984, and that has a heat input capacity from fuels

combusted in the steam generating unit of greater than 29 megawatts (MW) (100 million British thermal

units per hour (MMBtu/her)).

According to the information provided by Harvest, units 13 and 14 were constructed prior to the

regulatory applicability date and have a heat input capacity less than 29 MW. Units B001 and

B002 were constructed after the regulatory applicability date but have a heat input capacity less

than 29 MW. Therefore, Subpart Db does not apply.

17

40 CFR Part 60, Subpart Dc: Standards of Performance for Small Industrial-Commercial-Institutional

Steam Generating Units. This rule applies to steam generating units with a maximum design heat capacity

of 100 MMBtu/hr or less, but greater than or equal to 10 MMBtu/hr and commenced construction,

modification, or reconstruction after June 9, 1989.

According to information provided by Harvest, units 13 and 14, located at the Ignacio Gas Plant,

are affected sources under this subpart with a maximum design heat input capacity of between 10

and 100 MMBtu/hr. However, these units commenced construction before June 9, 1989 and have

not been reconstructed or modified. This subpart applies to units B001 and B002 because they

have a maximum design heat input capacity of 29 MMBtu/hr each and were constructed after June

9, 1989. Since the boilers burn natural gas, there are no emission limit requirements for particulate

matter or sulfur dioxide. However, the Ignacio Gas Plant is subject to the recordkeeping and

notification requirements of Subpart Dc. Therefore, Subpart Dc does apply.

40 CFR Part 60, Subpart K: Standards of performance for Storage Vessels for Petroleum Liquids for

which Construction, Reconstruction, or Modification Commenced After June 11, 1973, and Prior to May

19, 1978. This rule applies to storage vessels for petroleum liquids with a storage capacity greater than

40,000 gallons. 40 CFR Part 60, Subpart K does not apply to storage vessels for petroleum or condensate

stored, processed, and/or treated at a drilling and production facility prior to custody transfer.

According to information provided by Harvest, the Ignacio Gas Plant has 19 pressurized storage

tanks with a storage capacity greater than 40,000 gallons which store petroleum liquids. However,

these tanks are designed to operate in excess of 15 pounds per square inch gauge without

emissions to the atmosphere and thus, do not meet the definition of a storage vessel in this subpart.

Therefore, Subpart K does not apply.

40 CFR Part 60, Subpart Ka: Standards of Performance for Storage Vessels for Petroleum Liquids for

which Construction, Reconstruction, or Modification Commenced After May 18, 1978, and Prior to

June 23, 1984. This rule applies to storage vessels for petroleum liquids with a storage capacity greater

than 40,000 gallons. Subpart Ka does not apply to petroleum storage vessels with a capacity of less than

420,000 gallons used for petroleum or condensate stored, processed, or treated prior to custody transfer.

According to information provided by Harvest, the Ignacio Gas Plant has 19 pressurized storage

tanks with a storage capacity greater than 40,000 gallons which store petroleum liquids. However,

these tanks are designed to operate in excess of 204.9 kPa (15 psig) without emissions to the

atmosphere and thus, do not meet the definition of a storage vessel in this subpart. Therefore,

Subpart Ka does not apply.

40 CFR Part 60, Subpart Kb: Standards of Performance for Volatile Organic Liquid Storage Vessels

(Including Petroleum Liquid Storage Vessels) for which Construction, Reconstruction, or Modification

Commenced After July 23, 1984. This rule applies to storage vessels with a capacity greater than or equal

to 75 cubic meters (~629 bbl). The subpart does not apply to storage vessels with a capacity greater than

or equal to 151 cubic meters storing a liquid with a maximum true vapor pressure less than 3.5 kPa or

18

with a capacity greater than or equal to 75 cubic meters but less than 151 cubic meters storing a liquid

with a maximum true vapor pressure less than 15.0 kPa.

According to Harvest, the Ignacio Gas Plant has tanks with a capacity greater than 75 m3 (~629

bbl or 19,813 gal), but less than 151 m3 with a vapor pressure less than 15 kPa that commenced

construction after July 23, 1984, including a 33,684 gallon spent lube oil storage tank, two (2)

21,000 gallon spent lube oil/water storage tanks, and two (2) 42,000 gallon produced water tanks.

These tanks meet the exemption criteria specified in §60.110b(b) and are subject to limited

requirements of Subpart Kb.

