PAWNEE NATION OF OKLAHOMA (2017)
Tribal code
Ask Donna
What actually matters in this document.
Text
PAWNEE NATION OF OKLAHOMA
DIVISION OF NATURAL RESOURCES AND SAFETY
REGULATIONS
TITLE XII NATURAL RESOURCE PROTECTION ACT
1
Table of Contents
CHAPTER 1. Pawnee Nation Public Water Supply Regulation .................................................................. 4
Section 101. Purpose................................................................................................................................. 4
Section 102. Definitions............................................................................................................................ 4
Section 103. PWS criteria ......................................................................................................................... 7
Section 104. Laboratory approval ............................................................................................................. 7
Section 105. Disinfection requirements .................................................................................................... 8
Section 106. Process Control Tests......................................................................................................... 9
Section 107. Operating records & reports ................................................................................................. 9
Section 108. Pumphouse and equipment condition\maintenance ......................................................... 10
Section 109. Plugging abandoned wells ............................................................................................... 11
Section 110. Flushing of dead-ends ........................................................................................................ 11
Section 111. Water system connections .................................................................................................. 11
Section 112. Operator certification ......................................................................................................... 11
Section 113. Wastewater ......................................................................................................................... 11
Section 114. Water pressure ................................................................................................................... 12
Section 115. Public water supply annual service fees............................................................................. 12
Section 116. Security .............................................................................................................................. 12
Section 117. Water storage facilities\tanks ............................................................................................. 12
Section 118. Source water development ................................................................................................. 12
Section 119. Authorizations and permits (Minor water systems) ........................................................... 13
Section 120. Penalties for authorized systems ...................................................................................... 14
CHAPTER 2. Pawnee Nation Wastewater Regulation ............................................................................... 15
Section 201. Purpose............................................................................................................................... 15
Section 202. Definitions.......................................................................................................................... 16
Section 203. Authorizations and permits for on-site sewage treatment systems. ................................... 18
Section 204. General requirements for on-site sewage treatment systems ............................................. 19
Table 1. Pipe Specifications for On-Site Sewage Treatment Systems .................................................... 20
Section 205. Operation, repairs and maintenance ................................................................................... 21
Section 206. Soil Tests ............................................................................................................................ 22
Section 207. Building Sewer and Collection Systems ............................................................................ 23
Section 208. Septic Tanks ....................................................................................................................... 24
Section 209. Pump Tanks ..................................................................................................................... 26
Section 210. Aerobic Treatment System .............................................................................................. 28
2
Section 211. Lagoons............................................................................................................................ 30
Table 2. Size of Individual Residential Lagoon ...................................................................................... 31
Table 3. Size of Small Public lagoon ...................................................................................................... 31
212 Absorption Fields. ............................................................................................................................ 34
Table 4. Individual Conventional Subsurface Absorption Fields Designed Using a Percolation Test ... 41
Table 5. Individual Conventional Subsurface Absorption Fields Utilizing Chambers When Designed
Using Percolation Tests .......................................................................................................................... 41
Table 6. Individual Conventional Subsurface Absorption Fields Designed Using a Soil ...................... 42
Table 7. Small Public Conventional Subsurface Absorption Fields Designed Using a Percolation Test
................................................................................................................................................................ 42
Table 8. Small Public Conventional Subsurface Absorption Fields Designed Using a Soil Profile
Description .............................................................................................................................................. 42
Table 9. Individual Drip Irrigation Fields Designed Using a Soil Profile Description ........................... 43
Table 10. Individual Spray Irrigation Fields Designed Using Soil Profile Description-Net Evaporation
Pawnee and Payne Counties Zone 7 and Kay County Zone 8 ................................................................ 43
Section 213. Penalties for authorized systems ........................................................................................ 44
Resolution ............................................................................................................................................... 45
3
CHAPTER 1. Pawnee Nation Public Water Supply Regulation
Section 101. Purpose
This Chapter sets the operation standards for Public Water Supply systems, so they may provide safe
drinking water. This Chapter is analogous to the federal PWS program. Other Laws, Regulations,
and/or Standards may govern Public Water Supply system operations, such as the Discharge Laws
and/or Regulations, Laboratory Certification, Minor Public Water Supply Systems, Public Water
Supply Construction Standards, and Operator Certification. This Chapter implements Chapter Seven
“Water Supply Systems" at Title 12, Chapter 7 of the Pawnee Nation Natural Resource Protection Act.
The Pawnee Nation Environmental Regulatory Commission (ERC) shall implement this regulation by
issuance of permits and administrative enforcement actions. The DECS shall assist in inspections and
investigations and carry out the adjudicated enforcement actions. This chapter applies to any person or
entity, including any federal facility that operates a Public Water Supply system within the jurisdiction
of the Pawnee Nation.
Section 102. Definitions
In addition to terms defined in Title 12 of the Pawnee Nation Law and Order Code, the following
words or terms, when used in this Chapter, shall have the following meaning unless the context clearly
indicates otherwise:
“40CFR Part 141” means Code of Federal Regulations Title 40 Protection of Environment, Part
141 National Primary Drinking Water Regulations pursuant to section 1412 of the Public Health
Service Act as amended by the Safe Drinking Water Act (Pub. L. 93-523)
"Approved laboratory" means a laboratory certified or approved by EPA, Pawnee Nation DECS,
or an EPA approved third party certification program (such as the National Sanitation Foundation, and
Drinking Water Accreditation Program). Pawnee Nation DECS recognizes all State certified
laboratories which are compliant with EPA requirements for conducting drinking water analyses
(drinking water accreditation programs).
"AWWA" means the American Water Works Association.
"Commission (ERC)" means the Pawnee Nation Environmental Regulatory Commission or ERC.
"Community water system" means any PWS system that serves at least fifteen (15) service
connections used by year-round residents or regularly serves at least twenty-five (25) year-round
residents.
"DECS" means the Pawnee Nation “Department of Environmental Conservation and Safety”.
"Disinfection" means a process that inactivates pathogenic organisms in water by chemical
oxidants or equivalent agents.
“ERC” means Environmental Regulatory Commission
"EPA" means the Environmental Protection Agency.
"Groundwater under the direct influence of surface water" means any water beneath the
surface of the ground with significant occurrence of insects or other macro organisms, algae, or largediameter pathogens such as Giardia Lamblia or Cryptosporidium, or significant and relatively rapid
shifts in water characteristics such as turbidity, temperature, conductivity, or pH that closely correlate
to climatological or surface water conditions.
"Laboratory checks" means chemical, radiochemical, physical, bacteriological, and
microbiological tests made in a laboratory approved by the DECS, on water samples submitted to
confirm the quality of the water.
"Maximum contaminant level (MCL)" means the maximum permissible level of a contaminant
in a Public Water Supply system that has been determined to be necessary to safeguard the public
health as specified in these regulations. MCL are the same as primary drinking water standards.
"Maximum residual disinfectant level (MRDL)" means the level of a disinfectant added for
4
water treatment that may not be exceeded at the consumer's tap without an unacceptable possibility of
adverse health effects. Compliance with the MRDL will be determined using the disinfectant
concentration measured at the time Total Coliform Rule (TCR) samples are collected.
"Operator" means the individual who is responsible for the operations of the system. Operators
shall be certified in accordance to the laws and regulations of the Pawnee Nation and are liable for the
safe operations of the systems and compliance with the laws and regulations of the Pawnee Nation.
For systems operating without a certified operator, the system owner, manager, or corporate officer
shall be directly responsible and liable for safe operations of the system and compliance with the laws
and regulations of the Pawnee Nation.
"Operating records and reports" means the daily record of data connected with the operation of
the system compiled in a monthly report.
"Operator certification" means individual certifications issued by any state, tribal or federal
drinking water operator certification program to any individual credentialing them to operate a drinking
water systems for which they received certification. The DECS recognizes and approves all current
(non-revoked) operator certifications issued by any EPA approved state or federal operator certification
program. The DECS requires the operators certifications to be current (non-revoked) and on file with
the DECS. Certifications which are not current and on file with the DECS are not approved by the
DECS.
"Point of entry (POE)" means the point at which a source or combination of sources enters the
distribution system.
"Primary Drinking Water Standards" means the same as MCL.
"Protected groundwater free of sanitary defects" means a ground water source that is properly
designed and permitted, practices full-time chlorination, and is properly operated and maintained as
evidenced by no critical deficiencies on inspections.
"Public Water Supply (PWS) system" means a system, whether publicly or privately owned,
which supplies water under pressure to the public through pipes or other constructed conveyances
whether receiving payment for same or not. Multi-family dwellings, which are constructed, inspected,
and maintained under Pawnee Nation-approved plumbing code, purchase water from a state/tribal
permitted water system, do not provide treatment, and do not resell water, are not classified as a Public
Water Supply system. The following are the categories of Public Water Supply systems:
"Non-community water system" means any PWS system that serves an average of at least
twenty-five (25) individuals at least sixty (60) days per year but is neither a community water system
nor a non-transient non-community water system.
"Non-transient non-community (NTNC) water system" means any PWS system that is not a
community water system and that regularly serves at least twenty-five (25) of the same persons over
six months per year.
"Minor water system" means any other PWS system not included in (A), (B), or (C) of this
definition. These water systems may be state licensed facilities or non-licensed facilities.
(A) community system;
(B) non-community system;
(C) non-transient non-community system.
"Residual disinfectant concentration" means the concentration of disinfectant measured in
milligrams per liter (mg/l) in a representative sample of water.
"Secondary standard" means a non-mandatory guideline that has been determined to be desirable
to provide acceptable drinking water.
"Slow sand filtration" means a process involving passage of raw water through a bed of sand at
low velocity (generally less than 50 gallons/sq. ft./day) resulting in substantial particulate removal by
physical and biological mechanisms.
"Source" means any lake, stream, spring or groundwater supply that is used as treated or untreated
water for a PWS system.
5
"Total coliform positive sample" means a sample in which one or more coliform organisms are
found.
"Treatment technique" means the practice of a PWS system to properly remove pathogens and
total organic carbon.
"Turbidity" means the amount of suspended material in water as measured by Nephelometric
Turbidity Units (NTU).
"Water Treatment" means the act of removing contaminants from source water or adjusting
water quality by the addition of chemicals, filtration, and other processes, thereby making the water
safe for human consumption.
