September 2026 Update

Long Range Transportation

Plan

Port Gamble S'Klallam Tribe

Prepared for:

Port Gamble S’Klallam Tribe

31912 Little Boston Road E

Kingston, WA 98346

Prepared by:

September 2026

KH 090225140

Copyright © Kimley-Horn and Associates, Inc.

September 2026 Update

for

Long Range Transportation Plan

Prepared for:

Port Gamble S’Klallam Tribe

31912 Little Boston Road E

Kingston, WA 98346

Prepared by:

Kimley-Horn and Associates, Inc.

2828 Colby Avenue

Suite 200

Everett, Washington 98201

(425) 708-8275

This document, together with the concepts and designs presented herein, as an instrument of

service, is intended only for the specific purpose and client for which it was prepared. Reuse of and

improper reliance on this document without written authorization and adaptation by Kimley-Horn

and Associates, Inc. shall be without liability to Kimley-Horn and Associates, Inc.

© September 2026

KH 090225140

Long Range Transportation Plan

September 2026 Update

September 2026

KH 090225140

T ABLE OF C ONTENTS

EXECUTIVE SUMMARY ............................................................................................................................... 1

Program Objectives ...................................................................................................................... 1

Program Goal................................................................................................................................. 1

Plan Recommendations ............................................................................................................... 1

1

COMMUNITY PROFILE......................................................................................................................... 2

1.1 Introduction .......................................................................................................................... 2

1.2 Scope of Study ...................................................................................................................... 2

1.3 Study Area ............................................................................................................................. 2

1.4 Tribal History ........................................................................................................................ 4

1.5 Tribal Government ............................................................................................................... 4

1.6 Climate ................................................................................................................................... 5

1.7 Demographics ...................................................................................................................... 6

1.8 Employment.......................................................................................................................... 7

1.9 Land Use ................................................................................................................................ 8

2

EXISTING TRANSPORTATION SYSTEM.................................................................................................16

2.1 Tribal Transportation Program ........................................................................................16

2.2 Transportation Inventory ..................................................................................................16

2.2.1

State Routes ...........................................................................................................43

2.2.2

County Routes .......................................................................................................44

2.2.3

BIA Routes ..............................................................................................................56

2.2.4

Tribal Roads ...........................................................................................................56

2.2.5

Commercial/Business Park Roads ......................................................................57

2.2.6

Bridges and Docks ................................................................................................57

2.2.7

Marine Access ........................................................................................................57

2.2.8

Non-motorized Facilities ......................................................................................58

2.2.9

Public Transit .........................................................................................................58

2.2.10 Shuttles, Vans, and Shared Rides........................................................................61

Long Range Transportation Plan

September 2026 Update

September 2026

Page i

KH 090225140

2.3 Collision History..................................................................................................................61

2.3.1

Collision Locations ................................................................................................61

2.3.2

Collision Severity ...................................................................................................63

2.3.3

Collision Type .........................................................................................................66

2.3.4

Fatal and Major Injury Collisions.........................................................................69

2.3.5

Collision Trends .....................................................................................................71

2.4 Existing Traffic Operations................................................................................................72

3

2.4.1

Analysis Parameters .............................................................................................72

2.4.2

Traffic Volumes ......................................................................................................72

2.4.3

Roadway Operations ............................................................................................73

2.4.4

Intersection Operations .......................................................................................76

FUTURE CONDITIONS .......................................................................................................................79

3.1 Future Land Use .................................................................................................................79

3.1.1

Housing Development..........................................................................................81

3.1.2

Tribal Government Center ...................................................................................81

3.1.3

Community Trails ..................................................................................................81

3.1.4

Expand Reservation ..............................................................................................82

3.2 Transportation Need Analysis ..........................................................................................87

3.2.1

Traffic Patterns ......................................................................................................87

3.2.2

Social and Economic Development ....................................................................87

3.2.3

Health and Safety ..................................................................................................89

3.2.4

Environmental Concerns......................................................................................89

3.2.5

Scenic Byways and Tourism.................................................................................89

3.2.6

Development and Protection of Natural Resources ........................................90

3.2.7

Energy Conservation.............................................................................................90

3.2.8

Integration with Land Use Planning ...................................................................90

3.3 Future Transportation Improvements ............................................................................90

3.3.1

Kitsap County Six-Year Transportation Improvement Program ....................91

3.3.2

WSDOT STIP ...........................................................................................................91

Long Range Transportation Plan

September 2026 Update

September 2026

Page ii

KH 090225140

3.3.3

WSDOT Route Development Plans .....................................................................91

3.3.4

The Olympic Region Financially Constrained 20-Year Mobility Strategies ...92

3.3.5

PGST Comprehensive Plan ..................................................................................92

3.4 Future Traffic Operations..................................................................................................93

3.4.1

Future Roadway Operations................................................................................94

3.4.2

Future Intersection Operations...........................................................................97

3.4.3

Future Improved Intersection Operations ........................................................99

3.5 Nonmotorized Element .................................................................................................. 101

4

TRANSPORTATION IMPROVEMENT PROGRAM ................................................................................. 103

4.1 Road Standards ............................................................................................................... 103

4.2 Prioritization of Needs.................................................................................................... 103

4.2.1

Balancing Safety and Capacity Needs ............................................................. 104

4.2.2

Criteria for Evaluating Priorities ....................................................................... 105

4.3 Short-Term Improvements ............................................................................................ 105

4.4 Long-Term Improvements ............................................................................................. 105

4.5 Tribal Transportation Improvement Program ............................................................ 106

5

FUNDING AND IMPLEMENTATION................................................................................................... 107

5.1 Federal-Aid Highway Program ...................................................................................... 107

5.2 Federal Lands Highway Program .................................................................................. 107

5.3 Tribal Transportation Program ..................................................................................... 107

5.4 State and Federal Funds ................................................................................................ 108

5.5 Kitsap County................................................................................................................... 108

5.6 Bureau of Indian Affairs ................................................................................................. 108

5.7 Port Gamble S’Klallam Tribe .......................................................................................... 109

6

RECOMMENDATIONS..................................................................................................................... 110

Long Range Transportation Plan

September 2026 Update

September 2026

Page iii

KH 090225140

L IST OF F IGURES

Figure 1-1: Aerial View of Port Gamble S’Klallam Reservation (July 2025) .................................. 3

Figure 1-2: Conceptual Master Plan.................................................................................................. 9

Figure 1-3: Forest Lands ...................................................................................................................10

Figure 1-4: Red Cedar Subdivision ..................................................................................................11

Figure 1-5: Business Park Master Plan ...........................................................................................12

Figure 1-6: Warrior Ridge Master Plan ...........................................................................................13

Figure 1-7: 2021 Warrior Ridge Dev Plan .......................................................................................13

Figure 1-8: Heronswood Master Plan .............................................................................................14

Figure 1-9: Administration Campus Redevelopment Project .....................................................15

Figure 1-10. Raccoon Town ..............................................................................................................15

Figure 2-1: Kitsap County Transportation Network .....................................................................55

Figure 2-2: Port Gamble S’Klallam Tribe Transportation Network .............................................56

Figure 2-3: Kitsap Transit Route #307 ............................................................................................58

Figure 2-4: Kitsap Transit Route #391 ............................................................................................59

Figure 2-5: Collision Heat Map ........................................................................................................62

Figure 2-6: Collision Severity Map ...................................................................................................65

Figure 2-7: Collision Type .................................................................................................................66

Figure 2-8: Top Collision Types ........................................................................................................67

Figure 2-9: Active Transportation Collisions ..................................................................................68

Figure 2-10: Fatal and Major Injury Collisions Map ......................................................................70

Figure 2-11: Collision Contributing Factors ...................................................................................71

Figure 2-12: Existing Weekday 2026 PM Peak Hour Volumes ....................................................74

Figure 3-1: 2018 Adopted Land Use Plans for Business Park, Warrior Ridge, and

Heronswood.......................................................................................................................................80

Figure 3-2: PGST Land Purchase 924 acres ...................................................................................85

Figure 3-3: Land Purchase 924 acres..............................................................................................86

Figure 3-4: Tribal Admin Campus Map ...........................................................................................88

Figure 3-5: Kitsap County Kingston 2026-2031 TIP.......................................................................91

Long Range Transportation Plan

September 2026 Update

September 2026

Page iv

KH 090225140

Figure 3-6: Future 2046 PM Peak Hour Volumes ..........................................................................98

Figure 3-7: Tribal Concept Trail Plan Map ................................................................................... 102

L IST OF T ABLES

Table 1-1: US Census 2024 “American Community Survey estimate” ......................................... 6

Table 1-2: Enrollment Population Projections ................................................................................ 7

Table 1-4: Employment Status........................................................................................................... 8

Table 2-1: Route Summary...............................................................................................................17

Table 2-2: Collision Severity .............................................................................................................63

Table 2-3: Key Intersection Collision Severity................................................................................63

Table 2-4: Key Intersection Collision Rates ....................................................................................64

Table 2-5: Fatal and Major Injury Summary ..................................................................................69

Table 2-6: Roadway Level of Service Criteria .................................................................................73

Table 2-7: Current Roadway Level of Service ................................................................................75

Table 2-8: Level of Service Criteria for Stop-Sign Controlled Intersections ..............................76

Table 2-9: Existing Roadway PM Peak Hour LOS - 2026 ..............................................................77

Table 3-1: Tribal Lands as of July 2025 ...........................................................................................82

Table 3-2: Projected Roadway LOS - 2036 .....................................................................................95

Table 3-3: Projected Roadway LOS - 2046 .....................................................................................96

Table 3-4: Projected Intersection PM Peak Hour LOS – 2036 and 2046....................................97

Table 3-5: Hansville Road at Little Boston Road - Projected Roundabout LOS - 2035 ............99

Table 3-6: Hansville Road at 288th Street - Projected Signal LOS – 2046 ...................................99

Table 3-7: Hansville Road at 288th Street - Projected Roundabout LOS - 2046 ..................... 100

Table 3-8: Hansville Road at SR-104 - Projected Roundabout LOS - 2046 ............................. 100

Table 4-1: PGST Priority List .......................................................................................................... 104

Long Range Transportation Plan

September 2026 Update

September 2026

Page v

KH 090225140

L IST OF A PPENDICES

TRIBAL TRANSPORTATION PROGRAM INVENTORY ..................................................................................... A

BUREAU OF INDIAN AFFAIRS FUNCTIONAL CLASSIFICATION ....................................................................... B

STATE HIGHWAY LOG .............................................................................................................................. C

COUNTY ROAD LOG AND COUNTY SIX-YEAR TIP ...................................................................................... D

TURNING MOVEMENT TRAFFIC COUNTS AND DIAGRAMS ........................................................................... E

CAPACITY ANALYSIS WORKSHEETS AND ROADWAY SEGMENT CALCULATIONS ............................................. F

2018 MASTER PLAN ............................................................................................................................... G

PORT GAMBLE S’KLALLAM TRIBE TRANSPORTATION IMPROVEMENT PROGRAM ......................................... H

Long Range Transportation Plan

September 2026 Update

September 2026

Page vi

KH 090225140

EXECUTIVE SUMMARY

The Long-Range Transportation Plan (LRTP) is prepared in order to plan, develop, and

maintain a public transportation network that serves the needs of the community. The

transportation network should complement the social and economic development goals of

the Port Gamble S’Klallam Tribe (PGST). In addition, the transportation network should

provide for the safe and efficient movement of Tribal members, goods, and services in the

community and throughout the region. The transportation program objectives and goals

are listed below:

Program Objectives

⚫

To identify and map key transportation routes, facilities, services, and needs

⚫

To provide safe and convenient public access within the Reservation

⚫

To prioritize transportation projects

⚫

To increase the effectiveness of local and regional transportation improvement

funding

⚫

To assist in the economic development of the Reservation

Program Goal

PGST’s goal is to develop and maintain a transportation network that safely and efficiently

provides access throughout the Reservation and provides links to the adjacent

transportation networks maintained by Kitsap County (County) and Washington State

(State) agencies. This update was prepared to address Tribal transportation issues,

develop strategies for multimodal transportation, and establish both short- and long-term

Transportation Improvement Programs (TIP). This LRTP is expected to be updated every

five years and look forward at a long-term 20-year program. The short-term TIP is reviewed

and approved by Tribal Council on an annual basis.

Plan Recommendations

The Plan recommends that the following actions be taken to meet the Plan objectives:

⚫

Adopt the LRTP by resolution

⚫

Maintain and update a National Tribal Transportation Program Facility Inventory

(NTTFI)

⚫

Maintain and update a TIP annually

⚫

Coordinate with local agencies and Tribal organizations

⚫

Prepare preliminary cost estimates/seek alternate funding

Long Range Transportation Plan

September 2026 Update

September 2026

Page 1

KH 090225140

1

COMMUNITY PROFILE

1.1

Introduction

PGST is one of two federally recognized tribes located in the Kitsap County area of

Washington State. PGST depends on a range of transportation facilities for access to

services such as housing, jobs, food, health care and social services, recreation, and

subsistence harvest and hunting. Access to these services and facilities depends upon a

network of existing roads including Tribal, Bureau of Indian Affairs (BIA), County, and State

routes as well as marine access via harbors, designated boat launches, and docks. Access

to services also depends upon a network of public, non-profit, and private services such as

public transit, vanpools, Tribal van services, and informal ridesharing. Together this system

of infrastructure and services provides transportation access for the Tribal community. The

health and welfare of Tribal members and the larger community as a whole is dependent

on a well-maintained and easily accessible transportation network.

A portion of this LRTP has been adopted from the PGST’s website, history book, and other

Tribal documents. Thank you to the staff who provided resources and time to review and

comment on the document’s accuracy.

1.2

Scope of Study

The key elements of this study address:

⚫

Roadway and intersection safety and capacity analysis for a 20-year forecast (2046)

⚫

Identification of Tribal transportation issues

⚫

Development of strategies for multi-modal transportation

⚫

Updating the existing inventory of the Port Gamble S’Klallam Reservation road

system, including County and State roads that provide critical access to the

Reservation

⚫

Prioritization of short-term and long-term transportation projects

⚫

Development of a Multi-Year TIP

1.3

Study Area

The Study Area covers the PGST Reservation (trust lands) and adjacent Tribal ownership.

The entire Reservation is in trust status. The Reservation in trust status comprises

approximately 1,707 acres in North Kitsap County, Washington, including adjacent

tidelands. The original trust lands were comprised of 1,230 acres of land and 67 acres of

Long Range Transportation Plan

September 2026 Update

September 2026

Page 2

KH 090225140

tidelands. In 2012, 390 acres of land purchased from the Washington State Department of

Natural Resources (DNR) was brought into trust status. In 2014, 20 acres of land purchased

from Pope Resources was brought into trust status. PGST owns an additional 61 acres of

Off-Reservation Trust Lands and an additional 1,300 acres of Off-Reservation Fee Lands.

These are located adjacent to the trust lands to the north, east, and south. Figure 1-1

shows the boundaries of the Reservation.

Figure 1-1: Aerial View of Port Gamble S’Klallam Reservation (July 2025)

Long Range Transportation Plan

September 2026 Update

September 2026

Page 3

KH 090225140

The transportation network serving PGST extends beyond the boundaries of the Study

Area to include County and State roads that provide access to jobs, housing, and essential

services.

1.4

Tribal History

The PGST Reservation is located on the Kitsap Peninsula in north Kitsap County,

Washington. The Reservation is home to the Port Gamble S'Klallam Tribe, one of at least 28

federally recognized tribes in the state. The peninsula is surrounded by salt water which

supports a large number of fish and shellfish species that have always supported PGST’s

way of life. The Reservation and local lands and waters have been heavily impacted by a

nearby former lumber mill that operated for over 150 years, heavy marine industrial

activities, and a local landfill.

It is well accepted that the S’Klallam people lived along the shores of Hood Canal and Port

Gamble Bay. This is confirmed by historic maps and documents from the first explorers

and founders of the town of Port Gamble. The western shores of Port Gamble Bay

harbored a S’Klallam village which was occupied by PGST prior to 1853, when the Pope &

Talbot timber mill began construction. The S’Klallam people were persuaded to move

across the bay to Point Julia, with promises of lumber for house construction, firewood,

and Christmas presents.

From 1853 to 1935, Point Julia was a Tribal village site with numerous wood homes, other

outbuildings, paths, and water systems. In 1935, the village site was deemed unsuitable for

habitation by the U.S. government and was burned down. The federal government finally

bought land from Pope & Talbot in 1938 to create what is now the Port Gamble S’Klallam

Reservation.

Much of the culture of the Native American people living on the Reservation is centered on

the shoreline environment. The shoreline is surrounded by mixed residential, commercial,

and industrial uses. Tribal members continue to rely on fish and shellfish from Port Gamble

Bay for their cultural and economic well-being, just as they have for many thousands of

years.

1.5

Tribal Government

The Port Gamble S’Klallam Tribe is a sovereign nation, which exercises full control over its

land and natural resources. The entire Reservation is owned by PGST; there is no individual

or private ownership of land on the Reservation. The Reservation was set aside for the

Long Range Transportation Plan

September 2026 Update

September 2026

Page 4

KH 090225140

exclusive use and benefit of the Port Gamble S'Klallam people in 1938 and has remained in

100% Tribal trust status since its inception.