40 CFR Part 60, Subpart KKK: Standards of Performance for Equipment Leaks of VOC from Onshore

Natural Gas Processing Plants for which construction, reconstruction, or modification commenced after

January 20, 1984, and on or before August 23, 2011. This rule applies to compressors and other

equipment at onshore natural gas processing facilities. As defined in this subpart, a natural gas processing

plant is any processing site engaged in the extraction of natural gas liquids (NGLs) from field gas,

fractionation of mixed NGLs to natural gas products, or both. NGLs are defined as the hydrocarbons,

such as ethane, propane, butane, and pentane that are extracted from field gas.

Subpart KKK requires a source to comply with several requirements of 40 CFR 60, Subpart VV,

Standards of Performance for Equipment Leaks of VOC in the Synthetic Organic Chemicals

Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After

January 5, 1981 and on or Before November 7, 2006. Both Subpart VV and Subpart KKK regulate

fugitive emissions of VOC at onshore natural gas processing plants. The regulations for Subpart VV are

found at 40 CFR 60 §§60.480 through 60.489.

Natural Gas Processing Plant

Pursuant to the definitions at 40 CFR 60.631, a natural gas processing plant “means any processing site

engaged in the extraction of natural gas liquids from field gas, fractionation of mixed natural gas liquids

to natural gas products, or both.”

Natural Gas Liquids

Pursuant to the definitions at 40 CFR 60.631, natural gas liquids “means the hydrocarbons, such as

ethane, propane, butane, and pentane that are extracted from field gas.”

Process Unit

Process units are defined as equipment assembled for the extraction of natural gas liquids from field gas,

the fractionation of the liquids into natural gas products, or other operations associated with the

processing of natural gas products. A process unit can operate independently if supplied with sufficient

feed or raw materials and sufficient storage facilities for the products.

19

Applicability and Designation of Affected Facilities

The provisions of this subpart apply to the following components at onshore natural gas processing plants

that commenced construction, reconstruction, or modification after January 20, 1984 and on or before

August 23, 2011.

1. Compressors in VOC service or wet gas service are subject to this rule. A compressor is in VOC

service if it contains or contacts a process fluid that is at least 10% VOC by weight. In wet gas

service means that a piece of equipment contains or contacts the field gas before the extraction

step in the process.

2. All equipment except compressors within a process unit.

A compressor station, dehydration unit, sweetening unit, underground storage tank, field gas gathering

system, or liquefied natural gas unit is covered by this subpart if it is located at an onshore natural gas

processing plant. If the unit is not located at the plant site, then it is exempt from the provisions of this

subpart.

Equipment

Equipment means each pump, pressure relief device, open-ended valve or line, valve, compressor, and

flange or other connector that is in VOC service or in wet gas service, and any device or system required

by this subpart.

Subpart KKK establishes monitoring/testing requirements, recordkeeping requirements,

recordkeeping requirements and reporting requirements for the following components that may be

located at an onshore natural gas processing plant:

• Pumps in light liquid service

• Compressors in VOC service or wet gas service

• Pressure relief devices in gas vapor service

• Sampling connection systems

• Open-ended valves or lines

• Valves in gas/vapor or light liquid service

• Pumps and valves in heavy liquid service, pressure relief devices in light or heavy liquid

service, and flanges and other connectors

• Closed vent systems and control devices

• Vapor recovery systems

• Enclosed combustion devices

• Flares

In addition, the rule establishes separate requirements for the following:

•

Delay of repair of equipment for which leaks have been detected;

20

•

•

Alternative means of emissions limitation for components subject to the rule; and

Determining components that are not in VOC or wet gas service.

The Ignacio Gas Plant operates a fractionation plant to extract NGLs from the field gas, and thus

meets the definition of a natural gas processing plant under this subpart. According to Harvest,

Emission Units 19 and 20 were installed after January 20, 1984, and before August 23, 2011, and

contain components in VOC or wet gas service. Therefore, Subpart KKK does apply.

40 CFR Part 60, Subpart LLL: Standards of Performance for SO2 emissions from Onshore Natural Gas

Processing for which construction, reconstruction, or modification commenced after January 20, 1984,

and on or before August 23, 2011. This rule applies to sweetening units and sulfur recovery units at

onshore natural gas processing facilities. As defined in this subpart, sweetening units are process devices

that separate hydrogen sulfide (H2S) and carbon dioxide (CO2) from a sour natural gas stream. Sulfur

recovery units are defined as process devices that recover sulfur from the acid gas (consisting of H2S and

CO2) removed by a sweetening unit.

According to Harvest, the Ignacio Gas Plant has an amine sweetening unit that was constructed or

modified after the applicability date of January 20, 1984, and on or before August 23, 2011.

