LONG RANGE TRANSPORTION PLAN
(UPDATE APRIL 2024)
DUCK VALLEY RESERVATION
2775 W. Navigator Dr., Suite 210
Meridian, ID 83642
SHOSHONE-PAIUTE TRIBES LRTP
Contents
1.1
Study Overview.................................................................................................4
1.1.1
Background ................................................................................................5
1.1.2
Study Area Overview ..................................................................................5
1.1.3
Purpose and Need ......................................................................................7
1.1.4
Goals and Objectives ..................................................................................8
1.1.5
Tribal Transportation Program (TTP)...........................................................8
1.2
Previous Studies, Reports and Plans ..................................................................9
1.2.1
2010 Long Range Transportation plan.........................................................9
1.2.2
Road Safety Audit .......................................................................................9
1.2.3
Strategic Transportation Safety Plan (STSP) ................................................9
1.2.4
Tribal Transportation Improvement Projects ............................................10
1.3
Land Use and Socioeconomic Conditions.........................................................11
1.3.1
Land ownership ........................................................................................11
1.3.2
Land Use ...................................................................................................13
1.3.3
Existing Socioeconomical Conditions ........................................................16
1.3.4
Future Development and Growth Trends..................................................17
1.4
Existing and Future Transportation Conditions................................................19
1.4.1
Roadway Inventory ..................................................................................19
1.4.2
Existing Roadway Characteristics ..............................................................20
1.4.3
Existing Traffic Conditions ........................................................................24
1.4.4
Other Modes of Traffic .............................................................................27
1.4.5
Future Traffic Conditions ..........................................................................30
1.4.6
Development Plans...................................................................................30
1.5
Evaluation of Improvements ...........................................................................32
1.5.1
Evaluation Criteria ....................................................................................32
1.5.2
Paved Road Treatments............................................................................34
2
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.5.3
Unpaved Road Treatments .......................................................................35
1.5.4
Shoshone-Paiute Tribes Proposed Projects ...............................................35
1.5.5
State Department Proposed Projects ........................................................51
1.5.6
Tribal Transportation Program Update Recommendations .......................52
1.5.7
BIA Road Maintenance .............................................................................53
1.6
Affective Environment and Environmental Concerns ......................................53
1.6.1
Topography and Geology ..........................................................................54
1.6.2
Vegetation ................................................................................................54
1.6.3
Biology .....................................................................................................55
1.6.4
Hydrology .................................................................................................56
1.6.5
Prime Range and Farmlands .....................................................................58
1.6.6
Air Quality ................................................................................................58
1.6.7
Cultural Resources ....................................................................................58
1.6.8
Environmental Justice Review ..................................................................60
1.7
Transportation Plan Implementation and Updating ........................................61
1.7.1
Funding Sources .......................................................................................61
1.7.2
Implementation Guidelines ......................................................................75
1.8
Public Involvement .........................................................................................75
1.8.1
Working Group Meetings .........................................................................76
1.8.2
Public Meeting .........................................................................................77
APPENDIX A - TRAFFIC COUNTS ................................................................................78
APPENDIX B – PUBLIC INVOLVMENT – OPEN HOUSE.................................................80
3
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.1 Study Overview
The Shoshone-Paiute Tribes in cooperation with the Federal Highway Administration (FHWA)
conducted a long-range transportation plan to identify and address the most critical current and
future transportation needs on the Duck Valley Reservation. The study was funded by the FHWA and
administered through Tribal Transportation Program (TTP).
The primary goal of this study was to develop a transportation improvement plan that promotes
safety and mobility, enhances economic vitality, improves community livability, encourages
environmental and cultural sensitivity, and supports current and planned economic development.
The study also included a comprehensive inventory update of the Shoshone-Paiute Tribe's roads in
the National Tribal Transportation Facility Inventory (NTTFI), Roadway conditions currently in the
inventory to be updated, roadways added, and some roads removed.
4
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.1.1 Background
The Shoshone-Paiute Tribes of the Duck Valley Indian Reservation are a federally recognized tribe.
The Tribes are governed by the Business Council which is composed of a Chairman, Vice-Chairman,
and five Council Members. The Tribes once roamed the areas that are now Idaho, Nevada, and
Oregon. Descendants of the Western Shoshone and the Northern Paiute Tribes now mainly occupy
the land known as the Duck Valley Indian Reservation in Idaho and Nevada. The Duck Valley Indian
Reservation covers 289,819 acres held in trust by the U.S. Government. Tribal membership is over
2,000 with approximately 1,700 living on the reservation (www.shopaitribes.org/culture/).
Given the rural location, public transit is not available, so workers take to the roads for their daily
commute. Most of the employed population work in the census defined workforce category of
“Public Administration” on the Reservation. The following table is the breakdown of the workforce
industry on the Duck Valley Indian Reservation.
Table 1. Workforce Characteristics of the Duck Valley Indian Reservation (ACS 2019 5-Year Estimates)
Civilian employed population 16 years and over
Agriculture, forestry, fishing and hunting, and mining
Construction
Manufacturing
Wholesale trade
Retail trade
Transportation and warehousing, and utilities
Information
Finance and insurance, and real estate and rental and leasing
Professional, scientific, and management, and administrative and waste
management services
Educational services, and health care and social assistance
Arts, entertainment, and recreation, and accommodation and food services
Other services, except public administration
Public administration
Estimate
460
33
17
4
0
13
2
0
13
9
Percent
100%
7.20%
3.70%
0.90%
0.00%
2.80%
0.40%
0.00%
2.80%
2.00%
150
30
10
179
32.60%
6.50%
2.20%
38.90%
1.1.2 Study Area Overview
The Duck Valley Indian Reservation straddles the state line of southern Idaho and northern Nevada,
approximately 100 miles north of Elko, Nevada and 100 miles south of Mountain Home, Idaho.
Owyhee is the location of tribal headquarters, 142 miles southwest of Boise, Idaho (See Figure 1). The
reservation was established by the Executive Orders of April 16, 1877, May 4, 1886, and July 1, 1910,
and by an Act of Congress of June 18, 1934. Reservation lands are all contiguous in a near block with
the exception of the 3,981.68 federally owned acres at the Wildhorse Reservoir. There are 144,274.3
5
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
acres of tribal lands in Nevada and 145,545 acres in Idaho for the Duck Valley Reservation.
Nevada State Highway 225, which becomes Idaho State Highway 51, runs north-south through the
reservation.
The community contains the Tribal Headquarters, a retail center, health center, police station and
correctional facility, Tribal courthouse, post office, Owyhee Combined Schools, day care center,
community center, and powwow grounds.
Figure 1: Duck Valley Reservation Vicinity Map
6
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.1.3 Purpose and Need
The Long-Range Transportation Plan for the Shoshone-Paiute Tribe’s was initiated to develop a
phased, planning strategy to guide multimodal improvements with the goal of enhancing safety,
accessibility, mobility, and economic growth. The need for this study stemmed directly from the
Tribe's desire to increase economic vitality, improve community livability, update the existing
roadway inventory, and to enhance transportation conditions along major local and regional
transportation routes. The purpose of the project is demonstrated with the following statements of
need:
•
•
•
•
•
Update the Tribe's Roadway Inventory. No official road condition survey has been completed
on the Duck Valley Indian Reservation since 2010. To qualify for federal funding, the Tribe's
roadway inventory needs to be updated to reflect existing roadway conditions.
Promote Economic Growth and Community Livability. A plan for transportation investments
that encourages economic growth while maintaining the cultural and historic nature of the
study area needs to be developed. Transportation investments that provide multimodal,
transportation choices and connections at the local and regional level can spur business
growth and job creation, provide much needed transportation for the underserved area,
encourage physical activity among residents and promote tourism.
Accommodate Planned Growth. A plan for transportation needs to provide access for new
housing and new or expanded business developments.
Address Safety, Mobility, and Operational Needs. The current roadway network needs to be
evaluated to identify solutions to improve safety and mobility, optimize traffic operations, and
develop maintenance procedures. Key issues that need to be addressed include:
o Existing paved and unpaved roadways are in poor condition and are deteriorating; a
strategic improvement plan needs to be developed to maximize funding.
o Several Bus Routes are currently gravel roads. High use bus routes will be evaluated to
determine pavement needs.
o Roadways need to be upgraded to meet BIA design standards.
o The area has limited pedestrian walkways, crosswalks, bicycle facilities, and trails.
o There is currently no public transit service for local or regional needs.
Provide Bicycle, Pedestrian, and Trail Connections Between Activity Centers. Sidewalks and
bike paths are limited and unsafe within numerous locations of the study area. Improvements
are necessary to provide continuous and safe connections between business and activity
centers for residents and for recreational purposes.
The primary purpose of this study is to develop a comprehensive, phased transportation
improvement plan that can provide guidance to the Shoshone-Paiute Tribe’s when making future
land use and transportation decisions. Recommendations in this study will enable the Tribe’s,
7
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Owyhee County, and the Idaho and Nevada Department of Transportation to facilitate safer and
more efficient infrastructure for the traveling public and guide the development along the study
roadways. Study findings will also be used to update the BIA’s Road Inventory Field Data System
(RIFDS) to include changes to the Tribe’s National Tribal Transportation Facility Inventory (NTTFI),
and the Tribal Transportation Improvement Program (TTIP) for the next 5-year, 10-year and 20year planning horizon periods.
1.1.4 Goals and Objectives
With the overall goal to improve safety and mobility, the primary purpose of this study was to:
• Conduct a comprehensive evaluation of the multimodal transportation network within the
Duck Valley Indian Reservation.
• Develop a three-phased Improvement Plan that promotes safety and mobility, supports
economic development, and improves community livability.
• Identify specific improvement strategies to address the needs of the study area.
• Conduct a roadway field inventory and update the BIA RIFDS database.
• Develop a roadway maintenance plan that provides guidance on preservation, striping,
signage, and pavement maintenance/re-paving cycle.
• Communicate with stakeholders, Tribal members, Tribal officials, Owyhee County, and State
DOT’s at appropriate intervals to present results and obtain feedback.
1.1.5 Tribal Transportation Program (TTP)
Jointly administered by the U.S. Department of Transportation, FHWA and the Department of
Interior, BIA, the Tribal Transportation Program (TTP), formerly known as the Indian Reservation
Roads (IRR) program, addresses the transportation needs of Tribal governments by providing safe and
adequate transportation and public road access to and within Indian Reservations, Indian lands, and
Alaska Native Village communities. Under the Infrastructure and Investment Jobs Act (IIJA), the TTP
generally continues the IRR program, but includes two additional 2% takedowns for bridge
replacement and safety projects.
The NTTFI is a comprehensive national inventory of tribal transportation facilities that are eligible for
assistance under the TTP. To obtain proper funding, it is imperative that the NTTFI accurately reflects
the conditions of the tribal roadways. As a part of this study, a comprehensive roadway inventory was
conducted to update the Shoshone-Paiute Tribe's NTTFI, which was last updated 2010.
8
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.2 Previous Studies, Reports and Plans
To understand how the transportation system functions on the Duck Valley Indian Reservation an
inventory of those elements comprising the existing system was conducted. Conducting this
inventory was an integral step of the planning process to identify areas in need of improvement over
the 20-year planning period. This inventory was based on available data compiled by the BIA, Tribe,
State, Township, data available through Geographic Information System (GIS) database, and
additional information compiled through supplemental field data collection efforts. This data
included traffic counts, accident history, bicycle and transit routes, and classification.
This section describes the transportation system, as it presently exists. While the emphasis will be on
the road system, related systems (such as school buses, public transit, and postal routes) will be
addressed.
1.2.1 2010 Long Range Transportation plan
The 2010 Shoshone-Paiute Tribes 20 Year Long-Range Transportation Plan identified the multimodal
transportation needs for the next 20 years within the Duck Valley Indian Reservation, in conjunction
with development strategies for implementing improvements. Based on analysis of existing and
future needs and deficiencies, the study developed a prioritized project list to guide roadway and
bridge improvement projects. The first item on the list was the improvement of ten bus routes. The
list contains twenty-four other transportation improvement projects.
1.2.2 Road Safety Audit
Recognizing the transportation safety concerns of the Duck Valley Indian Reservation, a road safety
audit (RSA) was conducted on Nevada State Route 225 and Idaho State Highway 51 that runs through
the most populated part of the reservation. This RSA took place during June of 2013 and identified
key safety issues along the state highways.
1.2.3 Strategic Transportation Safety Plan (STSP)
The purpose of this STSP was developed to improve the transportation safety management efforts of
the Duck Valley Indian Reservation (DVIR). The plan was developed through the cooperative efforts of
the Shoshone-Paiute Tribes, federal and state governments, and other agencies with a vested interest
in transportation safety and will address safety issues through the four Es: Engineering, Enforcement,
Education, and Emergency Medical Services. The plan identified transportation safety concerns and
proposed action steps to be taken to improve transportation safety on the Reservation.
9
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.2.4 Tribal Transportation Improvement Projects
Within the Long-Range Transportation Plan, the school helped identify several roadway sections that
need to be paved to improve the safety of school bus routes. The existing road surface types of these
roads are gravel or earth. Proposed improvements include an asphalt pavement surface. These
roadways have been prioritized and five have been specifically chosen and scheduled for
reconstruction because they are the more heavily traveled of the bus routes (See Section 1.5.4 for
maps of prioritized projects).