PGST is a signatory to the Point No Point Treaty of 1855 with the United States Federal

Government. The Treaty set aside rights for tribes to continue access to their customary

fishing and hunting areas. Tribes retained aboriginal, treaty-protected rights to fish at usual

and accustomed grounds and to hunt and gather on all open and unclaimed lands. PGST

protects its natural resources on and off the Reservation through careful management and

enforcement.

A six-member Tribal Council was delegated legislative authority by the General Council and

actively governs PGST. In 1992, PGST became one of the first Self-Governance tribes in the

United States and has assumed control of its BIA and Indian Health Services (IHS)

programs. Under Self-Governance, PGST has been able to dramatically improve and

expand programs and services. Other "firsts" include the first Tribal Temporary Assistance

to Needy Families (TANF) program in Washington, the first TANF Tribe in the state to

operate a federally funded child support program, an award-winning health clinic, and an

acclaimed dental clinic.

1.6

Climate

The climate of Kitsap County is greatly tempered by winds from the Pacific Ocean.

Summers are warm but not hot, and winters are cool but not commonly freezing. Summers

are dry, but the rest of the year rains are frequent, especially late in fall and in the winter

season. The prevailing wind is from the south-southwest. In most winters one or more

storms bring strong and sometimes damaging winds. Some years the accompanying

rainfall causes serious flooding.

Kitsap County gets an average of 49 inches of rain per year. The US average is 37 inches.

Snowfall in Kitsap County is 7 inches. The average US city gets 25 inches of snow per year.

The number of days with any measurable precipitation in Kitsap County is 161.

On average, there are 153 sunny days per year in Kitsap County. The July high is around 75°

F with average summer temperatures of 62° F. The January low is 34° F with an average

winter temperature of 40° F. The comfort index, which is based on humidity during the hot

months, is 71 out of 100, where higher is more comfortable. The US average on the

comfort index is 44.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 5

KH 090225140

1.7

Demographics

PGST is located within the rapidly growing area of Central Puget Sound. The Reservation is

in a rapidly developing portion of Kitsap County located within the larger Puget Sound

region. As of 2025, Kitsap County had a population of approximately 283,374 according to

the US Census Bureau. The population is expected to grow to 303,528 by 2030 according to

the Washington State Office of Financial Management.

It is important to note that the availability of rental housing on the Reservation as well as

individual lot assignments on the Reservation play a significant role in Reservation

population. There are a number of families who live off the Reservation that would like to

move onto the Reservation, should housing become available. In the event that the rate of

housing construction on the Reservation increases, a significant jump in population is likely

to occur.

PGST is comprised of about 1,556 enrolled Tribal members as provided by the Tribal

Enrollment Office. Less than half of the Tribal members reside on the Reservation, along

with other Native Americans and non-Indians. The latest US Census information (2024

American Community Survey 5-Year Estimate) provides an estimate of total population and

a breakdown by age group on the Reservation:

Table 1-1: US Census 2024 “American Community Survey estimate”

Age Group Living on

No. of

Reservation

People

Under 20

176

20-24

39

25-34

81

35-44

70

45-54

85

55 & Over

173

TOTAL

624

Source: https://data.census.gov/table/ACSDP5Y2024.DP05?g=040XX00US53_160XX00US5355612

PGST is comprised of about 1,556 enrolled Tribal members as provided by the Tribal

Enrollment Office. Using a straight projection of 4.4% yearly growth rate, it is estimated that

by 2046, there will be an estimated 1,467 Reservation residents, 2,215 Tribal members

living off the Reservation for a total of approximately 3,681 total Tribal members,

summarized in Table 1-2.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 6

KH 090225140

Table 1-2: Enrollment Population Projections

Tribal Members Living on

Tribal Members Living off

Total Tribal

the Reservation

the Reservation

Members

2026

620

936

1,556

2031

769

1,161

1,930

2036

954

1,440

2,393

2041

1,183

1,786

2,968

2046

1,467

2,215

3,681

Year

Currently, approximately 40% of the Tribal members live on the Reservation. Reservation

population projection shown in PGST is comprised of about 1,556 enrolled Tribal members

as provided by the Tribal Enrollment Office. Using a straight projection of 4.4% yearly

growth rate, it is estimated that by 2046, there will be an estimated 1,467 Reservation

residents, 2,215 Tribal members living off the Reservation for a total of approximately

3,681 total Tribal members, summarized in Table 1-2.

Table 1-2 assumes that the current percentage of 40% stays constant through 2046. If

more than 40% of Tribal enrollment choose to live on the Reservation in the coming years,

the 2046 Reservation population estimate could be substantially higher.

The US Census American Community Survey estimate identified the median income on the

Reservation at $70,000 in 2024, which is $10,734 less than the national average. The

Washington state median household was $98,141 in 2024 and Kitsap County posted a

median income of $104,272 in 2025.

The U.S. Census Bureau “2024 American Community Survey 5-Year Estimates” identifies

that 20% of Reservation families live below the poverty line. This is more than one and a

half times the national average of 12.5%.

1.8

Employment

The Port Gamble area and the Reservation’s early enterprise centered on the timber and

fishing industries. Seasonal employment, scarce job opportunities, and the closure of

lumber mills have contributed to high unemployment rates. Fishing and shellfish is central

to PGST’s way of life from historic, cultural, and natural resource perspectives. A reduction

in salmon and other harvestable species has a disproportionately high impact on the

historical employment of Tribal members.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 7

KH 090225140

Major employers for Tribal members are Tribal government and its associated agencies,

individual treaty fishing enterprises, and local area businesses.

According to the Bureau of Labor Statistics, the April 2026 unemployment rate was 4.3%.

The Tribal unemployment rate was estimated to be 10.6% in 2024.

Table 1-3: Employment Status

Employment Status

2024 Estimate

Population 16 years and over

488

In labor force

283

Employed

252

Unemployed

30

Unemployment Rate

1.9

10.6%

Land Use

The majority of the Reservation is actively managed as forest land, with the remaining area

in residential, office, commercial, and other resource uses (See Figure 1-2 2007

Conceptual Master Plan). Approximately 870 acres are forest land, and 259 acres are

Riparian and Wildlife Reserve Areas (See Figure 1-3 Forest Land Use Classification). These

general land use designations were refined in 2018 with the adoption of three master

plans that provided more specific development guidance for the business park, Warrior

Ridge area, and Heronswood Gardens.

Reservation population is concentrated along the shoreline and clustered along the

southeastern and northwestern portions of the Reservation. All lands within the

Reservation are owned by PGST; there is no individual ownership within the Tribal

boundaries.

A designated Business Park area is located northwest of the Little Boston Road and

Hansville Road intersection. Gliding Eagle Market and Gas Station is located at this corner.

The Point Casino (Casino), an expanded Tribal casino, was built in 2013, and a new 94-room

associated hotel was added in 2016. Access to the Casino/hotel is from Hansville Road to

Salish Lane.

In 2016, the old wastewater treatment facility off of Little Boston Road NE was demolished

and a new one was constructed in the business park area behind (west of) the Casino and

hotel.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 8

KH 090225140

Figure 1-2: Conceptual Master Plan

Long Range Transportation Plan

September 2026 Update

September 2026

Page 9

KH 090225140

Figure 1-3: Forest Lands

Long Range Transportation Plan

September 2026 Update

September 2026

Page 10

KH 090225140

As of 2026, there are several new developments in various stages of construction.

Red Cedar Subdivision (Also known as “East Salmonberries”) is a planned 29-lot residential

subdivision under construction on Little Boston Road NE. The roadway and utilities are

installed and units are under construction by individual Tribal members (Figure 1-4).

Figure 1-4: Red Cedar Subdivision

Long Range Transportation Plan

September 2026 Update

September 2026

Page 11

KH 090225140

A Tribal Business Park is planned for the old “Ravenwood” site adjacent to the Gliding

Eagle store. Kickoff meetings to begin architecture and engineering for the business park

are scheduled for early March 2021 (Figure 1-5).

Figure 1-5: Business Park Master Plan

A new development on Warrior Ridge (“DNR land purchase”) is in progress. Phases 1 and 2

of the anticipated ten phases have been completed for the project as of the date of this

document and 37 single family housing units, four apartment buildings, and four duplexes

have been constructed. A new road system is also planned for Warrior Ridge, detailed in

the Warrior Ridge Master Plan (2018), which will provide an alternative connection from

Little Boston Road NE down to NE 228th Street (Figure 1-6 & Figure 1-7). This roadway

system will be multi-use and publicly accessible. The planned roadways may help improve

circulation and increase roadway capacity within the Reservation.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 12

KH 090225140

Figure 1-6: Warrior Ridge Master Plan

Figure 1-7: 2021 Warrior Ridge Dev Plan

Long Range Transportation Plan

September 2026 Update

September 2026

Page 13

KH 090225140

A new development at Heronswood is in progress. The project includes development of a

new access road, conference/wedding center and upgraded electrical, water, and sewer

service (Figure 1-8) Construction has yet to start as of the date on this report.

Figure 1-8: Heronswood Master Plan

Long Range Transportation Plan

September 2026 Update

September 2026

Page 14

KH 090225140

As of early 2026, the PGST Administration Campus Redevelopment Project is in the

planning phase and will include a new administration building, gym, community center, a

subterranean garage, parking lot, and open space amenities (Figure 1-9).

Figure 1-9: Administration Campus Redevelopment Project

A new residential development known as High-Kwh-S-Tah-Wn or Raccoon Town is

currently beginning construction and is anticipated to be finished by the end of 2026. When

completed, Raccoon Town will include 39 new residential lots.

Figure 1-10. Raccoon Town

Long Range Transportation Plan

September 2026 Update

September 2026

Page 15

KH 090225140

2

EXISTING TRANSPORTATION SYSTEM

2.1

Tribal Transportation Program

The Tribal Transportation Program (TTP) was established in 23 U.S.C. 202 to address the

transportation needs of Tribal communities. The stated purpose of the program is to

provide adequate and safe transportation and public road access to and within Indian and

Native Alaskan communities. The prime objectives of the program are to contribute to the

economic development, self-determination, and employment of Indians and Native

Americans.

Implementation of the TTP is under the Infrastructure Investment and Jobs Act (IIJA) Moving

Ahead for Progress in the 21st Century Act (MAP-21) (P.L. 117-58). IIJA provides TTP funding

through 2026. IIJA is administered by the Federal Highway Administration (FHWA). The IIJA

retains the statutory formula from MAP-21 as follows:

⚫

27% of funding based on PGST’s approved road mileage

⚫

39% of funding based on PGST’s most recent Native American Housing Assistance

and Self Determination Act (NAHASDA) population

⚫

34% of funding based on PGST’s Relative Need Distribution Factor (RNDF) and

Population Adjustment Factor (PAF) amounts from FY05 to FY12

TTP funds are 100% federal share. They may be used to satisfy local match requirements

on construction projects. The transportation planning requirements of the TTP Program

continue under the TTP. Funds must be expended on projects and activities identified on a

federally approved TIP. Road inventory will continue to be a major part of the

transportation planning, as it still accounts for 27% of the federal share of funds.

2.2

Transportation Inventory

The Transportation Network is made up of State, County, BIA, and Tribal roads and

bridges. Roads provide access to residential housing, recreation activities, commercial

enterprises, jobs, shopping, hospitals, and other essential services. Roads also provide

access to pedestrian and bicycle transportation facilities; public transportation and Tribal

transportation; and boat ramps, providing a link to marine access which is critical to

fishermen, shellfish harvesters, and other commercial and subsistence marine related

