LONG-RANGE TRANSPORTATION PLAN (2021)

Tribal code

Ask Donna

What actually matters in this document.

Text

LONG-RANGE TRANSPORTATION PLAN

FOR THE

PYRAMID LAKE PAIUTE TRIBE

MAY 2021 sles By:

High Road

Pyramid Lake Paiute Tribe ENGINEERING, INC.

908 Capitol Hil PO Box 97

Nixon, NV 89424 St. George, Utah 84771

435.767.8481

TABLE OF CONTENTS

1.0 JMtOAUCHION ccnsnccsecciicessmomamnnmnsconnne none coOEtNTOURCRNEEONNENRERTER 4

1.1 Tribal Transportation ProOgrantt vcs cccnsccsacnsmeemmonnennm eC: 4

1.2 Study Purpose And SCOPEC.h...... ceeeeeceeeeeeeeeeeeeeeeeeeneeeeeaeeaeeaaaaaaaeeeeeeeeeeeeeeeaeaneagenea 6

1.3 Description of the Study Period & Methodology ........c:cccccccccceceeceeseceeeeeeeeeeeeeeee 7

1.4 Organization Of Study... eeeeseeeeeseeeeeeeeeeeeeeeteeaeaaesaeaaeeaaaaaaaaeeeeeeeeeeeeeeaeaaaaaeee 8

12 FREE CeGYA VE ea we nmemeneninees sien rnin rnSi eihA ieascersi ee tenceein RST RI 9

1.6 Trarsportation Plan SUMMAl ys. ses iss ccseisesmsnessecmumemnncneres annn acme eaay 11

16% Prelit PAU CA CNS ia es cra scrses cs ors ere ew enennonaeenaannemcncennara emer eeanamnaMCeRsenenaNNeE 11

1.8 Funding Distribution FOrMUuIa ..0..... cc eeeeeeeeeeeeeneeeeeeeneeeeeeneeeeeeeeeeeeeeeeeeeeaaanaee es 13

2.0 Existing Conditions ..........cccceeeeeeeeeeeeeeeeeeeeeeeneeeeeeeeeeeeeeeeneneeeessasaseseeeeesenseeeseeeeenenes 15

2.1 Background Data ........cccceccccsecceeceeeeeeeeeenneeeeeecesneeeeseeceeeeeesseneeeeeeeeeesseeenaneeeeees 15

2.1.1. Demographics and Socioeconomic Data.........c.cccccecsecsseseeteteeeeeeeeeees 18

2.1.1.1 Population anid Growth wsisscscsssaamsverevs avn sausnnans osoxexmussenewnseevenas 18

S112 BPD OY MC i hiss as sosccserassamcmsnmemcnenenmmeensmres ienexemnmnmmminennsess 19

2.1.1.3 Title VI and Environmental JUStICE ........eceteeeeeeeeeeeeeeeeeeeees 19

2.1.2 Physical Characteristics...............ecccecceeeceeeeeeeeeneeeeeeeeeeeeeeeeeeeeeeeeeeeeees 20

2.1.2.1 Topography and SoOilS..........cccccceeeseeeeeseneeeeeeeeeeseeeeeeeeesseesnaeeess 21

2.1.2.2 Visual RESOUICES ......... cc cee ceeececeeeneee eee eeeeeeeeaaaaeeeeaeeaecaaeaeeeeeeeeenenes 21

BT ei) PRI GVUD EU is cscs sat cca eset ARABIA RRA RATS Hinisnnttliesreormnmal 22

212A NOISE WNPACS ss soccsnsanssnnccnsmnateneennmammenncmine mamnnrmanenanenenonen es 24

2.1.2.5 Water QuUaLItY .........cccccccccceceneeceeesseeeeeecsneeeeesesessneaeeeeeeesesseaeeees 24

2.1.2.6 Biological RESOUICES ..........cccccssssssseeseeeeeeseeeeaeeaaeeseeeeeeeeeseessaaeanes 24

2.1.2.7 Cultural RESOUICES 00.0... eect eee eter tetera aa eae aaaaeaaaaaaaaaaaeaaee 29

2.1.3 Land OWNErSNHIP........... cece eeeeeeaeeeeeeeeeaeeeeceesaesaaaaeaaeeseeeeeeeeeeeeeseaeaees 30

2.1.4 Existing Land USC... cece ccccceeeeeeeeeeeeeneaaeeeeeeeeeeeeeeeeeeeeeeeeeneees 31

214.1 R@SIAG NTA ccscccesmnanssensas ces memeauns srxearumememmnonesies mmmameaennnmnananneT 32

1 AZ, COMTIORCIAL camanemncsesmewesesns.ame nesarsqavecwsinemcusmecrmwemersn aemmeemmemecenmun 33

2.1.4.3 Institutional and Public Services ...............ceceeeeeeeeeeeeeeeteteeeaeeeeeees 34

2.1.4.4 Recreational ........cccccccccccccececcceeeeeeeeeeeeeeeeeeeeaeeaeaeaaaaaaaaaaeaaaeeeeaes 35

2.1.4.5 AQriCUltUral............cccccceccccceceeeeeseeeeeeeeeeeeeeeeeeeeeeesaaasaaaaaeaaaaeaaeeaeenas 38

2.1.4.6 Other USES .....cccccccecccecececcceceeccceeeceeccceceveeeeecseceeeaeeaeeaeeenseeaeeaees 38

2.2 THANSPOFtalion SYS cis sccainsncnmesnmmmmecns an anemsnrenemmmmnmeemnN 40

2.2.1 Existing Roadway SyStem 00.0... cccscesssseessssseeeseeeeeseessseeeeeeeeseeas 40

2.2.1.1 Overview of Current SYStOM....... i eeeeeeeeeeeeeeaeeeeeeeeeeeeeeees 40

2.2.1.2 Road Maintenance .........ccccc etree eeeeeeeeeeeeeeaeeeeeeeeeeeeeeeeees 41

22A08 Road COnStruCtiOlt.........n00sssnaicas as sono men NeD 42

22.2 Ftiictional Classifications Of ROSAWAYS scsi: csccusresoomensemcenmeaewosss 42

2ée20l FHWA Functional Class Cations vercncensecnmssamcannacmemecesxanmsnunnnccn 43

2.2.2.2 NDOT Functional Classifications ...........cccceeeeeeeeeeeeeeeees 44

2.2.2.3 BIA Functional Classifications .............ccececeeeeeeeeeeeeeeeeeeeeeeeeeenees 44

2.2.3 ROA INVENLOSY ooo... eee eeeeeeeeeeeeeeeee eee eeteeeeeeeeeeeeeeeaaeeeeeeeeeeneeeseeeeeeeeneeas 46

2.2.4 Right-of-Way Status... cc. cccccccsssesscsssseeessssseeeeeeeeesssssssseeseseesenees 47

225 ‘Traftié Goniteel ..........s0sssin ics on cas eeneNREENE Monee 47

226 DYSiNaGe AMI BRAQSS cvesssssmcansnsnensemsmnennnnveons mussoneneans enememmiommes 47

22.0 SilCSt LISAUNG senescence REE OROERARONKRAD 48

2.2.8 Public Transit, School Bus and Mail ROuteS .0......eeeeeseeeeeeeeeeenees 48

2.2.9 Pedestrian / Bicycle FacilitieS 20.0.0... eee eeeseeeeeeeeeeeeeeseeeeeeeeeeneeas 49

2.2.10 Recreation, Tourism, ANd TrailS...............ccccccceessseeeeeeseeeeeeeeeaaeeeeeeees 50

Z2A1 LGW ERTOPEGINGHI.......cccronnnncennsnninenn tensa sensi cincmanenanones oak caaOMRNNAENN 51

ZAAND AiG OP wisscaxcincisnscncccmmeennemenaemne ea TERRI 51

2.3 Existing Titifie VGlMMGScrcccscrmmamcenmmemamenesiss eecernemiencasas aneanueemummnmmenentn 51

2.4 Vehicle Crash Data .........ccccccccceeeeeeee cette etree eeenieeeeeeeeeteeenneeeeeeeeeeseeessneeseeaaes 51

3.0 The Transportation Planr.....ccccccssceccssseneeseseuseenessseeesesesenseesseneeneeseesaeenenneeseeseeseenens 54

3.1 Future Land USC .......cccccccccccccccccceeeeeeeeeeeeeeeeeeeeeeeeeeeeeseeeeeeeeseeeenaaaneneeeeeeeneeneenags 54

3.1.1 Tribal Goals and Objectives......... ee eeeeeeeeeeseeeeeeeeeseesseneeeeeenesaaes 54

3.1.2 Short & Long-Range Development Plans.............:ccceesesessseeeeeeseesees 55

3.13 Growth ASSUMPTIONS, cxisecuneennsmemeeerssenesmceumens cxnommawcesene commas 56

3.2 Projected Travel Denied s cs is cescsncemaxcormencsnsrecnescanesnem exscmane cxsesneserrenuen canons cee 56

3.2.1 Projected Traffic VOIUMES......0....:cccceceeeeteeeeeeneeeeeeeeeeeeeesnneeeeeeeseaaes 57

3.3 Analysis of Demand and Capacity ........ cee ccesseecesesessseeeeesseseseeeesneeseeaaees 59

3.4 Recommended Transportation Plan..............eeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeeseeeraeeaas 61

34,1 Road liiprovement Projects ....sccicscnccsasaccaenmenn ves aemwcenns evs enue anmweaws 62