Roadway construction projects that designed and on file to be constructed when funding is available
are (See Section 1.5.4 for Project Maps):
•
•
•
•
•
•
Route 2 – Sheep Creek Rd (2.5 miles)
Route 13 – Manning Rd West (1.0 mile)
Route 14 – S. Thacker Rd (1.0 mile)
Route 141 – Jones Rd (0.5 miles)
Route 142 – Premo Ln (0.5 miles)
Route 301 & 304 – Black Eagle Rd (0.3 miles)
Roadway Rehabilitation (CRABS) projects that designed and on file to be constructed when funding is
available are (See Section 1.5.4 for Project Maps):
•
•
•
Route 12 – Fawn Creek Rd (1.5 miles)
Route 13 – Manning Rd East (0.5 mile)
Route 15 – Crows Nest Rd (1.0 mile)
Roadway Rehabilitation (CRABS) and Preventative Maintenance (Chip Seal) projects that were
constructed in 2020:
•
•
•
•
•
•
Route 2 – Chinatown Rd Rehabilitation (3.0 miles)
Route 3 – Airport Rd Chip Seal (2.6 mile)
Route 7 – Thomas Loop Rd Chip Seal (2.0 mile)
Route 9 – Boney Ln & Pleasant Valley Rd Chip Seal (5.3 mile)
Route 14 – Thacker Lateral Rd Chip Seal (4.7 mile)
Route 902 – Blue Creek Rd Chip Seal (1.2 mile)
10
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.3 Land Use and Socioeconomic Conditions
This section summarizes current and future land use and socioeconomic conditions for the study
area.
1.3.1 Land ownership
The Duck Valley Indian Reservation dates back to the Treaty of Ruby Valley signed by the United
States and the Western Shoshone Tribes in 1863. Ancestral lands of the Western Shoshone and
Northern Paiute tribes make up the present-day Duck Valley Indian Reservation. In the 1800’s EuroAmericans moved onto the lands of the bands and extended families.
A Shoshone leader named Captain Sam, looking for a home for his people, inspected the Duck Valley
region in 1870 and recommended to the federal government that they be allowed to settle there.
The government supported his request, establishing the reservation by Executive Order in 1877.
In 1886 President Cleveland issued an executive order adding land to the Duck Valley Reservation for
the use of the Paiutes. President Taft added additional acreage to the reservation in 1910. The two
Tribes share the reservation to this day.
Tribal Realty Department indicated that the Duck Valley Indian Reservation is made up of a total of
291,481.41 acres of land. 289,497.83 acres are in Tribal Trust and 1,983.83 are Fee lands (See Figure
2, Reservation Map).
11
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Figure 2: Duck Valley Indian Reservation Map
12
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.3.2 Land Use
Integrating land use into transportation planning is essential so communities can support "smart
growth" processes and promote sustainable development. Sustainable development improves
mobility, supports economic growth, and ensures the financial stability of the transportation system.
This approach helps maintain the quality of living for the people, the quality of the community, and
reduces the need for roadway expansion.
Residential:
The Shoshone-Paiute Tribes has its own housing authority (See Figure 3), which reports directly to the
tribal business council, also supervises a home improvement program, and manages a total of 445
homes throughout the Duck Valley Reservation.
Farming and Ranching:
Farming and Ranching are mainstays for the Tribes and is reflected in the over 12,000 acres of
subjugated lands. Included in the total acreage of the Reservation is 22,231 acres of Wetlands. The
Wildhorse Reservoir irrigation project was constructed in 1936 to support farming and ranching
activities. The reservoir is approximately 12,800 which is located 35 miles downstream of Wild Horse
Dam and provides water for irrigation and stock raising.
The 12,800-acre irrigation project lies at the center of the Duck Valley Indian Reservation and is
separated into two district units. Duck Valley Unit and the Pleasant Valley Unit. Both irrigate lands
along with Owyhee River but are separated from each other by a basalt restriction in the river
channel called the "Narrows." The Duck Valley Unit lies upstream and to the south of the Narrows;
the Pleasant Valley Unit lies downstream and to the North of the Narrows.
Public and Recreation:
The Shoshone-Paiute Tribes manages three rainbow trout fisheries: Lake Billy Shaw (fly fishing),
Mountain View, and Sheep Creek Reservoirs (See Figure 2 above). The three fisheries and a stretch of
the Owyhee River are open to angling at certain times of the year (See Figure 2 above). A tribal fishing
permit is required to fish the Duck Valley waters. In addition, the Tribes have guided wildlife hunts to
the public.
The Tribes also have several camping areas at Wild Horse Reservoir, located 30 miles south of the
reservation boundary.
The Shoshone-Paiute Tribes maintains a Recreation Program that is part of the Owyhee Community
Health Facility. The Recreation program provides the community with activities, to enhance their
physical, emotional, spiritual, and social well-being.
13
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
The Recreation Program also provides a facility that the community can utilize for birthday parties,
meetings, powwows, funerals, and a place to get some much-needed exercise.
Health:
Owyhee has two health care centers: the Owyhee Community Health Facility and the Owyhee Public
Health Service Indian Hospital (See Figure 4). The tribe also has a community health representative.
The economic development strategic plan of 1999 prioritized increased access to health care,
including the creation of more extensive specialized services such as an alcohol/drug abuse center, a
nursing home for elders, home health care services, and a domestic violence safe house. Emergency
medical services are provided 24 hours a day.
Education:
The local school system, the Owyhee Combined Schools, is operated by the Elko County School
District (See Figure 4). It serves grades K-12, including children from off the reservation. Vocational,
GED, and college courses are available on the reservation from Great Basin Community College in
Elko. Grants for higher education and adult vocational training are available to all tribal members.
Institutional/Government:
Most Tribal and government institutions are located within the Reservation along SH-51 and SH-225.
Government facilities include the Tribal Headquarters, Juvenile Detention Center, Daycare, Senior
Center, Housing Authority (HA), U.S. Post Office, Tribal Court/Justice Department, Emergency
Services (Police and Fire Departments), Water and Sanitary Services, and Health and Human Services
(See Figures 3 & 4).
Commercial:
Commercial services within the Reservation are primarily located within the town of Owyhee, Nevada
except for a business complex just south of the Idaho/Nevada border. Within Owyhee commercial
land includes a café, hotel/lodge, and drive-thru fast food. Just south of the Idaho/Nevada border
along SH-225 within the business complex (Gas N Go) is the gas station, grocery market, RV hookups,
deli, and hardware store (See Figures 3 & 4).
14
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Industrial:
The Shoshone-Paiute Tribes owns and operates a gravel pit south of Owyhee along SH-225. Currently
gravel is screened and used on local projects (See Figure 5).
Figure 3: Land Use Location Map 1
Figure 4: Land Use Location Map 2
15
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Figure 5: Shoshone-Paiute Tribes Gravel Pit
1.3.3 Existing Socioeconomical Conditions
A review of the existing population and employment was conducted to understand the demographic
characteristics of the Duck Valley Indian Reservation and the surrounding region. As identified by the
US Census Bureau, the below table summarizes the population and housing growth trends from 2010
to 2020 for the Duck Valley Indian Reservation, Owyhee County, Idaho, and Elko County, Nevada, and
the States of Idaho and Nevada. According to the US Census Bureau, the Duck Valley Indian
Reservation had a slight increase in total population since 2010.
Table 1. Population and Housing Unit Growth Trends
Population
Graphic Area
2010
2020
Population
Growth
Housing Units
2010
2020
Housing Unit
Growth
Duck Valley
Indian
Reservation
1,309
1,338
2.2%
493
527
6.9%
Elko County, NV
48,818
53,702
10%
19,566
21,770
11.3%
16
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Owyhee
County, ID
11,389
11,913
4.60%
4,781
Nevada
2,700,551
3,104,614
15%
1,173,814 1,281,018 9.1%
14.8%
667,796
Idaho
1,567,582 1,839,106
Source: 2020 US Census, 2010 US Census
4,719
751,859
-1.3%
12.6%
Employment overview
To determine primary employment industries and current employment levels within the Reservation,
data was compiled from the United States Census Bureau. Based on this there are approximately 460
employees within the Duck Valley Indian Reservation. Based on the census major employers for Tribal
members include:
• Tribal government/Administration - 150 employees
• Educational services, and health care and social assistance - 179 employees
1.3.4 Future Development and Growth Trends
Forecasting socioeconomic conditions allows planners to anticipate changes in future travel demand
and to envision potential solutions. Development of rational projections for population, housing
units, and employment for each horizon year is vital to the process of forecasting realistic traffic
volumes. Potential future developments within the study area identified in the Shoshone-Paiute
Tribes Economic Summit report, Market Analysis & Business Plan Development, future planned
housing development from the Tribal Housing Authority, and input received from Tribal officials are
outlined below:
Potential Study Area Developments
Planning Area
Potential Development
101 Ranch - Recreation
• Lodging (Bed and Breakfast)
• Catch and release fishing
• Wildlife viewing
• horseback riding
Rizzi Ranch - Recreation
• Develop hot springs
• Hunting operation
USFA Transfer of Land to the Tribes - 15 miles
from the Shoshone Paiute Tribal Community Center in Owyhee, Nevada
17
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
• Seven (7) houses on it in varying stages of disrepair to develop for Tribal employees
Wild Horse Reservoir – Campgrounds and Site Improvements
• Improve ten (10) campsites
• Reinstate full-service RV park site
• Create day-use areas
• Implement Master Plan
Mountain View Lake – Implement Master Plan
• Add Cabins/Tepee lodging on the site, potable water, irrigation, bathroom upgrades
and overall site improvements.
• Evaluate Mountain View Reservoir improvements to determine application to Billy
Shaw Reservoir and Sheep Creek Reservoir.
Fish Hatchery
• Fish, Wildlife and Parks currently purchases all stocked fish from an outside source at a
cost of
approximately $200,000 annually. This expenditure could be transferred to the
operations of a Tribal-owned hatchery, which would take care of local needs and
provide employment.
Infrastructure Plans at Existing Developments or Unknown Locations
• Airport Communications at the Airport
• Internet Café in the Deli
• Wildhorse Marina (renovate and open)
• Auto Repair Shop
Economic Development Plans
• Fly Fishing Guide Service
• Hunting Guide Service – Game Birds
• Bed & Breakfast Lodge
• RV Park Expansion at the Travel Plaza
• Arts and Crafts Marketplace at the Travel Plaza
• Wilderness Camping
• Sportsman’s Shop
Housing Development Plans – Housing development is planned along SH-225
• 35 lots, 35 new homes
• Community Center.
New Combined Owyhee School – New School, all Grades, is planned off SH-225, east of the
grocery store
• School Building K-12
• Outdoor Gathering Area
• Outdoor Stadium
18
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
•
•
Maintenance Building/Area
Parking Areas
1.4 Existing and Future Transportation Conditions
Public Roads within the Reservation were constructed and are being maintained by the Nevada
Department of Transportation, Idaho Department of Transportation, and the Bureau of Indian Affairs.
The current (2021) IRR system mileage for the Duck Valley Indian Reservation, according to a Miles of
Road by Organization and Surface Type report from NTTFI, is 355.6 miles; 297.6 miles of BIA roads
and 40.8 miles of State highways. Below table shows road mileage type.
Table 2: Selected Characteristics of Public Roads on the Duck Valley Indian Reservation
Jurisdiction
Road Mileage by Surface Type
Paved Gravel Concrete
29
59.4
0.4
40.8 0.0
0.0
BIA Roads
State
Highways
County Road 0.0
Tribal Road
0.7
Federal Roads 0.0
TOTAL
70.5
0.0
0.7
6.5
66.6
0.0
0.2
0.0
0.6
Earth
35.5
0.0
Primitive/Trail Proposed
172
1.2
0.0
0.0
None
0.0
0.0
Total Miles
297.5
40.8
0.0
2.0
0.1
37.6
0.0
5.0
1.1
178.1
0.0
0.9
0.0
0.9
0.0
9.5
7.7
355.5
0.0
0.0
0.0
1.2
Source: Miles of Road by Organization and Surface Type report from NTTFI, FY 2021
Recommended revisions to the - Indian Reservation Road system are outlined in Section 1.5.6 herein,
and are subject to the approval of the Shoshone-Paiute Tribal Business Council and the BIA.
This section inventories essential elements of the existing transportation system and documents the
status/condition of each element. Major elements inventoried include roadway characteristics, crash
history, and roadway performance conditions.
1.4.1 Roadway Inventory
A two-phase roadway inventory program was developed to identify roadway conditions on
major roadways and for the update of the NTTFI. The first phase of the roadway inventory was
conducted in February 2022 of major roadways within the Duck Valley Indian Reservation and other
major regional routes utilized by Tribal members. Phase two of the roadway inventory was conducted
in April 2022 that primarily included rural and other lesser traveled roadways within the reservation.
19
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
In order to streamline data collection, a field inventory data collection sheet, where needed, was
developed to document roadway characteristics per the requirements set-forth by the BIA. Upon
completion, field data collection sheets will be transferred to BIA inventory forms, along with photo
and map attachments, for submittal to Road Inventory Field Data System (RIFDS). The roadway
inventory included conducting a windshield survey to capture the following key items:
•
•
•
•
•
Road identification - length, class, location, road purpose
Roadway conditions - number of lanes, width, surface conditions, shoulders
Drainage - bridge locations and drainage conditions
Alignment conditions
Safety hazards
The following sections provide an overview of information provided in the NTTFI as well as conditions
identified during a comprehensive field review conducted by the study team.
1.4.2 Existing Roadway Characteristics
The study area is comprised of a network of over 323 miles of paved and unpaved roadways. Regional
roadways that serve the Duck Valley Indian Reservation include a network of roadways that connect
residential areas with employment and educational facilities. Major roads serving the Reservation
include SH-225 and SH-51 regionally connecting the Reservation to Elko, Nevada, Mountain Home
and Boise Idaho. Numerous minor roadways to residential, farming and ranching, and recreation
areas.
Functional Classification
Functional classification is the process by which streets and highways are grouped into classes
according to their role of moving traffic through a roadway network. Planners and engineers utilize
this hierarchy to establish a roadway's design standards, speed, capacity, access management
features, and land use development. Functional classification also impacts a roadway's eligibility for
federal transportation funds for road improvements and maintenance. Roads within the Duck Valley
Indian Reservation are classified by both FHWA and BIA functional classification system. Below are
descriptions of each.
FHWA Functional Classification
Federal Functional Classification is assigned to all public roads using federal guidelines and is
approved by FHWA. Below is an overview of each FHWA approved classification within rural areas.