activities.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 16

KH 090225140

Table 2-1: Route Summary

Route

1

2

Section

10

10

Name

HOOD CANAL

DRIVE

POINT JULIA ROAD

Length

Ownership

0.4

0.3

BIA

BIA

BOAT RAMP

2

20

ACCESS-POINT

0.0

BIA

JULIA ROAD

2

30

3

10

3

20

POINT JULIA ROAD

TRIBAL CENTER

ROAD

TRIBAL CENTER

ROAD

0.1

BIA

Class

Construction

Need

Rural

BIA

Major

Improvement

Arterial

Needed

Rural

BIA

Major

Improvement

Arterial

Needed

Rural Local

Road

Rural Local

Road

BIA

Improvement

Needed

BIA

Improvement

Needed

0.1

BIA

Residential

Acceptable

0.1

BIA

Residential

Improvement

BIA

Needed

TRIBAL CENTER

3

30

ROAD PARKING

0.1

BIA

Other

Acceptable

LOT

BIA

4

10

CHURCH LANE

0.1

BIA

Residential

Improvement

Needed

BIA

4

20

CHURCH LANE

0.1

BIA

Residential

Improvement

Needed

5

5

10

20

S'KALLAM HILL

LANE

S'KALLAM HILL

LANE

BIA

0.1

BIA

Residential

Improvement

Needed

BIA

0.1

BIA

Residential

Improvement

Needed

BIA

6

10

IRONWOOD LANE

0.1

BIA

Residential

Improvement

Needed

Long Range Transportation Plan

September 2026 Update

September 2026

Page 17

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction

Need

BIA

7

10

TYEE LANE

0.1

BIA

Residential

Improvement

Needed

8

9

10

10

10

10

CUBBY SPARKS

PLACE

SALMON BERRIES

LANE

BOSTON LANE

CUL-DE-SAC

BIA

0.1

BIA

Residential

Improvement

Needed

BIA

0.1

BIA

Residential

Improvement

Needed

BIA

0.1

BIA

Residential

Improvement

Needed

BIA

11

10

BOSTON LANE

0.1

BIA

Residential

Improvement

Needed

Other

12

10

GLIDING EAGLE

0.1

Tribal

Residential

Improvement

Needed

12

15

GLIDING EAGLE

0.1

Tribal

Residential

Proposed

Road

Other

12

20

GLIDING EAGLE

0.1

Tribal

Other

Improvement

Needed

13

13

13

14

15

10

20

30

10

10

FUTURE ROAD

FUTURE ROAD

FUTURE ROAD

KWAYACHEN

COURT

BUD PURSER LANE

0.6

0.3

0.3

BIA

BIA

BIA

Major

Improvement

Arterial

Needed

Rural

BIA

Major

Improvement

Arterial

Needed

Rural

BIA

Major

Improvement

Arterial

Needed

BIA

0.1

BIA

Residential

Improvement

Needed

0.6

Long Range Transportation Plan

September 2026 Update

BIA

Rural

BIA

Residential

Acceptable

September 2026

Page 18

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction

Need

BIA

16

10

BEAR RIDGE DRIVE

0.2

BIA

Residential

Improvement

Needed

BIA

17

10

BEAR RIDGE

0.1

BIA

Residential

Improvement

Needed

BIA

18

10

SALISH LOOP

0.2

BIA

Residential

Improvement

Needed

Proposed

18

20

SALISH LOOP

0.1

BIA

Residential

19

10

SALISH LANE

0.1

BIA

Residential

Acceptable

20

10

RAVEN WOOD

0.5

BIA

Residential

Improvement

Road

BIA

Needed

BIA

21

10

EAGLEWOOD

0.1

BIA

Residential

Improvement

Needed

22

23

10

10

KLOOMACHIN

PLACE NE

HOOD CANAL

LANE

0.2

BIA

0.4

BIA

FUTURE ROAD

0.5

BIA

25

20

FUTURE ROAD

0.3

BIA

30

30

20

30

FUTURE ROAD

FUTURE ROAD

FUTURE ROAD

0.1

0.1

0.2

Long Range Transportation Plan

September 2026 Update

Residential

Improvement

Needed

10

10

Acceptable

BIA

25

30

Residential

BIA

BIA

BIA

Rural Local

Proposed

Road

Road

Rural Local

Proposed

Road

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

September 2026

Page 19

KH 090225140

Route

31

31

40

100

100

Section

10

20

10

10

20

Name

FUTURE ROAD

FUTURE ROAD

FUTURE ROAD

NE BOSTON LANE

NE BOSTON LANE

Length

Ownership

0.1

0.1

0.4

0.2

0.4

BIA

BIA

BIA

BIA

BIA

Class

Rural Local

Road

Rural Local

Road

Rural Local

Road

Construction

Need

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Rural

BIA

Major

Improvement

Arterial

Needed

Rural

BIA

Major

Improvement

Arterial

Needed

BIA

100

30

NE BOSTON LANE

0.1

BIA

Residential

Improvement

Needed

110

200

300

10

10

10

400

10

500

10

TIDEWINDS LOOP

SANITATION

ACCESS

NOO-KAYET

BUSINESS PARK

WARRIOR RIDGE

ROAD

HERONSWOOD

ROAD

0.1

0.2

BIA

BIA

Rural Local

Proposed

Road

Road

Rural Local

Road

Rural

0.5

Tribal

Minor

Arterial

0.1

Tribal

Residential

0.3

Tribal

Residential

BIA

Improvement

Needed

Proposed

Road

Proposed

Road

Proposed

Road

Substandard

1170

10

SEABECK

HIGHWAY NW

0.2

County

City Minor

With No

Arterial

Improvement

Planned

1170

20

SEABECK

HIGHWAY NW

Rural

1.6

Minor

Arterial

Long Range Transportation Plan

September 2026 Update

County

Substandard

With No

Improvement

Planned

September 2026

Page 20

KH 090225140

Route

1170

1170

1170

1170

1170

1170

1170

1342

1342

Section

30

40

50

60

70

80

90

10

20

Name

SEABECK

HIGHWAY NW

SEABECK

HIGHWAY NW

SEABECK

HIGHWAY NW

SEABECK

HIGHWAY NW

SEABECK

HIGHWAY NW

SEABECK

HIGHWAY NW

SEABECK

HIGHWAY NW

NEWBERRY HILL

ROAD NW

NEWBERRY HILL

ROAD NW

Length

Ownership

Rural

1.2

County

Minor

Arterial

Rural

1.8

County

Minor

Arterial

Rural

0.2

County

Minor

Arterial

Rural

1.7

County

Minor

Arterial

Rural

0.7

County

Minor

Arterial

Rural

0.9

County

Minor

Arterial

Rural

1.7

County

Minor

Arterial

Rural

1.7

County

Minor

Arterial

Rural

0.5

County

Minor

Arterial

Long Range Transportation Plan

September 2026 Update

Class

Construction

Need

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

September 2026

Page 21

KH 090225140

Route

1342

1342

1342

1342

1354

1354

1354

1354

1354

Section

30

40

50

60

10

20

30

40

50

Name

NEWBERRY HILL

ROAD NW

NEWBERRY HILL

ROAD NW

NEWBERRY HILL

ROAD NW

NEWBERRY HILL

ROAD NW

ANDERSON HILL

ROAD NW

ANDERSON HILL

ROAD NW

ANDERSON HILL

ROAD NW

ANDERSON HILL

ROAD NW

ANDERSON HILL

ROAD NW

Length

Ownership

Rural

0.5

County

Minor

Arterial

Rural

0.1

County

Minor

Arterial

Rural

0.2

County

Minor

Arterial

Rural

0.3

County

Minor

Arterial

Rural

1.1

County

Major

Arterial

Rural

1.6

County

Major

Arterial

Rural

0.5

County

Major

Arterial

Rural

0.2

County

Major

Arterial

Rural

0.6

County

Major

Arterial

Long Range Transportation Plan

September 2026 Update

Class

Construction

Need

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

September 2026

Page 22

KH 090225140

Route

1354

1354

Section

60

70

Name

ANDERSON HILL

ROAD NW

ANDERSON HILL

ROAD NW

Length

Ownership

Class

Rural

0.3

County

Major

Arterial

Rural

0.3

County

Major

Arterial

Construction

Need

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

1951

10

SILVERDALE WAY

NW

0.7

County

Major

With No

Arterial

Improvement

Planned

Substandard

1951

20

SILVERDALE WAY

NW

0.2

County

Major

With No

Arterial

Improvement

Planned

Substandard

1951

30

SILVERDALE WAY

NW

0.2

County

Major

With No

Arterial

Improvement

Planned

Substandard

1951

40

SILVERDALE WAY

NW

0.3

County

Major

With No

Arterial

Improvement

Planned

Substandard

1951

50

SILVERDALE WAY

NW

0.4

County

Major

With No

Arterial

Improvement

Planned

Substandard

1951

60

SILVERDALE WAY

NW

0.3

County

Major

With No

Arterial

Improvement

Planned

Substandard

1951

70

SILVERDALE WAY

NW

0.7

County

Major

With No

Arterial

Improvement

Planned

1951

80

SILVERDALE WAY

NW

0.8

Long Range Transportation Plan

September 2026 Update

County

Major

Substandard

Arterial

With No

September 2026

Page 23

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction

Need

Improvement

Planned

Substandard

1951

90

SILVERDALE WAY

NW

0.8

County

Major

With No

Arterial

Improvement

Planned

Substandard

1951

100

SILVERDALE WAY

NW

0.5

County

Major

With No

Arterial

Improvement

Planned

Substandard

1951

110

SILVERDALE WAY

NW

0.2

County

Major

With No

Arterial

Improvement

Planned

2001

2001

2001

2001

2001

2001

2001

2001

10

20

30

40

50

60

70

80

FOREST ROAD BR1

FOREST ROAD BR2

FOREST ROAD BR3

FOREST ROAD BR4

FOREST ROAD BR5

FOREST ROAD BR6

FOREST ROAD BR7

FOREST ROAD BR8

1.7

0.1

0.3

0.1

0.1

0.1

0.2

0.1

Long Range Transportation Plan

September 2026 Update

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

September 2026

Page 24

KH 090225140

Route

2001

2001

2001

2001

2001

2001

2002

2003

2003

2003

2003

2004

Section

90

100

110

120

130

140

10

10

20

30

40

10

Name

FOREST ROAD BR9

FOREST ROAD

BR10

FOREST ROAD

BR11

FOREST ROAD

BR12

FOREST ROAD

BR13

FOREST ROAD

BR14

FOREST ROAD BR2

FOREST ROAD BR3

FOREST ROAD BR4

FOREST ROAD BR5

FOREST ROAD BR6

FOREST ROAD BR4

Length

Ownership

0.1

0.3

0.1

0.1

0.1

0.1

0.2

0.6

0.2

0.1

0.1

0.4

Long Range Transportation Plan

September 2026 Update

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Class

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Construction

Need

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

September 2026

Page 25

KH 090225140

Route

2004

2005

2006

2006

2006

2007

2007

2007

2007

2008

2008

2008

Section

20

10

10

20

30

10

20

30

40

10

20

30

Name

FOREST ROAD BR4

FOREST ROAD BR5

FOREST ROAD BR6

FOREST ROAD BR6

FOREST ROAD BR6

FOREST ROAD BR7

FOREST ROAD BR7

FOREST ROAD BR7

FOREST ROAD BR7

FOREST ROAD BR8

FOREST ROAD BR8

FOREST ROAD BR8

Length

Ownership

0.1

0.3

0.4

0.1

0.4

1.0

0.1

0.1

0.1

0.5

0.1

0.1

Long Range Transportation Plan

September 2026 Update

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Class

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Construction

Need

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

September 2026

Page 26

KH 090225140

Route

2008

2008

2008

2009

2009

2010

2011

Section

40

50

60

10

20

10

10

3001

10

3001

20

3002

3002

10

20

Name

FOREST ROAD BR8

FOREST ROAD BR8

FOREST ROAD BR8

FOREST ROAD BR9

FOREST ROAD BR9

FOREST ROAD

BR10

FOREST ROAD

BR11

GLIDING EAGLE

TRAIL 3001

GLIDING EAGLE

TRAIL 3001

GLIDING EAGLE

TRAIL 3002

GLIDING EAGLE

TRAIL 3002

Length

Ownership

0.1

0.1

0.1

0.3

0.2

0.4

0.4

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Tribal

Class

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

0.3

Tribal

Non-Road

0.4

Tribal

Non-Road

30

TRAIL PEDESTRIAN

0.3

Tribal

Non-Road

40

GLIDING EAGLE

TRAIL 3002

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Proposed

Road

Proposed

Road

Improvement

BIA

0.9

Tribal

Non-Road

Improvement

Needed

0.0

Tribal

Non-Road

1.1

Tribal

Non-Road

Long Range Transportation Plan

September 2026 Update

Other

Needed

BRIDGE

3002

Need

Other

GLIDING EAGLE

3002

Construction

Proposed

Road

Proposed

Road

September 2026

Page 27

KH 090225140

Route

3002

Section

50

3003

10

3004

10

Name

CAMPUS

SIDEWALK

GLIDING EAGLE

TRAIL 3003

GLIDING EAGLE

TRAIL 3004

Length

Ownership

Class

Construction

Need

BIA

0.2

BIA

Non-Road

Improvement

Needed

1.6

Tribal

Non-Road

0.2

Tribal

Non-Road

Proposed

Road

Proposed

Road

Substandard

5527

10

TRACYTON

BOULEVARD NW

0.4

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5527

20

TRACYTON

BOULEVARD NW

0.3

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5527

30

TRACYTON

BOULEVARD NW

0.5

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5527

40

TRACYTON

BOULEVARD NW

0.9

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5527

50

TRACYTON

BOULEVARD NW

0.4

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5527

60

TRACYTON

BOULEVARD NW

1.0

County

City Minor

With No

Arterial

Improvement

Planned

5729

5729

10

20

BROWNSVILLE

HIGHWAY NE

BROWNSVILLE

HIGHWAY NE

0.4

0.7

Long Range Transportation Plan

September 2026 Update

County

County

City Minor

Arterial

City Minor

Arterial

Other

Improvement

Needed

Other

Improvement

Needed

September 2026

Page 28

KH 090225140

Route

5729

5729

5729

5729

5729

5729

5772

5772

5772

5772

Section

30

40

50

60

70

80

10

20

30

40

Name

BROWNSVILLE

HIGHWAY NE

BROWNSVILLE

HIGHWAY NE

BROWNSVILLE

HIGHWAY NE

BROWNSVILLE

HIGHWAY NE

BROWNSVILLE

HIGHWAY NE

BROWNSVILLE

HIGHWAY NE

MYHRE ROAD NW

MYHRE ROAD NW

MYHRE ROAD NW

MYHRE ROAD NW

Length

Ownership

0.2

0.1

0.6

0.5

1.4

0.7

0.2

0.6

0.2

0.1

County

County

County

County

County

County

County

County

County

County

Class

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City

Collector

Construction

Need

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Substandard

5774

10

BUCKLIN HILL

ROAD NW

0.3

County

Major

With No

Arterial

Improvement

Planned

Substandard

5774

20

BUCKLIN HILL

ROAD NW

0.3

County

Major

With No

Arterial

Improvement

Planned

Long Range Transportation Plan

September 2026 Update

September 2026

Page 29

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction

Need

Substandard

5774

30

BUCKLIN HILL

ROAD NW

0.2

County

Major

With No

Arterial

Improvement

Planned

Substandard

5774

40

BUCKLIN HILL

ROAD NW

0.3

County

Major

With No

Arterial

Improvement

Planned

Substandard

5774

50

BUCKLIN HILL

ROAD NW

0.6

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5774

60

BUCKLIN HILL

ROAD NW

0.7

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5905

10

CENTRAL VALLEY

ROAD NW

0.6

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5905

20

CENTRAL VALLEY

ROAD NW

0.5

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5905

30

CENTRAL VALLEY

ROAD NW

0.3

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5905

40

CENTRAL VALLEY

ROAD NW

0.6

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5905

50

CENTRAL VALLEY

ROAD NW

0.5

County

City Minor

With No

Arterial

Improvement

Planned

5905

60

CENTRAL VALLEY

ROAD NW

0.2

Long Range Transportation Plan

September 2026 Update

County

City Minor

Substandard

Arterial

With No

September 2026

Page 30

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction

Need

Improvement

Planned

Substandard

5905

70

CENTRAL VALLEY

ROAD NW

1.1

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5905

80

CENTRAL VALLEY

ROAD NW

1.5

County

City Minor

With No

Arterial

Improvement

Planned

Substandard

5905

90

CENTRAL VALLEY

ROAD NW

1.1

County

City Minor

With No

Arterial

Improvement

Planned

5970

5970

7037

7037

7037

7037

7037

10

20

10

20

30

40

50

SCANDIA ROAD

NW

SCANDIA ROAD

NW

MILLER BAY ROAD

NE

MILLER BAY ROAD

NE

MILLER BAY ROAD

NE

MILLER BAY ROAD

NE

MILLER BAY ROAD

NE

0.4

0.7

County

Collector

City

Collector

Rural

2.2

County

Major

Arterial

0.1

0.3

0.1

0.7

Long Range Transportation Plan

September 2026 Update

County

City

County

County

County

County

Other

Improvement

Needed

Other

Improvement

Needed

Substandard

With No

Improvement

Planned

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

September 2026

Page 31

KH 090225140

Route

7037

7037

7037

7040

7040

7040

7040

7040

7040

7040

7040

7040

Section

60

70

80

10

20

30

40

50

60

70

80

90

Name

MILLER BAY ROAD

NE

MILLER BAY ROAD

NE

MILLER BAY ROAD

NE

HANSVILLE ROAD

(KITSAP COUNTY)

HANSVILLE ROAD

(KITSAP COUNTY)

HANSVILLE ROAD

(KITSAP COUNTY)

HANSVILLE ROAD

(KITSAP COUNTY)

HANSVILLE ROAD

(KITSAP COUNTY)

HANSVILLE ROAD

(KITSAP COUNTY)

HANSVILLE ROAD

(KITSAP COUNTY)

HANSVILLE ROAD

(KITSAP COUNTY)

HANSVILLE ROAD

(KITSAP COUNTY)

Length

Ownership

0.2

0.9

0.8

1.9

0.4

0.1

0.3

0.1

1.3

0.2

2.0

1.2

Long Range Transportation Plan

September 2026 Update

County

County

County

County

County

County

County

County

County

County

County

County

Class

Construction

Need

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

Rural

Other

Minor

Improvement

Arterial

Needed

September 2026

Page 32

KH 090225140

Route

7165

7165

7250

7250

7319

Section

10

20

10

20

10

Name

STOTTLEMEYER

ROAD NE

STOTTLEMEYER

ROAD NE

BIG VALLEY ROAD

NE

BIG VALLEY ROAD

NE

NE DELANEY

ROAD

Length

Ownership

1.4

1.8

2.4

2.4

0.3

County

County

County

County

County

Class

Construction

Need

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local

Road

Other

Improvement

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local

Road

Other

Improvement

Needed

Substandard

7420

10

VIKING WAY NW

0.8

County

Major

With No

Arterial

Improvement

Planned

Substandard

7420

20

VIKING WAY NW

0.1

County

Major

With No

Arterial

Improvement

Planned

Substandard

7420

30

VIKING WAY NW

1.2

County

Major

With No

Arterial

Improvement

Planned

7441

7466

7466

10

10

20

LITTLE VALLEY

ROAD NE

GUNDERSON

ROAD NE

GUNDERSON

ROAD NE

0.3

1.3

1.0

Long Range Transportation Plan

September 2026 Update

County

County

County

City

Collector

Other

Improvement

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

September 2026

Page 33

KH 090225140

Route

7466

7479

7479

7479

7521

7715

7715

7715

7715

7726

7726

7726

Section

30

10

20

30

10

10

20

30

40

10

20

30

Name

GUNDERSON

ROAD NE

PORT GAMBLE

ROAD NE

PORT GAMBLE

ROAD NE

PORT GAMBLE

ROAD NE

HIGHLAND ROAD

NE

LINCOLN ROAD

NE

LINCOLN ROAD

NE

LINCOLN ROAD

NE

LINCOLN ROAD

NE

NW PIONEER HILL

ROAD

NW PIONEER HILL

ROAD

NW PIONEER HILL

ROAD

Length

Ownership

0.1

1.3

2.8

1.3

1.1

1.1

0.2

0.3

0.3

0.5

0.2

0.7

Long Range Transportation Plan

September 2026 Update

County

County

County

County

County

County

County

County

County

County

County

County

Class

Construction

Need

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

City Minor

Arterial

City

Collector

Rural Local

Road

Rural Local

Road

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

September 2026

Page 34

KH 090225140

Route

7765

7765

7822

7822

7822

7822

7852

7855

7858

7889

7903

7963

Section

10

20

10

20

30

40

10

10

10

10

10

10

Name

WAGHORN ROAD

NW

WAGHORN ROAD

NW

PIONEER WAY NW

PIONEER WAY NW

PIONEER WAY NW

PIONEER WAY NW

WESLEY WAY NW

PARK STREET NW

FERRY STREET NW

FALKNER ROAD NE

BEACH DRIVE NE

WHITFORD ROAD

NE

Length

Ownership

0.5

0.6

0.7

0.9

0.1

0.5

0.3

0.1

0.1

0.7

0.8

0.2

Long Range Transportation Plan

September 2026 Update

County

County

County

County

County

County

County

County

County

County

County

County

Class

Rural Local

Road

Rural Local

Road

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City Minor

Arterial

City

Collector

City

Collector

City

Collector

City

Collector

City

Collector

Rural Local

Road

Construction

Need

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

September 2026

Page 35

KH 090225140

Route

7966

8163

8163

8163

8369

8442

8580

8583

8601

8616

8625

8625

Section

10

10

20

30

10

10

10

10

810

10

810

820

Name

WHEELER STREET

NE

NE JEFFERSON

POINT ROAD

NE JEFFERSON

POINT ROAD

NE JEFFERSON

POINT ROAD

NE BARBER CUT

OFF ROAD

2ND STREET NE

288TH STREET NE

GAMBLE BAY

ROAD NE

GAMBLE PLACE NE

(KITSAP COUNTY)