3.4.2. Government Agency Responsibility ..............ccccccsssssccseeeeeeseeeeeeeeeees 69

S40 Projet Cost EStGleS specesacccnasmmmumoseesememaameneen mmmeemnnemmans 70

3.4.4 Proposed Revisions to BIA Road SyStem..........ccccccsesseeeesseeeesteees 78

3.4.4.1. Roads to be Added, Deleted, or Renumbered............::::ccceeeeees 79

3.4.4.2 BIA Road System Mileage Corrections...........cccceeeeeeeeeeeees 81

3.5 5-Year Tribal Transportation Improvement Program (TTIP)..........eeeeeeeeeeeees 81

3.6 Plan Implementation atid Updating ........0. sicaicarsnisnencmessmerenmemmnenanancameeanmenie 83

3.f Procedures Tor DevelopMent ROAGS sa. sa. 1s covessoxssssensecnnovnsessenmasmm coamnasanesa nee 83

G.%:1 DeSiGh Standard sicssccasonssesses ves wa verenmnwansssnanemancmmmienestasnenanemen 84

3.7.2 Plan Submittal and RevieW..........cccccccceeeseeeeeeereeeeeeeeeeeeeeeeeeeeeeneeeeeess 84

3.7.3 COMStrUCTION MONITOLING........ ee ee eeeeeeeeeesteeteeeeeeeeeeeeeeeeeeeeeeeeeeeeseeeeees 84

3.7.4 Maintenance FUNCINgG .............. cece ceeeeeeeeeeeeeeeeeeseeeeeaeuaeeaeeuaeaeaeeeaeeeeeees 84

LIST OF FIGURES, EXHIBITS & MAPS

Figure 12 Vieiriify MAP swisssvsessicnenvass sam ane asneomnamnmnnmecanenesias can euaaumneienn eameneasenecentnnannnsiers 10

Figure 2. Sid y Acie) WES serccces eases senereeenceemecemmsenoneu nine cur eReMNNeKRy ERERMERINTENNeeHs 17

Figure 3: Wadsworth to Pyramid Lake Trail ..........cccccccesseeessseeessseeseeseeeeeeeeeeeeeeeeaeeeees rif

Figure 4: Pyramid Lake SCenic ByWay .......ccccccccsssesesssseeeeeesseeeeeeseeseeeeeeeeeeeeseaeeeeeeee 39

Figure 5: Short-Range Projects MapS.....iescrcisecsmnncannansnannemsime oan en wn een aenennnananarens 66,67,68

APPENDICES

Appendix A — AADT Map, School Bus Route Maps, Mail Route Maps, Crash Data

Maps, Existing Conditions Maps, Future Conditions Maps

Appendix B — Road Inventory Data

Appendix C — 5 Year Tribal Transportation Improvement Program

Appendix D — NDOT and RTC 5 Year Transportation Plans

Appendix E — Tribal Resolution and Certification of Maintenance from Road Owners

Appendix F — Public Meeting Minutes

Appendix G - 25 CFR Part 170 and 23 U.S.C. 202

PART ONE

1.0 Introduction

This transportation study for the Pyramid Lake Indian Reservation was prepared for the

Pyramid Lake Paiute Tribe (PLPT/Tribe) and the Bureau of Indian Affairs (BIA) in

accordance with the Federal Lands Highway Office of Tribal Transportation Program

Delivery Guide — 2019, A Guide for Tribes Having a Tribal Transportation Program

Agreement with FHWA revised August 26, 2019. The policy requires that Tribal, State,

and Federal Government agencies carry out a transportation planning process for the

Tribal Transportation Program (TTP) deemed to be adequate to support their construction

and improvement program in accordance with 23 U.S.C. § 202 — Tribal Transportation

Program, 25 U.S.C. Indians, and under the guidance of 25 CFR Part 170.

1.1 Tribal Transportation Program

The Tribal Transportation Program (TTP) is the largest program in the Office of Federal

Lands Highway. Established in code 23 U.S.C. § 202 to address the transportation

needs of tribal governments throughout the United States, the program is to provide

safe and adequate transportation and public road access to and within Indian

reservations, Indian lands, and Alaska Native Village communities. There is a total of

566 federally recognized tribes that share the funds under the TTP. A prime objective of

the TTP is to contribute to the economic development, self-determination, and

employment of Native Americans.

Under the Fixing America’s Surface Transportation Act (FAST Act), the program

received $495 million in fiscal year 2019 and is authorized to receive $505 million in

fiscal year 2021. Two percent (2%) of the available TTP funds are set aside for

planning, an additional three percent (3%) are set aside for improving deficient bridges,

and an additional two percent (2%) are set aside to address safety issues on Native

lands. Safety funds are available through a competitive, discretionary program.

Tribal Transportation Facilities means public roads and transportation facilities that

are located within, or provide access to, an Indian reservation, Indian trust land, or

restricted Indian land which is not subject to fee title alienation without the approval of

the Federal Government, or Indian and Alaska Native villages, groups, or communities

in which Indians and Alaskan natives reside, whom the Secretary of Interior has

determined are eligible for services generally available to Indians under Federal laws

specifically applicable to Indians. This term includes all or part of the following systems:

Bureau of Indian Affairs Federal-Aid Roads- Existing public highways and proposed

routes which qualify as Bureau of Indian Affairs (BIA) roads under the National Tribal

Transportation Facility Inventory (NTTFI) pursuant to the provisions of Section 101(a) of

23 U.S.C. and for which the Bureau of Indian Affairs has or plans to obtain right-of-way.

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 4

Bureau of Indian Affairs Reservation Development Roads — Existing public highways

and proposed routes for which the BIA has, or plans to obtain legal right-of-way and that

serve the development needs of Indian Reservations and Alaskan Native Villages.

Other Bureau of Indian Affairs Branch Roads - Existing roads owned and maintained by

other branches of the BIA (includes Forestry and Facility Management roads).

Highway Trust Fund Roads - Existing BIA routes or sections of routes which were

constructed or improved with the use of Highway Trust Funds.

Tribal Roads — Existing and proposed public roads located on an Indian Reservation or

Trust Land that are under the jurisdiction and are maintained by a Tribe, and for which

the Tribe has or plans to obtain right-of-way.

County or Township Roads - Public roads whose rights-of-ways are under the

jurisdiction of a County or Township.

State Highways - Public highways whose rights-of-way are under the jurisdiction of a

State.

Other Federal Agency Roads - Public roads whose rights-of-way are under the

jurisdiction of various Federal Agencies such as Bureau of Land Management, Forest

Service, Corps of Engineers, Department of Defense, Bureau of Reclamation, or

National Park Service.

National Tribal Transportation Facility Inventory (NTTFI) means, at a minimum,

transportation facilities that are eligible for assistance under the Tribal Transportation

Program (TTP) that an Indian Tribe has requested, including facilities that meet at least

one of the following criteria:

1) Were included in the Bureau of Indian Affairs system inventory prior to October 1,

2004.

2) Are owned by an Indian Tribal government (“owned” means having the authority

to finance, build, operate, or maintain the facility (see 23 U.S.C. 101(a)(20)).

3) Are owned by the Bureau of Indian Affairs (“owned” means having the authority

to finance, build, operate, or maintain the facility (See 23 U.S.C. 101(a)(20)).

4) Were constructed or reconstructed with funds from the Highway Trust Fund

under the Indian reservation roads program since 1983.

5) Are public roads or bridges within the exterior boundary of Indian Reservations,

Alaska Native villages, and other recognized Indian communities (including

communities in former Indian reservations in the State of Oklahoma) in which the

majority of residents are American Indians or Alaska Natives.

6) Are public roads within or providing access to either:

a. An Indian reservation or Indian trust land or restricted Indian land that is

not subject to fee title alienation without the approval of the Federal

Government; or

b. An Indian or Alaska Native villages, groups, or communities whose

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page |5

residents include Indians and Alaska Natives whom the Secretary has

determined are eligible for services generally available to Indians under

Federal laws applicable to Indians.

7) Are primary access routes proposed by tribal governments, including roads

between villages, roads to landfills, roads to drinking water sources, roads to

natural resources identified for economic development, and roads that provide

access to intermodal terminals, such as airports, harbors, or boat landing.