Whereas the majority of funding does come from BIA, for the purposes of transportation, FHWA
provides for a majority of funding for Tribes in a program agreement with FHWA and the and the only
other funding provided by BIA is the maintenance funding they are required to use to maintain BIA
20
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
owned facilities. Roadways that do not have a FHWA-approved functional classification are deemed
ineligible for federal funding.
FHWA Functional Classification Definition
Classification
Principal
Arterial
Minor Arterial
Major Collector
Minor Collector
Description
Serve corridor movements having trip length and travel density characteristics
indicative of substantial statewide or interstate travel. They serve and connect
most areas with populations of 25,000 or more and provide an integrated
network of continuous routes without stub connections.
Link cities and larger towns and form an integrated network providing interstate
and inter-county service. Are spaced at appropriate intervals to allow for a
reasonable distance from developed areas. They have relatively high travel
speeds and minimum interference to through movements.
Primarily serve intra-county rather than statewide travel, by linking county seats,
larger towns, and other traffic generators to nearby towns and cities or higher
classified routes.
Provide access for population and traffic from local’s roads to major collectors.
Typically serve smaller communities and link local, traffic generators. Local Roads
Provide access to land next to the collector network and several travelers over
short distances.
BIA Functional Classification
The BIA Road system has several classes of routes. Functional classification means an analysis of a
specific transportation facility considering current and future traffic generators, and their relationship
to connecting or adjacent BIA, state, county, Federal, and/or local roads and other intermodal
facilities. Functional Classification is used to delineate the difference between the various road
and/or intermodal transportation facility standards eligible of funding under the TTP program. As part
of the TTP system management, all transportation facilities included on or added to the roadway
inventory must be classified according to the following functional classification system:
BIA Functional Classification Definition
Class
1
2
Description
Major arterial roads providing an integrated network with characteristics for serving traffic
between large population centers, generally, without stub connections and having
average daily traffic volumes of 10,000 vehicles per day or more with more than two lanes
of traffic.
Rural minor arterial roads providing an integrated network having the characteristics for
serving traffic between large population centers, generally without stub connections. May
also link smaller towns and communities to major resort areas that attract travel over long
distances and generally provide for relatively high overall travel speeds with minimum
interference to through traffic movement. Generally, provide for at least inter-county or
21
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
3
4
5
6
7
8
9
10
11
inter-state service and are spaced at intervals consistent with population density. This
class of road will have less than 10,000 vehicles per day.
Streets that are located within communities serving residential areas.
Rural major collector road is collector to rural local roads.
Rural local road that is either a section line and/or stub type roads, make connections
within the grid of the TTP system. This class of road may serve areas around villages, into
farming areas, to schools, tourist attractions, or various small enterprises. Also included
are roads and motorized trails for administration of forests, grazing, mining, oil,
recreation, or other use purposes.
City minor arterial streets that are located within communities and serve as access to
major arterials.
City collector streets that are located within communities and serve as collectors to the
city local streets.
This class encompasses all non-road projects such as paths, trails, walkways, or other
designated types of routes for public use by foot traffic, bicycles, trail bikes, snowmobiles,
all-terrain vehicles, or other uses to provide for the general access of non-vehicular traffic.
This classification encompasses other transportation facilities such as public parking
facilities adjacent to TTP routes and scenic byways, rest areas, and other scenic pullouts,
ferry boat terminals, and transit terminals.
This classification encompasses airstrips that are within the boundaries of the TTP system
grid and are open to the public. These airstrips are included for inventory and
maintenance purposes only.
This classification indicates an overlapping or previously inventoried section or sections of
a route and is used to indicate that it is not to be used for accumulating needs data. This
class is used for reporting and identification purposes only.
Right-of-Way Status
The BIA Road System is defined in 25 CFR 170.5, as existing and proposed roads on the TTP system for
which the BIA has or plans to obtain legal right-of-way. The BIA Road system was compiled and
established in 1974, based on a field survey performed by FHWA. Initially, BIA system roads were
roads that were used to provide public access to and within Indian lands. Many of these roads had no
recorded rights-of-way. Since then, rights-of-ways have been obtained as the roads were
reconstructed and/or improved. A right-of-way over Indian land must be approved by the BIA in the
form of a grant of easement signed by a BIA Agency Superintendent. Specific requirements for
obtaining rights-of-way over Indian lands are contained in 25 CFR 169. At present, road rights-of-way
within the Duck Valley Indian Reservation are owned by the State of Nevada, State of Idaho, and the
BIA. For the most part, there are no rights-of-ways on unimproved BIA system roads.
Traffic Control
Traffic control devices are all signs, signals, markings, and devices placed on, or adjacent to, a street
or highway by a public body having authority to regulate, warn, or guide traffic.
22
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
The Manual on Uniform Traffic Control Devices is the publication that sets forth the basic principles
which govern the design and usage of traffic control devices. The Manual was prepared by a National
Committee which included state, township, and municipal representation.
Traffic control on the reservation is provided by traffic lights, stop signs, speed limit signs and
directional signs as well as surface painted lines, directional arrows and other parking and traffic
related signage throughout the reservation.
Traffic control existing throughout the BIA road system is overall deficient however, eighteen miles of
BIA roads were improved in 2020 that included improvements to all signing and striping.
Drainage and Bridges
Even though their primary function is for the movement of traffic, roads and streets need to be
designed with drainage in mind. The drainage facilities associated with a designed street network
offers one of the most economical and expedient means of conveying storm water through a
developed area. Continuing improvement to the Reservation’s Street and road system will provide
great benefits to the Tribe’s drainage problems. It will be important for the two systems, drainage,
and road improvements, to evolve concurrently.
Many premature pavement failures have been traced to inadequate surface and subsurface drainage.
This has been observed throughout the reservation by deficient pavement cross-slope and vegetation
growth along the edges of the pavement that does not allow water to drain from the pavement and
shallow ditches. Numerous cracks in the pavements were observed that allow stormwater to
propagate through the pavement into the subsurface.
Bridges
A bridge is defined as a structure, including supports, erected over a depression or an obstruction,
such as water, a highway, or a railway, having a track or passageway for carrying traffic or other
moving loads, and having an opening measured along the center of the roadway of more than 20 feet
between under-copings of abutments or spring lines of arches, or extreme ends of the openings for
multiple boxes; it may include multiple pipes where the clear distance between openings is less than
half of the smaller continuous opening. TTP Bridges are inspected (inventoried) periodically,
depending on their condition. The result of these inspections is provided to BIADOT and recorded in
the Bridge Inventory System Supplemental (BISS) database.
Per FHWA: "A Structurally Deficient (SD) bridge is one that (1) has been restricted to light vehicles
only, (2) is closed, and/or (3) requires immediate rehabilitation to remain open. A Functionally
Obsolete (FO) bridge is one in which the deck geometry, load carrying capacity (comparison of the
23
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
original design load to the State legal load), clearance, or approach roadway alignment no longer
meets the usual criteria for the system.
There eleven (11) BIA owned bridges identified in the TTP Inventory for the Duck Valley Indian
Reservation. The bridge numbers assigned to these bridges are: H302, H305, H309, H311, H312,
H323, H324, H325, 326H, H327 and H328. Two of these Bridges (H309 and H327) are listed in the BIA
Bridge Inventory with a sufficiency rating lower than 50, two Bridges (H324 and H328) do not have
inspection reports. H324 appears to be in fair to good condition, H328 appears to be in poor
condition. One bridge (326H) is a proposed Bridge on BIA Route 141.
School and Bus Routes
Children attend the Owyhee Combined School located at 100 Academic Way in Owyhee, Nevada. The
school is for kindergarten through twelfth grade.
School buses have specific routes within the reservation boundary depending on the driver and
where they are picking up the children. Many of the bus routes are currently gravel roads, the Tribe
has made it a priority to pave the existing bus route gravel roads as listed in the priority projects
section of this report.
Mail is delivered to the US Post office located at 1 Main Street, Owyhee, Nevada. Tribal facilities also
receive mail and fed ex.
1.4.3 Existing Traffic Conditions
The measurement of traffic volumes is one of the most basic functions of roadway planning and
management. Traffic volume counts are the most common measure of roadway use, and they are
needed as input to most traffic engineering analysis. The objectives of a traffic volume study are to
estimate the Annual Average Daily Traffic (AADT) volumes and peak- hour traffic on any routes
affecting traffic within the reservation and other public roads within the TTP system. This data is used
to update the road inventory files, determine capacity deficiencies, and identify potential roadway
improvement projects.
During development of the previous LRTP, hour traffic volume counts on the Duck Valley Indian
Reservation were completed at potential high traffic areas. Based on the low population growth for
the area new counts were not necessary and these results were used for this study.
Traffic volumes derived from those traffic counts were then used to compute current and projected
(20-year) ADTs. Once the current ADTs were generated, projected (20-year) ADTs were computed.
The Bureau of Indian Affairs Department of Transportation (BIADOT) has established a growth rate of
24
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
2% per year for BIA inventory purposes. Future ADTs were computed by multiplying the current ADT
by a factor of 1.485. This factor represents a compound traffic growth rate of two percent per year
for 20 years.
Results of Traffic Study
The results of the twenty-four-hour traffic counts, completed previously, including vehicle
classification percentages and counts obtained from other sources are summarized on the Table
“Duck Valley Indian Tribe Traffic Counts” contained in Appendix A.
Traffic volume data is provided annually by the Nevada and Idaho Department of Transportation for
all roadways in the state on the Federal Aid System. Roadway classifications on the Federal Aid
System in urban areas include the following five classes of roadways: 1. Interstates; 2. Other
expressways; 3. Principal arterials; 4. Minor arterials, 5. Major collectors. For areas considered to be
rural, the road classifications are identical to the above for urban areas with minor collector roadways
added to the mix.
Typically, under this scenario, traffic volume data is not provided for local roads. Local roads tend to
carry a lower volume of daily or annual traffic, but collectively they represent the roadways with the
greatest number of linear miles of pavement.
In Addition, two intersection turn movement counts at the locations of State Route 225 and Boney
Road (BIA Route 9) and State Route 225 and School Entrance.
The outcome of the capacity analysis that was previously completed determined the levels of service
(LOS), shown on Table 3 for each intersection analyzed. The analysis was performed using the
Capacity Software (HCS). In general, LOS is defined in terms of delay, i.e., the measure of a driver’s
discomfort, fuel consumption, and lost travel time. The LOS criteria for unsignalized intersections are
related to general delay ranges. No time values (i.e., number of seconds per delay) are assigned.
Criteria are based on the unused capacity of the lane in question and are rated from “A” through “F”
with “A” meaning little delay and “F” denoting long delays and heavy congestion.
•
•
•
Level of Service A — Best, free flow operations (on uninterrupted flow facilities) and very low
delay (on interrupted flow facilities). Freedom to select desired speeds and to maneuver
within traffic is extremely high.
Level of Service B — Flow is stable, but presence of other users is noticeable. Freedom to
select desired speeds is relatively unaffected, but there is a slight decline in the freedom to
maneuver within traffic.
Level of Service C — Speed is becoming affected by the presence of other users. Maneuvering
within traffic requires substantial vigilance on the part of the user.
25
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
•
•
•
Level of Service D — High density but stable flow. Speed and freedom to maneuver are
severely restricted. The driver is experiencing a generally poor level of comfort and
convenience.
Level of Service E — Flow is at or near capacity. All speeds are reduced to a low, but relatively
uniform value. Freedom to maneuver within traffic is extremely difficult. Comfort and
convenience levels are extremely poor.
Level Service F — Worse, facility has failed, or a breakdown has occurred.
The Transportation Research Board’s Highway Capacity Manual recommends that the capacity under
ideal conditions for unsignalized intersection two-way stop control should not exceed 1,060
passenger cars per hour per lane or movement.
In general, for rural areas, LOS A and B represent no congestion, LOS C and D represent moderate
congestion, and LOS E and F represent severe congestion.
The results of the previously completed intersection turning movement counts are summarized in
Appendix A. In general the highest peak volumes were observed during 7:30 am to 8:30 pm and 3:30
pm to 5:45 pm. Over the past 10 years there has only been a total of 2.25% growth on the reservation
that equals a growth rate of .22% a year. The traffic volumes have not had any significant growth in
the past 10 years and are currently not projected to have significant growth in the future. The
projected ADT’s in Appendix A are significantly higher than the 2042 projected ADT’s based on actual
growth rate therefore, the cost to collect additional traffic counts would not add value to this report.
In addition, no traffic volume issues were observed or reported at these intersections. All
intersections have a level of service “A”, representing free flow, freedom to select desired speeds and
to maneuver within the traffic stream is extremely high. Minimum speed — 60 miles per hour (mph).
Table 3: Turning-Movement-Count Intersections: Level of Service (LOS)
Intersection
Peak Hour Analyzed
State Route 225 & Boney Road (BIA
Route 9)
7:00am — 8:00am
State Route 22S
& Boney Road (BIA Route 9)
8:00am — 9:00am
State Route 225
& Boney Road (BIA Route 9)
4:00pm — 5:00pm
Signalized
Level of Service
No
A
No
A
No
A
26
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
State Route 225 & Boney Road
(BIA Route 9)
5:00pm — 6:00pm
State Route 225
& School Entrance
7:00am — 8:00am
State Route 225 & School Entrance
8:00am — 9:00am
State Route 225
& School Entrance
4:00pm — 5:00pm
State Route 225 & School
Entrance
5:00pm — 6:00pm
No
A
No
A
No
A
No
A
No
A
1.4.4 Other Modes of Traffic
Existing Pedestrian, Bicycle, and Equestrian Facilitates
Currently there are 2 crosswalks on SH-225 at the Owyhee School with no receiving handicap ramps
or sidewalks at either end. There are some intermittent sections of sidewalks within developments
inside the town of Owyhee but no sidewalks along the public roads. Pedestrians primarily use the
shoulders of the roads for walking.