NE ECOLOGY

ROAD

LITTLE BOSTON

ROAD NE

LITTLE BOSTON

ROAD NE

Length

Ownership

0.5

1.1

0.1

0.6

1.0

0.3

0.8

1.5

County

County

County

County

County

County

County

City

Collector

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Construction

Need

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

1.2

County

Residential

Improvement

Needed

0.3

3.5

1.0

Long Range Transportation Plan

September 2026 Update

County

Class

County

County

County

Rural Local

Road

Other

Improvement

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

September 2026

Page 36

KH 090225140

Route

8630

8630

8630

8663

8667

8667

8667

8667

8668

8668

8687

Section

10

20

30

10

10

20

30

40

10

20

10

Name

NE EGLON ROAD

NE EGLON ROAD

NE EGLON ROAD

HOFFMAN ROAD

NE

NE WEST

KINGSTON ROAD

NE WEST

KINGSTON ROAD

NE WEST

KINGSTON ROAD

NE WEST

KINGSTON ROAD

NE SOUTH

KINGSTON ROAD

NE SOUTH

KINGSTON ROAD

LUDLOW DRIVE NE

Length

Ownership

1.3

0.4

0.1

1.2

1.1

0.5

0.3

0.3

1.6

1.3

0.3

County

County

County

County

County

County

County

County

County

County

County

HOOD CANAL

8696

10

DRIVE (KITSAP

2.0

COUNTY)

Long Range Transportation Plan

September 2026 Update

County

Class

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Construction

Need

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local

Road

Other

Improvement

Needed

Rural

Other

Major

Improvement

Arterial

Needed

September 2026

Page 37

KH 090225140

Route

Section

Name

Length

Ownership

HOOD CANAL

8696

8696

20

30

Major

Improvement

COUNTY)

Arterial

Needed

HOOD CANAL

Rural

Other

Major

Improvement

Arterial

Needed

DRIVE (KITSAP

DRIVE (KITSAP

0.4

1.3

County

County

DRIVE (KITSAP

1.3

County

COUNTY)

8716

8750

8750

8940

8940

8950

8950

8992

810

10

20

10

20

10

20

10

Need

Other

HOOD CANAL

40

Construction

Rural

COUNTY)

8696

Class

CLIFFSIDE DRIVE

(KITSAP COUNTY)

NE TWIN SPITS

ROAD

NE TWIN SPITS

ROAD

NE BUCK LAKE

ROAD

NE BUCK LAKE

ROAD

NE POINT NO

POINT ROAD

NE POINT NO

POINT ROAD

FOULWEATHER

BLUFF ROAD NE

0.6

2.0

1.6

0.9

0.1

0.7

0.3

1.1

County

County

County

County

County

County

County

County

Rural Local

Road

Other

Improvement

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural

Other

Major

Improvement

Arterial

Needed

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Rural Local

Road

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Other

Improvement

Needed

Substandard

9003

10

SR 3

0.1

State

Major

With No

Arterial

Improvement

Planned

Long Range Transportation Plan

September 2026 Update

September 2026

Page 38

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction

Need

Substandard

9003

12

SR 3

0.0

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

13

SR 3

3.7

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

15

SR 3

0.0

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

18

SR 3

2.1

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

20

SR 3

0.0

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

22

SR 3

0.6

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

23

SR 3

0.0

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

25

SR 3

2.4

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

26

SR 3

0.0

State

Major

With No

Arterial

Improvement

Planned

Long Range Transportation Plan

September 2026 Update

September 2026

Page 39

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction

Need

Substandard

9003

27

SR 3

1.2

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

28

SR 3

0.0

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

29

SR 3

0.9

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

30

SR 3

2.9

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

32

SR 3

0.0

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

36

SR 3

4.3

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

40

SR 3

0.0

State

Major

With No

Arterial

Improvement

Planned

Substandard

9003

50

SR 3

7.1

State

Major

With No

Arterial

Improvement

Planned

Substandard

9104

10

STATE ROUTE 104

5.1

State

Major

With No

Arterial

Improvement

Planned

9104

20

STATE ROUTE 104

0.0

Long Range Transportation Plan

September 2026 Update

State

Major

Arterial

Acceptable

September 2026

Page 40

KH 090225140

Route

Section

Name

Length

Ownership

9104

21

STATE ROUTE 104

0.0

State

9104

23

STATE ROUTE 104

0.0

State

Class

Major

Arterial

Major

Arterial

Construction

Need

Acceptable

Acceptable

Substandard

9104

30

STATE ROUTE 104

0.2

State

Major

With No

Arterial

Improvement

Planned

Rural

9104

32

STATE ROUTE 104

8.1

State

Major

Arterial

Rural

9104

40

STATE ROUTE 104

0.5

State

Major

Arterial

Rural

9104

50

STATE ROUTE 104

0.3

State

Major

Arterial

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

With No

Improvement

Planned

Substandard

9104

55

STATE ROUTE 104

0.4

State

City

With No

Collector

Improvement

Planned

Substandard

9104

60

STATE ROUTE 104

0.4

State

Other

With No

Improvement

Planned

Substandard

9305

20

STATE ROUTE 305

2.5

State

Major

With No

Arterial

Improvement

Planned

Substandard

9305

30

STATE ROUTE 305

1.2

State

Major

With No

Arterial

Improvement

Planned

Long Range Transportation Plan

September 2026 Update

September 2026

Page 41

KH 090225140

Route

Section

Name

Length

Ownership

Class

Construction

Need

Substandard

9305

40

STATE ROUTE 305

0.5

State

Major

With No

Arterial

Improvement

Planned

Substandard

9305

45

STATE ROUTE 305

0.4

State

Major

With No

Arterial

Improvement

Planned

Substandard

9305

50

STATE ROUTE 305

0.3

State

Major

With No

Arterial

Improvement

Planned

Substandard

9307

10

STATE ROUTE 307

0.1

State

Major

With No

Arterial

Improvement

Planned

Substandard

9307

20

STATE ROUTE 307

0.1

State

Major

With No

Arterial

Improvement

Planned

Rural

9307

21

STATE ROUTE 307

1.5

State

Minor

Arterial

Substandard

With No

Improvement

Planned

Substandard

9307

25

STATE ROUTE 307

0.9

State

Major

With No

Arterial

Improvement

Planned

Substandard

9307

30

STATE ROUTE 307

2.7

State

Major

With No

Arterial

Improvement

Planned

A detailed description of the current condition of each of the roads is included in the

approved NTTFI in Appendix A (Inventory Data Sheets). A description of the BIA Functional

Classifications is included in Appendix B. Route descriptions or narratives are summarized

below.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 42

KH 090225140

2.2.1

State Routes

The 2024 State Highway Log Planning Report was consulted for highway data.

Portions of four State highways have been incorporated into the NTTFI system (as agreed

by Letter of Understanding from the Washing State Department of Transportation

[WSDOT], dated August 22, 2007). Detailed capital projects and planning activities are

described below. Relevant portions of the WSDOT 2024 Highway Log are included in

Appendix C.

State Route 3: MP 34.51 to MP 60.02

Route N o. 9003

SR-3 is a State highway which runs in a north-south direction. It is classified by the State as

U1 – Urban Principal Arterial. The length of this route included in the inventory is 25.3 miles,

excluding bridges. The portion of SR-3 included in the TTP begins at the intersection with SR16, south of Bremerton, and continues north to the end of the route at the intersection of

SR-104, at the easterly end of the Hood Canal Bridge. The inventory includes Sections 010

through 050. As a State highway, all sections are eligible for federal funds.

In April 2005, a SR-3 Route Development Plan was published. The long-term improvements

recommended for SR-3 include: reconfigure the intersection of SR-3 and SR-104, construct

a holding lane for traffic stopped at bridge openings, construct southbound climbing lane

between Big Valley Road and Pioneer Way, reconfigure Kitsap Memorial Park access to the

Kinman Road/Big Valley intersection with SR-3, install traffic lights at Pioneer Hill Road,

Pioneer Way, and Big Valley Road (two of three were installed in 2008), and construct a

four-lane facility.

State Route 104: MP 8.87 to MP 24.86

Route N o. 9104

SR-104 is included in the NTTFI from the intersection of Beaver Valley Road (SR-19) in

Jefferson County to the Kingston Ferry Terminal in Kitsap County. The route is further

divided into Sections 010 through 060. This route is 14.7 miles long (excluding bridges). The

route is classified by the State as U1 - Urban Principal Arterial. As a State highway, all

sections are eligible for federal funds.

The County and WSDOT have identified circulation improvements in the Kingston area,

including SR-104. SR-104 is currently configured as a two-lane, one-way ingress and twolane, one-way egress from the Kingston Ferry Terminal and the downtown Kingston area.

In 2011, a Feasibility Study for Realignment looked at five alternatives plus a non-motorized

plan element. Most of the options include realigning ferry traffic to alternate routes and

freeing Main Street for local, transit, bicycle, and pedestrian traffic. Currently a holding lane

Long Range Transportation Plan

September 2026 Update

September 2026

Page 43

KH 090225140

is used to manage ferry traffic and a realignment project for SR-104 is in the

preconstruction phase.

State Route 305: MP 7.05 to MP 13.52

Route N o. 9305

SR-305 is included in the TTP from the western margin of the Agate Pass Bridge to the

intersection of SR-3. The route is entirely located within Kitsap County, including a portion

located within the city limits of Poulsbo. Sections 010 through 050 make up this portion of

the route. This route is 4.9 miles long. The route is classified by the State as U1 - Urban

Principal Arterial. As a State highway, all sections are eligible for federal funds.

In 2012, WSDOT analyzed six design alternatives for the intersection of SR-305 and

Suquamish Way. Alternatives varied from No Build to Lane Widening to a Roundabout. The

Roundabout has been selected as the preferred alternative in part because it is the most

successful design solution for alleviating traffic congestion and providing safe access for

motorized and non-motorized travelers. As of 2026, plans for construction of the

roundabout have been put on hold.

State Route 307: MP 0.00 to MP 5.25

Route N o. 9305

SR-307 is included in the TTP from the intersection of SR-305 to the intersection of SR-104,

Sections 010 through 030 (MP 0.00 to MP 5.25). This route is 5.3 miles long. As a State

highway, all sections are eligible for federal funds. The route is classified by the State as U1

- Urban Principal Arterial.

2.2.2

County Routes

Kitsap County Routes

Portions of 50 County roads have been incorporated into the TTP system (as agreed by

Letter of Understanding from the County, dated June 30, 2009) and accepted by the BIA.

Relevant portions of the County Road Log and County Six-Year TIP are included in

Appendix D.

Seabeck Highway NW

Route N o. 1170

Seabeck Highway NW is a County road that runs in a southeast to northwest direction. It is

classified by the County as Rural Minor Arterial changing to a Rural Major Collector. This

route connects the Silverdale area to Seabeck, which contains several access points to the

marine water of Hood Canal. It is a two-lane roadway in good condition. This route is

divided into Sections 10 through 90.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 44

KH 090225140

Newberry Hill Road

Route N o. 1342

Newberry Hill Road is a County road that runs in a southeast to northwest direction. It is

classified by the County as Urban Minor Arterial. This route runs east from Seabeck

Highway NW (Route 1170) and terminates at Silverdale Way (Route 1951) near Dyes Inlet. It

is a three-lane roadway (including a center turn lane) in good condition. This route is

divided into Sections 10 through 60.

NW Anderson Hill Road

Route N o. 1354

NW Anderson Hill Road is a County road that runs in an easterly direction from Seabeck

Highway (Route 1170). It is classified by the County as Rural Major Collector and becomes

an Urban Minor Arterial as it approaches Silverdale. This route also terminates at Silverdale

Way (Route 1951). It is a two-lane roadway in good condition. This route is divided into

Sections 10 through 70.

Silverdale Way NW

Route N o. 1951

Silverdale Way NW is a County road that runs in a southeast to northwest direction. It is

classified by the County as Urban Principal Arterial. This route runs through the Silverdale

area which contains numerous shopping malls, a hospital, and recreational opportunities. It

begins at the eastern terminus of Newberry Hill Road and extends northeasterly until its

terminus at the intersection with State Highway 308. This route is divided into Sections 10

through 110. It is a five-lane roadway (including a center turn lane) in good condition. The

road continues northerly from the terminus of Silverdale Way but is named Viking Way NW

(Route 7420). This route is divided into Sections 10 through 110.

Tracyton Boulevard NW

Route N o. 5527

Tracyton Boulevard NW is a County road that runs in a northerly direction. It is classified by

the County as Urban Minor Arterial. This route runs along the eastern shore of Dyes Inlet. It

begins at the intersection with NE Riddell Road and extends northerly until its terminus at

the intersection with NW Bucklin Hill Road (Route 5774). It is a two-lane roadway in good

condition. This route is divided into Sections 10 through 60.

Brownsville Highway NE

Route N o. 5729

Brownsville Highway NE is a County road that runs in a meandering fashion near the

western shore of Port Orchard Bay. It is classified by the County as Urban Minor Arterial.

This route begins at the intersection with SR-303 (Waaga Way) and extends northerly until

its terminus at the intersection with SR-308 (NW Luoto Road). The terminus of the route is

Long Range Transportation Plan

September 2026 Update

September 2026

Page 45

KH 090225140

located at the southern margin of Dogfish Bay. It is a two-lane roadway in good condition.

This route is divided into Sections 10 through 80.

NW Myrhe Road

Route N o. 5772

NW Myhre Road is a County road that runs in a northerly and then westerly direction. It is

classified by the County as Urban Minor Arterial. This route begins at the intersection with

NW Bucklin Hill Road (Route 5774) and extends northerly until its terminus west of its

intersection with Silverdale Way NW (Route 1951). The start of the route is coincident with

the northerly terminus of Tracyton Boulevard NW (Route 5527). It is a three-lane roadway

(including center turn lane) in good condition. This route is divided into Sections 10 through

40.

NW Buckli n Hill Road

Route N o. 5774

NW Bucklin Hill Road is a County road that runs in an easterly direction. It is classified by

the County as Urban Principal Arterial changing to Urban Minor Arterial. This route begins

at the intersection with NW Anderson Hill Road (Route 1354) and extends east to intersect

with Central Valley Road (Route 5905). It is initially a two-lane roadway and becomes a fourlane roadway with the change in classification. It is generally in good condition. This route is

divided into Sections 10 through 60.

Central Valley Road NW

Route N o. 5905

Central Valley Road NW is a County road that runs northerly. It is classified by the County as

Urban Minor Arterial. This route begins at the intersection with NW Nichols Avenue and

extends northerly until its terminus at the intersection with SR-308 (NW Luoto Road). It is a

two-lane roadway in good condition. This route is divided into Sections 10 through 90.

NW Scandia Road

Route N o. 5970

NW Scandia Road is a County road that runs easterly for the first section, then veers

southerly for the second section. It is classified by the County as Urban Local Access. This

route begins at the intersection with Viking Way NW and extends until its terminus at the

intersection with SR-308 (NW Luoto Road). It is a two-lane roadway in good condition. This

route is divided into Sections 10 through 20.

Miller Bay Road NE

Route N o. 7037

Miller Bay Road NE is a County road that runs in a north-south direction. It is classified

Rural Major Collector. This route begins at the intersection with Augusta Avenue NE and

Long Range Transportation Plan

September 2026 Update

September 2026

Page 46

KH 090225140

extends northerly until its terminus at the intersection with SR-104 (Route 9104). It is a twolane roadway in good condition. This route is divided into Sections 10 through 80.

Hansville Road NE

Route N o. 7040

Hansville Road NE is a County roadway which runs in a north-south direction. It is classified

as a Rural Major Collector by the County. It is a two-lane roadway in good condition, with

wide paved shoulders. The posted speed limit is 45 miles per hour (mph), slowing to 35

mph near SR-104, where a left-turn-lane is provided. Hansville Road provides access from

SR-104 to the Reservation. Hansville Road continues north and provides access to the

community of Hansville, recreation, and fishing opportunities. This route is divided into

Sections 10 through 90.

Stottlemeyer Road NE

Route N o. 7165

Stottlemeyer Road NE is a County road which runs in a northly direction. The road

intersects with NE Lincoln Road and extends north to its terminus at the intersection with

NE Gunderson Road. The route is classified by the County as Rural Major Collector. The

road is a two-lane road. This route is divided into Sections 10 through 20. The road is

considered to be in good condition.

Big Valley Road NE

Route N o. 7250

Big Valley Road NE is a County road that runs northerly in a meandering fashion. It is

classified by the County as Rural Minor Collector. This route begins at the intersection with

SR-307 (Route 9307) and extends northerly until its terminus at the intersection with SR-3

(Route 9003). It is a two-lane roadway in good condition. This route is divided into Sections

10 through 20.

NE Delaney Road

Route N o. 7319

NE Delaney Road is a County road that runs easterly from the southwestern corner of the

Reservation. It is classified by the County as Rural Local Access. This route begins at the

intersection with Hansville Road NE and extends until it dead ends. It is a two-lane roadway

in good condition. This route is defined by one section - Section 10.

Viking Way NW

Route N o. 7420

Viking Way NW is a County road that runs in a northerly direction. It begins as an extension

of Silverdale Way NW (Route 1951). It is classified by the County as Urban Minor Arterial.

This route extends northerly, and enters the city of Poulsbo, where County ownership

Long Range Transportation Plan

September 2026 Update

September 2026

Page 47

KH 090225140

terminates. It is a two-lane roadway in good condition. This route is divided into Sections 10

through 30.