1.2 Study Purpose and Scope

This Long-Range Transportation Plan (LRTP) was prepared by High Road Engineering

to meet the Pyramid Lake Paiute Tribe’s goal of identifying and inventorying roads

eligible for the NTTFI system in order to secure funding for needed transportation

improvements. This study presents a plan to improve existing transportation facilities

and develop new transportation opportunities within the PLPTT Reservation and

evaluate present and future transportation needs in and around Reservation Lands. The

LRTP will provide the Tribe a plan to establish a prioritized listing of road

improvement/construction projects to meet current and projected transportation needs.

The study will also be used for the development of a Tribal Transportation Improvement

Program (TTIP) to implement a short term (5 year) construction program.

Key focus areas of the LRTP are safety, health and economic development. The LRTP

also Identifies road inventory updates to the Tribal Transportation Program (TTP),

formerly known as the Indian Reservation Roads (IRR) Program. That assist in

expanding the level and types of funding available for transportation projects. The

program is jointly administered by the Federal Highway Administration’s Office of

Federal Lands Highway (FLH) and the Bureau of Indian Affairs (BIA) in accordance with

a memorandum of understanding.

This study considers the potential transportation impacts of existing and planned tribal

development projects to establish a prioritized list of transportation needs. The study

includes the following tasks:

Inventory of TTP roads and transportation facilities.

Identify obvious hazards that exist on/along the TTP system.

Identify and evaluate present and future transportation needs.

Provide a 20-year transportation plan that defines those needs and is responsive

to short- and long-term development projections.

e Develop a prioritized listing of recommended road improvements/construction

projects for use by the Tribe and BIA in implementing a construction program to

meet current and projected (20-year) transportation needs.

The objective of this study is to produce a LRTP recommendations providing for multimodal transportation facilities that will enable Tribal leaders to take advantage of

desirable development opportunities, protect community resources and traditions, and

enhance the use of the Tribe's land by its residents.

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 6

This transportation plan is intended to be fiscally and developmentally sound and is

intended to address the funding issues and eligibility restrictions associated with

Highway Trust Fund (HTF) monies. Each Tribe is politically and geographically diverse,

and each has its own goals and objectives for a transportation system. However,

because the system is composed of public roads, many of which fall under BIA, State

County, and City responsibility, several transportation issues common to all Tribes can

be identified. These are:

e To provide safe and convenient public access within their boundaries.

e To provide access to new and old development.

e Tocomplement surrounding public transportation facilities as part of the areawide public transportation system.

e Toassist in the economic development of the Tribe.

e To produce a plan for providing transportation facilities.

1.3 Description of the Study Period & Methodology

The Long-Range Transportation Plan and Road Inventory Update processes were

conducted over an eight-month period with regular coordination meetings, public

outreach meetings, and formal reviews. The methodology of this study consists of three

phases.

Phase 1 — Data Collection

The first phase began by making initial contacts with the Tribe, BIA Western Region

Department of Transportation, and BIA Western Nevada Agency to establish

relationships and gather pertinent government furnished materials. Next, outreach was

made to the County of Fernley, Town of Wadsworth, Nixon & Washoe, Lyon and Storey

Counties as well as the Nevada Department of Transportation to notify these road

owners of the Tribe’s planning efforts and to collect the necessary road data and

existing planning documents available.

As a part of Phase 1, the existing transportation system was inventoried. Authorization

to access data from the Road Inventory Field Data System (RIFDS) for the Pyramid

Lake Indian Reservation was obtained from the BIA Department of Transportation

(BIADOT). Physical characteristics and conditions of approximately 16.4 miles of

roadway were gathered by Arrow Pro Land Surveys through field reconnaissance. The

data was recorded on standardized RIFDS Inspection Sheets for Tribal roads selected

by the Tribe to be added to the NTTFI System. A digital photograph was taken of each

road section, and Strip Maps were created for each route showing all road sections.

Published traffic counts were used for current Average Daily Traffic (ADT) numbers for

this planning document. The traffic data is input into RIFDS to support higher traffic

volumes where possible. ADT was carried over from previous years road inventory and

the default ADT was allocated to all sections with no data.

For all non-BIA routes inventoried, coordination with the road owner is required to gain

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 7

approval to include these routes in the Tribe’s system. Within the Pyramid Lake Indian

Reservation, State routes are a part of the Tribe’s roadway network. Therefore, review

and approval from the State of Nevada Department of Transportation was performed.

This process resulted in a Certification of Road Maintenance letter from the State.

To complete the Phase 1 Data Collection, the Road Inventory Updates were submitted to

the Tribe and the BIA Western Region Planning Office for review. Then the data was

input into RIFDS and submitted for final approval by BIADOT. All Inspection Data

Sheets, Strip Maps, Photographs, Traffic Counts, and Certification of Road Maintenance

letters were uploaded into the system to support the request to include each route.

Phase 2 — Selective Study and Analysis of Transportation Needs

The second phase involved community outreach and the development of system

alternatives. A community survey and call for comments was published on the Tribe’s

Facebook page and flyers were posted in each of the communities. The draft report

was available to the public for comments. The survey seeks to capture the community

attitudes regarding transportation needs and to solicit input on short term and long term

transportation needs. A public meeting was conducted on April 16, 2021 during a

Special Council Meeting to explain the study and hear any input or comments. See

Appendix F for public involvement details. This phase also performed the major

analytical work tasks of the study, including an evaluation of roads maintenance needs.

Phase 3 — Finalization of Study

The third phase of work included the preparation of the final transportation plan based

on the review of the alternatives by Tribal Leaders and BIA Officials. This final phase

also evaluates the social and economic factors associated with the priority list of road

construction projects. Project descriptions and cost estimates were developed for each

proposed road improvement in the 5-year plan. Projects were prioritized based on an

objective ranking system which considers the Tribe’s annual share of TTP construction

funds, public safety, pavement management strategies, and Tribal Council input.

This phase of the study developed a 5-Year Tribal Transportation Improvement

Program (TTIP). The TTIP identifies the costs of pre-construction engineering,

construction, construction monitoring, and tribal administration for the short-term

projects the Tribe will pursue under the Tribal Transportation Program. The TTIP also

identifies the funding sources for improvements and must be financially constrained

based upon the estimated annual tribal share of TTP funding or other known funding

sources (grants, partnerships, etc.)

1.4 Organization of Study

The Long-Range Transportation Plan is organized into three parts as follows:

Part 1 - Introduction

The first part provides an introduction of the TTP and of this study. Topics familiarize the

reader with terminology and provide context to the program and regional transportation.

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 8

Part 2 — Existing Conditions

The second part of the study describes the background data, existing transportation

system, and the existing traffic volumes. This section of the report details the existing

land use, socio-economic data, demographics, and physical characteristics of the study

area. The existing roadway system is analyzed to understand the functional

classifications, rights-of-ways, traffic control, drainage, bridges and street lighting

conditions. The existing road system is summarized, and a table of road mileage by

surface type is given. Maps are provided to graphically show the transportation network

and depict the land ownership and uses.

Part 3 — The Transportation Plan

The third part of the study details the Tribe’s goals and objectives for short-term

development plans with long-term plans in mind. Based upon the future developments a

recommended transportation plan is outlined. The road inventory data is summarized,

and a comparison listing provides proposed update information. Each proposed

improvement has a description and cost estimate. From the Tribe’s prioritization of

projects, a 5-Year TTIP is generated for programming purposes. This part of the plan

describes a process for implementation and updating the LRTP, as well as procedures

for developing roadways.

1.5 Regional Context

Tribal lands are located in northwestern Nevada primarily within southeastern Washoe

County. The 475,000 acre reservation includes Pyramid Lake, which is entirely

enclosed by the surrounding 112,000 acres just 35 miles northeast of Reno, NV. The

Pyramid Lake Paiute Tribe has the largest reservation acreage in Nevada and is

adjacent to Lyon, Storey and Pershing Counties. Tribal lands surrounding the lake are

at approximately 3,800 feet and rise toward the mountains in the east, west and

southwest.

The Pyramid Lake Paiute Reservation can be accessed by a well improved road.

Interstate 80 (I-80) (Dwight D. Eisenhower Hwy) runs east-west through the State of

Nevada and passes through the reservation on the southern tip by the towns of

Wadsworth and Fernley, NV. This highway leads to major cities in Nevada such as

Reno which is 35 miles southwest of Wadsworth. Las Vegas is 418 miles to the

southeast via US 50 & 95. See Figure 1 — Vicinity Map for locations.

This space intentionally left blank.

