Dowagiac River Restoration

Tribal code

Ask Donna

What actually matters in this document.

Text

Dowagiac River Restoration

Final Assessment Report

June 27, 2013

Prepared for:

Pokagon Band of Potawatomi

58620 Sink Road

Dowagiac, MI 49047

DOWAGIAC RIVER RESTORATION

DOWAGIAC RIVER ASSESSMENT

FINAL REPORT

Prepared for

Pokagon Band of Potawatomi

58620 Sink Road

Dowagiac, MI 49047

Prepared by

Inter-Fluve, Inc.

301 S. Livingston St., Suite 200

Madison, WI 53703

608-441-0342

June 27, 2013

June 11, 2013

[2]

DOWAGIAC RIVER RESTORATION

TABLE OF CONTENTS

INTRODUCTION................................................................................................................................4

PROJECT GOALS ...........................................................................................................................4

CRITICAL ELEMENTS IN THIS REPORT .................................................................................................6

WATERSHED OVERVIEW ....................................................................................................................7

GENERAL ...................................................................................................................................7

HISTORIC IMPACTS .......................................................................................................................9

GEOLOGIC HISTORY .................................................................................................................... 13

Bedrock Geology .......................................................................................................................................... 13

Glacial Geology ............................................................................................................................................ 14

SOILS AND WETLANDS................................................................................................................. 18

FLORA AND FAUNA ..................................................................................................................... 20

FIELD ASSESSMENT RESULTS .............................................................................................................22

GEOMORPHIC ANALYSIS ..............................................................................................................22

upper watershed condition ......................................................................................................................... 22

Existing project reach Conditions ................................................................................................................ 31

Historic Conditions....................................................................................................................................... 36

SEDIMENTATION ........................................................................................................................ 43

Depth of Refusal Survey .............................................................................................................................. 43

RODGERS POND ........................................................................................................................ 49

HYDROLOGIC ANALYSIS ...............................................................................................................53

Flood Magnitudes ........................................................................................................................................ 54

Base Flows ................................................................................................................................................... 57

Changes to watershed hydrology ................................................................................................................ 58

HYDRAULIC ANALYSIS ................................................................................................................. 62

Existing Conditions....................................................................................................................................... 63

Proposed Conditions.................................................................................................................................... 66

Project-Related Changes ............................................................................................................................. 67

DESIGN RECOMMENDATIONS ............................................................................................................76

PLAN FORM ALIGNMENT OF DOWAGIAC CHANNEL.............................................................................76

DOWAGIAC CROSS SECTIONAL GEOMETRY ....................................................................................... 80

HABITAT ELEMENTS OF RESTORED DOWAGIAC CHANNEL .....................................................................81

Floodplain Habitat ....................................................................................................................................... 81

In-Channel Habitat ....................................................................................................................................... 82

RODGERS LAKE OUTLET ...............................................................................................................88

CONSTRUCTABILITY AND COSTS .....................................................................................................89

CHALLENGES AND FURTHER INVESTIGATION FOR FINAL DESIGN ............................................................. 90

REFERENCES..................................................................................................................................91

APPENDIX A – MAPS ...................................................................................................................... 94

APPENDIX B – RESULTS OF TREE SURVEY ............................................................................................. 94

APPENDIX C – PHOTO LOG ...............................................................................................................94

June 11, 2013

[3]

DOWAGIAC RIVER RESTORATION

INTRODUCTION

The Pokagon Band of Potawatomi Indians are one of the only native american tribes within the midwest that

reside on their ancestral lands. Though many of the Potawatomi people were subjected to the forced removal

policy of the US government and moved to reservations in the west, a small band under the direction of

Chief Leopold Pokagon were able to remain. Silver Creek and Pokagon Townships within Cass County

encompass most of the current land holdings of the tribe. The Dowagiac River flows through these

townships and within tribal lands. True to the tribal culture of respect for Mother Earth, the band has

endeavored to heal historic impacts created by the channelization of the Dowagiac.

The management of waterways has evolved across the nation as science has illuminated the correlation

between healthy river corridors and clean drinking water, flood abatement, and nutrient processing among a

multitude of other beneficial relationships. No longer are the goals of development (primarily agriculture

here) and healthy rivers in opposition, with techniques to successfully accomplish both well understood and

proven. Benefits of healthy river systems for fishing, hunting, paddling, and the general aesthetics of a natural

system are valued in both urban and rural communities. For these reasons many local stakeholders are

seeking river revitalization as both an economic and ecological positive for the community.

Figure 1. The valley of the historic Dowagiac River is very similar to this drawing. Channelization in

the early 1900s cut a straight channel through the valley, restoration seeks to return to this more

natural condition, depicted here.

PROJECT GOALS

The boundaries for this restoration project run approximately from Peavine Street to just above Crystal

Springs Street at the tribal property boundary. Discussions with tribal biologists have outlined a set of Project

Goals that are used to inform and guide the design approach. Goals were developed specific to the two major

elements of the river corridor, the river channel itself, and the floodplain on either side of the channel (Figure

June 11, 2013

[4]

DOWAGIAC RIVER RESTORATION

2). Project goals have been discussed with the tribe and categorized into goals related to the channel proper

and the adjacent floodplain of the system.

Dowagic River Channel

Increase frequency of pool habitat and riffle

habitat (if appropriate)

Increase the frequency of large wood habitat,

both single logs and jams

Restore sinuosity and meanders to near prechannelization conditions

Maintain recreational passage through the

channel

Re-establish more natural patterns of scour

and deposition to create bed heterogeneity

Eliminate or minimize flood profile changes

upstream that may impact adjacent

neighbors

Dowagic River Floodplain

Increase the frequency and extent of

floodwater accessing the floodplain

Preserve and increase microtopographic

features that develop complex habitat types

on the floodplain

Breach or remove levee spoils placed during

channelization in the early 1900s

Re-establish or maintain tribally significant

vegetation within the floodplain

Ecological goals will be accomplished through a return to the pre-disturbance channel. This report centers on

the understanding of historic phases of manipulation to the watershed and the river corridor itself that

resulted in todays Dowagiac River system. By understanding the “layers of impact,” restoration can begin to

peel back those layers and return the system to a more functional condition. Restoration must occur however

within the contemporary watershed constraints which have developed over nearly 100 years.

Roads, bridges, and homes have been built within the corridor. Agriculture thrives within the historic swamp

lands of the headwaters near Decatur. Restoration goals must be accomplished only to the extent that

changes to these existing uses are understood in detail and demmed acceptable. Often termed a “good

neighbor policy” it is common for river projects to define changes not only within the project area but above

and below as well, ensuring that these changes are acceptable to adjacent landowners.

June 11, 2013

[5]

DOWAGIAC RIVER RESTORATION

Figure 2. This house upstream of Peavine St. is sited very near the Dowagiac floodplain

CRITICAL ELEMENTS IN THIS REPORT

This report is a synopsis of the data collection phase of the project. Data collection focused on two areas, the

collection of field information (surveys, photographs, cores of sediments, probing the existing river etc) as

well as the collection and review of existing, published information (DNR reports, bridge information,

historic documents, landownership records etc.). Several critical elements of the project were identified at the

outset of the project and the data here is intended to shed light on these areas.

#1 – Changes to Sediment Transport – Rivers move water and sediment downstream, this is their basic physical

purpose dictating all other functions. This is how the Dowagiac valley was formed, as the river cut vertically

and horizontally into the landscape eroding sediment over time down to the St Joseph River. Several changes

occurred to natural rates of sediment and water transport. First, the watershed was likely clearcut in the mid1800s for agriculture and timber harvest. This essentially removed the protective “blanket” of vegetation

throughout the watershed and opened bare ground to erosion by rainfall – delivering more sediment to the

river than normal. Over the last several decades the watershed has likely reduced the delivery of sediment to

the channel as soil conservation practices, re-vegetation, and paving of roads have all reduced erosion.

Whether this reduction is a return to more “natural” levels of the early 1800s is unknown. The second change

was the channelization itself in the early 1900s which increased the slope and energy of the channel to

transport sediment and increased the velocity and speed with which water could flow downstream. In essence

the channel appears to have been very efficient over the last 100 years at moving both water and sediment

along a near constant bed slope established by the channelization project. This has been to the detriment of

the health of the river. Putting the river back into its historic channel will create an anomaly within this

efficient corridor, creating +/- 5 miles of new channel where currently only +/- 3 miles of straight channel

exist. This section will have a flatter bed slope and water will be allowed to flood laterally out onto the

floodplain. If the upstream watershed is delivering a large load of sediment through the channel, once this

load encounters our project reach, it may deposit within the lower slope section of the project. If the

June 11, 2013

[6]

DOWAGIAC RIVER RESTORATION

sediment load from upstream is small, it will likely pass through the restoration section without causing

significant changes.

#2 – Presence of Riffles – The document “Feasibility Assessment for Rehabilitating the Dowagiac River System

in Southwestern Michigan - A Watershed Analysis of Potential Changes to the Ecology and

Community” (Clarke et al., 1998) includes a well- researched and thorough account of the watershed and the

potential for restoration. Within this report, the restoration of the channel calls for the establishment of riffles

and pools within the channel. The character of a river varies along its length, occasionally quite abruptly. It is

not uncommon to find wetland sections of river channel where the bed slope is relatively flat, the channel

narrow and deep, and a bed composed of sand or organic material, though coarse gravel can be encountered

as well. Other sections feature a steeper bed slope with a well-defined channel and gravel bed. Water depth

varies from deep in pools to shallow in riffle areas. Rock riffles occur with regularity between meander pools

in this type of river. The latter form appears to be intact within the vicinity of Kinzie Road on the Dowagiac,

though was not investigated in detail. The former, more wetland-like channel section is apparent in the upper

sections of the river near Decatur. In between these two areas the river likely transitioned between wetland

sections and pool/riffle sections prior to channelization. Whether the project area was located in a more

wetland type channel section or a pool / riffle channel section is an area the assessment attempted to shed

light on. This information aids in understanding the habitat types that might re-develop in the project area,

and the expected fauna that would occupy such habitats.

#3 – Hydraulic Changes and Bed Elevations – Upon channelization, the historic channel was deepened below the

bed elevation of the meandering channel. Placing water back into the old channel at a higher bed elevation

may induce changes to the elevation of the water surface under a variety of flow conditions. Typically an

increase in water elevation is evident at normal flows and diminishes at floods. Bridge crossings at Peavine,

Sink, and Crystal Springs also induce a hydraulic control at a certain flood event, essentially reducing the

volume of water that can pass through the opening and causing a backup upstream. Understanding the

hydraulic implications of the project is paramount to communicating the potential changes to upstream

landowners. A prominent “lesson learned” from the MEANDRS group with the Dodd Park restoration was

a need to better anticipate and communicate these changes, as the reoccupation of the old meander raised the

water surface elevation at normal flows upstream of the project.

WATERSHED OVERVIEW

GENERAL

The Dowagiac River drains approximately 285 mi2 of the southwest corner of Michigan’s Lower Peninsula. It

originates in Decatur Township, Van Buren County, and terminates approximately 31 miles downstream at its

confluence with the St. Joseph River in Berrien County, near the town of Niles, MI (Figure 3). The river has

two major branches, the Dowagiac River (west) and Dowagiac Creek (east). A northeast-southwest trending

glacial moraine, the Inner Kalamazoo Moraine, separates the two branches which come together west of

Dowagiac, MI. Above the confluence, the Dowagiac River has a relatively low gradient and primarily drains

swampland. It was straightened along most of its length at the turn of the 19th century to improve drainage

efficiency. Conversely, Dowagiac Creek is a steeper, faster-flowing stream, although large segments have been

impounded, especially through the town of Dowagiac.

Southwestern Michigan was covered by glaciers until around 15,000 years ago, and the landforms, soils, and

surface geology are the result of the retreat of the most recent glaciation. Thick, complex deposits of glacial

sands and gravels blanket the region. The watershed is generally flat to gently rolling with an elevation range

between 680 feet and 895 feet above sea level; however, moraines, kettles, kames, eskers, and outwash plains

associated with past glacial activity provide topographic variability (Kirby and Hampton, 1998).

June 11, 2013

[7]

DOWAGIAC RIVER RESTORATION

The climate of the watershed is characterized by relatively high precipitation and moderate temperatures,

largely controlled by nearby Lake Michigan. Total annual precipitation at Dowagiac, MI, is 22 inches. Most of

the rainfall and snowmelt water drains to the Dowagiac River and its tributaries as groundwater. The glacial

materials associated with the outwash plains and moraines are relatively permeable, allowing precipitation to

infiltrate and travel in subsurface pathways through the deposits rather than across the ground surface as

runoff. The coarse glacial material of the watershed is responsible for storing tremendous volumes of cold

groundwater which maintain the Dowagiac River flow, even in the heat of summer, as a cold water river

system.

Historically, oak savanna and oak-hickory forests dominated the upland areas of the watershed, although

maple-beech forests were likely not uncommon. Along the Dowagiac River, the floodplains were dominated

by wet hardwood forests, often featuring black ash, a significant species for the tribe. A variety of wetland

types could also be found along the river. Today, agriculture dominates the watershed, comprising 55% of the

total acreage. The uplands are primarily used for crops, especially corn, but hogs and other livestock are also

raised in portions of the watershed.

June 11, 2013

[8]

DOWAGIAC RIVER RESTORATION

Figure 3. Location Map for the Dowagiac River Project Reach.

HISTORIC IMPACTS

The first settlement in Cass County was in 1825 and rapid settlement followed in the 1830s (Rogers, 1875).

The township of Pokagon was settled in 1858. Pioneers voiced concerns over diseases such as typhoid fever

that they attributed to the presence of the swamps. Prospectors and settlers were also interested in reclaiming

land from the wetlands to increase property values. As early as 1875 the Dowagiac River drainage was

June 11, 2013

[9]

DOWAGIAC RIVER RESTORATION

discussed as an improvement project amongst representatives from Cass and Van Buren County (Hamper,

1996). Almost 25 years later, the Dowagiac River was straightened, lowered, and channelized between 1901

and 1928 to drain the surrounding swamp making land more suitable for agriculture.

The drainage project was built in two phases. The first phase began at the railroad bridge south of Decatur

Township and ended at the south line of Section 9 in Pokagon Township, the location of the current Peavine

St. Bridge, and the upstream end of our project reach. Excavation commenced in July 1901 and was

completed two years later in the spring of 1903 (Hamper, 1996). The contractor used a dredge barge that

worked day and night at a rate of one mile every 15 days to remove soil from the newly excavated channel

(per unreferenced notes filed at the Cass County Historic Library). Excavated spoils were to be placed “3 feet

from the edge of the excavation, not higher than 4 feet on each side and balanced between each bank”

(Records of the Cass Co Drainage Commission). These levees are still evident today.

The existing Dowagiac River which “was only about two feet deep and 40-50 feet wide…was dredged to a

depth of four feet” (per unreferenced notes filed at the Cass County Historic Library). Channel dimensions

as documented by Hamper (1996) described the drain dimensions as “25-30 feet in width and 4 feet in

depth.” Phase I of the drainage project diverted 30 miles of the meandering river into 14 miles of

straightened, channelized ditch by “removing the kinks”. The project resulted in the loss of 16 miles of river

length, increased channel gradient, lowered bed elevation and a disconnection of the river to its floodplain.

This work effectively doubled the slope of channel by removing over half of its length.

The first phase of the project was considered too short and too shallow to adequately drain the area. A

second phase of construction was proposed, including dredging both upstream and downstream of the initial

reach to an eight foot depth (per unreferenced notes filed at the Cass County Historic Library). Dredging was

to begin at the upper end of the Dowagiac River southeast of Decatur, near Pickerel Lake, and continue

approximately twenty-five miles south ending north of Niles township in Berrien County, just upstream of

present day Kenzie Rd. (Hamper, 1996; Figure 4). The dredge barge for Phase 2 was recorded as 75 feet long

and 20 feet wide with a 60 foot long boom and a four foot draft.

Construction of the second phase of the drainage project was not nearly as efficient as the first.

Unpredictable soils (quicksand), equipment shortages and failures, landowner lawsuits, bridge concerns and a

distracted and financially negligent contractor, created numerous delays. Construction of the upstream

portion of the river – including the re-dredging of the initial reach - began in June 1917 and was halted in the

spring of 1919. It was not until December 1920 that the contractor reached the Peavine St. Bridge. Due to

litigation, the drainage project was not completed until 1928. At the end of both phases, the drainage project

was accredited with reclaiming between 15,000 and 20,000 acres of “marginal and swamp land” (per

unreferenced sources in Dowagiac River Drain notes in Cass County Historical library files).

Historic documents indicate an abundance of springs in the area. One particularly active spring was described

in Pokagon Township Section 8, just north of Peavine St. near the current project (Figure 5, north of station

22000). Two prospectors envisioned a waterfront town excavated from the springs and connected to the

Dowagiac River via a dredged channel. Accounts from 1875 describe a large spring – Toponnebee – that was

“strong and high enough to furnish ample supply for two thirds of the town” (Rogers, 1875). The paper

Town of Shakespeare was never realized and consists of agricultural fields today. We noted evidence of

substantial groundwater seepage in this part of the project site during field reconnaissance.

