BC Meeting Materials July 27, 2016

Open Session

CERTIFICATION

I, the undersigned, as Secretary of the Oneida Business Committee, hereby certify that

the following 355 pages are the Open Session meeting materials presented at a meeting

duly called, noticed and held on the 27th day of July, 2016.

____________________________

Lisa Summers, Tribal Secretary

Oneida Business Committee

Page 1 of 342

Oneida Business Committee

Executive Session

9:00 a.m. Tuesday, July 26, 2016

Executive Conference Room, 2nd floor, Norbert Hill Center

Regular Meeting

9:00 a.m. Wednesday, July 27, 2016

BC Conference Room, 2nd floor, Norbert Hill Center

Agenda

To get a copy of the agenda, go to: oneida-nsn.gov/government/business-committee/agendas-packets/

I.

CALL TO ORDER AND ROLL CALL

II.

OPENING

A. Meet the Workforce Innovation and Opportunity Act (WIOA) and Temporary Assistance for

page 8

Needy Families (TANF) Summer Youth workers

Sponsor:

Lisa Summers, Tribal Secretary

B. Recognition of the Oneida Powwow Committee for the 44th Annual Oneida Nation Powwow

Sponsor:

III.

ADOPT THE AGENDA

IV.

OATHS OF OFFICE

V.

page 10

Jennifer Webster, Councilwoman

A. Oneida Police Department Officers – Donovan Duggan, Alexis Hughes, Ralph Powless Jr.

page 11

B. Bay Bancorporation, Inc. Board of Directors – Nathaniel S. King

page 13

MINUTES

A. Approve July 13, 2016, regular meeting minutes

Sponsor:

Lisa Summers, Tribal Secretary

Oneida Business Committee Regular Meeting Agenda of July 27, 2016

Page 1 of 7

page 15

Page 2 of 342

VI.

RESOLUTIONS

A. Adopt resolution titled Amending the Self-Governance Multi-Year Funding Agreement

Sponsor:

B. Adopt resolution titled Garnishment Law Amendments

Sponsor:

page 31

Chris Johns, Coordinator/Self-Governance

page 38

Brandon Stevens, Councilman

VII.

APPOINTMENTS (No Requested Action)

VIII.

STANDING COMMITTEES

A. Legislative Operating Committee

Sponsor:

Councilman Brandon Stevens, Chair

1. Accept memo regarding Membership Ordinance Emergency Amendments

page 69

B. Finance Committee

Sponsor:

Tribal Treasurer Trish King, Chair

1. Approve July 18, 2016, Finance Committee meeting minutes

IX.

page 72

GENERAL TRIBAL COUNCIL

A. Petitioner Michael Debraska: Special GTC meeting regarding Per Capita Distribution

$3,000/$5,000

Sponsor:

Lisa Summers, Tribal Secretary

1. Accept legislative analysis

page 78

2. Defer legal analysis

page 83

EXCERPT FROM JULY 13, 2016: (1) Motion by Lisa Summers to accept the legislative

progress report, seconded by David Jordan. Motion carried unanimously. (2) Motion by Lisa

Summers to accept the legal progress report, seconded by Fawn Billie. Motion carried

unanimously.

EXCERPT FROM MAY 25, 2016: Motion by Lisa Summers to accept the financial analysis,

seconded by David Jordan. Motion carried unanimously.

EXCERPT FROM MAY 12, 2016: Motion by David Jordan to accept the verified petition from

Michael Debraska regarding Per Capita Distribution; to send the verified petition to the Law,

Finance, Legislative Reference, and Direct Report Offices for the legal, financial, legislative,

and administrative analyses to be completed; to direct the Law, Finance, and Legislative

Reference Offices to submit the analyses to the Tribal Secretary’s Office within sixty (60)

days, and that a progress report be submitted in forty-five (45) days; and to direct the Direct

Report Offices to submit the appropriate administrative analyses to the Tribal Secretary’s

Office within thirty (30) day, seconded by Lisa Summers. Motion carried unanimously.

B. Approve Reconvened 2016 Semi-Annual General Tribal Council meeting date

Sponsor:

Lisa Summers, Tribal Secretary

Oneida Business Committee Regular Meeting Agenda of July 27, 2016

Page 2 of 7

page 85

Page 3 of 342

X.

STANDING ITEMS

A. Accept update regarding Work Plan for CIP project # 14-002 Cemetery Improvements

page 91

(This item is scheduled to begin at 11:00 a.m.)

Sponsor:

James Petitjean, Interim Assistant Division Director/Development

B. Defer update from Constitutional Amendments Implementation Team to August 10, 2016

Sponsor:

page 232

Melinda J. Danforth, Tribal Vice-Chairwoman

XI.

UNFINISHED BUSINESS (No Requested Action)

XII.

TABLED BUSINESS

A. Adopt resolution titled Implementing Per Capita Plan for Fiscal Year 2017 to Fiscal

page 234

Year 2021 Adopted by General Tribal Council on June 13, 2016

Sponsor:

Lisa Summers, Tribal Secretary

EXCERPT FROM JULY 13, 2016: (1) Motion by Lisa Summers to adopt resolution titled

Implementing Per Capita Plan for Fiscal Year 2017 to Fiscal Year 2021 Adopted by General

Tribal Council on June 13, 2016, seconded by Brandon Stevens. Motion ruled out of order by

Chairwoman Tina Danforth. (2) Motion by Lisa Summers to table this item to the July 27, 2016,

regular Business Committee meeting, seconded by David Jordan. Motion carried unanimously.

XIII.

NEW BUSINESS

A. Approve request to activate $265,000 from approved FY 2016 CIP budget for CIP project #

page 238

14-014 – OGE Remodel Phase II

Sponsor:

Troy Parr, Assistant Division Director/Development

B. Approve concept paper for Capital Improvement Project # 13-011 – Oneida Nation High

School

Sponsor:

page 242

Troy Parr, Assistant Division Director/Development

C. Approve limited waiver of sovereign immunity – Career Cruising/Anaca Technologies Inc.

page 248

– contract # 2016-0710

Chair:

Debra Danforth, Oneida School Board

Liaison:

Fawn Billie, Councilwoman

D. Enter E-poll results into the record opposing travel request – Chairwoman Tina Danforth –

page 262

Women Empowering Women for Indian Nations (WEWIN) Conference – Tulalip, WA –

August 15-18, 2016

Sponsor:

Lisa Summers, Tribal Secretary

E. Approve revised Oneida Business Committee Standard Operating Procedure titled

Conducting Electronic Voting (E-Polls)

Sponsor:

Lisa Summers, Tribal Secretary

Oneida Business Committee Regular Meeting Agenda of July 27, 2016

Page 3 of 7

page 271

Page 4 of 342

XIV.

TRAVEL (No Requested Action)

XV.

REPORTS (This section of the agenda is scheduled to begin at 1:30 p.m.)

A. OPERATIONAL REPORTS

1. Accept Environmental Health & Safety FY ’16 3rd quarter report

page 283

(1:30 p.m. - 1:50 p.m.)

Sponsor: Patrick Pelky, Division Director/Environmental Health & Safety

EXCERPT FROM JULY 13, 2016: Motion by Lisa Summers to defer the Environmental

Health & Safety Division FY ’16 3rd quarter report to the July 27, 2016, regular Business

Committee meeting, seconded by Brandon Stevens. Motion carried unanimously.

2. Accept Division of Land Management FY ’16 3rd quarter report

page 290

(1:50 p.m. - 2:10 p.m.)

Sponsor: Patrick Pelky, Division Director/Land Management

EXCERPT FROM JULY 13, 2016: Motion by Lisa Summers to defer the Division of Land

Management FY ’16 3rd quarter report to the July 27, 2016, regular Business Committee

meeting, seconded by Fawn Billie. Motion carried unanimously.

3. Accept Oneida Housing Authority FY ’16 3rd quarter report

page 296

(2:10 p.m. - 2:30 p.m.)

Sponsor: Dale Wheelock, Director/Oneida Housing Authority

B. CORPORATE REPORTS (No Requested Action)

C. BOARDS, COMMITTEES, AND COMMISSIONS

1. Accept Anna John Resident Centered Care Community Board FY ’16 3rd quarter report

page 301

(2:30 p.m. - 2:45 p.m.)

Chair:

Candace House

Liaison:

Melinda J. Danforth, Tribal Vice-Chairwoman

EXCERPT FROM JULY 13, 2016: Motion by Jennifer Webster to defer the Anna John

Residential Centered Care Community Board FY ’16 3rd quarter report to the July 27, 2016,

regular Business Committee meeting, seconded by Trish King. Motion carried unanimously.

2. Accept Oneida Nation Veterans Affairs Committee FY ’16 3rd quarter report

page 319

(2:45 p.m. - 3:00 p.m.)

Chair:

Mike Hill

Liaison:

Jennifer Webster, Councilwoman

3. Accept Oneida Police Commission FY ’16 3rd quarter report

(3:00 p.m. - 3:15 p.m.)

Chair:

Bernie John-Stevens

Liaison:

Lisa Summers, Tribal Secretary

Oneida Business Committee Regular Meeting Agenda of July 27, 2016

Page 4 of 7

page 323

Page 5 of 342

4. Accept Oneida Powwow Committee FY ’16 3rd quarter report

page 332

(3:15 p.m. - 3:30 p.m.)

Chair:

Tonya Webster

Liaison:

Fawn Billie, Councilwoman

5. Accept Southeastern Oneida Tribal Services Advisory Board FY ’16 3rd quarter report

page 340

(3:30 p.m. - 3:45 p.m.)

Chair:

Daniel Schiller

Liaison:

Tina Danforth, Tribal Chairwoman

XVI.

EXECUTIVE SESSION

A. REPORTS

1. Accept Gaming General Manager report – Louise Cornelius, Gaming General Manager

page 343

(9:00 a.m. - 9:45 a.m.)

2. Accept Intergovernmental Affairs & Communications report – Nathan King, Director

page 404

3. Accept Chief Counsel report – Jo Anne House, Chief Counsel

page 448

B. STANDING ITEMS

1. Land Claims Strategy (No Requested Action)

2. Oneida Golf Enterprise – Ladies Professional Golf Association

page 449

(10:15 a.m. - 10:45 a.m.)

Sponsor: Trish King, Tribal Treasurer

C. AUDIT COMMITTEE (No Requested Action)

D. UNFINISHED BUSINESS

1. Accept close-out report regarding complaint # 2015-DR11-01

Sponsor:

David Jordan, Councilman

EXCERPT FROM MAY 25, 2016: Motion by David Jordan to approve the request to close-out

complaint # 2015-DR11-01, seconded by Jennifer Webster. Motion carried unanimously.

EXCERPT FROM APRIL 27, 2016: Motion by Jennifer Webster to defer complaint # 2015DR11-01 to the May 25, 2016, regular Business Committee meeting, seconded by Tehassi

Hill. Motion carried unanimously.

EXCERPT FROM MARCH 30, 2016: Motion by David Jordan to defer the update regarding

complaint # 2015-DR11-01 to the April 27, 2016, regular Business Committee meeting,

seconded by Jennifer Webster.

EXCERPT FROM MARCH 9, 2016: Motion by David Jordan to defer the update regarding

complaint # 2015-DR11-01 to the March 30, 2016, regular Business Committee meeting,

seconded by Jennifer Webster. Motion carried unanimously.

EXCERPT FROM FEBRUARY 24, 2016: Motion by Lisa Summers to defer the remainder of

the agenda to the March 9, 2016, regular Business Committee meeting, seconded by Fawn

Billie. Motion carried unanimously.

EXCERPT FROM DECEMBER 9, 2015: Motion by Lisa Summers to accept complaint #

2015-DR11-01 and to defer item to Chairwoman Tina Danforth, Councilman David Jordan,

and Councilman Brandon Stevens for follow-up, seconded by Jennifer Webster. Motion

carried unanimously.

Oneida Business Committee Regular Meeting Agenda of July 27, 2016

Page 5 of 7

page 457

Page 6 of 342

2. Accept close-out report regarding complaint # 2015-DR11-02

Sponsor:

page 464

David Jordan, Councilman

EXCERPT FROM MAY 25, 2016: Motion by David Jordan to approve the request to close-out

complaint # 2015-DR11-02; and to accept item as information, seconded by Trish King.

Motion carried with one abstention.

EXCERPT FROM APRIL 27, 2016: Motion by Jennifer Webster to defer Complaint # 2015DR11-02 to the May 25, 2016, regular Business Committee meeting, seconded by Tehassi

Hill. Motion carried unanimously.

EXCERPT FROM MARCH 30, 2016: Motion by David Jordan to defer the update regarding

Complaint # 2015-DR11-02 to the April 27, 2016, regular Business Committee meeting,

seconded by Jennifer Webster.

EXCERPT FROM MARCH 9, 2016: Motion by David Jordan to defer the update regarding

complaint # 2015-DR11-02 to the March 30, 2016, regular Business Committee meeting,

seconded by Brandon Stevens. Motion carried unanimously.

EXCERPT FROM FEBRUARY 24, 2016: Motion by Lisa Summers to defer the remainder of

the agenda to the March 9, 2016, regular Business Committee meeting, seconded by Fawn

Billie. Motion carried unanimously.