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 9

Location

yc

ne)

=

©

ic

0)

7)

®

yO

Carson City

ae ‘e wa...

i [Yerinton]

Pyramid Lake Paiute Indian Reservation

Washoe County, Nevada

Western Region — Western Nevada Agency

Map Legend

INTERSTATE ++H++++H+ RAILROAD TRACKS mes §=STATE BOUNDARY

HIGHWAY 02 CONGRESSIONAL DISTRICT COUNTY BOUNDARIES 450,000 300,000

JL. RIVERS ] INDIAN RESERVATION LANDS

ROADS

1.6 Transportation Plan Summary

The transportation plan presented herein should be considered a flexible plan adaptable

to the changing needs and conditions within the community. The Tribe should use the

plan as the basis for programming and budgeting future roadway improvement funds

while recognizing that such priorities and improvement needs will change over time. Thus,

the priority list must be reviewed and modified as needed on an annual basis. The overall

plan must also be updated every five to seven years, or when major changes in land use

has developed.

The 2041 Transportation Plan recognizes the realistic need to provide better mobility in

areas, as well as promoting increased opportunities for alternative modes of

transportation. In order to develop the Transportation Plan by 2041, there are crucial

improvement projects that need to be implemented over the next 20 years. Based on

forecasts, improvement projects were grouped into three time periods: short-range (0 to

5 years), mid-range (6 to 10 years), and long-range (11 to 20 years) based on relative

urgency for completion. Road priority projects are discussed in Section 3.1.2.

Current BIA road system mileage for the Pyramid Lake Indian Reservation approved by

the Regional Director as of March 2021 consists of 286.5 miles. The mileage consists of

149.1 miles of BIA Roads, 64.8 miles of Tribal Roads, 72.6 miles of State Roads, and 0.0

miles of County Roads.

As a part of this Long-Range Transportation Plan project, the Road Inventory was

updated to add sections, to correct prior inventory data that was missing or returned,

and to obtain Certifications of Maintenance from road owners. The recommended road

system revisions consist of adding 11.2 miles to the TTP system. The mileage consists

of 3.1 miles of BIA Roads, 0.1 miles of Tribal Roads, 4.5 miles of State Roads, and 3.5

miles of County Roads. The 2021 Road Inventory Update will both add and delete

mileage in the TTP system. Specific information on recommended road system

revisions is contained in Section 3.4.4.

1.7 Eunding Allocations

On December 4, 2015, the President signed into law the Fixing America’s Surface

Transportation Act (FAST Act). The Act is a Five-Year authorization through fiscal year

2020. On September 30, 2020, the President signed into law H.R. 8337, Continuing

Appropriations Act 2021 and Other Extensions Act of 2021 providing a one-year

extension for surface transportation programs at fiscal year 2020 levels. The surface

transportation programs were funded at over $2.425 billion for fiscal years 2016 through

2021. The two landmark bills that brought surface transportation into the 21S' century—

the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA) and the

Transportation Equity Act for the 21st Century (TEA-21) shaped the highway program to

meet the Nation's changing transportation needs. The previous highway bill, Moving

Ahead for Progress in the 21% Century (MAP-21) built on and refined many of the

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 11

policies established in 1991 by creating a streamlined, performance-based, and

multimodal program to address the many challenges facing the U.S. transportation

system. These challenges include improving safety, maintaining infrastructure condition,

reducing traffic congestion, improving efficiency of the system and freight movement,

protecting the environment, and reducing delays in project delivery.

MAP-21 created a unified program for Federal lands transportation facilities, Federal

lands access transportation facilities, and tribal transportation facilities. The Indian

Reservation Roads (IRR) program was changed to the Tribal Transportation

Program (TTP) who’s purpose is to improve access to and within Tribal lands. TTP

funds can be used for transportation planning, research, engineering, and construction

of highways, roads, parkways and transit facilities within Indian Reservations. This

program generally continues the existing Indian Reservation Roads program, while

adding new set asides for tribal bridge projects and tribal safety projects. It continues to

provide set asides for program management and oversight and tribal transportation

planning. A new statutory formula for distributing funds among tribes, based on tribal

population, road mileage, and average funding under SAFETEA-LU, plus an equity

provision, is to be phased in over a 4-year period.

The FAST Act continues improved delivery methods established under MAP-21 for the

transportation program. TTP funding may be provided via a direct funding agreement

with the Federal Highway Administration (FHWA) or the Bureau of Indian Affairs (BIA)

(Government to Government Agreement). Tribes also have the option to receive funding

in accordance with the Indian Self-Determination and Education Assistance Act (Public

Law 93-638). The Pyramid Lake Paiute Tribe currently administers their program under

a Government to Government Agreement with the BIA. Program Agreements and Self-

Determination Contracts are available to Tribal governments that have satisfactorily

demonstrated financial stability and financial management to the Secretary of Interior.

Funds are allocated among Tribes using a new statutory formula based on tribal

population, road mileage, and average tribal shares of the former Tribal Transportation

Allocation Methodology (TTAM) formula. TTP funds shall only be expended on projects

identified in a Transportation Improvement Program approved by the Secretary of

Interior. The greater amount of 25% of a Tribe's program funds or $500,000 may now

be used for the purpose of TTP system maintenance as defined in 25 CFR Part 170.

Although the Bureau of Indian Affairs (BIA) will retain primary responsibility for TTP

maintenance programs through the Department of Interior (DOI) appropriations. A total

of $15 million (3%) is set aside for projects replacing structurally deficient or functionally

obsolete TTP bridges. The FAST Act requires the inspection of all public bridges,

including tribal bridges, and the reporting of data into FHWA’s National Bridge

Inspection System. There is also $10 million (2%) set aside for a Tribal Safety Program.

Federal Lands Access - The FAST Act authorized $270 million in fiscal year 2021 for

projects that improve access to the Federal estate on infrastructure owned by States

and local governments, including Tribal governments. Replacing and expanding the

Forest Highways program, projects providing access to any Federal lands are eligible

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 12

for this new comprehensive program. Funds are distributed by formula based on

recreational visitation, Federal land area, Federal public road mileage, and the number

of Federal public bridges. Eighty percent of funds go to States with large areas of public

land. States are required to provide a non-Federal match for program funds (which has

not been the case historically for Federal lands highway funding). Programming

decisions will be made locally using a tri-party model in each State comprised of

representatives from FHWA, State DOT, and local government in consultation with

applicable Federal land management agencies. Tribes may apply for Federal Lands

Access Program funding if the road or facility being proposed for funding is owned or

operated by the Tribe and provides access to a Federally owned land (not a Tribal

land). For example, a Tribally owned road (as opposed to a BIA-owned road) that

provides access to a national park or national forest is eligible for the Federal Lands

Access Program.

Tribal Transportation Provisions - Transfer of Highway and Transit Funds - Allows

a State to transfer apportioned Highway Trust Funds to another Federal agency. The

project can be administered by the Federal agency under its procedures. This makes it

possible for States to transfer funds to the Bureau of Indian Affairs (BIA). The BIA could

then administer projects under their procedures including contracting with an Indian

Tribe under the Indian Self-Determination and Education Assistance Act (ISDEAA).

The Department of Interior, Bureau of Indian Affairs completed consultations and a final

rule was published to update the Tribal Transportation Program regulations to comply

with the current surface transportation authorization.’ The Final Rule establishes

policies and procedures governing the Tribal Transportation Program (TTP). The

program is jointly administered by the Bureau of Indian Affairs (BIA) and the Federal

Highway Administration’s (FHWA) Federal Lands Highway (FLH) Office.

1.8 Funding Distribution Formula

The BIA Final Rule 25 CFR Part 170 published November 7, 2016 in the Federal

Register Vol. 81, No. 215 establishes a funding distribution methodology by a statutory

formula. 23 U.S.C. 202(b)(3)(A) provides the basis for the funding formula and its

transition into use. The annual TTP funding amount available for distribution is

determined as follows:

(a) The following set-asides are applied to the Tribal Transportation Program before the

determination of final tribal shares:

(1) 2% to Tribal transportation planning (23 U.S.C. 202(c));

(2) 3% to Tribal transportation facility bridges (23 U.S.C. 202(d));

(3) 2% to Tribal safety (23 U.S.C 202(e));

(4) Administrative expenses (23 U.S.C 202(a)(6)) determined annually; and

(5) Tribal supplemental program (23 U.S.C. 202(b)(3)(C)).

1 Federal Register/Vol. 81 No. 215/ Monday, November 7, 2016/Tribal Transportation Program; Final Rule: Codified

at 25 Code of Federal Regulations (“CFR”) Part 170

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 13

(b) After deducting the set asides identified in paragraph (a) of this section, on October

1 of each fiscal year, the Secretaries will distribute the remainder authorized to be

appropriated for the TTP among Indian Tribes as follows:

(1) For each Indian Tribe, 20% of the total relative need distribution factor and

population adjustment factor as determined by the Tribal Transportation

Allocation Methodology (see 25 CFR 170 dated July 19, 2004)) for the fiscal

year 2011 funding amount made available to that Indian Tribe; and

(2) The remainder using Tribal shares as described in § 170.201 and Tribal

supplemental funding as described in § 170.202.

