WATER QUALITY PROGRAM (2026)
Tribal code
Ask Donna
What actually matters in this document.
Text
WATER QUALITY PROGRAM
ENVIRONMENTAL PROGRAMS DEPARTMENT
THE SOUTHERN UTE INDIAN TRIBE
PO BOX 737, MS 84, IGNACIO, CO 81137
(970) 563 – 0135 ∙ (970) 563 – 0384 FAX
October 30, 2025
SENT VIA EMAIL: christina.l.schroeder@usace.army.mil
Christina Schroeder
Acting Chief, Regulatory Division
U.S. Army Corps of Engineers Albuquerque District
4101 Jefferson Plaza NE
Albuquerque, NM 87109-3435
Re:
2026 Nationwide Permits 401 Water Quality Certification (Request for Certification)
Dear Ms. Schroeder:
The Southern Ute Indian Tribe’s Environmental Programs Department (EPD) received a 401 certification
request from the U.S. Army Corps of Engineers (Army Corps) for 2026 Nationwide Permits (NWPs) on
June 18, 2025. A pre-filing meeting was requested on May 2, 2025, and held on May 28, 2025.
Actions on 401 Certification Request for Proposed 2026 NWPs
EPD takes the following water quality certification actions under Section 401 of the Clean Water Act on
the Army Corps’ proposed NWPs:
•
•
“After-the-Fact” NWPs: Permits determined to be applicable after a project or associated discharge
has occurred – Deny
NWPs where the District or Division Engineer has granted a waiver on limits – Deny
NWP# Title
1
Aids to Navigation
2
Structures in Artificial Canals
3
Maintenance
4
Fish and Wildlife Harvesting,
Enhancement, and Attraction
Devices and Activities
Certification Action
Waive
Certify with Conditions;
Deny when there is a trenching activity or when activities have
potential to discharge into perennial streams or special aquatic
sites including wetlands
Certify with Conditions;
Deny when there is a trenching activity or when activities require
a Pre-Construction Notice (PCN) or have potential to discharge
into perennial streams or special aquatic sites including wetlands
Certify with Conditions
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Scientific Measurement
Devices
Survey Activities
Outfall Structures and
Associated Intake Structures
Oil and Gas Structures on the
Outer Continental Shelf
Structures in Fleeting and
Anchorage Areas
Mooring Buoys
Temporary Recreational
Structures
Oil or Natural Gas Pipeline
Activities
Bank Stabilization
Linear Transportation Projects
U.S. Coast Guard Approved
Bridges
Return Water from Upland
Contained Disposal Areas
Hydropower Projects
Minor Discharges
Minor Dredging
Response Operations for Oil or
Hazardous Substances
Surface Coal Mining Activities
Removal of Vessels
Approved Categorical
Exclusions
Indian Tribe or State
Administered Section 404
Programs
Structural Discharges
[Reserved]
Aquatic Habitat Restoration,
Establishment, and
Enhancement Activities
Modifications of Existing
Marinas
Residential Developments
Moist Soil Management for
Wildlife
Maintenance of Existing Flood
Control Facilities
Completed Enforcement
Actions
Certify with Conditions
Certify with Conditions;
Deny when there is a trenching activity or when activities have
potential to discharge into perennial streams or special aquatic
sites including wetlands
Deny
Waive
Waive
Waive
Waive
Deny
Deny
Deny
Waive
Deny
Deny
Deny
Certify with Conditions
Deny
Deny
Certify with Conditions
Certify with Conditions
Deny
Certify with Conditions
N/A
Certify with Conditions
Waive
Deny
Certify with Conditions
Deny
Deny
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
A
Temporary Construction,
Access, and Dewatering
Cranberry Production
Activities
Maintenance Dredging of
Existing Basins
Boat Ramps
Emergency Watershed
Protection and Rehabilitation
Cleanup of Hazardous and
Toxic Waste
Commercial and Institutional
Developments
Agricultural Activities
Reshaping Existing Drainage
Ditches
Recreational Facilities
Stormwater Management
Facilities
Mining Activities
Repair of Uplands Damaged by
Discrete Events
Discharges in Ditches
[Reserved]
Commercial Shellfish
Mariculture Activities
Coal Remining Activities
Underground Coal Mining
Activities
Land-Based Renewable Energy
Generation Facilities
Water-Based Renewable
Energy Generation Pilot
Projects
Removal of Low-Head Dams
Living Shorelines
Seaweed Mariculture Activities
Finfish Mariculture Activities
Electric Utility Line and
Telecommunications Activities
Utility Line Activities for
Water and Other Substances
Water Reclamation and Reuse
Facilities
Activities to Improve Passage
of Fish and Other Aquatic
Organisms
Deny
Waive
Certify with Conditions
Waive
Certify with Conditions
Deny
Deny
Deny
Certify with Conditions
Deny
Deny
Deny
Deny
Deny
N/A
Waive
Deny
Deny
Deny
Deny
Deny
Waive
Waive
Waive
Deny
Deny
Deny
Certify with Conditions;
Deny when there is a trenching activity or when activities require
a Pre-Construction Notice (PCN) or have potential to discharge
into perennial streams or special aquatic sites including wetlands
Conditions of Certification
Included in Table 1 are the justifications and appropriate citations for each condition. This project must
also comply with the Tribe’s certification requirements, which apply to all certifications unless
specifically set forth otherwise in a certification decision. The Tribe’s certification requirements are
found in Section 4-106 of the 401 Certification Procedures, and a copy of the requirements is enclosed
with this certification.