However, the Ignacio Gas Plant has a design capacity less than 2 long tons per day (LT/D) of

hydrogen sulfide (H2S) in the acid gas (expressed as sulfur). Per §60.640, the facility is required

to comply with the recordkeeping requirements of §60.647(c) but is not required to comply

with §§60.642 through 60.646.

40 CFR Part 60, Subpart IIII: Standards of Performance for Stationary Compression Ignition Internal

Combustion Engines. This subpart establishes emission standards and compliance requirements for that

control of emissions from stationary compression ignition (CI) internal combustion engines (ICE) that

commenced construction, modification, or reconstruction after July 11, 2005, where the CI ICE are

manufactured on or after specified manufacture trigger dates. The manufacture trigger dates are based on

the engine type and displacement liter per horsepower (hp). For the purposes of this subpart, the date that

construction commences is the date the engine is ordered by the owner or operator.

Harvest provided the following information:

NSPS Subpart IIII Applicability Determination

Harvest Four Corners, LLC, Ignacio Gas Plant

Unit

Serial No

25

909602

26

6TB04260

Unit Description

Waukesha H886D CI

Emergency Pump

Engine

Caterpillar W4-3798 CI

Emergency Pump

Engine

Fuel

Maximu

m HP

Commence

Construction,

Modification, or

Reconstruction

Date

Diesel

384

Prior to

07/11/2005

07/01/2006

No

Diesel

305

Prior to

07/11/2005

07/01/2006

No

21

Trigger Date

for

ApplicabilityManufactured

on or after

Subject

to NSPS

IIII

According to Harvest, units 25 and 26 were manufactured prior to July 1, 2006 and have not been

modified or reconstructed after July 11, 2005 (the trigger dates for fire pump engines) and have

not been reconstructed or modified (as defined in §60.15). Therefore, the requirements of

Subpart IIII do not apply.

Should Harvest propose to install a replacement engine for unit 25 or 26, which is subject to

Subpart IIII, Harvest will not be allowed to use the off permit changes provision, and will be

required to submit a minor permit revision application to incorporate Subpart IIII requirements

into the permit.

40 CFR Part 60, Subpart KKKK: Standards of Performance for Stationary Combustion Turbines. This

subpart establishes emission standards and compliance schedules for the control of emissions from

stationary combustion turbines that commenced construction, modification, or reconstruction after

February 18, 2005.

According to Harvest, emission units 27, 28, 29, 30, and 31 have a heat input at peak load equal to

or greater than 10.7 gigajoules (10 MMBtu) per hour and commenced construction, modification,

or reconstruction after February 18, 2005. Therefore, Subpart KKKK does apply.

40 CFR Part 60, Subpart OOOO: Standards of Performance for Crude Oil and Natural Gas Production,

Transmission and Distribution. This subpart establishes emission standards and compliance schedules for

the control of VOC and SO2 emissions from affected facilities that commence construction, modification

or reconstruction after August 23, 2011and on or before September 18, 2015. Affected facilities under

this subpart include gas wells, compressors, pneumatic controllers, storage vessels, process unit

equipment, and sweetening units.

According to Harvest, the Ignacio Gas Plant has compression equipment associated with units 27,

28, and 29 and reciprocating compressors (driven by units 30 and 31) in VOC/wet gas service and

process units that commenced construction or were modified after August 23, 2011. Therefore,

Subpart OOOO does apply.

40 CFR Part 60, Subpart OOOOa: Standards of Performance for Crude Oil and Natural Gas Facilities.

This subpart establishes emission standards and compliance schedules for the control of greenhouse gases

(GHG), volatile organic compounds (VOC), and sulfur dioxide (SO2). The standards in this subpart apply

to affected facilities in the crude oil and natural gas source category that commence construction,

modification, or reconstruction after September 18, 2015.

On January 29, 2016, a change to the West Dehydrator/Mol Sieve process unit increased the

emission rate and required a capital expenditure as defined in 40 CFR 60.5430a. This change is

considered a modification in accordance with §60.14. As such, the West Dehydrator/Mol Sieve

process unit and Amine Unit are considered an affected facility subject to the standards of

OOOOa.

22

National Emission Standards for Hazardous Air Pollutants (NESHAP)

40 CFR Part 63, Subpart A: General Provisions. This subpart contains national emissions standards for

HAPs that regulate specific categories of sources that emit one or more HAP regulated pollutants under

the CAA. The general provisions under subpart A apply to sources that are subject to the specific

subparts of Part 63.

As explained below, the Ignacio Gas Plant is subject to specific subparts under 40 CFR Part 63.