EXCERPT FROM DECEMBER 9, 2015: Motion by Lisa Summers to accept complaint #

2015-DR11-02 and to defer item to Chairwoman Tina Danforth, Councilman David Jordan,

and Councilman Brandon Stevens for follow-up, seconded by Fawn Billie. Motion carried

unanimously.

3. Accept close-out report regarding complaint # 2015-DR14-01

Sponsor:

page 471

David Jordan, Councilman

EXCERPT FROM MAY 25, 2016: Motion by David Jordan to approve the request to close-out

complaint # 2015-DR14-01, seconded by Brandon Stevens. Motion carried with one

abstention.

EXCERPT FROM APRIL 27, 2016: Motion by Jennifer Webster to defer Complaint # 2015DR14-01 to the May 25, 2016, regular Business Committee meeting, seconded by Tehassi

Hill. Motion carried unanimously.

EXCERPT FROM MARCH 30, 2016: Motion by David Jordan to defer the update regarding

Complaint # 2015-DR14-01 to the April 27, 2016, regular Business Committee meeting,

seconded by Jennifer Webster.

EXCERPT FROM MARCH 9, 2016: Motion by David Jordan to defer the update regarding

complaint # 2015-DR14-01 to the March 30, 2016, regular Business Committee meeting,

seconded by Brandon Stevens. Motion carried unanimously.

EXCERPT FROM FEBRUARY 24, 2016: Motion by Lisa Summers to defer the remainder of

the agenda to the March 9, 2016, regular Business Committee meeting, seconded by Fawn

Billie. Motion carried unanimously.

EXCERPT FROM DECEMBER 9, 2015: Motion by David Jordan to defer complaint # 2015DR14-01 to Chairwoman Tina Danforth, Councilman David Jordan, and Councilman Brandon

Stevens for follow-up, seconded by Lisa Summers. Motion carried unanimously.

E. TABLED BUSINESS (No Requested Action)

F. NEW BUSINESS

1. Approve limited waiver of sovereign immunity – Micros Fidelio World Wide, LLC. –

contract # 2016-0734

Sponsor: Louise Cornelius, Gaming General Manager

Oneida Business Committee Regular Meeting Agenda of July 27, 2016

Page 6 of 7

page 478

Page 7 of 342

2. Approve request from Southeastern Oneida Tribal Services Advisory Board to

page 494

terminate appointment of member

Chair:

Daniel Schiller, Southeastern Oneida Tribal Services Advisory Board

Liaison:

Tina Danforth, Tribal Chairwoman

3. Review complaint # 2016-DR07-01 and determine appropriate next steps

page 496

(1:30 p.m. - 2:00 p.m.)

Sponsor: David Jordan, Councilman

4. Accept letter of resignation in accordance with section 7.2 of employment contract #

page 560

2013-0856 and determine next steps

(9:45 a.m. - 10:15 a.m.)

Sponsors: Lisa Summers, Tribal Secretary; David Jordan, Councilman

XVII.

ADJOURN

Posted on the Oneida Nation’s official website, www.oneida-nsn.gov, at 5:00 p.m., Friday, July 22, 2016, pursuant to the

Open Records and Open Meetings Law, section 7.17-1.

The meeting packet of the open session materials for this meeting is available by going to the Oneida Nation’s official

website at: oneida-nsn.gov/government/business-committee/agendas-packets/

For information, please call the Business Committee Support Office at (920) 869-4364 or (800) 236-2214.

Oneida Business Committee Regular Meeting Agenda of July 27, 2016

Page 7 of 7

Page 8 of 342

Page 9 of 342

Page 10 of 342

Page 11 of 342

Oneida Business Committee Agenda Request

1. Meeting Date Requested:

07 / 27 / 16

2. General Information:

Session:

Open

Agenda Header:

Executive - See instructions for the applicable laws, then choose one:

Oaths of Office

Accept as Information only

Action - please describe:

Administer Oath of Office

3. Supporting Materials

Report

Resolution

Contract

Other:

1.

3.

2.

4.

Business Committee signature required

4. Budget Information

Budgeted - Tribal Contribution

Budgeted - Grant Funded

5. Submission

Authorized Sponsor / Liaison:

Lisa Summers, Tribal Secretary

Primary Requestor/Submitter:

Richard VanBoxtel, Oneida Police Department

Your Name, Title / Dept. or Tribal Member

Additional Requestor:

Name, Title / Dept.

Additional Requestor:

Name, Title / Dept.

Page 1 of 2

Unbudgeted

Page 12 of 342

Oneida Business Committee Agenda Request

6. Cover Memo:

Describe the purpose, background/history, and action requested:

Oath of Office for three (3) new hire Officers:

Donovan Duggan

Alexis Hughes

Ralph Powless Jr.

1) Save a copy of this form for your records.

2) Print this form as a *.pdf OR print and scan this form in as *.pdf.

3) E-mail this form and all supporting materials in a SINGLE *.pdf file to: BC_Agenda_Requests@oneidanation.org

Page 2 of 2

Page 13 of 342

Oneida Business Committee Agenda Request

1. Meeting Date Requested:

07 / 27 / 16

2. General Information:

Session:

Open

Agenda Header:

Executive - See instructions for the applicable laws, then choose one:

Oaths of Office

Accept as Information only

Action - please describe:

Administer Oath of Office to Nathaniel S. King to the Bay Bancorporation Inc. Board of Directors

3. Supporting Materials

Report

Resolution

Contract

Other:

1.

3.

2.

4.

Business Committee signature required

4. Budget Information

Budgeted - Tribal Contribution

Budgeted - Grant Funded

5. Submission

Authorized Sponsor / Liaison:

Lisa Summers, Tribal Secretary

Primary Requestor:

Kathleen M. Metoxen, Executive Tribal Clerk

Your Name, Title / Dept. or Tribal Member

Additional Requestor:

Name, Title / Dept.

Additional Requestor:

Name, Title / Dept.

Page 1 of 2

Unbudgeted

Page 14 of 342

Oneida Business Committee Agenda Request

6. Cover Memo:

Describe the purpose, background/history, and action requested:

The posting was in the February 18, 2016 issue of the Kalihwisaks for (1) vacancy on the Bay Bancorporation

board for a (3) year term with the deadline of March 18, 2016. There were (6) applicants for the (1) vacancy on the

Bay Bancorporation. The appointment was made on the July 13, 2016 BC Agenda.

1) Save a copy of this form for your records.

2) Print this form as a *.pdf OR print and scan this form in as *.pdf.

3) E-mail this form and all supporting materials in a SINGLE *.pdf file to: BC_Agenda_Requests@oneidanation.org

Page 2 of 2

Page 15 of 342

Oneida Business Committee Agenda Request

1. Meeting Date Requested:

07 / 27 / 16

2. General Information:

Session:

Open

Agenda Header:

Executive - See instructions for the applicable laws, then choose one:

Minutes

Accept as Information only

Action - please describe:

Approve July 13, 2016, regular meeting minutes

3. Supporting Materials

Report

Resolution

Contract

Other:

1. July 13, 2016, regular meeting minutes

3.

2.

4.

Business Committee signature required

4. Budget Information

Budgeted - Tribal Contribution

Budgeted - Grant Funded

Unbudgeted

5. Submission

Authorized Sponsor / Liaison:

Lisa Summers, Tribal Secretary

Primary Requestor/Submitter:

Submitted by: Heather Heuer, Info. Mgmt. Specialist/BC Support Office

Your Name, Title / Dept. or Tribal Member

Additional Requestor:

Name, Title / Dept.

Additional Requestor:

Name, Title / Dept.

Page 1 of 2

Page 16 of 342

Oneida Business Committee

Executive Session

9:00 a.m. Tuesday, July 12, 2016

Executive Conference Room, 2nd floor, Norbert Hill Center

Regular Meeting

9:00 a.m. Wednesday, July 13, 2016

BC Conference Room, 2nd floor, Norbert Hill Center

Minutes – DRAFT

EXECUTIVE SESSION

Present: Chairwoman Tina Danforth, Treasurer Trish King, Secretary Lisa Summers, Council members:

Fawn Billie, David Jordan, Brandon Stevens, Jennifer Webster;

Not Present: Vice-Chairwoman Melinda J. Danforth, Councilman Tehassi Hill;

Arrived at: ;

Others present: Patrick Stensloff, Dale Wheelock, Troy Parr, Jo Anne House, Joanie Buckley, Dave

Cluckey, Larry Barton, Ralinda Ninham-Lamberies;

REGULAR MEETING

Present: Chairwoman Tina Danforth, Treasurer Trish King, Secretary Lisa Summers, Council members:

Fawn Billie, David Jordan, Brandon Stevens, Jennifer Webster;

Not Present: Vice-Chairwoman Melinda J. Danforth, Councilman Tehassi Hill;

Arrived at: ;

Others present: Jo Anne House, Brad Graham, Bill Graham, Don White, Susan House, Heather Heuer,

Joanie Buckley, Jessica Wallenfang, Donald Miller, Mike Hill, Danelle Wilson, Chris Johnson, Shannon

Columb, Cathy Metoxen, Dawn Moon-Kopetsky, Leyne Orosco, Larry Barton, Dale Wheelock, Susan

White, Troy Parr, Paul Witek, Patrick Pelky, Nancy Barton, Mason Thomas, Jacque Boyle, James

Petitjean, Florence Petri, Nathan Smith, Arthur Cornelius, Floyd Hill, Reann Skenandore, Bonnie Pigman,

Sheila Huntington, Brent Truttman, Elena Hill, Leanna Doxtator, Sue Doxtator;

I.

CALL TO ORDER AND ROLL CALL by Chairwoman Tina Danforth at 9:01 a.m.

For the record:

II.

Vice-Chairwoman Melinda J. Danforth is attending the Region 5 Tribal

Operations Committee (R5TOC) meeting in Bowler, WI on behalf of

Councilman Tehassi Hill. Councilman Tehassi Hill is away on approved

travel to attend the Food Distribution Program on Indian Reservations

meeting in Norman, OK.

OPENING (00:00:25) by Tribal Member Shirley Barber

Page 17 of 342

III.

ADOPT THE AGENDA (00:01:55)

Motion by Lisa Summers to adopt the agenda with the following change: [Move item 14.B.01. Approve

travel request in accordance with Travel & Expense Policy – Nine (9) Oneida Nation Veterans Affairs

Committee (ONVAC) members – Indian Summer Festival – September 8-11, 2016, first on the agenda],

seconded by Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

IV.

OATHS OF OFFICE (No Requested Action)

V.

MINUTES (00:04:53)

A. Approve June 22, 2016, regular meeting minutes

Sponsor:

Lisa Summers, Tribal Secretary

Motion by Lisa Summers to approve the June 22, 2016, regular meeting minutes, seconded by Fawn

Billie. Motion carried with one abstention:

Ayes:

Fawn Billie, Trish King, Brandon Stevens, Lisa Summers, Jennifer

Webster

Abstained:

David Jordan

Not Present:

Melinda J. Danforth, Tehassi Hill

B. Approve July 5, 2016, special meeting minutes

Sponsor:

Lisa Summers, Tribal Secretary

Motion by Lisa Summers to approve the July 5, 2016, special meeting minutes, seconded by David

Jordan. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

VI.

RESOLUTIONS (00:06:00)

A. Adopt resolution titled Participation in a Nationwide Elder Needs Assessment

Sponsor:

Don White, Division Director/Governmental Services

Motion by Lisa Summers to adopt resolution # 07-13-16-A Participation in a Nationwide Elder Needs

Assessment, seconded by Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

B. Adopt resolution titled The Economic Development Administration Program Grant

Sponsor:

Joanie Buckley, Division Director/Internal Services

Motion by Lisa Summers to adopt resolution # 07-13-16-B The Economic Development Administration

Program Grant, seconded by Trish King. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Page 18 of 342

C. Adopt resolution titled Revenue Allocation Plan Fiscal Year 2016

Sponsor:

Jo Anne House, Chief Counsel

Motion by Lisa Summers to adopt resolution # 07-13-16-C Revenue Allocation Plan Fiscal Year 2016,

seconded by Trish King. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

D. Adopt resolution titled Implementing Per Capita Plan for Fiscal Year 2017 to Fiscal

Year 2021 Adopted by General Tribal Council on June 13, 2016

Sponsor:

Lisa Summers, Tribal Secretary

Motion by Lisa Summers to adopt resolution titled Implementing Per Capita Plan for Fiscal Year 2017 to

Fiscal Year 2021 Adopted by General Tribal Council on June 13, 2016, seconded by Brandon Stevens.

Motion ruled out of order by Chairwoman Tina Danforth.

For the record:

Chairwoman Tina Danforth stated based on what Jo Anne said she said

it is my discretion to call it out of order due to the grey areas and again I

think due to the uncertainty of what the outcome of the June 13th

because the main motion is the main motion and the main motion was

$2,000 for 5 years. That stands. And if there’s an amendment that is

contradictory then we are not ready to move forward unless we are going

to pay $2,000 plus $1,300 and I don’t think that was the intent of the floor

on that day. And I think from a procedural standpoint this needs to be

addressed and it’s not clear. It is totally not clear. A main motion passes,

the entirety of the main motion passes along with its’ amendments.

Based on that, I am going to say it’s out of order.

Motion by Lisa Summers to table this item to the July 27, 2016, regular Business Committee meeting,

seconded by David Jordan. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

VII.