A new gravel path was recently constructed along SH-225 from the Owyhee townsite north to the
Shoshone-Paiute Tribes Government Center.
Currently there are no bicycle lanes or designated equestrian trails within the study area. Bicyclists,
particularly along SH-225, are forced to utilize vehicle travel lanes because of narrow shoulders Along
SH-225.
Pedestrian Needs
The Reservation currently has limited pedestrian and bicycle facilities, input from stakeholders and
community members suggests an overriding need for increased pedestrian access between
residential areas and activity centers. Sidewalks, paths, pedestrian related needs, and bicycle facilities
include:
• Sidewalks with additional street lighting are needed in the Owyhee School area and townsite
for children to walk to/from schools.
27
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
•
•
Sidewalks are needed along the BIA roads and SH-225 throughout the Owyhee townsite for
pedestrian movement.
The newly constructed gravel path needs to be paved in the future and lengthened to the
north to the waste management site.
Existing Transit Services
Currently there is no official public transit service within the Duck Valley Indian Reservation. Elko
County has the Southern Nevada Transit Coalition. This is a private, non-profit organization. However,
it currently does not serve the Duck Valley Indian Reservation.
The Owyhee Community Health Facility who provides Ambulatory Care Services has been awarded
funding to increase its transit capabilities.
Amtrak is operated out of Elko, Nevada. There are several train schedules available. Union Pacific
Railroad also operates out of Elko.
Scenic Byways
The National Scenic Byways Program is part of the U.S. Department of Transportation, Federal
Highway Administration. The program is a grass-roots collaborative effort established to help
recognize, preserve, and enhance selected roads throughout the United States. Idaho and Nevada
have designated Scenic Byways; however, there are none within the Duck Valley Indian Reservation.
Aviation
The closest airport to the Duck Valley Indian Tribe is their airport located west of Owyhee. In
September 2010, the existing airport was renovated.
The Owyhee Airport is a public use airport located west of the central business district of Owyhee in
Elko County Nevada. It is owned by the Shoshone-Paiute Tribe and is within the Duck Valley Indian
Reservation. The airport was originally built by the United States Army Air Force in 1942 and was
known as Owyhee Flight Strip.
28
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Figure 6: Owyhee Airport Location
The Boise Airport, also known as Gowen Field is located approximately 140 miles northwest from the
Duck Valley Indian Reservation. Gowen Field is a joint civil-military, commercial and general aviation
airport. The airport is operated by the city of Boise Department of Aviation and is overseen by the
Airport Commission. Boise is a landing rights airfield requiring international general aviation flights to
receive permission from a Customs and Border Protection officer before landing on the field. In
addition to being a commercial and general aviation airport, Boise also sees usage by the Idaho Air
National Guard on the Gowen Field Air National Guard Base portion of the airport. The National
Interagency Fire Center is based in the city of Boise and the Boise Airport is used for logistical
support. The United States Forest Service also uses Boise Airport as a base for aerial firefighting air
tankers during the wildfire season.
The Elko Regional Airport is located approximately 97 miles southeast from the Duck Valley
Indian Reservation. Elko Regional Airport has two runways: commercial and general aviation. General
Aviation hangers and tie downs are located on the east end of the airport. The new Air Carrier
Passenger Terminal is 20,000 square feet and is located on the interior of the airport. The new
terminal is accompanied by a 300-space vehicle parking lot accessible from Mountain City Highway.
29
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.4.5 Future Traffic Conditions
In its most basic form, travel demand is a measure of the number of people (or their vehicles) who
travel to and from all the various possible locations within and outside of a given area. That travel
must take place on a transportation system or network, in this case, a road network. Projection of
travel demand has three components: trip generation, trip distribution, and trip assignment.
The type and degree of development projected for the year 2042 on the reservation or in its vicinity is
based on information provided by tribal members, staff and other officials or agencies.
The factors used in the generation of trips were determined from a review of the Shoshone-Paiute
Tribes Economic Summit report, Market Analysis & Business Plan Development, and future planned
housing development from the Tribal Housing Authority.
In developing a 20-Year Transportation Plan for the community, we have made assumptions based
upon the awareness of the existing conditions and of the plans to meet current and future needs.
Using these assumptions, we have projected the degree of development that is probable by the year
2042 given the population to be served and the economic resources available for implementing
development plans.
The road network must accommodate existing as well as projected traffic volumes that can be
determined through present and projected growth patterns.
1.4.6 Development Plans
The following projects have been identified as potential development plans for the Shoshone-Paiute
Tribes based on the Economic Summit report, Market Analysis & Business Plan Development, and
future planned housing development from the Tribal Housing Authority.
Planning Area
Potential Development
101 Ranch - Recreation
• Lodging (Bed and Breakfast)
• Catch and release fishing
• Wildlife viewing
• horseback riding
Rizzi Ranch - Recreation
• Develop hot springs
• Hunting operation
USFA Transfer of Land to the Tribes - 15 miles
from the Shoshone Paiute Tribal Community Center in Owyhee, Nevada
30
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
• Seven (7) houses on it in varying stages of disrepair to develop for Tribal employees
Wild Horse Reservoir – Campgrounds and Site Improvements
• Improve ten (10) campsites
• Reinstate full-service RV park site
• Create day-use areas
• Implement Master Plan
Mountain View Lake – Implement Master Plan
• Add Cabins/Tepee lodging on the site, potable water, irrigation, bathroom upgrades and
overall site improvements
• Evaluate Mountain View Reservoir improvements to determine application to Billy Shaw
Reservoir and Sheep Creek Reservoir
Fish Hatchery
• Fish, Wildlife and Parks currently purchases all stocked fish from an outside source at a cost of
approximately $200,000 annually. This expenditure could be transferred to the operations of
a Tribal-owned hatchery, which would take care of local needs and provide employment.
Infrastructure Plans at Existing Developments or Unknown Locations
• Airport Communications at the Airport
• Internet Café in the Deli
• Wildhorse Marina (renovate and open)
• Auto Repair Shop
Economic Development Plans
• Fly Fishing Guide Service
• Hunting Guide Service – Game Birds
• Bed & Breakfast Lodge
• RV Park Expansion at the Travel Plaza
• Arts and Crafts Marketplace at the Travel Plaza
• Wilderness Camping
• Sportsman’s Shop
Housing Development Plans – Housing development is planned along SH-225
• 35 lots, 35 new homes
• Community Center
New Combined Owyhee School – New School, all Grades, is planned off SH-225, east of the grocery
store
• School Building K-12
• Outdoor Gathering Area
• Outdoor Stadium
• Maintenance Building/Area
• Parking Areas
31
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
The most reliable way to estimate the traffic generated by a proposed development is to use the trip
generation rates observed at an existing development of similar land use and building type. For these
types of developments, the accepted source document of trip generation rates (Trip Generation,
current Edition - Washington, D.C., Institute of Transportation Engineers) should be used.
Trip generation calculations will need to be performed for average weekday trips and weekday AM
and PM peak-hour trips 20 years beyond the initiation of each development. This information is used
to develop recommendations for road improvement programs. Future volumes, including
programmed improvements, are analyzed against the capacities of existing roadways to develop road
improvement projects.
1.5 Evaluation of Improvements
This section presents the initial improvement concepts and the criteria used for evaluating
recommendations for the study area. Initial concepts were developed based on deficiencies and
needs identified in the existing conditions analyses, future land use, socioeconomics, traffic
conditions, and the goals and objectives established by the Shoshone-Paiute Tribes.
1.5.1 Evaluation Criteria
Transportation system deficiency analysis and input from the public, stakeholders, and
Transportation Safety Plan resulted in a comprehensive list of existing and future transportation
issues and needs for the Shoshone-Paiute Tribes. Potential improvements identified were evaluated
and prioritized to determine the projects/improvements that best serve the needs of the Duck Valley
Indian Reservation. The following summarizes the criteria utilized to evaluate and to quantify the
benefits of each potential transportation improvement option. Based on the results of the evaluation,
projects were prioritized into short-, mid-, and long-term implementation phases. Planning level cost
estimates were also developed based on typical per mile/foot construction costs in 2022. Estimated
costs for each project are expressed in 2022 dollars and do not include ROW acquisition costs. This
report assumes the Tribes will donate needed ROW for transportation needs. Actual costs for
projects could vary at the time of implementation; therefore, a detailed analysis should be performed
on a case-by-case basis to determine actual costs. Unless otherwise noted, the recommended
projects are not yet funded.
Safety
• Objectives
o Reduce vehicle, pedestrian, and bicycle collisions
o Improve access for emergency services
• Measures
32
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
o Improves overall Safety
o Serves as alternative/emergency access route
o Enhances pedestrian/bicyclist Safety
Infrastructure Preservation/Maintenance
• Objectives
o Preserve and maintain existing transportation infrastructure.
• Measures
o Preserves existing infrastructure
Mobility and Accessibility
• Objectives
o Reduce congestion, bottlenecks, and travel times for all modes
o Support future traffic demand
o Improve linkages between vehicular, transit, pedestrian, and bicycle modes
• Measures
o Improves overall Safety
o Serves as alternative/emergency access route
o Enhances pedestrian/bicyclist Safety
Economic Development
• Objectives
o Support economic growth
• Measures
o Serves tourist or economic development
Environmental and Title VI Impacts
• Objectives
o Protect natural and cultural environment
o Avoid or minimize negative impacts on Title VI population groups
• Measures
o Impact on environmental/cultural resources
o Impact on Title VI
Implementation Feasibility
• Objectives
o Minimize capital cost of improvements, including preservation of ROW
o Reduce ROW impacts
o Implementable and flexible
• Measures
o Construction feasibility
o Cost effectiveness
o ROW impacts
33
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.5.2 Paved Road Treatments
On-going, paved road maintenance and pavement reconstruction is critical to the overall safety and
convenience of the Shoshone-Paiute Tribe's transportation network. Maintaining a road's pavement
condition can lessen maintenance costs on vehicles, improve overall safety, and provide motorists
with a smoother, more comfortable ride. Pavement improvement projects include:
•
Pavement Rehabilitation: Minor rehabilitation consists of non-structural enhancements to
eliminate age-related, top-down surface cracking that develops in flexible pavements due to
environmental exposure. Major rehabilitation consists of structural enhancements that both
extend the service life of an existing pavement and/or improve its load-carrying capability.
Surface treatment methods include micro surfacing, chip seal, slurry seal, and crack seal.
•
Pavement Reconstruction: Complete removal and replacement of the existing pavement
structure. Required when a pavement has either failed or has become functionally obsolete.
Reconstruction is also warranted when pavement needs to be widened to meet roadway
standards.
Most of the paved BIA roads within the reservation are in poor condition due to lack of preventative
maintenance in the past. The only roads that are in good repair are Route 2, Chinatown Road and
Route 3, Airport Road since Airport Road was reconstructed in 2010 and Chinatown Road was
rehabilitated (CRABS) in 2020. This only makes up approximately 5 miles of the 25.2 miles of BIA
paved roads within the Reservation. There are still over 20 miles of paved roads that need
rehabilitation or full reconstruction however, these type of construction activities are cost prohibitive
compared to the annual FHWA funding currently available to the Tribes. The Tribes receive just over
1.1 million dollars in funding a year to perform transportation improvement on their system.
TYPE OF IMPROVEMENT
COST PER MILE
Full Reconstruct
Rehabilitation (CRABS)
Preventative Maintenance (Chip Seal w/ Crack
Seal)
$ 2,800,000
$ 700,000
$ 130,000
Based on the costs shown above and without additional funding available it, is cost prohibitive to fully
reconstruct the BIA roads. The Tribes annual funding is not enough to reconstruct ½ mile of road each
year. In addition, as shown below in the priority projects there are over 6 miles of existing gravel
roads that are bus routes that the Tribes would like paved. With the economical constraints the
Tribes will put forth a cost-effective approach to improving the roadway system using preventative
measures and rehabilitation measures, where applicable. Outside funding in the form of grants will
34
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
be pursued to perform the cost prohibited reconstruction projects. Available grants will be discussed
in section 1.7.1 of this report.
1.5.3 Unpaved Road Treatments
Paving road surfaces results in several benefits, including reduced vehicle maintenance, improved
driving experience and safety, and reduced dust emissions. The priority list below identifies gravel
roads the Tribes want to pave. Most roads located within the Duck Valley Indian Reservation are
unpaved roads. Since these roads are low volume facilities, they generally do not meet the minimum
requirements to qualify for paving; therefore, continued maintenance of these roads will be required.
Gravel roads often have the advantage of lower construction and sometimes lower maintenance
costs. If properly maintained, a gravel road can safely serve traffic for many years.
1.5.4 Shoshone-Paiute Tribes Proposed Projects
The recommended 20-year transportation plan for the Duck Valley Tribe consists of an integrated set
of roadway improvements/construction projects needed to meet current and projected goals.
This list has been prepared to allow some items that could be delayed due to State funding and/or
negotiations/discussions with other agencies, the potential to ‘slide’ (up or down) within the list until
such time as funding becomes available.
The “Short Term Projects” are being put forth to identify the projects proposed first (highest priority)
at this time.
5-YEAR TRANSPORTATION IMPROVEMENT PROJECTS (TTPTIP, See Figure 23)
1. Rodeo Grounds Road, Route 102
Rodeo Grounds Road is the main access to the Tribal Fire Station and Rodeo Grounds. PS&E has
been completed to reconstruct and pave 0.25 miles (See Figure 8).
2. Newtown Subdivision Improvements
Pave, curb and gutter, sidewalk. These will need to be placed on the TTP road inventory (See
Figure 7).
35
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Figure 7: Priority Project #2
3. Chinatown Loop, Routes 12, 13, and 15
Improve deteriorated paved road bus routes. PS&E has been completed to pulverize, mix asphalt
with base, add cement, compact, and repave 2.5 miles (See Figure 8).