Little Valley Road NE

Route N o. 7441

Little Valley Road NE is a County road that runs in a northerly direction. The road begins at

the northern limits of the city of Poulsbo, near the intersection with Forest Rock Hills Lane.

The road terminates at the intersection with SR-307 (Bond Road NE, Route 9307). Big Valley

Road NE (Route 7250) continues to the north. This route is a two-lane roadway in fair

condition. This route is defined by Section 10.

Gunderson Road NE

Route N o. 7466

Gunderson Road NE is a County road which runs in an easterly direction. The road

intersects with SR-307 (Bond Road NE, Route 9307) to the west and extends east to its

terminus at the intersection with Miller Bay Road NE. The route is classified by the County

as Rural Major Collector. The road is a two-lane road. This route is divided into Sections 10

through 30. The road is considered to be in good condition.

Port Gamble Road NE

Route N o. 7479

Port Gamble Road NE is a County road which runs in a northerly direction. The road

intersects with Essex Avenue NE to the south and extends to its terminus at the

intersection with State Highway 104. The route is classified by the County as Rural Local

Access. The road is a two-lane road in good condition. This route is divided into Sections 10

through 30.

Highland Road NE

Route N o. 7521

Highland Road NE is a County road that runs in a northerly direction. The road begins at

the intersection with NE Crawford Drive. The road terminates at the intersection with SR104 (Route 9104). This route provides access to Wolfle Elementary School and is a two-lane

roadway in good condition. This route is defined by Section 10.

NE Lincol n Road

Route N o. 7715

NE Lincoln Road is a County road that runs in an easterly direction. It is classified by the

County as Rural Major Collector. This route begins at the northeastern boundary of the city

of Poulsbo and extends east to terminate at Central Valley Road (Route 5905). It is a twolane roadway generally in good condition. This route is divided into Sections 10 through 40.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 48

KH 090225140

NW Pioneer Hill Road

Route N o. 7726

NW Pioneer Hill Road is a County road that runs in an easterly direction. It is classified by

the County as Rural Local Access. This route begins at the intersection with Pioneer Way

NW (Route 7822) and extends east to intersect with SR-3 (Route 9003). It is a two-lane

roadway. It is generally in good condition. This route is divided into Sections 10 through 30.

Waghorn Road NW

Route N o. 7765

Port Gamble Road NE is a County road which runs in a northerly direction. The road

intersects with NW Pioneer Hill Road to the south and extends to its terminus at the

intersection with Pioneer Way NW. The route is classified by the County as Rural Local

Access. The road is a two-lane road in good condition. This route is divided into Sections 10

and 20.

Pioneer Way NW

Route N o. 7822

Pioneer Way NW is a County road that runs in an easterly direction. It is classified by the

County as Rural Major Collector and Urban Minor Arterial. This route begins at the

intersection with SR-3 (Route 9003) and extends west and south to intersect with Aldo

Road. It is a two-lane roadway. It is generally in good condition. This route is divided into

Sections 10 through 40.

NW Wesley Way

Route N o. 7852

NW Wesley Way is a County road that runs in a northwesterly direction. It is classified by

the County as Urban Local Access. The road begins at the intersection with Lofall Road NW.

The road terminates at Hood Canal shoreline access. This route is a two-lane roadway in

good condition. This route is defined by Section 10.

NW Park Street

Route N o. 7855

NW Park Street is a County road that runs in an easterly direction. It is classified by the

County as Urban Local Access. The road begins at the intersection with NW Ferry Street

(Route 7858). The road terminates at NE Park Street, which provides access to a State park

and the shoreline. This route is a two-lane roadway in good condition. This route is defined

by Section 10.

NW Ferry Street

Route N o. 7858

NW Ferry Street is a County road that runs in a northeasterly direction. It is classified by the

County as Urban Local Access. The road begins at the intersection with NW Wesley Way

Long Range Transportation Plan

September 2026 Update

September 2026

Page 49

KH 090225140

(Route 7852). The road terminates at NW Park Street (Route 7858). This route is a two-lane

roadway in good condition. This route is defined by Section 10.

Falkner Road NE

Route N o. 7889

Falkner Road NE is a County road that runs in an easterly and then southerly direction. It is

classified by the County as Urban Local Access. This route begins and ends at intersections

with SR-3 (Route 9003). It is a two-lane roadway. It is generally in good condition. This route

is defined by Section 10.

Beach Drive NE

Route N o. 7903

Beach Drive NE is a County road that runs in a northeasterly direction. It is classified by the

County as Urban Local Access. This route begins and ends at dead ends but is accessed by

several residential roads. It is a two-lane roadway considered to be in good condition. This

route is defined by Section 10.

Whitford Road NE

Route N o. 7963

Whitford Road NE is a County road that runs in a northerly direction. It is classified by the

County as Rural Local Access. The road begins at the intersection with Wheeler Street NE

(Route 7966). The road terminates at the shore of Hood Canal and provides access to

fishing and other marine activities. This route is a two-lane roadway in good condition. This

route is defined by Section 10.

Wheeler Street NE

Route N o. 7966

Wheeler Street NE is a County road that runs in a northerly then westerly direction. It is

classified by the County as Rural Local Access. The road begins at the intersection with SR104 (Route 9104). The road terminates at a dead end. This route is a two-lane roadway in

good condition. This route is defined by Section 10.

NE Jefferson Poi nt Road

Route N o. 8163

NE Jefferson Point Road is a County road that runs in an easterly and then southerly

direction. It is classified by the County as Rural Local Access. This route begins at the

intersection with South Kingston Road NE, extends east to a 90-degree bend, then

continues south and east to terminate at the intersection with NE Klabo Road. It is a twolane roadway generally in good condition. This route is divided into Sections 10 through 30.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 50

KH 090225140

NE Barber Cut Off Road

Route N o. 8369

NE Barber Cut Off Road is a County road that runs in a southerly and then an easterly

direction. It is classified by the County as Rural Local Access. NE Barber Cut Off Road

provides access to an elementary school. This route begins at the intersection with SR-104

(Route 9104), meanders south and east to terminate at the intersection with NE West

Kingston Road. It is a two-lane roadway generally in good condition. This route is divided

into a single section - Section 10.

2nd Street NE

Route N o. 8442

2nd Street NE is a County road that runs in a northeasterly direction. The road begins at the

intersection with Washington Boulevard NE. The road terminates at the intersection with

SR-104 (Route 9104). This road provides access into the community of Kingston. It is

classified by the County as Rural Local Access. This route is a two-lane roadway in fair

condition. This route is defined by Section 10.

NE 288th Street

Route N o. 8580

NE 288th Street is a County road that runs in an easterly direction. The road begins at the

intersection with Hansville Road NE (Route 7040) and terminates at the intersection with

Gamble Bay Road NE. This route is a two-lane roadway in good condition. It is classified by

the County as Rural Local Access. This route is defined by Section 10.

Gamble Bay Road NE

Route N o. 8583

Gamble Bay Road NE is a County road that runs in a southwesterly direction. The road

begins at the intersection with NE 288th Street (Route 8580) and terminates at the

intersection with SR-104 (Route 9104). This route is a two-lane roadway in good condition.

It is classified by the County as Rural Local Access. This route is defined by Section 10.

Gamble Place NE

Route N o. 8601

Gamble Place NE is located in the southeast portion of the Reservation. The road intersects

with Little Boston Road NE (Route 8625) on the north and extends south to a dead end.

Gamble Place NE is a County road classified as Rural Local Access. The route is a two-lane

roadway in good condition. This route is divided into a single section - Section 10.

NE Ecol ogy Road

Route N o. 8616

NE Ecology Road is a County road that runs easterly from its intersection with Hansville

Road NE (Route 7040). This route was formerly named NE Solid Waste Site Road. It is

classified by the County as Rural Local Access. This route dead ends at a closed dump and

Long Range Transportation Plan

September 2026 Update

September 2026

Page 51

KH 090225140

is currently used as a transfer station. It is a two-lane roadway in good condition. This route

is defined by one section - Section 10.

Little Boston Road NE

Route N o. 8625

Little Boston Road NE is located west of Hansville Road NE (Route 7040) and is classified as

a Rural Local Access and Rural Minor Collector by the County. It provides access into and

through the Reservation and functions as a collector for all local roads within the

Reservation. It is a two-lane roadway with paved shoulders and starts and ends at

intersections with Hansville Road. It is defined by Sections 810 through 820.

NE Eglon Road

Route N o. 8630

NE Eglon Road is a County road that runs in an easterly direction. It is classified by the

County as Rural Local Access. This route begins at the intersection with Hansville Road NE

(Route 7040) and continues east to its second section, where the road makes a 90-degree

bend to the south. The road terminates at an intersection with Hoffman Road NE It is a

two-lane roadway generally in good condition. This route is divided into Sections 10

through 30.

Hoffman Road NE

Route N o. 8663

Hoffman Road NE is a County road that runs in a southerly and then easterly direction. The

road begins at the intersection with NE Eglon Road (Route 8630) and continues to its

terminus at the intersection with Sunrise Beach Drive NE. It is classified by the County as

Rural Local Access. This route is a two-lane roadway in good condition. This route is defined

by Section 10.

NE West Kingston Road

Route N o. 8667

NE West Kingston Road is a County road that runs in an easterly direction. It is classified by

the County as Rural Major Collector. This route begins at the intersection with Miller Bay

Road NE (Route 7037) and extends east to provide access to several schools. It is a two-lane

roadway. The route terminates in the community of Kingston at the intersection with SR104 (Route 9104). It is generally in good condition. This route is divided into Sections 10

through 40.

NE South Kingston Road

Route N o. 8668

NE South Kingston Road is a County road that runs in a southeasterly direction. It is

classified by the County as Rural Minor Collector. This route begins at the intersection with

NE West Kingston Road (Route 8667) and extends southeast and then southwest to the

Long Range Transportation Plan

September 2026 Update

September 2026

Page 52

KH 090225140

community of Indianola. It is a two-lane roadway, generally in good condition. This route is

divided into Sections 10 through 20.

Ludlow D rive NE

Route N o. 8687

Ludlow Drive NE is a County road that runs in a southerly direction. The road begins at the

intersection with Sunrise Beach Drive NE continues to its terminus at a dead end, which

provides access to the shoreline at Puget Sound. It is classified by the County as Rural Local

Access. This route is a narrow two-lane roadway in fair condition. This route is defined by

Section 10.

Hood Canal Drive NE

Route N o. 8696

Hood Canal Drive NE is a County road that runs in a northerly direction. It is classified by

the County as Rural Minor Collector. This route is a two-lane roadway in good condition.

This route is defined by Section 10 through Section 30. The road terminates at an

intersection with NE Twin Spits Road (Route 8750).

Hood Canal Drive is a County road that intersects the PGST-owned Hood Canal Drive. In

2006, PGST closed vehicle access to the portion of Hood Canal Drive outside the

Reservation boundary. Pedestrian access is still available across the Reservation boundary.

Cliffside Drive NE

Route N o. 8716

Cliffside Drive is a County road that runs in an easterly direction. The route begins at its

intersection with Hood Canal Drive NE (Route 8696). Cliffside Drive intersects Little Boston

Road NE (Route 8625) on its eastern margin. It is classified by the County as Rural Minor

Collector. This route is a two-lane roadway in good condition. This route is defined by

Section 810.

NE Twin Spits Road

Route N o. 8750

NE Twin Spits Road is a County road which runs in a westerly direction. The road intersects

with Hansville Road NE (Route 7040) and extends to its terminus at the intersection with

the shoreline of Hood Canal. The route is classified by the County as Rural Minor Collector.

The road is a two-lane road in good condition. This route is divided into Sections 10 and 20.

NE Buck Lake Road

Route N o. 8940

NE Buck Lake Road is a County road which runs in an easterly direction. The road intersects

with Hansville Road NE (Route 7040) and extends west, makes a 90-degree turn to the

south, and terminates at Buck Lake County Park. The route is classified by the County as

Long Range Transportation Plan

September 2026 Update

September 2026

Page 53

KH 090225140

Rural Local Access. The road is a two-lane road in good condition. This route is divided into

Sections 10 and 20.

NE Point No Point Road

Route N o. 8950

NE Point No Point Road is a County road that runs in an easterly direction. It is classified by

the County as Rural Local Access. This route begins at the intersection with Hansville Road

NE (Route 7040) and continues east to terminate at Point No Point Park. It is a two-lane

roadway generally in fair condition. This route is divided into Sections 10 through 20.

Foulweather Bluff Road NE

Route N o. 8992

Foulweather Bluff Road NE is a County road that runs in a northerly direction. The road

begins at the intersection with NE Twin Spits Road (Route 8750) and continues to its

terminus at a dead end. It is classified by the County as Rural Local Access. This route is a

two-lane roadway in good condition. This route is defined by Section 10.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 54

KH 090225140

Figure 2-1: Kitsap County Transportation Network

Long Range Transportation Plan

September 2026 Update

September 2026

Page 55

KH 090225140

2.2.3

BIA Routes

Figure 2-2: Port Gamble S’Klallam Tribe Transportation Network

2.2.4

Tribal Roads

Forest Service Roads

Route N o. 2001 -2011

Series “2000” roads on the Reservation are either forest roads, or other service and

emergency access roads. In general, these roads are gravel or dirt and in poor to fair

condition. These roads are owned by PGST.

For details of each of the local service roads on the reservation, see the TTP Inventory in

Appendix A.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 56

KH 090225140

2.2.5

Commercial/Business Park Roads

Salish Lane

Route N o. 0019

This road is located in the mid-eastern portion of the Reservation. Salish Lane provides

access to the Casino. The road intersects with Hansville Road (located within County rightof-way). Tribal members use Salish Lane for access to commercial enterprises and

recreation.

Gliding Eagle

Route N o. 0012

PGST has developed a gas station and convenience store. This road is located in the

southeastern portion of the Reservation, is composed of two sections, and each section is

0.1 miles long. The southern terminus intersects Little Boston Road NE. The eastern

terminus intersects Hansville Road. The road continues to the north and terminates at the

southern margin of Ravenwood Street. Tribal members use Gliding Eagle for access to

services.

2.2.6

Bridges and Docks

There are numerous bridges located within the state routes listed above, as well as the

Kingston Ferry Terminal. The scope of this plan does not include a detailed discussion of

these bridges, which are maintained by WSDOT.

There is one bridge within the Reservation boundaries located adjacent to Route 0002,

Point Julia Road. The bridge provides access for both recreational activities and commercial

enterprises. The bridge is owned and maintained by PGST.

The current trails plan calls for extending the bicycle/walking trail that starts at the

Wellness Center access road and terminates at Middle Creek. A new bridge will have to be

constructed to span Middle Creek to complete the trail. This new section has been named

“Little Boston Pedestrian Facility.”

2.2.7

Marine Access

Point Julia serves the fishing community and recreation boats. There are two boat ramps

on Point Julia: The North Boat Ramp and the South Boat Ramp. The North Boat Ramp was

replaced in 2017 and the South Boat Ramp was replaced in 2022.

In addition, Tribal members access marine activities from many County Roads. Tribal

members require access to the shoreline to reach their usual and accustomed (U&A)

fishing and shellfish harvest areas.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 57

KH 090225140

2.2.8

Non-motorized Facilities

In the last five years, several pedestrian facilities have been constructed on the

Reservation. However, there is still a need to provide additional pedestrian facilities to

provide safe access throughout the community.

Pedestrian safety is of utmost priority to PGST, and this is reflected in the Priority List.

Series “3000” routes on the Reservation are pedestrian and mixed-use facilities. Proposed

routes are included in the TTP to qualify for funding through the BIA. Funding has been

received in the past from the WSDOT Pedestrian & Bicycle Safety Program to construct a

portion of the mixed-use route along Little Boston Road.

2.2.9

Public Transit

Kitsap Transit

The public transit provider in Kitsap County is Kitsap Transit. Currently, Kitsap Transit does

not provide direct service to the Reservation. However, Kitsap Transit Routes 307 and 391

provide daily service to the Kingston area along Miller Bay Road and SR-104 (See Figure 2-3

and Figure 2-4). A park & ride is located at "George's Corner" at the intersection of SR-104

and Hansville Road and is served by Bus Route #391 and #307.

Figure 2-3: Kitsap Transit Route #307

Long Range Transportation Plan

September 2026 Update

September 2026

Page 58

KH 090225140

Figure 2-4: Kitsap Transit Route #391

Long Range Transportation Plan

September 2026 Update

September 2026

Page 59

KH 090225140

Route #391 Kingston/Bainbridge operates weekdays between the Kingston ferry

terminal and the Bainbridge ferry, and Route #307 Kingston/North Viking Ferry provides

service between Poulsbo and Kingston. Kitsap Transit also makes connections with

Jefferson County Transit in Poulsbo for service to Port Townsend and Port Ludlow. All bus

schedules are coordinated with morning and evening commuter ferries.

Kitsap Transit provides vanpools for peak hour commuters and offers the "Worker/Driver

Program". This service is designed to transport employees to and from various worksites,

with the route ending at the driver's place of employment. Worker/Driver Port Gamble

Route originates at “George’s Corner” park and ride and transports employees to

Charleston Base.