Crystal Springs was a large spring noted at the downstream end of the project site (Figure 5, station 10000).

The area was developed by the Methodist Church as a campground which held its first meeting in 1860

(Barbara Wood Hunzcher, Cass County Historic Library, personal communication).

June 11, 2013

[10]

DOWAGIAC RIVER RESTORATION

Figure 4. Dowagiac River Drainage Project Phases.

The Crystal Springs Campground is still in use today; however, the spring for which it was named is now

gone. Per historical accounts, “the spring is situated about twenty-five rods (412 feet) south of the Dowagiac

Creek, at the head of a ravine covered with a natural growth of timber…The volume discharged by the spring

is estimated to be six hundred barrels per hour” (Rogers, 1875; p200). In 1873 the site was slated to become a

State Fish Hatchery for rearing “California salmon trout and white fish” (Rogers, 1875; p200). Due to

“impurity of the water and uneven temperatures” the fishery was discontinued in 1881 (from an undated

Crystal Springs Campgrounds document submitted by Donna Kowalewski, Historical Project Coordinator in

Cass County Historical Library). Dredging of the Dowagiac River dried up the spring. In a Chapter titled

“Crystal Springs” in an undocumented source filed in Cass County Historical library, “the effect of the

dredging was gradual, but final.”

One mill dam is recorded within the project area in Section 17 of Pokagon Township and is located on the

Pokagon Township map in the Atlas of Cass County Michigan, 1873. Per Hamper (1996), the mill was

located along the North-South quarter line of section 17 “on the Smith Lake outlet to Dowagiac Creek”

(Figure 5, station 20000). The hydraulic head at the dam was fourteen feet and the mill was powered by one

overshot wheel. An impounded pond is evident in the 1872 map on the west side of Sink Road. The mill was

constructed in the 1850s for the purpose of making fence caps for lumber rail fences. It was discontinued

when timber in the area was overharvested. According to Hamper (1996), there are no remains of the mill at

the site.

June 11, 2013

[11]

DOWAGIAC RIVER RESTORATION

Figure 5. Section of 1873 atlas map of Pokagon Township, MI. Map provides approximate river

alignment, parcel ownership, and important features along the channel such as springs and mills.

June 11, 2013

[12]

DOWAGIAC RIVER RESTORATION

GEOLOGIC HISTORY

A river is a product of the forces which created and shaped its watershed. A thorough understanding of the

geology of the watershed can provide important information related to the movement of water and sediment

within the landscape that govern most functions in the river.

BEDROCK GEOLOGY

The bedrock underlying the Dowagiac River Watershed consists of Late Devonian to Mississippian age (320380 million years ago) rock formations (Figure 6) representing a period where southwestern Michigan was

part of an offshore marine environment (Dorr and Eschman, 2001). The gray Ellsworth Shale underlies the

western third of the Dowagiac Watershed. It comprises a mixture of green and gray muds from the

Wisconsin Highlands to the west and black muds from the Appalachian Region to the east. The younger

Coldwater Shale underlies the eastern two-thirds of the watershed and consists of black to gray, silty shale

with thin layers of limestone, dolomite, and sandstone. The Ellsworth and Coldwater Formation rocks are

relatively flat-lying units, although they are eroded in areas exposed when the adjacent sea receded toward the

end of the Mississippian period. Because the Pleistocence age glacial drift is so thick, covering the bedrock

with 100-600 feet of material (Rieck and Winters, 1993), there is almost no correlation between the bedrock

geology and the surface topography within the Dowagiac Watershed, including stream courses. However,

relatively thin areas in glacial drift thickness may roughly correspond with topographic highs or ridges in the

bedrock surface.

Figure 6. Bedrock geology for the region surrounding the Dowagiac River Project Reach (red box).

June 11, 2013

[13]

DOWAGIAC RIVER RESTORATION

GLACIAL GEOLOGY

The surficial, or visible, geology within the Dowagiac Watershed consists almost entirely of Pleistocene glacial

deposits, along with limited post-glacial stream deposits (

Figure 8). The glacial deposits resulted from the advance, temporary halt, and then retreat of the glaciers

during the Wisconsinan age (75,000 – 10,000 years ago), which was the last glacial period of the Pleistocene.

The Dowagiac watershed lies in an area where the Michigan Lobe of the Wisconsin Glacier expanded and

contracted over time. The watershed material includes moraines deposited while the ice front was relatively

stationary, as well as material carried away from the ice by meltwater flow and deposited in channels, sheets,

and deltas. Glacial sediments within the watershed consist of outwash sand and gravel, ice contact outwash

sand and gravel, end moraines of coarse textured till, coarse textured till, and glacial lake deposits (Kincare,

2010).

Moraines

A moraine marks the edge of the glacier. A moraine is primarily a pile or ridge of unconsolidated rock and

sand deposited at the edge of a glacier when the glacier is at equilibrium (i.e., where the rate of ice advance is

balanced by the rate of melting and there is no considerable advance or retreat). The moving ice in a glacier

acts much like a conveyor belt, carrying debris from upstream within the glacier to the margins of the ice, and

sometimes along the margins as well. Therefore, the longer the terminus of the glacier stays in one place the

more debris will accumulate in the moraine. In continental glacial systems, sets of moraines often run parallel

to one another, forming where the ice front is stationary for a period, marking its edge, before climate

conditions change and the glacier begins retreating to its next stable position. This latter process corresponds

to the moraines along the Dowagiac River and other moraines in southwest Michigan.

The Michigan Lobe of the Wisconsin Glaciation advanced south, along what is now Lake Michigan, into

Illinois and Indiana. The Kalamazoo Moraine and the Valparaiso Moraine demarcate the eastern flanks of the

Michigan Lobe over subsequent time periods as the ice retreated at the end of the Wisconsin period (Kincare,

2010;

Figure 8). The Dowagiac River flows between the two moraines. The east half of the Dowagiac River

Watershed is comprised of the Kalamazoo Moraine system. This system is defined by two ridges separated by

a nearly continuous but narrow gravel plain that can be traced from north of Kalamazoo, MI, to South Bend,

IN. The western, inner, ridge separates the north branch of the Dowagiac River from Dowagiac Creek. The

Valparaiso Moraine is located on the western side of the Dowagiac Watershed (Figure 7,

Figure 8). It is lower, flatter, and wider than the Kalamazoo system and formed after the ice retreated from

the Kalamazoo System position. Both moraines are constructed of shingled, fluvio-deltaic complexes that

were built out into glacial lakes (Stone et al., 2003). In the case of the Valparaiso System, the deltas were built

into Glacial Lake Dowagiac. Both moraines are characterized by a complex arrangement of knolls, basins, and

ridges formed by the overlapping deltas and subsequent sediment collapse associated with melting ice blocks

along the ice front. The upper moraine deposits are coarse grained, locally containing boulders and lenses of

poorly sorted till, but they grade to sands at depth and to the east (Kincare, 2010).

June 11, 2013

[14]

DOWAGIAC RIVER RESTORATION

Figure 7. Generalized cross section of the Dowagiac River valley at the upstream end of the project

reach. The overall valley is defined by the Valparaiso Moraine to the west (left) and the Kalamazoo

Moraine to the east (right) – the red line (cross section) is about 6.5 miles wide.

Glacial Lake Deposits

Temporary lakes are often created in the areas between the leading edge of a glacier and the moraine formed

at the previous stable ice front position. The moraines act as dams, impounding melt water and rearranging

drainage courses as water levels rise and fall. The “bed” of the lake is similar to modern lakes with a relatively

flat, level surface. When the lakes dry up or drain via spillways, these flat lake beds remain. Similarly, Glacial

Lake Dowagiac ponded behind a ridge deposited between the Kalamazoo Moraine and the Valparaiso

moraine as the Michigan Lobe retreated to the west (Kincare 2010;

Figure 8). The lake was about 10 miles across and extended from Grand Rapids, MI, to South Bend, IN

where it spilled south into the Kankakee River system. It expanded to the west as the ice retreated and

continued to be functional until the ice had receded sufficiently to permit meltwater to discharge down the

Paw Paw and St. Joseph River Valleys. The Dowagiac Swamp and the low flat plain occupying much of

Pokagan and Silver Creek Townships in Cass County, which contain the project reach, are the remnants of

this lake (Leverett and Taylor, 1915). The relatively flat valley gradient created by the lake bed is also

expressed in the low gradients of the Dowagiac River and the river’s associated riparian wetlands upstream of

Sumnerville, MI.

June 11, 2013

[15]

DOWAGIAC RIVER RESTORATION

Outwash and Other Deposits

While ice covered the modern Dowagiac River valley and was producing the Kalamazoo moraine, drainage

probably overflowed south toward the Wabash River drainage basin in Indiana. Retreat from the Kalamazoo

Moraine to the Valparaiso Moraine, about 17,500 years ago, redirected flow to the Kankakee River system

(Ekblaw and Athy, 1925). Glacial Lake Dowagiac formed between the moraines (

Figure 8), overflowing to the Kankakee near South

Figure 8. Photo of the channelized portion of the Dowagiac River near Decatur. One can imagine a

lake bed here, bounded between the two moraines on the left and right.

Bend (Kincare, 2010; Leverett and Taylor, 1915). The Lake and its associated waterways formed a glacial

spillway which conveyed meltwater and sediment to the south. Rivers and creeks in the watershed generally

flow along the remnants of the spillway and form most of the valley floor. The outwash plain is 5-7 miles

wide at the city of Dowagiac, and contains a high percentage of sand and gravel, mostly as part of delta

deposits formed along the spillway. Modern day alluvium (sediment transported by the modern river),

consisting of sands and gravels reworked from glacial outwash, is found along the modern stream system

throughout the watershed (Hamper, 1996).

June 11, 2013

[16]

DOWAGIAC RIVER RESTORATION

Figure 9. Glacial geology of the region surrounding the Dowagiac River project area (red box). The

river flows between two end moraines associated with the Michigan Lobe of the Wisconsin

continental glaciation. Glacial retreat from the Kalamazoo Moraine system to the Valparaiso

Moraine system established a southwest trending meltwater spillway dominated by Glacial Lake

Dowagiac. The spillway is largely filled with gravelly, sandy delta deposits from upstream (north)

and off of the Valparaiso Moraine.

June 11, 2013

[17]

SOILS AND WETLANDS

Most soils in the Dowagiac River watershed are well drained sandy and loamy soils representing the relatively

coarse glacial deposits found in the basin. These sandy, loamy soils allow water to infiltrate into the ground,

thereby recharging the groundwater and contributing to the groundwater flow in the Dowagiac River and its

tributaries (Cass County Conservation District, 2002). The main upland soil units along the channel in the

study area are the Kalamazoo Loam and the Oshtemo and Brady Sandy Loams (Figure 10).

The main soil associations for the outwash plains and moraine deposits are listed below:

Coloma-Spinks-Oshtemo: Deep, nearly level to strongly sloping, well-drained, coarse textured and

moderately coarse textured soils on outwash plains and terraces.

Oshtemo-Kalamazoo-Houghton: Nearly level to strongly sloping, well-drained, moderately coarse

textured and coarse textured soils, some are deep and some are moderately deep over sand and

gravel, on outwash plains and moraines.

Riddles-Crosier-Oshtemo: Deep, nearly level to strongly sloping, well-drained and somewhat

poorly drained, medium textured and moderately fine textured soils on till plains.

Schoolcraft-Kalamazoo-Elston: Nearly level to rolling, well drained soils that have loamy or loamy

and sandy subsoil; formed in glacial outwash.

The soils adjacent to the Dowagiac River, especially upstream of the Peavine Creek-Dowagiac River

confluence, consist of mucky, poorly developed, and very poorly drained soils including the Glendora Muck,

the Houghton Muck, and to a lesser degree, the Adrain Muck. Muck soils are those with a high organic

component, formed partly or almost completely by the decomposed remains of woody or herbaceous

vegetation. These soils are likely closely associated with Glacial Lake Dowagiac’s flat lake bed and the river’s

original (pre-1900) floodplain and broad riparian wetlands. The organic soils are important components of

many wetland communities present in this region. Outwash plain deposits underlie the floodplain soils, and

therefore the muck does not impede delivery of groundwater to the river. However, their poorly drained

nature prevents infiltration and artificial drainage is required where the soils are used for agriculture (Cass

County Conservation District, 2002). Draining the Glendora Muck near Decatur, MI, upstream of the study

site, was the primary impetus for channelizing the Dowagiac River.

DOWAGIAC RIVER RESTORATION

Figure 10. Soil Survey Geographic database (SSURGO) map of the soils along the project reach of

the Dowagiac River. The floodplain soils are primarily organic rich Glendora and Houghton Muck

Soils. The uplands are dominated by sandy loams and loams, especially the Oshtemo and

Kalamazoo soil types.

June 11, 2013

[19]

DOWAGIAC RIVER RESTORATION

FLORA AND FAUNA

The report by Clarke et al (1998) - Section 2.4.3 Biological Profiles includes an excellent description of the

historic and contemporary faunal assemblage of the Dowagiac. Here we touch on data collected since that

report, as well as observations associated with the Dodd Park restoration project.

A 1997 Michigan Natural Features Inventory by P.J. Comer and D.A. Albert is an interpretation of the 1800

General Land Office surveys (Figure 11). Per the interpretation, the dominant vegetation type west of the

Dowagiac River is a Beech/Sugar Maple forest with islands of cedar swamp and pockets of shrub swamp and

emergent marsh. Pockets of black ash swamp are noted north of Peavine St. The landscape to the east of the

river is predominantly mixed oak savannah with prairie grasslands and lowland emergent marsh pockets.

Trees that were noted by the surveyor in 1830 include: White oak, beech, red oak, yellow oak, elm and

tamarack.

Figure 11. Historic vegetation adjacent to the Dowagiac River based on the 1800’s GLO surveys

(Comer et al., 1997).

June 11, 2013

[20]

DOWAGIAC RIVER RESTORATION

The vegetation assessment and tree survey showed the dominant community within the study area to be

floodplain forest dominated by silver maple, sycamore, green ash, hackberry and American elm. Several areas

of shrub swamp and emergent marsh were also observed throughout the study area, especially along the

eastern river bank. Overall, the vegetation community types observed in the field did not match those of the

historic mapping. This is likely based on the scale the historic mapping data was collected and post

settlement land activities such as logging, farming (including dredging). Based on the vegetation, topography

and hydrology observed in the field, it is apparent that the historic mapping did not accurately identify the

vast bottomlands associated with river in this area.

The vegetation assessment conducted during the March field work identified 93 woody and herbaceous

species within the study area. Trees were surveyed along the existing spoils areas within the project area.

Species and diameter were noted. Observations of additional fauna were made within this area as they were

encountered. Observations were compared with the vegetation survey completed by Wilhelm in 2012. The

comparison showed that 51 of the original 111 species (June 2012) were observed in 2013. It should be

noted that the vegetation assessment was conducted in late spring (March 19-20, 2013) and is in no way a

complete survey or assessment since many of the herbaceous plants were not present or were unable to be

identified. Additionally, 37 species were added to the 2012 list, including 27 native species and 10 adventive

species (Appendix). Some of these adventive species are species that can be potentially invasive (PI) and the

spread of these plants should be minimized especially when performing any earth moving activities such as

channel realignment.

Figure 12: Species and relative abundance of trees within the spoils areas available for harvest and

use for restoration.

June 11, 2013

[21]

DOWAGIAC RIVER RESTORATION

Aquatic sampling has been conducted by the MDEQ and MDNR within the watershed and tributaries. The

following general observations are consistent within the mainstem. Habitat is depressed throughout the

mainstem river for reasons discussed elsewhere in this report.

Fish – Fish species above the Pucker Street dam are consistent with a cold water fishery. Assessments in the

mainstem included a total of 37 species, with Brown Trout being the most numerous species. Brown trout

have been stocked by MDNR in the Dowagiac. Although the species diversity was considered good in a

report by Wesley and Duffy (2003), it was noted that habitat was lacking. Discussions with landowners during

the March 2013 field work indicated some brook trout have been observed in the Dowagiac, a native trout

species (brown trout are introduced) but these fish have not been found in the MDNR surveys. The dam at

Pucker Street prevents fish passage and connection with the larger St Joseph River. Species from Lake

Michigan did historically migrate to the river. Lake Sturgeon were noted to ascend the Dowagiac historically

and Lake trout were noted to spawn in the river above Niles (Ballard, 1948).

Macroinvertabrates – Between 22 and 32 taxa were identified in the 2012 survey. Assemblages of mayflies,

stoneflies, and caddisflies were present, consistent with a cold water system and indicative of good water

quality. The number of taxa generally increases in the upstream direction. The increase of taxa does not result

in an increase in the quality of the community however. The Dodd Park site, which included a river wide high

of 37 taxa – was the result of restoration work completed to expose coarse substrate in the old meander.