6
Section 103. PWS criteria
(a)
All systems must be permitted by the Pawnee Nation and properly operate, in accordance with
an effective Operations and Maintenance manual approved by the ERC. All systems must
maintain each unit to provide treatment of the water in accordance with the approved plans and
specifications, in accordance with the purpose for which the units were designed and according
to the terms of their permits. Permits may contain more stringent provisions than contained
in the rules to meet the requirements of the provisions of 40 CFR adopted by reference in this
chapter. Operators must be trained in the proper operation and maintenance of the system.
(b)
Public water supply systems must comply with all applicable Primary Drinking Water
Standards in 40 CFR Part 141, which includes, but is not limited to, the following:
(1)
Microbiological standards in 40 CFR Section 141.63;
(2)
Inorganic chemicals standards in 40 CFR Section 141.62;
(3)
Organic chemical standards in 40 CFR Section 141.61;
(4)
Disinfectant byproduct standards in 40 CFR Section 141.64;
(5)
Radiochemical standards in 40 CFR Section 141.66;
(6)
Turbidity standards in 40 CFR Sections 141.73, 141.173 and 141.550-553; and
(7)
Residual disinfectant level standards in 40 CFR Section 141.65.
(c)
Public water supply systems must comply with all applicable monitoring and analytical
requirements in 40 CFR Part 141, which includes, but is not limited to, the following:
(1)
Coliform requirements in 40 CFR Section 141.21;
(2)
Turbidity requirements in 40 CFR Section 141.22;
(3)
Inorganic chemicals requirements in 40 CFR Section 141.23;
(4)
Organic chemical requirements in 40 CFR Section 141.24;
(5)
Radiochemical requirements in 40 CFR Section 141.25 and Section 141.26;
(6)
Lead and copper requirements in 40 CFR Section 141, Subpart I;
(7)
Sodium requirements in 40 CFR Section 141.41;
(8)
Corrosivity requirements in 40 CFR Section 141.42;
(9)
Filtration and disinfectant requirements in 40 CFR Sections 141.74, 141.174, and
141.560 141.562; and
(10) Disinfectant residuals and disinfectant by-product requirements in 40 CFR, Part
141,Subparts C, H and L.
(d)
Systems, which operate on an intermittent or seasonal basis, shall submit bacteriological
samples on two consecutive days prior to placing the system into operation. The system can
be placed into operation only after the samples are shown to be safe.
Section 104. Laboratory approval
Compliance analyses for coliform, inorganics, organics, radioactivity and corrosivity contaminants
must be performed in a laboratory approved by the ERC. Laboratory certification must be based upon
Safe Drinking Water Act requirements and must be specific to each parameter analyzed. Testing
required for compliance with turbidity treatment technique, disinfectant residual, temperature and pH
requirements may be performed by a laboratory operator certified by the EPA, State, ERC, or DECS.
Process control tests may be performed by a laboratory operator certified by the EPA, State, ERC, or
DECS. The DECS may approve a laboratory for the purposes of testing for compliance with primary
drinking water standards upon written submittal of a request for approval from the owner of the
laboratory and upon proof satisfactory to the DECS that the laboratory:
(1)
possesses sufficient personnel, equipment, and facilities;
(2)
implements an adequate quality control and quality assurance program;
7
(3)
(4)
owns and will continue to own sufficient managerial and financial resources to
continuously comply with and implement all requirements of "Standard Methods for
the Examination of Water and Wastewater" in accordance with the current "Manual for
the Certification of Laboratories Analyzing Drinking Water;" and
transmits the analyses to the DECS in an electronic form acceptable to the DECS, no
later the tenth (10 ) day of the following month. The DECS shall provide the results to
the ERC.
th
Section 105. Disinfection requirements
(a)
Mandatory disinfection. Full-time disinfection is mandatory for:
(1)
surface water, groundwater under the direct influence of surface water, and spring
water supplies, unless an alternative has been approved by the DECS. Each system
must provide disinfection in accordance with 40 CFR Sections 141.72(b) and meet the
monitoring requirement contained in 40 CFR Section 141.74(c);
(2)
groundwater supplies or purchase water systems whenever the record of bacteriological
tests show:
(A)
a persistent presence of Total Coliform; or
(B)
a verified Fecal Coliform, or E. Coli MCL exceedance
(3)
any new well in a system where the initial bacteriological tests of the well do not show
a safe record with the DECS for two (2) consecutive days after completion and testing
of the well.
(b)
Modification of disinfection methods. When any change in the disinfection process is
contemplated, contact the DECS and ERC. Submittal of an application, including plans,
specifications, engineering reports, disinfection profile and disinfection benchmark justifying
such a change maybe required in order to obtain approval from the ERC.
(c)
Chlorine.
(1)
Systems that use chlorine must test for free chlorine and total chlorine residual twice a
day in the distribution system.
(2)
Free chlorine residuals at the most distant points in a water distribution system must be
≥ 0.3 mg/L.
(3)
Free chlorine residuals must be at least 1.0 mg/L at the POE. Higher residuals may be
required depending on pH, temperature and other characteristics of the water.
(4)
Continuing testing. After modification of the treatment process, perform the
bacteriological tests for samples collected at each of the selected points at quarterly
intervals forone year, and then annually, when samples are collected for total
trihalomethane determination. Submit the results to the DECS.
(5)
Primary Disinfection. A disinfectant must be added to provide the required log
inactivation of Giardia Lamblia cysts before ammonia is added.
(6)
Total chlorine. The minimum total chlorine residual at the most distant points in a
water distribution system must be 1.0 mg/l and at least 2.0 mg/l at the POE. Higher
residuals may be required depending on pH, temperature and other characteristics of
the water.
(d)
Process control tests for disinfectants. Control tests must be performed by all systems that
disinfect in accordance with procedures approved by the DECS. Sampling points must be
changed regularly so that the system is sampled completely at least once each week.
8
Section 106. Process Control Tests
(a)
Surface water, groundwater under the direct influence of surface water, and springs.
(1)
Systems that use coagulation, settling, softening or filtration must do the following
chemical control tests on the filtered water twice a day, record the results on a report
form provided or approved by the ERC, and submit the form to the DECS Director
each month:
(A)
Alkalinity - Phenolphthalein (P);
(B)
Alkalinity - Total;
(C)
Hardness (where softening is used);
(D)
pH value; and
(E)
Stability to calcium carbonate (once per day).
(F)
Perform jar tests as needed to determine the optimum coagulant dosages for
plant control and operation to meet turbidity requirements;
(2)
Where chlorination is practiced, determine the free chlorine residual twice daily in the
distribution system and once daily at the POE;
(A)
Free chlorine residual within distribution system must be ≥ 0.3 mg/L;
(B)
Free chlorine residual at the POE must be ≥ 1.0 mg/L.
(3)
Turbidity and residual disinfection samples must be collected and analyzed in
accordance with 40 CFR Part 141, Subparts H and P;
(4)
Measurement for total coliforms, fecal coliforms and HPC must be conducted by a
laboratory certified by the State or EPA to do such analysis in accordance with 40 CFR
141.74;
(5)
Yearly testing of Nitrates (NO3) and Nitrites (NO2).
(b)
Groundwater supplies. The following tests are required for community and non-transient noncommunity water systems utilizing groundwater as a source. Test results must be listed as
indicated on the appropriate forms and submitted to the Director each month:
(1)
Static level and pumping level of each well must be determined quarterly;
(2)
Alkalinity, pH, and stability must be determined at least monthly for community
systems and at least quarterly for non-transient non-community water systems;
(3)
Where chlorination is practiced, determine the chlorine residual twice daily in the
distribution system and once daily at the POE;
(A)
Free chlorine residual within distribution system must be ≥ 0.3 mg/L;
(B)
Free chlorine residual at the POE must be ≥ 1.0 mg/L.
(4)
Monthly measurements for total coliforms, fecal coliforms and HPC must be
conducted by a laboratory certified by the DECS or EPA to do such analysis in
accordance with 40 CFR 141.74;
(5)
Yearly testing of Nitrates (NO3) and Nitrites (NO2).
(c)
Purchase water systems. Purchase water community systems that provide supplemental
chlorination must determine the chlorine residual twice daily in the distribution system and
once daily at the POE;
(1)
Free chlorine residual within distribution system must be ≥ 0.3 mg/L;
(2)
Free chlorine residual at the POE must be ≥ 1.0 mg/L.
Section 107. Operating records & reports
(a)
Immediate notification to ERC, DECS and the general public. Each system must report to the
DECS and the general public, by the end of the next business day, if any of the following occur:
(1)
Waterborne disease outbreak;
(2)
Finished water turbidity exceeds one (1) NTU;
9
(3)
(4)
5)
(6)
Chlorine residual falls below 0.3 mg/l at the POE and whether the residual was restored
to at least 0.3 mg/l within four (4) hours;
Nitrate level exceeds 5 mg/l;
Verification of a positive Fecal Coliform or E. Coli sample; and
Exceedance of the Chlorine Dioxide MRDL.
(b)
Records. Operators of any system must keep a daily record of the results of required process
control tests and list the results of microbiological checks on the dates sampled. The records
of all laboratory checks and control tests must indicate when, where, and by whom the tests
were made. The PWS system must complete and submit the original of the DECS-approved
monthly operational report form to the DECS with a copy to the appropriate local DECS
representative no later than the tenth (10th) day of the following month.
(c)
Water treatment systems.
(1)
Systems that provide water treatment must keep:
(A)
a daily record of the operations performed in the treatment process;
(B)
observations, cost and occurrences related to the operation of the plant; and
(C)
the control tests and laboratory checks.
(2)
In addition, water treatment plants designed for turbidity and microbial removal must
keep:
(A)
the number of filtered water turbidity samples taken during the month;
(B)
the number and percentage of turbidity samples that are less than or equal to
the standards; and
(C)
the date and value of any turbidity measurements that exceed one (1) and five
(5) NTU. Where continuous monitoring is used, measurements must be
recorded every four (4) hours during plant operation.
(d)
Groundwater systems. Operators of groundwater systems must keep a daily record of all well
operations, in addition to the process control tests and laboratory checks required for ground
water supplies. Community and Non-Transient Non-Community systems must submit monthly
operational reports to DECS.
(e)
Purchase water systems. Operators of community systems that purchase water as their sole
source and provide supplemental chlorination must submit a monthly operational report to the
DECS of the operation of the system, in addition to required laboratory checks. Monthly
reports are not required from purchase water systems that do not add a disinfectant.