Therefore, the General Provisions of Part 63 does apply as specified in the relevant subparts.

40 CFR Part 63, Subpart HH: National Emission Standards for Hazardous Air Pollutants from Oil and

Natural Gas Production Facilities. This subpart applies to the owners and operators of affected units

located at natural gas production facilities that are area or major sources of HAPs, and that process,

upgrade, or store natural gas prior to the point of custody transfer, or that process, upgrade, or store

natural gas prior to the point at which natural gas enters the natural gas transmission and storage source

category or is delivered to a final end user. The affected units are glycol dehydration units, storage vessels

with the potential for flash emissions, and the group of ancillary equipment, and compressors intended to

operate in volatile hazardous air pollutant service, which are located at natural gas processing plants.

Throughput Exemption

Those sources whose maximum natural gas throughput, as appropriately calculated per §63.760(a)(1)(i)

through (a)(1)(iii), is less than 18,400 standard cubic meters per day are exempt from the requirements of

this subpart.

Source Aggregation

Major source, as used in this subpart, has the same meaning as in §63.2, except that:

1)

Emissions from any oil and gas production well with its associated equipment and emissions from

any pipeline compressor station or pump station shall not be aggregated with emissions from other

similar units.

2)

Emissions from processes, operations, or equipment that are not part of the same facility shall not

be aggregated.

3)

For facilities that are production field facilities, only HAP emissions from glycol dehydration units

and storage vessels with the potential for flash emissions shall be aggregated for a major source

determination.

Facility

For the purpose of a major source determination, facility means oil and natural gas production and

processing equipment that is located within the boundaries of an individual surface site as defined in

23

Subpart HH. Examples of facilities in the oil and natural gas production category include, but are not

limited to: well sites, satellite tank batteries, central tank batteries, a compressor station that transports

natural gas to a natural gas processing plant, and natural gas processing plants.

Production Field Facility

Production field facilities are those located prior to the point of custody transfer. The definition of

custody transfer (40 CFR 63.761) means the point of transfer after the processing/treating in the

producing operation, except for the case of a natural gas processing plant, in which case the point of

custody transfer is the inlet to the plant.

Natural Gas Processing Plant

A natural gas processing plant is defined in 40 CFR 63.761 as any processing site engaged in the

extraction of NGLs from field gas, or the fractionation of mixed NGLs to natural gas products, or a

combination of both. A treating plant or gas plant that does not engage in these activities is considered to

be a production field facility.

Major Source Determination for Production Field Facilities

The definition of major source in subpart HH (at 40 CFR 63.761) states, in part, that only emissions from

the dehydration units and storage vessels at production field facilities shall be aggregated when comparing

to the major source thresholds.

For facilities that are not production field facilities, HAP emissions from all HAP emission units shall be

aggregated.

Area Source Applicability

40 CFR Part 63, Subpart HH also applies to area sources of HAPs. An area source is a HAP source

whose total HAP emissions are less than 10 tpy of any single HAP or 25 tpy for all HAPs in aggregate.

This subpart requires different emission reduction requirements for glycol dehydration units found at oil

and gas production facilities based on their geographical location.

Units located in densely populated areas (determined by the Bureau of Census) and known as urbanized

areas with an added 2-mile offset and urban clusters of 10,000 people or more, are required to have

emission controls. Units located outside these areas will be required to have the glycol recirculation

pump rate optimized or operators must document that uncontrolled annual actual benzene emissions are

less than 0.9 megagrams (1,984 lbs.).

Any source that determines that it is not a major source but has actual emissions of 5 tons per year of a

single HAP or 12.5 tons per year of a combination of HAP (i.e., 50 percent of the major source

24

thresholds), shall update its major source determination within 1 year of the prior determination and each

year thereafter, using gas composition data measured during the preceding 12 months.

Applicability of Subpart HH to the Ignacio Gas Plant

The Ignacio Gas Plant extracts Natural Gas Liquids (NGLs) from field gas, and therefore, is

considered a natural gas processing plant. NGLs and natural gas are transported to the local market

via pipeline and truck loading from the plant, hence, the point of custody transfer, as defined in

Subpart HH, occurs at the facility. For facilities that are not production field facilities, HAP

emissions from all HAP emission units shall be aggregated for a major source determination. On

June 11, 2011, Harvest submitted a request to reclassify the facility from a major source to an area

source of HAP. The permit was revised and the Ignacio Gas Plant classified as an Area Source.

Therefore, the Ignacio Gas Plant is subject to the area source requirements of Subpart HH.