4. Boney Lane, Route 9
Pavement repair, crack seal, chip seal 3 miles (See Figure 8).
5. S. Thacker Lateral, Route 14
Pave to improve safety on gravel road bus routes. PS&E has been completed to pave the gravel
roadway for 1.0 miles (See Figure 8).
6. Manning Rd, Route 13
Pave to improve safety on gravel road bus routes. PS&E has been completed to pave the gravel
roadway for 0.8 miles (See Figure 8).
7. Premo Ln, Route 142
Pave to improve safety on gravel road bus routes. PS&E has been completed to pave the gravel
roadway for 0.5 miles (See Figure 8).
8. Jones Rd, Route 141
Pave to improve safety on gravel road bus routes. PS&E has been completed to pave the gravel
roadway for 0.6 miles (See Figure 8).
36
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
9. BIA Route 2, Sheep Creek Road, after the 'Y'
Pave to improve safety on gravel road bus routes. PS&E has been completed to pave the gravel
roadway for 2.1 miles (including bus turn around), from existing paving to the southwest to (and
including) the bus turn around (See Figure 8).
Figure 8: Priority Projects, #1, 3, 4, 5, 6, 7, 8, 9, & 11
10. New BIA Route (Access to New Owyhee Combined School)
Construct new route to proposed Owyhee Combined School. Will need to be placed on the TTP
road inventory (See Figure 9).
37
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
11. New BIA Route, Transfer Street (Access to New Owyhee Combined School)
Reconstruct new route to access proposed Owyhee Combined School. Will need to be placed on
the TTP road inventory (See Figure 9).
Figure 9: Long-Term Priority Project #10 and 11
38
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
LONG-TERM TRANSPORTATION IMPROVEMENT PROJECTS (TTPTIP shown in table further below)
12. Route 22
Grade and pave from BIA Route 14 (Thacker Lateral Road) to SR 225 (See Figure 12).
13. Black Eagle Rd, Routes 301/304
Pave to improve safety on gravel road bus routes. PS&E has been completed to pave the gravel
roadway for 0.5 miles (See Figure 8).
14. BIA Route 101 (Owyhee Community Streets)
Reconstruction with curb and gutter and sidewalks (See Figure 10).
Figure 10: Long-Term Priority Project #14
39
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
15. Pathway- Along West Side of SH-225
The pathway has been started. Along west side of SH-225 from the post office to the State line.
From the Owyhee townsite to the Tribal Business Center gravel has been placed with some ADA
ramps. Complete the pathway to the State line and fully pave it (See Figure 11).
Figure 11: Long-Term Priority Project #15
16. Jones Rd, Route 141
From BIA Route 14 (Thacker Lateral Road) to SR 225 (2.25 miles): This project consists of grading,
draining, and paving 1.0 mile of unimproved road; the remaining of 1.25 miles of gravel road will
consist of grading, draining, and paving as well. (See Figure 12).
17. Mountain View Road, Route 8
Grade and pave from Mountain View Reservoir to SR 225 (See Figure 13).
18. Sunset Drive, Route 104
Grade and pave Gah Nee employee housing road (See Figure 12).
19. National Guard Road, Route 901
Construct new road to extend Route 901 to connect roadways (See Figure 12).
40
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Figure 12: Long-Term Priority Projects #12, 16, 18, 19, & 21
20. Pleasant Valley Road, Route 903
Grade and pave from existing gravel to mouth of canyon (See Figure 13).
Figure 13: Long-Term Priority Projects #17 & 20
21. Thacker Lateral, Route 14-2
Construct new road between Boney Lane to National Guard (See Figure 12).
41
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
22. Spring Valley Roadways
Make improvements to the existing urban roadways. These will need to be placed on the TTP
road inventory (See Figure 14).
Figure 14: Long-Term Priority Project #22
23. Thomas Loop Subdivision Improvements
Pave roadways and driveways. These will need to be placed on the TTP road inventory (See Figure
15).
Figure 15: Long-Term Priority Project #23
42
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
24. Duck Valley housing Authority New Subdivision
Off SH-225, Proposed subdivision roads with 35 lots. These will need to be placed on the TTP road
inventory (See Figure 16).
Figure 16: Long-Term Priority Project #24
5-YEAR TRANSPORTATION BRIDGE IMPROVEMENT PROJECTS (TTPTIP, See Figure 24)
1. H328
Existing 100-foot span bridge on Route 22 needs replaced based on visual inspection (See Figure
17).
2. 326H
New 100-foot span bridge on Route 141 (See Figure 17).
3. H327
Existing 130-foot span bridge on Route 203 with a sufficiency rating well below 50 needs to be
replaced (See Figure 18).
4. H309
Existing 23-foot span bridge on Route 12 with a sufficiency rating well below 50 needs to be
replaced (See Figure 17).
43
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Figure 17: Priority Bridge Projects #1, 2, & 4
Figure 18: Priority Bridge Project #3
44
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
LONG-TERM TRANSPORTATION BRIDGE IMPROVEMENT PROJECTS
1. DVIR 124
Construction of a new bridge across the Owyhee River on BIA Route 124 to provide safe, allweather access to agricultural areas in the far southeastern portion of the reservation. (Sugar Loaf
area).
2. DVIR 123
Construction of a new bridge across the Owyhee River on BIA Route 123 to provide safe, allweather access to agricultural areas in the far southeastern portion of the reservation.
3. DVIR 909
Construction of a new bridge across the Blue Creek on BIA Route 909 to provide safe, all-weather
access to agricultural areas in the far north-central portion of the reservation.
SAFETY IMPROVEMENT PROJECTS (See Figures 19, 20, and 21)
1. Miscellaneous Projects: Signing, Striping, Guardrail, Etc.
Traffic signs and striping communicate rules, warnings, and guidance to drivers to navigate the
roadway system safely and effectively. Guardrail provides safety to the driver where objects and
non-traversable side-slopes exist. Many of the BIA roads do not have adequate signage, striping
and guardrail. Projects need to be planned to make the necessary safety improvements
throughout the reservation.
2. LIGHTING PROJECTS
Street and pedestrian lighting is intended to create a safe, nighttime environment by increasing
visibility between pedestrians, motorists, and their surroundings. For motor vehicles, installing
street lighting improves driver's visibility and in turn can reduce the risk of traffic accidents and
the severity of crashes. Good outdoor lighting can also create and encourage a pedestrian friendly
environment by providing extended hours of light to utilize pedestrian facilities. The following
locations/intersections need lighting:
• Duck Valley Gas N Go
45
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Figure 19: Proposed Lighting at the Gas N Go
•
SH-225 and Academic Way
Figure 20: Proposed Lighting at SH-225 and Academic Way
46
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
•
SH-225 and Sho-Pai St.
Figure 21: Proposed Lighting at SH-225 and Sho-Pai St.
47
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
MAINTANANCE IMPROVEMENT PROJECTS
1. Culvert Replacement Program
Existing culverts throughout the Reservation are in very poor condition and need to be replaced
before failure occurs. Currently there is one culvert that has failed requiring the Tribes to close
the route. This program will include culvert inspection, evaluation, reporting and ultimately
replacement of culverts specified for replacement. A schedule of the culverts to be replaced will
be developed for the next 5 years.
Figure 22: Typical Culvert Replacement
2. Pavement and Asset Management System/Prev. Maint. & Rehab Projects
Acquire Software, collect data, analyze, develop reports, and plan, and perform preventative
maintenance and rehabilitation projects on TTP roads.
This system will provide a systematic process of collecting and analyzing pavement data so that
cost-effective strategies can be selected to provide and maintain pavements in a serviceable
condition. The following routine maintenance activities will be developed and scheduled over 20years for all BIA routes.
48
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
•
•
•
Pavement Patching, Crack Sealing, Chip Sealing, Overlays, Full-Depth
Reclamation/Rehabilitation, Reconstruction
Shoulder Maintenance, Drainage and Structure Clean-out and Repair, Guardrail Replacement,
Repair, and Cleaning
Striping, Sign Replacement, Fence, Cattleguard, and Gate Clean-Out and Repair
Figure 23: Pavement Condition Versus Time Curve
49
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
TRANSPORTATION IMPROVEMENT PROJECTS (TTPTIP fiscally constrained)
50
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Figure 24: Fiscally Constrained TTIP
1.5.5 State Department Proposed Projects
The Statewide Transportation Improvement Program (STIP) is a four-year financial document that
lists all projects expected to be funded in those four years with Federal participation. The current
document for the state of Nevada is for federal fiscal years 2021 through 2024. The STIP is updated
periodically throughout its life. The January 28, 2021, approved project listing provides information
on all Nevada Department of Transportation projects. The County of Elko further identities these
projects that are only within Elko County.
NEVADA DEPARTMENT OF TRANSPORTATION PROJECTS
1. Duck Valley Shoshone Paiute Tribe Van Acquisition for New Transit Program (2021 - $73,605)
Duck Valley Shoshone Paiute Tribe Van Acquisition for New Transit Program - Duck Valley
Shoshone Paiute Tribe is a rural private non-profit and tribal (Native American) agency that is
seeking to start transit service for the public with special consideration to the elderly and persons
with disabilities. The funding will be used to purchase an accessible van to provide access to
services within the community and in larger nearby communities with more amenities and
services.
51
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
IDAHO TRANSPORTATION DEPARTMENT PROJECTS
Idaho’s Statewide Transportation Improvement Program is for Fiscal Years 2022 through 2028. The
Duck Valley Indian Reservation falls within District 3 for the state. There are no programmed projects
at this time that would have any impact on the Duck Valley Indian Reservation.
1.5.6 Tribal Transportation Program Update Recommendations
The National Tribal Transportation Facility Inventory (NTTFI) is a comprehensive national inventory of
all tribal transportation facilities that are eligible for TTP funding, and includes specific facility
information, such as classification, route/bridge number, current and projected traffic volumes,
pavement conditions, etc., and is utilized for the ongoing review of facility conditions. This inventory
is utilized as the basis to identify a tribe's transportation system, determine the transportation needs
of a tribe, and serves as a basis for apportioning federal funds.
To obtain funding and accurately report the status of the tribe's transportation system, the current
NTTFI for the Shoshone-Paiute Indian Tribes was reviewed against field review conditions and to
identify necessary corrections and updates. Below Tables provide summaries of the proposed
mileage revisions to the Tribe's NTTFI. Figures shown further above illustrate the roadways
recommended for inclusion in the NTTFI.
TABLE 4: SUMMARY OF PROPOSED BIA ROAD SYSTEM MILEAGE REVISIONS
Miles
Existing BIA DOT Inventory
297.5
Roads to be Added to BIA System
3.9 plus Rizza and Mt
City Roads, New
Owyhee Combined
School Access Rd
0.0
0.0
Roads to be Deleted from BIA System
Other Route Mileage Corrections
Proposed BIA Road System
301.4 plus Rizza and Mt
City Roads TBD
TABLE 5: SUMMARY OF PROPOSED TRIBAL ROAD SYSTEM MILEAGE REVISIONS
Miles
Existing Tribal Inventory
9.5
Roads to be Added to BIA System
Roads to be Deleted from BIA System
0.0
0.0
52
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Other Route Mileage Corrections
0.0
Proposed Tribal Road System
9.5
TABLE 6: SUMMARY OF PROPOSED NON-BIA ROAD SYSTEM MILEAGE REVISIONS
Miles
Existing Non-BIA DOT Inventory
48.5
Roads to be Added to Non-BIA System
Roads to be Deleted from Non-BIA System
Other Route Mileage Corrections
0.0
0.0
0.0
Proposed Non-BIA Road System
48.5
1.5.7 BIA Road Maintenance
The BIA is obligated by CFR 25, Part 170, to maintain the BIA Road System to a safe and satisfactory
standard based on the availability of funds and the road's as-built condition. Road maintenance funds
are appropriated by Congress and allocated to the BIA separately from the Federal Highway Trust
Funds (HTF) used for initial construction. Road maintenance funds are used to provide an optimal
level of road maintenance based on the road condition and the availability of funds. Road
Maintenance activities include: the preservation and repair of the road surface, blading roadway
shoulders and ditches, clearing drainage structures, snow removal and the installation/replacement
of traffic control, directional and street signs.
Typically, the Agency Road Engineers/Managers work with the tribes in establishing a road
maintenance program to determine the type and level of maintenance to be performed on BIA roads
within each reservation based on Agency's road maintenance budget. Maintenance priorities are
frequently determined by weather and/or road conditions which inhibit access to and from
communities to employment centers, community services and health facilities. Emergency road
conditions have highest priority. Other priorities are determined based on surface type and use.
If roadways funded and constructed with HTF are not properly maintained, then future HTF road
construction funds can be withheld. This situation might occur if maintenance funding is limited such
that adequate repairs and upkeep of the roadway are not possible.
1.6 Affective Environment and Environmental Concerns
Inventory of the physical, natural, and cultural environment is an important component of the
transportation planning process. When environmental conditions and concerns are reviewed in the
early stages of the transportation planning process, transportation solutions can be developed to
53
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
avoid or lessen the negative impacts on the natural environment. This chapter presents a review of
environmental conditions within the study area.
1.6.1 Topography and Geology
The general project area, the Owyhee River Valley, and associated drainages, provide subsistence for
numerous species of plants and animals. The immediate project area which includes the Duck Valley
Reservation is in the Lower Middle Snake Sub Basin. Elevation varies greatly. Higher elevations
include the Owyhee Mountains that include South Mountain (7,850 feet), Juniper Mountain (6,775
feet) and the Silver City Range (8,100 feet). The mountain ranges are carved by canyons which drain
into the Owyhee and Snake Rivers. A sagebrush steppe environment characterizes much of the
region with the area receiving levels of precipitation ranging between eight and twelve inches
annually.
Recommendations for Further Analysis
A geotechnical evaluation of soils will need to be conducted during the design phase of project
implementation to determine pavement, slope protection, and structural needs.