(f)
Record keeping. All records must be available for inspection by the ERC and DECS and
maintained for at least ten (10) years unless otherwise specified. The DECS shall provide
reports received to the ERC.
Section 108. Pumphouse and equipment condition\maintenance
(1) must be protected from flooding if located within a floodplain;
(2) fire protection must be to code, as per NFPA 101;
(3) heating, ventilation, and lighting must be adequate;
(4) equipment should be accessible and moveable for maintenance;
(5) pumphouse must be well maintained, orderly, and have adequate storage;
(6) electrical wiring must be maintained and outlets grounded;
(7) backflow prevention device must be installed;
(8) piping should be labeled or color coded;
10
(9) must have raw water and treated water sampling taps;
(10) auxiliary power must be available;
(11) must keep inventory of tools and critical spare parts;
Section 109. Plugging abandoned wells
PWS systems must plug all unused or dry water wells, water test wells, or water test holes promptly
according to DECS approved well-plugging procedures or rules to protect the water-bearing formation.
Section 110. Flushing of dead-ends
PWS systems must avoid dead-ends in the distribution system. Where a dead-end main exists, it must
be equipped with a valve or other arrangement for flushing. Flush until the water is clear or a chlorine
residual is found. Flush every ninety (90) days or more often where conditions require.
Section 111. Water system connections
(a)
(b)
PWS systems must not allow the connection of a new customer without an approved sewage
disposal system.
PWS systems shall:
(1)
not allow a physical connection between a line carrying a public drinking water supply
and a line carrying water of unknown or questionable quality.
(2)
not allow connections from any PWS system to any device or system that poses a health
threat unless it is equipped with an air gap of at least 6 inches or two pipe diameters,
whichever is larger, above the overflow or drain pipe. The installation of a reduced
pressure zone backflow prevention device will be considered in lieu of an air gap. To
allow maintenance on the backflow prevention device, the design shall include a
diversion line with equal backflow prevention. Do not locate backflow prevention
devices in a pit or vault where they can become submerged. A fire suppression system
is not considered a hazardous water supply.
(3)
not allow a cross-connection between a public water system and any private water
system.
(4)
provide an air gap at all points where finished water is connected to a drain.
Section 112. Operator certification
All community and non-transient non-community PWS systems are required to have certified operators
in accordance with the laws and regulations of the Pawnee Nation.
Section 113. Wastewater
(a)
Sanitary waste. All sanitary and laboratory chemical wastewater must be discharged to a
sanitary sewer collection system or to an approved on-site wastewater disposal system in
accordance to the laws and regulations of the Pawnee Nation.
(b)
Treatment plant wastewater and sludge. Disposal of wastewater and residuals from treatment
units (filter backwash water, clarifier blow-off, etc.) must be done so according to regulations
and laws of the Pawnee Nation. Each lagoon shall be cleaned when the depth of the residuals
is within two feet (2') of the maximum operating depth. For information about permits and
requirements, contact the Director, DECS.
11
Section 114. Water pressure
All PWS systems must maintain a water pressure of at least twenty-five (25) psi throughout the
distribution system.
Section 115. Public water supply annual service fees
Each PWS system shall be charged an annual fee as established by the Pawnee Nation ERC.
Section 116. Security
A PWS system shall provide:
(1)
fencing with locking gates;
(2)
locks on access manholes;
(3)
locks and screened vents on pumphouses;
(4)
screened vent on wellhead designed to equalized air pressure and keep foreign objects
out;
(5)
other necessary precautions to prevent vandalism, pilfering, trespass, and sabotage.
Section 117. Water storage facilities\tanks
Water storage facilities and\or tanks must meet the following guidelines:
(1)
Structure protected from vandalism or sabotage;
(2)
Site well drained and protected;
(3)
Tank access road in good condition;
(4)
Tank can be isolated from system;
(5)
Air vent and overflow are screened;
(6)
Air vent ≥ 6” above tank surface, and down turned or covered from rain;
(7)
Overflow and drain lines terminate 12”-18” above grade;
(8)
Splash pads for overflow and drain lines;
(9)
Access panel sealed and locked;
(10) Tank level indicator working properly;
(11) Ladder caged and/or safety harness system available;
(12) Tank inspected and cleaned regularly;
(13) Disinfection procedure in place for repairs and maintenance.
Section 118. Source water development
(a)
Continued protection for all sources. A PWS system shall provide protection for all sources
of water from potential sources of contamination through ownership, zoning, easements,
leasing or other legal means.
(b)
Reservoir and lake protection. PWS systems shall provide protection for a reservoir or lake
used as a source of water. Control the marginal shoreline land by purchase or ordinance. If
control is through the use of an ordinance, the ordinance must describe the water district
boundaries and enforcement rules which shall include:
(1)
regulating the public health aspects of the water supply, waste and sewage disposal and
recreation activities;
(2)
regulating the building of structures within the control area;
(3)
regulating aquatic activities involving human body contact with the water, including
restricting body contact with the water during recreational or other activities when the
water quality or public health may be adversely affected; and
(4)
regulating the removal of brush and trees to the high water elevation, regulating the
12
protection from floods during construction within the control district, and regulating
the plugging of wells which are inundated, in accordance with DECS, ERC
requirements.
(c)
Groundwater source protection. To protect all groundwater wells from microbiological
contamination:
(1)
disinfect every new, modified or reconditioned groundwater well in accordance with
American Water Works Association standard specifications after completion of work
on the well and the placement of the permanent pumping equipment;
(2)
upon completion of the well, the PWS system shall submit a copy of the well driller's
log to the DECS;
(3)
upon completion of the well, collect at least two (2) bacteriologically safe samples on
consecutive days. Collect samples after chlorine used to disinfect the well has been
completely dissipated and submit the sampling records to the DECS;
(4)
if any samples show the presence of coliform bacteria, additional samples shall be
taken to determine the degree of contamination and the treatment required; and
(5)
if any of the samples show the presence of fecal coliform, a study shall be conducted
and a determination made whether the groundwater source is under the direct influence
of surface water.
(6)
provide sufficient distance from a well to possible sources of pollution to assure that a
subsurface flow of contaminated water will not reach the well. Minimum separation
distances are:
(A)
one hundred feet from a property line,
(B)
fifty feet from all septic tank and sewer lines, and
(C)
fifty feet from lateral fields, unless the percolation rate is one inch in less than
five minutes, then the separation distance shall be one hundred feet.
Section 119. Authorizations and permits (Minor water systems)
(a)
Requirement for authorizations and permits. No one may construct a new public water supply
system, modify an existing public water supply system, or otherwise operate a public water
supply system until ERC has:
(1)
issued an authorization to construct or modify a public water supply system, and /or
(2)
issued a permit for Public Water Supply Operations.
(b)
Applying for authorization and/or permit. An applicant seeking an authorization to construct a
new or modify a public water supply system, or operate an existing system shall submit the
following to the ERC:
(1)
Application form. A completed and signed ERC Form "Application for Authorization
to Construct or Modify a Public Water Supply System”, or Public Water Supply
Operations permit.
(2)
Site drawing. A site drawing that includes (as applicable):
(A)
the property lines;
(B)
the location of the proposed of existing well;
(C)
the location of any one-hundred year flood plains within one-quarter (1/4) mile
of the proposed or existing water well site; and
(D)
all potential sources of pollution within three hundred feet (300') of the
proposed or existing water well.
(3)
Wellhead protection checklist. Complete and sign DECS "Wellhead Protection
Checklist."
13
(c)
Non-authorized or permitted systems. Any person constructing or modifying a drinking
water system, or operating a drinking water system without valid permit as required under
this Regulation is subject to criminal and/or civil penalties of the Pawnee Nation.
Section 120. Penalties for authorized systems
(a)
Access to operating records and reports. Access to all facilities, operating records, and
reports must be made accessible to DECS and ERC staff at all times.
(b)
Compliance orders.
(1)
Except as provided in paragraph (2), whenever on the basis of any information, the
ERC or DECS determines that any PWS and/or its operator is in violation of any
requirement of this chapter, the ERC or DECS may issue an order requiring
compliance within a reasonable specified time period or the ERC may commence
administrative enforcement against violations, or the DECS may commence a
criminal and/or civil action in the District Court of the Pawnee Nation in which the
violation occurred relief, including a temporary or permanent injunction.
(2)
The DECS shall cooperate with the U.S. EPA to ensure enforcement of federal
regulations.
(c)
Penalties. If a violator fails to comply with an order under this subjection within the time
specified in the order issued by the ERC or DECS, he or she shall be liable administratively
and/or judicially with civil penalties of not more than $5,000 for each day of continued
noncompliance. In determining the amount of a penalty assessed under this section, the
Pawnee Nation Court or ERC, as the case may be, shall consider the history, severity and
duration of the violation; any good faith efforts to comply with the applicable requirements;
the violator's full compliance history, including the severity and duration of past violations,
if any; the economic impact of the penalty on the violator; as an aggravating factor only,
the economic benefit, if any resulting from the violation; and any other factors that the
Pawnee Nation Court or the ERC deems relevant. All penalties collected pursuant to this
section shall be deposited into the Environmental Regulatory Revolving Fund. Only
facilities and operators having a valid authorization and/or permit issued by the Pawnee
Nation ERC or DECS shall be subject to administrative enforcement. Violations
occurring with no permit shall be subject to civil and/or criminal enforcement of the
Pawnee Nation.
14
CHAPTER 2. Pawnee Nation Wastewater Regulation
Section 201. Purpose
This Chapter establishes requirements for the design, construction, installation, and operation of
individual and small public on-site sewage treatment systems to ensure that sewage is properly
treated in order to protect the public health and the environment. This Chapter implements
Chapter Ten “Waste Water" at Title 12, Chapter 10 of the Pawnee Nation Natural Resource
Protection Act. The Pawnee Nation Environmental Regulatory Commission (ERC) shall
implement this regulation by issuance of permits and administrative enforcement actions. The
DECS shall assist in inspections and investigations and carry out the adjudicated enforcement
actions. This chapter applies to any person or entity, including any federal facility that are subject
to operate or are operating an individual and/or small public on-site sewage treatment systems
Public Water Supply system within the jurisdiction of the Pawnee Nation.