APPOINTMENTS (No Requested Action)

VIII.

STANDING COMMITTEES (00:15:56)

A. Legislative Operating Committee

Sponsor:

Councilman Brandon Stevens, Chair

1. Accept June 15, 2016, Legislative Operating Committee meeting minutes

Motion by Lisa Summers to accept the June 15, 2016, Legislative Operating Committee meeting minutes,

seconded by Trish King. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Page 19 of 342

B. Finance Committee

Sponsor:

Treasurer Trish King, Chair

1. Approve July 5, 2016, Finance Committee meeting minutes

Motion by Lisa Summers to approve the July 5, 2016, Finance Committee meeting minutes, seconded by

David Jordan. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

C. Community Development & Planning Committee (No Requested Action)

D. Quality of Life Committee (No Requested Action)

IX.

GENERAL TRIBAL COUNCIL (00:17:23)

A. Petitioner Michael Debraska: Special GTC meeting to establish a Health Care Board

Sponsor:

Lisa Summers, Tribal Secretary

1. Accept financial analysis

EXCERPT FROM MAY 25, 2016: (1) Motion by Lisa Summers to accept the legislative

analysis, seconded by David Jordan. Motion carried unanimously. (2) Motion by Lisa

Summers to accept the legal analysis, seconded by David Jordan. Motion carried

unanimously. (3) Motion by David Jordan to defer the financial analysis for thirty (30) days,

seconded by Jennifer Webster. Motion carried unanimously.

EXCERPT FROM MAY 11, 2016: Motion by Jennifer Webster to defer the legal analysis to

the next regular business Committee meeting, seconded by David Jordan. Motion carried

unanimously.

EXCERPT FROM APRIL 27, 2016: Motion by Melinda J. Danforth to accept the legislative

progress report regarding Petitioner Michael Debraska: Special GTC meeting to establish a

Health Care Board, seconded by Jennifer Webster. Motion carried unanimously.

EXCERPT FROM March 9, 2016: Motion by David Jordan to accept the verified petition from

Michael Debraska: Special GTC meeting to establish a Health Care Board; to send the

verified petition to the Law, Finance, Legislative Reference, and Direct Report Offices for the

legal, financial, legislative, and administrative analyses to be completed; to direct the Law,

Finance, and Legislative Reference Offices to submit the analyses to the Tribal Secretary’s

Office within sixty (60) days, and that a progress report be submitted in forty-five (45) days;

and to direct the Direct Report Offices to submit the appropriate administrative analyses to

the Tribal Secretary’s Office within thirty (30) days, seconded by Trish King. Motion carried

unanimously.

Motion by Lisa Summers to accept the financial analysis regarding Petitioner Michael Debraska: Special

GTC meeting to establish a Health Care Board, seconded by David Jordan. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Page 20 of 342

B. Petitioner Michael Debraska: Special GTC meeting regarding Per Capita Distribution

$3,000/$5,000

Sponsor:

Lisa Summers, Tribal Secretary

1. Accept legislative progress report noting the analysis is due at the July 27, 2016,

regular Business Committee meeting

Motion by Lisa Summers to accept the legislative progress report regarding Petitioner Michael Debraska:

Special GTC meeting regarding Per Capita Distribution $3,000/$5,000, noting the analysis is due at the

July 27, 2016, regular Business Committee meeting, seconded by David Jordan. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

2. Accept legal progress report noting the analysis is due at the July 27, 2016, regular

Business Committee meeting

Motion by Lisa Summers to accept the legal progress report regarding Petitioner Michael Debraska:

Special GTC meeting regarding Per Capita Distribution $3,000/$5,000, noting the analysis is due at the

July 27, 2016, regular Business Committee meeting, seconded by Fawn Billie. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

EXCERPT FROM MAY 25, 2016: Motion by Lisa Summers to accept the financial analysis,

seconded by David Jordan. Motion carried unanimously.

EXCERPT FROM MAY 12, 2016: Motion by David Jordan to accept the verified petition from

Michael Debraska regarding Per Capita Distribution; to send the verified petition to the Law,

Finance, Legislative Reference, and Direct Report Offices for the legal, financial, legislative,

and administrative analyses to be completed; to direct the Law, Finance, and Legislative

Reference Offices to submit the analyses to the Tribal Secretary’s Office within sixty (60)

days, and that a progress report be submitted in forty-five (45) days; and to direct the Direct

Report Offices to submit the appropriate administrative analyses to the Tribal Secretary’s

Office within thirty (30) day, seconded by Lisa Summers. Motion carried unanimously.

X.

STANDING ITEMS (No Requested Action)

Page 21 of 342

XI.

UNFINISHED BUSINESS (1:32:43)

A. Accept update regarding Oneida Sacred Burial Grounds per GTC Directive

(This item is scheduled to begin at 11:00 a.m.)

Sponsor:

Brandon Stevens, Councilman

EXCERPT FROM JUNE 22, 2016: Motion by Jennifer Webster [… to request the Tribal Secretary

notify the Land Commission, Division of Land Management, Development Division, Trust &

Enrollment Committee, and any other parties that are necessary, to be present at the July 13,

2016, regular Business Committee meeting, seconded by Fawn Billie.

Motion carried

unanimously.]1

EXCERPT FROM JUNE 8, 2016: Motion by Lisa Summers to accept the information in the

memorandum from the Trust Department dated May 31, 2016, as information, noting there have

been two (2) identified alternative sites for a cemetery should the need arise and to send this item

to the next available Officers’ meeting for continued follow-up with the overall cemetery work plan,

seconded by Tehassi Hill. Motion carried unanimously.

EXCERPT FROM MARCH 9, 2016: (1) Motion by Tehassi Hill to accept the presentation

regarding the Oneida Sacred Burial Grounds per GTC Directive, seconded by Trish King. Motion

carried unanimously. (2) Amendment to the main motion by Tehassi Hill to request an update at

the first regular Business Committee meeting in June regarding potential locations of the

cemetery, seconded by Trish King. Motion carried unanimously.

Motion by Lisa Summers to accept the update and handout regarding Oneida Sacred Burial Grounds as

information, seconded by Brandon Stevens. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

XII.

TABLED BUSINESS (No Requested Action)

XIII.

NEW BUSINESS (00:20:19)

A. Approve request to support recommendation of Nathanial S. King to be appointed to the

Bay Bancorporation Board of Directors

Liaison:

Tina Danforth, Tribal Chairwoman

Motion by Lisa Summers to approve the request to support the recommendation of Nathanial S. King to

be appointed to the Bay Bancorporation Board of Directors, seconded by David Jordan. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

This excerpt comes from the June 22, 2016, regular Business Committee meeting minutes for item X.A.

Defer update regarding Work Plan for CIP # 14-002 Cemetery Improvements to the July 27, 2016, regular

Business Committee meeting.

1

Page 22 of 342

B. Approve Indian Housing Plan for Fiscal Year 2017

Sponsor:

Dale Wheelock, Director/Oneida Housing Authority

Motion by Lisa Summers to approve the Indian Housing Plan for Fiscal Year 2017, seconded by Fawn

Billie. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

C. Accept update and presentation as information – Youth Leadership Event – Washington

D.C. – June 12-16, 2016

Sponsor:

Tina Danforth, Tribal Chairwoman

Motion by David Jordan to accept the update and presentation as information – Youth Leadership Event –

Washington D.C. – June 12-16, 2016, seconded by Lisa Summers. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

D. Enter E-poll results into the record approving letter of support from Oneida Business

Committee for grant application submission by Oneida Nation’s gang task force program

seeking program funding aimed at decreasing risks of girls entering juvenile system

Sponsor:

Lisa Summers, Tribal Secretary

Motion by Lisa Summers to enter the E-poll results into the record approving letter of support from Oneida

Business Committee for grant application submission by Oneida Nation’s gang task force program

seeking program funding aimed at decreasing risks of girls entering juvenile system, seconded by

Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

E. Enter E-poll results into the record for approved travel request – Councilman Tehassi Hill –

Food Distribution Program on Indian Reservations meeting – Norman, OK – July 11-13,

2016

Sponsor:

Lisa Summers, Tribal Secretary

Motion by Jennifer Webster to enter the E-poll results into the record for approved travel request –

Councilman Tehassi Hill – Food Distribution Program on Indian Reservations meeting – Norman, OK –

July 11-13, 2016, noting it is 100% grant funded, seconded by Lisa Summers. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Secretary Lisa Summers departs at 10:01 a.m.

Secretary Lisa Summers returns at 10:04 a.m.

Page 23 of 342

F. Approve request to direct Tribal Treasurer and Chief Counsel to submit declaratory ruling

request to Oneida Judiciary by July 15, 2016, regarding Chairwoman Tina Danforth’s

opinion that the June 13, 2016, General Tribal Council’s per capita motion and

amendments had irregularities and needed further discussion by General Tribal Council

Sponsor:

Trish King, Tribal Treasurer

Motion by Lisa Summers to approve the request to direct the Tribal Treasurer and Chief Counsel to

submit declaratory ruling request to Oneida Judiciary by July 15, 2016, regarding interpretation and

opinion that the June 13, 2016, General Tribal Council’s per capita motion and amendments had

irregularities and needed further discussion by General Tribal Council. Motion failed for lack of support.

Motion by Trish King to withdraw this request from the agenda, seconded by Lisa Summers. Motion

carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

XIV.

TRAVEL (1:11:14)

A. TRAVEL REPORTS

1. Accept travel report – Chairwoman Tina Danforth – National Leadership Conference –

Hinckley, MN – June 20-23, 2016

Motion by Lisa Summers to accept the travel report – Chairwoman Tina Danforth – National Leadership

Conference – Hinckley, MN – June 20-23, 2016, seconded by David Jordan. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to defer this item to the Chairwoman’s Office for further development; and to

bring back a proposal on how we can implement over the next year, seconded by Jennifer Webster.

Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

B. TRAVEL REQUESTS

1. Approve travel request in accordance with Travel & Expense Policy – Nine (9) Oneida

Nation Veterans Affairs Committee (ONVAC) members – Indian Summer Festival –

September 8-11, 2016

Liaison:

Jennifer Webster, Councilwoman

Motion by David Jordan to approve the travel request in accordance with Travel & Expense Policy – Nine

(9) Oneida Nation Veterans Affairs Committee (ONVAC) members – Indian Summer Festival –

September 8-11, 2016, noting it is a budgeted item, seconded by Lisa Summers. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Page 24 of 342

2. Approve travel request – Secretary Lisa Summers – Midwest Alliance of Sovereign

Tribes (MAST) summer meeting – Pokagon Band of Potawatomi Indians/Buffalo, MI –

July 20-21, 2016

Motion by David Jordan to approve the travel request – Secretary Lisa Summers – Midwest Alliance of

Sovereign Tribes (MAST) summer meeting – Pokagon Band of Potawatomi Indians/Buffalo, MI – July 2021, 2016, seconded by Fawn Billie. Motion carried with one abstention:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Jennifer

Webster

Abstained:

Lisa Summers

Not Present:

Melinda J. Danforth, Tehassi Hill

3. Approve travel request – Councilman Tehassi Hill – 2016 Partners in Action

Conference – Sault Ste. Marie, MI – July 19-21, 2016

Motion by Lisa Summers to approve the travel request – Councilman Tehassi Hill – 2016 Partners in

Action Conference – Sault Ste. Marie, MI – July 19-21, 2016; and to approve up to two (2) additional

Business Committee members to also attend if it is within their budgets, seconded by Jennifer Webster.

Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to recess at 10:35 a.m. and to reconvene at 11:00 a.m., seconded by Fawn

Billie. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Meeting called to order by Chairwoman Tina Danforth at 11:03 a.m.

Vice-Chairwoman Melinda J. Danforth and Councilman Tehassi Hill not present.

Motion by Lisa Summers to recess at 11:39 a.m. and to reconvene at 1:30 p.m., seconded by David

Jordan. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Meeting called to order by Chairwoman Tina Danforth at 1:30 p.m.

Vice-Chairwoman Melinda J. Danforth and Councilman Tehassi Hill not present.

Page 25 of 342

XV.

REPORTS (2:08:30) (This section of the agenda is scheduled to begin at 1:30 p.m.)

A. OPERATIONAL REPORTS

1. Accept Development Division FY ’16 3rd quarter report

Sponsors: James Petitjean, Interim Assistant Division Director/Development; Jacque Boyle,

Interim Assistant Division Director/Operations; Scott Cottrell, Utilities Manager

Motion by Trish King to accept the Development Division FY ’16 3rd quarter report, seconded by Lisa

Summers. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to request the Interim Assistant Development Division Director of Operations to

analyze the questions that have come up today regarding the Healthcare facility and then provide

updated information at the August 16, 2016, Business Committee work meeting, seconded by Jennifer

Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

2. Defer Environmental Health & Safety Division FY ’16 3rd quarter report to the July 27,

2016, regular Business Committee meeting

Sponsor: Patrick Pelky, Division Director/Environmental Health & Safety

Motion by Lisa Summers to defer the Environmental Health & Safety Division FY ’16 3rd quarter report to

the July 27, 2016, regular Business Committee meeting, seconded by Brandon Stevens. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

3. Defer Division of Land Management FY ’16 3rd quarter report to the July 27, 2016,

regular Business Committee meeting

Sponsor: Patrick Pelky, Division Director/Land Management

Motion by Lisa Summers to defer the Division of Land Management FY ’16 3rd quarter report to the July

27, 2016, regular Business Committee meeting, seconded by Fawn Billie. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

B. CORPORATE REPORTS (No Requested Action)

Page 26 of 342

C. BOARDS, COMMITTEES, AND COMMISSIONS

1. Defer Anna John Residential Centered Care Community Board FY ’16 3rd quarter report

to the July 27, 2016, regular Business Committee meeting

Chair:

Candace House

Liaison:

Melinda J. Danforth, Tribal Vice-Chairwoman

Motion by Jennifer Webster to defer the Anna John Residential Centered Care Community Board FY ’16

3rd quarter report to the July 27, 2016, regular Business Committee meeting, seconded by Trish King.

Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

2. Accept Oneida Nation Arts Board FY ’16 3rd quarter report

Chair-Elect: Dawn Walschinski

Liaison:

Jennifer Webster, Councilwoman

Motion by Jennifer Webster to accept the Oneida Nation Arts Board FY ’16 3rd quarter report, seconded

by Lisa Summers. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

XVI.

EXECUTIVE SESSION (1:16:27)

A. REPORTS

1. Accept Chief Counsel report – Jo Anne House, Chief Counsel

Motion by Lisa Summers to accept the Chief Counsel report dated July 8, 2016, seconded by Jennifer

Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

B. STANDING ITEMS

1. Land Claims Strategy (No Requested Action)

C. AUDIT COMMITTEE

Sponsor:

Councilman Tehassi Hill, Chair

1. Accept May 12, 2016, Audit Committee meeting minutes

Motion by Lisa Summers to accept the May 12, 2016, Audit Committee meeting minutes, seconded by

Fawn Billie. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Page 27 of 342

2. Approve Four Card Poker audit and lift confidentiality requirement allowing tribal

members to view the audit

Motion by Lisa Summers to approve the Four Card Poker audit and lift confidentiality requirement

allowing tribal members to view the audit, seconded by Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

3. Approve Three Card Poker Rules of Play audit and lift confidentiality requirement

allowing tribal members to view the audit

Motion by Lisa Summers to approve the Three Card Poker Rules of Play audit and lift confidentiality

requirement allowing tribal members to view the audit, seconded by Fawn Billie. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

4. Approve Roulette Rules of Play audit and lift confidentiality requirement allowing

tribal members to view the audit

Motion by Lisa Summers to approve the Roulette Rules of Play audit and lift confidentiality requirement

allowing tribal members to view the audit, seconded by Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

D. UNFINISHED BUSINESS

1. Accept update regarding Print Shop – Mail Center Operational Plan

(1:30-2:00)

Sponsor: Joanie Buckley, Division Director/Internal Services

EXCERPT FROM APRIL 13, 2016: Motion by Fawn Billie to accept the Print Shop – Mail

Center Operational plan as information and to request an update for the July 13, 2016,

regular Business Committee meeting, seconded by Melinda J. Danforth. Motion carried

unanimously.

EXCERPT FROM MARCH 30, 2016: No formal action was taken on this item.

EXCERPT FROM DECEMBER 9, 2015: (1) Motion by David Jordan to accept the report,

seconded by Fawn Billie. Motion carried unanimously. (2) Motion by Lisa Summers to require

the next update be brought back to the March 23, 2016, regular Business Committee

meeting, seconded by Jennifer Webster. Motion carried unanimously.

EXCERPT FROM SEPTEMBER 23, 2015: Motion by Brandon Stevens to accept the update

as information, seconded by Fawn Billie. Motion carried unanimously.

EXCERPT FROM SEPTEMBER 9, 2015: (1) Motion by Jennifer Webster to accept this item

as information, seconded by Lisa Summers. Motion carried unanimously. (2) Amendment to

the main motion by Melinda J. Danforth to request the Internal Services Director bring back

the assessment to the Business Committee in three (3) months, seconded by Lisa Summers.

Motion carried unanimously.

Motion by Lisa Summers to accept the Oneida Printing October-May 2016 report; and to request a final

close-out report be brought back in ninety (90) days which includes any final transition items and

timelines, seconded by Brandon Stevens. Motion carried unanimously:

Page 28 of 342

Ayes:

Not Present:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to request the Internal Services Division Director to start including transitioning

this item into their quarterly report, seconded by Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

2. Accept transition plan from Internal Services/MIS Department regarding Surveillance

System Replacement Project

(This item is scheduled to begin at 2:00 p.m.)

Sponsor: Joanie Buckley, Division Director/Internal Services

EXCERPT FROM APRIL 27, 2016: Motion by David Jordan to accept the update from the

Gaming Commission, Retail, Finance, and Gaming regarding Surveillance System

Replacement Project and to request that the agreed upon action plan be placed in writing and

signed by all affected parties, seconded by Tehassi Hill. Motion carried unanimously.

EXCERPT FROM APRIL 13, 2016: (1) Motion by Lisa Summers to request that the team

working on this item meet and collaborate on how to proceed and bring back this item to the

April 27, 2016, regular Business Committee meeting for an update, seconded by Jennifer

Webster. Motion carried unanimously. (2) Motion by Lisa Summers to defer a policy

development on this issue to the Internal Services/MIS Department to bring back a

recommendation on a transition plan which moves the Nation towards a long-term systems

alignment and for this draft plan to be brought back to the July 13, 2016, regular Business

Committee meeting, seconded by Fawn Billie. Motion carried unanimously. (3) Motion by

David Jordan to request all the teams that were to be brought together and put under one

team for a RFP to be vetted out and be transparent, seconded by Lisa Summers. Motion

carried unanimously.

Motion by Lisa Summers to accept the transition plan from Internal Services/MIS Department regarding

Surveillance System Replacement Project, seconded by Fawn Billie. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to direct that an internal team be established from a minimum of MIS

Department, Oneida Police Department, Gaming Commission and Security, and Purchasing Department

to develop a full transition plan for the Operations based on the recommendations provided in the report;

and to request an update on the progress be brought back to a regular Business Committee meeting in

six (6) months which would be January of 2017, seconded by Jennifer Webster. Motion carried

unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

E. TABLED BUSINESS (No Requested Action)

Page 29 of 342

F. NEW BUSINESS

1. Review U.S. Dept. of Housing and Urban Development (HUD) On-Site Monitoring

review report and determine appropriate corrective actions

(This is item is scheduled to begin at 9:00 a.m.)

Sponsor: Melinda J. Danforth, Tribal Vice-Chairwoman

Motion by Lisa Summers to request the Legislative Operating Committee to develop emergency

amendments to the Conflict of Interest Policy to address mandatory recusal in the event of certain

conflicts within forty-five (45) days; and to bring back final amendments as soon as possible (in regards to

Finding #1), seconded by Brandon Stevens. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to direct the Chief Financial Officer to address training requirements, including

that there is cross-training to ensure a trained employee is available during each step of the process (in

regards to Finding #2), seconded by Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to direct the Chief Financial Officer to begin development of an updated or new

Standard Operating Procedure addressing sole source contracting and, where needed, documentation of

external funding approval of sole source (in regards to Finding #3), seconded by David Jordan. Motion

carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to direct the Tribal Secretary to develop Standard Operating Procedures and

necessary Charter amendments regarding appointments to boards and agenda of corporate entities

which prohibit conflict with duties as a tribal employee (in regards to Finding #4), seconded by Jennifer

Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Motion by Lisa Summers to direct the Tribal Secretary to coordinate the management responses with the

Law Office, Finance, Housing, and Planning on behalf of the Oneida Business Committee by the

identified deadline, seconded by Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

2. Approve draft letter of engagement retaining Fletcher Law, PLLC – contract # 20160718

Sponsors: Trish King, Tribal Treasurer; Brandon Stevens, Councilman

Motion by Lisa Summers to approve engagement retaining Fletcher Law, PLLC – contract # 20160718; and to request the funds come from the Business Committee special projects budget with the

understanding the funds are allocated from the Student Ambassador, Language Immersion, and Rites of

Passage allocations, seconded by Trish King. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Page 30 of 342

3. Review Business Committee Officers’ recommendations regarding personnel action,

transition, and annual evaluation follow-up

Sponsor: Melinda J. Danforth, Tribal Vice-Chairwoman

Motion by Lisa Summers to approve the Business Committee Officers’ recommendations dated July 12,

2016, regarding personnel action, transition, and annual evaluation follow-up; and to direct the ViceChair’s Office to carry out the actions approved in the materials presented, seconded by Fawn Billie.

Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

4. Approve request to direct Area Manager of Human Resources Dept. to postpone

posting Land Claims Commission – Administrative Assistant position

Sponsors: Trish King, Tribal Treasurer; Lisa Summers, Tribal Secretary

Liaison:

Jennifer Webster, Councilwoman

Motion by Lisa Summers to approve the request to hold off on posting the Land Claims Commission –

Administrative Assistant position until the Business Committee and Land Claims Commission can meet to

discuss and collaborate efforts to create efficiencies in staff roles, seconded by Jennifer Webster. Motion

carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

5. Review and approve Business Committee Officer’s recommendations regarding

Interim Assistant Development Division Director – Operations’ thirty (30) day report

Sponsor: Melinda J. Danforth, Tribal Vice-Chairwoman

Motion by Lisa Summers to accept the update from the Interim Assistant Development Division Director of

Operations; and to ask the Officers to continue working with the Interim Assistant Director to obtain a

more detailed report on the operations as it relates to overall measurements, including the Plumbing

Departments’ work with the Operations, Community, and the newly developed Housing Division,

seconded by Jennifer Webster. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

XVII.

ADJOURN

Motion by Lisa Summers to adjourn at 2:25 p.m., seconded by Fawn Billie. Motion carried unanimously:

Ayes:

Fawn Billie, David Jordan, Trish King, Brandon Stevens, Lisa Summers,

Jennifer Webster

Not Present:

Melinda J. Danforth, Tehassi Hill

Minutes prepared by Heather Heuer, Information Management Specialist

Minutes approved as presented/corrected on ___________.

_________________________________

Lisa Summers, Secretary

ONEIDA BUSINESS COMMITTEE

Page 31 of 342

Page 32 of 342

Page 33 of 342

BC Resolution # __-__-__-_

Amending the Self-Governance Multi-Year Funding Agreement

WHEREAS,

the Oneida Nation is a federally recognized Indian government and a treaty tribe

recognized by the laws of the United States of America; and

WHEREAS,

the Oneida General Tribal Council is the governing body of the Oneida Nation; and

WHEREAS,

the Oneida Business Committee has been delegated the authority of Article IV, Section 1,

of the Oneida Tribal Constitution by the Oneida General Tribal Council; and

WHEREAS,

the Oneida Nation is a Self-Governance Tribe under Title V of P.L.93-638, as amended;

and

WHEREAS,

the Oneida Nation has a Multi-Year Funding Agreement with the federal Department of

Health and Human Services’ Indian Health Service which includes FY 2016; and

WHEREAS,

Section 10 of the Multi-Year Funding Agreement enables modifications of the Agreement

in the form of an amendment which requires the written consent of both the Oneida Nation

and the Secretary or their authorized representative.

NOW THEREFORE BE IT RESOLVED, the Oneida Nation wishes to amend the Self-Governance MultiYear Funding Agreement by adding the following language: “The Oneida Nation’s Comprehensive Health

Services Division agrees to be bound by 42 CFR Part 136 Subpart I in the administration and provision of

Purchased and Referred Care services carried out under this Agreement.”

Page 34 of 342

Page 35 of 342

Page 36 of 342

Page 37 of 342

Page 38 of 342

Oneida Business Committee Agenda Request

1. Meeting Date Requested:

07 / 27 / 16

2. General Information:

Session:

Open

Agenda Header:

Executive - See instructions for the applicable laws, then choose one:

Resolutions

Accept as Information only

Action - please describe:

Adopt the Garnishment Law Amendments

3. Supporting Materials

Report

Resolution

Contract

Other:

1. Backup

3.

2.

4.

Business Committee signature required

4. Budget Information

Budgeted - Tribal Contribution

Budgeted - Grant Funded

5. Submission

Authorized Sponsor / Liaison:

David Jordan

Primary Requestor/Submitter:

Jennifer Falck, LRO

Your Name, Title / Dept. or Tribal Member

Additional Requestor:

Name, Title / Dept.

Additional Requestor:

Name, Title / Dept.

Page 1 of 2

Unbudgeted

Page 39 of 342

Page 40 of 342

Page 41 of 342

Page 42 of 342

Page 43 of 342

Page 44 of 342

Page 45 of 342

Page 46 of 342

Page 47 of 342

Page 48 of 342

Page 49 of 342

Page 50 of 342

Page 51 of 342

Page 52 of 342

Page 53 of 342

Page 54 of 342

Page 55 of 342

Page 56 of 342

Page 57 of 342

Page 58 of 342

Page 59 of 342

Page 60 of 342

Page 61 of 342

Page 62 of 342

Page 63 of 342

Page 64 of 342

Page 65 of 342

Page 66 of 342

Page 67 of 342

Page 68 of 342

Page 69 of 342

Oneida Business Committee Agenda Request

1. Meeting Date Requested:

07 / 27 / 16

2. General Information:

Session:

Open

Agenda Header:

Executive - See instructions for the applicable laws, then choose one:

Standing Committees

Accept as Information only

Action - please describe:

A memo from LOC Chair to OBC updating the Membership Ordinance Emergency Amendments activity

3. Supporting Materials

Report

Resolution

Contract

Other:

1. Memo

3.