Harvest determined that actual average benzene emissions from the TEG dehydration units at the

facility are less than 0.90 megagrams per year. Per 40 CFR 63.764(e)(1)(ii), the Ignacio Gas Plant

is exempt from the general standards of 40 CFR 63.764(d). Therefore, only the recordkeeping

requirements of 40 CFR 63.774(d)(1) apply to the facility.

40 CFR Part 63, Subpart HHH: National Emission Standards for Hazardous Air Pollutants from Natural

Gas Transmission and Storage Facilities. This subpart applies to natural gas transmission and storage

facilities that transport or store natural gas prior to entering the pipeline to a local distribution company or

to a final end user, and that are a major source of hazardous air pollutant (HAP) emissions. Natural gas

transmission means the pipelines are used for long distance transport (excluding processing).

According to information provided by Harvest, the Ignacio Gas Plant is not part of the natural gas

transmission and storage source category. Therefore, Subpart HHH does not apply.

40 CFR Part 63, Subpart YYYY: National Emission Standards for Hazardous Air Pollutants from

Stationary Combustion Turbines. This rule establishes national emission limitations and work practice

standards for HAPs emitted from stationary combustion turbines. An affected source includes any

stationary combustion turbine located at a major source of HAP emissions. Affected sources under this

rule are any existing, new, or reconstructed stationary combustion turbine located at a major source of

HAP emissions. For the purpose of this rule, existing is defined as a stationary combustion turbine that

commenced construction prior to January 14, 2003.

Stationary Combustion Turbine:

Stationary combustion turbines are defined in §63.6175 as all equipment, including but not limited to the

turbine, the fuel, air, lubrication and exhaust gas systems, control systems (except emissions control

equipment), and any ancillary components and sub-components comprising any simple cycle stationary

combustion turbine, any regenerative/recuperative cycle stationary combustion turbine, the combustion

turbine portion of any stationary combined cycle steam/electric generating system. Stationary means that

25

the combustion turbine is not self-propelled or intended to be propelled while performing its function.

Stationary combustion turbines do not include turbines located at a research or laboratory facility, if

research is conducted on the turbine itself and the turbine is not being used to power other applications at

the research or laboratory facility.

Major Source:

Major Source for purposes of this subpart has the same meaning as provided in 40 CFR 63.2 with the

exception that emissions from any oil or gas exploration or production well (with its associated

equipment) and emissions from any pipeline compressor station or pump station shall not be aggregated

with emissions from other similar units, to determine whether such emission points or station are major

sources, even when emission points are in a contiguous are or under common control.

Applicability of Subpart YYYY to the Ignacio Gas Plant

According to information provided by Harvest, the Ignacio Gas Plant is an area source of HAPs

Therefore, Subpart YYYY does not apply.

40 CFR Part 63, Subpart ZZZZ (RICE MACT): National Emission Standards for Hazardous Air

Pollutants for Stationary Reciprocating Internal Combustion Engines. This rule establishes national

emission limitations and operating limitations for HAPs emitted from stationary spark ignition internal

combustion engines (SI ICE) and stationary compression ignition internal combustion engines (CI ICE).

For the purposes of this standard, construction or reconstruction is as defined in §63.2.

Engine Type

Summary of Applicability to Engines at Major HAP Sources

Major HAP Sources

Horse Power Rating

New / Existing

Applicability Trigger Date

SI ICE – All1

≥ 500 HP

New

On or After:

12/19/2002

SI ICE – 4SRB

> 500 HP

Existing

Before:

12/19/2002

SI ICE – All1

≤ 500 HP

New

On or After:

6/12/2006

SI ICE – All1

≤ 500 HP

Existing

Before:

6/12/2006

CI ICE – All2

≥ 500 HP

New

On or After:

12/19/2002

CI ICE – Non Emergency

> 500 HP

Existing

Before:

12/19/2002

CI ICE – All2

≤ 500 HP

New

On or After:

6/12/2006

CI ICE – All2

≤ 500 HP

Existing

Before:

6/12/2006

1. All includes emergency ICE, limited use ICE, ICE that burn land fill or digester gas, 4SLB, 2SLB, and 4SRB.

2. All includes emergency ICE and limited use ICE

Engine Type

Summary of Applicability to Engines at Area Hap Sources

Area HAP Sources

Horse Power Rating

New / Existing

Applicability Trigger Date

SI ICE – All1

All HP

New

On or After:

6/12/2006

SI ICE – All1

All HP

Existing

Before:

6/12/2006

CI ICE – All2

All HP

New

On or After:

6/12/2006

CI ICE – All2

All HP

Existing

Before:

6/12/2006

1. All includes emergency ICE, limited use ICE, ICE that burn land fill or digester gas, 4SLB, 2SLB, and 4SRB.

2. All includes emergency ICE and limited use ICE

26

Applicability of 40 CFR 63, Subpart ZZZZ to the Ignacio Gas Plant:

Unit

Serial

Number

25

909602

26

6TB04260

Unit Description

Waukesha H886D CI

Emergency Pump Engine

Caterpillar W4-3798 CI

Emergency Pump Engine

Fuel

Site Rated

HP

Commenced Construction or

Reconstruction Date

Subject to

MACT

ZZZZ?