15
Section 202. Definitions
In addition to terms defined in Title 12 of the Pawnee Nation Law and Order Code, the following
words or terms, when used in this Chapter, shall have the following meaning unless the context clearly
indicates otherwise:
“Aerobic treatment unit” means a treatment that provides digestion of organic matter
through oxidation and has been tested and certifies by an ANSI accredited certifier as meeting the
most current ANSI/NSF Standard 40, whether or not it includes nitrogen reduction.
“ANSI” means the American National Standards Institute.
“ASTM” means the American Society for Testing and Materials.
“Certified installer” means a person in the business of installing or constructing on-site
sewage treatment systems who have been certified by the Pawnee Nation DECS to inspect and
approve his/her own installations.
“Certified soil profiler” means a person who has been certified by the Pawnee Nation
DECS to perform soil profile descriptions to be used to design on-site sewage treatment systems.
“DECS” means Pawnee Nation Department of Environmental Conservation and Safety
“Distribution structure” means a watertight concrete or plastic compartment, box, or
solid piping that allows the distribution of sewage at the same elevation throughout the subsurface
treatment field.
“Drip irrigation” means the use of pressure to distribute aerobically treated effluent to a
subsurface dispersal field using small diameter tubing equipped with pressure compensation
emitters.
“ERC” means Pawnee Nation Environmental Regulatory Commission
“Evaportranspriration/absorption (ET/A)” means the subsurface dispersal of sewage
for treatment field.
“IAPMO” means the International Association of Plumbing and Mechanical Officials.
“Installer” means any person who installs an on-site sewage treatment system or who is
in the business of contracting to install or furnishing labor to install on-site sewage treatment
systems.
“Level” means within a four-inch range of the same elevation.
“Lift station” means a short-term storage reservoir, containing an automatically controlled
pump, which pumps sewage to a higher elevation for treatment.
“Low pressure dosing” means the use of pressure to distribute effluent evenly throughout
the dispersal field through small diameter perforated piping.
“Modification” means the expansion or relocation of any part of an existing on-site
sewage treatment system, which does not fall under the definition of new installation.
“New installation” means the installation of a new on-site sewage treatment system. This
includes the replacement of an existing lagoon, aerobic treatment unit and/or dispersal field, even
when the existing septic tank is not replaced.
“NSF” means the National Sanitation Foundation
“On-site sewage treatment system means an individual or small public on-site sewage
treatment system as defined in the Chapter.
“Redoximorphic soil features” means soil that, due to wetness, contains features that
exhibit a color of less than or equal or two (2) chroma and greater than or equal to four (4) value
in concentrations greater than five percent (5%) in two (2) consecutive intervals.
“Repair” means the repair of any part of an existing on-site sewage treatment system or
the replacement of any part of an existing on-site sewage treatment system as long as the
replacement part is placed in the exact same location that the original part had been located.
Repair does not include excavation and replacement of a subsurface absorption trench.
16
“Retention structure” is a sealed concrete or plastic structure that retains sewage until it
reaches a depth of ten inches (10”) and then allows it to flow to another trench.
“Rock fragment” means unattached pieces of rock two millimeters (2mm) in diameter or
larger that are resistant to rupture (strongly cemented or extremely hard.)
“Sewage” means wastewater that generally originates as human waste from certain
activities including using toilet facilities, washing, bathing, preparing foods and washing laundry,
excluding industrial wastewater.
“Small public on-site sewage treatment system” means an on-site sewage treatment
system, except one that serves an individual residence or duplex, which has an average daily flow
of five thousand (5000) gallons or less.
“Soil profile description” means the identification and characterization of soil at a specific
site.
“Soil texture” means the percent by weight of sand, silt, and clay for particles smaller than
two millimeters (2mm) in diameters
“Storage media” means a natural or manufactured material that provided void spaces for
storage and dispersal of effluent in the trenches of a subsurface treatment system.
“Water body” means any reservoir or stream listed in either the most current Pawnee
Nation Water Quality Standards.
“Water body protection area” means the land area around a water body comprised of
Zone 1 and Zone 2.
“Water saturated soil” means soil characterized by either the presence of groundwater or
redoximorphic soil features.
“Zone 1” means the land within six hundred sixty feet (660’) of the highest normal pool
elevation established for a reservoir or within six hundred sixty (660’) of a stream bed.
“Zone 2” means the land within one thousand three hundred twenty feet (1320’) of the
highest normal pool elevation established for a reservoir or within one thousand three hundred
twenty feet (1320’) of a stream bed.
17
Section 203. Authorizations and permits for on-site sewage treatment systems.
(a)
Requirement for authorizations and permits are defined in Chapter 10 Section 1001 of Title
12 Natural Resource Protection Act. Permits shall be required for construction or
modification of a municipal treatment works, non-industrial wastewater treatment system,
sanitary sewer system or other sewage treatment works. No permit shall be required for the
construction or modification of a private individual sewage disposal system provided that
such system is constructed or modified in accordance with applicable requirements of this
chapter.
(b)
Applying for authorizations; necessity for permit.
(1)
An installer seeking an authorization to construct a new or modify existing on-site
sewage treatment system shall submit a completed and signed:
(A)
“Request for Authorization/Permit to Construct an On-Site Sewage
Treatment System” along with the appropriate fee(s).
(2)
Any construction or modification design that deviates from the rules in the Chapter
will require the installer to apply for an individual permit to construct a new or
modify an existing alternative system.
(c)
Applying for permits and alternative systems. Installers seeking an individual permit to
construct a new or modify an existing alternative on-site sewage treatment system shall
submit a completed and signed:
(1) “Request for Authorization/Permit to Construct an On-Site Sewage Treatment System”
along with the appropriate fee(s).
18
Section 204. General requirements for on-site sewage treatment systems
(a)
Inspections. All new installations of, modifications to and/ or repairs to on-site sewage
treatment systems shall be inspected and approved by the DECS, certified installer, or selfinspected and approved by a certified installer before new installations, modifications or
repairs can be backfilled and/or before the system may be placed into operation.
(b)
Treatment. On-site sewage treatment systems shall only be used for treatment of sewage.
All sewage must be treated and dispersed according to the rules in this Chapter.
(c)
Ownership. An on-site sewage treatment system shall be located only where:
(1)
All components of the on-site sewage treatment system, which includes tanks,
pumps, dispersal fields and collection lines(s), are or will be located on property
that is:
(A)
Owned by the owner of the on-site sewage treatment system; and/or
(B)
Dedicated in a recorded easement for the installation and operation
of the on-site sewage system to the owner of the on-site sewage
treatment system, or
(2)
All components of an on-site sewage treatment system, excluding service lines, are
or will be located on property that is:
(A)
Owned by municipality, rural water district, rural sewer district or
federally recognized tribe; and/or
(B)
Dedicated to a municipality, rural water district, rural sewer district
or federally recognized tribe in a recorded easement for the
installation and operation of the on-site sewage system.
(d)
Requirement for a dispersal field or lagoon. All on-site sewage treatment systems shall
utilize one of the dispersal fields described in a lagoon.
(e)
Sizing. All dispersal fields and lagoons shall be sized based on average daily flow. The
size of on-site sewage treatment systems should be increased if the actual or anticipated
water usage exceeds the above-stated average.
(f)
Separation distances. The designer and the installer shall comply with the required
vertical separation distances and the horizontal separation distances
(g)
Pipe specifications. All pipe used in on-site sewage treatment systems shall meet or exceed
the minimum specifications.
(h)
Water body restrictions. No dispersal field may be within Zone 1 of a water body protection
area unless it is preceded by a nitrogen reduction system that has been tested and certified
by an ANSI accredited third party certifier as meeting the most current ANSI/NSF Standard
245.
19
Table 1. Pipe Specifications for On-Site Sewage Treatment Systems
USE
PIPE SIZE
Building sewer and other solid Minimum 3” diameter
pipe when used for single family
residences only
Building sewer and other solid Minimum 4” diameter
pipe when the average flow is
2,000 gpd or less
Building sewer and other solid Minimum 6” diameter
pipe when the average flow is
greater than 2,000 gpd
Discharge line from lift stations
or other pressurized effluent
waste water lines
Low pressure dosing manifold
pipe
Low pressure dosing perforated
pipe
Perforated pipe when used in a
conventional
subsurface
absorption field or an ET/A field
Minimum 1” diameter
3” diameter
ACCEPTABLE MATERIALS
Acrylonitrile Butadiene Styrene (ABS):
ASTM D2661
ASTM D2751
ASTM F628
Polyvinyl Chloride (PVC)
ASTM D2665
ASTM D2949
ASTM 3033
ASTM 3034
ASTM F789
Polyvinyl Chloride (PVC)
ASTM D2846
ASTM F441
ASTM F442
Schedule 40
1 ½” diameter
Minimum 3” diameter
Polyethylene (PE)
ASTM F405
ASTM F810
ASTM D3350
Polyvinyl Chloride (PVC)
ASTM D2729
ASTM D3034
ASTM D3350
20
Section 205. Operation, repairs and maintenance
(a)
Proper operation. The owner of an onsite sewage treatment system shall ensure that the
system is maintained and operated properly so that:
(1)
Sewage or effluent from the system is properly treated and does not surface, pool,
flow across the ground or discharge to surface waters;
(2)
Septic tanks, lift stations, low pressure dosing tanks, flow equalization tanks,
aerobic treatment units and lagoons shall be maintained so that they do leak or
overflow; and
(3)
The required security measures are intact (e.g. required fences are intact, septic tank
lids are intact, and manhole covers are properly secured.)
(b)
Malfunctioning systems. If an on-site sewage treatment systems malfunctions, the person
owning or otherwise responsible for the system shall take prompt action to repair the
malfunctioning system, prevent further violations and remediate the site.
(c)
Enforcement. Violations of this Chapter are subject to enforcement actions and penalties
set forth by the DECS.
21
Section 206. Soil Tests
(a)
Requirement for soil test. A soil test shall be used to identify the dispersal site for all
modifications on on-site sewage systems and/or to identify the dispersal site and size the
dispersal field for new installations of on-site sewage treatment systems except for:
(1)
Lagoons; and
(2)
Aerobic treatment systems that utilize spray irrigation when sized for Group 5 soil
in the corresponding net evaporation zone.
(b)
Required credentials. Soil tests may only be performed by Professional Engineers,
Professional Land Surveyors, Professional Sanitarians or Professional Environmental
Specialists registered to practice in Oklahoma or Soil Scientists as recognized by the
Pawnee Nation. Additionally, an individual performing soil profile descriptions must also
be either:
(1)
An Environmental Specialist for the DECS and authorized by DECS to perform
soil profile descriptions; or
(2)
Certified by the DECS to perform soil profile descriptions.