2.

4.

Business Committee signature required

4. Budget Information

Budgeted - Tribal Contribution

Budgeted - Grant Funded

5. Submission

Authorized Sponsor / Liaison:

Brandon Stevens

Primary Requestor/Submitter:

Jennifer Falck, LRO

Your Name, Title / Dept. or Tribal Member

Additional Requestor:

Name, Title / Dept.

Additional Requestor:

Name, Title / Dept.

Page 1 of 2

Unbudgeted

Page 70 of 342

Page 71 of 342

Page 72 of 342

Page 73 of 342

Page 74 of 342

ONEIDA NATION

P.O. Box 365

Oneida, WI 54115

MEMORANDUM

TO:

Finance Committee

CC:

Business Committee

FR:

Denise Vigue, Executive Assistant

DT:

July 19, 2016

RE:

E-Poll Results of: FC Meeting Minutes of July 18, 2016

An E-Poll vote of the Finance Committee was conducted to approve the

July 18, 2016 Finance Committee meeting minutes. The results of the

completed E-Poll are as follows:

E-POLL RESULTS:

There was a Majority 4 YES votes from Wesley Martin, Jr., Larry Barton,

Jennifer Webster and Chad Fuss to approve the July 18, 2016 Finance

Committee Meeting Minutes.

The minutes will be placed on the next BC agenda of July 27, 2016 for

approval and the next Finance Committee agenda of August 1, 2016 to

ratify this E-Poll action.

Yaw⩑ko

__________________________________________________________________________________________________________________________________________________________

* Per the Finance Committee By-Laws Article III-Meetings, 3-4 Quorum. Four (4) members of the Finance Committee shall

constitute a quorum & 3-6 Voting. (d) The Finance Committee shall act by a majority of vote of the quorum present at any

meeting.

Page 75 of 342

ONEI D A FI N ANCE COM M I TTEE

FC WORK MEETING

July 18, 2016 – 8:30 A.M.

BC Executive Conference Room

FINANCIAL PLANNING MEETING

July 18, 2016 – 9:00 A.M.

BC Executive Conference Room

REGULAR MEETING

July 18, 2016 – 10:00 A.M.

BC Executive Conference Room

REGULAR MEETING MINUTES

FC Work Meeting:

Patricia King, Treasurer/FC Chair

Jenny Webster, BC Council Member

Chad Fuss, Gaming AGM/FC Alternate

Larry Barton, CFO/FC Vice-Chair

Louise Cornelius, GGM

Wesley Martin, Jr., Community Elder Member

Excused: David Jordan, BC Council Member and Patrick Stensloff, Purchasing Director

FC Financial Planning Meeting:

Patricia King, Treasurer/FC Chair

Jenny Webster, BC Council Member

Chad Fuss, Gaming AGM/FC Alternate

Larry Barton, CFO/FC Vice-Chair

Louise Cornelius, GGM

Wesley Martin, Jr., Community Elder Member

Excused: David Jordan, BC Council Member and Patrick Stensloff, Purchasing Director

FC Regular Meeting:

Patricia King, Treasurer/FC Chair

Larry Barton, CFO/FC Vice-Chair

Jenny Webster, BC Council Member

Chad Fuss, Gaming AGM/FC Alternate

Wesley Martin, Jr., Community Elder Member

Excused: David Jordan, BC Council Member and Patrick Stensloff, Purchasing Director

Others Present: David Emerson, Tim Skenandore, Sharon Mousseau, Linda Jenkins, Carla Witkowski

and Denise Vigue, FC recording secretary

I.

II.

Call to Or der : The Regular FC meeting was called to order by the FC Chair at 10:05 A.M.

Approv al of Agenda: JULY 18, 2016:

Motion by Larry Barton to approve the Finance Committee agenda for July 18, 2016 with: two

ADD On requests under Capital Expenditures; one ADD On request under New Business; and

one ADD On request under Donations. Seconded by Jennifer Webster. Motion carried

unanimously.

III.

Approv al of Mi nutes: JULY 5, 2016 (approved via FC E-Poll on 7/6/16):

Motion by Wesley Martin, Jr. to ratify the FC E-Poll action of July 6, 2016 approving the Finance

Committee meeting minutes of July 5, 2016. Seconded by Jennifer Webster. Motion carried

unanimously.

IV.

Tabled Business:

Motion by Wesley Martin, Jr. to keep the Community Fund items 1-4 on the table. Seconded by

Chad Fuss. Motion carried unanimously.

1. Laptop Purchase

Amount: $300.

Michael Debraska

2. I-Pad Pro Purchase

Amount: $300.

Beverly Somers

3. I-Pad Pro Purchase

Amount: $300.

Daniel Miller

4. I-Pad Air Purchase

Amount: $300.

B.Jan Frion

Page 76 of 342

V.

Capital Expenditures:

1. Incredible Technologies (6) Slot Games

David Emerson, Gaming Slots Department

Handouts of additional backup information were provided; wrapping up purchases for the year

with this purchase of exceptional performers; already at main, hoping to recreate profits with

installation at Mason Street; discussion of nominal pricing for trade in values; shipping costs; and

specific vendors. Gaming does work with Purchasing on solicitation of qualified buyers for used

machines.

Motion by Wesley Martin, Jr. to approve the Gaming Capital Expenditure for the Incredible

Technologies (6) Slot Games in the amount of $121,234.80. Seconded by Jennifer Webster.

Motion carried unanimously.

2.

ADD ON: IGT (4) Slot Games

David Emerson, Gaming Slots Department

Handouts of additional backup information were provided; these are poker games utilizing the

latest technology; showing added game play/profitability.

Motion by Jennifer Webster to approve the Gaming Capital Expenditure for the IGT (4) Slot

Games in the amount of $64,188.80. Seconded by Wesley Martin, Jr. Motion carried

unanimously.

3.

ADD ON: Miron Construction Contract Amendment

Tim Skenandore, Gaming Facilities

This is a contract amendment to complete exterior work; working with Engineering advised to

use this same contractor that completed remodel project to keep consistency of appearance;

funds are budgeted and have been approved through Gaming Capital Expenditures. The CFO

noted for Gaming Facilities that one of the sub-contractors did have Indian Preference issues in

the past and to ensure this will not be with current project.

Motion by Wesley Martin, Jr. to approve the Miron Construction Contract Amendment in the

amount of $114,809.00. Seconded by Jennifer Webster. Motion carried unanimously.

VI.

New Business:

1. Direct Care Therapy Services

Carla Witkowski, BIA Early Intervention

This is a sole source contract for speech and language services; staff provided through Direct

Care is qualified and credentialed to move from program to program, this is 100% funded by

the bureau.

Motion by Larry Barton to approve the Direct Care Therapy Services contract in the amount of

$175,000. Seconded by Wesley Martin, Jr. Motion carried unanimously.

2.

ADD ON: Lamers Bus Line – contract

Sharon Mousseau, ONES Administrator

This is a multi-year (6) contract, this will be year three; there was a discussion on how much

received from the bureau and how much needed through tribal contribution; CFO noted in the

last year of this contract it should be sent out for bid.

Motion by Chad Fuss to approve year three payment for the Lamers Bus Line contract in the

amount of $380,000. Seconded by Larry Barton. Jennifer Webster abstained. Motion carried.

VII.

Donation Requests /Reports:

1. Report: Wisconsin Indian Education Association

Requestor: Rachel Byington and the SW WIEA Planning Team

Page 77 of 342

Motion by Jennifer Webster to accept as FYI the required Donation Follow-Up Report from the

Wisconsin Indian Education Association. Seconded by Larry Barton. Motion carried

unanimously.

2.

Report: Military Order of the Purple Heart

Requestor: George Greendeer, Commander, MoPH

Motion by Jennifer Webster to accept as FYI the required Donation Follow-Up Report from the

Military Order of the Purple Heart. Seconded by Wesley Martin, Jr. Motion carried

unanimously.

3. ADD ON: Bad River Request for Emergency Assistance

Larry Barton, CFO

There was a discussion of the request an e-mail received Kaylynn Gresham at Emergency

Management of the request for assistance to the Bad River reservation that has flood damages;

the BC has already provided from their donation line $5,000. for bottled water as that is the

greatest need; there is a fund set up at the bank for general assistance; the max amount that

can be approved under the FC Donation policy is $2,500, or a procedural exception can be made

if FC can donate more; will need to follow up with Kaylynn of current status/needs; e-mail can

be used as backup for the records.

Motion by Wesley Martin, Jr. to approve $2,500 from the FC Donation Line to be sent to the

Associated Bank- Bad River Tribal Relief Fund to assist the Bad River Reservation with emergency

assistance. Seconded by Larry Barton. Motion carried unanimously.

VIII.

IX.

X.

Executive Session: No items

Follow Up: No items

FYI and /or Thank You:

1. FYI: American Gaming Systems (8) Trial Games

David Emerson, Gaming Slots Department

Motion by Jennifer Webster to accept as FYI the information regarding the 8 Trial Games (no

purchase) from American Gaming Systems (AGS). Seconded by Wesley Martin, Jr. Motion

carried unanimously.

XI.

Adjour n: Motion by Wesley Martin, Jr. to adjourn. Seconded by Jennifer Webster.

Motion carried unanimously. The regular FC meeting ended at 10:43 A.M.

Minutes taken and transcribed by:

Denise Vigue, Executive Assistant in Finance

& Finance Committee Recording Secretary

Finance Committee- E-Poll Minutes Approval Date:

Oneida Business Committee- FC Minutes- Approval Date:

JULY 19, 2016

IX. GENERAL TRIBAL COUNCIL

A. Petitioner Michael Debraska: Special GTC meeting regarding Per Capita Distribution

$3,000/$5,000

Sponsor: Lisa Summers, Tribal Secretary

1. Accept legislative analysis

2. Defer legal analysis

B. Approve Reconvened 2016 Semi-Annual General Tribal Council meeting date

Sponsor: Lisa Summers, Tribal Secretary

These agenda items contain information for Tribal Members only. Please visit the Business Committee

Support Office on the second floor of the Norbert Hill Center with Tribal I.D. to obtain full packet materials.

Materials may also be obtained after logging into the Tribal Members only portal at https://oneidansn.gov/members-only/gtc-portal/bc-meeting-materials-for-members-only/

For any questions, please call the Business Committee Support Office at (920)869-4364 or send an email

to TribalSecretary@oneidanation.org. Thank you.

Page 91 of 342

Oneida Business Committee Agenda Request

1. Meeting Date Requested:

7

/ 27 / 16

2. General Information:

Session:

Open

Agenda Header:

Requesting this item to be scheduled at 11:00 a.m., as

representatives from GEI Consultants, Inc. will be

present to provide summary of the DRAFT

hydrogeologic report with powerpoint

Executive - See instructions for the applicable laws, then choose one:

Unfinished Business

Accept as Information only

Action - please describe:

Accept update of Work Plan for Cemetery Improvements project #14-002.

3. Supporting Materials

Report

Resolution

Contract

Other:

1. Memo

3. Hydrogeologic Study - DRAFT

2. Work Plan

4.

Business Committee signature required

4. Budget Information

Budgeted - Tribal Contribution

Budgeted - Grant Funded

Unbudgeted

5. Submission

Authorized Sponsor / Liaison:

Brandon Stevens, Council Member

Primary Requestor/Submitter:

James Petitjean, Interim Asst. Division Director/Development

Your Name, Title / Dept. or Tribal Member

Additional Requestor:

Paul J. Witek, Senior Tribal Architect/ Engineering Dept.

Name, Title / Dept.

Additional Requestor:

Fawn Cottrell, Contract Processor/ Engineering Dept.

Name, Title / Dept.

Page 1 of 2

Page 92 of 342

Oneida Business Committee Agenda Request

6. Cover Memo:

Describe the purpose, background/history, and action requested:

STANDING ITEM:

Purpose:

Follow-up to item XII.A from December 9, 2015 OBC Meeting for a update to Work Plan.

Background:

On December 9, 2015 the Business Committee approved a motion to request the Cemetery Improvement

Project #14-002 Work Plan be a standing item on the second regular Business Committee meeting agenda of

each month starting in January of 2016 for updates.

The Oneida Cemetery Improvements - Hydrogeologic Study has been worked on by GEI Consultants, Inc. A first

DRAFT of the study is attached and representatives from GEI will be present at the meeting to summarize the

draft report and answer questions.

Action Requesting:

1. Acceptance of Work Plan status update for Cemetery Improvements project #14-002.

1) Save a copy of this form for your records.

2) Print this form as a *.pdf OR print and scan this form in as *.pdf.

3) E-mail this form and all supporting materials in a SINGLE *.pdf file to: BC_Agenda_Requests@oneidanation.org

Page 2 of 2

Page 93 of 342

Oneida Nation

Engineering Department

Memo

To:

Oneida Business Committee

From:

Paul J. Witek, AIA, LEED-AP – Senior Tribal Architect

CC:

Troy Parr – Assistant Development Division Director

James Petitjean – Interim Assistant Development Division Director

Date:

July 19, 2016

Re:

Cemetery Improvements #14-002 – Work Plan Update

On December 9, 2015 the Business Committee approved a motion to request the Cemetery Improvement

Project #14-002 Work Plan be a standing item on the second regular Business Committee meeting agenda of

each month starting in January of 2016 for updates.