Diesel

384

Prior to 06/12/2006

Yes

Diesel

305

Prior to 06/12/2006

Yes

According to Harvest the Ignacio Gas Plant was a area source of HAPS on the Subpart ZZZZ

compliance date of June 12, 2006. Units 25 and 26 are emergency compression ignition (CI)

stationary RICE less than 500 site-rated HP constructed prior to June 12, 2006 and have not been

reconstructed since this date. Therefore, Units 25 and 26 are considered existing stationary

RICE, and are subject to the Subpart ZZZZ area source requirements for existing

emergency CI engines.

40 CFR Part 63, Subpart DDDDD (Boiler MACT (for major sources)): National Emission Standards for

Hazardous Air Pollutants for Major Sources: Industrial, Commercial, and Institutional Boilers and

Process Heaters. This rule establishes national emission limitations and operating limitations for HAPs

emitted from new and existing industrial boilers, institutional boilers, commercial boilers, and process

heaters that are located at major sources of HAPs. Boilers or process heaters that combust natural gas for

fuel or have a maximum designed heat input capacity less than 10 MMBtu/hr are subject to work practice

standards in lieu of emission limits. For the purposes of this subpart, an affected unit is an existing unit if

it was constructed prior to June 4, 2010.

According to Harvest, the Ignacio Gas Plant is an area source of HAPs as defined by §63.7575.

Therefore, Subpart DDDDD does not apply.

40 CFR Part 63, Subpart CCCCCC: National Emission Standards for Hazardous Air Pollutants for

Source Category: Gasoline Dispensing Facilities. The rule establishes national emission limitations and

management practices for HAP emitted from the loading of gasoline storage tanks, at gasoline dispensing

facilities (GDF) at area sources of HAP, including requirements for compliance demonstration. The

affected sources include, each GDF, each gasoline cargo tank during the delivery of product to a GDF,

and each gasoline storage tank.

The Ignacio Gas Plant is an area source of HAP’s as defined by §63.2 for Subpart CCCCCC and

performs loading operations of gasoline into a gasoline storage tank, Unit TK1. Therefore,

Subpart CCCCCC does apply.

40 CFR Part 63, Subpart JJJJJJ: National Emission Standards for Hazardous Air Pollutants for Industrial,

Commercial, and Institutional Boilers Area Sources. The rule establishes emission standards to reduce

emissions of toxic air pollutants from industrial, commercial, and industrial boilers located at area

sources. The final rule covers boilers located at area source facilities that burn coal, oil, or biomass, but

not boilers that burn only gaseous fuels or any solid waste.

27

According to information provided by Harvest, the Ignacio Gas Plant uses regeneration heaters

and not boilers as defined by (§63.11237) and the regulation does not apply to gas fired boilers as

defined by (§63.11195(e)), Subpart JJJJJJ therefore does not apply.

Compliance Assurance Monitoring (CAM) Rule

40 CFR Part 64: Compliance Assurance Monitoring Provisions. According to 40 CFR 64.2(a), the CAM

rule applies to each Pollutant Specific Emission Unit (PSEU) at a major source that is required to obtain a

Part 70 or Part 71 permit if the unit satisfies all of the following criteria:

1)

The unit is subject to an emission limitation or standard for the applicable regulated air pollutant

other than an emissions limitation or standard that is exempt under §64.2(b)(1);

“§64.2(b)(1): Exempt emission limitations or standards. The requirements of this part shall not

apply to any of the following emission limitations or standards:

(i)

(ii)

(iii)

(iv)

(v)

(vi)

Emission limitations or standards proposed by the Administrator after November 15, 1990

pursuant to Section 111 or 112 of the Act;

Stratospheric ozone protection requirements under Title VI of the Act;

Acid Rain Program requirements pursuant to Sections 404, 405, 406, 407(a), 407(b) or

410 of the Act;

Emissions limitations or standards or other applicable requirements that apply solely

under an emissions trading program approved or promulgated by the Administrator under

the Act that allows for trading emissions with a source or between sources;

An emissions cap that meets the requirements specified in §70.4(b)(12) or §71.6(a)(13)(iii)

of this chapter;

Emission limitations or standards for which a Part 70 or 71 permit specifies a continuous

compliance determination method, as defined in §64.1.”

