PUBLIC NOTICE OF PROPOSED CWA § 401 CERTIFICATION (2022)

Tribal code

Ask Donna

What actually matters in this document.

Text

PUBLIC NOTICE OF PROPOSED CWA § 401 CERTIFICATION

by the

SENECA NATION ENVIRONMENTAL PROTECTION DEPARTMENT

Background: On February 15, 2022, the Seneca Nation (Nation) received a completed “Permit

Application for Construction Projects Within Waterways” (CPWW) from the National Fuel Gas

Supply Corporation of Erie, Pennsylvania, regarding the proposed exposure/replacement of

approximately 240 feet of existing 8-inch steel natural gas distribution pipeline (PY2 Project). The

PY2 Project also requires a permit under Section 404 of the federal Clean Water Act (CWA),

which in turn requires certification under CWA § 401 by the Seneca Nation as to whether the PY2

Project will comply with the Nation’s water quality requirements. Pursuant to CWA § 401, the

Seneca Nation Environmental Protection Department (EPD) seeks public and agency comment

regarding its proposed certification of the CWA § 404 permit at issue here.

CWA § 401 Water Quality Certification: Under CWA § 401, a federal agency may not issue a

permit or license to conduct any activity which may result in any discharge into waters of the

United States unless a Section 401 water quality certification is issued or waived by the state or

authorized tribe where the discharge will originate. The Nation was approved to administer a CWA

§ 401 program on March 12, 2021. Examples of federal permits and licenses requiring certification

include the CWA §§ 402 and 404 permits issued by the EPA and the U.S. Corps of Engineers,

respectively.

The PY2 Project: The PY2 Project in part proposes streambank stabilization measures of a

portion of Clear Creek and an adjacent, unnamed tributary, both of which are located southwest of

Lenox Road within the Cattaraugus Territory of the Seneca Nation in Erie County, New York. The

approximate latitude/longitude of this location is 42.518538, -78.946152. The Project—

identification no. LRB-1999-02373—is anticipated to proceed under the CWA § 404 Nationwide

Permits (NWPs) 3 and/or 13 (yet to be determined). Although the PY2 Project commenced last

year (2021), the expiration and reissuance of the NWPs, effective February 25, 2022, necessitates

a new project-specific CWA § 401 certification.

Public Comment Period: Pursuant to CWA § 401(a)(1), the public comment period for the

proposed CWA § 401 certification of the PY2 Project by the EPD is thirty (30) days from the date

of publication of this notice in the SNI Newsletter (Community News Section) and other publicly

available locations. Agency representatives and members of the public are encouraged to submit

written comments to the EPD, by 4:30pm on May 12, 2022, as follows:

by email at epd@sni.org or

by USPS mail to the Seneca Nation Environmental Protection Department, 84 Iroquois

Drive, Irving NY 14081, Attention: Water Program Manager

Copies: A copy of the PY2 CPWW Application (which provides information regarding the PY2

Project) is available under the “documents” tab at the EPD website, here:

https://sni.org/community-services/environmental-protection/ or may be requested by contacting

the email shown above, with the title, “Request for Copy of PY2 CPWW Application” in the

subject line.

Page 1 of 1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.