Given the results from the Dodd Park site, located in the lower part of the river, habitat would appear to be

the more limiting factor over water quality in the development of a healthy macroinvertabrate community.

FIELD ASSESSMENT RESULTS

GEOMORPHIC ANALYSIS

UPPER WATERSHED CONDITION

A windshield survey of the upper Dowagaic watershed was performed in an effort to understand the potential

sediment load carried by the river into our project reach. Photos were collected at each stop and georeferenced into Google Earth to provide a record. To determine sediment load in a qualitative sense there

were three components of note. First was sediment delivery to the channel – signs of erosion on the

landscape and tributary channels with systemic erosion and instability signal a high level of active delivery may

be ocurring. The second observation is within the channel itself. Signs of deposition associated with mid

channel bars indicate the load to the channel is significant. Corresponding sign of erosion indicate that the

channel itself is providing sediment from its banks and bed. The final observation was the nature of the

material itself. Fine material typically moves in suspension and is less sensitive to slope changes associated

with our project. Sand and gravel however are heavier and tend to move along the bed of the channel, and

may be affected by a change in slope with the project. Within this context the upper watershed was assessed.

At Old Swamp Rd., Near Decatur – A small tributary enters along the road showing some signs of erosion, the

channel is extremely low gradient with little capacity to transport sediment that gets into the channel. This

location is just below Pickeral Lake, noted as the area where the historic dredging project occurred.

June 11, 2013

[22]

DOWAGIAC RIVER RESTORATION

Figure 13: Tributary showing some erosion and sediment delivery to the Dowagiac River

Figure 14: The Dowagiac looking downstream at Old Swamp Rd.

46th Street Bridge – A continued low gradient channel, evidence of some frequent dredging of the channel

exists. The channel itself is stable and not contributing sediment from the banks

June 11, 2013

[23]

DOWAGIAC RIVER RESTORATION

Figure 15: Looking upstream from 46th street

CR 215 / Glenwood Rd. Bridge – Trees are more prolific along the channel here, but the general cross section is

maintained. Bed material appears to be sand and fine material, consistent with a wetland channel.

Figure 16: Dowagiac River at CR 215

June 11, 2013

[24]

DOWAGIAC RIVER RESTORATION

Twin Lakes Rd. Bridge – Trees continue in this section, the channel appears to gain some width here and the

adjacent landscape indicates a transition out of the swamps of the upper watershed. The bed is largely sand

and fines with no gravels apparent. Bank height begins to increase slightly.

Figure 17: Twin Lakes Rd. - trees and banks indicate a stable channel section. Periodic dredging

may still occur here, evidenced by the lack of trees along the right bank in the photo

At Dewey Lake Rd. Bridge – A slight floodplain is evident here in the photograph as well as a slight bend – may

indicate a location where the old channel and the excavated channel were coincident. Overall similar

observations, stable channel, a bed of sands and fines. If there were significant sediment coming in from

upstream a small deposit might be expected along the right bank in the photo below.

Figure 18: Dowagiac River at Dewey Lake Rd.

June 11, 2013

[25]

DOWAGIAC RIVER RESTORATION

Tributary below Dewey Lake Rd. Bridge – A tributary enters the river below Dewey Lake Rd. and crosses Dewey

Lake Rd. just west of the Dowagiac. The channel of the tributary appears to be stable at this location and is

contributing a sand load to the channel of the Dowagiac. Investigation of the tributary upstream of this

location was not performed but based on observations at this location, rates of sediment delivery might be

considered normal, as little evidence of deposition is apparent.

Figure 19: Dowagiac tributary at Dewey Lake Road

June 11, 2013

[26]

DOWAGIAC RIVER RESTORATION

At Rudy Rd. – The river here begins to take the form noted within the project area with significant spoils

piles on each side of the straight channel. Trees along the banks are leaning slightly and some exposed roots

are evident, indicating some erosion is occurring but at very slow rates. The bed is composed of sands and

fines here and some deposition is apparent in the photo below on the right bank.

Figure 20: Dowagiac River at Rudy Rd.

At Middle Crossing Rd. – This sections appears to be slightly more active than others, although it must be

noted that this observation is specific to the area around the bridge. Trees are more common in the channel

and the dimensions appear consistent with what was observed upstream. Some bank erosion is noted in the

right of the photo, the first significant erosion noted, but localized and likely due to scour from trees. The

levees on either side persist, though have been removed by landowners where houses are present. A small

tributary enters here from the west, draining cultivated land. In the photos the contribution of sediment from

this tributary is higher than normal, but this scenario appears to be infrequent within the watershed.

June 11, 2013

[27]

DOWAGIAC RIVER RESTORATION

Figure 21: Dowagiac mainstem at Indian Lake Rd.

Figure 22: A small tributary along Middle Crossing Rd., just west of the Dowagiac. Sand is present

in the channel and during runoff events, it is likely topsoil is being mobilized into the channel as

well given the lack of buffer

June 11, 2013

[28]

DOWAGIAC RIVER RESTORATION

At M-62 – Very similar to upstream sections and to our project area. This is the last stop prior to the

confluence with Dowagiac Creek, one of the larger tributaries to the Dowagiac. The creek includes a mill dam

that arrests most sediment delivery its upper watershed before it can get to the mainstem Dowagiac. Sand is

noted in the bed.

Figure 23: Dowagiac Creek at M-62. The sand bed is prevalent in the photo

Figure 24: Looking downstream from M-62 at the Dowagiac

June 11, 2013

[29]

DOWAGIAC RIVER RESTORATION

Based on the observations in the upper watershed, the Dowagiac appears to gain some sediment from

tributaries within the area above Twin Lakes Rd., but the material cannot be transported easily by the low

gradient channel in this reach unless it is fine material that can be moved in suspension. Below Twin Lakes

Rd. where the landscape gains some topography sediment is gained from the tributaries as well and to a lesser

extent from the channel itself that can be mobilized by the channel. An exhaustive investigation of the river

was not performed, but it appears that sand comprises the majority of the sediment load within the river.

Sand moves nearly continuously within the Dowagiac system and is likely being delivered to the project reach.

The volume of this material, in qualitative sense, does not appear to be excessive, evidenced by a lack of bar

formation or an aggraded bed.

Figure 25: A long profile from Google Earth - the project area is highlighted in the profile

A helpful tool in understanding the movement of sediment and water as well as the energy of a river system is

the long profile. The profile is an elevation, typically of the bed of the channel from its headwaters to its

confluence with a larger river. The specific elevations in Figure 25 are not important, but the overall shape of

various segments of the profile are. Beginning in the headwaters, the flat, wetland swamp is apparent with a

few short steeper transitions down to additional flat areas. As water leaves the wetland area the slope

increases slightly and channel picks up energy. Through the project area the slope is gradual until just below,

likely near the Dodd Park area where the river begins to steepen on its way down to the St Joseph River

valley. The steepest section includes the Pucker Street Dam – to take advantage of the high energy of the

river here. The steepness of the slope dictates the type of river patterns at various locations along the 30 mile

length, with the wetland sections in the headwaters, transitions between wetland and pool/riffle sections in

the middle, and finally a steeper channel with coarse cobbles and gravels and mild rapids making the

transition down into the St Joe Valley.

June 11, 2013

[30]

DOWAGIAC RIVER RESTORATION

EXISTING PROJECT REACH CONDITIONS

The Dowagiac River, from Peavine St. to the southern extent of the property owned by the Pokagon Band of

the Potawatomi, currently flows approximately 2.9 miles through forested riparian wetland. The River was

channelized along almost its entire length (18.6 miles), including the project reach, and is now almost

completely straight with a sinuosity (channel length/valley length) in the study area of 1.07 (Table 1; Figure

28). The dredge spoils were piled along the channel, usually around 4 feet or more above the existing

floodplain, and have been overgrown and stabilized by trees and brush. Despite the time that has passed since

the channel was dredged, the river is still relatively homogeneous through the project reach. Channel bed

elevations do not vary significantly and the gradient is relatively consistent (0.0004; Figure 29). Pools are often

deep, but infrequent. When they occur, they are often the direct result of obstructions, such as bridge

abutments and woody debris. Channel widths are also strikingly consistent. They range from 40 to 70 feet,

but are most often around 50 to 60 feet wide and depths at a 1.5-year recurrence interval flood, used as an

approximate surrogate for bankfull, is approximately 7.5 feet (Table 1). Overall, the channel is an artificial,

straightened G channel (Rosgen, 1996).

In artificially straightened and entrenched systems, channels will usually follow a general pattern of recovery

or adjustment (Schumm, 1977). They will often incise, which in turn, causes over-steepening and

destabilization along the banks. The banks then begin to erode and the channel widens. Over time, the

channel equilibrates and will form a new set of bars and meanders within the enlarged space it carved for

itself during its adjustment period. In the case of the Dowagiac River, the channel will eventually begin to

erode its banks, undercut the existing spoils berm, and re-establish its meandering form within its floodplain.

This process on the Dowagiac is slow, governed mainly by the low slope and stream power of the system,

and the presence of well-established vegetation along the margins that resist erosion. There is evidence that

the channel is beginning to adjust. Some trees have been undercut by the river eroding the toe of the banks.

Erosion is also evident where woody debris deflects flow into adjacent channel banks. The process could

initiate further meandering and adjustment, but new vegetation along the berm and in the floodplain will

prolong any significant recovery.

Table 1. Existing and proposed river characteristics and Rosgen stream and valley types.

June 11, 2013

Channel Characteristic

Existing

Proposed

Length (feet)

Gradient

Sinuosity

Width:Depth

Entrenchment

Stream Type

Valley Type

15445

0.0004

1.1

8.0

1.3

G5c

VIIIc

25442

0.0002

1.8

10.8

15.0

C5cVIIIc

[31]

DOWAGIAC RIVER RESTORATION

Figure 26. The Dowagiac River features long, straight, homogeneous channel reaches bordered by

vegetated berms (dredge spoils).

730

725

720

Surveyed Water surface

Existing Bed Surface

Avg slope

Crystal Springs

Sink Rd

Peavine St

Frost St

Hwy 62

705

700

Sink Rd

Hwy 62

710

Frost Rd

Peavine Rd

715

Crystal Spring Rd

Elevation (ft, NAVD88)

Linear (Existing Bed Surface)

y = 0.0004x + 689.02

R² = 0.9639

695

690

685

0

5000

10000

15000

20000

25000

30000

35000

40000

Station (ft)

Figure 27. Long profile through the Dowagiac River Project Reach. The bed has a relatively

consistent slope throughout (0.0004 feet/feet) and little variability in bed elevation.

June 11, 2013

[32]

DOWAGIAC RIVER RESTORATION

Figure 28. Typical erosion and woody debris along the Dowagiac River banks.

The floodplain is largely forested, although local grassy wetlands and bog areas are common, especially along

stretches of abandoned channel. The floodplain includes valuable microtopography comprising small ridges,

berms, and depressions associated with past channel migration, and many of the depressions are filled with

standing water. These ponded areas often support new trees (saplings). Additionally, small tributary channels

drain groundwater seeps along the valley wall and bottom, providing cold water habitats within the

floodplain. Many of these channels flow to depressions or are effectively dammed at the river by the spoils

berm, adding to the ponded area (Figure 32).

Bed material along the project reach is primarily sand, although gravel patches have formed locally where the

channel abuts the valley walls, where tributaries have deposited coarser material in the mainstem, and where

the channel has likely cut through lenses of gravel within the outwash deposits or the dredged material.

Exposed bank material and spoils along the channel reveal that most of the margins are sandy with an

inconsistent gravel layer often appearing between the organic soil layer and the sand below. Gravel seems to

be more common downstream of the project reach where gradients begin to increase. For instance, a

significant gravel layer was unearthed as part of the Dodd Park Project at Sumnerville, MI. Additionally,

depth-of-refusal (DOR) data suggests the floodplain in the project reach primarily includes a layer of fine

sediment and organics overlying a layer of medium and coarse sands. Gravel and cobbles were located with

the DOR rod, but they were mostly localized deposits. Examples include a gravel/cobble layer roughly 2 feet

below ground surface immediately downstream of Peavine St., and another layer at the surface along Edwards

Road.

June 11, 2013

[33]

DOWAGIAC RIVER RESTORATION

Figure 29. Plan form map of the depth of refusal (DOR) survey locations. The DOR measurements

were collected along relict channel positions. Refusal generally occurred in sand, although localized

gravel deposits were encountered downstream of Peavine St. and along Edwards Street (yellow

circles)

Figure 30. Forested floodplain south of Peavine St. (Location 12). The photograph also exhibits

hummocky topography related to meander scroll bars and standing water associated with the latest

channel position in the bend.

June 11, 2013

[34]

DOWAGIAC RIVER RESTORATION

Figure 31. Grassy, muddy wetland along the old channel alignment at photo location 34.

Figure 32. Standing water supporting numerous tree saplings at photo location 29.

June 11, 2013

[35]

DOWAGIAC RIVER RESTORATION

Figure 33. Coldwater tributary draining upstream spring and nearby groundwater seeps at photo

location 22.

HISTORIC CONDITIONS

Although the existing condition of the Dowagiac River is straight and relatively homogeneous, historic

documents, sequential aerial photography, and airborne LiDAR (Light Detection and Ranging) survey data

suggest the channel and valley wetlands were much more active in the past. Prior to dredging and/or possible

additional impacts (e.g., agricultural erosion and subsequent channel deposition), the river appears to have

meandered throughout its wider valley sections. The LiDAR data, and to some degree the aerial photographs,

clearly show numerous abandoned meander bends along the floodplain, especially between stations 25000

and 20000 (Figure 35), and upstream and downstream of the project reach (Figure 356).

The observable relict channels range in width from 50 to 100 feet wide, with most measurements between 60

and 80 feet and a mean around 65 feet. They display clear signs of past activity, such as remnant scroll bars

associated with channel migration, and channel cutoffs at narrow meander bend necks (Figure 345). The past

activity likely accounts for the quality of the microhabitat observed along the valley floor. The channel was

likely acting as a meandering C-type channel (Rosgen, 1996; Table 1) – eroding the banks at the outside of

bends and depositing material on the point bars formed at the inside of the bends – and the evidence has

been preserved by locking the channel in its present position.

June 11, 2013

[36]

DOWAGIAC RIVER RESTORATION

Figure 34. Preserved scroll bars and relict meander bends along the Dowagiac River in the upstream

end of the project.

Figure 35. Well preserved meander bends along the Dowagiac River downstream of the project reach

and Crystal Springs St.

June 11, 2013

[37]

DOWAGIAC RIVER RESTORATION

It remains unclear when each of the individual abandoned bends were active within the project reach. Some

bends, such as the two to the north of the channel, between stations 23000 and 22000, appear to be relatively

young. These meanders exhibit a distinct plan form and topographic shape. Other bends include sections that

appear to be well preserved, but adjacent sections appear filled, well vegetated, and occur at higher elevations.

Additionally, the valley between sections 13000 and 10000 appears to be relatively wide and conducive to

meandering, but the LiDAR and other data do not provide a definitive historic channel pattern. Reaches

upstream and downstream of the project reach, however, exhibit relatively well persevered historic plan

forms, presumably active just prior to dredging. These channels indicate the Dowagiac River was considerably

more sinuous (channel length/valley length > 1.7), especially in the wider sections (Figure 36).

With the assistance of Jonathan Wuepper at the Cass County Historic Library in Cassopolis, MI, we were able

to locate microfiche copies of the original General Land Office (GLO) Public Land Survey System (PLSS)

maps and notes. The current project area is located within Township 6 South, Range 16 West in Pokagon

Township of Cass County, Michigan. The project falls within Sections 16, 17, 19, and 20 of Pokagon

Township, which was surveyed by William Brookfield in 1830. Mr. Brookfield walked the section lines and

made note of the vegetation and landscape (mostly for its suitability for settlement) as well as noting where

landscape changes occurred. Of particular relevance are the notes describing where and how often the

surveyor crossed a water feature and any accounts of the feature’s character or width. He also provided a

sketch map of his measured and general observations (Figure 367). In general, the surveyor’s notes are fairly

consistent with the map in the 1872 Atlas of Cass County – Pokagon Township. The mapped channel

features three bends west of the Peavine St. crossing, followed by a relatively long straight reach, where the

river is not observable from the section lines, and then it finally begins to meander again at the downstream

end of the project reach, at Crystal Springs Street.

June 11, 2013

[38]

DOWAGIAC RIVER RESTORATION

Figure 36. Historic map developed for the General Land Office Public Land Survey System. Callouts

indicate channel widths and tree species encountered as the surveyor traversed the Dowagiac River.

Notes from surveyor in the direction he was walking the line between sections are transcribed from the

microfiche notes in the Appendix. The Pokagon Township map of 1873 illustrates six meander bends at the

upstream end of the project between sections 8 and 17. In his walk east between sections 8 and 17 (Peavine

St.) the surveyor notes four instances of meeting the Dowagiac River. He notes the width between 100 to 150

links wide or roughly 66 – 100 feet. The land in this section was described as “level and rich with white, red,

yellow oak and beech etc.” The surveyor also noted two spring brooks west of the river along the section line.