Updates to the Cemetery Work Plan have been submitted monthly since that time. Highlights of status updates

on this month’s report are:

Item

No.:

Item Title:

Status:

2.c

Install additional monitoring

wells

Additional wells on property to east are scheduled to be installed the

week of July 25.

3.d

Hydrogeology Study

Draft Report submitted. Will need information from additional

monitoring wells on parcel to the east to finalize report.

4.a

Request funding for

implementation

Funding requested in FY2017 CIP Budget request. Request did not

make final proposed CIP Budget. There is an unobligated balance

remaining on current funding.

G:\ENG\Projects\14-002 Cemetery\Correspondence Outgoing\Memo - Work Plan Update.docx

Page 94 of 342

WORK PLAN

Cemetery Improvements Project

#14‐002

No.

1

2

3

Description

Continue data readings

from monitoring wells.

Install additional

monitoring wells.

Hydrogeology Study

(ground‐water study).

7/19/16

Notes

Tasks

Task

Coordinator

Estimated

Completion

Date

On‐going

On‐going

12/16/15

Complete, issued 12/9/15; proposals

received 12/16/15.

1/22/16

Complete.

Monthly data readings.

a.

Collect data.

CW&S Dept.

Install monitoring wells at existing raised

plateaus and on property to east.

a.

Draft and release Request For

Proposals (RFP).

b.

Draft and award contract.

Engineering

Dept.

Engineering

Dept.

The study will review previous reports,

existing data from monitoring wells, data

from new monitoring wells and provide

verification/recommendations of plan of

action to address groundwater concerns.

Study duration is anticipated to be 6 months.

4

Request funding for

implementation.

Funding will be requested through the CIP

Budget and amounts will be based upon

estimates included in the Hydrogeology

Study.

5

Additional drain tile

installation.

Contingent upon results of Hydrogeology

Study. If study results confirm this is an

appropriate action, work will commence as

funding allows.

Status

c.

Install monitoring wells

Vendor

2/9/16

4 wells installed Feb. 8 & 9.

Additional wells on property to east

are scheduled to be installed the

week of July 25.

a.

Identify budget source for study.

Troy Parr

12/14/15

Transfer of funds from #07‐009

Building Demolitions was approved

by Finance Committee 12/14/15.

b.

Draft and release Request For

Proposals (RFP).

c.

Draft and award contract.

Engineering

Dept.

Engineering

Dept.

d.

Conduct study.

GEI

Fall 2016

e.

Present Final Report to OBC

Engineering

Dept. / GEI

Fall 2016

Draft Report submitted.

1/28/16

3/14/16

Issued 1/9/16; 4 proposals received

and scored 1/28/16.

GEI Consultants, Inc. approved,

Notice to Proceed issued.

Draft Report submitted. Will need

information from additional

monitoring wells on parcel to the

east to finalize report.

a.

Include budget request in annual

fiscal year CIP Budget request.

Engineering

Dept.

6/16/16

Funding requested in FY2017 CIP

Budget request. Request did not

make final proposed CIP Budget.

There is an unobligated balance

remaining on current funding.

a.

Define specific scope of work with

Technical Team.

Engineering

Dept.

T.B.D.

Waiting on Hydrogeology Study

results.

b.

Drain tile installation.

CW&S Dept.

T.B.D.

Waiting on completion of item 5.a.

G:\ENG\Projects\14‐002 Cemetery\Misc\14‐002 Work Plan.docx

1

Page 95 of 342

WORK PLAN

Cemetery Improvements Project

#14‐002

No.

6

Description

Raise grades between

existing plateaus.

7/19/16

Task

Coordinator

Estimated

Completion

Date

Prepare Construction Documents

to define scope of work and allow

bidding of work.

Vendor/

Engineering

Dept.

T.B.D.

Waiting on Hydrogeology Study

results.

b.

Request bids and award

construction contract.

Engineering

Dept.

T.B.D.

Waiting on completion of item 6.a.

c.

Construction

Vendor

T.B.D.

Waiting on completion of item 6.b.

Notes

Contingent upon results of Hydrogeology

Study. If study results confirm this is an

appropriate action, work will commence as

funding allows.

Tasks

a.

G:\ENG\Projects\14‐002 Cemetery\Misc\14‐002 Work Plan.docx

2

Status

Page 96 of 342

Consulting

Engineers and

Scientists

Oneida Cemetery Improvements –

Hydrogeologic Study

Oneida Cemetery

Oneida, Wisconsin

Submitted to:

Oneida Nation

P.O. Box 365

Oneida, Wisconsin 54155

Submitted by:

GEI Consultants, Inc.

3159 Voyager Drive

Green Bay, Wisconsin 54311

920-455-8200

July 2016

Project 1603850

Paul J. Killian, P.E.

Senior Project Engineer

Roger A. Miller, P.G., C.P.G.

Senior Hydrogeologist

Page 97 of 342

Table of Contents

Executive Summary

2

1.

Introduction

3

2.

Conceptual Site Model

2.1

Surface Conditions

2.2

Groundwater Conditions

2.2.1 Site Improvements

2.2.2 Pre-Drainage System Conditions

2.2.3 Post-Drainage System Conditions

2.3

Subsurface Soil Conditions

2.4

Summary of Conditions

2.4.1 Influence of the Neighboring Wetland

2.4.2 Influence of Existing Subsurface Drainage System

2.4.3 Unsaturated Burial Depth

4

4

5

5

5

6

6

7

7

8

8

3.

Alternatives for Continued Site Use

3.1

Overview

3.2

Feasible Alternatives

3.2.1 Maintain Typical Burial Practices

3.2.2 Add Fill and Drainage to Raise Site Elevations

3.2.3 Expand Existing Subsurface Drainage System

3.2.4 Replace Subsurface Soil with Permeable Fill

3.3

Evaluation of Alternatives

10

10

10

11

11

12

13

13

4.

Conclusions and Recommendations

4.1

Groundwater Control

4.2

Modifying Perceptions and Practices

4.3

Surface Water Management

4.4

Groundwater Monitoring

4.5

Expansion to the East

14

14

14

15

15

15

5.

References

16

GEI Consultants, Inc.

i

Page 98 of 342

Tables

Table 1 Summary of Mitigation Alternatives

Figures

Figure 1 Site Location Map

Figure 2 Geoprobe and Monitoring Well Location Diagram

Figure 3 Groundwater Contour Map 3/12/2008

Figure 4 Groundwater Contour Map 4/6/2016

Figure 5 Cross Section A-A’

Figure 6 Cross Section B-B’

Figure 7 Depth to Groundwater, Average 3rd Quarter

Figure 8 Depth to Groundwater, Average 1st, 2nd and 4th Quarter

Figure 9 Probability of Depth to Groundwater Greater Than 6 Feet

Figure 10 Cemetery Site Plan

Appendices

Appendix A Groundwater Elevation Records

Appendix A Drainage System Discharge Records

Precipitation Records

Appendix B Soil Boring Logs and Monitoring Well Construction Forms

Appendix C Private Well Logs

PJK:cah

Document1

GEI Consultants, Inc.

ii

Page 99 of 342

Executive Summary

GEI Consultants, Inc. (GEI) was retained by the Oneida Nation to complete a hydrogeologic

study of the cemetery property located south of West Adam Drive in Brown County, Wisconsin.

The purpose of the hydrogeologic study was to characterize conditions influencing groundwater

flow and correspondingly the burial depth which could be achieved during operation of the

cemetery. Alternatives for mitigating site conditions to maintain an unsaturated burial depth of

at least 6 feet were identified and evaluated based on several criteria.

Results of the hydrogeologic study indicate groundwater elevations, flow direction and surface

water interaction are controlled by topography, subsoil conditions and regional and local

drainage features. The cemetery property is situated on a local surface water divide with

topography directing surface water drainage south, north, northeast and northwest. In general,

the water table beneath the site mimics surface topography and surface water flow directions,

with local flow components north, south, east and west.

The subsurface drainage system installed in 2013, while successfully collecting groundwater, has

limited influence in the silty clay subsoil environment. Raising surface elevations by adding

imported fill improves the unsaturated burial depth but also appears to have created groundwater

mounds, likely the result of increased pore water pressure from the loading/consolidation of the

underlying silty clay.

Alternatives for expanding the subsurface drainage system, improving the permeability of

subgrade soils and raising site elevations are presented and a comparative evaluation completed.

This evaluation concludes that portions of the cemetery can achieve five to six feet of

unsaturated burial depth by controlling the environment. Alternatively, continued use of the

cemetery can proceed by modifying perceptions and practices to allow burials within saturated

soils. One approach will require a construction effort and the other approach will likely require a

public outreach and education effort.

GEI Consultants, Inc.

Page 100 of 342

1.

Introduction

The property located near the southeast corner of the intersection of County Highway U and

West Adam Drive was allocated by the Oneida Nation for use as a cemetery in 2001. The

cemetery is located in eastern Brown County, south of the community of Oneida, Wisconsin.

The cemetery consists of approximately 12 acres within a 50-acre parcel, partially wooded. The

cemetery borders a restored wetland, Where the Water Birds Nest, located to the south. The site

is designed to accommodate approximately 1,700 grave sites.

Since 2001, the site has been subject to several studies to define the surface and groundwater

conditions. Specific studies include the following:

Test pits and a limited feasibility study completed prior to the property allocation in

2001.

Soil borings and groundwater monitoring wells installed in 2007 with monthly records of

groundwater elevations generated for approximately twelve months.

Soil geoprobes and three groundwater monitoring wells installed in 2008.

Site improvements completed in 2008 to raise the elevation of the burial sites.

Groundwater monitoring wells were abandoned in fall 2008.

A subsurface drainage system was installed in December 2013 with records of discharge

rate measured since that time.

Eight groundwater monitoring wells installed in 2014 with records of groundwater

elevations measured since that time.

Additional groundwater monitoring wells and site improvements implemented in 2015.

Four groundwater monitoring wells installed in 2016 with weekly records of groundwater

elevations measured since that time.

GEI Consultants, Inc. (GEI) was retained by the Oneida Nation to study the existing historical data

as well as new information currently being generated, and provide technical conclusions regarding

the future use of the site as a cemetery.

This report summarizes results of our evaluation of site conditions, including review of existing

reports, groundwater and surface water records and regional geologic/hydrogeologic references.

Results of the data review are subsequently presented in a Conceptual Site Model (CSM). The

CSM provides a summary of the interaction between surface water and groundwater, groundwater

flow direction, horizontal and vertical gradients. The CSM is used to organize and communicate

information about site characteristics and reflects our interpretation of available information.

Based on the CSM, feasible alternatives for managing groundwater elevations to facilitate

continued use of the cemetery are presented and evaluated.

GEI Consultants, Inc.

Page 101 of 342

2.

Conceptual Site Model

2.1

Surface Conditions

The cemetery property is located in eastern Brown County in an area of relatively flat

topography. The elevation of the cemetery property and adjacent land ranges from about +700 to

about +710. The cemetery is located approximately 1 mile east of Duck Creek, a regional

waterway which controls much of the Oneida watershed. The location of the cemetery property

is indicated on Figure 1. Apparent on Figure 1 is County Highway E (Freedom Road) located

along a topographic ridge that extends northeast to southwest along the east side of Duck Creek.

Also indicated on Figure 1 are the limits of the floodplain, which identifies flood risk boundaries

as designated by the Federal Emergency Management Agency (FEMA) and recorded wetlands as

designated by the Wisconsin Department of Natural Resources. As indicated in Figure 1, areas

neighboring the cemetery include some floodplain or wetland.

All surface water drainage from the cemetery ultimately flows northwest to Duck Creek;

however, the cemetery property is located within a local surface water divide. Most of the

surface water drainage from the south and east portions of the cemetery drain south to a restored

wetland, Where the Water Birds Nest. The northeast portion of the cemetery drains east and

north while the west portion of the cemetery drains northwest. .

Hydrologic Investigations Atlas HA-470, E.L.Oakes and L.J. Hamilton, 1973, place the cemetery

property in the Menominee-Oconto-Peshtigo River basin and identify soil deposits as stratified

glacial drift consisting of clay, silt and sand lake deposits.

The Soil Survey of Brown County (USDA Soil Conservations Service, 1974) provides detailed

maps describing shallow soil conditions throughout the county. Soil types identified by the

USDA Soil Survey are depicted on Figure 2. As indicated on Figure 2, the USDA Soil Survey

characterize soils at the cemetery site primarily as:

Kewaunee Series (KhB) – consisting of silty or loamy material overlying clayey glacial

till.

Manistee Series (MeB, MfB) – consisting of loamy fine to medium sand overlying

reddish-brown silty clay lacustrine sediment of glacial till.

As indicated in Figure 2, the Manistee Series (MfB) extends to the upland portion of property

east of the cemetery. Soils characteristic of Where the Water Birds Nest are mapped as Ogden

muck and Wauseon loam, poorly drained soils high in organic matter likely remnant of a shallow

glacial lake basin.

GEI Consultants, Inc.