(c) Tribal shares are determined by using the NTTFI as calculated for fiscal year 2012,

and the most recent data on American Indian and Alaska Native population within each

Indian Tribe’s American Indian/Alaska Native Reservation or Statistical Area, as

computed under the Native American Housing Assistance and Self-Determination Act of

1996 (25 U.S.C. 4101 et seq.), in the following manner:

(1) 27% in the ratio that the total eligible road mileage in each Tribe bears to the

total eligible road mileage of all American Indians and Alaskan Natives. For

the purposes of this calculation, eligible road mileage will be computed using

only facilities included in the inventory described below:

(i) Were included in the BIA System Inventory prior to October 1, 2004;

(ii) Are owned by an Indian Tribal government;

(iii) Are owned by the Bureau of Indian Affairs.

(2) 39% in the ratio that the total population in each Tribe bears to the total

population of all American Indians and Alaskan Natives; and

(3) 34% will be initially divided equally among each BIA Region.

(d) The share of funds will be distributed to each Indian Tribe within the BIA Region in

the ratio that the average total relative need distribution factors and population

adjustment factors from fiscal years 2005 through 2011 for a Tribe bears to the average

total of relative need distribution factors and population adjustment factors for fiscal

years 2005 through 2011 in that region.”

Intentionally left blank

2 2016-26141.pdf (govinfo.gov)

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 14

PART TWO

2.0 Existing Conditions

This chapter provides information on demographics & socioeconomic data, physical

characteristics, land use, and the transportation system features of the Pyramid Lake

Indian Reservation.

2.1 Background Data

Pyramid Lake Paiute Tribe is a federally recognized Tribe consisting of Paiute Indians

that operate under a Constitution adopted and approved by the Department of Interior

on January 26, 1936. The Constitution establishes a Tribal Council of ten-members, a

Chairman, Vice-Chairman, and eight council members elected bi-annually in December

for a staggered two year term limit.

The Pyramid Lake Reservation is located adjacent to Washoe, Lyon, Storey and

Pershing Counties in northwestern Nevada approximately 35 miles northeast of Reno,

NV. The 475,000 acre reservation lies within the Basin and Range province; an area

characterized by alternating north-south trending mountain ranges and flat valley floors.

The reservation covers one of these valley floors including the 117,400 acre Pyramid

Lake and portions of adjacent mountain ranges and valleys. The Pyramid Lake Paiute

Tribe are Northern Paiute people. The bands of Paiute people who lived in the vicinity of

territory incorporated about 2,000 square miles, including both Pyramid and Washoe

Lakes.

The Town of Nixon is located at 39°49'53.0" North, 119°21'24.6" West (39.831396, -

119.356840) which is southeast of Pyramid Lake. Important structures in this town are

the U.S. Post Office, Pyramid Lake Jr/Sr High School, Pyramid Lake Paiute Tribal

Offices, Tribal Museum, Tribal Nixon Store (gas station/fishing), Tribal Police

Department and the Solar Power farms.

The Truckee River flows south to north through the southern part of the reservation and

into the southern tip of Pyramid Lake. Nixon is characterized by this river which winds

through the town. Agricultural fields run along the river where prime farmland is

available. Residential homes are built outside of farmland areas close to the river.

Nevada State Route’s (SR) 446 and 447 make a T-intersection at the Nixon Store

southeast of Pyramid Lake High School. These roads provide main access to the

reservation and Pyramid Lake recreational areas.

The town of Wadsworth is on the southern tip of the reservation and is 14 miles south of

Nixon. It is a census designated place where the Tribe has revenue generating

enterprises including Cemex sand & gravel, |-80 Smoke Shop, Big Bend RV Park and

the I-80 RV and Campground. The Town of Fernley is the closest urban center where

essential services and shopping centers are available. In downtown Fernley there are

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 15

grocery stores, pharmacies, a hospital, the public library, all types of places to eat and

much more.

Much of the economy on the Pyramid Lake Reservation is centered around Lahontan

Cutthroat Trout (LCT) fishing and recreational activities at Pyramid Lake. In addition to

permit fees for fishing, day use and overnight camping, the Tribe also receives lease

and tax revenue. Several Tribal members belong to the Pyramid Lake Cattleman's

Cooperative Association and the Association utilizes the reservation desert open range

to operate and manage the individual cattle herds.*

Today, the Pyramid Lake Paiute Tribe has an enrolled membership of 2,288 people and

a population of 1,525. The reservation is made up of one single land area. See Figure 2

— Study Area Map for locations.

Intentionally left blank

3 Pyramid Lake Paiute Tribe (PLPTt.nsn.us)

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 16

: oe =

fe | Smoke Creek iit hi —\ jae

F Desert boty LF VaR |

+ B , 2 SS [Humboldt

~ gh a 2 ae ; “ae Biss fat

? : | Pershing

Reservation

Location

7

i ix

ay

Pyramid Lake

i] Paiute Reservation |

Virginia rs :

Peak ee

e«

Wadsworth gs

iat Bt 2) sq Yad

Location: ; Pyramid Lake Paiute Indian Reservation

Congressional Dist. 02

Nixon, NV Washoe County, Nevada

T20-23N, R24E ion —

Tai ZEN ROSE Western Region Western Nevada Agency

T22—29, R22E Map Legend

T23—29, R21E INTERSTATE

724-29, R20E A RIVERS

728,29, RI9E ROADS H+HH+ RAILROAD TRACKS

INTERSTATE COUNTY BOUNDARIES 02 CONGRESSIONAL DISTRICT

HIGHWAY INDIAN RESERVATION LANDS

2.1.1. Demographics and Socioeconomic Data

2.1.1.1. Population and Growth

The U.S. Census Bureau 5-Year Estimates

report the population for the tribe is 1,525

people*. Reno is the third largest County in

Nevada and the population estimated for 2019

was 255,601 people with a growth rate of

13.4% from '10-'19°. Washoe County had

471,519 residents and a growth rate of 11.9%

over the same time period®. The State of

Nevada estimated population for 2019 was

3,080,156 people and grew approximately

14.1% from 2010 to 20197.

The 2020 Census has come to a close, and

the Bureau is working hard to compile data

from the new census®.

Native American Housing Assistance and Self-

Determination Act (NAHASDA) 2018 data lists

the Native American population for the PLPTT

Reservation as 5,494 and Tribal enrollment as

2,747 members. Tribal population as

documented by the Tribal government is 1,300

and enrolled members is 2,288. The majority

of enrolled Tribal members reside on the

reservation, with approximately 12% of this

Table 2.1- Population Age Distribution

2015-2019 Estimated

Pyramid Lake Paiute Tribe, NV

Sex and Age Number

Total population 1,525

Male 743

Female 182

Under 5 years 104

5 to 9 years 63

10 to 14 years 85

15 to 19 years 47

20 to 24 years 85

25 to 34 years 289

35 to 44 years 145

45 to 54 years 180

55 to 59 years 163

60 to 64 years 112

65 to 74 years 133

75 to 84 years 96

85 years and over 23

Median age (years) 41.5

18 years and over 1,246

65 years and over 252

Source: US Census Bureau- 2015-2019

American Community Survey 5-Year Estimates?

membership residing in other areas. It is very important to update the Tribe’s population

data accurately with the NAHASDA office. These population numbers are what

calculate in the tribal shares funding distribution formula for the Tribal Transportation

Program.

Table 2.2- Profile of General Demographic Characteristics

Area 2010 2019 Population % Change

Nevada 2,700,551 3,080,156 14.1%

Washoe County 421,407 471,519 11.9%

County of Reno 225,221 255,601 13.4%

PLPT Reservation 1,360 1,525 12.1%

Source: US Census Bureau Data

4 https:/Avww.census.gov/tribal/?aianihh=3010

5 U.S. Census Bureau QuickFacts: Reno city, Nevada

6 U.S. Census Bureau QuickFacts: Washoe County, Nevada

7 https://www.census.gov/quickfacts/fact/table/renocitynevada,NV,washoecountynevada/PST045219?

8 https://www.census.gov/newsroom/press-releases/2020/update-2020-data-processing.html

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 18

2.1.1.2 Employment

Tribally owned enterprises contribute to the Tribal economy, as do federal grants.

Economic opportunities developed by the Tribe provide new jobs in the area, contribute

to the betterment of the local community, the Tribe and its members. The Tribe owns

and operates the Nixon Store, I-80 Smoke Shop, Big Bend RV Park, I-80 RV &

Campground, and lake camping and fishing opportunities to the public as Tribal

enterprises within the reservation area.

Table 2.4 - Employed Civilian Population

16 Years and Over 2019

Table 2.3 - Profile of Selected

Economic Characteristics 2019

Pyramid Lake Paiute Tribe, NV Pyramid Lake Paiute Tribe, NV

Employment Status Estimate Occupation Estimate

Population 16 years and over 1,270 Civilian employed population 16 years 678

In labor force 798 and over

Civilian labor force 798 Management, business, science, 114

Employed 678 and arts occupations

Unemployed 120 Service occupations 156

Armed Forces 0 Sales and office occupations 115

Not in labor force 472 Natural resources, construction, 123

TTErRIGaPETE REIS oe and maintenance occupations

. 0 . .

