ENVIRONMENTAL PROTECTION DEPARTMENT

Environmental Impact Assessment Form

To Be Completed by Applicant or Designee

Purpose: The Environmental Impact Assessment procedure is designed to help applicants and the

Nation determine whether the impact a project creates may be significant. It is our duty to protect our

Earth so that successive generations will continue to receive sustenance from her in the same way we

have. This procedure encourages this commitment and concern about how our actions today impact

upon the future of our world environment. Often this impact is subjective or immeasurable. However,

this procedure is intended to provide a method that identifies a range of possible impacts to be

addressed.

Instructions: Complete the form and return to the Environmental Protection Department at

epd@sni.org. Please also send any relevant project plans and/or maps and diagrams.

Project & Applicant Information

Applicant Name, Title, &

Agency

Applicant/Agency Address &

Phone:

1. Project Location:

Seneca Nation Territory:

Precise location (address, nearest

intersection, landmarks, etc.) Please

include map if available:

2. Is proposed project:

New

Expansion

Modification

3. Check any of the following which apply:

The project is maintenance or repair involving no substantial changed to an existing

structure or facility

The project is the replacement of a facility in-kind on the same site

The project is the repair or construction of a minor necessary structure, such as

sheds or fencing, not changing land use

The project is maintenance of existing landscaping or natural growth

The project involves information and data collection, surveys, or other studies

4. Describe the project briefly:

5. Physical Dimensions and Scale of Project

Total contiguous acreage owned or controlled by project sponsor:

Project acreage to be developed:

Initially:

Ultimately:

Project acreage to remain undeveloped:

Length of project, in miles:

If the project is an expansion, indicate the percent of expansion proposed:

Number of off-street parking spaces:

Existing:

Proposed:

Maximum vehicular trips generated per hour, upon completion:

If residential, number and type of housing

One Family:

units, initially/proposed:

Dimensions of the largest purposed structure (length, width, height):

Linear feet of frontage along a public thoroughfare:

Multi Family:

6. If the project is a single-phase project, what is the anticipated period of construction?

7. If the project is a multi-phased project:

Total number of anticipated phases

Anticipated date of commencement of phase

one

Approximate date of completion of final phase

Is phase one functionally dependent on

subsequent phases?

8. Number of jobs:

Generated during project:

Generated upon completion of project:

Eliminated by proposed project:

9. Will the project require the relocation of any existing projects or facilities?

YES

NO

If yes, please explain:

10. Will blasting occur during construction?

YES

NO

Project Permit Information

1. Amount of land affected by project, in acres:

Initially:

Ultimately:

2. What is the present land use in the vicinity of the project?

Residential

Industrial

Commercial

Agricultural

Park/Forest/Open Space

Other (please describe):

3. Does any aspect of this project currently have a valid permit or approval?

YES

NO

If yes, list department or agency, type of permit, and date of issuance:

4. Will this project require any modification of any existing valid permit?

YES

NO

If yes, please explain:

5. Was there a public comment period or other community review?

YES

NO

6. Is the site/area served by existing public utilities?

YES

NO

If yes, does sufficient capacity exist to allow connections?

YES

NO

Will improvements be necessary to allow connections?

YES

NO

7. Has the site ever been used for the disposal of solid or hazardous waste?

YES

NO

If yes, please explain:

8. Is the project within a non-attainment area for criteria pollutants such as ozone, VOCs, a

Prevention of Significant Deterioration area, or either a 10-mile radius designated Class 1

(Pristine) area?

YES

If yes, please explain:

NO

9. Could this project result in any adverse effects associated with the following areas of concern?

Existing air quality, surface or

groundwater quality or quantity, noise

levels, existing traffic pattern, solid waste

production or disposal, potential for

erosion, drainage or flooding problems,

or any other ground disturbing activity

Aesthetic, agricultural, archaeological,

historic or other natural or cultural

resources, or community or

neighborhood character

Vegetation or fauna, fish or wildlife

species or their habitat

YES

NO

If Yes, please explain:

Existing plans or surrounding community

balance or a change in community use of

land or other natural resources

Growth or subsequent development

induced by the proposed action

Other short term, long term, or

cumulative effects

Changes in use of quantity or type of

energy

10. Is there, or is there likely to be, controversy related to potential adverse environmental impacts

which prohibits or infringes on other individuals’ way of life?

Project Environmental Impact Information

1.

What is the total acreage of the project area?