In addition to the Tribe’s certification conditions, the project must be completed in accordance with
applicable NWPs and their General Conditions, as well as applicable Regional Conditions to Nationwide
Permits in the State of Colorado. Compliance with the terms and conditions of the Nationwide Permit,
the Best Management Practices (BMPs) within Tribe’s certification conditions, and the Tribe’s
certification requirements described below will provide reasonable assurances that the permitted
activities will be conducted in a manner which will not violate water quality standards and will address
the Tribe’s most significant water quality concerns. Projects for which EPD has elected to certify with
conditions will comply with water quality requirements as defined at 40 CFR 121.1(n), subject to the
following conditions pursuant to Section 401(d):
Condition 1: A copy of the Tribe’s 401 certification letter for NWPs shall be maintained on-site at all
times and available for inspection.
Condition 2: The project proponent shall provide EPD a written description of sediment and erosion
control BMPs and/or a site-specific Stormwater Pollution Prevention Plan (SWPPP) 10 days prior to
initiating construction. These measures shall be used to fully maintain and protect all existing water uses
throughout the duration of the project and prevent discharge of disturbed soil into the waterway from the
shoreline. All sediment and erosion control measures shall be in place prior to the onset of construction
or prior to work in a waterbody. These measures shall provide for implementation of BMPs during and
after construction including:
• A method statement that describes the phasing of sediment and erosion control measures
installation and construction activities to include:
o Timing (i.e., date estimates) of pre-construction preparation, BMP installation,
construction, and removal.
o The types and locations of sediment and erosion control features that shall be used
onsite, including sediment control fences, haybales, heavy mud mats, or other
structures. The project proponent shall actively maintain these features during
construction.
• Construction materials and equipment storage areas shall be at least 100 feet away from a
waterbody. If it is not possible to site the storage area 100 feet away, the project proponent
shall explain the additional measures that will be taken to ensure there is no sediment migration
into the waterway.
Condition 3: For projects with temporary impacts to aquatic resources, the project proponent shall
submit written description of site-specific aquatic resource restoration and monitoring measures to EPD
10 days prior to construction activities. The project proponent shall restore and monitor the site
consistent with the restoration and monitoring description. The described elements must include and/or
expand upon the details supplied in this project’s certification request:
• Pre-construction, the project proponent shall identify:
o Mitigation measures for disturbed aquatic resources and upland areas, where they are
adjacent to the aquatic resource, and restoration of disturbed riparian areas
o Species for restoration and techniques for planting. The project proponent shall use
identical native species or use salvaged plants removed during construction to the extent
practicable. Non-native and invasive species shall not be used for restoration activities.
o Monitoring success criteria such that species regrowth is functionally equivalent to the predisturbed site or achieves a 70% vegetative cover.
o Monitoring protocol for at least three growing seasons or until replanted areas meet
monitoring success criteria. The project proponent shall identify adaptive management
measures to reestablish aquatic resource functions and values if restoration of the site does
not meet monitoring success criteria.