Source: US Census Bureau- 2015-2019 American Production, transportation, and 170

Community Survey 5-Year Estimates? material moving occupations

Source: US Census Bureau- 2015-2019 American

Community Survey 5-Year Estimates?

2.1.1.3 Title VI and Environmental Justice

Title VI of the Civil Rights Act of 1964 and related statutes ensure that individuals are

not subjected to discrimination on the basis of race, color, national origin, age, sex, or

disability. In February 1994, President Clinton signed Executive Order 12898, “Federal

Actions to Address Environmental Justice in Minority Populations and Low-Income

Populations.” The purpose of the order was to focus attention on the “environmental and

human health conditions in minority communities and low-income communities with the

goal of achieving environmental justice.” The Order does not supersede existing laws or

regulations; rather, it requires consideration and inclusion of these targeted populations

as mandated in previous legislation including:

e Title VI of the Civil Rights Act of 1964;

e National Environmental Policy Act of 1969 (NEPA);

e Section 309 of the Clean Air Act; and

e Freedom of Information Act.

The U.S. Department of Transportation issued its final order to implement the provisions

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 19

of Executive Order 12898 on April 15, 1997. This final order requires that information be

obtained concerning the race, color, or national origin, and income level of populations

served or affected by proposed programs, policies, and activities. It further requires that

steps be taken to avoid disproportionately high and adverse impacts on these

populations. One of the first steps in ensuring environmental justice is the identification

of those populations specifically targeted by the Order—minority and low-income

populations. According to the U.S. Census Bureau 2019 estimates, the racial

composition on the Pyramid Lake Paiute Tribe Reservation is predominantly American

Indian and Alaska Native (61%), White (31%) and Hispanic or Latino (%).

Table 2.5 - Racial Demographic Percentages in 2019

PLPT Reservation Washoe County, NV

Race Category Number Percent Number Percent

Total Population 1,525 100% 471,519 100.0%

White 472 31% 400,791 85.0%

Minority Populations

Black or African American 14 1% 14,146 3%

American Indian / Alaska Native 928 61% 9,430 2%

Asian 12 1% 28,291 6% |.

Native Hawaiian / Pacific Islander 37 2% - <0%

Some Other Race 15 1% - -%

Two or More Races 47 3% 18,389 4%

Hispanic (only) - -% - -%

Source: US Census Bureau- 2015-2019 American Community Survey 5-Year Estimates?

Source: US Census Bureau Demographic Profile Data 20194

Table 2.6 - Disadvantaged Populations in 2019

Total Minorit Total Female

Area Poe Population. Age GSrand:Older Housing Population

, Number | Percent | Number | Percent Units Number | Percent

a eccwvation 1,525 | 1139 | 69% | 252 | 165% | 668 782 | 51%

Coan 471,519 | 70,256 | 15% | 79,215 | 16.8% | 205,417 | 233,402 | 49.5%

Source: US Census Bureau- 2015-2019 American Community Survey 5-Year Estimates?

Source: US Census Bureau Demographic Profile Data 20194

The planned improvement projects are expected to improve the overall transportation

system of the study area and benefit the regional network. More detailed analysis will be

needed for individual design projects that are federally funded to ensure that there are not

disproportionately high and adverse impacts to disadvantaged or vulnerable populations.

yi

This section provides a brief overview of environmental conditions in the Study Area.

Environmental conditions should be considered in the development of

transportation alternatives.

Physical Characteristics

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 20

2.1.2.1. Topography and Soils

Elevations range from 3,820 feet at lake level to 8,182 feet at Tohakum Peak east of

Pyramid Lake. Washoe Lake (since diversion of the Truckee River a dry playa

moistened only by seasonal precipitation) is located on the eastern boundary of the

reservation and the Smoke Creek Desert lies to the northwest. Pyramid Lake still

receives water from the Truckee River, but its level has dropped nearly eighty feet since

the Derby Dam diversion was installed in 1905.

The Pyramid Lake Reservation has a semi-arid climate, with an annual precipitation

range of less than seven inches in the basins and up to eighteen inches in the

mountains. Most precipitation falls as snow in the mountains, providing stream runoff

with peak flow in early spring. Summers are dry, with very little rainfall in July and

August.

Soils in the study area are dynamic. Along the Truckee River prime farmland soil is

sandy loam which turns to sand further away from the river. Soils around Pyramid Lake

are typically fine sand which quickly gives way to very stony sandy loam in higher

elevations towards the mountains in the east, west and southwest.

Much of the rangeland on the reservation contains native plant communities consisting

of sagebrush, salt shrub and associated species depending on elevation and exposure.

The condition of the rangeland has been affected by periodic droughts and overgrazing,

in some places, by cattle and feral horses. Wildfires have also burned areas of the

reservation. The resulting vegetation is thus a mixture of the native perennial

herbaceous vegetation, and invasive species resulting from drought, wildfire, and

grazing.

Pyramid Lake is noted for its interesting tufa formations, which are formed when calcium

rich spring water comes into contact with the carbonates in the water of the lake. This

process formed the Pyramid attraction protruding out of the lake, which gives the lake

its name, is one of these geologic features. The reservation also contains several areas

of geothermal activity.

2.1.2.2 Visual Resources

The Pyramid Lake Indian Reservation is in a visually aesthetic area that attracts tourists

and should be maintained, protected, or enhanced. Many recreational visitors and

tourists value the nearby outdoor attractions. These activities range from fishing,

camping, hunting, kayaking, hiking and fun! Much of the economy on the Reservation is

centered around fishing and recreational activities at Pyramid Lake. The lake’s natural

beauty draws outdoor goers from the region, but the trophy Lahontan Cutthroat Trout

brings in many visitors from out of state. Travelers also take advantage of stunning

views by driving around Pyramid Lake, spending some time in a traditional tent style

Tribal campsite or camping in the Tribe’s RV Park.

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 21

Mountains run along the reservation boundary encompassing Pyramid Lake as seen

below in the panorama view. Interstate 80 (I-80) runs east and west across Nevada and

crosses over the southern tip of the reservation south of Wadsworth. I-80 provides

access for travelers from California, Oregon, Idaho, Utah and beyond to reach this

aesthetic destination.

Panorama looking east to Pyramid Lake

2.1.2.3 Air Quality

The Clean Air Act, which was last amended in 1990, requires the Environmental

Protection Agency (EPA) to set National Ambient Air Quality Standards (40 CFR part

50) for pollutants considered harmful to public health and the environment. The Clean

Air Act identifies two types of national ambient air quality standards. Primary

standards provide public health protection, including protecting the health of "sensitive"

populations such as asthmatics, children, and the elderly. Secondary

standards provide public welfare protection, including protection against decreased

visibility and damage to animals, crops, vegetation, and buildings.

The EPA has set National Ambient Air Quality Standards for six principal pollutants,

which are called “criteria” air pollutants. Periodically, the standards are reviewed and

may be revised. The current standards are listed below. Units of measure for the

standards are parts per million (ppm) by volume, parts per billion (ppb) by volume, and

micrograms per cubic meter of air (g/m’).9

The Pyramid Lake Paiute Reservation, County of Reno and Washoe County, NV are

NOT designated as a non-attainment area.

Table 2.7 - National Ambient Air Quality Standards Table

Pollutant Primary/ Averaging Level Form

7 Secondary Time — oe a

Gaon primary 8hours = QY9ppm __ Notto be exceeded

‘Monakide (CO) 1 hour 35 ppm more than once per

— #8... _ : i year

9 https://www.epa.gov/criteria-air-pollutants/naaqs-table

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 22

primary — Rolling 3 0.15 ug/m? ) Not to be exceeded

Lead (Pb) and month

ere secondary average ~ Se ee :

primary 1 hour 100 ppb 98th percentile of 1-

hour daily maximum

concentrations,

Nitrogen Dioxide averaged over 3 years

{NO2) primary 1 year 53 ppb () Annual Mean

and

: _ secondary

primary 8 hours 0.070 ppm °) Annual fourth-highest

and daily maximum 8-hour

ozone) secondary concentration,

as. Sent averaged over 3 years

PM2s5 primary 1 year 12.0 ug/ms annual mean,

averaged over 3 years

secondary 1 year 15.0 g/m? annual mean,

averaged over 3 years

Particle primary 24 hours 35 ug/m? 98th percentile,

Pollution and averaged over 3 years

(PM) __ secondary _ a

PM1o primary 24 hours 150 g/m? Not to be exceeded

and more than once per

secondary year on average over

3 years

primary 1 hour 75 ppb 4) 99th percentile of 1-

hour daily maximum

concentrations,

at - ei jis) es a ed Netaged Ovele years

secondary 3 hours 0.5 ppm Not to be exceeded

more than once per

eee (<1: aan

Sulfur Dioxide

(SO2)

(1) In areas designated nonattainment for the Pb standards prior to the promulgation of the current (2008)

standards, and for which implementation plans to attain or maintain the current (2008) standards have not

been submitted and approved, the previous standards (1.5 pg/m3 as a calendar quarter average) also

remain in effect.