The south end of the project is described as a marsh landscape with cedar and tamarack trees. The surveyor

notes entering and leaving the river in these sections, although he likely did not cross the channel

perpendicular to flow and therefore some of the measurements are wider than expected. Additionally, he may

have been walking through partial wetland area adjacent to the channel. The river is noted as 1.63 chains wide

June 11, 2013

[39]

DOWAGIAC RIVER RESTORATION

(107 feet) walking west between Section 19 and 30, and 2.13 chains wide (140 feet) walking north between

Section 19 and 20. This reach of the river is just downstream of Crystal Springs. The land in this area is

described as “wet, second rate, with beech, white oak, and white ash.”

An 1873 survey map of the channel, which was completed prior to the major dredging effort along the

Dowagiac River, suggests the channel was relatively straight even before channelization. The mapped channel

does not follow the patterns seen on the LiDAR exactly, but it does follow the general pattern of relict

meandering at the upstream end of the project reach (stations 25000 to 22000) and to some degree,

downstream of the reach. If the river alignment on the 1873 map is inaccurate, it is unclear whether the

channel was naturally straight in this section, if it had already been straightened in sections, or if some change

in the hydrology or sediment load had occurred in the system, prompting this straightened condition. In the

latter case, the channel may have become straighter in response to increased sediment inputs related to

adjacent agricultural practices. Sediment may have choked the longer bends, forcing flow across, and through,

the meander necks, thus cutting off the bends. Currently, there is little evidence to support or refute any of

these possibilities.

The remainder of the historic data represents the time period after the Dowagiac River channel had been

dredged. The 1938 air photos show the straightened channel in the same position as it is today. The berm

even appears to be vegetated already, especially upstream of Sink Rd. The main difference between the 1938

images and more recent photos is the forested cover within the floodplain and along the adjacent uplands.

There are numerous areas along the channel that had either been cleared to the channel margin or supported

a different vegetation type prior to 1938. For example, the area at station 14000 and 13000 was cleared of

vegetation on the east bank, and the floodplain between stations 24000 and 21000 featured numerous patches

that may have been open wetland habitats. Additionally, a large area of land south and east of Rodgers Lake,

which appeared to be pasture in 1938, is now forested. Over time, reduced flooding (i.e., loss of channel –

floodplain connectivity) and abandonment of adjacent agricultural fields has likely allowed forests to recover

and expand. This activity has likely reduced sediment loads to the river.

June 11, 2013

[40]

DOWAGIAC RIVER RESTORATION

Figure 37. Comparison between 1938 and more recent air photos. The 1938 photos include less

forested cover within the floodplain and along the adjacent uplands. There are numerous areas along

the channel that had either been cleared up to the channel or supported a different vegetation type

prior to 1938 than now.

June 11, 2013

[41]

DOWAGIAC RIVER RESTORATION

Figure 38. Comparisons between 1938 and more recent air photos. The 1938 photos include less

forested cover within the floodplain and along the adjacent uplands. There are numerous areas along

the channel that had either been cleared up to the channel or supported a different vegetation type

prior to 1938 than now.

June 11, 2013

[42]

DOWAGIAC RIVER RESTORATION

SEDIMENTATION

DEPTH OF REFUSAL SURVEY

In order to determine past channel shape and possible cut material, we incorporated a Depth-of-Refusal

(DOR) survey into our channel and floodplain characterization. A DOR survey involves pushing a long,

narrow rod (i.e., chimney cleaning rod) through the floodplain and channel material and noting the general

sediment sizes and the depths at which the sediment changes. DOR measurements were made at relict

channel locations throughout the floodplain and relict channel. Sediment cores were also collected to confirm

the DOR data.

In general, the DOR measurements and cores provided useful information on the makeup of the floodplain

deposits. The surface material usually consists of 1 to 9 feet (mean = 3.3 feet) of dark mixed silt, fine sand,

and organic material. A layer of fine to medium sand underlies the organic layer. It is usually between 0 and 7

feet thick (mean = 3.2 feet) and can be layered with medium and coarse sands or homogenous. Final refusal

was generally within a layer of coarser sand. Exceptions to this general pattern of layering existed within the

project area, however. Gravel and cobbles were found near the surface at station 25000 and 13000, and gravel

was often found near many of the tributary channels. A clay layer was noted at a few locations south of

station 22000. Sand appears to have been the dominant bed material, and well sorted medium sand is spread

throughout the floodplain, consistent with the overall composition of the watershed.

Figure 39. Gravel noted in the spoils along the existing channel near station 22000

June 11, 2013

[43]

DOWAGIAC RIVER RESTORATION

Figure 40. Gravel in the bank of the existing channel just below Peavine St.

The elevations and depths of first refusal were variable along the proposed alignment (Error! Reference

source not found.44). Near Peavine St., at the upstream end of the project reach, the DOR was more than 6

feet above the existing channel, whereas within the abandoned channel north of station 22000, DOR was

more than 2 feet below the existing channel cut. Overall, the values fluctuated 2 to 6 feet along the profile,

but suggest the previous channel was around 4 feet higher than the bed elevation of the current channel. This

corroborates the anecdotal evidence indicating that the dredge cut was 4 feet deeper than the original channel.

Gravel areas, represented with black circles in Error! Reference source not found.44, are primarily located

where the channel flowed against the valley wall and may have represented former riffles. Gravel at the

upstream end of the project reach (i.e, Peavine St.) may be related to the narrower upstream valley. The gravel

could be deposited as the energy dissipates in the transition between the narrower, steeper valley segment and

the wider, flatter downstream segment. The rest of the relict channel is relatively flat (i.e., lower gradient),

although the slope appears to increase in the narrow segment downstream of Sink Rd. The downstream third

of the project area (downstream of DOR 109; Error! Reference source not found.44), which featured

relatively large areas of standing water at the time of the survey, appears to be exceptionally flat. Additional

data is needed to better define the channel in this segment. Most of the variability seen in the DOR data can

likely be attributed to variability in sampling location (i.e., what part of the abandoned channel section was

probed) and variability in channel position and form over time.

June 11, 2013

[44]

DOWAGIAC RIVER RESTORATION

Figure 41. Coarse sand under organics within a DOR core at photo location 31. The sand is relatively

coarse with both sediment units including penny-sized chunks of wood.

Figure 42. Sand within a DOR core at photo location 14. The sand is fine to coarse with bivalve

shells throughout.

June 11, 2013

[45]

DOWAGIAC RIVER RESTORATION

710

Depth of Refusal - Site 5

708

Elevation (feet)

706

Water

704

Fines/Organics

702

700

Sand

698

Coarse Sand

696

0

20

40

60

80

Distance Along Cross - Section (feet)

LiDAR Surface

Ground Surface

Refusal - Layer 1

Refusal - Layer 2

100

120

Figure 43. Depth of refusal survey data at a DOR cross section. The former channel bed is likely

represented by refusal at Layer 1 (top of the sand layer).

The sedimentation history of the channel is challenging to interpret with the data collected data. As area

settlement increased in the mid-1800s, it seems likely that vegetation was cleared for agriculture, roads, and

residential areas. In other regions of the United States, similar changes in land use had major impacts to the

sediment load and hydrologic regime of rivers and streams which translated into significant shifts in stream

geomorphic characteristics (Jacobson and Primm, 1997; Knox, 1977; Phillips, 1991; Trimble, 1982).

Depending on the geologic, atmospheric, and vegetation characteristics of a watershed, rivers and streams can

have drastically different responses to land use changes. Depending on the context, channels may either

widen or contract, beds may incise or aggrade, floodplains may aggrade or be abandoned, or channels may

straighten or meander.

June 11, 2013

[46]

Figure 44. Depth of refusal profile along the proposed alignment.

The sand found in the abandoned channels during the DOR survey appears to be widespread. DOR probing

upstream of Frost St., north of the project reach,(recall Peavine St. was the boundary between different

phases of dredging) found floodplain and abandoned channel sediment conditions similar to those in the

project reach (recall Peavine St. was the northern extent of the proposed project and the boundary between

different phases of dredging). At the seven upstream DOR survey locations (i.e., upstream of Frost St.), the

organic layer ranged between 1 and 5 feet thick (mean = 3.5 feet), and the underlying sand layer ranged from

2 to 5.5 feet thick (mean = 3.7 feet). Final rod refusal was in coarse sand at 7.3 feet, on average. The results,

which are similar to the DOR results in the project area, indicate the sand is likely a consistent part of the

valley sediment. It was likely left behind as the channel meandered its way back and forth across the

floodplain.

Current and historic data defining sediment transport in the Dowagiac River is limited. The Pucker Street

Dam is the only main stem barrier that traps sediment. It is located approximately three miles upstream of the

Dowagiac River confluence with the St. Joseph River in Niles Township, Berrien County. As of 2008, the

impoundment at full head (20 feet) creates a narrow 60 acre pond with an average water depth of three feet.

Pucker Street Dam was originally a wooden dam constructed in 1897 to power a mill. The existing concrete

dam was built about 100 feet downstream of the wooden dam in 1928, contiguous with dredging upstream.

In 1940, just 12 years later, enough sand and silt had settled behind the dam that it had to be dredged. This

activity pre-dates the earliest aerial photographs. The 1938 photographs (Figure 4545) depict delta formation

at the upstream end of the impoundment, indicating continued filling. By 1999, a significant delta had formed

over the upper third of the reservoir, leaving low lying vegetated islands and bars of fine material (Figure

4545). The wedge of sediment formed despite at least one dredging event and multiple accidental and

maintenance related sediment releases. The reservoir was drawn down in the early 2000s, and the

corresponding air photos show exposed deposition throughout the former pond. The dam has essentially

been abandoned with three gates permanently left open. Monitoring of the sediment up- and downstream of

the dam allowed for bedload transport rate estimates of 3 tons/day and 1 ton/day in the fall of 2001 and

2002, respectively (Wesley, 2008), which presumably represent normal rates of transport through the dam

reach.

Deposition at the

upstream end of the

Pucker Street Dam

impoundment

Figure 45. Comparison of the 1999 air photo and 1938 air photo at the Pucker Street Dam

impoundment. A sizeable delta formed over the northern (top of figure) third of the reach.

DOWAGIAC RIVER RESTORATION

RODGERS POND

Rodgers Pond is a small impoundment on the Rodgers Lake Outlet Channel located just upstream of the All

Seasons Resort Road. The Band is interested in replacing the culvert and restoring the pond to a natural

stream corridor. Several iterations of manipulation to the outlet channel are evident, both modern and

historic strcutures and crossings abound. We completed a topographic/bathymetric survey of the site along

with a depth of refusal (DOR) survey in the pond. Survey data from March, 2013 were compiled into

AutoCAD Civil3D along with LiDAR data collected in April, 2013. Surface models were developed for the

topographic/bathymetric data, DOR data, and LiDAR.

The maximum depth in the pond is about 6 feet and reduces to just a few inches about 325 feet upstream of

the culvert at All Seasons Resort Road, near the defunct walking bridge. Refusal depths average 2.8 feet below

the bed elevation of the pond. A profile of the surfaces along the thalweg of the Rodgers Lake Outlet

Channel indicates a discontinuity in the profile (Figure 477, black dashed line). This information indicates that

the road embankment material was excavated from the pond, essentially removing the historic stream and

floodplain corridor. Typically the DOR data indicates the former surface of the channel and floodplain. Here

it is likely indicative of a surface has little bearing on the overall restoration of the stream corridor.

Upstream from Rodgers Pond, a beaver dam was present about 1,500 feet upstream and 200 feet downstream

of Rodgers Lake. The beaver dam helps provide vertical stability for the lake and the channel. Without the

beaver dam, water levels would drop in Rodgers Lake. A relic crossing is evident below the dam, likely an old

farm or logging crossing, identifed by two old culverts in the bed of the channel. Below the dam, another old

crossing exists with a dilapidated culvert that is easily removed. Downstream the channel was re-routed to the

north for unknown reasons and enters the Dowagiac River just below Sink Rd. The historic alignment is still

evident on site.

All Seasons

Resort Rd

Rodgers

Lake

Rodgers

Pond

New

alignment

Figure 46. Location of the Rodgers Lake Outlet Channel and Pond. The channel will be re-aligned

to its historic location. The current outlet to the Dowagiac River is at station 122+00.

June 11, 2013

[49]

DOWAGIAC RIVER RESTORATION

725

All Seasons

Resort Rd.

Beaver dam

Old Road

Crossing

715

LiDAR

Survey

DOR

710

Elevation (feet)

720

705

700

3500

3000

2500

2000

1500

Distance (feet)

1000

500

0

Figure 47. Rodgers Lake Outlet Channel profile for the proposed alignment shown in Figure 46.

Note the discontinuity in the profile indicating the pond has been dredged.

Figure 48. Beaver dam just below Rodgers Lake

June 11, 2013

[50]

DOWAGIAC RIVER RESTORATION

Figure 49. Typical view of the upstream section of channel above Rodgers Pond

Figure 50. The old crossing above the pond - note the two old pipes in the bed

June 11, 2013

[51]

DOWAGIAC RIVER RESTORATION

Figure 51. Looking downstream at the Rodgers Pond toward the road

Figure 52: Looking downstream from All Seasons Rd. during the January flood

June 11, 2013

[52]

DOWAGIAC RIVER RESTORATION

HYDROLOGIC ANALYSIS

The Dowagiac is a unique river. Few rivers and streams are capable of supporting a cold water fishery in

southern Lower Michigan, especially rivers with top widths near 60 feet that are susceptible to heating from

the sun. The cold water is the result of extensive coarse-textured surficial sediments deposited by recent

glaciations (see geologic discussion above). These sediments are highly permeable and induce significant

infiltration of precipitation into the ground which subsequently discharges to the Dowagiac River as base

flow. This groundwater-derived base flow is significantly cooler than water derived from surface runoff.

The project reach is located downstream of the confluence with Dowagiac Creek which contains a large

portion of the upstream drainage area (55%). Within the project reach, there are three tributaries that provide

a significant source of flow: (1) an unnamed tributary 2,300 feet upstream of Sink Rd. to the west of the river,

(2) Peavine Creek located 1,200 feet upstream of Sink Rd. to the east of the river, and (3) the Rodgers Lake

Outlet Channel located 1,200 feet downstream of Sink Rd. to the west of the river.

Dowagiac Creek

confluence

Project

reach

Figure 53. Locations of the Sumnerville (04101800) and State Highway 51 (04101535) USGS flow

gaging stations relative to the project reach. The red polyline indicate the project reaches on the

Dowagiac Creek and the Rodgers Lake Outlet Channel.

To better understand the flow regime of the Dowagiac River, we utilized the US Geological Survey (USGS)

flow gage at Sumnerville (04101800) to estimate peak flood magnitudes and the duration and frequency of

base flows. The Sumnerville Gage includes a period of record from 1961 to 2012. An additional flow gage

was installed by the USGS at State Highway 51 (04101535) in February, 2013, but the short record of this

gage prevented us from utilizing the data for historic analysis. This gage was useful for scaling discharges

required for the hydraulic model calibration.

June 11, 2013

[53]

DOWAGIAC RIVER RESTORATION

The following sections focus on the estimation of flood flows, a characterization of base flow within the

system, and finally a discussion on the changes to watershed hydrology over the period encompassing

European settlement to present.

FLOOD MAGNITUDES

Dowagiac River

To estimate flood magnitudes, a Log-Pearson Type III (LP3) probability distribution was fit to the

Sumnerville flow gaging station data on the Dowagiac River (USGS gage 04101800) (IACWD, 1983). This

gage is located 1.2 miles downstream of the project site (Figure 53) and has a drainage area of 255 mi2

compared with 219 mi2 at the downstream end of the project area. The flow gaging station at State Highway

51 (USGS gage 04101535) was not utilized for flood magnitude analysis given its short period of record.

The gage record at Sumnerville included 52 years of data; however, analysis of the annual peak flood plot

(Figure 54) suggests peak flood magnitudes have an increasing trend over the period of record. Given the

importance of flood hydrology to the project, the data was parsed to examine the potential effect of this trend

on predicted discharge. Three component sets were analyzed. First, the 1983 through 2013 data set was used

because it includes inter-decadal climate cycles that have been shown to persist within the Lake Michigan

region (Thompson and Baedke, 1997; Hanrahan, 2009; Wang et al., 2012). This 30 year data record (31 floods

were recorded, but one was omitted from the analysis as it was an outlier) provided a sufficient time period to

complete the LP3 analysis (a minimum of 10 years is recommended for analysis [IACWD, 1983]). The second

period of analysis focused only on the data record over the last 10 years (11 floods were recorded, but one

was omitted from the analysis as it was an outlier); the shortest period of time recommended for analysis. The

final data set included the entire 52 year period.