“§64.1: Continuous compliance method means a method, specified by the applicable standard or

an applicable permit condition, which:

(1) Is used to determine compliance with an emission limitation or standard on a continuous

basis, consistent with the averaging period established for the emission limitation or standard;

and

(2) Provides data either in units of the standard or correlated directly with the compliance limit.”

2)

The unit uses a control device to achieve compliance with any such limit or standard; and

3)

The unit has pre-control device emissions of the applicable regulated pollutant that are equal to or

greater than 100% of the amount, in tons per year, required for a source to be classified as a major

source.

28

According to Harvest, the CAM requirements specified at 40 CFR Part 64 apply to Units 15, 16,

and 17 with respect to the VOC emission limits identified in PSD Permit #PSD-SU-0027-01.00.

Chemical Accident Prevention Program

40 CFR Part 68: Chemical Accident Prevention Provisions. This rule applies to stationary sources that

manufacture, process, use, store, or otherwise handle more than the threshold quantity of a regulated

substance in a process. Regulated substances include 77 toxic and 63 flammable substances which are

potentially present in the natural gas stream entering the facility and in the storage vessels located at the

facility. The quantity of a regulated substance in a process is determined according to the procedures

presented under §68.115. §68.115(b)(l) and (2)(i) indicate that toxic and flammable substances in a

mixture do not need to be considered when determining whether more than a threshold quantity is present

at a stationary source if the concentration of the substance is below one percent by weight of the mixture.

§68.115(b)(2)(iii) indicates that prior to entry into a natural gas processing plant, regulated substances in

naturally occurring hydrocarbon mixtures need not be considered when determining whether more than a

threshold quantity is present at a stationary source. Naturally occurring hydrocarbon mixtures include

condensate, field gas, and produced water.

According to Harvest, the Ignacio Gas Plant does have regulated substances above the threshold

quantities in this rule. Therefore, the facility is subject to the requirement to develop and

submit a risk management plan.

Stratospheric Ozone and Climate Protection

40 CFR Part 82, Subpart F: Air Conditioning Units. According to information provided by Harvest, no

maintenance, service, repair or disposal of any equipment containing Class I or Class II refrigerants

chlorofluorocarbons (CFCs)) occurs at Ignacio Gas Plant. However, if Harvest was to engage in any of

the afore mentioned activities it must comply with the standards of part 82, Subpart F for recycling and

emissions reduction if they service, maintain, or repair the air conditioning units in any way or if they

dispose of the units.

40 CFR Part 82, Subpart H: Halon Fire Extinguishers. According to information provided by Harvest,

there are no halon fire extinguishers at Ignacio Gas Plant. However, should Harvest obtain any halon fire

extinguishers, then it must comply with the standards of 40 CFR Part 82, Subpart H for halon emissions

reduction, if it services, maintains, tests, repairs, or disposes of equipment that contains halon or uses such

equipment during technician training. Specifically, Harvest would be required to comply with 40 CFR

Part 82 and submit an application for a modification to this Title V permit.

Mandatory Greenhouse Gas Reporting

40 CFR Part 98: Mandatory Greenhouse Gas Reporting. This rule requires sources above certain

emission thresholds to calculate, monitor, and report greenhouse gas emissions. The requirements of 40

29

CFR Part 98 and CAA §307(d)(1)(V), the CAA authority under which 40 CFR Part 98 was promulgated,

however, need not be included in a tribal-issued part 70 permit because those requirements are not

included in the definition of “applicable requirement” in either 40 CFR part 70 or RAC 1-103(11).

Although the rule is not an applicable requirement under 40 CFR Part 70 or the RAC, the source is not

relieved from the requirement to comply with the rule separately from compliance with its Part 70

operating permit. It is the responsibility of each source to determine whether Part 98 is applicable and to

comply, if necessary.