• Post-construction, revegetation efforts shall occur in accordance with the restoration and
monitoring description and elements provided to EPD. Disturbed soil and vegetation shall be
restored to pre-disturbance reference conditions based on monitoring success criteria. Nursery
and seed stock shall be acquired from localized sources and stockpile weed-free topsoil shall
replace disturbed soil areas.
• Post-construction, the project proponent shall provide documentation of annual monitoring
efforts, including photographs. At a minimum, photographs shall be submitted before
construction and post-construction until the site meets monitoring success criteria. Monitoring
reports and photographs shall be submitted to EPD at wqs@southernute-nsn.gov, subject line:
CWA 401 Certification - NWPs - Restoration Monitoring.
Condition 4: When operating equipment or undertaking construction riparian areas or waterways:
• Prior to arriving on the project site and entering a waterway, all equipment shall be cleaned,
and the project proponent must provide to EPD evidence or certification of equipment
cleaning/decontamination outlined in Article 4-106(t) to avoid aquatic nuisance species
infestation. Remove all plants, animals, or mud and thoroughly wash equipment that have
come in contact with the water before leaving a lake or stream.
• All equipment shall be inspected daily and prior to entering any waterway, for oil, gas, diesel,
anti-freeze, hydraulic fluid, and other petroleum leaks. Before equipment is used on a project
and upon discovery of any fluid leaks, all fluid leaks must be repaired. If a fluid leak cannot be
repaired promptly, the equipment shall not be used on site and moved offsite within 24 hours.
• All contaminated areas shall be cleaned immediately, and contaminated soil removed from the
site or contained in enclosed containers. Containers shall be located no closer than 100 feet to a
waterbody or wetland. If it is not possible to site the storage area 100 feet away, the project
proponent shall explain additional measures in their sediment and erosion control BMPs.
• Containment booms and/or absorbent material shall be available onsite. In the case of spills,
containment booms and/or absorbent materials shall be employed immediately to prevent
discharges from reaching waters of the U.S. Any spills shall be reported to the Army Corps,
and EPD at wqs@southernute-nsn.gov within 24 hours.
Condition 5: Except as specified in the application, the project proponent shall not allow debris,
concrete, oil or petroleum, organic material, or other construction related materials or wastes to enter
into or be stored within 100 feet of where it may enter into waters of the U.S.
Condition 6: The project proponent shall notify EPD when construction activities are complete at
wqs@southernute-nsn.gov.
Conclusion
Thank you for your ongoing partnership in the implementation of the regulatory programs of the Clean
Water Act. If you have questions about this certification, please contact me or Geoff Hensgen, Water
Quality Program Manager at (970) 563-2805 or ghensgen@southernute-nsn.gov.
Sincerely,
Mitchell A.
Dorsk
Digitally signed by
Mitchell A. Dorsk
Date: 2025.10.30
14:57:45 -06'00'
Mitchell Dorsk
Southern Ute Indian Tribe
Water Quality and Remediation Division Head
P.O. Box 737 MS# 84
Ignacio, Colorado 81137
970-563-2272
mdorsk@southernute-nsn.gov
Enclosures:
1. Southern Ute Indian Tribe 401 Certification Requirements
2. Table 1: Supporting Information for Certification Conditions
CC:
Daniel Delgado, USACE, daniel.i.delgado@usace.army.mil
401 Notifications, USACE, SPA-RD-CO@usace.army.mil
Steven Crosson, USACE, steven.b.crosson@usace.army.mil
Matthew Montgomery, USACE, matthew.r.montgomery@usace.army.mil
Kiel Downing, USACE, kiel.g.downing@usace.army.mil
Estella Moore, USEPA, Moore.Estella@epa.gov
Jeffrey Ullman, USEPA, ullman.jeffrey@epa.gov
Southern Ute Indian Tribe (SUIT)
401 Water Quality Certification Requirements
SUIT Clean Water Act Section 401 Certification Procedures for Nationwide Permits, Regional
General Permits, and Individual Section 404 Permits Issued by the U.S. Army Corps of Engineers
Article 4-106. Certification Requirements
(1) The following requirements shall apply to all certifications unless specifically authorized by the 401
certification issued by the Department:
(a) A water quality certification shall require the project owner and operator to notify the Division
Head of all changes in the project subsequent to certification.