Annual peak discharge (cfs)

10000

y = 6.6759x - 12251

R² = 0.1213

1000

100

1950

1960

1970

1980

1990

2000

2010

2020

Year

Figure 54. Annual instantaneous peak discharges for the Dowagiac River gaging station at

Sumnerville (USGS 04101800). One high outlier was detected in 2008 and removed from the flood

quantile estimation procedure. The solid black line represents a linear trendline through the data.

There is a general increase in annual peak flood magnitude.

June 11, 2013

[54]

DOWAGIAC RIVER RESTORATION

The application of the LP3 method for determining flood magnitudes required calculating first, second and

third moments of logarithms of the annual maximum peak discharges at the USGS Dowagiac River gaging

station at Sumnerville (04101800). For the third moment (i.e., skew coefficient), we used a generalized value

that combined the gaging record with a regional average value as flood quantiles are relatively sensitive to the

value (IACWD, 1983). With the entire gage record data, the skew was 0.085 while the regional average skew

was 0.081 (Croskey and Holtschlag, 1983). The similarity between the two values confirms that the

Sumnerville gage reflects regional climate and runoff regimes. Combining the two values resulted in a

generalized value of 0.083. For the parsed data, the sample skew coefficient was 0.17 and 0.28 for the 30- and

10-year gaging records, respectively. The higher skews indicate larger magnitude floods in recent years.

Flood magnitude estimation also involved testing for outliers in the data. One high outlier of 2,300 cfs from

2008 was detected in all three gaging period analyses and was omitted from the analysis. No low outliers were

found. Transformation of the LP3 results to the project area were based on the results of regional regression

equation estimates at the project site and the gaging station. The regression equations relate various

physiographic and climatic characteristics to estimated peak floods (Holtschlag and Croskey, 1984). For the

southern region of Michigan, floods were found to correlate with drainage area, storage area, slenderness

ratios (length of channel squared divided by the drainage area), precipitation intensity, and the types of

surficial geologic material. To utilize the regression equations, we multiplied the LP3 estimated flood

magnitudes at the Sumnerville Gage by the ratio of regression equation estimates for the corresponding

recurrence interval at the project site and the Sumnerville Gage with the following equation:

𝑄𝑠𝑖𝑡𝑒,𝑟𝑒𝑔

𝑄𝑠𝑖𝑡𝑒 = 𝑄𝑆𝑀𝑁,𝐿𝑃3 (

)

𝑄𝑆𝑀𝑁,𝑟𝑒𝑔

Qsite was the predicted discharge at the site of interest, QSMN,LP3 was the estimated flood magnitude at the

Sumnerville gage using the IACWD (1982) method, Qsite,reg was the flood magnitude predicted by the

regression equation at the site of interest, and QSMN,reg was the flood magnitude predicted by the regression

equation at the Sumnerville gage. The results of this analysis are shown in Table 2.

Predicted flood magnitudes at the project site were smaller than magnitudes obtained by simply scaling

drainage areas. This adjustment makes sense as the floodplains along the Dowagiac River have the ability to

attenuate flows when floods overtop the channel banks.

Table 2. Peak flood magnitude estimates at the USGS gage (04101800) using the full, 30-year, and 10year data records. The 30-year record predicted the highest discharges and was used to provide a

more conservative approach for hydraulic modeling.

Discharge (cfs) for various gaging record lengths

Recurrence Interval

(years)

Full record

30-year

10-year

1.43

901

911

897

2

952

1017

991

5

1149

1218

1166

10

1269

1341

1271

25

1314

1488

1394

50

1517

1593

1480

100

1617

1695

1562

June 11, 2013

[55]

DOWAGIAC RIVER RESTORATION

The flood magnitudes for the 30-year gage record resulted in the largest estimates while the full record had

the second highest estimates and the 10-year record had the lowest estimates. We applied the 30-year gaging

data for the hydraulic model as it provided more conservative results by producing higher estimated water

surface elevations and larger shear stresses.

Table 3. Predicted flood magnitudes at Peavine St., Sink Rd., and Crystal Springs St. based on the

30-year Sumnerville Gage data record and the regression equation transformation.

Recurrence Interval

(years)

Discharge (cfs)

Sink

Crystal Springs

1.43

Peavine

753

803

809

2

841

897

903

5

1008

1075

1083

10

1110

1184

1193

25

1233

1314

1324

50

1320

1408

1418

100

1405

1498

1509

Rodgers Lake Outlet Channel

Peak flows in the Rodgers Lake Outlet Channel were estimated using regional regression equations

(Holtschlag and Croskey, 1984) and corroborated with flow gaging data. The same regression equations that

were used for the Dowagiac River gage transfer were applied to the 1.03 mi 2 drainage area for the Rodgers

Lake Outlet Channel. Variables used for the equations included: surficial geology (100% glacial outwash),

channel slope (19 feet/mile), the percentage of the channel running through lakes and swamps (47%), and the

slenderness ratio (2.38). The resulting discharges are listed in Table 4. The ratio of 100-year flood magnitude

to 5-year flood magnitude is quite small at only 2. This result is due to the large attenuation capacity available

at Rodgers Lake and the upstream wetlands for storing precipitation runoff and slowly releasing the water

downstream. Thus, flows are relatively stable during floods.

Confirmation of the estimated flood magnitudes was provided by discharge measurements on January 31,

2013 during an estimated 1.3-year flood on the Dowagiac River. Projecting the regression results using a

logarithmic trendline, the estimated discharge was 6 cfs for a 1.3-year flood. The discharge was not measured

directly on the day of the flood, but a nearby stream discharge was measured at 2 cfs and was visually

estiamted to have a similar magnitude as the Rodgers Lake Outlet Channel. Provided that the visual estimate

produced a ±100% error, the regression equation results provide a conservative estimate of peak flood

magnitudes.

June 11, 2013

[56]

DOWAGIAC RIVER RESTORATION

Table 4. Estimated flood magnitudes in the Rodgers Lake Outlet Channel at the All Seasons Resort

Road.

Recurrence Interval

(years)

Discharge (cfs)

5

10

25

12

14

18

50

100

21

24

BASE FLOWS

Base flow is the portion of the river discharge that results from groundwater. Surface water runoff when

added to base flow, induces floods of various magnitudes. It is important to note the base flow, although

constant, does vary in magnitude with the season and the associated amount of precipitation in a given year.

This groundwater contribution is important to the Dowagiac River, providing a stable source of cold water

that makes it suitable habitat for cold water species.

To investigate base flow in the Dowagiac, a plot of the average daily discharge can be useful. Average daily

discharge should factor out major flood events over time and provide an understanding of the average flow

on any day of the year in the Dowagiac. This average would represent base flow. A plot of this average daily

discharge in included in Figure 55 below. Looking closer at this plot, the seasonality of flow on the Dowagiac

is apparent, with higher flows in the spring, gradually trending lower into summer then increasing in late fall

and winter with rainfall and lake effect snow events.

To understand the changes between wet years and dry years in the magnitude of base flow, the exceedance

probability is useful. The exceedance is best understood by filling in the values to the following sentence –

“Over the period of record (1961-present) on this day, flow exceeded X cfs only X% of the time.” The driest

of years would be indicated by the 100% exceedance value. In other words, flow has never been below this

value during the period of record. Base flow during wet years is difficult to interpret as the lower flow

exceedance values begin to incorporate some element of the flood signature. In Figure 55 below we used the

10% value to indicate base flow in extremely wet years.

Table 5. Low flow statistics at the Sumnerville gage and at Crystal Springs St. and Peavine St.

% Time Exceeded

1

5

10

50

75

90

June 11, 2013

Sumnerville Gage

777

541

458

276

205

162

Discharge (cfs)

Crystal Springs St.

670

467

395

238

177

140

Peavine St.

528

368

311

188

139

110

[57]

DOWAGIAC RIVER RESTORATION

900

Mean

800

100%

700

10%

Discharge (cfs)

600

500

400

300

200

100

0

1/1

3/1

4/30

6/29

Day of the year

8/28

10/27

12/26

Figure 55. Probability of flows exceeded for each day of the year at the Sumnerville gage. The black

line is the average flow magnitude for each day averaged for the gage record since 1980, while the

green and red lines relate to flows exceeded 10% and 100% of the time, respectively, for each day of

the year.

CHANGES TO WATERSHED HYDROLOGY

The current hydrologic regime of the Dowagiac River has changed since the arrival of Europeans in the

watershed. The magnitude of this change is important for the design of the Dowagiac River Restoration

Project as historic channel locations may have existing under a different flood regime, responsible for shaping

the channel. Investigating the magnitude of the changes in both peak discharge and base flow can provide

context for the geometry of the old channels within the project area.

Peak Flow Changes

In the Dowagiac River, the average and variability of peak floods have increased based on the gage record

(1961-2012). Visual assessment of the annual peak flood data (Figure 54) suggests that the mean and variance

of peak discharges have both increased since 1961 when flow gaging began. This is confirmed by the fitted

trend line to the data. Another analysis tool that determines hydrologic regime change is a flashiness index. As

watershed or atmospheric conditions change through time, the precipitation runoff response of a watershed

and river also changes. Analysis of flood hydrographs can reveal these changes as the time to peak discharge

and the recession back to base flow will change with different atmospheric or watershed conditions. Baker et

al. (2004) developed a flashiness index (Richards-Baker Flashiness Index) that was based on the differences in

average daily discharge between successive days at a gaging station. An increase in flashiness value for a year

indicates that the differences between average daily flows were larger in that given year. In other words, the

time decreases for a river to rise from base flow to the maximum discharge during a flood. Similarly, the time

required for the flood to recede back to base flow from peak discharge will also decrease.

June 11, 2013

[58]

DOWAGIAC RIVER RESTORATION

1200

Discharge (cfs)

1000

800

600

400

200

Apr 15-min

Jan 15-min

Apr daily avg

Jan daily avg

0

0

2

4

6

8

10

12

14

16

18

20

Days

Figure 56. Typical hydrographs at the Sumnerville flow gage using 15-min and daily average data.

Separate flood events from January and April, 2013 are shown with a common daily x-axis scale.

Note that the rising limbs and time from base flow to peak discharge is about the same for each

event despite one occurring with rain on snow in the winter and the other occurring in April due to

rain alone. The differences between average daily discharges on successive days form the basis of

the Richards-Baker Flashiness Index.

Fongers et al. (2012) applied the Richards-Baker Flashiness Index to the Dowagiac River gage at Sumnerville

(Figure 57). They calculated the index for each year of the gaging record then estimated the trend of the data.

Between 1961 and 1972 there appeared to be a decreasing trend with the R-B Index values, though there was

some scatter. Fongers et al. (2012) did not calculate trend statistics for this time period. Nevertheless, the

decreasing trend is apparent in the data. It is not known, however, what caused the decrease in flashiness.

One possible scenario could be the increase in forested areas and the maturing of existing forests within the

watershed.

From 1973 through 2011 there was a significant (p-value 0.00) increase in flashiness. Common causes of

increased flashiness include urbanization, channelization (straightening), drain tile installation, or

deforestation. In the Dowagiac River, the major changes are likely related to continued alteration of

hydrology for drainage purposes. This assessment follows a simple process of elimination as the population

of the watershed has not increased markedly, forestation within the watershed has likely increased based on

limited aerial photo interpretation, and the channelization of the main stem Dowagiac already occurred well

before gage recording began.

June 11, 2013

[59]

DOWAGIAC RIVER RESTORATION

Figure 57. Richards-Baker Flashiness Index results from the Sumnerville gage (Fongers et al., 2012).

After 1972 there was a significant increase in flashiness.

An increase in peak flows, flashiness and variability were evident in the Dowagiac River gage data over the

last 40 years; however, flow records were not available between pre-European settlement (early 1800s) and

current hydrologic conditions. As a surrogate for pre-gaging record peak flood analysis, we estimated bankfull

flows for the relict channel to compare with current peak flood estimates. This analysis is based on evidence

that most dynamically stable rivers with low gradients in agricultural watersheds have bankfull channels that

are adjusted to convey a peak flood between the 1.0-1.5-year recurrence interval (Williams, 1978; Powell et al.,

2006). The 1.0-1.5-year recurrence interval is a flood that is, on average, estimated to occur once every year

(based on the annual flood series).

To estimate the bankfull discharge of the relict channels, we first estimated an average 65 foot channel top

width from the LiDAR data, confirmed by DOR probing. An average bankfull depth of 5 feet was estimated

between the DOR survey elevations and the current floodplain elevations. The reach average slope was

determined by dividing the current drop in elevation through the valley by the plan form length of the old

channel to obtain a grade of 0.00037 (for comparison, the current, channelized slope is about 0.00043).

Finally, 1:1 (horizontal:vertical) bank slopes were specified and the roughness values were subjectively

increased to 0.055 from 0.05 to account for additional large woody debris likely present in the relict channel.

The resultant discharge was 420 cfs.

We also tested the sensitivity of this analysis to various channel configurations as the historic river likely

varied from steeper to milder grades and there is likely some scatter around the measured DOR. To begin, we

tested the sensitivity to slope by increasing, then decreasing the drop in channel bed elevation by 2 feet while

the plan form alignment remained the same. This exercise assumes all other channel dimensions noted above

are constant. The results indicate that the bankfull discharges vary between 340 and 460 cfs (Table 6).

As slopes change, bank heights also typically change. Accordingly, we tested the change in bankfull discharge

with an increase and decrease in bankfull depth by 1 feet. The slope was specified as 0.00037 for all three

scenarios. The results indicate that the bankfull discharge varies between 300 and 550 cfs.

June 11, 2013

[60]

DOWAGIAC RIVER RESTORATION

Table 6. Estimated bankfull discharges for the relict channel with various slopes. Bankfull depths

were held constant at 5 feet. The slopes were determined by increasing and decreasing the drop in

elevation along the plan form alignment by 2 feet. Note that the maximum discharge of 460 cfs is

still much less than the current 1.05-year flood discharge of 639 cfs.

Slope

Q (cfs)

0.00026

0.00037

0.00043

340

420

460

Table 7. Estimated bankfull discharges for the relict channel with various bankfull depths. The

channel slope was held constant at 0.00037. The depths represent the range of potential depths

found in the DOR survey. Note that the maximum discharge of 550 cfs is still much less than the

current 1.05-year flood discharge of 639 cfs.

Bankfull depth (feet)

Q (cfs)

4

5

6

300

420

550

Comparison with the current estimated 1.05 and 1.43 year peak floods (1.05- and 1.43-year recurrence

intervals are used because they are the reciprocals of the 0.95 and 0.7 probabilities for which frequency

factors are readily available [Chow et al., 1988]) of 639 cfs and 803 cfs, respectively, suggests that annual flood

magnitudes have increased substantially since European settlement.

Although annual floods (1-1.5-year recurrence) appear to have increased significantly, it is important to be

aware that the historic channels within the project area were still active until 1910 when channelization

occurred. By 1910 the watershed experienced large scale deforestation and conversion to agriculture. The

historic channel, currently present in the floodplain, therefore, would have adjusted or been adjusting to

hydrologic and sediment transport regimes that were different than pre-settlement conditions. For the relict

channel to arrive at the form we encountered in the floodplain, multiple channel evolution processes are

possible. Channel widening and incision may have occurred as precipitation runoff increased due to the lack

of canopy interception of rainfall, the channeling of water down row crops in fields, the lack of roughness on

the land to impede runoff, and the absence of large woody debris in the channel to attenuate floods.

Conversely, the conversion to agriculture and the reduction of riparian forests could have increased sediment

supply to the river, filling up the channel cross section to reduce depths and induce excessive overbank

deposition. To delineate precise historic channel geometries, it would be necessary to date sedimentation

layers and/or radiocarbon date organic matter, an effort well beyond the scope of this project. Nevertheless,

the results indicate that peak floods were likely different in 1910 than they are today.

Other methods were also investigated to attempt to understand the magnitude of change in hydrologic

regime since settlement of the watershed. The Nature Conservancy’s Indicators of Hydrologic Alteration was

investigated for applicability (The Nature Conservancy, 2009). This program, however, analyzes existing flow

gage data to develop environmental flow standards. The results of the method are directed towards

determining flow requirements for various riverine and riparian bugs, fishes and plants. It does not predict

changes in flow regime due to changes in land use. Additionally, the program relies on existing gage data

rather than allowing us to predict pre-settlement conditions long before a gage was present on the river.

The US Geological Survey National Hydrologic Assessment Tool (NATHAT) (Cade, 2009) was also

investigated, but was found to provide similar results as The Nature Conservancy’s program. NATHAT relies

on existing gage data to detect changes in hydrologic regime. Although we know changes have occurred in

June 11, 2013

[61]

DOWAGIAC RIVER RESTORATION

the watershed since the Sumnerville gage began operation in 1960, the bulk of the hydrologic alteration

occurred previous to 1960. As noted above, the flashiness index provides evidence that the watershed

continues to change; however, these likely pale in magnitude to the changes induced between the mid 1800’s

and 1920’s.