As reported in the 2022-2027 Transit Development Plan, Kitsap Transit provided countywide mobility service through the use of fixed route service, ACCESS buses, VanLink social

service agency vanpools, worker/driver service, general public dial-a-ride service, ondemand and foot ferry service where applicable.

Public Transportation (Transit) on Indian Reservations

In 2012, PGST prepared a Transit Study Plan with funds from a Transit Planning Grant from

the Federal Transit Administration (FTA). The purpose of this study was to analyze and

recommend a comprehensive system of transit alternatives that best meet the needs of

the Tribal community over the next five years. This study identified the transit alternatives

available to PGST, described the preferred alternative, and presented a plan for

implementation of that preferred alternative.

The goals of the federal Tribal Transit Program are: 1) to enhance the access of public

transportation on and around Indian reservations in nonurbanized areas to health care,

shopping, education, employment, public services, and recreation; 2) to assist in the

maintenance, development, improvement, and use of public transportation systems in

rural and small urban areas; 3) to encourage and facilitate the most efficient use of all

federal funds used to provide passenger transportation in nonurbanized areas through the

coordination of programs and services; and 4) to provide for the participation of private

transportation providers in nonurbanized transportation to the maximum extent feasible.

As with many tribes, PGST is looking at the efficacy of coordinating transit service to

support its community. The Reservation is currently within the Kingston on-demand service

area and the on-demand fast ferry commuter service area. Tribal and community members

would benefit from links to surrounding areas for business, employment, medical, and

educational trips. The plan determined that a two-phase program would best meet the

Long Range Transportation Plan

September 2026 Update

September 2026

Page 60

KH 090225140

needs of PGST. Phase I includes coordination and utilization of existing services, both those

available through Kitsap Transit and the various departments within the PGST. Phase II

recommends an extension of Kitsap Transit service, to be negotiated with the agency

directly. Phase II is subject to transit demand, funding availability, and negotiations with

Kitsap Transit.

2.2.10 Shuttles, Vans, and Shared Rides

PGST operates a van for elderly pickup. This is an example of a Tribally owned and

operated transportation option. The Youth Services program is also seeking funding for a

van to serve the youth population.

2.3

Collision History

Collision data for the PGST was requested from WSDOT, which maintains a database of

collisions occurring in all of the State. Collision data was requested from WSDOT for the

PGST Reservation as well as major roadways leading to the Reservation for the years 2021

through 2025. The data represents all reported, vehicle-involved collisions. A total of 192

crashes were reported from 2021 to 2025, which included one fatal crash, eight major

injury crashes, and 183 other injury type collisions. It should be noted that historically,

reservation collisions across the nation are significantly under reported.

2.3.1

Collision Locations

A total of 192 crashes were reported from 2021 to 2025. Figure 2-5 shows the location of

crashes within the study area over the five-year period as a heat map. The heat map

indicates Hansville Road has a high concentration of crashes, particularly at the

intersections of SR-104, 288th Street, Little Boston Road NE, and Eglon Road. The

intersection of SR-104 and 288th Street also has a high concentration of crashes based on

the heat map. All these locations are discussed in further detail in the report.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 61

KH 090225140

Figure 2-5: Collision Heat Map

Long Range Transportation Plan

September 2026 Update

September 2026

Page 62

KH 090225140

2.3.2

Collision Severity

The collisions within the PGST Reservation as well as major roadways leading to the

Reservation were analyzed based on crash severity. Table 2-3 summarizes the number of

collisions per year by severity. Figure 2-6 shows the location of collisions by severity.

Table 2-2: Collision Severity

Severity

2021

2022

2023

2024

2025

Total

(K) Fatal Injury

0

0

0

0

(A) Suspected Major Injury

1

4

5

17

27

1

7

8

26

42

2

9

4

23

38

10

6

26

42

1

4

8

5

25

43

1

8

38

28

117

192

(B) Suspected Minor Injury

(C) Possible Injury

(O) PDO / No Injury

Total

The collision data shows there was one fatal injury collision (0.5% of collisions), eight

suspected major injury collisions (4% of collisions), 38 suspected minor injury collisions

(20% of collisions), 28 possible injury collisions (14% of collisions), and 117 no apparent

injury/property damage only collisions (61% of collisions).

Table 2-3 summarizes the number of crashes based on severity at the intersections with

the most reported crashes.

Table 2-3: Key Intersection Collision Severity

Major

Minor

Possible

PDO / No

Injury

Injury

Injury

Injury

0

0

1

0

4

5

0

0

0

0

2

2

0

0

2

2

3

7

0

0

5

9

21

35

0

1

0

1

5

7

Fatal

Hansville Road NE at

Eglon Road

Hansville Road NE at

Little Boston Road NE

Hansville Road NE at

288th St

Hansville Road NE at

SR-104

SR-104 at

288th St

Total

The intersection of Hansville Road NE at SR-104 had 35 crashes reported at the intersection

over a five-year period. However, the table shows zero crashes were fatal or major injury.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 63

KH 090225140

The calculated crash rate in Million Entering Vehicles (MEV) for the intersection is included

in Table 2-4.

Table 2-4: Key Intersection Collision Rates

Total

Years

5

28391

5

0.97

2

129582

5

0.08

7

120271

5

0.32

35

212602

5

0.90

7

84691,3

5

0.50

Collisions

Hansville Road NE at

Eglon Road

Hansville Road NE at

Little Boston Road NE

Hansville Road NE at

288th St

Hansville Road NE at

SR-104

SR-104 at

288th St

Collision

Volume

Rate (MEV)

1

Calculated using average daily trips (ADTs) provided in Section 2.4.3

Calculated by multiplying peak hour turning movement counts by K factor

3

Calculated using WSDOT provided ADT

2

The Collision rate, which adjusts for total entering traffic volumes, shows a MEV of 0.90 for

the intersection of Hansville Road NE at SR-104. Typically, a rate of less than 1.0 and a

frequency less than 10 collisions a year at a signalized intersection would indicate that

additional analysis is not required. However, this intersection is very close to both those

general guidelines. Additionally, the capacity review indicated the SR-104 at Hansville

intersection expected to fail standard level of service thresholds within about 10 years. This

intersection should be placed on the 6-year TIP for an updated intersection control

evaluation (ICE) for safety and capacity.

The intersection of Hansville Road NE at Eglan Road has the highest collision rate of the

study intersections but is still below the 1.0 significance rate. Additionally, the intersection

of Hansville Road NE at Eglan Road has a collision frequency of 1.0 collisions per year,

which is well below the 5 per year frequency normally used as a concern measure for

unsignalized intersections. This should undergo periodic collision history monitoring and

be evaluated further in the next strategic safety plan update.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 64

KH 090225140

Figure 2-6: Collision Severity Map

Long Range Transportation Plan

September 2026 Update

September 2026

Page 65

KH 090225140

2.3.3

Collision Type

The number of collisions by type are summarized in Figure 2-7. The data shows the top

collision types are fixed object (28% of collisions), rear end (26% of collisions), roadway

departure (12% of collisions), angle (12% of collisions), and left-turn (8% of collisions).

Figure 2-8 illustrates the top collision types by location. A majority of the rear end and leftturn collision types occur along Hansville Road. The high number of fixed object and

highway departure should be further evaluated in the next strategic safety plan or a road

safety audit for the entire length of Hansville north of SR-104 and Little Boston Road to

identify specific location improvements that would reduce fixed object and roadway

departure collisions.

Figure 2-7: Collision Type

Active transportation road users include people walking and those riding bicycles. Of the

192 reported collisions, three collisions were active transportation related. One collision

involved a major injury with a pedestrian, one collision involved a major injury with a pedal

cyclist, and one collision involved a minor injury crash with a pedal cyclist. Figure 2-9

illustrates the active transportation related crashes by location and severity. The three

active transportation crashes occurred on Hansville Road between Little Boston Road NE

and 288th Street.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 66

KH 090225140

Figure 2-8: Top Collision Types

Long Range Transportation Plan

September 2026 Update

September 2026

Page 67

KH 090225140

Figure 2-9: Active Transportation Collisions

Long Range Transportation Plan

September 2026 Update

September 2026

Page 68

KH 090225140

2.3.4

Fatal and Major Injury Collisions

Of the 192 reported crashes within the PGST Reservation, as well as major roadways

leading to the Reservation, one collision involved a fatal injury, and eight collisions involved

a major injury. Table 2-7 summarizes the reported fatal and major injury collisions. Figure

2-10 shows the fatal and major injury collisions by location. There are no specific clusters of

fatality or major collisions, thus no specific trends.

Table 2-5: Fatal and Major Injury Summary

Date

8/6/2025

1/1/2021

7/12/2022

3/24/2023

10/19/2023

1/2/2025

5/19/2025

7/16/2025

10/3/2025

Location

Severity

Hansville Road north of

(K) Fatal

288th Street

Injury

Hansville Road NE at

(A) Major

Evening Star Lane

Injury

SR-104 at 288th Street

Collision

Type

Secondary

Contributing

Contributing

Factor

Factor

Other

Pedal cyclist

Contributing

-

Circ Not Listed

Under

Pedestrian

Influence of

-

Alcohol

(A) Major

Left turn

Injury

Hansville Road NE at

(A) Major

QC Opposite

Sunnywoods Lane

Injury

Direction

Hansville Road NE north

(A) Major

of Ohman Road

Injury

Hansville Road NE north

(A) Major

of Hunt Club Lane

Injury

Hansville Road NE north

(A) Major

Roadway

of Ohman Road

Injury

Departure

Hansville Road NE north

(A) Major

Parked

of Eglon Road

Injury

Vehicle

Hood Canal Place at

(A) Major

Hood Canal Drive

Injury

Fixed Object

Improper

Turn/Merge

-

Other

Under

Contributing

Influence of

Circ Not Listed

Drugs

Apparently Ill

-

Other

Head on

Contributing

-

Circ Not Listed

Fixed Object

Long Range Transportation Plan

September 2026 Update

Primary

Other

Contributing

-

Circ Not Listed

Other

Contributing

Apparently Ill

Circ Not Listed

Under

Exceeding

Influence of

Stated Speed

Alcohol

Limit

September 2026

Page 69

KH 090225140

Figure 2-10: Fatal and Major Injury Collisions Map

Long Range Transportation Plan

September 2026 Update

September 2026

Page 70

KH 090225140

2.3.5

Collision Trends

The reported collision contributing factors are summarized in Figure 2-11. The top

contributing factors for collisions within the PGST Reservation, as well as major roadways

leading to the Reservation, are distraction (19% of collisions), alcohol impairment (13% of

collisions), exceeding speeds (9% of collisions), vehicle failing to yield right-of-way (7% of

collisions), drowsiness (6% of collisions), and vehicles following too closely (6% of collisions).

The top contributing factors indicate high-risk behavior by drivers contributing to collisions.

When the Tribe updates their Strategic Safety Plan, additional public input will be evaluated

with the collision data to determine appropriate enforcement engineering,

education/encouragement and emergency services options to improve the traveling

public’s safety on the Reservation and its approach roads.

Figure 2-11: Collision Contributing Factors

Long Range Transportation Plan

September 2026 Update

September 2026

Page 71

KH 090225140

2.4

Existing Traffic Operations

2.4.1

Analysis Parameters

Congestion at intersections and along roadways is generally measured in terms of level of

service (LOS). Level of Service is a qualitative term describing operating conditions a driver

will experience while traveling on a particular road or highway during a specific time

interval. In accordance with the Transportation Research Board’s Highway Capacity Manual

(HCM), 7th Edition, road facilities and intersections are rated between LOS A and LOS F,

with LOS A being free flow and LOS F being forced flow or over-capacity conditions.

The County has established the following performance standards: 85% of the County Road

lane miles in the transportation network must be at or below maximum LOS/volume-to-capacity

standards. Conversely, 15% of the lane miles will be permitted to exceed LOS/volume-to-capacity

standards. A roadway will be considered deficient when the average for the link falls below

LOS D in urban areas and LOS C in rural areas.

For the purposes of this study, the County roads and intersections providing direct access

to the Reservation were reviewed to determine what improvements may be needed to

meet the stated goals of the LRTP.

2.4.2

Traffic Volumes

The traffic volumes used in the analysis were collected from multiple sources. These traffic

volumes were used for the base-year operations analysis, and as the basis for futureyear traffic volume projections.

Traffic count data is collected by WSDOT for state routes and is available online through

the WSDOT Traffic count data webpage.

Traffic count data for County roads were provided by the County for the following locations

and dates:

⚫

Hansville Road between North of Eglon Road and SR-104 (April 2026)

⚫

Hansville Road North of Buck Lake Road (November 2023)

⚫

Twin Spirits Road East of Hood Canal Drive (2019)

⚫

Gamble Bay Road North of Grove Lane (June 2025)

⚫

288th Street West of Hansville Road (April 2026)

⚫

Hansville Road Little Boston Analysis Report (2025)

Long Range Transportation Plan

September 2026 Update

September 2026

Page 72

KH 090225140

Existing turning movement counts at the following intersections were collected by the

independent count firm Traffic Data Gathering (TDG) in April 2026:

⚫

Little Boston Road NE at NE Boston Lane

⚫

Little Boston Road NE at Admin Center North Driveway

⚫

Little Boston Road NE at Admin Center South Driveway

⚫

Hansville Road NE at Casino South Driveway

⚫

SR-104 at Hansville Road NE

In addition, traffic counts collected in June 2025 for the Hansville Road Little Boston Road

Analysis Report (Transpo Group, 2025) were used in the analysis of this report, relevant

count data from the original report included in Appendix E.

The traffic data collected in 2019, 2023, and 2025 is still relevant in 2026. Growth on the

Reservation has not increased enough to have a measurable impact on older traffic data.

The existing 2026 PM peak hour volumes are shown in Figure 2-12.Traffic count data is

provided in Appendix E.

2.4.3

Roadway Operations

The current operation of the Reservation roadway network has been assessed using a link

capacity analysis. Each roadway in Kitsap County has an assigned maximum vehicle

carrying capacity for ADT. The capacity was assigned based on the revised Florida

Department of Transportation (DOT) System Planning Office Capacity Tables. These

capacities represent land use assessment that is either urban, rural, or rural transitioning

to urban. Roadway link LOS analysis is used to assess if facilities are meeting the LOS

standards.

Roadway travel volumes are compared to roadway capacity to develop the volume-tocapacity (V/C) ratio. The V/C ratios relate directly to measures of LOS as shown in Table 2-6.

Table 2-6: Roadway Level of Service Criteria

V/C Ratio Range

LOS

.60 and below

A

.60 to .69

B

.70 to .79

C

.80 to .89

D

.90 to .99

E

1.00 and above

F

Long Range Transportation Plan

September 2026 Update

September 2026

Page 73

KH 090225140

Figure 2-12: Existing Weekday 2026 PM Peak Hour Volumes

Long Range Transportation Plan

September 2026 Update

September 2026

Page 74

KH 090225140

Table 2-7 provides a summary of the current roadway LOS for Hansville Road, which is the

main access to the Reservation, and other approach roads to the Reservation. The reserve

capacity at LOS D for each segment is also included. This is an indication of how much

more traffic each roadway segment can accommodate and still maintain a LOS D

standard. The roadway segment calculations are included in Appendix F of this report.

Table 2-7: Current Roadway Level of Service

Roadway Segment

Hansville Road north

of Buck Lake Road

Hansville Road north

of Eglon Road

Hansville Road south

of Eglon Road

Casino south

entrance/Salish Lane,

west of Hansville Road

Hansville Road north

Previous

ADT Volume

(year)

2026 ADT

Volume1

Roadway

max

Capacity

V/C

Ratio5

LOS

Roadway

Capacity

at LOS D

Reserve

Capacity

1,635 (2023) 2

1,735

15,000

0.11

A

13,350

11,615

-

2,8392

15,000

0.19

A

13,350

10,511

6,240 (2025) 3

6,365

15,000

0.41

A

13,350

6,985

-

1,1004

10,000

0.11

A

8,900

7,800

-

8,6492

15,000

0.58

A

13,350

4,701

-

10,7642

15,000

0.72

C

13,350

2,586

-

11,4062

15,000

0.76

C

13,350

1,944

3,054 (2025)3

3,115

13,200

0.23

A

11,748

8,633

-

1,2632

10,000

0.10

A

8,900

7,637

1,616 (2019)

1,8562

10,000

0.12

A

8,900

7,044

1,446 (2025)

1,4752

10,000

0.11

A

8,900

7,425

of Little Boston Road

Hansville Road north

of 288th Street

Hansville Road north

of SR-104

Little Boston Road

west of Hansville Road

288th Street west of

Hansville Road

Twin Spits Road east

of Hood Canal Drive

Gamble Bay Road

north of Grove Lane

1

Roadway segments with ADT volume data from before 2026 were projected to 2026 volumes using a 2% annual

growth rate.

2

ADT volume provided by Kitsap County.

3

ADT volume referenced from the Hansville Road Little Boston Road Analysis Report (Transpo Group, 2025).

4

ADT volume estimated from the traffic counts collected by TDG in April 2026.