(c)
Submission of soil test results to the DECS. When a soil test is required, the results shall
be submitted to the DECS.
(d)
Verification of design. If there is reason to believe soil test results submitted to DECS are
inaccurate or that there is water saturated soil or soil impervious to boring in any of the test
holes at any depth up the thirty six inches (36”), the system design may be verified by the
DECS.
(e)
Fill areas and excavation. If there has been a fill of more than six inches (6”) of soil or
any excavation over an identified dispersal site, the DECS office must be contacted to
determine if an additional soil test is needed. Soil test shall not be performed in major
earth fill areas.
22
Section 207. Building Sewer and Collection Systems
(a)
General provisions
The pipe used for building sewer and collection lines shall comply with the pipe
specifications. The joints of all solid pipes are sealed to be watertight.
(b)
Installation
(1)
Minimum fall. The following minimum fall requirements shall be met:
(A)
Three-inch and four-inch pipe. Pipe having a diameter of three inches (3”)
or four inches (4”) that delivers sewage to a septic tank or a trash tank shall be
installed with a minimum fall of one-eight inch (1/8”) per foot.
(B)
Six-inch pipe. Pipe having a diameter of six inches (6”) that delivers sewage to a
septic tank or a trash tank shall be installed with a minimum fall of one-sixteenth
inch (1/16”) per foot.
(2)
Cleanouts. For all pipe located upstream of a septic tank, a two-way cleanout or a
two-way cleanout assembly shall be installed:
(A)
Within five feet (5’) from where the plumbing stubs out of the building or
appurtenance to the building;
(B)
Within five feet (5’) after each change in direction of more than forty-five
degrees (45); (C) For each one hundred-foot interval of straight pipe.
23
Section 208. Septic Tanks
(a)
General Provisions
Once installed, the tops of septic tanks shall have no more than one inch (1”) variation in
elevation from side to side and end to end. Septic tanks shall be constructed to prevent
sewage from leaking out of the tanks and to prevent the infiltration of water into the tanks.
(b)
Types of Tanks
(1)
Concrete tanks. Concrete tanks shall be reinforced with rebar or fiber, and
constructed of a mix which demonstrated a twenty-eight day compressive strength
of four (4) thousand pounds per square inch (4,000 psi).
(2)
Fiberglass and plastic tanks. Fiberglass and plastic tanks shall meet either IAPMO
or CSA standards for septic tanks and shall be installed according to the
manufacturer’s recommendations.
(c)
Design
(1)
Compartments. A septic tank may consist of one (1) or two (2) compartments,
All septic tanks shall have a removable lid or a manhole opening of at least twenty
inches (20’) in diameter or, if rectangular, having no side less than twenty inches
(20”) in length over each compartment. All lids and manholes shall be sealed to
prevent leakage.
(2)
Two-compartment tanks. The passage in the common wall of two-compartment
tanks shall be located below the liquid level and between twenty percent (20%) to
forty percent (40%) of the liquid depth. There shall be a vent through the common
wall.
(3)
Inlets and outlets. The outlet of the septic tank shall be two inches (2”) lower than
the inlet of the septic tank. Baffles for inlets and outlets shall be constructed and
located as follows:
(A)
Construction. Baffles shall be used on all inlets and outlets. Cleanout
openings shall be located directly above the inlet and outlet baffles. Inlets
and outlets shall have a watertight seal.
(B)
Locations. All baffles shall extend at least six inches (6”) below the liquid
depth of the septic tank.
Inlet. Inlet baffles shall extend at least six inches (6”) below the liquid
depth of the septic tank.
Outlet. Outlet baffles shall extend below the liquid level by twenty percent
(20%) to forty percent (40%) of the liquid depth.
(d)
Precast concrete tanks. Precast concrete tanks shall have a minimum:
(1)
Wall thickness of two and one-half inches (2-1/2”):
(2)
Bottom thickness of three inches (3”); and
(3)
Cover thickness of four inches (4”).
(e)
Liquid Capacity
(1)
Individual on-site sewage treatment system. A septic tank used in an individual
on-site sewage treatment system for a residential unit for four (4) or fewer
bedrooms shall have a liquid capacity of at least one thousand (1000) gallons. An
additional two hundred fifty (250) gallons of capacity must be added for each
additional bedroom.
24
(2)
(3)
(4)
Small public sewage system. The liquid capacity for a septic tank used in a small
public sewage system shall be equal to or greater than the average daily flow plus
fifty percent (50%), but in no case shall it be less than one thousand (1000) gallons.
Two-compartment tanks. The capacity of the influent compartment of a twocompartment tank shall not be less than one-half (1/2) nor more than two-thirds
(2/3) of the total required liquid capacity of the tank.
All septic tanks. All septic tanks shall be designed to have a liquid depth of at least
three feet (3’) but not more than six and one-half feet (6 1/2’); and an air space of
eight inches (8’) or more inside the tanks.
25
Section 209. Pump Tanks
(a)
General Provisions
(1)
Primary settling. All sewage entering a pump tank (i.e., a lift station, a flow
equalization tank or a low pressure dosing tank) must pass through a septic tank or
a trash tank for primary settling.
(2)
Pump tank design and construction. Pump tanks shall:
(A)
To be constructed to prevent sewage from leaking out of the tank and to
prevent the infiltration of water into the tank;
(B)
When made of concrete, meet the requirements of Section 208.
(C)
Have a manhole opening of at least twenty inches (20”) in diameter or, it
rectangular, having no side less than twenty inches (20”) in length. The
manhole cover shall have a lock, locking bolt, or some type of fastener that
requires tools for removal. The manhole opening shall extend a minimum
of two inches (2”) above ground elevation.
(D)
Have a threaded union installed in the discharge line located within eighteen
inches (18”) of the manhole opening so that the pump can be removed
without entering the pump tank; and
(E)
Have a check valve installed in the discharge line after the threaded union.
The check valve shall be the same diameter as the discharge line.
(3)
Pump design. Pumps shall be:
(A)
Designed to pump sewage or other liquid containing fine
particles/suspended solids;
(B)
Rated to pump at least the average daily flow the required distance and
elevation; and
(C)
When used as a low pressure dosing pump, rated at least fifty (50) gallons
per minute with no more than eight feet (8’) of head pressure.
(4)
Prevention of back siphonage. Pump discharges shall flow through a structure or
device that prevents the back suphonage of wastewater to the pump tank.
(b)
Sizing Pump tanks shall be sized as follows:
(1)
Lift stations. The lift station pump tank shall have a minimum liquid storage
capacity of one thousand (1000) gallons.
(A)
Daily flow over 500 gallons. For systems with average daily flows over
five hundred (500) gallons, the liquid capacity of the pump tank shall be at
least twice the highest daily flow.
(B)
Daily flow over 2000 gallons. For systems with an average daily flow over
two thousand (2000) gallons, the liquid capacity of the pump tank may be
reduced to one-half (1/2) of the average daily flow, if a backup pump is
available on site.
(2)
Flow equalization tanks. The flow equalization pump tank shall have a minimum
liquid storage capacity of one thousand (1000) gallons. If the daily flow is greater
than five hundred (500) gallons, the liquid capacity of the pump tank shall be sized
at least the highest daily flow.
(3)
Low pressure dosing tanks. The low pressure dosing pump tank shall be sized to
have a minimum liquid capacity of at least one and one-half (1 ½) times the average
daily flow.
26
(c)
Pump controls. The pump controls shall be set as follows:
(1)
Lift stations. The following control settings apply to lift stations:
(A)
Never more than ½ full. The pump controls shall be set so that the pump
tank is never more than one-half (1/2) full.
(B)
Alarm. There shall be an alarm set to activate and alert the owner/operator
if the pump tank becomes more than one-half (1/2) full.
(2)
Flow equalization tanks. The following control settings apply to flow equalization
tanks:
(A)
Never more than ½ full. The pump controls shall be set so that the pump
tank is never more than one-half (1/2) full.
(B)
Alarm. There shall be an alarm set to activate and alert the owner/
operator if the pump tank becomes more than one-half (1/2) full.
(C)
Regulating pumping rate. The pumping of wastewater to the treatment
system shall be regulated by timers, float switches or by piping and valves
that allow excess pumped effluent to be returned to the flow equalization
tank. The pumping of wastewater to the treatment system shall not exceed:
(i)
one-fourth (1/4) of the design capacity of the treatment system in a
one-hour period; and
(ii)
The daily treatment capacity of the treatment system in any given
twenty- four hour period.
(3)
Low pressure dosing tanks. The following control settings apply to low pressure
dosing tanks:
(A)
Alarm. There shall be an alarm set to activate and alert the owner/operator
if the reserve volume of the pump tank falls below one day’s flow
(B)
Regulating pumping rate. The pumping of wastewater to the dispersal
field shall be regulated by timers, float switches or by piping and valves that
allow excess pumped effluent to be returned to the low pressure dog pump
tank. The pump controls shall be set so that the pumping of wastewater to
the dispersal field shall:
(i)
Occur at least four (4) times per day; and
(ii)
Not exceed one fourth (1/4) of the daily flow per dosing event.
27
Section 210. Aerobic Treatment System
(a)
Residential sewage treatment only. Aerobic treatment systems shall only be used for
treatment of sewage from residential units and cannot be used when the average daily flow
is less than one hundred (100) gallons per day or greater than one thousand five hundred
(1500) gallons per day.
(b)
Design and installation
(1)
Fluctuating flows. If the daily flow fluctuates so that the flow on any given day
during the week exceeds the aerobic treatment unit’s daily capacity, then an aerobic
treatment system may not be used unless a flow equalization tank, which meets the
requirements of Section 209, is installed between the trash tank and the aerobic
treatment unit.
(2)
Components of aerobic treatment systems. Aerobic treatment systems shall be
comprised of the following components:
(A)
Trash tanks. There shall be a trash tank that meets the requirements of
ANSI/NSF Standard 40. The trash tank shall:
(i)
Be constructed to prevent sewage from leaking out of the tank and
to prevent the infiltration of water into the tank;
(ii)
Have a minimum liquid capacity of three hundred (300) gallons or
the average daily flow, whichever is greater, except that the
minimum liquid capacity shall not be less than was used in the
ANSI/NSF certification process;
(iii)
Have a removable lid or manhole opening of sufficient size to allow
for maintenance. The lid or manhole shall be sealed to prevent
leakage and extend a minimum of two inches (2”) above ground
elevation. The cover for the opening shall have a lock, locking bolt
or some type of fastener, or require a tool for removal; and
(iv)
Have baffles installed at its inlet and outlet. The baffles shall
extend to within two inches (2”) of the top of the trash tank.