1.6.2 Vegetation
Approximately 30 percent of the region’s vegetation is composed of exotic annuals, which include
exotic mustards, cheatgrass, and others. About 40 percent consists of native shrub communities,
including big sagebrush, winterfat, and shadscale communities. The remaining area is dominated by
native perennial grasses-chiefly Sandberg's bluegrass and bottlebrush squirrel tail.
The native vegetation types surrounding the flatter, valley floor study areas have been highly
manipulated due to agricultural practices. These low-lying areas are primarily used for grass, hay, and
pasture. The wetland plant community dominants within the study area include sandbar willow,
broadleaf cattail, reed canary grass, Baltic rush, and meadow barley. Some of the roadsides within
the irrigated agricultural area have stands of sandbar willow but facultative upland plants dominate
the understory. Wood’s rose, which is also facultative upland, was also mixed in with the willow in
several locations.
Recommendations for Further Analysis
Any roadway improvement projects have the potential to affect native plants. During the design
phase, a detailed review will need to be conducted to identify impacts on protected plant species.
54
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
1.6.3 Biology
Within the region, there are several animal species found in association with the modern vegetative
distributions. These are part of the Northern Great Basin Complex which includes mule deer, jack
rabbits, coyote, badger, Townsend's ground squirrel, kangaroo rat, and mice. Several species of
avifauna inhabit the area as well, including eagles, hawks, owls, falcons, larks, curlews and magpies.
The United States Fish and Wildlife Service (USFWS) has identified three (3) federally listed species
that may be present in the study area. See Table 7. No designated or proposed critical habitat areas
were identified.
Table 7: USFWS Federally Listed Threatened and Endangered Species for the Study Area
Common Name/
Scientific Name
Columbia Spotted frog
(Rana luteiventris)
Greater sage-grouse
(Centrocercus urophasianus)
Gray wolf
(Canis lupus)
Status
Habitat
Candidate
Riparian areas where emergent vegetation and
standing
water are present, within the sage-juniper
shrublands; in
or near permanent bodies of water.
Candidate Sage-brush areas at elevations ranging from 4,000 to
over
9,000 feet.
Proposed Habitat varies from temperate forests, mountains,
Endangered tundra,
taiga, and grasslands; require ungulate prey and
human caused mortality rates that are not excessive.
The USFWS also identified 15 migratory birds of concern that may be present in the study area. See
Table 8.
Table 8: Migratory Birds Potentially Present in the Study Area
Common Name
Scientific Name
Seasonal Occurrence in the
Project
Brewer’s Sparrow
Spizella breweri
Breeding
Calliope Hummingbird
Stellula calliope
Breeding
Greater sage-grouse
Centrocercus urophasianus
Year-round
Bald eagle
Haliaeetus leucocephalus
Wintering
Eared Grebe
Podiceps nigrocollis
Breeding
55
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Burrowing Owl
Athene cunicularia
Breeding
Green-tailed Towhee
Pipilo chlorurs
Breeding
Sage Thrasher
Oreoscoptes montanums
Breeding
Olive-sided flycatcher
Contopus copperi
Breeding
Lewis’s Woodpecker
Melanerpes lewis
Breeding
Loggerhead Shrike
Lanius ludovicianus
Breeding
Long-Billed curlew
Numenius americanus
Breeding
Fox Sparrow
Passerella liaca
Breeding
Short-eared Owl
Asio flammeus
Year-round
Swainson’s hawk
Buteo swainsoni
Breeding
The protection of birds is regulated by the Migratory Bird Treaty Act (MBTA) and the Bald and Golden
Eagle Protection Act (BGEPA). Any activity, intentional or unintentional, resulting in take of migratory
birds, including eagles, is prohibited unless otherwise permitted by the USFWS. Any potential projects
within the study area have the potential to affect nesting birds protected under the MBTA, if any
migratory birds are present in the proposed project areas.
Recommendations for Further Analysis
Construction within the study area may have the potential to affect the USFWS threatened and
endangered species list and nesting birds protected. During the design and environmental overview
phase of project implementation, a detailed biological analysis will need to be conducted to
determine the specific presence/absence of projected species and potential mitigation measures.
1.6.4 Hydrology
The study area is located within the Duck Valley Indian Reservation, an area containing the Owyhee
River, Sheep Creek Reservoir, Mountain View Reservoir, and lake Billy Shaw as well as numerous
sloughs, streams, and springs. Duck Valley also contains several large irrigation canals including the
Duck Valley Canal, the Thacker Lateral Canal, and the Agency Canal. Water features in Duck Valley
contribute water to the Owyhee River which flows northwest into Lake Owyhee and eventually the
Snake River in eastern Oregon.
Water Quality
The Shoshone-Paiute Tribes operate the Water Pollution Prevention (WPP) program to protect the
Water Resources on lands owned by the Shoshone Paiute Tribes. These lands are the Duck Valley
Indian Reservation (DVIR) and lands recently acquired south of the DVIR. The Water resources are
Surface Water and Groundwater.
56
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
The Tribes WPP program is supported by CWA 106 funds administered through the U.S.
Environmental Protection Program. Hence two of the primary goals of the program is to satisfy the
goals set forth by the Clean Water Act and to satisfy administrative goals of the Shoshone-Paiute
Tribes. Section 101 of the CWA states “The objective of this Act is to restore and maintain the
chemical, physical, and Biological integrity of the Nation’s waters.” Likewise, the goal of the Tribes is
to manage its resources so that the water bodies on tribal lands are fully supporting designated or
existing beneficial uses in accordance with the Tribes Water Quality Standards.
The program works with- others to achieve results. These include other tribal programs as well as the
administration and Tribal Council. The government entities that the WPP program works on are
projects for Federal and State. Professional consultants contribute to the success of the ShoshonePaiute Tribal Water Pollution Prevention program.
Wetlands
The study area is located within the High Desert Wetlands sub-region of the greater Northern Basin
and Range Ecoregion. This sub-region includes valleys which contain remnant wetlands, floodplains,
alluvial terraces, lakes, reservoirs, and perennial/ephemeral streams. Vegetation commonly found in
wetter areas includes sedges, rushes, tufted hairgrass, meadow barley, creeping wildrye, and
bluegrass. Uplands are generally composed of various sagebrush species and native grasses (EPA
2012). The study area also contains several large irrigation canals including the Duck Valley Canal, the
Thacker Lateral Canal, and the Agency Canal. Water features in Duck Valley contribute water to the
Owyhee River which flows northwest into Lake Owyhee and eventually the Snake River in eastern
Oregon. Agriculture is the primary land use within the study area. Wetlands are defined by the
Environmental Protection Agency (EPA) as lands where saturation with water is the dominant factor
determining the nature of soil development and the types of plant and animal communities living in
the soil and on its surface. Wetlands typically are areas where water covers the soil or is present
at/near the surface of the soil year-round or during varying periods throughout the year.
With the goal of maintaining or increasing wetland area, enhancing wetland function, establishing
wetland parameters data, and identifying wetland areas in need of protection and/or restoration the
Shoshone-Paiute Indian Tribes, in accordance with Section 404 of the Clean Water Act, must take into
consideration potential impacts to waters of the U.S. (WOUS) and special aquatic sites as a result of
any proposed projects.
Recommendations for Further Analysis
A drainage analysis will need to be conducted during the design phase to determine the degree of
impacts on the area's hydrological features and to identify potential mitigation measures. During the
57
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
design process, coordination will need to occur with the USFWS and EPA to identify and to
incorporate elements that protect wetlands in and around the study area.
1.6.5 Prime Range and Farmlands
Agriculture is the primary land use within the study area. During the site visit multiple fields were
observed being irrigated and hayed or grazed to provide feed for livestock.
Recommendations for Further Analysis
If land in the area of proposed projects is considered prime agriculture use, as identified by the
Tribes, analysis needs to be conducted to determine whether water delivery irrigation systems
associated with these lands are adversely affected by the recommended improvements.
1.6.6 Air Quality
Under the Clean Air Act (CAA), EPA sets limits on certain air pollutants, including setting limits on how
much can be in the air anywhere in the United States. The Clean Air Act also gives EPA the authority
to limit emissions of air pollutants coming from sources like chemical plants, utilities, and steel mills.
Individual states or tribes may have stronger air pollution laws, but they may not have weaker
pollution limits than those set by EPA.
Dust, due to most roadways being unpaved, is the main pollutant on the Reservation.
Recommendations for Further Analysis
During the proposed project construction best management practices should be used by the
Contractor or Tribes to control particulate matter (dust). Dust control procedures for existing gravel
roads using Calcium Chloride or Magnesium Chloride should be implemented each year.
1.6.7 Cultural Resources
Cultural resources are properties that reflect the heritage of local communities, states, and nations.
Properties judged to be significant and to retain sufficient integrity to convey that significance are
termed “historic properties” and are afforded certain protection in accordance with state and federal
legislation.
History
Descendants of the Western Shoshone and the Northern Paiute occupy the Duck Valley Indian
Reservation of Idaho and Nevada. Various bands of the two closely related tribes have jointly utilized
the area from time immemorial.
58
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
On April 16, 1877, United States President Rutherford B. Hayes established the reservation for the
Western Shoshone and on May 4, 1886, United States President Grover Cleveland expanded the
Reservation for the Northern Paiute through respective Executive Orders. On July 01, 1910, United
States President William H. Taft further expanded the reservation by yet another Executive Order.
In the early days of the Duck Valley Reservation the people lived in earthen willow and sagebrush
huts. The tribal bands located at Duck Valley existed as best as they were allowed under the watchful
eye of the Indian Agent and Indian Police. Farming and ranching were the mainstay for the people.
The Shoshone and Paiute united at Duck Valley under the Indian Reorganization Act of 1934 and
formed a tribal government through a Constitution and Bylaws which was adopted in 1936.
Farming and Ranching are still mainstays for Duck Valley and is reflected in the 12,000 acres of
subjugated lands. The Duck Valley Reservation is composed of 289,819 acres held in trust by the
United States Government for the use and occupancy of the Shoshone-Paiute Tribes. Included in the
total acreage of the Reservation is 22,231 acres of Wetlands. Wildhorse Reservoir was constructed in
1936 for the Duck Valley Irrigation Project. Tribal membership is over 2,000 with approximately 1,700
living on the reservation. The Shoshone-Paiute Tribes of Duck Valley continue to exist within the
original territories of their ancestors.
Section 4(F) and Section 6(F) resources
Section 4(f) of the US Department of Transportation Act of 1966 and the Section 6(f) of the Land and
Water Conservation Fund (LWCF) Act are intended to protect the nation's recreational resources
from significant transportation-related impacts. Section 6(f) is a component of the LWCF Act of 1965
that protects recreational properties acquired or developed with LWCF Act funds that could be
affected by transportation projects. No Section 6(f) properties have been identified in the Duck Valley
Indian Reservation.
Section 4(f) stipulates that the FHWA and other DOT agencies cannot approve the use of land for
transportation improvements on publicly owned parks, recreational areas, wildlife and waterfowl
refuges, or public and private historical sites unless there is no feasible or prudent alternative, or the
projects include all possible planning to minimize harm to the property. The "use" of Section 4(f) is
defined in CFR Title 23, Part 771.135(p) as:
•
•
•
When property is permanently incorporated into a transportation facility;
When there is a temporary occupancy of land that is adverse in terms of the statute’s
preservation purpose; or
When there is a constructive use of a Section 4(f) property. A constructive use of Section 4(f)
resource occurs when the proximity impacts of a proposed project adjacent or nearby a
59
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Section 4(f) property results in a substantial impairment to the property's activities or features
that qualify a resource for protection under Section 4(f).
A historic site is considered a Section 4(f) property if it is eligible for the National Register of Historic
Places (NRHP) under Criterion A, B, or C if the site is associated with events that have made a
significant contribution to the broad patterns of our history, associated with the lives of persons
significant in our past, or embodies the distinctive characteristics of a type, period, or method of
construction, or that represents the work of a significant distinguishable entity whose components
may lack individual distinction. Within the immediate area of the Reservation, a number of smallscale surveys have been conducted. Potential Section 4(f) properties within the study areas include:
•
•
Small historic trash scatters and isolates.
11 historic buildings have been recorded with only the following 2 of these considered eligible
o Old Jail (Building 334)
o Old Powerhouse (Building 333)
Recommendations for Further Analysis
Additional analysis needs to be conducted into resources eligible for protection under Section 6(f)
and Section 4(f) to evaluate potential impacts of the proposed improvements on these resources.
1.6.8 Environmental Justice Review
Title VI of the Civil Rights Act of 1964 and related statutes ensure that individuals are not excluded
from participation in, denied the benefit of, or subjected to discrimination under any program or
activity receiving federal financial assistance based on race, color, national origin, age, sex, and
disability. Executive Order 12898, Federal Actions to Address Environmental Justice in Minority
Populations and Low-Income Populations, dictates that programs, policies, and activities identify and
address, as appropriate, disproportionately high adverse human health and environmental effects on
minority and low-income populations. Protected populations considered in this analysis include
minority, elderly, low-income, and disabled populations.
Multimodal transportation improvements would provide numerous positive impacts to
environmental justice populations in the study area. Enhanced pathways that provide bicycle and
pedestrian facilities would increase protected population's ease of access to local activity centers,
places of employment, medical services, and community facilities. Additionally, proposed roadway
improvements would benefit traffic accessing traditional Native American gathering areas, residential
access, and farming and ranching uses of these roadways, as well as postal and bus routes. During
construction, there would be only minimal, temporary restrictions to travel, which would impact all
users of the roadways equally.
60
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Recommendations for Further Analysis
The potential positive and negative impacts on the protected populations should be discussed in the
environmental analysis of the design phase. Consideration should be given during the construction
phase of project implementation on the impacts to minority-owned businesses, the mobility needs of
the protected populations, and on residential parcels of protected populations. In addition, on-going
outreach efforts need to be made to include meaningful participation by all residents, including lowincome, disabled, below poverty and minority populations, throughout projects.