Base Flow Changes

The base flow regime has changed slightly over the gaging record at Sumnerville. Discharges during the

winter months have increased in the period between 1983 and 2012 compared with the 1961 through 1982

period. It is unknown what caused the increase in winter flows, but some potential causes may include:

warmer winter temperatures allowing for additional groundwater recharge, or increased drain tiling

intercepting the groundwater table and discharging to the river. In the summer, base flows appear to have

remained stable throughout the gaging record.

Base flow changes since before European settlement could not be determined as flow gaging data was not

available. Regime changes could be determined by constructing a calibrated hydrologic model of the

watershed. This analysis was beyond the scope of our work.

350

1961-1982

300

1983-2012

Discharge (cfs)

250

200

150

100

50

0

1/1

3/1

4/30

6/29

8/28

10/27

12/26

Day of the year

Figure 58. Daily discharges exceeded 90% of the time at the Sumnerville Gage. Base flows in the

1983-2012 time period have increased during the winter and remained steady in the summer

compared with the 1961-1982 time period.

HYDRAULIC ANALYSIS

Hydraulic modeling was performed using the one-dimensional program HEC-RAS. Although the model does

not account for horizontal or vertical variations in velocity, it is appropriate for most river systems that do

not have lateral flow directions on floodplains. The geometry for the existing conditions model was provided

by the topographic/bathymetric survey completed in March, 2013 and LiDAR data collected in April, 2013.

Cross section locations and configurations were altered from the original model to determine the effects of

various restoration scenarios on hydraulic characteristics. The peak and base flow magnitudes from the

hydrologic analysis were applied for the steady flow component in HEC-RAS.

June 11, 2013

[62]

DOWAGIAC RIVER RESTORATION

Two models were created for this analysis. The first was a model of existing conditions calibrated to

conditions observed on the site. The second model was a proposed conditions model, intended to predict the

hydraulic conditions associated with placing the Dowagiac back into its old channel under a restored

condition. Both model iterations are discussed in detail below.

EXISTING CONDITIONS

Model Construction

The geometric data for the existing conditions HEC-RAS model were synthesized in AutoCAD Civil3D from

the March, 2013 survey data and the April, 2013 LiDAR. In AutoCAD, points from the topographic survey

were integrated into a land surface model. Separate surfaces were setup for the survey and LiDAR data. An

alignment representing the existing thalwegs (the deepest part of the channel cross section) was drawn

through the surface models to define reach lengths between cross sections. Hydraulic cross sections were

overlaid onto surveyed cross sections. Overbank flow path lengths between cross sections were estimated

from the difference between centroids of the flow areas in the left and right floodplains. Finally, the geometry

established in AutoCAD was exported to HEC-RAS for further model development.

Bridge data was setup in HEC-RAS by measuring distances and elevations in the survey points in AutoCAD.

An energy equation approach was specified for all bridges. Contraction and expansion ratios were specified to

be 0.3 and 0.5 at the adjacent upstream and downstream cross sections to the bridges, respectively.

Ineffective flow areas were established at the cross sections adjacent to the bridges to block off areas that

would not actively convey water during floods but would remain wetted. We assumed a 1:1 contraction ratio

angle immediately upstream of the bridges and a 2:1 expansion ratio as flows exit the bridges.

Ineffective flow areas were established in the floodplains of cross sections where levees were present. The

levees were formed during the excavation of the straightened channel and aligned parallel the river. There are

low saddle points in the levees, however, that allow water to spill laterally onto the floodplain. We estimated

an elevation about 0.5 feet higher than the low spots in the levees as the threshold where water conveyance

begins on the floodplain. Water surfaces below this threshold were assumed to have minimal flow

conveyance in the floodplain areas.

Model Calibration

To calibrate the hydraulic model, we adjusted roughness values until modeled water surface elevations

matched observed elevations during two high flow events. On January 31, 2013, we surveyed water surface

elevations while the average discharge at the Sumnerville Gage was 843 cfs. The corresponding recurrence

interval for the flood was approximately 1.3 years. To utilize the data in the hydraulic model, we linearly

interpolated data between the Sumnerville and Highway 51 Gage based on drainage area with the following

equation:

𝑄𝑙 = 𝑄51 + (𝐷𝐴𝑙 − 𝐷𝐴51 ) (

𝑄𝑆 − 𝑄51

)

𝐷𝐴𝑆 − 𝐷𝐴51

where 𝑄𝑙 is the discharge at the desired location, 𝐷𝐴𝑙 is the drainage area at the desired location, 𝐷𝐴51 is the

drainage area at the Highway 51 gage, 𝐷𝐴𝑆 is the drainage area at the Sumnerville gage, 𝑄𝑆 is the measured

discharge at the Sumnerville gage, and 𝑄51 is the measured discharge at the Highway 51 gage. The estimated

discharges using this interpolation method resulted in magnitudes that were within 2-4% of the scaling

method utilized for the peak flow analysis.

June 11, 2013

[63]

DOWAGIAC RIVER RESTORATION

Flow magnitudes were derived for the bridge crossings at Highway 62, Frost St., Peavine St., Sink Rd., and

Crystal Springs St., which were all included in the model. The calibrated Manning’s n values varied from 0.054

in the channel downstream of Sink Rd. to 0.045 in portions of the channel just downstream from Peavine St.

The floodplain values were all specified to be 0.1 as estimated using roughness partitioning methods

suggested by Arcement and Schneider (1989). The differences between the observed and modeled water

surfaces were all within 0.10 feet for the January 30 discharge (Table 8), indicating good model agreement.

On April 19, 2013, water surface elevations were measured by Robert Frank and Grant Poole of the Pokagon

Band of Potawatomi during a 1,120 cfs flow event at the Sumnerville Gage. The discharge magnitude

corresponds to approximately a 3.5-year flood. Measured water surface elevations were referenced to bridge

low chord elevations that were previously surveyed in March, 2013 (Figure 6060). Some error was inherent

with this methodology as it was difficult to survey bridge low chord elevations exactly while standing on top

of the bridge deck (estimated error about 0.10 feet). Additional error was involved with measuring down

from the low chord to the water surface elevation during the flood (additional estimated error about 0.10

feet). Nevertheless, measured water surface elevations were 0.16 feet higher than those predicted by the

model at Sink Rd., 0.00 feet at Peavine St., and 0.01 feet lower at Frost St. These errors were based on

maintaining the same roughness values established for the January 31, 2013 calibration.

Finally, we surveyed one high water mark from the September, 2008 flood in Paul Hinsey’s shed along Sink

Rd., about 2,600 feet upstream of the Sink Rd. bridge (elevation 710.21 feet). The flood had a magnitude of

2,300 cfs which was larger than the predicted 500-year recurrence interval flood. At this stage, there was

significant flow conveyance on the floodplain. The model predicted water surface elevation at this discharge

was 0.45 feet higher than the measured elevation. This error is relatively large, however, it confirms that the

hydraulic model is conservative with predicting flood water surface elevations. Roughness values were left the

same, though extensive research indicates flow roughness decreases with stage (Shields and Gippel, 1995;

Dudley et al., 1998). If we lowered the roughness values, the resulting water surface elevation predicted by the

model would decrease. In other words, we are very confident that the actual water surface elevations for large

floods (25-500+ year recurrence interval) will be at or lower than the predicted elevations in the model.

Table 8. Differences between measured and modeled water surface elevations during the January

and April, 2013 flood events.

Modeled vs. measured water surface differences (feet)

January 31, 2013 (843 cfs)

April 19, 2013 (1006 cfs)

September 15, 2008

0.04

-0.02

-0.45

0.07

0.16

0.07

-0.02

-0.04

-0.01

-0.05

-0.09

0.09

0.06

June 11, 2013

0.05

-0.45

[64]

DOWAGIAC RIVER RESTORATION

DowagiacRiver

725

Legend

WS 4/19/13

720

WS 1/31/13

Ground

OWS 1/31/13

715

Elevation (ft)

OWS 4/19/13

710

705

700

695

690

0

5000

10000

15000

20000

25000

30000

Main Channel Distance (ft)

Figure 59. Modeled and observed (black diamonds) water surface elevations on January 31, 2013

(blue line) and April 19, 2013 (red line). Matching these elevations created a calibrated model with

errors less than 0.10 feet.

Figure 60. Example of how water surface elevations were measured with reference to the low chords

of the bridges during the April, 2013 flood. This is at Sink Rd. (photo provided by Robert Frank).

Downstream boundary conditions were specified as a known water surface for the calibrated model, but were

set to normal depth for the existing and conditions models. We calibrated the normal depth slope until

modeled and observed water surfaces during the two 2013 high flow events matched the known water surface

June 11, 2013

[65]

DOWAGIAC RIVER RESTORATION

elevations at the downstream end of the model. The resultant slope was 0.00037 which is milder than the

channel grades upstream. This is consistent because the downstream end of the modeled reach is influenced

by backwater from raising the channel bed 4 feet at the Dodd Park re-meander project (Cass County

Conservation District, 2007).

PROPOSED CONDITIONS

Model Construction

As part of this investigation, we completed a preliminary analysis of changes to hydraulic conditions with the

proposed project in place. Since we have not finished the final design stage of the project, we bracketed a

range of potential proposed channel geometries for analysis. A preliminary channel alignment was

determined based on historic maps, LiDAR data, and field reconnaissance observations (see section Plan

Form Alignment of Dowagiac Channel). The proposed bankfull channel width was specified to be 60 feet as

this is the lower end of the range of possibilities (60-80 feet; see Table 9). The smaller top width provided a

more conservative model as it created higher predicted water surface elevations, creating a worst case

scenario. This was critical to understand the potential impact of floods on nearby homes due to the project.

The bankfull channel depth was set to 6 feet so that the 1.05-year flood would be just contained within the

bank tops at a slope of 0.00037 (see discussion below). The 0.00037 slope was determined by subtracting the

elevation of the channel bed at Peavine St. from Crystal Springs St., then dividing by the plan form length of

the proposed channel. As the DOR in the old channel to be re-occupied indicates, there was likely some

variability in channel grades within the project reach. Therefore, the minimum and maximum values in Table

9 indicate a range that the proposed design should contain.

Table 9. Proposed bankfull channel geometry compared with the existing geometry. We bracketed a

minimum and maximum range of probable proposed channel geometries. The final configuration

will be determined during the final design stage.

Channel characteristic

Existing channel

Bankfull width

Bankfull depth

Sinuosity

Slope

Proposed channel

Minimum

Maximum

80 feet

10 feet

1.00

60

5

1.53

80

7

1.53

0.00043

0.00026

0.00043

The elevation of the proposed channel bed was raised 3 feet above the existing channel bed so that the top of

the proposed 6 foot tall banks would approximately match the existing floodplain elevation. Once water

levels overtop the banks at the 1.05-year flood, therefore, most of the valley will become inundated.

Reconnection of the floodplain was one goal for this project.

The old channel and spoil piles adjacent to the river were graded flat in the model. We assumed that the

material to be cut from the spoils would exactly offset the fill in the channel. Although areas of the current

channel may not be filled in with the project, this geometry is valid in HEC-RAS as these areas will not

actively convey flood flows. All bridge geometries and cross sections immediately upstream and downstream

of the bridges were unaltered for the proposed conditions model.

Proposed cross sections were laid out between the existing bridge locations with an average spacing around

1,000 feet. This spacing is denser than the 2,100 feet required by Samuels (1989) based on a slope of 0.00037

June 11, 2013

[66]

DOWAGIAC RIVER RESTORATION

and a bankfull channel depth of 6 feet. The sections were located in areas where the bankfull channel’s flow

direction was the same as the direction of overbank flow (middle of meander bends). This layout prevented

having cross sections in areas where flow may not be one-dimensional or directed down-valley. Bankfull

channel reach lengths were delineated using the proposed channel alignment. Overbank flow area reach

lengths were measured between the distances between centroids of flow area at each cross section. The

centroid of flow area was defined as one third of the distance from the bankfull channel top to the edge of

the floodplain valley. Roughness values were increased to 0.055 in the bankfull channel throughout the

project area to reflect increased densities of large woody debris that will likely be placed. This increase reflects

suggestions by Arcement and Schneider (1989) for large woody debris occupying about 15% of the flow area

in the proposed channel. Floodplain roughness remained unchanged from existing conditions.

PROJECT-RELATED CHANGES

Flood and Base Flow Changes

Three homes were identified within and upstream of the project area that may be susceptible to flooding

under existing and proposed conditions. To analyze potential impacts, we integrated the HEC-RAS hydraulic

model with the LiDAR land surface model to develop maps of inundation areas before and after the

proposed project. As the project will likely raise the channel bed about 3 feet and increase sinuosity, the water

surface elevations during most flow conditions will rise. Increased water elevation will be greatest during

normal flows and gradually decrease as the flow, or flood magnitude increases. During these large flood

events, water surface elevations will be smaller as the floodplain conveys the majority of the water and the

floodplains will not be altered with the project.

Table 10. Water surface elevation increase due to the proposed project for various flood recurrence

intervals and the September 15, 2008 flood (greater than 500-year recurrence interval).

RI

1.05

1.43

1.67

2

5

10

25

50

100

500

Sept. 15, 2008

Sink Rd.

3.16

2.86

2.78

2.69

2.38

2.20

1.99

2.06

1.94

1.71

1.40

Peavine St.

2.46

1.90

1.80

1.68

1.29

1.07

0.83

0.71

0.56

0.24

0.15

Frost St.

0.48

0.2

0.16

0.12

0.03

0

0

0

0

0

0

To analyze the potential impacts to nearby homes (Figure 61), we compared existing and proposed conditions

during the 100-year flood event. This flood has a one-percent chance of occurring each year. It is used by the

National Flood Insurance Program and all other Federal agencies to determine whether flood insurance

should be purchased (French and Associates, 1998).

During average base flow conditions, water surface elevations will rise about 3 feet within the project reach.

Nevertheless, the character of the river should not change drastically after project completion as river depths

June 11, 2013

[67]

DOWAGIAC RIVER RESTORATION

will remain approximately the same. Depths will likely vary between 3.5 and 4.0 feet at most cross sections

with some deeper and shallower sections. In general, the depths will vary more than the existing channel as

pools and riffle areas will be created. The increased complexity reflects more natural conditions of healthy

river systems and will create better habitat for aquatic bugs and fishes.

Upstream of the project area, greater channel depths and water surface elevations are expected. As the

downstream bed elevation increases while the upstream bed remains the same, backwater will create slower

velocities and deeper water. Nevertheless, the river will remain within the channel banks (levees) as it does

now. Immediately upstream of Peavine St. there will still be approximately 2 vertical feet of bank exposed. At

Frost St., the channel is already in an incised condition and there will be little change in the water surface

elevation during base flows. The water surface here will increase about 1 foot during average flows compared

to existing conditions.

Downstream of the project area, no rise in water surfaces will occur. Here, the river is controlled by

downstream hydraulics due to the low gradient.

House 3

House 2

House 1

Figure 61. Map of the homes that were analyzed for potential flood impacts with the project.

June 11, 2013

[68]

DOWAGIAC RIVER RESTORATION

Home #1 – (Parcel 14-110-017-296-30)

One of the homes situated near the proposed channel is located about 1,000 feet upstream of Sink Rd. on the

west of the historic river valley. The river may be raised and shifted laterally about 400 feet closer to the home

under the proposed restoration alignment. At the 100-year flood, water surfaces rise 2.04 feet along the cross

section of the valley that includes the home (Figure 6361). The existing water surface is currently estimated at

708.11 feet while the proposed conditions would increase the elevation to 710.15 feet for the same flood

event. The ground surface adjacent to the home was measured at 710.62 feet using the LiDAR data,

providing about 0.5 feet of freeboard. Laterally, this pushes the edge of the water surface moves closer to the

home about 30 feet.

At base flow conditions, water surfaces will increase up to 3.65 feet, though the channel depth will remain

approximately the same as the existing river. This increase should produce wetter ground conditions around

the home, likely returning some of the vegetation community to wetlands.

Home

Figure 62. Photo (looking upstream) of the relict channel that may be re-occupied near the home

approximately 1,000 feet upstream of Sink Rd. on the west side of the valley.

June 11, 2013

[69]

DOWAGIAC RIVER RESTORATION

Table 11. Water surface elevation changes at the home approximately 1,000 feet upstream of Sink Rd.

on the west side of the valley.

RI

Base flow

1.43

100

500

EG

701.03

705.72

708.11

708.69

Change

+3.65

+2.92

+2.04

+1.81

PR

704.68

708.64

710.15

710.50

735

Proposed ground

EG 100

PR 100

730

EG 1.43

PR 1.43

Home

Elevation (feet)

725

720

Proposed

channel

Peavine

Creek

715

710

705

700

0

200

400

600

800

1000

1200

1400

1600

1800

Distance (feet)

Figure 63. Valley wide cross section at House #1 - 1,000 feet upstream of Sink Rd. Existing (EG) and

proposed (PR) water surface elevations are shown for the 1.43- and 100-year floods. Note that water

surfaces rise with the proposed restoration; however, the house is not impacted.

June 11, 2013

[70]

DOWAGIAC RIVER RESTORATION

Figure 64. Plan view of the water surface extents around Sink Rd. at the 100-year flood. The

proposed (red polygon) water surface rises and covers a larger area than the existing (blue hatched

polygon) area.