5

V/C ratio calculated with 2026 ADT volumes.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 75

KH 090225140

2.4.4

Intersection Operations

The LOS calculations for intersections determine the amount of control delay (in seconds)

that drivers will experience while proceeding through an intersection. Control delay

includes all deceleration delay, stopped delay, and acceleration delay caused by the traffic

control device. The LOS is directly related to the amount of delay experienced.

The LOS at signalized, roundabout, and all-way stop-controlled intersections is based on

the average delay of all approaches. The LOS for two-way stop-controlled intersections is

based on average delays for the critical stopped approach. The LOS criteria for stopcontrolled intersections differ from signalized intersections due to signalized intersections

being designed to carry higher traffic volumes and experience greater delay. Geometric

characteristics and conflicting traffic movements are taken into consideration when

determining LOS values. Table 2-8 shows the level of service criteria for intersections.

Table 2-8: Level of Service Criteria for Stop-Sign Controlled Intersections

Intersection Control Delay

Level of

Service

Expected Delay

(Seconds per Vehicle)

Unsignalized

Signalized

Intersections

Intersections

Volume to

Capacity

(v/c)

A

Little/No Delay

<10

<10

0.0 to 0.5

B

Short Delays

>10 and <15

>10 and <20

0.5 to 0.7

C

Average Delays

>15 and <25

>20 and <35

0.7 to 0.8

D

Long Delays

>25 and <35

>35 and <55

0.8 to 0.9

E

Very Long Delays

>35 and <50

>55 and <80

0.9 to 1.0

F

Extreme Delays

>50

>80

> 1.0

The capacity analysis was completed utilizing the existing channelization and intersection

control. The peak hour factors and heavy vehicle factors from the existing traffic counts

were used in the LOS calculations for the PM peak hour period at the study intersections.

The capacity analysis worksheets are included in Appendix F of this report. The results of

the existing Level of Service Analysis are summarized in Table 2-9.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 76

KH 090225140

Table 2-9: Existing Roadway PM Peak Hour LOS - 2026

2026 PM Peak Hour

Intersection

1

Control

Two-Way

1.

Little Boston Road NE at

Little Boston Lane

2.

Admin Center North Driveway at

Little Boston Road NE

3.

Little Boston Road NE at

Admin Center South Driveway

Stop-Control

4.

Hansville Road NE at

Casino South Driveway

Stop-Control

5.

Hansville Road NE at

Little Boston Road NE1

Stop-Control

6.

Hansville Road NE at

288th Street

Stop Control

7.

Hansville Road NE at

SR-104

Stop-Control

Two-Way

Stop-Control

Two-Way

Two-Way

Two-Way

Two-Way

Signal

Delay

LOS

(sec)

A

9.0

A

9.4

B

10.0

B

11.3

F

65.6

D

27.9

D

41.0

2026 LOS and Delay calculations for Hansville Road NE at Little Boston Road NE are based on volumes

grown from 2025 volumes referenced from the Hansville Road Little Boston Road Analysis Report (Transpo

Group, 2025).

Most intersections, except for Hansville Road at Little Boston Road, the intersection of

Hansville Road at 288th Street, and the intersection of Hansville Road at SR-104, currently

operate at LOS B or better with the existing traffic volumes. The intersection of Hansville

Road at Little Boston Road operates at LOS F and the intersections of Hansville Road at

288th Street and Hansville Road at SR-104 operate at LOS D. Note the typical acceptable

standard for this area is LOS D or better.

Hansville Road / S R-104

This is the major intersection providing access to the Reservation. The intersection

currently operates at LOS D with a delay of 41.0 seconds. Although the intersection is

operating at an acceptable level, future growth will cause increased delays. Of the analyzed

intersections, Hansville Road at SR-104 had the highest number of collisions with 35 being

reported between 2021 and 2025. None of the reported collisions involved fatalities or

major injury.

A southbound right-turn lanes was proposed for construction at the intersection of

Hansville Road at SR-104 in the 2024 Kitsap County Statewide TIP (STIP) but was removed

Long Range Transportation Plan

September 2026 Update

September 2026

Page 77

KH 090225140

from the 2025 Kitsap County STIP. Based on the projected traffic operations at the

intersection of Hansville Road at SR-104, additional capacity and/or lanes will be required

to maintain acceptable LOS and cannot be improved by signal optimization alone.

Geometric improvements at this intersection would require WSDOT approval.

Hansville Road / Little Boston Road

The intersection currently operates at LOS F with a delay of 65.6 seconds. The intersection

currently does not operate at an acceptable level; future growth will worsen delay times.

Hansville Road at Little Boston Road had two collisions reported between 2021 and 2025.

None of the reported collisions involved fatalities or major injury.

Due to capacity restraints, a roundabout is planned to be constructed at this intersection.

The Hansville Road Little Boston Road Analysis Report completed in 2025 by Transpo

Group analyzed design alternatives for the proposed roundabout.

Hansville Road / Casino Entra nce

Land Use plans indicate that this area will develop as a business park and commercial area.

The new wastewater facility will facilitate expansion of business activities in the business

park area. There are several existing access points to Hansville Road. North of the Gliding

Eagle Gas Station, the only access points to Hansville Road are the north and south

entrances to the Casino. The intersection of Hansville Road at the Casino South Driveway

currently operates at LOS B with a delay of 11.3 seconds. The intersection currently

operates at an acceptable level. None of the reported collisions near the Casino driveways

involved fatalities or major injury.

Hansville Road / 288 t h Street

The intersection of Hansville Road at 288th Street had seven reported collisions between

2021 and 2025. One of the reported collisions near the Casino driveways involved a major

injury. Due to Hansville Road being the major roadway into the Reservation, delay is

anticipated to increase in the future years with traffic growth. The Warrior Ridge master

planned north-south roadway would provide both capacity and emergency access relief

once constructed.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 78

KH 090225140

3

FUTURE CONDITIONS

3.1

Future Land Use

PGST approved its first Comprehensive Land Use Plan in 2003. A more refined conceptual

master plan was prepared in 2008 adding more specificity and development options. The

plan was again refined in 2018 to provide development options for three large areas on the

Reservation, including the Business Park, Warrior Ridge, and Heronswood. It is important to

note that the goals, objectives, and standards reflected in the 2003 remain official policy

today. The plan provides policy guidance for Tribal land use, commercial development,

and assertion of Tribal protectable interest in resources of value, both on and off the

Reservation. The plan proposes phased development of land use review and regulatory

systems including land use designations, development standards, environmental

protections, building permit processes, and permit tracking. Goals include:

⚫

Provide a mix of affordable housing and lot sizes in clean and safe neighborhoods

⚫

Provide for future housing needs by developing housing in newly acquired lands

and north end of the Reservation

⚫

Provide a concentration of community facilities at the Tribal Government Center

⚫

Create a network of community trails, walking paths, and view shed areas along

Little Boston Road

⚫

Establish commercial/business/industrial zones along Hansville Road

⚫

Convert the Ravenwood Trailer Park into a commercial area

⚫

Create a business park at the frontage of Hansville Road north of the Little Boston

intersection

⚫

Create a retail anchor and high profile "gateway" to the Reservation

⚫

Acquire northeast acreage of DNR to expand Tribal Reservation land

In 2018, the Trial Council adopted a series of refinements to the original plan. Three distinct

areas (Business Park, Warrior Ridge, and Heronswood) were subject to a detailed planning

process. The result makes up the 2018 Master Plan. The build-out of this Master Plan will

require access roads, service roads, and internal circulation roads. The development plans

showing conceptual roads and development plans are included in Appendix G. The entire

plan set (including maps, narrative, and conceptual layouts) for each area have not been

included in the appendices because of size constraints, but it is the Tribal Council’s

intention that the 2018 Master Plan be included and made a part of this 2026 LRTP Update

as Appendix G.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 79

KH 090225140

Figure 3-1: 2018 Adopted Land Use Plans for Business Park, Warrior Ridge, and

Heronswood

Long Range Transportation Plan

September 2026 Update

September 2026

Page 80

KH 090225140

The following is a summary of the changes in Tribal land use in the past five years.

3.1.1

Housing Development

In 2020, a 29-lot residential development, known as Old Red Cedar Subdivision, was started

and progress has been made on road access, utilities, and several of the lots. The project

included the provision of additional water and sewer capacity for serving future residential

developments such as Kloomachin North. A new development on Warrior Ridge is also in

progress which will include a new road system that will connect Little Boston Road NE to

NE 288th Street. The first two phases of ten planned phases have been completed with the

construction of 37 single-family housing units, four apartment buildings, and four

duplexes. Another development, known as Raccoon Town, is currently under construction

and is anticipated to be finished by the end of 2026 with 39 new residential lots. In

addition, a number of new replacement homes have been constructed by the Housing

Authority. Approximately five new homes have been constructed or purchased under the

Housing Authority “184 Program.”

3.1.2

Tribal Government Center

A new Integrated Health Facility was completed in 2021. A new Natural Resources Fish

Laboratory was constructed in 2019 adjacent to the Children and Family Services building.

The Administration Campus Redevelopment is currently in the planning phase and is

anticipated to include a new administration building, gym, community center,

subterranean garage, parking lot, and open space amenities.

PGST intends to move all Wellness employees into the new Integrated Health Facility and

remodel the Wellness building for court operations and staff.

3.1.3

Community Trails

A Trail System Concept Plan was developed in 2006 with the assistance of a grant from the

National Parks Service. One phase of a mixed-use trail has been completed and connects

the Gliding Eagle Market with the lower reach of Little Boston Road NE. As of 2026, the trail

has been extended to the Admin Campus, completed in 2025. A geotechnical report has

been completed for the next phase of the trail up to the Tribal Center in 2024. Sidewalks

were constructed within the Administration Campus (Tribal Government Center). The next

phase will connect these two facilities to provide a safe path for pedestrians that is

separated from Little Boston Road NE.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 81

KH 090225140

3.1.4

Expand Reservation

PGST has been actively pursuing new land purchases in the last few years and has

purchased:

⚫

Pope property (20.24 acres Trust Status 2014)

⚫

Heronswood property (14.97 acres Trust status 2014)

⚫

Blue House property (35.63 acres Trust status 2016)

⚫

Foxglove property (9.20 acres Trust status 2018)

⚫

Hansville Block property (924.91 acres in 2019).

⚫

Kountry Korner (0.89 acres in 2017)

⚫

South Kountry Korner (1.56 acres in 2020)

⚫

A&A Tree Farms (14.40 acres in 2023)

⚫

Duckabush 47 (47.56 acres in 2023)

⚫

Fall property (7.33 acres in 2024)

⚫

Gunnerman property (3.56 acres in 2024)

⚫

Miller Lake (265.00 acres in 2024)

⚫

Minder Meats (1.57 acres in 2025)

⚫

Bjarnson Property (13.57 acres in 2025)

Table 3-1: Tribal Lands as of July 2025

Land Area

Acreage

Source of Acreage

Acquired

Data

by Tribe

Converted

Proclaimed

to Trust

as

Land

Reservation

Reservation

Uplands (1938

2008 BLM Survey

3/12/1936

6/16/1938

6/16/1938

67.20

1936 Warranty Deed

3/12/1936

6/16/1938

6/16/1938

Warrior Ridge

390.28

Wengler Survey

1/6/2005

2/29/2012

6/22/2016

Pope 20-Trust

20.24

Wengler Survey

9/26/1989

7/31/2014

6/22/2016

boundary)

Tidelands (1938

boundary

Total

1,229.75

1,707.47

Off Reservation Trust Lands

Heronswood

14.97

BLM LDR Certificate

7/12/2012

7/15/2024

N/A

Blue House

35.63

Wengler Survey

5/7/2003

10/12/2016

N/A

Foxglove

9.2

BLM LDR Certificate

11/21/2016

1/3/2018

N/A

3/6/2020

6/18/2025

N/A

Miller Bay Road

Property

Total

1.56

Proctor survey for

BLA

61.36

Long Range Transportation Plan

September 2026 Update

September 2026

Page 82

KH 090225140

Land Area

Acreage

Source of Acreage

Acquired

Data

by Tribe

Converted

Proclaimed

to Trust

as

Land

Reservation

Off Reservation Fee Lands

Pope 20-Fee

Simonsen

property

20.08

Wengler Survey

9/26/1989

N/A

N/A

1.07

County Assessor

12/23/2011

N/A

N/A

12/16/2019

N/A

N/A

7/31/2017

N/A

N/A

3/6/2020

N/A

N/A

9/7/2023

N/A

N/A

12/20/2023

N/A

N/A

Hansville Block

924.91

Kountry Korner

0.89

South Kountry

Korner

1.56

WestSound & David

Evans Surveys

Proctor survey for

BLA

Proctor survey for

BLA

A&A Tree Farms

14.40

Duckabush 47

47.56

Fall property

7.33

County Assessor

7/29/2024

N/A

N/A

3.56

County Assessor

9/13/2024

N/A

N/A

265.00

Proctor survey

10/28/2024

N/A

N/A

1.57

Kitsap Co Assessor

4/28/2025

N/A

N/A

13.57

Kitsap Co Assessor

7/15/2025

N/A

N/A

Gunnerman

property

Miller Lake

Minder Meats

Bjarnson

property

Total

Total Acreage

Tribal Lands

County Assessor

Jefferson County

Assessor

1,299.94

3,068.77

There remains a large, unmet need for new residential lots for Tribal members.

In order to fill this need, substantial infrastructure improvements will be required. New

roads will need to be constructed to serve future residential areas. These roads will link to

the existing transportation network. Figure 1-2 shows the proposed residential areas to be

developed, as well as the boundary of the Commercial Zone/Business Park.

The 2018 Master Plan shows proposed land uses for the business park, Heronswood

property, and Warrior Ridge. The 2018 Master Plan is intended to refine the 2007

Conceptual Master Plan by providing more specific proposals for a road network, housing

types, utilities, and so on within these planning areas.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 83

KH 090225140

One area of redevelopment that was not included in the Master Plan is Point Julia, the

primary marine access point on the Reservation. However, a recent grant application

summarized the plans for the Point Julia Brownsfield cleanup and subsequent

redevelopment:

This project will be redeveloped jointly with the PGST’s plans for a future boat

ramp and water trail system connecting the various ports and docks. Walkways

will link existing parks and trails to the Tribal center along a scenic waterfront

capitalizing on vegetation and greenways. Low impact site development will

provide pollution free access to the natural beauty of the Hood Canal’s Puget

Sound environment.

The proposed construction will replace existing bare pavement and grass with

Low Impact Development (LID) across the site; increase landscaped areas by 35%;

and construct non-motorized multiple use paths, picnic tables, and greenways.

The location and size of the site and adjacent properties provides an exceptional

opportunity for re-development with a park-like setting capitalizing on natural

vegetative barriers that reduce contaminated stormwater runoff. Landscape

designs will emphasize use of native plant establishment that are naturally

‘water-wise’ (reduced water usage).

Development plans include recycling viable properties using existing

infrastructure to reduce resource consumption, utilize fish-friendly dock or ramp

facilities, protect undeveloped open space from development, and prevent sprawl.

As part of this and associated projects, the PGST is adopting “Low-ImpactDevelopment” (LID) strategies that incorporate sustainable systems, water

reuse/conservation, and reduce runoff.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 84

KH 090225140

Figure 3-2: PGST Land Purchase 924 acres

Long Range Transportation Plan

September 2026 Update

September 2026

Page 85

KH 090225140

Figure 3-3: Land Purchase 924 acres

Long Range Transportation Plan

September 2026 Update

September 2026

Page 86

KH 090225140

3.2

Transportation Need Analysis

In addition to future land use analysis, there are several factors that need to be considered

in the development of future roads and other elements of the Transportation Network.

These include:

⚫

Current and future traffic patterns

⚫

Social/economic development

⚫

Health and safety

⚫

Environmental concerns

⚫

Scenic byways/tourism

⚫

Development and protection of natural resources

⚫

Energy conservation

⚫

Integration with Land Use Planning

3.2.1

Traffic Patterns

In general, the current traffic patterns are expected to remain the same in the future. The

only potential change would be the Warrior Ridge north south roadway that could provide

an alternative north south local travel way and emergency access between 228 th Street and

Little Boston Road. Currently, residential areas are clustered on smaller streets (BIA Class 3)

which then funnel traffic onto section line and/or stub type roads (BIA Class 4), which

collect traffic for arterial type roads (BIA Class 2). Arterial roads provide an integrated

network having the characteristics for serving traffic between large population centers.

Arterials may also link smaller towns and communities together. Commercial areas are

more likely to be located closer to arterials for quick access to other businesses and other

community areas.

The goal to create a network of community trails, walking paths, and view shed areas

along Little Boston Road will require an update to the existing network. Current pedestrian

and bike use is limited predominantly to the existing roads. The establishment of a

separate network of paths and trails will provide safe access and will create a new traffic

pattern.

3.2.2

Social and Economic Development

One of the primary goals of PGST is to create a retail anchor and high profile "gateway" to

the Reservation. This will provide increased opportunities for both social and economic

development. The expansion of the Casino provided social and economic stimulus. New

jobs were created, and the earning capacity of the economic enterprise increased. Further

Long Range Transportation Plan

September 2026 Update

September 2026

Page 87

KH 090225140

expansion of the commercial zone and increased business opportunities will complement

the existing Casino and convenience store/gas station enterprises.