1.7 Transportation Plan Implementation and Updating
This transportation plan presents the results of a study completed in 2022. It reflects the current
requirements for transportation facilities to satisfy the Community's needs and is based upon the
existing conditions and anticipated future development within the Community and Tribal Priorities.
The plan should not be thought of as a static document. It should be viewed as a dynamic document
capable of being modified to meet changing social and economic development demands.
The plan should be reviewed by the Tribe and Federal Lands Highway office on an annual basis to
keep up with changes in Community development that may warrant a change in the project listing
and/or a change in a project's priority. Changes in the project listing should be coordinated with and
accomplished within the time frames established by the funding agency so as not to hamper the
implementation of the agency's road improvement program on the Community. The overall
Community transportation plan should be reviewed and updated every five years, or when there are
major changes in the tribe's land use plan. Five-year updates are currently planned by the Tribes
and/or FLH.
1.7.1 Funding Sources
The successful implementation of the Long-Range Transportation Plan for the Shoshone-Paiute Tribes
is contingent upon the availability of funding for design and construction of the improvement
projects. Primary funding sources for the area include Federal programs, BIA, NDOT, ITD, and other
regional government agencies.
Through the continuing appropriations act, the Infrastructure Investment and Jobs Act (IIJA).
Infrastructure Investment and Jobs Act:
• Generally referred to as the bipartisan infrastructure bill, this law authorizes $1.2 trillion in
total spending, including $550 billion of new spending on hard infrastructure.
•
The law also addresses climate change as it pertains to surface transportation.
61
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
•
It revises Buy America procurement procedures for highways, mass transit, and rail.
•
It implements new safety requirements for all modes of transportation.
•
It directs the Department of Transportation (DOT) to establish a program to ensure the longterm solvency of the Highway Trust Fund.
•
In total, this law addresses federal aid for highways and transit; highway and motor carrier
safety; hazardous materials; and rail programs of the Department of Transportation (DOT).
•
It incorporates and extends through 2022 the 2021 federal-aid highway, transit, and safety
programs as well as the federal-aid highway program, transit programs, highway safety, motor
carrier safety, and rail programs from 2023 through 2026.
•
The Infrastructure Investment and Jobs Act includes the $1.75 trillion+ Build Back Better Act
or social infrastructure plan. Together, the passage of both laws would necessitate spending
more than $3 trillion.
•
While the enacted Infrastructure Investment and Jobs Act legislation deals primarily with socalled hard infrastructure—including roads, bridges, waterways, and other physical
structures—the Build Back Better Act is a social safety net and climate bill (although the
Infrastructure Investment and Jobs Bill also contains climate-related provisions).
Under the Infrastructure Investment and Jobs Act the Tribal Transportation Program (TTP) provides 3
billion over 5 years with the ultimate goal to provide safe and adequate transportation and public
road access to and within Indian reservations and Indian lands. The TTP also includes a certain
percentage of funds allocated for tribal bridge and tribal safety projects. The Tribal Transportation
Program is funded by contract authority from the Highway Trust Fund and is subject to the overall
Federal-aid obligation limitation. Funds are allocated among Tribes using a statutory formula based
on tribal population, road mileage and average tribal shares of the former Tribal Transportation
Allocation Methodology (TTAM) formula. In accordance with the Infrastructure Investment and Jobs
Act, Tribes may utilize up to 25% or $500,000 of their TTP funds, whichever is greater, for eligible
road maintenance activities identified in 25 CFR 170.800.
Table 9 presents a comprehensive matrix of potential funding sources for roadway, safety, pedestrian
and bicycle, and transit improvements that the Shoshone-Paiute Tribes can apply for funding to
implement the Plan for Improvements. The following resources also provide additional information
related to funding sources.
62
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
Local Public Agency Projects Manual for Federal-Aid Funded Projects
The NDOT Local Public Agency Projects Manual provides information and guidance to assist local
public agencies (i.e., counties, cities, towns) and tribal governments with projects funded through the
Federal Highway Administration from planning to final acceptance. The manual outlines the NDOT
and FHWA policies and procedures when developing, delivering, and administering transportation
projects. The Manual is available at the following website link:
https://www.dot.nv.gov/home/showdocument?id=1541
Additionally, another available tool is the Federal-aid Essentials. It is web-based and can be accessed
at:
http://www.fhwa.dot.gov/federal-aidessentials/index.cfm
Table 9: Potential Funding Sources
Funding
Program
Tribal
Transportation
Program (TTP)
Eligible Uses
Transportation
planning, research,
maintenance,
engineering,
rehabilitation,
restoration,
construction, and
reconstruction of
tribal transportation
facilities; Operation
and maintenance of
transit programs
and facilities that
are located on, or
provide access to,
tribal land or are
administered by a
tribal government.
Tribal
Transportation
Transportation planning procedures
Planning
for the TTP must be
Program
consistent with
Statewide and
Metropolitan
Administering
Agency
FHWA
FHWA
63
HORROCKS ENGINEERS
Program and
Funding Details
Formula based
on tribal
population, road
mileage and
average tribal
shares of the
former Tribal
Transportation
Allocation
Methodology
(TTAM) formula
Contact
Information
Kevin Spohrer
Tribal
Coordinator
Office of Tribal
Transportation
Federal
Highway
Administration
Funded by a setaside of up to
2% from
TTP funds. Funds
are allocated
directly to
Kevin Spohrer
Tribal
Coordinator
Office of Tribal
Transportation
Federal
610 E. 5th Street
Vancouver, WA
98661
Cell
Phone: 512-4689615
E-mail:
Kevin.Spohrer@do
t.gov
SHOSHONE-PAIUTE TRIBES LRTP
planning
processes.
Tribe based on a
formula.
Highway
Administration
610 E. 5th Street
Vancouver, WA
98661
Cell
Phone: 512-4689615
E-mail:
Kevin.Spohrer@do
t.gov
Tribal
Transportation
Program
Safety Funds
(TTPSF)
Each year under the
FAST Act, 2% of the
available TTP funds
are set aside to
address
transportation
safety issues in
Native America.
Federal Funds
are
allocated to
the
Regional Office
based
on approved
Tribal
Applications
for these
funds.
Projects ranked
by BIA, FHWA
and Tribes.
Development of
new tribal
safety plans: up
to $12,500
Update existing
tribal safety
plans over 3
years old: up to
$7,500
Adam Larsen
TTPSF Program
Manager
Federal
Highway
Administration
1200 New Jersey
Avenue SE.,
Washington, DC
20590
Phone: 360619-7751; Cell:
360-619-2601
E-mail:
adam.larsen@dot.
gov
Funding for
safety
infrastructure
projects and
other eligible
activities is
variable: The
total funding
available is
$10,000,000.
Tribal Bridge
Program
Funds may be used
for planning, design,
engineering,
preconstruction,
construction, and
inspection of a
project to
replace, rehabilitate,
Federal Funds
are
allocated to
the
Regional Office
based
on approved
applications
64
HORROCKS ENGINEERS
Funded by a setaside of up to
3% from
TTP funds.
Russell Garcia
Tribal TTP
Bridge Program
Manager, Tribal
Transportation
Federal
Highway
Administration
SHOSHONE-PAIUTE TRIBES LRTP
seismically retrofit,
paint, or for antiicing and deicing, or
to implement any
countermeasures
(Including multiplepipe culverts) for
eligible tribal
transportation
facility bridges. To
be eligible, a bridge
must
have an opening of
at least 20 FT, be
classified as a tribal
transportation
facility, and be
structurally deficient
or
functionally
obsolete.
Nevada
There are two broad
Transportation types of eligible
Alternatives
activities:
Program
1) Transportation
(TAP)/Surface infrastructure
Transportation (constructed
Program (STP) improvements); and
2)
Non‐infrastructure
projects (efforts
related to
Education,
Encouragement,
Enforcement and
Evaluation) that
effect kindergarten
(K) through eighth
(8th) grade
students.
NDOT
Fixing America’s
Surface
Transportation
(FAST) Act was
enacted and
TAP was
replaced with
the “STP
Set‐Aside”
under the
Surface
Transportation
Block Grant
Program and is
now called
TAP/STP
Set‐aside.
Funding amount
of maximum soft
cap of
$750,000.
65
HORROCKS ENGINEERS
1200 New Jersey
Avenue, SE
Washington, DC
20590
Cell
Phone: 703-4046223
E-mail:
russell.garcia@dot
.gov
from the
Region for
these
funds.
Coy Peacock
Transportation
Alternatives
Program
(TAP)/STP
Set‐aside
Manager
NDOT
1263 S. Stewart
Street
Carson City, NV
89712
Cell
Phone: 775888‐7124
E-mail:
cpeacock@dot.sta
te.nv.us
SHOSHONE-PAIUTE TRIBES LRTP
RAISE
Discretionary
Grants
Transit Rural
Area Program
Nevada State
Fund road, rail,
transit and port
projects that
promise to achieve
national objectives.
U.S.
Department of
Transportation
Program
administration,
capital expenses and
operating expenses
to providers of
general-public
transportation
services in small
urban and rural
areas.
The NDOT acts
as a passthrough
agency to
provide
Section 5311
federal
funding.
“Expend money in
NDOT
66
HORROCKS ENGINEERS
Previously
known as the
Better Utilizing
Investments to
Leverage
Development
(BUILD) and
Transportation
Investment
Generating
Economic
Recovery
(TIGER)
Discretionary
Grants, Congress
has dedicated
nearly $9.9
billion for
thirteen rounds
of National
Infrastructure
Investments to
fund projects
that have a
significant local
or regional
impact.
Section 5311
funding
assistance can
assist with up to
80% of program
administration,
up to 95% of
capital or
mobility
management
expenses, and
up to 59.38% of
operating or
intercity bus
expenses.
Office of
Infrastructure
Finance and
Innovation
Office of the
Secretary of
Transportation
1200 New
Jersey Ave, SE
Washington, DC
20590
United States
The Federal
Nevada
Phone: 202-3660301
E-mail:
RAISEgrants@dot.g
ov
Nevada DOT
Transit Office
Federal Grant
Application
1263 S. Stewart
Street, Room 320
Carson City, NV
89712
Cell
Phone: 775888‐7124
E-mail:
transitteam@dot.
nv.gov
SHOSHONE-PAIUTE TRIBES LRTP
Fund for
Aviation
the Fund to award
grants to a county,
city or other local
government in this
State for obtaining
matching money for
federal programs
and
any other programs
relating to airports
or for the planning,
establishment,
development,
construction,
enlargement,
improvement, or
maintenance of any
airport, landing area
or air navigation
facility owned or
controlled by the
county,
city or other local
government”
Aviation
Administrations’
(FAA) Airport
Improvement
Program (AIP)
Matching Grant
for airports that
fall within the
National Plan of
Integrated
Airport Systems
(NPIAS)
presently
reimburses the
sponsor up to
the 6.25% local
match for any
Airport
Improvement
Program (AIP)
grant from the
FAA. Under the
Nevada Fund for
Aviation
Grant Program
some or all the
6.25% local
match not
covered by FAA
AIP may be
reimbursed from
the Nevada Fund
for Aviation, not
to exceed
$50,000.
67
HORROCKS ENGINEERS
Department of
Transportation
Aviation
Planning
Section
1263 S. Stewart
Street
Carson City, NV
89712
Cell Phone:
775-888-7353
E-mail:
aviation@dot.nv.
gov
SHOSHONE-PAIUTE TRIBES LRTP
Federal Lands
Transportation
Program
(FLTP)
Eligible projects
FHWA
include, but are not
limited to:
• Program
administration,
transportation
planning,
research, preventive
maintenance,
engineering,
rehabilitation,
restoration,
construction, and
reconstruction of
Federal lands
transportation
facilities
• Operations and
maintenance of
transit facilities
• Any transportation
project eligible
under title 23 of the
United States Code
that is within or
adjacent to, or that
provides access to
Federal lands open
to the public.
AID
Eligible projects:
FHWA
Demonstration Projects submitted
Program
for an AID
Demonstration
grant must:
• Be eligible for
assistance under
title 23, United
States
Code.
• Be ready to initiate
within 6 months of
receiving an
AID Demonstration
award.
On October 1 of
each fiscal year,
funds
will be allocated
among Federal
Land
Management
Agency (FLMA)
partners
1200 New Jersey
Avenue, SE
Washington, DC
20590
Cell Phone:
202-366-9494
E-mail:
flh.webmaster
@dot.gov
The AID
Demonstration
Program
provides funding
as
an incentive to
accelerate the
deployment and
adoption
of proven
innovative
practices and
technologies in
highway
transportation
68
HORROCKS ENGINEERS
Office of
Federal Lands
United States
Department of
Transportation
Federal
Highway
Administration
Fawn
Thompson
Contact
Program
Coordinater,
FHWA
Innovative
Technologies &
Collaboration
Team
Phone: 404895-6229
E-mail:
fawn.thompson@
@dot.gov
SHOSHONE-PAIUTE TRIBES LRTP
• Involve any phase
of a highway
transportation
project between
project planning and
project delivery
including planning,
financing, operation,
structures,
materials,
pavements,
environment, and
construction.
• Include an
innovation proven in
real-world highway
transportation
application,* though
not routinely used
by the applicant or
the subrecipient.
• Address TIDP goals
and other program
requirement
Federal Lands
Access
Program
Eligible projects
include, but are not
limited to:
• Transportation
planning, research,
engineering,
preventive
maintenance,
rehabilitation,
restoration,
construction, and
projects. The
Federal Highway
Administration
(FHWA)
anticipates
approximately
$10
million to be
made available
for AID
Demonstration
grants
in 2022 from
amounts
authorized
within the
Technology
and Innovation
Deployment
Program (TIDP)
under the
Infrastructure
Investment and
Jobs Act. The
grants are
administered
through the
FHWA Office of
Transportation
Workforce
Development
and Technology
Deployment.
The funds made
available under
this
program will be
available for the
current
year plus three
additional years.