Page 102 of 342

2.2

Groundwater Conditions

2.2.1

Site Improvements

Grading and surface drainage improvements were implemented at the cemetery property in 2008.

Improvements completed at that time included installing a culvert below the cemetery access

road and constructing drainage swales. Portions of the site were filled and graded to raise the

ground surface elevation at several of the burial sites in the south and central portion of the

cemetery. According to design plans, the burial sites were raised, as much as 4 feet, by

constructing a minimum 12-inch sandy drainage layer over the existing grade and covering with

sandy fill with at 6 inched of topsoil or 4 inches of hardwood mulch.

As indicated previously, a subsurface drainage system was installed in winter 2013. The location

of the drain lines are indicated on Figure 2. In general, the primary drain line consists of 6-inch

diameter perforated corrugated polyethylene pipe installed to an elevation of approximately

+700. Lateral drains constructed of 4-inch diameter perforated pipe extend north and east from

the main line as indicated on Figure 2. The main discharge line extends along the south edge of

the cemetery and continues west across the adjacent agricultural field to discharge to a surface

outfall approximately 500 feet west of the cemetery. The portion of the drain line that extends

across the agricultural field is non-perforated. The elevation of the surface outfall is +697.9.

Information provided in Appendix A includes and evaluation of discharge records from the

drainpipe relative to precipitation data obtained from Austin Straubel International Airport,

located approximately 3 miles northeast of the cemetery. Discharge rates recorded at the surface

outfall range from less than 5 gallons per minute (gpm) to over 45 gpm. Although there is little

direct correlation between available discharge records and rainfall events, seasonal fluctuations

and trends are apparent. Discharge rates are generally greater in spring (March, April, and May)

and decrease during summer months.

Figure 2 indicates the locations of exploration soil borings and groundwater monitoring wells on

and adjacent to the cemetery property. Groundwater elevations, and correspondingly, the depth

to groundwater, were evaluated relative to the time the subsurface drainage system was installed

and additional fill was imported to raise site grades. Records from May 2007 through July 2008

describe conditions prior to construction of the drain line and filling while water level records

from March 2014 through the present represent conditions following installation of the

subsurface drainage line and other site improvements.

2.2.2

Pre-Drainage System Conditions

Groundwater elevations recorded in monitoring wells installed on the cemetery property since

2007 were reviewed relative to precipitation records. Groundwater elevations relative to rainfall

are indicated on the graphs provided in Appendix A of this report.

Figure 3, a groundwater contour map based on March 2008 data, provides a general illustration

of the water table prior to installation of the drain lines. As depicted in Figure 3, the highest

groundwater elevation (+ 706.72) was recorded at MW-2 , located near the center of the

cemetery property. From the groundwater mound at MW-2, Figure 3 suggests groundwater flow

direction is east, west and north at a hydraulic gradient of 1% to 2%. Groundwater elevations

GEI Consultants, Inc.

Page 103 of 342

recorded in 2007 and 2008 generally depict a groundwater mound near the center of the

cemetery property with MW-2 representing the highest groundwater level ranging from about

+702 to about +707.

2.2.3

Post-Drainage System Conditions

Groundwater elevations recorded since March 2014 are included in the data summarized in

Appendix C. The groundwater contour map provided as Figure 4 represents an interpretation of

the groundwater table based on water elevations recorded in April 2016. Figure 4 depicts

conditions following the installation of the subsurface drainage system in 2013 and following the

filling and grading completed in 2008. Conditions mapped in Figure 4 do not represent the

highest or lowest conditions recorded, rather, they are considered typical for this time of the year.

As indicated in Figure 4, several areas of localized groundwater mounding are apparent in the

area north of the subsurface drain line. The elevated groundwater elevations at Well- 10, Well11 and Well-2, suggest groundwater flow direction south toward the drain line and north toward

Adam Drive. East and west flow components are also apparent.

Groundwater elevation data suggests that groundwater levels increased after the fill was placed

in 2008. This is indicated in the information included in Appendix A and depicted on the

groundwater contour map provided as Figure 4. When a load is placed on saturated material, the

load is fully transferred to the water contained within the pores of the soil. This is known as

excess pore water pressure. Over time, the excess pore water pressure is transferred to the soil as

the water leaves the pores. If the soil has a high hydraulic conductivity, or the ability to transfer

water rapidly, the extra load placed on the water is dissipated relatively quickly. However, if the

subsurface has a low hydraulic conductivity, as is the case with the silty clay in the cemetery, the

extra load that is placed on the water is dissipated over a longer period of time, and the

groundwater level will rise, then fall slowly as the water is dissipated. Infiltration of precipitation

through the sandy fill also contributes to water table mounding observed.

2.3

Subsurface Soil Conditions

Review of boring logs and private well logs largely confirm results of the soil survey identifying

silty clay deposits, with little sand, in the northwest portion of the cemetery property with sand

overlying clay encountered in the east and southeast portions of the site. Soil boring logs and

well installation diagrams corresponding to the locations shown on Figure 2 are included in

Appendix B.

Subsurface conditions are illustrated on the geologic cross sections provided by Figure 5 and

Figure 6. These cross sections indicate the presence of silty sand deposits in the east portion of

the cemetery and how the thickness of the sand deposits generally increase on the property east

of the cemetery. This silty sand layer also appears to extend to the south, toward the wetland

pond as indicated by the boring log for monitoring well MW-8. The water table is likely within

the silty clay deposits in the north and west portions of the cemetery and appears to be within the

silty sand material in the areas east and southeast.

GEI Consultants, Inc.

Page 104 of 342

The glacial deposits overlie bedrock consisting of dolomite of the Galena, Platteville and

Decorah formations. Underlying the dolomite, the St. Peter Sandstone is present and is typically

the formation from which many of the private water supply wells draw from. Private well logs

from properties surrounding the cemetery are provided in Appendix C. As indicated by these

private well logs, dolomite bedrock encountered at a depth of 50 to 100 feet and sandstone

encountered at a depth of about 120 feet to over 200 feet.

USDA Soil Survey maps a bedrock escarpment just south of the cemetery property and east of

the wetland pond. Reviewing the soil boring log for MW-8, located south of the wooded area

near the north end of the wetland pond, there is a note indicating rock at a depth of 14 feet.

Although this may be a boulder, it is also possible that bedrock may be nearer to the surface in

the southeast portion of the site than reflected in the private well logs.

2.4

Summary of Conditions

2.4.1

Influence of the Neighboring Wetland

The predominant surface water feature in the area south of the cemetery is the restored wetland,

Where the Water Birds Nest. This wetland was created by constructing a shallow excavation and

controlling the discharge from the drainage way located southwest of the pond. The surface

water of the wetland pond initially fluctuated with water levels generally maintained at about

elevation +702. In November 2013, outfall conditions were modified to consistently control the

wetland pod elevation to +700. Groundwater elevation records from May 2007 through July

2008 represent conditions in the cemetery during which time the pond elevation fluctuated near

elevation +702 while subsequent data collected since March 2014 represent conditions under

which the wetland pond elevation was controlled at +700.

Evaluating the two data sets representing conditions with the pond at elevation near +702

compared to the pond at elevation +700 indicates the following conditions (note that the 20072008 data set was modified by eliminating elevation data from monitoring wells not located on

the cemetery property):

Average

St. Deviation

Minimum

Maximum

Range

2007‐2008

701.55

3.09

695.29

707.13

11.84

2014 +

702.85

2.08

698.35

709.07

10.72

Results indicate no statistically significant difference in the data sets suggesting they each

represent the same population of data. Although we do not imply a causal relationship, it is

notable that the average, minimum, and maximum values of groundwater elevations on the

cemetery property increased after lowering the wetland pond by two feet. The 2014 data also

includes the effect of localized water table mounding after fill was imported. Although this

could mask some of the effect of lowering the pond elevation, the distance of the cemetery from

GEI Consultants, Inc.

Page 105 of 342

the pond and the predominance of fine-grained soils between the pond and the cemetery likely

mute the influence of the reduced pond level as observed in monitoring wells at the cemetery.

Direct comparison of these data sets to evaluate the influence the pond level may have on

groundwater elevations is challenging due to several factors including:

Natural variations in groundwater elevations,

The influence of the subsurface drainage system installed in 2013,

The influence of additional fill and grading completed in 2008, and

Differences in monitoring well locations represented by the two data sets.

Based on our review of site conditions it is our opinion that the wetland pond south of the

cemetery is not significantly influencing groundwater elevations at the cemetery relative to

conditions that would exist if the wetland pond was not created. Graphical representation of

groundwater elevations provided in Appendix A indicate that most of the time groundwater

elevations in the cemetery are greater than +700 suggesting groundwater is recharging the pond.

During dry periods where groundwater elevations fall below +700, the pond may be recharging

the water table. More detailed monitoring of groundwater conditions between the wetland pond

and the cemetery property would be required to further define the hydrologic relationship.

2.4.2

Influence of Existing Subsurface Drainage System

Groundwater flow is influenced by topography, geology, and regional and local drainage

features. As indicated previously, the cemetery property is situated on a local surface water

divide with topography directing surface water drainage south, north, northeast and northwest.

The difference in hydraulic conductivity between the silty clay and silty sand deposits will also

influence groundwater flow and groundwater elevations. Figure 3 and Figure 4 depict

groundwater elevations from a limited number of observation points at a specific time. Actual

groundwater flow conditions are more complex than conditions exhibited in these figures.

Prior to installation of the subsurface drainage system, groundwater flow was likely similar to

surface water flow with variable components to the northwest, north, northeast, southeast, south

and southwest. Following installation of the subsurface drainage system and the addition of fill

to raise burial sites, groundwater levels remained elevated limiting burial in some areas of the

cemetery. Groundwater conditions in the silty sand will be influenced more readily by

precipitation events and be more responsive to the subsurface drainage system. Considering

conditions depicted in the cross-section shown on Figure 6, the subsurface drain pipe is likely

collecting more groundwater from the area to the south with limited influence on the

groundwater elevations in the cemetery property to the north.

2.4.3

Unsaturated Burial Depth

Groundwater elevations, and correspondingly, the depth to groundwater, may significantly

influence the continued use of the property for a cemetery. Groundwater elevations fluctuate

over 3 to 7 feet throughout the year. Historical groundwater data provided in Appendix C is

graphically summarized to show changes in groundwater elevations from March 2014 through

GEI Consultants, Inc.

Page 106 of 342

May 2016. As expected, groundwater elevations exhibit seasonal fluctuations and are generally

lower during the summer months (third quarter) relative to the other seasons.

Groundwater conditions representative of the third quarter of the year are presented in Figure 7

by mapping the average depth to groundwater recorded at monitoring well locations. As

indicated in Figure 7, most of the cemetery property maintains over 5 feet of unsaturated depth

with some areas south of the access road having over 6 feet of unsaturated depth.

Comparatively, the average depth to groundwater recorded in the remaining times of the year

(first, second and fourth quarters) are presented in Figure 8. As indicated in Figure 8, areas of

the cemetery with an unsaturated depth of over 5 feet are limited to areas immediately adjacent

to the subsurface drainage pipe.

Based on a statistical evaluation of available groundwater data, the probability of exceeding an

unsaturated depth of six feet was determined and results summarized on Figure 9. Monitoring

wells MW-9, MW-10, MW-11, and MW-12 have limited data and results are limited to the first

and second quarters only. At each of the existing monitoring well locations the probability that

an unsaturated thickness of at least six feet varies significantly throughout the year. At

monitoring wells located north of the access road (MW-2, MW-4 and MW-6) there is little

certainty that an unsaturated depth of six feet will ever be achieved. At some locations in the

southeast area of the site (MW-5, MW-7) there is increased potential that at least six feet of

unsaturated depth will be present, particularly during the third quarter of the year. The

information presented in Figure 9 suggests that, although six feet of unsaturated burial depth may

be present during certain times of the year, the probability that conditions will remain

unsaturated throughout the remainder of the year is very low.

GEI Consultants, Inc.

Page 107 of 342

3.

Alternatives for Continued Site Use

3.1

Overview

The Conceptual Site Model concludes there is a low probability that an unsaturated burial depth

of five to six feet can be maintained throughout the cemetery under current conditions.

Therefore, continued use of the site would require one of the following general approaches:

1. Modifying site conditions to achieve five to six feet of unsaturated burial depth, or

2. Modifying perceptions and practices to allow burials within saturated soils.

Although the scope of this alternatives analysis is largely focused on technical options for

modifying site conditions, we briefly explored the potential for cemetery operations under

current conditions. GEI contacted several cemetery operators through the Wisconsin Cemetery

and Cremation Association and Cemetery Operations Assistance and Solutions, and confirmed

that high groundwater in cemeteries is a relatively common condition, particularly in areas with

clay subsurface conditions (F. Groh, R. Roberts, G. Porter, personal communication, June 21,

2016). Typical mitigation practices include providing proper grading and drainage conditions,

waiting several days until surface water drains to perform burials in the springtime or after heavy

rains, and dewatering freshly dug grave sites to remove excess water. In addition, sealed vaults

are often used for burials in high groundwater locations as opposed to traditional vaults or grave

boxes. Concrete sealed vaults are typically heavy enough to overcome the buoyant forces

associated with a sealed vault. A full review of Wisconsin State Statue Chapter 157 does not

stipulate a minimum groundwater depth within a cemetery.