Home #2 – (Parcel 14-110-009-172-00)

The second home is located just upstream of Peavine St. on the west side of the river. Although the river

upstream of Peavine St. will not be re-routed with the project, the increased bed elevations downstream will

induce some backwater that could impact upstream homes. Nevertheless, after the project, water surfaces

during the 100 year flood are not expected to impact the home despite the 0.56 foot rise from 711.53 feet to

712.09 feet. The 712.09 foot elevation is still 3 feet lower than the elevation of the ground surface at the

home. This translates into a 35 foot buffer of dry land at the 100 year flood.

Base flow water surface elevations will rise and create deeper water adjacent to the home. The estimated

increase is 2.93 feet. The increase will still remain below channel bank tops here. A significant rise in

groundwater elevations is not expected as there should still be about 3 foot depths to the groundwater

surface.

June 11, 2013

[71]

DOWAGIAC RIVER RESTORATION

Figure 65. Photo looking west from the river at the home just upstream of Peavine St. There is little

freeboard for the house in the background.

735

730

Elevation (feet)

725

720

715

Existing ground

EG 1.43

EG 100

PR 1.43

PR 100

Home

710

705

700

695

0

100

200

300

400

Distance (feet)

500

600

700

Figure 66. Valley wide cross section at the home just upstream from Peavine St. Existing (EG) and

proposed (PR) water surface elevations are shown for the 1.43- and 100-year flood. Note that water

surfaces rise with the proposed restoration; however, the house is not impacted.

June 11, 2013

[72]

DOWAGIAC RIVER RESTORATION

Table 12. Water surface elevation changes at the home just upstream of Peavine St.

RI

Base flow

1.43

100

500

EG

704.24

708.86

711.53

712.18

PR

707.17

710.76

712.09

712.42

Change

+2.93

+1.90

+0.56

+0.24

Figure 67. Plan view of the water surface extents around Peavine St. at the 100-year flood. The

proposed (red polygon) water surface rises and covers a larger area than the existing (blue hatched

polygon) area.

June 11, 2013

[73]

DOWAGIAC RIVER RESTORATION

Home #3 – (Parcel 14-110-009-167-01)

At Frost Road, flood impacts will be smaller with the proposed project as it is located about 6,000 feet

upstream of any channel grading work. Still, given the extremely mild slope of the river, some changes will

occur in this area. About 450 feet downstream from the Frost St. Bridge is a home on the east side of the

river that is relatively close to the water. From the LiDAR data, it appears that the home was placed on fill to

raise the building to a higher elevation than the surrounding floodplain elevation. With the proposed project,

the 100-year flood elevation is not expected to change. The 100-year flood elevation is 713.55 feet and the

home is at an elevation of about 715.35 feet as measured by the ground with the LiDAR data. This provides a

1.8 foot vertical buffer between the water surface and the foundation of the home. During base flow

conditions, there will be a rise in water surface elevation. An increase of about 0.93 feet will create deeper

water.

Table 13. Water surface elevation changes with the proposed project at the home about 450 feet

downstream from Frost St. on the east side of the river.

RI

Base flow

1.43

100

500

EG

706.72

711.83

713.66

714.01

PR

707.65

712.03

713.61

713.96

Change

+0.93

+0.20

+0.00

+0.00

735

Existing ground

EG 100

PR 100

Elevation (feet)

730

EG 1.43

PR 1.43

Home

725

720

715

710

705

700

0

100

200

300

400

500

600

700

800

900

1000

Distance (feet)

Figure 68. Valley wide cross section at the home about 450 feet downstream from Frost St. on the

river left. Existing (EG) and proposed (PR) water surface are shown for the 1.43- and 100-year flood.

Note that water surfaces rise with the proposed restoration; however, the house is not impacted.

June 11, 2013

[74]

DOWAGIAC RIVER RESTORATION

Figure 69. Plan view of the water surface extents around Frost St. at the 100-year flood quantile. The

proposed (red polygon) water surface rises and covers a larger area than the existing (blue hatched

polygon) area.

Summary of Hydraulic Impacts to Homes

The hydraulic analysis indicates that although normal, or seasonal base flow, will be elevated, 100-year flood

flows should not impact homes above Peavine St. The home just upstream of Sink Rd. has the least free

board at about 0.5 feet. at the 100-year flood, suggesting there may be some impact. However, given that the

modeled roughness values and channel dimensions were conservative, we are confident that the home will

not be impacted during this flood event.

The hydraulic model used is as accurate as the information utilized in its calibration. The two flows used for

calibration were much lower than a 100-year event, but as discussed, we have left roughness values consistent

with these floods to evaluate impacts at the 100-year event, although they should in fact decrease. Given the

size of the floodplain available within the Dowagiac, an increase of nearly 60 cfs would be required to raise

the water surface elevation 0.1 feet at the home just above Sink Rd. With 0.5 feet of freeboard here, this

would require an additional 300 cfs discharge to begin flooding the home. This information is useful in

understanding how robust the model predictions are.

If these projected impacts to nearby homes are deemed unacceptable, there are alternatives for the proposed

channel that will reduce these threats. First, the proposed channel bed could be lowered. This would result in

June 11, 2013

[75]

DOWAGIAC RIVER RESTORATION

larger flows being contained within the bankfull before spilling onto the floodplain. A second alternative is

widening the proposed channel. Our analysis of the relict channel indicates a width of 65 feet rather than the

60 foot modeled width. This will decrease predicted water surface elevations slightly. Greater widths,

however, are not suggested as the power of the channel available to transport sediments will be reduced if it is

over-widened. Eventually, the channel will fill up with sediments again and have self-organize into a channel

with a smaller top width. A third alternative would be to keep the channel as proposed, but construct levees

around the homes that may be impacted. These levees would only need to be about 2-3 foot tall berms to

prevent water from approaching the home near Sink Rd. during the 100-500-year flood events.

We have purposely utilized a conservative approach in analyzing the flood effects, making certain that

landowners are aware of the changes and have all of the information necessary to fully understand the project

and the potential changes within their property. Living along a river always involves risk of flooding, but the

goal of this project is to follow a good neighbor policy and be certain these issues are discussed at length.

Groundwater and Wetland Changes

As water surface elevations rise within and upstream of the project reach for most flows, groundwater table

elevations are also expected to rise. The resulting depth from the ground surface to the groundwater table will

be shallower with the project, likely expanding existing wetlands and creating new ones. Clarke et al. (1998)

also indicated that areas upstream of Dodd Park will be sensitive to increases in groundwater elevation. Most

of these impacted areas will be contained within the historic Dowagiac River floodplain. Whether the springs

– noted in historic accounts to have dried up will return with the restoration of the former bed elevation is

unknown.

DESIGN RECOMMENDATIONS

PLAN FORM ALIGNMENT OF DOWAGIAC CHANNEL

Appendix A includes detailed maps of the plan form alignment for initial design purposes. The proposed

alignment (relict alignment) maximizes the channel length through the reach by taking advantage of most of

the abandoned bends within the floodplain. In the upstream section of the project reach (station 25000 to

21000), the proposed alignment follows the route suggested by the 1873 historic atlas map. Downstream of

station 21000 here, the proposed alignment follows relict meander bends based on degree of definition as

seen in the field and on the LiDAR maps. Where channel definition was lacking, floodplain patterns and

probable pathways based on upstream and downstream channel alignment were used as guides. The existing

channel will be utilized where the proposed and current plan form are coincident, at crossings, and where the

channel should likely be kept away from nearby infrastructure. Additionally, proposed/historic alignments

have been adjusted in some meander bends to protect homes along the original channel. For instance, the

inactive bend at station 19000 is currently within 100 feet of a residence, and, therefore, pulling the proposed

bend north might be prudent (Figure 7070). Or, in the case of the large meander north of station 22500, the

cutoff channel should be occupied to maintain cold water tributary habitat along the westerly arm of the

abandoned meander, and to avoid restoring the channel adjacent to Peavine St. (Figure 44). In most of these

cases, the channel was aligned through scroll bars along the inside of the abandoned bend.

June 11, 2013

[76]

DOWAGIAC RIVER RESTORATION

Figure 70. Large meander southwest of station 19000. A chute channel within the scroll bars on the

inside bend should be occupied to protect the structures along the bend.

Figure 71. Large meander north of station 22500. The cutoff channel should be occupied to maintain

coldwater tributary habitat along the westerly arm of the abandoned meander, and to avoid Peavine

St.

June 11, 2013

[77]

DOWAGIAC RIVER RESTORATION

Although it is likely that the meander bends comprising the proposed alignment were not all active at the

same time, and the channel south of Sink Rd. may have been relatively straight immediately prior to dredging,

maximizing the number of bends and the sinuosity will help meet many of the design goals. The meanders

will deliver water throughout the floodplain, even in the wider sections, thereby helping increase wetland

function and habitat. Additionally, re-establishing bends will also likely re-establish scour and deposition in

the channel and floodplain. Once these processes are reinstated, they will provide more heterogeneous

velocities and diverse bathymetry and topography along the meander sequences, thereby creating more

complex aquatic and riparian habitats. A host of additional processes related to nutrient cycling, flood storage,

and biotic exchange between the floodplain and channel will be renewed by the restoration of a natural

flooding regime to the reach. There are few potential impacts to infrastructure due to normal channel

adjustment within the reach, so once meandering is re-established, allowing the channel to adjust its sinuosity

should not be an issue

June 11, 2013

[78]

DOWAGIAC RIVER RESTORATION

Figure 72. Overview of the proposed Dowagiac River plan form alignment (see Appendix for

details).

June 11, 2013

[79]

DOWAGIAC RIVER RESTORATION

DOWAGIAC CROSS SECTIONAL GEOMETRY

Descriptions of the Dowagiac River’s width prior to dredging vary depending on the source. An unknown

observer remarked that the river was “only about two feet deep and 40-50 feet wide” (unreferenced notes

filed at the Cass County Historic Library), whereas the General Land Office surveyor measured eight channel

crossings between 60 to 120 feet, with an average of 99 feet. The 40-50 foot width estimates were likely

related to the first phase of dredging, which took place upstream of the project reach. Channel cross sections

usually increase in the downstream direction, and therefore, these values are likely too low for the project

reach. They also likely correspond to general water levels, not bankfull conditions. With respect to the

surveyor notes, width measurements were often taken along section lines, which often crossed the channels at

an angle (i.e., not perpendicular to flow), thereby biasing the widths towards higher magnitudes. For instance,

the channel is estimated to be about 108 feet wide (1.63 chains) along the section line dividing sections 19 and

30, but just north of there, along the line between sections 19 and 20, the channel was noted as 66 feet wide

(1 chain). The difference being that the channel measurement at the second location was more perpendicular

to flow. A perpendicular measurement in the first case would have provided a width of approximately 70 feet.

Additionally, many of the measurements were taken across meander bends. In general, bends tend to feature

wider channel sections than straighter channel sections, and therefore, these measurements also likely overestimate channel width.

In addition to the historical data, the LiDAR survey data provided valuable information for defining channel

widths prior to dredging. In many floodplain areas, the pre-dredging channel appeared to be relatively well

preserved and channel widths were directly measured within the GIS. Using this method, random channel

width measurements ranged from 50 to 100 feet. Where the channel was well defined, the widths were

consistently around 65 feet, with wider sections located in bends.

Finally, regression equations based on channel dimensions measured throughout southern Michigan (Rachol

and Borley-Morse, 2009) predicted a channel width at 87 feet for the contributing Dowagiac River watershed

at Sink Rd. It is important to note, however, that these rating curves were not organized by geomorphic

stream type which can aid in tightening predicted dimensions and the R 2 value was 0.69.

Except for the overly-shallow estimate of 2 feet mentioned previously, there was no description of channel

depth for the project reach in the reviewed historic documents. Therefore, estimates of depth for the historic

channel were based primarily on field observations. Defined abandoned channels were often delineated by 2

foot high banks lined by vegetation with exposed roots (Figure 73). We assumed the top of these banks were

the historic top-of-bank at bankfull conditions, and then added the average DOR for the organic-sand

interface (i.e., 3.3 feet), providing an overall channel depth of 5.3 feet. This depth was rounded up to 6 feet

since this provided sufficient capacity to contain the 1.05-year flood magnitude (see Proposed Conditions

Model Construction). The increased depth relative to the DOR results and the anecdotal evidence from presettlement conditions makes sense as channels typically have a larger bankfull area as peak flows increase.

Conversely, the regression equations for southwestern Michigan rivers and streams (Rachol and BorleyMorse, 2009) suggested a depth of 3 feet for the Dowagiac River channel. This value would create a bankfull

channel that would be overtopped multiple times per year.

June 11, 2013

[80]

DOWAGIAC RIVER RESTORATION

Figure 73. Bank along an abandoned channel as indicated by: (1) a break in slope from the

floodplain surface down to the water, and (2) the exposed roots facing the channel.

HABITAT ELEMENTS OF RESTORED DOWAGIAC CHANNEL

As noted in the discussion of design goals above, the habitat potential for the project lies largely within two

realms, the in-channel habitat and the floodplain habitat. The overall goal for any habitat project is to increase

complexity of habitats, which in turn increases the types and abundance of species that utilize such areas. A

brief discussion of the expected project based on the data gathered is below.

FLOODPLAIN HABITAT

The existing levee (excavation spoils) runs along the entire length of the project. This levee represents the

volume of material removed from the excavation of the new channel in the early 1900s. Putting the channel

back into a meandering alignment will effectively breach this levee – allowing water that follows the

meandering channel to spill freely onto the floodplain during flood events and inundating areas seasonally.

Topography – microtopogrpahy in fact – defines habitat complexity in a floodplain. Areas only a few inches

lower or higher than the average elevation of the floodplain can include a different vegetation community

which in turn dictates a different faunal community as well.

June 11, 2013

[81]

DOWAGIAC RIVER RESTORATION

Figure 74: A great example of the role microtopography plays on the floodplain. The photo indicates

varies areas of inundation on the existing Dowagiac floodplain

Although the existing floodplain is intact, complete with this microtopograpy, the project will include shallow

wetland scrapes as well as shallow deposits of fill to augment the existing topographic variation. This work

will be constructed in disturbance areas necessary to gain access for construction and confined largely to the

corridor of the existing straight channel where the spoils from excavation of the meandering channel will be

placed. Upon completion of the project, the current channel will become part of the floodplain as well. Here

we intend to preserve portions of the existing channel as open water wetlands within the floodplain and fill

other portions along the corridor to the grade of the adjacent floodplain or above creating at least 3 different

elevations for developing various types of communities.

IN-CHANNEL HABITAT

Large Wood

Habitat within the newly created meandering channel will be augmented by the construction of large wood

complexes and single log pieces. Analogs of these exist within the current channel as well (Figures 75 and 76

below). A complex of large wood provides important habitat for young of the year species, by creating a

complex of small branches within which to hide from predation. These complex also induces deposition

within the channel, creating areas within and downstream of the complex that are more shallow but in turn

typically deepening areas adjacent to the complex as well. Often noted as log jams – this connotation is

June 11, 2013

[82]

DOWAGIAC RIVER RESTORATION

avoided here because these will be constructed with recreational passage in mind. Thus they will not span the

channel and afford easy pass through for canoes. These will still require periodic maintenance overtime to

ensure wood captured from upstream does not completely block the channel. These complexes can be

constructed within the restored channel utilizing trees from the existing levee.

Figure 75: This complex of wood affords excellent habitat for young fish. The deposition of sand

behind the wood can be seen in the photo, with a deep hole to the left. This jam is wider than

necessary but affords an understanding of the type of habitat that will develop in the restored

channel of the Dowagiac.

Single log structures are a second type of habitat that will be created within the restored channel. These are

typically composed of a single tree, or perhaps 2 trees, and are intended to induce scour pools, typically

creating habitat for larger adult fish, such as trout. Trees are anchored into the bank and typically placed

below the water to slow the natural breakdown process.

June 11, 2013

[83]

DOWAGIAC RIVER RESTORATION

Figure 76: A good example of single log habitat. A floating log on the left in the foreground and a

second tree below the waterline at right.

Channel Banks

In most areas, the old channel will be reactivated with active flow. The existing banks and associated mature

trees along those banks will be preserved creating an instant channel bank which can resist erosion. Overtime

undercut banks will develop and the root mass of trees will become exposed providing refuge along this

interface (Figure 77). New banks (flow barrier) will need to be constructed wherever the existing channel

needs to be cut off from the restored channel. In all instances this will be required on the upstream side of

the existing channel. This bank will be constructed using a bioengineering approach. Two components to this

design include the lower bank, or the toe of the bank, beginning just above the water line and extending

down to the bed of the channel, and the upper bank (Figures 78 and 79). The lower bank or toe will receive a

treatment that will likely include a mixture of rock and trees (often called toe wood) to ensure the river cannot

erode through the bank at this location. This toe protection also affords a level of habitat as well when wood

is incorporated properly. The upper bank will be composed of fabric encapsulated soil lifts. The fabric

provides short term protection from erosion until the vegetation planted or seeded within the soil can

become established and take over the long term stabilization of the bank. This approach will not only provide

a stable barrier, keeping flow from re-occupying the existing channel, but will likely provide some quasiupland habitat within the floodplain as well.