(a)
Inlet. Inlet baffles shall extend at least six inches (6”)
below the liquid depth of the trash tank.
(b)
Outlet. Outlet baffles shall extend below the liquid level by
twenty percent (20%) to forty percent (40%) of the liquid
depth.
(B)
Aerobic treatment unit. There shall be an aerobic treatment unit that:
(i)
Has been tested and certified by an ANSI accredited third party
certifier as meeting the most current ANSI/NSF Standard 40 and
when required by water body restrictions ANSI/NSF Standard 245;
(ii)
Is constructed to prevent sewage from leaking out if the tank and
to prevent the infiltration of water into the tank
(iii)
Is rated at or above the design daily flow;
(iv)
Produces effluent clear enough that the bottom of the pump tank is
visible when it is full; and
(v)
Has an opening of sufficient size to allow for maintenance that
extends a minimum of two inches (2”) above ground elevation.
The cover for the opening shall have a lock, locking bolt or some
type of fastener.
28
(C)
(D)
(E)
Method of disinfection. If spray irrigation is used as the type of dispersal,
then there shall be a method to disinfect the effluent that has been tested and
certified by an ANSI accredited third party certifier as meeting the most
current ANSI/NSF Standard 46, between the aerobic treatment unit and the
pump tank ( or in the pump tank). If chlorination is used as the disinfection
method, a free chlorine residual of two tenths of a milligram per liter (0.2
mg/l) must be maintained in the pump tank. All other methods of
disinfection shall effectively reduce the fecal coliform count to less than
two hundred colonies per one hundred milliliters (200/100ml).
Pump tank. There shall be a pump tank, which:
(i)
Meet the requirements of ANSI/NSF Standard 40 or Section 208 b;
(ii)
Have a minimum liquid capacity of seven hundred (700) gallons per
day, have a liquid capacity of at least twice the average daily flow;
(iii)
Have a sampling port in the pump tank at the discharge outlet or in
the treated effluent line following the pump.
(iv)
Have a float in the pump tank set so that the pump tank is never more
than one-half (1/2) full;
(v)
Have a high-water alarm set to activate and alert the owner/operator
if the pump tank becomes more than one-half (1/2) full; and
(vi)
Have an opening of sufficient size to allow for maintenance that
extends a minimum of two inches (2”) above ground elevation.
The cover for the opening shall have a lock, locking bolt or some
type of fastener, or require a tool for removal.
Dispersal field. Effluent treated by an aerobic treatment unit shall be
dispersed as listed in either:
Conventional subsurface absorption fields
Shallow extended subsurface absorption fields
Evapotranspiration/absorption fields
Low pressure dosing fields
Drip irrigation fields; and
Spray irrigation fields.
(i)
Level. Once installed, the top of each tank (i.e., trash tank, aerobic
treatment unit and pump tank) shall have no more than one inch (1”)
variation in elevation from side to side and end to end.
(ii)
Depth of aerobic treatment system components. The top of all
components of the aerobic treatment system, excluding trash tank
and dispersal field, shall be covered with no more than twenty-four
inches (24”) of soil.
(iii)
Solid pipe. The solid pipe used to connect the components of an
aerobic treatment system must meet the minimum specifications.
(iv)
Fall. Unless a lift pump is utilized, there shall be fall between:
the trash tank and aerobic treatment unit; and the aerobic treatment
unit and the pump tank.
(v)
Manufacture’s specification. All aerobic treatment system shall
be installed in accordance with the manufacturer’s specification.
29
Section 211. Lagoons.
(a)
General provisions
(1)
Primary settling. All sewage entering a lagoon must first pass through a septic
tank for primary settling.
(2)
Total retention. All lagoons shall be total retention.
(3)
Location. Installers shall not locate lagoons where vegetation, timber, or terrain
could interfere with prevailing wind action or shade the lagoon during daylight
hours.
(4)
Prohibitions. Owner /operator shall not discharge or dispose of sludge from the
lagoon prior to obtaining approval from the DECS.
(5)
Closure. The DECS may, when public health or safety issues arise, require the
owner/operator to properly close a lagoon when it is no longer in use.
(b)
Lagoon design.
(1)
Sizing. The lagoon shall be designed according to tables 2 and 3 in this section.
No lagoon shall have bottom dimensions smaller than ten feet (10’) or, for round
lagoons, have a diameter small than fifteen feet (15’).
(2)
Uniform shape. The shape of the lagoon shall be essentially square or round with
no island or peninsulas.
(3)
Total Depth. The total depth of the lagoon shall be at least seven feet (7’).
30
Table 2. Size of Individual Residential Lagoon
Length in Feet of Each Side of the Bottom of a Square Residential Lagoon
Location
Number of Bedrooms in residence
Two or Fewer
Three
Four
Kay County
20
25
30
Pawnee County
20
30
35
Payne County
20
30
35
Five
35
45
45
Diameter in Feet of the Bottom of a Round Residential Lagoon
Kay County
25
30
40
Pawnee County
30
40
45
Payne County
30
40
45
45
55
55
Table 3. Size of Small Public lagoon
Size in Feet of the Bottom of a Small Public Lagoon
Average Daily Flow
Kay County
Pawnee County
In gallons
Square
Round
Square
Round
100
Prohibited
200
17
23
22
29
300
28
35
34
42
400
37
45
44
53
500
45
54
52
63
600
52
62
60
72
700
59
69
68
80
800
65
76
74
88
900
71
82
81
95
1000
76
89
87
102
1100
81
94
92
108
1200
86
100
98
114
1300
91
105
103
120
1400
95
110
108
126
1500
100
115
113
131
1600
104
120
117
136
1700
108
125
122
142
1800
112
129
126
147
1900
116
133
131
151
2000
120
138
135
156
2500
137
157
154
178
3000
154
175
172
198
3500
168
192
188
216
4000
182
207
203
233
4500
195
221
218
249
5000
207
235
231
264
(c)
Payne County
Square
Round
22
34
44
52
60
68
74
81
87
92
98
103
108
113
117
122
126
131
135
154
172
188
203
218
231
29
42
62
63
72
80
88
95
102
108
114
120
126
131
136
142
147
151
156
178
198
216
233
249
264
Bottom Construction. The bottom of the lagoon shall meet the following requirements:
31
(1)
(2)
(3)
(4)
(5)
Level bottom. The bottom of the lagoon shall be level.
Compacted clay. The bottom of the lagoon and the interior slope of the dike shall
be constructed of homogeneous clay soil and shall be compacted thoroughly.
Leakage test required. During the final inspection, a leakage test shall be
conducted on the lagoon.
Leakage test procedure. The leakage test shall be performed in a manner approved
be the DECS or by:
(A)
Digging one (1) hole in the bottom of the lagoon and four (4) equally spaced
holes on the interior slope of the dike at the four-foot water elevation line
of the lagoon. The test hole shall be six inches (6”) deep;
(B)
Presoaking the holes by filling them with water and refilling them as
necessary to maintain a water depth of six inches (6”) in each hole for at
least four (4) hours. The presoak shall commence no earlier than twentyfour (24) hours prior or the start of the leakage test procedure; and;
(C)
After completing the presoak, filling each hole with eater and then recording
the drop in the water level in sixty (60) minutes or the time it takes until one
inch (1”) of water has percolated into the soil.
Failing leakage test. If the leakage rate in any of the test holes exceeds one inch
(1”) in sixty minutes (60) minutes, the lagoon shall be lined with twelve inches
(12”) of compacted clay (Group 5 soil) or bentonite, or a synthetic liner in
accordance with of at least 30 mil. The lagoon shall be retested after installation
of a clay or bentonite liner and may not be approved until the leakage rate is less
than or equal to one inch (1”) in sixty (60) minutes. Synthetic liner shall be at least
30 mil (0.030 inch) thick, unless is subject to heavy traffic, then liner shall be at
least 60 mil (0.060) thick.
(d)
Dikes. Dikes shall be constructed as follows:
(1)
Topsoil. Before construction, all vegetation and topsoil shall be removed in the
area of the dikes.
(2)
Lifts. Dikes shall be constructed of homogenous clay in six to nine inches (6-9”)
compacted lifts.
(3)
Slopes. Dikes shall be constructed with a slope of no more than one foot(1’)
vertical rise per three feet (3’) horizontal run (1:3) with a minimum top width of
four feet (4’). The top of dikes shall be uniformly graded with no depressions or
mounds that would hinder maintenance.
(4)
Gravity flow systems. For gravity flow systems, the top if the dike shall be at least
six inches (6”) below the lowest floor elevation if any building served.
(5)
Surface runoff. The top of the dike shall be at least one foot (1’) above the
surrounding terrain to divert surface runoff.
(e)
Lagoon inlet line and septic tank outlet
(1)
Lagoon inlet line. The lagoon inlet line shall:
(A)
Be made of solid pipe that complies with the minimum specifications listed
in Appendix C;
(B)
Terminate in the center of the lagoon;
(C)
Be anchored and supported; and
(D)
Discharge onto a concrete structure that is a minimum of one (1) square
foot.
32
(2)
Septic tank outlet. For gravity flow systems, the outlet if the septic tank shall be
at least one foot (1’) above the designed five-foot (5’) maximum liquid depth of the
lagoon.
(f)
Fence
(1)
Fence required. In order to prevent unauthorized access to the lagoon, the lagoon
area shall be surrounded with a fence unless the entire property is fenced and access
is controlled.
(2)
Specifications. The fence shall:
(A)
Be, at a minimum, four feet (4’) high and provide protection equivalent to
the protection afforded by a woven wire or equally spaced five (5) wire
fences. Lagoons that fall within the definition of a small public sewage
system and that are located within three hundred fifty feet (350’) of existing
or platted residential areas or that are in public assess areas shall be
surrounded by a six foot (6’) woven wire fence or equivalent.
(B)
Have a gate that provides access to the lagoon for mowing equipment and
maintenance needs.
(C)
Not interfere with wind action to the lagoon’s surface or shade the lagoon.