(b) A water quality certification shall not be transferable without the written approval of the
Division Head.
(c) Authorized representatives from the Department shall be permitted to enter upon the site where
the construction activity or operation of the project is taking place for purposes of inspection of
compliance with BMPs and certification conditions.
(d) In the event of any changes in control or ownership of facilities where the construction activity
or operation of the project is taking place, the successor shall be notified in writing by their
predecessor of the existence of the BMPs and certification conditions. The permittee shall provide
a copy of such notification to the Division.
(e) If the permittee discovers that certification conditions are not being implemented as designed,
or are not operating or functioning as designed, or if there is an exceedance of water quality
standards despite compliance with the certification conditions by the permittee, the permittee shall
verbally notify the Division of such failure or exceedance within two working days of becoming
aware of the same. Within ten working days of such notification, the permittee shall provide to the
Division, in writing, the following:
i. In the case of the failure to comply with the certification conditions, a description of (i) the
nature of such failure, (ii) any reasons for such failure, (iii) the period of non-compliance, and
(iv) the measures to be taken to correct such failure to comply; and
ii. In the case of the exceedance of water quality criteria, (i) an explanation, to the extent
known after reasonable investigation, of the relationship between the project and the
exceedance, (ii) the identity of any other known contributions to the exceedance, and (iii) a
proposal to modify the certification conditions so as to remedy the contribution of the project
to the exceedance.
(f) Any anticipated change in discharge location, quantities, or composition associated with the
project must be reported to the Division by submission of a written notice by the permittee no less
than ten days before the change. If the change is determined to be significant, the permittee will be
notified within ten days, and the change will be acknowledged and approved or disapproved.
(g) Any diversion from or bypass of facilities necessary to maintain compliance with the terms and
conditions herein is prohibited, except (i) where unavoidable to prevent loss of life or severe
property damage, or (ii) where excessive storm drainage or runoff would damage any facilities
necessary for compliance with limitations and prohibitions herein. The Division shall be notified
immediately in writing of each such diversion or bypass.
(h) At least 5 days before commencement of a project in a watercourse, which the Division has
certified, or conditionally certified, the permittee shall notify the Division.
(i) Immediately upon discovery of any spill or other discharge to waters of the United States not
authorized by the applicable license or permit, the permittee shall notify the Division.
(j) Construction operations within watercourses and water bodies shall be restricted to only those
project areas specified in the federal license or permit.
(k) No construction equipment shall be operated below the existing water surface.
(l) Work should be carried out diligently and completed as soon as practicable. To the maximum
extent practicable, discharges of dredged or fill material shall be restricted to those periods when
impacts to designated uses are minimal.
(m) The project shall incorporate provisions for operation, maintenance, and replacement of BMPs
to assure compliance with the conditions identified in this section, and any other conditions placed
in the permit or certification. All such provisions shall be identified and complied with in an
operation and maintenance plan which will be retained by the project owner and available for
inspection within a reasonable timeframe upon request by any authorized representative of the
Division.
(n) The use of chemicals during construction and operation shall be in accordance with the
manufacturers’ specifications. There shall be no excess application and introduction of chemicals
into waters of the United States.
(o) All solids, sludges, dredged or stockpiled materials and all fuels, lubricants, or other toxic
materials shall be controlled in a manner so as to prevent such materials from entering waters of
the United States.
(p) All seed, mulching material and straw used in the project shall be certified weed-free.
(q) Discharges of dredged or fill material in excess of that necessary to complete the project are not
permitted.
(r) Discharges to waters of the United States not identified in the license or permit and not certified
in accordance therewith are not allowed.
(s) No discharge shall be allowed which causes non-attainment of federal or tribal narrative water
quality or biological criteria.
(t) Before any equipment touches the water, the project proponent must provide to the Division:
(i) a certification that (a) the equipment has not been used in waters with the possibility of
aquatic nuisance species infestation and (b) the equipment has been thoroughly decontaminated
using water that is heated to a temperature necessary to kill aquatic nuisance species,
(ii) evidence that the equipment has passed a Colorado Parks and Wildlife invasive species
inspection, or
(iii) a certification in a form that is acceptable to the Division, signed by a third-party
consultant, certifying that the equipment has undergone a waters of the United States-specific
preventative decontamination using water that is heated to a temperature necessary to kill
aquatic nuisance species.