(2) The level of the annual NO2 standard is 0.053 ppm. It is shown here in terms of ppb for the purposes

of clearer comparison to the 1-hour standard level.

(3) Final rule signed October 1, 2015, and effective December 28, 2015. The previous (2008) O3

standards additionally remain in effect in some areas. Revocation of the previous (2008) O3 standards

and transitioning to the current (2015) standards will be addressed in the implementation rule for the

current standards.

(4) The previous SO2 standards (0.14 ppm 24-hour and 0.03 ppm annual) will additionally remain in

effect in certain areas: (1) any area for which it is not yet 1 year since the effective date of designation

under the current (2010) standards, and (2)any area for which an implementation plan providing for

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 23

attainment of the current (2010) standard has not been submitted and approved and which is designated

nonattainment under the previous SO2 standards or is not meeting the requirements of a SIP call under

the previous SO2 standards (40 CFR 50.4(3)). A SIP call is an EPA action requiring a state to resubmit all

or part of its State Implementation Plan to demonstrate attainment of the required NAAQS.

2.1.2.4 Noise Impacts

For federally funded projects, a qualitative or quantitative noise analysis would need to

be conducted for the proposed transportation improvements to determine the nature

and extent of noise impacts.

2.1.2.5 Water Quality

At the most basic level, the health of our rivers depends on the health of upstream

waters. If a waterway is polluted, filled in, or otherwise compromised the stream network

will be adversely affected. That is why the Clean Water Rule protects our rivers as well

as their tributaries and wetlands.'°

An evaluation for the presence of potential jurisdictional waters of the U.S. was

conducted in the study area through a review of the EPA’s Clean Water Act approved

jurisdictional determinations mapping tool.'’ There are no jurisdictional determinations

as waters of the U.S. within Reservation Lands, but there are a few sites northwest of

Wadsworth which are described as wetland, spring, stream, river, pond or lake that only

exists for a short period.

Analysis of floodplains on or near the reservation were done by using the Federal

Emergency Management Agency (FEMA)- FEMA Flood Map tool.'? Searches revealed

Tribal lands are primarily outside the 0.2% annual (500-year) floodplain boundary.

Detailed information can be found on Flood Insurance Rate Map (FIRM) Number

32031C2950G. Regulatory floodways exist in and near Storey County within the

southern tip of the PLPT Reservation along the Truckee River near Interstate 80 and

detailed information can be found on FIRM Number 32029C0110D.

2.1.2.6 Biological Resources

The dominating plant community consists of sagebrush and salt shrub which are

sparsely scattered across the rangeland. Over the years the reservation has been

impacted by drought, over grazing (natural & domesticated) and wildfires resulting in a

mixture of new plant growth from native perennial herbaceous vegetation to invasive

species. A few of the larger animals you might see in this area are antelope, deer, elk,

wild horses, domestic cattle and sheep. Domesticated animal forage is sparse, so

ranchers grow alfalfa along the Truckee River where possible as a resource.

10 https:/Awww.americanrivers.org/2015/08/jurisdictional-waters-under-the-clean-water-act/

11 https://watersqeo.epa.gov/cwa/CWA-JDs/?searchText=nevada&pageNum=1#ijd/5080738

12 https://msc.fema.gov/portal/search#searchresultsanchor

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 24

Investigation into the PLPT’s biological resources was done through the U.S. Fish &

Wildlife Service (FWS) and the Nevada Fish and Wildlife Office online resources. The

FWS-IPaC (Information for Planning and Consultation) project planning tool revealed

there is one endangered species expected to occur on the Pyramid Lake Paiute

Reservation, but its habitat and wellbeing are closely monitored’’. There are no critical

habitats within the Study Area. The following table lists protected species in the Study

Area:

Table 2.8 — Threatened and Endangered Species within the LRTP Study Area

Group | Name Scientific Name Status

Birds Yellow-billed Cuckoo (Coccyzus americanus) Threatened

Fishes — | Cui-ui (Chasmistes cujus) Endangered

Fishes | Lahontan Cutthroat Trout | (Oncorhynchus clarkii henshawi) | Threatened

Source: FWS IPaC website"

Certain birds are protected under the Migratory Bird Treaty Act and the Bald and

Golden Eagle Protection Act. The Tribe should conduct specific environmental studies

during a transportation improvement project to follow appropriate regulations regarding

migratory birds.

Anaho Island

The prized National Wildlife Refuge called Anaho Island is located inside of Pyramid

Lake on the southeast side. The island is home to one of the largest nesting colonies of

American White Pelicans, over 10,000 birds, in the lower U.S.! The U.S. Fish and

Wildlife Service manages Anaho Island NWR under a Memorandum of Understanding

with the Pyramid Lake Paiute Tribe. Anaho Island has no mammalian predators and is

closed to the public, so it provides undisturbed breeding habitat for colonial nesting

birds such as American White Pelicans (Pelecanus erythrorhyncos), Double-crested

Cormorants (Phalacrocorax auritus), California Gulls (Larus californicus) and Great Blue

Herons (Ardea herodias)."4

Pyramid Lake is known as being North America’s most beautiful desert lake and home

to many year round recreational activities. Pyramid Lake was designated as the first

National Scenic Byway entirely on an Indian Reservation and has been recently named

Nevada's first Preserve America Tribal Community. The lake has no outlet and is a

residual body remaining from the prehistoric Great Lake Lahontan water body that

covered most of northwestern Nevada thousands of years ago. The lake is fed primarily

by the Truckee River and was named one of the best fisheries in the world by Fly

Fishing and Tying Journal in 2010. The lake is world renowned for its Lahontan

Cutthroat Trout and Cui-ui fish; Pyramid Lake is the only place on earth where the Cuiui can be found! The lake is also home to the Anaho Island National Wildlife Refuge,

which supports one of the largest breeding colonies of American white pelicans in North

America. The Paiute people call themselves Numu, or “The People”. Pyramid Lake

13 https://ecos.fws.gov/ipac/location/KTKWS3SVCZFY3KBSRIAL4STDKI/resources

14 About the Refuge - Anaho Island - U.S. Fish and Wildlife Service (fws.gov)

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 25

Paiutes are called Kooyooe Tukkadu or “Cui-ui Eaters’. Deeply grounded in their

environment, the Paiutes believe that power (pooha) resides in any natural object

including animals, plants, stones, water and geographical features. '°

Pyramid Lake is classified as a Mesotrophic, Monomictic, Hyposaline, Terminal Lake

Which is 27 miles long and 4-11 miles wide. Surface elevation is approximately 3,800 ft.

and its surface area is 172 miles*. The lake has a maximum depth of 330 ft. with a

volume of water totaling 21.39 million acre-feet over a 69 mile perimeter. Due to the

high salt content at 4.5 ppt this alkaline lake has a pH of 9.2. The average air

temperature in summer is 86° water 75°, and in the winter air temperature is around 45°

water 43°. Average annual precipitation is 7 inches, but drought is in the forecast for

2021. The lake turns over between December and February and the summertime bluegreen algae bloom occurs between July & September. There are 5 species of fish in the

Lake including the trophy Lahontan Cutthroat Trout, Sacramento Perch, Tui-chub,

Tahoe Sucker, and the endangered Cui-ui sucker fish. Trout spawning happens from

March through May at the lake in Sutcliffe and on the lower Truckee River. Cui-ui

spawning happens in April and typically runs through June in the lower Truckee River.'?

Lahontan National Fish Hatchery Complex

There are many fish hatcheries within the Study Area, but the Lahontan National Fish

Hatchery Complex is located outside of the reservation near southeast Lake Tahoe at

710 U.S. Hwy 395 N, Gardnerville, NV 89410. This facility manages the recovery

implementation for the endangered Cui-ui and the threatened Lahontan Cutthroat Trout

(LCT). The Complex maintains a brood stock of a unique genetic strain of Lahontan

cutthroat trout that represent the original lake form that evolved in ancient Lake

Lahontan.

Over a fifteen year period the Complex has carefully developed a stock of LCT from wild

fish collected at Pilot Peak. Throughout this process genetic diversity is carefully

maintained with each spawning fish individually marked, genetically analyzed and then

paired with the individual that will most preserve the unique genetics of this rare

lacustrine (lake form) of cutthroat trout. The resulting Pilot Peak strain, which grows 0.6

inches per month at the hatchery, is now in full production. This fish is also performing

well in Pyramid Lake, growing at a monthly rate of about one half inch per month, with

six year old fish reaching twenty four pounds in weight.