(g)
Lagoon Maintenance
(1)
The Lagoon shall be from trees, bushes and grasses taller than 6”. A grass cover
shall be maintained at all times.
(2)
The Lagoon shall maintain a 2 -5 foot liquid depth to provide for aerobic and
anaerobic layers to prevent plants from establishing.
(3)
The fence shall be inspected and any holes, gaps and sags repaired immediately on
discovery.
(4)
The dike shall be inspected to ensure it maintains the shape and height of original
construction.
(5)
The dike shall be repaired for any damage caused by erosion, rodents and any
burrowing animals
33
212 Absorption Fields.
(a)
Conventional subsurface absorption fields
(1)
Location. All conventional subsurface absorption fields shall be:
(A)
located in the identified dispersal site; and
(B)
installed more than five feet (5') from the septic tank or aerobic treatment
unit.
(2)
Fall. Unless a pump is utilized, there shall be a minimum fall of two inches (2")
from the bottom of the outlet of the septic tank to the:
(A)
highest point of the storage media in the conventional subsurface absorption
field; or
(B)
highest point of the sidewall openings of a chamber in the conventional
subsurface absorption field.
(3)
Minimum linear length. All conventional subsurface absorption fields must meet
the minimum length requirements set forth in Tables 4-8 in this section. If
perforated pipe is used between distribution structures and installed in accordance
with the trench requirements of this Section, it may be counted as part of the overall
required length of the conventional subsurface absorption field.
(4)
Trench length limitation. Conventional subsurface absorption fields shall be
constructed so that no sewage flows through more than a total of one hundred fifty
linear feet (150') of perforated pipe or chambers in any given path.
(5)
Trench spacing. The trenches in a conventional subsurface absorption field shall be
spaced at least eight feet (8') apart, center to center.
(6)
Trench width. All trenches in a conventional subsurface absorption field shall be
twenty-four inches (24") wide.
(7)
Trench depth. Each trench in a conventional subsurface absorption field shall have
a uniform depth of at least eighteen inches (18"), and no more than thirty inches
(30"). The bottom of the trenches shall be level.
(8)
Dispersal and storage. Each trench in a conventional subsurface absorption field
shall contain a zone for the dispersal and storage of effluent comprised of either
perforated pipe and storage media, or chambers.
(A)
Perforated pipe with storage media. When perforated pipe and storage
media are used to disperse and store effluent throughout the trenches, the
following requirements shall apply:
(i)
Perforated pipe. The perforated pipe shall:
(1)
meet the minimum specifications listed in Section 204 (g)
table 1.
(2)
extend the entire length of the trenches.
(ii)
Storage Media. The storage media shall:
(1)
be at least ten inches (10") deep and at least twenty-four
inches (24") wide the entire length of the trench;
(2)
be installed with at least two inches (2") of storage media
above and two inches (2") of storage media below the
perforated pipe;
(3)
be level in each trench and across the dispersal field, unless
installed in trenches of different elevations.
(B)
Chambers. When chambers are used to disperse and store effluent
throughout the trenches, the chambers shall:
34
(i)
(ii)
(9)
(10)
(b)
have a minimum bottom width of twenty-two inches (22");
have a minimum sidewall height of ten inches (10") with the
sidewalls having evenly distributed open space. If the sidewall
height is less than ten inches (10"), then the trench shall be
backfilled with storage media to meet the ten-inch height
requirement;
(iii)
meet the IAPMO PS 63-2005 standard;
(iv)
extend the entire length of the trenches;
(v)
be level in each trench and across the dispersal field, unless installed
in trenches of different elevations.
Retention structure. Retention structures must be used between trenches of different
elevations in conventional subsurface absorption fields. When a retention structure
is used:
(A)
the top of the outlet pipe of a retention structure or the top of the outlet pipe
of a chamber being used as a retention structure shall be fourteen inches
(14") above the trench bottom; and
(B)
the line from the outlet of a retention structure to the next distribution point
shall be constructed of solid pipe and shall be backfilled with compacted
native soil.
Backfill. For conventional subsurface absorption fields:
(A)
the depth of the backfill shall be consistent and shall not vary more than
four inches (4"); and
(B)
the backfill shall consist of at least eight inches (8") of topsoil.
Shallow extended subsurface absorption fields
(1)
Location. All shallow extended subsurface absorption fields shall be:
(A)
located in the identified dispersal site; and
(B)
installed more than five feet (5') from the septic tank or aerobic treatment
unit.
(2)
Fall. Unless a pump is utilized, there shall be a minimum fall of two inches (2")
from the bottom of the outlet of the septic tank to the:
(A)
highest point of the storage media in the shallow extended subsurface
absorption field; or
(B)
highest point of the sidewall openings of a chamber in the shallow extended
subsurface absorption field.
(3)
Minimum linear length. All shallow extended subsurface absorption fields must
meet the minimum length requirements set forth in Tables 4-8 of this section. If
perforated pipe is used between distribution structures and installed in accordance
with the trench requirements of this Section, it may be counted as part of the overall
required length of the shallow extended subsurface absorption field.
(4)
Trench length limitation. Shallow extended subsurface absorption fields shall be
constructed so that no sewage flows through more than a total of one hundred fifty
linear feet (150') of perforated pipe or chambers in any given path.
(5)
Trench spacing. The trenches in a shallow extended subsurface absorption field
shall be spaced at least eight feet (8') apart, center to center.
(6)
Trench width. All trenches in a shallow extended subsurface absorption field shall
be twenty-four inches (24") wide.
35
(7)
(8)
(9)
(10)
(c)
Trench depth. Each trench in a shallow extended subsurface absorption field shall
have a uniform depth of at least fourteen inches (14"), and no more than thirty
inches (30"). The bottom of the trenches shall be level.
Dispersal and storage. Each trench in a shallow extended subsurface absorption
field shall contain a zone for the dispersal and storage of effluent comprised of
either perforated pipe and storage media, or chambers.
(A)
Perforated pipe with storage media. When perforated pipe and storage
media are used to disperse and store effluent throughout the trenches, the
following requirements shall apply:
(i)
Perforated pipe. The perforated pipe shall:
(1)
meet the minimum specifications listed in Section 204 (g)
table 1.
(2)
extend the entire length of the trenches.
(ii)
Storage Media. The storage media shall:
(1)
be at least six inches (6") deep and at least twenty-four
inches (24") wide the entire length of the trench;
(2)
be installed with at least one inch (1") of storage media
above and one inch (1") of storage media below the
perforated pipe;
(3)
be level in each trench and across the dispersal field, unless
installed in trenches of different elevations.
(B)
Chambers.
When chambers are used to disperse and store effluent
throughout the trenches, the chambers shall:
(i)
Have a minimum bottom width of twenty-two inches (22");
(ii)
Have a minimum sidewall height of six inches (6") with the
sidewalls having evenly distributed open space;
(iii)
Meet the IAPMO PS 63-2005 standard;
(iv)
Extend the entire length of the trenches;
(v)
Be level in each trench and across the dispersal field, unless installed
in trenches of different elevations.
Retention structure. Retention structures must be used between trenches of different
elevations in shallow extended subsurface absorption fields. When a retention
structure is used:
(A)
the top of the outlet pipe of a retention structure or the top of the outlet pipe
of a chamber being used as a retention structure shall be ten inches (10")
above the trench bottom; and
(B)
The line from the outlet of a retention structure to the next distribution point
shall be constructed of solid pipe and shall be backfilled with compacted
native soil.
Backfill. For shallow extended subsurface absorption fields:
(A)
The depth of the backfill shall be consistent and shall not vary more than
four inches (4"); and
(B)
The backfill shall consist of at least eight inches (8") of topsoil.
Low pressure dosing fields
(1)
Location. All low pressure dosing fields shall be:
(A)
Located in the identified dispersal site;
36
(B)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(d)
Installed more than five feet (5') from the septic tank or aerobic treatment
unit; and
(C)
Preceded by a low pressure dosing tank.
Header line. The header pipe (i.e., the pipe between the pump tank and the
manifold) shall:
(A)
Have a diameter the same as the diameter of the outlet of the low pressure
dosing pump; and
(B)
Be no longer than thirty feet (30').
Total linear length. All low pressure dosing fields shall meet the total linear length
requirements set forth in Tables 4-8 of this section.
Trench length. Each trench in a low pressure dosing field shall be forty feet (40')
long.
Trench spacing. The trenches in a low pressure dosing field shall be spaced six feet
apart, center to center.
Trench width. All trenches in a low pressure dosing field shall be twenty-four
inches (24") wide.
Trench depth. Each trench in a low pressure dosing field shall have a uniform depth
of at least fourteen inches (14") and no more than thirty inches (30"). The bottom
of the trenches shall be level.
Dispersal and storage. Each trench in a low pressure dosing field shall contain a
zone for the dispersal and storage of effluent comprised of low pressuring dosing
pipe and storage media.
(A)
Low pressure dosing pipe. Low pressure dosing pipe shall:
(i)
meet the minimum specifications listed in Section 204 (g) table 6;
(ii)
Have one-fourth inch (1/4") diameter holes spaced five feet (5')
apart the entire length of the pipe;
(iii)
Extend the entire length of the trenches; and
(iv)
Have all of the joints glued.
(B)
Storage media. The storage media shall:
(i)
Be at least six inches (6") deep and at least twenty-four inches (24")
wide the entire length of the trench;
(ii)
be installed with at least two inches (2") of the storage media above
and two inches (2") of storage media below the low pressure dosing
pipe; and
(iii)
Be level in each trench and across the low pressure dosing field.
Retention structures prohibited. Retention structures may not be used in low
pressure dosing fields.
Backfill. For low pressure dosing fields:
(A)
The depth of the backfill shall be consistent and shall not vary more than
four inches (4"); and
(B)
The backfill shall consist of at least eight inches (8") of topsoil.
Evapotranspiration/absorption (ET/A) fields
(1)
Location. All ET/A fields shall be:
(A)
Located in the identified dispersal site; and
(B)
installed more than five feet (5') from the septic tank or aerobic treatment
unit.
37
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(e)
Fall. Unless a pump is utilized, there shall be a minimum fall of two inches (2")
from the bottom of the outlet of the septic tank to the highest point of the storage
media in the ET/A field.