(2) Best Management Practices.
(a) BMPs are required for all projects for which Division certification is issued except for section
402 permits. Project proponents must select and propose BMPs to the Division to be employed in
their project.
(b) All certification requests for certifications which require BMPs shall include a map of project
location, a site plan, and a listing of the selected BMPs chosen for the project. At a minimum, each
project must provide for the following:
i. Permanent erosion and sediment control measures that shall be installed at the earliest
practicable time consistent with good construction practices and that shall be maintained and
replaced as necessary throughout the life of the project.
ii. Temporary erosion and sediment control measures that shall be coordinated with permanent
measures to assure economical, effective, and continuous control throughout the construction
phase and during the operation of the project.
Table 1: Supporting Information for Certification Conditions
Numbered
Condition
Why the condition is necessary to assure the activity will
comply with water quality requirements
Citation that
authorizes the
condition
Condition
1, 6
This condition is necessary to ensure that construction site
operators are aware of and abide by Tribal 401 certification
conditions, Tribal Certification Requirements, Nationwide Permit
18 and its General Conditions, as well as applicable Regional
Conditions to Nationwide Permits in the State of Colorado.
SUIT 401
Certification
Requirements
4-106(1)(a)-(d)
Conditions
2, 4, 5
These conditions are necessary to ensure water quality is not
degraded by toxic pollutants in toxic amounts, raw materials, oil,
grease, gasoline, sediment, soil, or construction materials.
40 CFR
230.10(c);40
CFR 230.10(d);
40 CFR 230.71;
40 CFR 230.75;
SUIT 401
Procedures
Sections 4106(1)(e)-(g), 4106(1)(i), 4106(1)(o)-(s), 4106(2)(a)-(b)
Conditions
3, 4
These conditions are necessary to protect water quality because it
ensures that the project proponent is using planning and
construction practices that will maintain the aquatic resource
functions and values. Monitoring for at least three growing
seasons, or until replanted areas meet monitoring success criteria
will provide an adequate indication that the restoration effort is
able to demonstrate restoration is successful. This condition is
necessary to ensure minimization of adverse effects on plants and
animals and to preserve water quality benefits provided by
vegetation in riparian and wetland vegetation, including protecting
wildlife dependent on aquatic ecosystems. This condition is
necessary to sustain aquatic resource functions and value
characteristics (e.g., ensure minimization of potential adverse
impacts on the aquatic ecosystem that often occurs through the
placement and installation of hard armoring along streambanks),
to measure the progress of wetland revegetation, and to ensure that
non-native and invasive species do not become established.
Revegetation with natives and stockpiling of weed-free topsoil are
restoration techniques that minimize adverse impacts of potential
point source discharges. Revegetation, of areas denuded by the
discharge, with natives and stockpiling of weed-free topsoil are
40 CFR
230.10(d); 40
CFR 230.70; 40
CFR 230.75;
SUIT WQS
Sections 6.1.1,
6.1.3, 6.1.6, 6.1.8,
7.1, 7.2, 13.1;
SUIT 401
Procedures
Sections 4106(1)(e)-(g), 4106(1)(i), 4106(1)(o)-(t), 4106(2)(a)-(b)
restoration techniques that can be used to minimize adverse
impacts because riparian vegetation acts as buffer to reduce the
amount of sediment and pollutants that enter waterways. Native
vegetation, because it is adapted to local conditions (e.g., soil
types and temperature) provides this function most efficiently.
Native vegetation also protects the biological integrity of waters.
Condition 5 This condition is necessary to ensure water quality is not degraded
by oil, grease, gasoline, or other types of fluids used to operate
and maintain equipment used to complete the project. This
condition also helps protect the water quality and native biology of
the impacted waters by preventing the spread of invasive or
nuisance species.
11
40 CFR
230.10(c)-(d); 40
CFR 230.70; 40
CFR 230.71; 40
CFR 230.72; 40
CFR 230.74;
SUIT WQS
Sections 6.1.1,
6.1.2, 6.1.8, 7.1,
7.2, 13.1; SUIT
401 Procedures
Sections 4106(1)(e)-(g), 4106(1)(i), 4106(1)(o)-(s), 4106(2)(a)-(b)
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.