About 300,000 - 400,000 LCT are raised and released each year, all of which are

genetically monitored to ensure that the historical genetic legacy is preserved. The

Complex provides fish of all age classes in support of fishery management, recovery

activities as well as supporting recreational fishing. Currently the Lahontan National Fish

Hatchery produces fish for Pyramid Lake, Walker Lake, the Truckee River, Fallen Leaf

Lake and Marlette Reservoir. ,

Other work includes partnering with Tribal, federal and state agencies on watershed

connectivity, the National Fish Passage Program, river restoration, instream flow

15 PLPTT 20150819 FishingCampingBoating Regs Final.pdf (fws.gov)

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 26

development and fishery monitoring and management. Central to the program is the

ongoing partnerships with several Tribes, where we jointly work on fishery management

and river restoration within Tribal lands. We also collaborate with Universities to

continually refine our conservation and management strategies. The hatchery is open

for visitors from Monday through Friday between 8 AM and 3 PM."¢

Marble Bluff Fish Passage Facility (MBFP)

The Marble Bluff Fish Passage Facility aids in the spawning migration of cui-ui and LCT

from Pyramid Lake into the Truckee River. The MBFP is located inside Reservation

Lands near the end of the Truckee River approximately 3 miles upstream of Pyramid

Lake and northwest of Nixon. The facility consists of four major components: Marble

Bluff Dam, a fish lock (elevator), a fisnhway and a fish handling building. The fish lock is

a 40 foot deep chamber that fills with water and allows fish to migrate over the dam

without being lifted out of the water, similar to an elevator. The high-tech fish lock can

move as many as 2,000 cui-ui in 15 minutes and has been instrumental in the reestablishment of the cui-ui spawning migration from Pyramid Lake to the Truckee River.

Adults spend two to three weeks in the river and larvae drift back to the lake within three

weeks of hatching.

The facility was constructed in 1975 to reduce further erosion of the lower Truckee River

and to impound and divert water to the fishway to allow passage around the delta.

Without this facility, these fish are unable to access their old spawning grounds because

of the changes in the lake's elevation over the last century. During the cui-ui spawning

season, biologists are able to sample a small portion of the fish as they move through

the lock. They weigh, measure, determine the gender of the fish, and check for tags

before returning them to the river. This information helps biologists understand the

recovery needs of cui-ui and to assess their life history and populations trends.

Current activities at the facility include the development of an incubation system for LCT

eggs in the fish handling building. This system allows newly hatched trout to be raised in

and imprinted with water from the Truckee River. In 2007 (the first year of operation) the

incubation system produced approximately 28,400 Lahontan cutthroat trout fry, which

were stocked into upstream tributaries of the Truckee River. These LCT will return to

spawn in the Truckee River, help to reestablish the LCT within its historic habitat.

The Marble Bluff Fish Passage Facility is operated in partnership with the U.S. Bureau

of Reclamation and the Pyramid Lake Paiute Tribe. The Lahontan National Fish

Hatchery Complex operates and maintains the facility. The Bureau of Reclamation is

responsible for the maintenance of the fish lock and the dam. The Pyramid Lake Paiute

Tribe has land management responsibilities for Pyramid Lake and its surrounding area.

The facility is open to the public during the spawning season (March through early

June).17

Pyramid Lake Fisheries

16 Lahontan National Fish Hatchery Complex (fws.qov)

17 Lahontan National Fish Hatchery Complex (fws.gov)

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 27

The mission of Pyramid Lake Fisheries is to operate and maintain fishery facilities at

Pyramid Lake and the lower Truckee River for the purpose of enhancing Cui-ui and

Lahontan Cutthroat Trout populations, while creating a balance within natural resources

management actions, which reflects the social, cultural, economic, and natural resource

values of the Pyramid Lake Paiute people.

The goal of Pyramid Lake Fisheries is to maintain both a recreational and trophy fishery

for Lahontan Cutthroat Trout, while working collaboratively with partners to protect,

conserve, and restore aquatic resources, fish habitats, and water quality within the

Pyramid Lake - Truckee River watershed.

The role of Pyramid Lake Fisheries is to coordinate fish production of their hatcheries,

with the hatchery production of the US FWS facilities to maintain and enhance the fish

community of Pyramid Lake for the tribe and all our visitors.

Hatcheries

The Tribe has a complex of three different trout hatcheries and two hatcheries that

provide Cui-ui plants for the lower Truckee River. Every year the hatchery system

produces between 600,000-1,000,000 sub-catchable Lahontan Cutthroat Trout for

release into the lake and the river. The facilities are funded in part through federal

grants and partnerships with local government wildlife agencies to maintain top notch

hatcheries for Pyramid Lake and the Truckee River.'®

e Dunn Hatchery - Up to 400,000 trout eggs are incubated here in Sutcliffe

annually. The hatchery is also used as a training base for tribal members to gain

experience and education in fish husbandry.

e Koch Cui-ui Hatchery - Also in Sutcliffe is the hatchery for raising the endangered

Cui-ui to supplement the population in the lake.

e Numana Hatchery - This is the largest hatchery within the Pyramid Lake

Fisheries with a total fish cap of 20,000 pounds. Located 8 miles north of

Wadsworth, NV on Highway 447. Eggs taken at Lake Operations in the spring

are transported here and raised from fry to fingerling size before being

transported back to Sutcliffe for acclimation to the alkaline water of Pyramid

Lake. Up to 800,000 eggs are incubated here annually.

10 to 15 % of all fish raised here are tagged with either a coded-wire tag or an

injection of a bright colored plastic elastomer. Pyramid Lake Fisheries has

developed a portable fish tagging trailer that facilitates the tagging process.

These tags allow fisheries personnel to look at the performance of certain year

classes of fish and evaluate the success of different stocking strategies. Anglers

also help in this effort and retrieve noses from tagged fish, providing them to

biologist after a day of fishing at the lake.

18 Pyramid Lake Fisheries Departments - Hatcheries

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 28

e Big Bend Hatchery - This hatchery is located in Wadsworth along the Truckee

River. This facility was designed to raise LCT to the fingerling stage and then

plant them into the river. The hope is that the trout will imprint on the river water

and return to this area to spawn. In recent years, the Big Bend Facility was

converted for the incubation and release of Cui-ui to a wetland area along the

Truckee River, which allows larval Cui-ui to enter the river and migrate naturally

down to Pyramid Lake.

e Lake Operations - Lake Ops serves the important function of spawning Lahontan

Cutthroat Trout for each year’s production. The Lake Operations Facility (Lake

Ops) is located in Sutcliffe. Lake operations is primarily an acclimation facility.

Pyramid Lake is the source of water for Lake Ops with an intake pipeline that

runs east into Pyramid Lake that takes cold water from a depth of 50 feet. The

LCT are reared in freshwater in the hatcheries; they are then acclimated to the

more saline and alkaline lake water before being released into Pyramid Lake.

After being reared to a minimum size of 4 inches, Cutthroat trout are transferred

to Lake Ops for acclimation and stocking in the fall when water temperatures on

the shore are cool enough for trout survival.

In March, yearling cutthroat are placed into circular tanks. The outflow from these

tanks is diverted down a spawning channel to the lake. Mature fish key on the

scent of the juvenile, “attraction” fish and ascend the spawning channel where

they can be sorted for spawning. This is the high point of the year and a main

attraction for visitors. The fish entering the spawning channel are sorted by sex

and maturity. Weekly spawns take place from early April through May until the

annual production goal is met. On a normal year, Pyramid Lake Fisheries will

take up to 1.5 million eggs and rear 800,000 to 1 million trout for release."

The National Wetlands Inventory Mapper shows wetlands of interest occurring at

specific points along Pyramid Lake and the Truckee River within Reservation Lands."®

Freshwater emergent wetland habitat and freshwater forested/shrub wetland habitat are

primarily on the northwest side of the lake close to shore and where standing water can

occur. In and around Sutcliffe these same wetland features exist near the lake, but they

are spottier, more disconnected and smaller than the northwest areas. Wetlands stretch

along Hardscrabble Creek and Fish Hatchery Road, which run parallel to each other,

west of Sutcliffe. The riverine area is on the south end of the lake, 3 miles north of the

Marble Bluff Fish Passage Facility, northwest of Nixon.

2.1.2.7 Cultural Resources

Cultural resources reflect the heritage of local communities, states, and nations. As

transportation projects are developed, care must be taken to assure that cultural

resources on Tribal lands are protected. Legal requirements from the Native American

19 https://www.fws.gov/wetlands/data/Mapper.html

Pyramid Lake Paiute Tribe Long-Range Transportation Plan Page | 29

[OCR skipped on page(s) 31-85]

[Read from a scan; the first 30 pages.]

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

LONG-RANGE TRANSPORTATION PLAN (2021) | Frix