June 11, 2013

[84]

DOWAGIAC RIVER RESTORATION

Figure 77: A relic channel illustrating the mature trees along the old banks of the channel that would

be preserved and remain once active flow is restored to this channel again.

Figure 78: Example of the type of bank constructed where the existing straight channel would be cut

off from flow.

June 11, 2013

[85]

DOWAGIAC RIVER RESTORATION

Figure 79: Photo of the above design following construction

Figure 80: Mature trees are in ready supply along the spoil piles (levees) on either side of the existing

channel.

June 11, 2013

[86]

DOWAGIAC RIVER RESTORATION

Pool and Riffle Habitat

It is clear based on probing that, at a minimum, lenses of gravel and perhaps cobble exist within the valley

bottom of the Dowagiac in the project area. Where encountered, we expect at a minimum coarse material to

be exposed, whether a riffle develops (defined as a shallow flow section with a slightly higher gradient) is still

being determined. Pools will develop in two places, on the outside of meander bends and in association with

scour from obstructions, typically wood, encountered in the channel. Pools on meander bends are often a

product of sediment deposited on the inside of the bend, often called the point bar. Based on field

observations in the project area at the only bend in the existing channel (downstream of station 7000), this

process persists and will be magnified when the channel is re-meandered with a multitude of bends.

Figure 81: Below station 7000, a slight bend in the channel exhibits a weak point bar (covered in

snow on left) and deeper pool on the outside of the bend.

Channel Migration

It is clear from the LiDAR data that the Dowagiac channel is an active channel, moving around on within its

valley bottom with some frequency. Carbon dating would be the only way to determine the ages of the

various channels encountered at the site to determine the rates of channel migration. A meander may develop

and migrate toward a critical radius over a period of years of centuries before it is cut off and abandoned by

the river (refer to Figure 1 in the beginning of this report). We can assume that the vegetation, in this case

floodplain forest, will provide the natural check to balance the erosive forces of the river. Thus whatever

migration develops will be a part of the natural function of the river in developing diverse habitats.

June 11, 2013

[87]

DOWAGIAC RIVER RESTORATION

Figure 82: Sand is depositing on a point bar within the Dodd Park remeander site as would be

expected to occur within this project.

RODGERS LAKE OUTLET

The restoration of Rodgers Pond back to a stream system will focus on the nature of the crossing at All

Seasons Road. It is clear that the road holds the volume of material necessary to rebuild the bed elevation of

the pond to match the stream grades above and below the road crossing. However, removal of this material

would require the road grade to include a significant dip in the driving surface that may not be desirable.

Ample fill material will be available from the mainstem construction and could be imported to the site to

compose the volume necessary to rebuild the stream AND maintain the road in its current configuration.

Figure 83. A bottomless arch bridge (left) and a buried concrete box (right) that can be used to

replace the existing structure at All Seasons Rd.

June 11, 2013

[88]

DOWAGIAC RIVER RESTORATION

The crossing under the road will be replaced and could become a small bridge, perhaps a timber frame

structure if the fill elevation were reduced. If the road maintains its current configuration, a buried box culvert

can be used to provide passage for both fish and other aquatic species through the culvert. Inter-Fluve has

constructed similar configurations elsewhere (Figure 83).

The stream will be constructed in a manner similar to what exists immediately upstream and downstream of

the crossing. The gradient and the valley type indicate a stream with tight sinuosity. Pools develop as steps,

often in response to a log control or weir in the channel and riffles develop between subtle meanders.

Excavation will be necessary in the upper end of the existing pond to remove material and expose the predam stream bed in all other areas fill will be required. The floodplain will be replanted with floodplain forest

species consistent with assemblage above and below the crossing.

Further discussion with the tribe regarding the use and expectation of this area will allow preferred

restoration options to be dialed in.

CONSTRUCTABILITY AND COSTS

Both the Dowagiac mainstem and Rodgers Lake afford excellent access, assuming landowner cooperation,

for equipment and ample space within which to manage materials and construct the project. Other than the

challenges inherent in working within an active river corridor, largely related to management of water, both

flood and groundwater, and challenging soil conditions for access, the sites lend themselves well to the

projects at hand. A couple of insights are useful to mention at this early stage as the logistics of construction

begin to take form.

Single Pass Construction – key to limiting the disturbance areas on a site, in particular a wet site, is managing

access. On the mainstem Dowagiac, the only areas that appear necessary for disturbance lie within the

existing channel corridor, defined laterally by the extents of the spoils, and the proposed channel corridor. In

utilizing a technique we call single pass construction, the haul road will be the proposed channel. In this

manner, much of the adjacent, intact floodplain can be left relatively undisturbed. Access within areas of this

channel may be challenging and require haul roads of mats to be constructed and low ground pressure

equipment will be required.

Phasing - given the spatial extent of the project and the potential funding cycles for construction, the project

will have to be phased. A myriad of options exist for phasing construction and could be as simple as

completing single meander bends on an annual basis or taking large lengths on for a whole construction

season. All work in the new channel can be performed off-line until the very end when material can be placed

in the existing channel to direct flow into the newly excavated one. Phasing is less opportunistic at Rodgers

Pond, where access and traffic management will be the keys during construction.

Inter-Fluve has found costs for restoration projects vary by orders of magnitude, even among contractors

bidding on the same documents. A recent large scale project north of Cadillac included a range of $3M $12M among a suite of 4 contractors bidding the project. This is typical, as restoration work is often a foreign

experience for many companies. The major components of the Dowagiac Mainstem and Rodgers Pond

construction are noted below, with associated quantities. Minor components, such as excavation of wetland

scrapes and fill work around the existing channel are considered to be included within the major work item

“Channel Excavation,” though not specifically called out. These costs and quantities are decidedly

conservative at this pre-design phase of the project. Costs assume local contractors will perform the work and

have not been regionalized to the Dowagiac area. A 30% contingency has been added to all totals to reflect

the level of design.

June 11, 2013

[89]

DOWAGIAC RIVER RESTORATION

DOWAGIAC MAINSTEM

Item

Quantity

Unit

Unit Cost

Total Cost

Notes

Bank Treatment - FES Lift and Log/ Rock Toe

30

100 LF

$

25,000

$

Each flow barrier is 100 LF to construct Above Sink Rd = 8-16

750,000

Below Sink Rd = 10-20

Habitat- Log Jams / Single Logs

250

EA

$

2,800

$

700,000

Channel Excavation and Access

170,000

CY

$

15

$

2,550,000

Subtotal $

Concept Level Contingency (30%) $

Total $

4,000,000

1,200,000

5,200,000

Composed of 8-10 Trees Each $350/Log = $2800/Jam 10

Jams/Single Logs / 1000' Channel 25000 Total LF

25,500 LF Total, Average Depth 3' Width 65" Above Sink Rd +/76,100 CY Below Sink Rd = +/- 90,100 CY

RODGERS POND

Item

Stream Construction

New Crossing Structure

Fill For Stream Bed

Quantity

Unit

Unit Cost

460

LF

$

250

$

115,000 Includes bank treatment, Wood etc +/- 460 ft

1

EA

$

80,000

$

80,000 Range $60-$100K depending on structure

3,000

CY

$

10

$

30,000

Subtotal $

Concept Level Contingency (30%) $

Total $

225,000

67,500

292,500

Total Cost

Notes

+/- 3000 CY

In looking at the costs, particularly for the mainstem Dowagiac, it becomes apparent that the tribe may be

able to purchase equipment and self-perform much of the construction work with staff who are experienced

with such projects. Given the size and scale of the work, phases over several years may be necessary to

complete the project. The equipment required would likely be limited to a few excavators and dump trucks as

much of the work is earth moving in nature. All of the excavation, even if performed in the wet, can be done

mechanically.

CHALLENGES AND FURTHER INVESTIGATION FOR FINAL DESIGN

This report is a step in the process toward restoration of the Dowagiac River and Rodgers Pond. Field

investigation, processing and modeling of this data have allowed us to become familiar with the challenges

and advantages provided by the site and to begin to rough in a plan for the work. Additional investigations

are required to take the project through the Final Design phase. A few are noted below.

Hydraulic Implications – it is clear that restoration will include changes to the hydraulics, a benefit to the system,

but changes that will affect landowners within and above the project area. Additional modeling and

discussion will be key to fully vetting this issue

Transitions from New to Old Channel – If phased, a discontinuity will be present where the new channel and old

channel coincide, perhaps up to 3’. On the upstream end, where water leaves the existing channel and moves

into the new channel, this transition may not require attention. On the downstream end however, the

potential exists for headcutting to occur at this location and may require various techniques for stabilization.

The reality of this scenario will have to be investigated during Final Design.

Additional Data Collection – A tremendous amount of information has been gathered to date. Several pieces of

information related to subsurface conditions will further detail the situation. The first is a more detailed DOR

survey along the chosen alignment, defining what might be considered the microtopography of the excavated

channel, important for estimating quantities. The second is a series of test pits within areas intended to be

excavated. By digging below grade, we can confirm the nature of the material to be encountered and provide

a level of assurance to contractors on the nature of the material at the site.

June 11, 2013

[90]

DOWAGIAC RIVER RESTORATION

REFERENCES

Arcement, G.J., and V.R. Schneider, 1989. Guide for selecting Manning’s roughness coefficients for natural

channels and flood plains. U.S. Geological Survey Water-Supply Paper 2339.

Baker, D.B, R.P. Richards, T.T. Loftus, and J.W. Kramer. 2004. A new flashiness index: characteristics and

applications to Midwestern rivers and streams. Journal of the American Water Resources Association,

40(2): 503-22.

Ballard, R, 1948. Tales of Early Niles. Niles Printing Company, Niles, Michigan.

Cade, B.S. 2006. National Hydrologic Assessment Tool (NATHAT). U.S. Geological Survey.

Cass County Conservation District. 2002. Dowagiac River Watershed Plan. 46p.

Cass County Conservation District. 2007. Dowagiac River MEANDR Restoration II: Evaluation Report.

Appendix 1.

Chow, V.T., D.R. Maidment, and L.W. Mays. 1988. Applied Hydrology. McGraw-Hill.

Clarke, G.P.A., J.R. Batres-Marroquin, B.L. Braden, H. Kato, A.M. Perot, Jr. 1998. Feasibility assessment for

rehabilitating the Dowagiac River System in Southwestern Michigan: A Watershed Analysis of Potential

Changes to the Ecology and Community. The University of Michigan, School of Natural Resources and

Environment.

Comer, P. J., Albert, D. A., Wells H. A., Hart B. L., Raab J. B., Price D. L., Kashian D. M., Corner, R. A., and

D. W. Schuen. 1995. Michigan's presettlement vegetation, as interpreted from the General Land Office

Surveys 1816–1856. Michigan Natural Feature Inventory, Lansing, Mich.

Croskey, H.M., and D.J. Holtschlag. 1983. Estimating generalized flood skew coefficients for Michigan. U.S.

Geological Survey Water-Resources Investigations Report 83-4194, Lansing, Mi.

Dudley, S.J., J.C. Fischenich, and S.R. Abt. 1998. Effect of woody debris entrapment on flow resistance.

Journal of the American Water Resources Association, 34(5): 1189-97.

Dorr, J.A. and D.F. Eschman. 2001. Geology of Michigan. University of Michigan Press, Ann Arbor, MI. 476p.

Ekblaw, G.E. and L.F. Athy. 1925. Glacial Kankakee torrent in northeastern Illinois, Geological Society of

America Bulletin, 36: 417-28

Fongers, D., R. Day, and J. Rathbun. 2012. Application of the Richards-Baker flashiness index to gaged

Michigan rivers and streams. Michigan Department of Environmental Quality, Lansing, Mi.

French and Associates, Ltd. 1998. Managing Floodplain Development Through the National Flood Insurance

Program. Park Forest, Illinois, 527 pp.

Hamper, S. 1996. Dowagiac Stories-Windows to the Past. Vol. 1.

Hanrahan, J.L., S.V. Kravtsov, and P.J. Roebber. 2009. Quasi-decadal cycles in levels of lakes Michigan and

Huron. Journal of Great Lakes Research, 35: 30-35.

June 11, 2013

[91]

DOWAGIAC RIVER RESTORATION

Holtschlag, D.J., and H.M. Croskey. 1984. Statistical models for estimating flow characteristics of Michigan

streams. U.S. Geological Survey Water-Resources Investigations Report 84-4207, Lansing, Mi.

Jacobson, R.B., and A.T. Primm. 1997. Historical land use changes and potential effects on stream

disturbance in the Ozark Plateaus, Missouri. U.S. Geological Survey Water-Supply Paper 2484,

Washington, D.C.

Interagency Advisory Committee on Water Data [IACWD]. 1982. Guidelines for determining flood flow

frequency: Bulletin 17B of the Hydrology Subcomittee. U.S. Geological Survey, Office of Water Data

Coordination, Reston, Va.

Kiang, J., R. Olsen, and R. Waskom. Workshop on nonstationarity, hydrologic frequency analysis, and water

management. Colorado Water Institute Information Series No. 109.

Kincare, K.A. 2010. The late Wisconsin and Holocene development of the St. Joseph River. Dissertation for

PhD, Michigan State University, Dept of Geology. ProQuest Dissertations and Theses; 2010. 179p.

Kirby, M.J. and D.R. Hampton. 1997. The Hydrology and Hydrogeology of the Dowagiac River Watershed Southwest Michigan. Western Michigan University, Department of Geology, Institute of Water Sciences.

Knox, J.C. 1977. Human impacts on Wisconsin stream channels. Annals of the Association of American

Geographers, 67(3): 323-42.

Leverett, F. and F.B. Taylor. 1915. Pleistocene of Michigan and Indiana and the history of the Great Lakes.

US Geologoical Survey, Monograph 53.

Phillips, J.D. 1991. Fluvial sediment budgets in the North Carolina Piedmont. Geomorphology, 4: 231-241.

Powell, G.E., D. Mecklenburg, and A. Ward. 2006. Evaluating channel-forming discharges: a study of large

rivers in Ohio. Transactions of the ASABE, 49(1): 35-46.

Rachol, C.M., and K. Boley-Morse. 2009. Estimated bankfull discharge for selected Michigan rivers and

regional hydraulic geometry curves for estimating bankfull characteristics in southern Michigan rivers.

U.S. Geological Survey Scientific Investigations Report 2009-5133, 300 pp.

Rieck, R.L., and H.A. Winters, 1993. Drift volume in the southern peninsula of Michigan – a prodigious

Pleistocene endowment. Physical Geography 14: 478-93.

Rogers, H.S. 1875. History of Cass County, Michigan from 1825-1875.Cassopolis, MI: WH Mansfield Vigilant

Book and Job Printing (1875).

Rosgen, D.L. Applied fluvial geomorphology. Wildland Hydrology Consultants, Pagosa Springs, CO.

Samuels, P.G. 1989. Backwater lengths in rivers. Proceedings, Institute of Civil Engineers, Part 2, Research

and Theory, 87: 571-82.

Schumm, S.A. 1977. The Fluvial System. Wiley-Interscience.

Shields Jr., F.D., C.J. Gippel. 1995. Prediction of the effects of woody debris removal on flow resistance.

Journal of Hydraulic Engineering, 121(4): 341-54.

June 11, 2013

[92]

DOWAGIAC RIVER RESTORATION

Stone, B.D., Kincare, K.A., OLeary, D.W., Lundstrom, S.C., Taylor, E.M., and S.E. Brown. 2003. Glacial

and postglacial geology of the Berrien County region of Michigan. 49 th Midwest Friends of the

Pleistocene Field Conference, 70pp.

Thompson, T.A., and S.J. Baedke. 1997. Strand-plain evidence for late Holocene lake-level variations in Lake

Michigan. Geological Society of American Bulletin 109(6): 666-82.

Trimble, S.W. 1983. A sediment budget for Coon Creek Basin in the Driftless Area, Wisconsin, 1853-1977.

American Journal of Science, 283: 454-74.

Wang, J., X. Bai, H. Hu, A. Clites, M. Colton, and B. Lofgren. 2012. Temporal and spatial variability of Great

Lakes ice cover, 1973-2010. Journal of Climate, 25: 1318-329.

Wesley, J.K. 2008. Dowagiac River - Pucker Street Dam Draw Down Experience. Michigan Department of

Natural Resources Status of the Fishery Resource Report 2008-58.

Williams, G.P. 1978. Bank-full discharge of rivers. Water Resources Research, 14(6): 1141-54.k

June 11, 2013

[93]

DOWAGIAC RIVER RESTORATION

APPENDIX A – MAPS

APPENDIX B – RESULTS OF TREE SURVEY

APPENDIX C – PHOTO LOG

June 11, 2013

[94]

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.