Minimum linear length. All ET/A fields must meet the minimum length
requirements set forth in Tables 4-8 of section. If perforated pipe is used between
distribution structures and installed in accordance with the trench requirements of
this Section, it may be counted as part of the overall required length of the ET/A
field.
Trench length limitation. ET/A fields shall be constructed so that no sewage flows
through more than a total of one hundred fifty linear feet (150') of perforated pipe
in any given path.
Trench spacing. The trenches in an ET/A field shall be spaced at least eight feet (8')
apart, center to center.
Trench width. All trenches in an ET/A field shall be twenty-four inches (24") wide.
Trench depth. Each trench in an ET/A field shall have a uniform depth not to exceed
twenty-four inches (24"). The bottom of the trenches shall be level.
Dispersal and storage. Each trench in an ET/A field shall contain a zone for the
dispersal and storage of effluent comprised of perforated pipe and storage media.
(A)
Perforated pipe. The perforated pipe shall:
(i)
Meet the minimum specifications listed Section 204 (g) table 1; and
(ii)
Extend the entire length of the trenches.
(B)
Storage media. The storage media used shall:
(i)
Be at least ten inches (10") deep and at least twenty-four inches
(24") wide the entire length of the trench;
(ii)
Be installed with at least two inches (2") of the storage media above
and two inches (2") of storage media below the perforated pipe;
(iii)
Be level in each trench and across the ET/A field, unless installed in
trenches of different elevations.
Retention structure. Retention structures must be used between trenches of different
elevations in ET/A fields. When a retention structure is used:
(A)
The top of the outlet pipe of a retention structure shall be fourteen inches
(14") above the trench bottom; and
(B)
The line from the outlet of a retention structure to the next distribution point
shall be constructed of solid pipe and shall be backfilled with compacted
native soil.
Backfill. For ET/A fields:
(A)
The trenches shall be backfilled with clean sand to within two inches (2")
of the ground level;
(B)
The sand used to backfill the trenches shall be separated from the storage
media by material that allows the flow of water but prevents the flow of
sand; and
(C)
After a trench is backfilled with sand, two to four inches (2"-4") of sandy
loam soil shall be mounded over the trench.
Drip irrigation fields
(1)
Location. All drip irrigation fields shall be:
(A)
Preceded by an aerobic treatment unit;
38
(B)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(f)
Preceded by a filter capable of filtering particles larger than one hundred
(100) microns; and
(C)
Located in the identified dispersal site.
Components. All components used in the drip irrigation field shall be designed and
manufactured specifically for use in wastewater treatment systems.
Pump. The pump shall:
(A)
Be set to distribute no more than one fourth (1/4) of the designed daily flow
to the drip irrigation pipe during each pumping interval;
(B)
When in operation, maintain a minimum pressure of ten (10) psi and a
maximum pressure of forty-five (45) psi throughout the drip irrigation pipe;
and
(C)
Have a high-water alarm set to activate and alert the owner/operator if the
pump tank becomes more than one-half (1/2) full.
Minimum linear length. All drip irrigation fields shall meet the minimum length
requirements set forth in Table 9 of this Section.
Drip irrigation pipe. The pipe used in drip irrigation fields shall be designed and
manufactured for the purpose of distributing wastewater and comply with the
minimum specifications in Section 204 (g) table 1.
Installation of pipe. The pipe used in drip irrigation fields shall be:
(A)
Installed eight to ten inches (8-10") deep;
(B)
Installed according to the manufacture's specifications; and
(C)
Equipped with emitters spaced:
(1)
one foot (1') apart in soil groups 1, 4, and 5; and
(2)
two feet (2') apart in soil groups 2, 2a, 3, and 3a.
Emitters. The emitters shall be set to wet four square feet (4 ft2) and be pressure
compensating to deliver uniform distribution regardless of the pressure entering the
drip line.
Prevent backflow. To prevent backflow, at least one (1) vacuum relief valve,
located in a valve box lined with gravel, shall be located at the highest point on both
the supply manifold and the return manifold.
Back flush. There shall be a method to flush the drip irrigation pipe. The flush water
shall be returned to the trash tank, aerobic treatment unit or pump tank.
Spray irrigation fields
(1)
Location. All spray irrigation fields shall:
(A)
Be preceded by an aerobic treatment unit;
(B)
Be located in the identified dispersal site, when a soil profile test is used to
size the irrigation field;
(C)
Utilize at least two sprinkler heads to disperse the treated effluent; and
(D)
Be vegetated and landscaped, and/or terraced to prevent runoff.
(2)
Sizing. The spray irrigation field shall be sized according to Table 10 f this
Section. When calculating the overall area of the spray irrigation field, areas of
overlap may only be counted once.
(3)
Sprinklers. The sprinklers shall be designed to:
(A)
Provide uniform distribution of treated effluent over the entire spray
irrigation field without misting; and
(B)
Have a trajectory of no more than fifteen-degrees (15°) to keep the spray
stream low to the ground surface.
39
(4)
Spray irrigation. The spray irrigation shall be:
(A)
Adjusted and maintained at a rate to prevent runoff; and
(B)
Controlled by a timing device to take place daily between 1:00 a.m. and
6:00 a.m.
40
Table 4. Individual Conventional Subsurface Absorption Fields Designed Using a
Percolation Test
Number of Bedrooms in Residence
Percolation Rate
For
Dispersal Two
or
Three
Four
Site
Fewer
0-15 minutes per
inch
16-30 minutes per
inch
31-45 minutes per
inch
46-60 minutes per
inch
61-75 minutes per
inch
>75 minutes per inch
Each
Additional
Bedroom
160
215
270
55
250
330
410
80
340
450
560
110
470
630
790
160
620
830
1040
210
Prohibited
Minimum Trench Length in Feet
Table 5. Individual Conventional Subsurface Absorption Fields Utilizing Chambers
When Designed Using Percolation Tests
Minimum Trench Length in Feet
Number of Bedrooms in Residence
Percolation Rate
For
Dispersal Two
or
Three
Four
Site
Fewer
0-15 minutes per inch
16-30 minutes per
inch
31-45 minutes per
inch
46-60 minutes per
inch
61-75 minutes per
inch
>75 minutes per inch
Each
Additional
Bedroom
200
270
340
70
310
410
510
100
420
560
700
140
590
790
990
200
770
1030
1290
260
Prohibited
41
Table 6. Individual Conventional Subsurface Absorption Fields Designed Using a Soil
Profile Description for Pawnee and Payne Counties
Minimum Trench Length in Feet
Number of Bedrooms in Residence
Soil Group
Two
Fewer
1
2
2a
3
3a
4
5
Prohibited
160
250
340
500
660
Prohibited
or
Three
Four
Each
Additional
Bedroom
210
330
450
665
880
260
410
550
860
1100
50
80
100
165
220
Table 7. Small Public Conventional Subsurface Absorption Fields Designed Using a
Percolation Test
Minimum Linear Feet Per Gallon per Day
Percolation Rate for Dispersal Site
Linear Feet per Gallon per Day
0-15 minutes per inch
16-30 minutes per inch
31-45 minutes per inch
46-60 minutes per inch
61-75 minutes per inch
>75 minutes per inch
1.2
1.5
2
2.5
3.85
Prohibited
Table 8. Small Public Conventional Subsurface Absorption Fields Designed Using a
Soil Profile Description
Minimum Linear Feet per Gallon per Day
Soil Group
Linear Feet per Gallon per Day
1
2
2a
3
3a
4
5
Prohibited
0.8
1.3
1.7
2.5
3.3
Prohibited
42
Table 9. Individual Drip Irrigation Fields Designed Using a Soil Profile Description
Minimum Trench Length in Feet
Number of Bedrooms
Soil Group
1
2
2a
3
3a
4
5
Two or Fewer
Three
Four
Each Additional
Bedroom
125
160
250
340
500
660
1000
165
210
330
450
665
880
1330
25
260
410
550
830
1100
1660
40
50
80
100
165
220
330
Table 10. Individual Spray Irrigation Fields Designed Using Soil Profile
Description-Net Evaporation Pawnee and Payne Counties Zone 7 and Kay County
Zone 8
Minimum Spray Irrigation Area in Square Feet
Number of Bedrooms in Residence
Soil Group
1
2
2a
3
3a
4
5
Two or Fewer
Three
7
8
7
8
7
8
Each Additional
Bedroom
7
8
1324
1456
1589
1721
1854
1986
2648
1165
1282
1398
1515
1631
1748
2330
1766
1942
2119
2295
2472
2648
3531
1554
1709
1864
2020
2175
2330
3107
2207
2427
2648
2868
3089
3310
4413
1942
2136
2330
2525
2719
2913
3884
442
486
530
574
618
662
883
Four
389
427
466
505
544
582
777
43
Section 213. Penalties for authorized systems
(a)
Access to operating records and reports. Access to all facilities, operating records and
reports must be made accessible to DECS and ERC staff at all times.
(b)
Compliance orders.
(1)
Except as provided in paragraph (2), whenever on the basis of any information, the
ERC or DECS determines that any PWS and/or its operator is in violation of nay
requirement of this chapter, the ERC or DECS may issue an order requiring
compliance within a reasonable specified time period or the ERD may commence
administrative enforcement against violations, or the DECS may commence a
criminal and/or civil action in the District Court of Pawnee Nation in which the
violation occurred relief, including a temporary or permanent injunction.
(2)
The DECS shall cooperate with the U.S. EPA to ensure enforcement of federal
regulations.
(c)
Penalties. If a violator fails to comply with an order under this subjection within the time
specified in the order issued by the ERC or DECS, he or she shall be liable administratively
and/or judicially with civil penalties of not more than $5,000 for each day of
noncompliance. In determining the amount of a penalty assessed under this section, the
Pawnee Nation Court or ERC, as the case may be, shall consider the history, severity, and
duration of the violation; any good faith efforts to comply with the applicable requirements;
the violator’s full compliance history, including the severity and duration of past violations,
if any; the economic impact of the penalty on the violator; as an aggravating factor only,
the economic benefit, if any resulting from the violation; and any other factor that the
Pawnee Nation Court or the ERC deems relevant. All penalties collected pursuant to this
section shall be deposited into the Environmental Regulatory Revolving Fund. Only
facilities and operators having a valid authorization and/or permit issued by the Pawnee
Nation ERC or DECS shall be subject to administrative enforcement. Violations
occurring with no permit shall be subject to civil and/or criminal enforcement of the
Pawnee Nation.
44
Resolution
45
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.