4. Public Participation

a. Public Notice

Per RAC § 2-109, all Part 70 draft operating permits shall be publicly noticed and made available for

public comment. Public notice is given by publication in a newspaper of general circulation in the area

where the source is located or in a state publication designed to give general public notice, to persons on a

mailing list developed by the Tribe, including those who request in writing to be on the list, and by other

means if necessary to assure adequate notice to the affected public. If an interested person would like to

be added to the Tribe’s mailing list to be informed of future actions on permits issued by the Tribe, please

send your name and address:

by United State Postal Service to:

by any other delivery service to:

Southern Ute Indian Tribe

Air Quality Program

PO Box 737 MS #84

Ignacio, Colorado 81137

Southern Ute Indian Tribe

Air Quality Program

Part 70 Program

398 Ouray Drive

Ignacio, Colorado 81137

Public notice for the draft permit was published in the Southern Ute Drum on September 23, 2022, and

the Durango Herald on September 21, 2022, in order to provide opportunity for public comment on the

draft permit and the opportunity to request a public hearing.

b. Opportunity for Comment

Members of the public were given an opportunity to review a copy of the draft permit prepared by the

Tribe, the application, this statement of basis for the draft permit, and all supporting materials for the draft

permit. Copies of these documents were available at:

Southern Ute Indian Tribe

Environmental Programs Division

Air Quality Program

71 Mike Frost Way

Ignacio, Colorado 81137

30

Electronic copies of draft permits and statement of basis were available on the Tribe’s Air Quality

Webpages at: https://www.southernute-nsn.gov/justice-and-regulatory/epd/public-comments/

All documents were available for review at the Southern Ute Indian Tribe’s Environmental Programs

Division office Monday through Friday from 8:00 a.m. to 4:00 p.m. (excluding holidays).

Any interested person could have submitted written comments on the draft operating permit during the

public comment period at the address specified in the public notice. The Tribe considered and addressed

all comments in making a final decision on the permit. The Tribe keeps a record of the commenters and

of the issues raised during the public participation process.

Anyone, including the applicant, who believed any condition of the draft permit was inappropriate could

have raised all reasonably ascertainable issues and submitted all arguments supporting his or her position

by the close of the public comment period. Any supporting materials submitted must have been included

in full and could not be incorporated by reference, unless the material was already submitted as part of the

administrative record in the same proceeding or consisted of Environmental Commission, tribal, state or

Federal statutes and regulations, EPA documents of general applicability, or other generally available

reference material.

c. Opportunity to Request a Hearing

A person may submit a written request for a public hearing to the Part 70 Permit Contact at the addresses

listed above, by stating the nature of the issues to be raised at the public hearing. Based on the number of

hearing requests received, the Tribe will hold a public hearing whenever it finds there is a significant

degree of public interest in a draft operating permit. The Tribe will provide public notice of the public

hearing. If a public hearing is held, any person may submit oral or written statements and data concerning

the draft permit.

d. Public Petitions to the Administrator

In the event the Administrator of the United States Environmental Protection Agency does not object to

issuance of the permit, on the basis that it would not be in compliance with applicable requirements,

within its 45-day review period, any person may then petition the Administrator within 60 days after the

expiration of the Administrator’s 45-day review period to make such objection. Any such petition must

be based only on objections to the permit that were raised with reasonable specificity during the public

comment period unless the petitioner demonstrates that it was impracticable to raise such objections

within such period, or unless the grounds for such objections arose after such period. If the administrator

objects to a permit as a result of this petition, the Tribe shall not issue the permit until the Administrator’s

objection has been resolved, except that a petition for review does not stay the effectiveness of a permit or

its requirements if the permit was issued after the end of the 45-day review period and before the

Administrator’s objection.

31

e. Appeal of Permits

Within 60 days after the Tribe’s final permit action, an applicant, any person who filed comments on the

draft permit or participated in the public hearing, and any other person who could obtain judicial review

of that action under applicable law, may appeal to the Environmental Commission in accordance with

RAC 2-109(8) and the Commission’s Procedural Rules.

Petitions for administrative review of final permit actions can be filed after the deadline designated by the

Commission only if they are based solely on grounds arising after the deadline for administrative review

has passed. Such petitions shall be filed no later than 60 days after the new grounds for review arise. If

the final permit action being challenged is the Tribe’s failure to take final action, a petition for

administrative review may be filed any time before the Tribe denies or issues the final permit.

f. Notice to Affected States/Tribes

As described in RAC § 2-109(3), public notice of the draft operating permit was given to all affected

programs.

The following entities were notified:

•

•

•

•

•

•

•

State of Colorado, Department of Public Health and Environment

State of New Mexico, Environment Department

Ute Mountain Ute Tribe, Environmental Programs Department

Navajo Tribe, Navajo Nation EPA

Jicarilla Apache Tribe, Environmental Protection Office

National Park Service, Air Resources Division, Denver, CO

U.S. Department of Agriculture, United States Forest Service, Rocky Mountain

Region

32

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.