Another goal of PGST is to provide a concentration of community facilities at the Tribal

Administration Complex. The concentration of facilities has increased the overall traffic

volume to the Tribal Administration Complex but has also made it more convenient for

Tribal members to receive services in one central location. In 2011, street and pedestrian

improvements were made to most of the Administration Complex. A short stretch of road

which serves the health and dental clinics, library, Housing Authority office, and

administration offices for preschool does not have continuous pedestrian access.

Figure 3-4: Tribal Admin Campus Map

Long Range Transportation Plan

September 2026 Update

September 2026

Page 88

KH 090225140

3.2.3

Health and Safety

A primary goal of transportation planning is to ensure a safe and effective network for

moving people. Transportation networks are often comprised of mostly roads for vehicular

traffic. PGST has a high population of youth, elders, and others who use alternative modes

of travel. It is especially important to keep walkers, bicyclists, and other users safe from

conflicts with vehicular traffic. The development of a network of paths and trails will help

meet this goal, but attention must also be paid to the interaction of vehicles and other

users at road crossings and other intersections.

A network of paths will provide a unique opportunity for fitness and health. With an

increase in the use of the trail network, an increase in the health of the community will be

achieved. In addition, a decrease in the amount of vehicle trips will commensurately

decrease the emissions from vehicles.

3.2.4

Environmental Concerns

Construction of new roads requires a balance between the needs of the users and the

sensitivity of the surrounding environment. There are numerous sensitive areas on the

Reservation that need to be considered during the planning phase of future roads and

other network elements. There are steep slopes, wetlands, creeks (some of which are fishbearing), and other critical habitats. There are also culturally sensitive areas that need to be

considered when developing plans for future transportation improvements. The

construction of new roads should avoid these areas as much as possible. If impacts cannot

be avoided, appropriate mitigation measures should be required.

Prior to projects being started on the Reservation, the Tribe conducts a "Title 24" process in

which various departments can provide feedback and/or concerns; especially the Tribes’

Natural Resource and Cultural Resource departments.

3.2.5

Scenic Byways and Tourism

There are currently no scenic byways designated on the Reservation. However, with the

increase in traffic that is anticipated to follow the increased development of the Tribal

Government Center, the Casino, and the commercial zone, the possibility of developing a

Scenic Byway designation is appealing. Tourists who arrive for casino and shopping

experiences could also drive a scenic route that may include both on- and off-Reservation

Scenic Byways.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 89

KH 090225140

3.2.6

Development and Protection of Natural Resources

The primary natural resource currently available to PGST is forestry. A road network is in

place to access forestry lands but is in disrepair. There are no current mining operations,

agricultural uses, or oil extraction activities on the Reservation. There are currently no

plans to develop extraction or agricultural activities on the Reservation. A Forestry

Management Plan is regularly updated, and timber harvests are scheduled according to the

plan. The Forestry Management Plan includes mapping of forestry and other uses (See

Figure 1-3) to prevent another land use from conflicting with the management of the

forestry resource.

3.2.7

Energy Conservation

As discussed in 3.2.3 Health and Safety, an increase in the use of pedestrian and bicycle

facilities will decrease vehicle use. This is one of the easiest ways to conserve energy. Public

transit is also effective in reducing energy use. There are currently no plans to increase the

public transit available on the Reservation beyond the on-demand service currently

available to Kingston. However, Tribal members often ride share to and from work and

other activities throughout the Reservation.

3.2.8

Integration with Land Use Planning

Land Use and Transportation features relate to each other. The location and density of

development influences traffic patterns, and in turn the accessibility of a site influences

potential land use. For example, without separated pedestrian facilities, vehicular use is

more common. Transportation planning requires that the system as a whole is analyzed.

For example, can the transportation system accommodate the increased growth that

comes from increased development? Section 3.4 Future Traffic Operations looks at

capacity of roads with additional traffic.

3.3

Future Transportation Improvements

Many resources include future transportation improvement projects. These include Tribal

plans, County TIPs, State Route Development Plans, and other LRTP goals and planning

documents. Those plans that include and affect the routes that are currently a part of the

approved NTTFI are discussed below.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 90

KH 090225140

3.3.1

Kitsap County Six-Year Transportation

Improvement Program

Transportation projects in unincorporated Kitsap County are implemented through the SixYear TIP and the Capital Improvement & Preservation Program. New projects identified in

the 2026-2031 County TIP are identified in the map below.

Figure 3-5: Kitsap County Kingston 2026-2031 TIP

3.3.2

WSDOT STIP

Review of the WSDOT STIP (2026-2029) shows several transportation projects that will

impact PGST. These are done in partnership with the County and PGST and are shown on

the previous map.

3.3.3

WSDOT Route Development Plans

SR-3 Route Development Plan - This plan will study the transportation needs on SR-3

between SR-305 in Poulsbo and the Hood Canal Bridge. The focus is on long-term mobility

and short-term safety improvements. This corridor was selected for the current study to

address congestion caused by increasing traffic and the daily openings at the Hood Canal

Bridge.

SR 104 EIS NEPA Pilot Project - WSDOT studied SR-104 because it is anticipated that steady

growth on the Olympic and Kitsap peninsulas will cause significant delays on this route by

Long Range Transportation Plan

September 2026 Update

September 2026

Page 91

KH 090225140

2025. The project was one of three national pilot projects to test a new process to

streamlining the environmental review and approval of transportation projects. A

Preliminary Draft Environmental Impact Statement (EIS) has been prepared; however,

project funding ended and there are no plans to restart this project at this time.

3.3.4

The Olympic Region Financially Constrained 20 -Year

Mobility Strategies

SR-104

⚫

SR-307 to Lindvog Road - widen from 2/3 lanes to 4 lanes; access management

⚫

Lindvog Road to Kingston Ferry and Couplet - Construction additional lanes and

signals per SR-104 Corridor Traffic Circulation Improvements

⚫

SR-305 to SR-104 - Widen from 2 lanes to 4 lanes; access control.

⚫

SR 303 from Sheridan to Ridell – Install adaptive signal system at signalized

intersections

3.3.5

PGST Comprehensive Plan

PGST's 2003 Comprehensive Land Use Plan includes the following transportation goals:

⚫

Study realignment and improvement of Little Boston Road behind the Tribal

Government Center to increase safety, facilitate traffic flow, and access to

community facilities.

⚫

Provide a network of sidewalks, trails, and paths, including bike paths, to improve

community safety and recreation.

⚫

Provide adequate streetlights, signage, and road maintenance for safety and orderly

traffic flow.

⚫

Establish access road conditions in the forested area to improve community

access to natural areas while providing controls for trespass and woodcutting.

⚫

Establish a road access plan for any newly acquired lands with an emphasis

on access for housing.

⚫

Develop a transportation plan, including access and parking, for all

commercial/industrial areas.

The current status of each of the stated goals are included below:

⚫

The realignment of Little Boston Road was not pursued. As the Administration

Complex grew a third primary access point to the government services area was

added at the northern margin. This access provides capacity for increased traffic

Long Range Transportation Plan

September 2026 Update

September 2026

Page 92

KH 090225140

volume, increases pedestrian safety, and increases access to facilities. The

additional access point meets the stated goals without incurring the additional

expense and conflict of rerouting the main arterial.

⚫

A Trail Plan was adopted in 2006 and included several phases and types of trails to

serve the community. See Section 3.4 Nonmotorized Element for further details.

⚫

The Planning Department is currently pursuing the installation of streetlights at

several major locations along the trail route. Most intersections within the

Reservation are lit and signed. There are some missing signs on residential streets

that need to be installed to increase safety for users. A maintenance plan for street

signs will need to be prepared. All new street signs should be reflective to meet the

requirements of the Manual on Uniform Traffic Control Devices (MUTCD).

⚫

Forest service roads, while included in the Priority List, have not been funded with

Tribal Transportation dollars. The priorities have been new construction and repair of

existing residential and marine access roads. Other funding sources have been used to

install gates in locations where trespass has been an issue.

⚫

As the commercial/business park zone develops, it is expected that there will be a

need for a left-hand turn lane from Hansville Road, and corridor improvements will

likely include access control and internal connections between the Casino,

commercial uses, and residential uses. Improvements to Hansville Road (a County

maintained road) will be made in cooperation with the County. The County installed

a pocket turn lane at the Little Boston Road/Hansville Road intersection in 2004. A

blinking yellow caution light was established in 2015. The County also installed a center

turn lane for the southern access point to the Casino and commercial zone (with

contributions from PGST). In 2011, PGST extended the left-hand turn lane to include a

new casino entrance north of the previous location.

3.4

Future Traffic Operations

To assess the future transportation needs of the PGST Reservation, and the ability of the

existing roadway network to accommodate planned growth, traffic volumes were

estimated for the 2036 and 2046 horizon years. A 2% annual growth rate was applied to

the 2026 volumes to estimate future traffic volume projections.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 93

KH 090225140

3.4.1

Future Roadway Operations

Table 3-2: Projected Roadway LOS - 2036

Roadway Segment

Hansville Road north

of Buck Lake Road

Hansville Road north

of Eglon Road

Hansville Road south

of Eglon Road

Casino south

entrance/Salish Lane,

west of Hansville

Road

Hansville Road north

of Little Boston Road

Hansville Road north

of 288th Street

Hansville Road north

of SR-104

2036 ADT

Volume

Roadway

Capacity

V/C

Ratio

LOS

Roadway

Capacity at

LOS D

Reserve

Capacity at

LOS D

1,995

15,000

0.13

A

13,350

11,355

3,464

15,000

0.23

A

13,350

9,886

7,613

15,000

0.51

A

13,350

5,737

1,342

10,000

0.13

A

8,900

7,558

10,552

15,000

0.70

C

13,350

2,798

13,132

15,000

0.88

D

13,350

218

13,915

15,000

0.93

E

13,350

-565

3,726

13,200

0.28

A

11,748

8,022

1,541

10,000

0.15

A

8,900

7,359

1,972

10,000

0.20

A

8,900

6,928

1,764

10,000

0.18

A

8,900

7,136

Little Boston Road

west of Hansville

Road

288th Street west of

Hansville Road

Twin Spits Road east

of Hood Canal Drive

Gamble Bay Road

north of Grove Lane

Based on the data, the overall projected 2036 LOS on the approach roadways, except for

Hansville Road, to the Reservation is acceptable, and there is adequate capacity to serve

projected traffic. Along Hansville Road from SR-104 to south of 288th Street, the projected

LOS is anticipated to operate at LOS E and along Hansville Road north of 288th Street

anticipated to operate at LOS D.

Table 3-3 provides a summary of the roadway segment future LOS for the 20-year horizon.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 94

KH 090225140

Table 3-3 provides a summary of the roadway segment future Levels of Service for the 10year horizon. The roadway segment calculations are included in Appendix F of this report.

Table 3-2: Projected Roadway LOS - 2036

Roadway Segment

Hansville Road north

of Buck Lake Road

Hansville Road north

of Eglon Road

Hansville Road south

of Eglon Road

Casino south

entrance/Salish Lane,

west of Hansville

Road

Hansville Road north

of Little Boston Road

Hansville Road north

of 288th Street

Hansville Road north

of SR-104

LOS

Roadway

Capacity at

LOS D

Reserve

Capacity at

LOS D

0.13

A

13,350

11,355

15,000

0.23

A

13,350

9,886

7,613

15,000

0.51

A

13,350

5,737

1,342

10,000

0.13

A

8,900

7,558

10,552

15,000

0.70

C

13,350

2,798

13,132

15,000

0.88

D

13,350

218

13,915

15,000

0.93

E

13,350

-565

3,726

13,200

0.28

A

11,748

8,022

1,541

10,000

0.15

A

8,900

7,359

1,972

10,000

0.20

A

8,900

6,928

1,764

10,000

0.18

A

8,900

7,136

2036 ADT

Volume

Roadway

Capacity

V/C

Ratio

1,995

15,000

3,464

Little Boston Road

west of Hansville

Road

288th Street west of

Hansville Road

Twin Spits Road east

of Hood Canal Drive

Gamble Bay Road

north of Grove Lane

Based on the data, the overall projected 2036 LOS on the approach roadways, except for

Hansville Road, to the Reservation is acceptable, and there is adequate capacity to serve

projected traffic. Along Hansville Road from SR-104 to south of 288th Street, the projected

LOS is anticipated to operate at LOS E and along Hansville Road north of 288 th Street

anticipated to operate at LOS D.

Table 3-3 provides a summary of the roadway segment future LOS for the 20-year horizon.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 95

KH 090225140

Table 3-3: Projected Roadway LOS - 2046

Roadway Segment

Hansville Road north

of Buck Lake Road

Hansville Road north

of Eglon Road

Hansville Road south

of Eglon Road

Casino south

entrance/Salish Lane,

west of Hansville

Road

Hansville Road north

of Little Boston Road

Hansville Road north

of 288th Street

Hansville Road north

of SR-104

2046 ADT

Volume

Roadway

Capacity

V/C

Ratio

LOS

Roadway

Capacity at

LOS D

Reserve

Capacity at

LOS D

2,436

15,000

0.16

A

13,350

10,914

4,230

15,000

0.28

A

13,350

9,120

9,298

15,000

0.62

A

13,350

4,052

1,639

10,000

0.16

A

8,900

7,261

12,887

15,000

0.86

D

13,350

463

16,038

15,000

1.07

F

13,350

-2,688

16,995

15,000

1.13

F

13,350

-3,645

4,550

13,200

0.34

A

11,748

7,198

1,882

10,000

0.19

A

8,900

7,018

2,408

10,000

0.24

A

8,900

6,492

2,155

10,000

0.22

A

8,900

6,745

Little Boston Road

west of Hansville

Road

288th Street west of

Hansville Road

Twin Spits Road east

of Hood Canal Drive

Gamble Bay Road

north of Grove Lane

For the 20-year horizon, the overall projected LOS on the approach roadways, except for

Hansville Road, to the Reservation is expected to stay within acceptable LOS with adequate

capacity to serve projected traffic. Along Hansville Road from SR-104 to north of 288th

Street, the projected LOS is anticipated to operate at LOS F and along Hansville Road north

of Little Boston Road anticipated to operate at LOS D.

Improvements will need to be completed along Hansville Road to improve operations and

reduce delays. Providing left-turn lanes along Hansville Road at significant intersections

improves ADT capacity levels closer to 18,000 ADT which would return link LOS for

Hansville to near LOS D/E levels. Additionally, the Warrior Ridge developments north south

Long Range Transportation Plan

September 2026 Update

September 2026

Page 96

KH 090225140

roadway could help reduce ADT on a large section of Hanville Road. Development and

growth are likely to cause future delays and possible safety issues (See Section 2.4.3).

3.4.2

Future Intersection Operations

The future 2046 PM peak hour volumes are shown in Figure 3-6. Table 3-4 summarizes the

projected 2036 and 2046 intersection LOS. The capacity analysis worksheets are included

in Appendix F of this report.

Table 3-4: Projected Intersection PM Peak Hour LOS – 2036 and 2046

Intersection

2036 PM Peak

2046 PM Peak

Hour

Hour

Control

LOS

1.

Little Boston Road NE at

Little Boston Lane

2.

Admin Center North Driveway at

Little Boston Road NE

3.

Little Boston Road NE at

Admin Center South Driveway

4.

Hansville Road NE at

Casino South Driveway

5.

Hansville Road NE at

Little Boston Road NE1

6.

Hansville Road NE at

288th Street

7.

Hansville Road NE at

SR-104

1

Two-Way

Stop-Control

Two-Way

Stop-Control

Two-Way

Stop-Control

Two-Way

Stop-Control

Two-Way

Stop-Control

Two-Way Stop

Control

Signal

Delay

(sec)

Delay

LOS

(sec)

A

9.2

A

9.5

A

9.7

B

10.1

B

10.5

B

11.2

B

12.4

B

14.4

F

132.3

F

>1,000

F

52.3

F

194.1

F

80.3

F

135.5

2036 and 2046 LOS and Delay calculations for Hansville Road NE at Little Boston Road NE are based on

volumes grown from 2025 volumes referenced from the Hansville Road Little Boston Road Analysis Report

(Transpo Group, 2025).

Most intersections, except for Hansville Road at Little Boston Road, the intersection of

Hansville Road at 288th Street, and the intersection of Hansville Road at SR-104 are

anticipated to operate at LOS B or better with the project 2046 traffic volumes. The

intersection of Hansville Road at Little Boston Road, the intersection of Hansville Road at

288th Street, and intersection of Hansville Road at SR-104 are anticipated to operate at LOS

F with Hansville Road at Little Boston Road expected to operate with significantly higher

delay. Geometric improvements are likely to be needed in order to improve the operations

at both intersections.

Long Range Transportation Plan

September 2026 Update

September 2026

Page 97

KH 090225140

Figure 3-6: Future 2046 PM Peak Hour Volumes

Long Range Transportation Plan

September 2026 Update

September 2026

Page 98

KH 090225140

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

September 2026 Update | Frix