2. What is the approximate breakdown of acreage, by percentage?

Current

Proposed

Meadow or Brush land, nonagricultural

Forested

Agricultural (orchards, croplands,

pastures, etc.)

Wetland

Water Surface Area

Unvegetated (rock, earth, fill)

Buildings, roads, or other paved

surfaces

Other:

3. Predominant soil type in project area:

a. Soil Drainage type, by percentage:

Well Drained:

Moderately Drained:

Poorly Drained:

b. If agricultural land, how many acres of soil are classified as Prime Farmland or hydric

soils, per USDA soil survey:

4. Are there bedrock outcroppings within project area?

YES

NO

If yes, what is the depth to bedrock, in feet?

5. Are there any unique or unusual land forms (cliffs, geological formations, etc.) within project

area?

YES

If yes, please explain:

NO

6. Approximate percentage of proposed project area with slopes:

0-10%

11-15%

16% or greater

7. What is the depth of the water table, in feet?

8. Is the project area located over a primary, principle, or sole source aquifer?

YES

NO

9. Are there streams within or contiguous with the project area?

YES

NO

Name of stream:

River, which stream is a tributary to:

10. Are there lakes, ponds, or wetland areas within or contiguous to the project area?

YES

NO

If yes, what is the size of the lake, pond, or wetland, in acres?

11. Does the project area contain any species of plant or animal that is identified as threatened or

endangered?

YES

NO

Which species is/are threatened or endangered?

Which agency lists the species as threatened or endangered?

12. Does hunting, fishing, or plant gathering occur within the project area?

YES

NO

13. Does the project area include natural or cultural sites known to be important to the community?

YES

NO

14. Is the project area substantially contiguous to, or contain any building, site, or district which is

listed on the Tribal or National registers of historic places?

YES

NO

15. Is the project area currently used by the community as an open space or recreation area?

YES

NO

If yes, please explain:

16. Material Removal:

How much natural material (rock, earth, etc.) will be removed from the

project area?

How many acres of vegetation (trees, shrubs, ground cover, etc.) will

be removed from site?

Will any mature forest (over 100 years old) or other locallyimportant plant life be removed from this site?

17. Will disturbed areas be reclaimed?

YES

NO

If yes, what is the intended purpose of reclaimed

materials:

Will topsoil be stockpiled for reclamation?

Will upper subsoil be stockpiled for reclamation?

How much fill material will be added to the site?

18. Is surface liquid waste disposal involved?

YES

NO

If yes, indicate type of waste (sewage, industrial, etc.) and

amount:

Name of water body into which effluent will be discharged:

How will stormwater runoff be managed:

19. Is subsurface liquid waste disposal involved?

YES

NO

YES

NO

20. Will the project generate solid waste?

YES

NO

If yes,

How much solid waste will be generated per

month?

Will any waste NOT go into a sewage disposal

system or into a sanitary landfill?

Where will this waste be disposed of?

What is the anticipate rate of disposal?

What is the anticipated site life of this waste?

21. Will the project generate any hazardous waste or involve storage/use of hazardous material?

YES

NO

If yes,

What waste product or material?

How much will be generated?

How will it be stored?

How will it be disposed of?

22. Will surface area of existing water bodies increase or decrease due to project?

YES

NO

If yes, please explain:

23. Is the project area or any portion of the project area located within a 100-year flood plain?

YES

NO

24. Water Use

What is the total anticipated water use, in gallons per day?

If water supply is from a well, indicate pumping capacity, in gallons per minute:

25. Will the project require the use of herbicides or pesticides?

YES

NO

26. Is open burning anticipated during or after completion of the project?

YES

NO

If yes, please explain:

27. Will the project result in air pollution emissions?

YES

NO

If yes, please explain:

28. Will the project routinely produce odors (more than one hour per day)?

YES

NO

29. How will fugitive dust created during the project be controlled?

30. Will the project produce operating noise exceeding the local ambient noise level?

YES

NO

31. Will the project result in an increase in energy use?

YES

NO

If yes, indicate type:

32. Does the project involve local, state, federal, or tribal funding?

YES

If yes, please explain:

NO

Applicant Acknowledgement: The above provided information is correct to the best of my knowledge. I

understand that the Seneca Nation of Indians and their associated departments may request more

information or provide approval with contingent requirements.

Signature:

Print Name and Title:

Date:

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

———— SENECA NATION ———— | Frix