PUBLIC NOTICE OF PROPOSED CWA § 401 CERTIFICATION

Tribal code

Ask Donna

What actually matters in this document.

Text

PUBLIC NOTICE OF PROPOSED CWA § 401 CERTIFICATION

by the

SENECA NATION ENVIRONMENTAL PROTECTION DEPARTMENT

Project: On February 1, 2023, the Seneca Nation (Nation) Environmental Protection Department

(EPD) received a completed “Permit Application for Construction Projects Within Waterways”

(CPWW) from the New York State Department of Transportation (Applicant). The scope of work

for the project identified as Pin Number 5101.92, and encompasses Pavement Rehabilitation and

Restoration on US Route 219 and Route 954T, from 1-mile south of the Seneca Nation Territory

boundary line, to “T” intersection with Route 417, the replacement of culvert CIN 5101.18

(“Pavement Rehabilitation on US Route 219 and Route 954T from 1-mile south of Seneca Nation

Territory boundary line, to “T” intersection with Route 417” or “Project”), as follows: bridge

rehabilitation portion for BIN 6414.50 over the Allegany River, replace ground mounted signs

and guiderail, in the Town of Carrollton, Cattaraugus County, New York. The Project is

anticipated to proceed under the CWA § 404 Nationwide Permit 3 (NWP-3). This project requires

permitting under Section 404 of the federal Clean Water Act (CWA), which in turn requires

certification under CWA § 401 by the Seneca Nation as to whether the Project will comply with

the Nation’s water quality requirements. Pursuant to CWA § 401, the Seneca Nation

Environmental Protection Department (EPD) seeks public and agency comment regarding the

proposed certification of the CWA § 404 permit at issue.

CWA § 401 Water Quality Certification: Under CWA § 401, a federal agency may not issue

a permit or license to conduct any activity which may result in any discharge into waters of the

United States unless a Section 401 water quality certification is issued or waived by the state or

authorized tribe where the discharge will originate. The Nation was approved to administer a

CWA § 401 program on March 12, 2021. Examples of federal permits and licenses requiring

certification include the CWA §§ 402 and 404 permits issued by the EPA and the U.S. Corps of

Engineers, respectively.

Public Comment Period: Pursuant to CWA § 401(a)(1), the public comment period for the

proposed CWA § 401 certification of the Rehabilitation and Restoration of US Route 219 and

Route 954T from 1-mile south of the south of Seneca Nation Territory boundary line, to “T”

intersection with Route 417 by EPD is thirty (30) days from the date of publication of this notice

in the SNI Newsletter (Community News Section) and other publicly available locations. Agency

representatives and members of the public are encouraged to submit written comments to EPD,

by 4:30pm on April 25, 2023, as follows:

by email at epd@sni.org or

by USPS mail to the Seneca Nation Environmental Protection Department, 84 Iroquois

Drive, Irving NY 14081, Attention: Water Program Manager

Copies: A copy of this CPWW Application is available under the “documents” tab at the EPD

website, here: https://sni.org/community-services/environmental-protection/ or may be requested

by contacting the email shown above, with the title, “Request for Copy of Pavement Rehabilitation

on US Route 219 and Route 954T CPWW Application” in the subject line.

Page 1 of 1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.