Funds
are distributed
by formula
FHWA
69
HORROCKS ENGINEERS
James Herlyck
FLAP Contact
James.Herlyck
@dot.gov
Central Federal
Lands
Federal
Highway
Administration,
USDOT
12300 West
Dakota Avenue
SHOSHONE-PAIUTE TRIBES LRTP
Highway
Safety
Improvement
Program
(HSIP)
reconstruction of
Federal Lands
Access
Transportation
Facilities
• Operation and
maintenance of
transit facilities
• Any transportation
project eligible
under title 23 of the
United States Code
that is within or
adjacent to, or that
provides access to
Federal lands open
to the public
The HSIP is a core
Federal-aid program
with the purpose of
achieving a
significant reduction
in fatalities and
serious
injuries on all public
roads, including
non-State-owned
public roads and
roads on tribal
lands. Any project
on a
public road, trail or
path that is
consistent with the
state’s
Strategic Highway
Safety Plan and
corrects a safety
problem is eligible
for HSIP funding.
Eligible projects
include, but are not
limited to:
• Intersection
among States
that have
Federal lands
flh.webmaster
@dot.gov
FHWA Funds
Administered
Through
State DOT’s
and Planning
Organizations
70
HORROCKS ENGINEERS
Lakewood, CO
80228
Cell Phone:
720-963-3500
E-mail:
The Highway
Safety
Improvement
Program (HSIP)
is a core Federalaid program
with the purpose
to achieve a
significant
reduction in
traffic fatalities
and serious
injuries on all
public roads,
including nonState-owned
roads and roads
on tribal land.
The HSIP
requires a datadriven, strategic
approach to
improving
highway safety
on all public
roads with a
focus on
Karen Scurry
HSIP Program
Contact
Phone: 202897-7168
E-mail:
karen.scurry@do
t.gov
SHOSHONE-PAIUTE TRIBES LRTP
USDA
Community
Facility Grants
improvements
• Construction of
shoulders
• Traffic calming
• Improvements for
bicyclists,
pedestrians, and
individuals
with disabilities.
• Minimum
standards of retroreflectivity of traffic
signs
and pavement
markings
The USDA
USDA
Community Facilities
Direct Loan and
Grant Program
provides direct loans
and/or grants for
essential community
facilities in rural
areas. Priority is
given to healthcare,
education, and
public safety
projects. Funds may
be used to purchase,
construct, enlarge,
or improve facilities.
performance.
USDA provides
grants to assist
in the
development of
essential
community
facilities in rural
areas and towns
with populations
up to 20,000.
Grants are
available to
public entities
such as
municipalities,
counties, and
special-purpose
districts, as well
as nonprofit
corporations and
tribal
governments.
71
HORROCKS ENGINEERS
Jim Park
USDA Acting
State Director
1390 South Curry
Street
Carson City, NV
89703-9910
Phone: 775443-4750
SHOSHONE-PAIUTE TRIBES LRTP
Transportation
Alternatives
Program
(TAP)
Low or No
Emission
Vehicle
Program 5339(c)
4Projects Include:
• On-road and offroad pedestrian and
bicycle facilities
• Infrastructure
projects for
improving nondriver access to
public
transportation and
enhanced mobility
• Community
improvement
activities
• Environmental
mitigation
• Safe Routes to
School projects
• Streetscape
improvements
• Refurbishment of
historic
transportation
facilities
• Other investments
that enhance
communities
Eligible Activities
Eligible projects
include:
NDOT will
administer
Federal funds
Federal Transit
Administration
purchasing or
leasing low- or noemission buses
acquiring low- or noemission buses with
a leased power
source
constructing or
leasing facilities and
related equipment
(including intelligent
technology and
software) for low- or
72
HORROCKS ENGINEERS
The
Transportation
Alternatives
Program
provides federal
funds for
communitybased projects
that expand
travel choices
and enhance the
transportation
experience by
integrating
modes and
improving the
cultural, historic,
and
environmental
aspects of our
transportation
infrastructure.
Janie Fromm
TAP Program
Administrator
The Low or No
Emission
competitive
program
provides funding
to state and
local
governmental
authorities for
the purchase or
lease of zeroemission and
low-emission
transit buses as
well as
acquisition,
construction,
Office of
Program
Management
Federal Transit
Administration
Phone: 775888-7727
E-mail: TAPProgram@dot.nv.
gov
1200 New Jersey
Avenue, SE
Washington, DC
20590
Phone: 202366-7951
SHOSHONE-PAIUTE TRIBES LRTP
Grants for
Buses and Bus
Facilities
Competitive
Program
no-emission buses
constructing new
public
transportation
facilities to
accommodate lowor no-emission
buses
rehabilitating or
improving existing
public
transportation
facilities to
accommodate lowor no-emission
buses
Additionally 0.5% of
a request may be for
workforce
development
training and an
additional 0.5% may
be for training at the
National Transit
Institute (NTI).
Applicants for zeroemission vehicles
must also spend 5%
of their award on
workforce
development and
training as outlined
in their ZeroEmission Transition
Plan, unless the
applicant certifies
that their financial
need is less.
Eligible Activities:
Federal Transit
Capital projects to
Administration
replace, rehabilitate
and purchase buses,
vans, and related
equipment, and to
73
HORROCKS ENGINEERS
and leasing of
required
supporting
facilities.
FTA announced
approximately
$1.1 billion
available for
Fiscal Year 2022
grants to help
modernize bus
fleets and bus
facilities across
the country,
including to help
transit agencies
purchase or
lease low- or noemission
vehicles that use
advanced
technologies to
help improve air
quality and
combat climate
change.
The FY22 grant
opportunity is
part of a larger
package in FY22
competitive
grant funds to
Office of
Program
Management
Federal Transit
Administration
1200 New Jersey
Avenue, SE
SHOSHONE-PAIUTE TRIBES LRTP
Tribal Transit
Program
(TTP)
construct busrelated facilities,
including
technological
changes or
innovations to
modify low or no
emission vehicles or
facilities.
Additionally, 0.5% of
a request may be for
workforce
development
training, and an
additional 0.5% may
be for training at the
National Transit
Institute. Applicants
for zero-emission
vehicles must also
spend 5% of their
award on workforce
development and
training as outlined
in their ZeroEmission Transition
Plan, unless the
applicant certifies
that their financial
need is less.
Eligible projects
Federal Transit
include public
Administration
transportation
capital
projects for startups, replacement, or
expansion,
operating
costs for start-ups,
and planning.
74
HORROCKS ENGINEERS
help modernize
bus fleets and
bus facilities
across the
country,
including $1.1
billion to help
transit agencies
purchase or
lease low- or noemission
vehicles that use
advanced
technologies to
help improve air
quality and
combat climate
change.
Washington, DC
20590
Phone: 202366-7951
Federal public
transportation
law (49 USC
5311(c)(1)(A))
authorizes the
competitive
amount of the
Public
Transportation
on Indian
Reservations
(Tribal Transit
Program or TTP)
Program. The
Region 9
Office
Federal Transit
Administration
San Francisco
Federal Building
90 7TH ST STE 15300
SAN FRANCISCO
CA 941036701 Phone:
415-734-9490
SHOSHONE-PAIUTE TRIBES LRTP
TTP is a set-aside
from the
Formula Grants
for Rural Areas
program that
included a $30
million formula
program and a
$5 million
competitive
grant program.
1.7.2 Implementation Guidelines
Implementation of the Plan for Improvements requires active participation from local citizens, private
entities, and local, County, and State government officials. The following actions are recommended in
order to successfully implement the Plan for Improvements developed as part of this study.
•
•
•
•
•
The Shoshone-Paiute Tribal Business Council needs to formally approve this plan to initiate
the process of requesting project inclusion in the BIA TTP TIP and to subsequently receive
Federal funds.
Coordinate with the BIA the entry of updated Tribal Road inventory data into the Road
Inventory Field Data System (RIFDS) for inclusion in the National Tribal Transportation Facility
Inventory (NTTFI).
Establish a partnership with Elko County, ITD, and NDOT for the on-going planning,
maintenance, improvement, and funding for roadways
Solicit grants for bicycle and pedestrian improvements to add paths and enhance connections
to existing facilities, and to construct new facilities in deficient locations.
Further research and apply for funding for each project identified in the Plan for
Improvements.
1.8 Public Involvement
Public involvement is the process of involving the public throughout the transportation planning
process through meaningful communication with stakeholders and interested citizens. To ensure that
transportation decisions reflect the public's best interests, public involvement is a critical component
of the transportation planning process. To engage the public and stakeholders, the study work plan
includes two working group meetings with the Tribal Council and Department Leads, and two public
meetings to inform, discuss, and to seek input.
75
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
The working group meetings with Tribal Council and Department Leads were successful in obtaining
information regarding the study and providing input for the recommended transportation
improvements.
Phase I of public outreach efforts introduced the project to the public with a focus on existing and
future conditions. The purpose of the meetings was to discuss the deficiencies and needs of the study
area and elicit input on the public’s "vision" for the future for the Duck Valley Indian Reservation.
Phase II presented the draft transportation improvement plan to receive feedback and fine tune the
study recommendations.
1.8.1 Working Group Meetings
The Shoshone-Paiute Tribes hosted two meetings one on March 1, 2022, and the other on June 14,
2022 at the Shoshone-Paiute Tribes Council Chambers with the study team and Tribal Council. The
goal of the meeting was to obtain information regarding the study and receive input for the
recommended transportation improvements. The meeting commenced with a brief presentation of
the study goals and objectives by the study team. The presentation was followed by an opportunity
for participants to discuss improvement options and provide recommendations on areas of
improvement. Maps and estimated project costs were displayed to illustrate the existing road
conditions and identify areas of concern.
Key comments received during the first working meeting included:
•
The maintenance of the roads needs to be revisited and maintained often, for the safety of all
traffic. Many of the gravel and earth roads need more attention specifically roads leading to
the cemeteries. A meeting with the Tribes, study team, and BIA maintenance was discussed
and will be conducted to discuss the Tribal Transportation Projects to coordinate with
maintenance projects.
•
Add Rizza Ranch Property Roads within Tribal property to tribal inventory.
•
Add recently acquired Mountain City Property Roads within Tribal property to tribal inventory.
•
Tribes to coordinate with BIA Irrigation regarding costs to replace irrigation culverts
throughout the Reservation under the TTP roads. Culverts will be replaced with new
construction projects.
•
4-year priority projects were selected during the meeting and will be place on the Tribal TIP.
Key comments received during the second working meeting included:
76
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
•
The display boards that were going to be presented to the public were discussed.
•
Bridge and road priorities were discussed with concurrence from the leaders regarding the list
that was being presented.
1.8.2 Public Meeting
The Shoshone-Paiute Tribes and the study team hosted a public meeting on June 29, 2022, at the
Shoshone-Paiute Tribes Council Chambers. The goal of the meeting was to inform the public of the
project's goals and objectives, discuss the deficiencies and needs of the study area, and elicit input on
the public's "vision" for the future of the Duck Valley Indian Reservation. In total, there were 8
members of the community in attendance, not including study team members. The meeting was held
over 2.5 hours. Display boards were set-up showing the study goals and objectives, a summary of
existing conditions, and key issues identified by the study team for the public to view and ask
questions about. A questionnaire was handed out offering the opportunity for participants to pose
additional questions, write comments, and to provide recommendations on areas of improvement
and solutions. Throughout the 2.5 hours continued conversations between the public and study team
members occurred regarding the Plan and priority project lists. The boards displayed included: study
overview; map of current roadway issues within the Reservation as identified by the study team; and
a map of the multimodal issues. Comment/questionnaire forms were also provided to each meeting
attendee.
Key comments received during the public meeting included:
•
•
•
•
•
•
The maintenance of the roads needs to be revisited and maintained often, for the safety of all
traffic.
Tribes need to pursue more funding for Transportation.
Bus routes need to be improved.
Multimodal paths need to be improved and constructed throughout the Reservation.
Additional road signage is needed throughout the Reservation.
Improve roads for emergency vehicles.
Appendix B provides a comprehensive summary of the public meeting.
77
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
APPENDIX A - TRAFFIC COUNTS
78
HORROCKS ENGINEERS
SHOSHONE-PAIUTE TRIBES LRTP
APPENDIX B – PUBLIC INVOLVMENT –
OPEN HOUSE
80
HORROCKS ENGINEERS
PLEASE JOIN US!
Shoshone-Paiute Tribes
Shoshone-Paiute Tribes Long Term Transportation Improvement Plan
and Projects – Public Open House
Date: June 29, 2022
Time: 4:30 pm to 7:00 pm
Place: Tribal Headquarters Chambers
Action: The Shoshone-Paiute Tribes, in collaboration with the BIA and Federal
Highways, is updating the Tribe’s Long Range Transportation Plan (LRTP) and Tribal
Transportation Improvement Projects (TTIP) Priority list. This Study is funded through
the Federal Highway Administration (FHWA). The LRTP and TTIP will provide
recommendations to improve automobile, bus, bicycle, equestrian, and aviation for the
next 5, 10, and 20 years. Your knowledge and experience on recommendations for future
transportation improvements for the community is needed.
Summary: This notice is to advise interested parties that an open house is being held, at
the time and location listed above, to present the LRTP and TTIP.
The Shoshone-Paiute Tribes objective is to inform and receive feedback from the
community and traveling public, to address any concerns and determine the need for
other roadway enhancements regarding the LRTP and TTIP.
For Review of the Draft Plan and Additional Information: Additional information
concerning this project can be obtained by contacting Renee’ Thomas, at (208) 759-3100
Ext., 1255 or Mr. Jimmy Young, Consultant Project Manager, at (208) 463-4197.
Comments: For any individuals that may be unable to attend the open house you can
send your comments/suggestions/concerns to:
Shoshone-Paiute Tribes, Tribal Headquarters
Attn: Renee’ Thomas, Project Secretary
P.O. Box 219
Owyhee, NV 89832
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.