Modern cemeteries are not considered to be a significant source of groundwater contamination.

(Personal communication with Mr. Gary Edelstein, Wisconsin Department of Natural Resources,

July 12, 2016). A study completed in Ontario, Canada in 1992 concluded cemeteries do not

impact groundwater quality with formaldehyde or nitrogen.

3.2

Feasible Alternatives

The feasibility of corrective action alternatives depends on several factors including:

1. Effectiveness - the comparative degree the alternative will achieve a permanent condition

of an unsaturated burial depth of five to six feet. The relative practicality of each

alternative.

2. Ease of Implementation - the comparative technical and administrative feasibility of

alternatives related to the ease or difficulty and complexity of implementation including

the availability of materials and services as well as permitting requirements. The relative

level of future maintenance required to sustain the alternative.

GEI Consultants, Inc.

Page 108 of 342

3. Implementation Schedule - the comparative timeliness of the alternatives in terms of

achieving conditions under which continued use of the cemetery can proceed.

4. Site Disturbance - relative indication of the qualitative impact to the property as a result

of the remedy selection considering aesthetic quality and general public perception. The

comparative degree in which the remedy be implemented in such a way to preserve

natural features and limit site disturbance.

5. Economic - comparative direct and indirect costs of implementing the alternative,

including costs related to design, permitting, construction, equipment, site preparation,

labor and reporting. Includes comparative costs associated with maintenance, and costs

of performance evaluations, including monitoring and performance reporting. All costs

as probable based on estimated disposal, treatment and labor costs and estimated material

quantities.

The remedial action options discussed herein were developed specific to achieving an

unsaturated burial depth of five to six feet. Feasible corrective action alternatives consist of the

following:

1. Maintain typical burial practices

2. Add fill, provide drainage features and grade the site to raise surface elevations,

3. Expand the existing subsurface drainage system, and

4. Replace subsurface soil with more permeable fill, add drainage features.

Results of the alternatives analysis are summarized on Table 1 and subsequently discussed in

greater detail.

3.2.1

Maintain Typical Burial Practices

This alternative consists of maintaining typical burial practices which includes completing

burials at depths below the water table. We recognize the practical requirement of Wisconsin

State Statue 157.114, which states that a cemetery must provide for burials during each season.

Historical groundwater elevation data suggests that at some locations in the cemetery, during

certain times of the year (particularly the third quarter), the burial depth will be unsaturated.

However, encountering an unsaturated condition throughout the year, without implementing

groundwater control, is not likely.

3.2.2

Add Fill and Drainage to Raise Site Elevations

This alternative consists of placing imported fill across strategic portions of the site, similar to

improvements completed in 2008. The purpose of adding fill is to provide a gently sloping grade

to help prevent surface water ponding while raising surface elevations to increase burial depth.

Adding coarse-grained fill would enhance drainage efficiency and better transmit infiltration to

the drains.

GEI Consultants, Inc.

Page 109 of 342

As discussed previously, the added fill over the site has the potential to induce excess pore water

pressure in the clay causing groundwater levels to elevate. Therefore, implementation of this

option includes the addition of drainage features, such as wick drains, to control the pore water

pressure. Wick drains, also known as Prefabricated Vertical Drains (PVD) and Vertical Strip

Drains (VSD), are a ground improvement technique that provides drainage paths for pore water

in clay, using prefabricated geotextile filter-wrapped plastic strips with molded channels. The

installation of wick drains in addition to properly grading the site will allow for the excess pore

water pressure to be dissipated in a shorter period of time.

Wick drains consist of synthetic band-shaped material approximately 4 inches wide by ¼ inch

thick and are composed of a plastic strip with drainage channels, wrapped in a filter fabric. The

installation of the drains is performed using vibratory hammers and/or static methods, and the

wick drain layout typically consists of a triangular or square pattern. The water flows through

the drainage material vertically to a natural or constructed drainage feature.

To achieve five to six feet of unsaturated burial depth, we estimate the elevation of the existing

grade would need to be raised two to three additional feet. This will create elevated burial plots

which could be as high as six or seven feet above the existing access road elevation.

Aesthetically, this may not be an attractive alternative although landscaping and walking trails

could be incorporated to soften the effect of the grade changes.

Similar to other alternatives discussed, this approach can be limited to portions of the cemetery

site as opposed to the entire property. Specifically areas designated in the cemetery site plan

(Figure 10) Area A, B, C located on the west end of the site, Area F, G and Area J, K located in

the center of the site south of the access road.

By adding additional fill to the site, the underlying clay soils will likely settle, which could affect

the surface grading across the site and increase maintenance requirements related to this

alternative. Adding the wick drains will accelerate the settlement and reduce the impact to future

structures such as headstones.

3.2.3

Expand Existing Subsurface Drainage System

This alternative consists of placing additional drain tile throughout the site. Due to the finegrained nature and low permeability of the silty clay soils, the influence of subsurface drain pipe

will be limited. To be effective in controlling groundwater levels, a network of drain pipe,

installed less than ten feet apart would be necessary. Conceptually, the drain lines would be

installed between each row of burial plots which would provide an anticipated spacing of eight to

ten feet.

As an alternative to mitigating the entire cemetery property, the installation of additional

subsurface drain pipe could initially be limited to those areas of the cemetery designated as

family plots with additional drain lines added for future need. Additional drain lines located

south of the access road could be installed to drain to the existing header pipe. Drain pipe

installed north of the access road may require an active lift station consisting of a manhole and

discharge pump. As the system expands additional lift stations may be necessary.

GEI Consultants, Inc.

Page 110 of 342

3.2.4

Replace Subsurface Soil with Permeable Fill

The silty clay soil which is predominant throughout most of the cemetery property is poorly

drained requiring additional drainage features to control groundwater elevations. By removing

the silty clay and replacing it with imported sand fill, drainage and groundwater control could be

improved. Construction of the Oneida Fishery Restoration Project located near the northwest

corner of the intersection of CTY U and Crook Road in Outagamie County provides the

opportunity for importing sand fill to the cemetery site. The Fishery Restoration Project consists

of approximately 80 acres, portions of which will be excavated to expand an existing lake.

This alternative consists of completely replacing the subsurface with sandy soil generated from

the lake expansion. Replacing the silty clay with sandy soil will improve subsurface drainage

and increase the effectiveness of the existing and future subsurface drainage system. The sand

backfill alone will not result in an increased unsaturated burial depth and may actually cause an

increase in groundwater elevations as water accumulates in the sand backfill. Accordingly, this

option should not be implemented without expanding the subsurface drainage system and

installing a surface cover constructed of less permeable clay material.

Anticipated earthwork quantities to improve approximately 4.5 acres of the site are estimated at

approximately 30,000 cubic yards of excavation (about 1,800 truckloads), approximately 25,000

cubic yards of imported sand and reuse of approximately 5,000 cubic yards of clay to construct a

surface cover.

3.3

Evaluation of Alternatives

Table 1 provides a detailed comparative evaluation of each remediation alternative with regard to

the evaluation criterion. Comments regarding advantages, limitations, and comparative

similarities and differences of the individual alternatives are also provided. Table 1 also includes

a numerical score based on the order of preference of the alternatives relative to one another.

As indicated in Table 1, each criterion includes a weighting factor which can influence the final

weighted ranking of alternatives. The weighting factor allows an evaluation of alternatives

based on the relative importance of a specific condition such as cost or effectiveness.

Results of the comparative evaluation of remedial action alternatives conclude that, unweighted,

the alternative of maintaining typical burial practices is the highest ranked option for continued

use of the site. This is largely due to the low cost, no site disturbance, and ease of

implementation. However, the effectiveness of this option is comparatively low and does not

result in a permanent unsaturated burial depth. Modifying the weighting factor to increase the

relative importance of the effectiveness reduces the attractiveness of this alternative and suggests

site dewatering, with or without the addition of fill, would be an appropriate solution.

The numerical scoring and ranking system presented in Table 1 is not intended to result in a

definitive solution. Rather, it is intended to present the relative benefits and comparative

disadvantages of each alternative relative to evaluation criteria selected.

GEI Consultants, Inc.

Page 111 of 342

4.

Conclusions and Recommendations

4.1

Groundwater Control

Recommendations for continued site use largely depend on whether a five to six foot unsaturated

burial depth is a controlling factor in completing burials at this site. If an unsaturated burial

depth is required at all times throughout the year, we recommend expanding the existing

subsurface drainage system and importing additional fill as necessary. As previously concluded,

unless perceptions and practices are modified to accept burial within saturated soil, groundwater

control will be necessary to consistently lower groundwater elevations. The evaluation of

feasible alternatives indicates the option of replacing the clay subsoil with a sandy backfill is a

potentially costly effort which requires significant site disturbance to achieve. Conversely,

limiting burials to only the dry time of the year does not prevent groundwater from migrating

into burial sites during other times of the year. Therefore, constructing a more extensive

subsurface drainage system with the potential to increase ground surface elevations is likely the

most practical approach for continued use of the cemetery.

To reduce the cost of implementing site mitigation efforts, we recommend focusing groundwater

control on those areas of the cemetery where there is the greatest potential for success.

Specifically, we recommend that Area H and Area I, (identified on Figure 10) located in the

northeast portion of the property, be reserved for a use other than burial plots. Mitigating this

area to control groundwater elevations would be challenging. Alternatively this area may be

used for reforestation, parking or other gathering space.

Further limiting the areas requiring mitigation should also be considered. For example,

mitigation of Areas D and E, located north of the access road, could be limited to Rows 1 and 2;

Areas F and G could be limited to Rows 1 through 5 and Areas J and K could be limited to Rows

1 through 4. A subgrade drainage system consisting of drainage pipe installed to an elevation of

+700 between each row is expected to maintain groundwater levels below an elevation of +702.

Establishing a surface grade of +708 in these areas should provide the desired five to six feet of

unsaturated burial depth.

4.2

Modifying Perceptions and Practices

The potential to continue cemetery operations under current conditions was explored. This

would require the modification of perceptions that burials need to occur in unsaturated ground.

High groundwater in cemeteries is a relatively common condition, particularly in areas with

shallow clayey soils. As an alternative to maintaining an unsaturated burial depth, incorporating

sealed vaults, providing proper grading and drainage conditions, waiting several days until

surface water drains, and dewatering freshly excavated grave sites to remove excess water can be

GEI Consultants, Inc.

Page 112 of 342

practiced, eliminating the need for engineered groundwater control. These are typical mitigation

practices used in cemeteries with elevated water tables.

4.3

Surface Water Management

The filling and grading completed in 2008 appears to have reduced the surface water ponding

issues previously experienced. Although significant rainfall events will likely result in

temporary flooding, proper drainage and site grading currently being practiced should reduce the

extended impact of these events.

We recommend surface water runoff be directed away from the site through existing drainage

ditches. Grading and filling should be completed to limit the amount of surface water that can

enter the existing (or future) subsurface drainage systems.

4.4

Groundwater Monitoring

The benefit of continued groundwater monitoring also depends on whether an unsaturated burial

depth is a requirement for continued site use. If it is deemed acceptable to complete burials

below the water table, the benefit of continued groundwater monitoring would be limited and

frequent groundwater monitoring could be discontinued. If documentation of an unsaturated

burial depth is necessary, we recommend that groundwater conditions be monitored following

implementation of the selected mitigation alternative. Monitoring of groundwater elevations

can be limited to the areas of the site at which future burials will occur. This includes Areas A,

B and C at the west portion of the site; Areas D and E south of the access road; Areas F, G, J,

and K located north of the access road; and Areas L through W at the northeast end of the site.

As an alternative to installing conventional groundwater monitoring wells, it may be less

obtrusive to install pneumatic or vibrating wire piezometers to monitor groundwater elevations

(as pressure head) at critical locations. These piezometers convert water pressure to a

frequency signal via a diaphragm such that a change in pressure on the diaphragm causes a

change in the frequency signal transmitted to the readout device. The piezometers can be

grouted in a borehole and wired to a common surface monitoring location. Advantages include

reducing the surface casing visible throughout the cemetery, limiting the field monitoring effort

and providing consistent data.

4.5

Expansion to the East

According to soil boring and logs generated from exploration borings, the subsurface transitions

from clay to primarily silty sand on the property located east of the cemetery. Monitoring wells

previously installed on this property indicate adequate depth to groundwater to allow unsaturated

burials. We understand additional groundwater monitoring wells will be installed on this

property and groundwater elevations will be collected seasonally. Results of this groundwater

monitoring will confirm the potential use of that property for expanding the cemetery and assist

in defining specific limits for burial sites.

GEI Consultants, Inc.

Page 113 of 342

5. References

E.L.Oakes and L.J. Hamilton (1973) Hydrologic Investigations Atlas HA-470 MenomineeOconto-Peshtigo River Basin, United States Geologic Survey.

Graef, Anhalt, Schloemer & Associates, Inc. (2007). Oneida Cemetery Groundwater Monitoring

Project Oneida CIP Project #06-008, Oneida, Wisconsin. Prepared for Oneida Tribe of

Indians of Wisconsin, October 2007.

Graef, Anhalt, Schloemer & Associates, Inc. (2008). Final Monitoring Well Observations –

Oneida Cemetery Groundwater/Stormwater Corrections. Prepared for Oneida Tribe of

Indians of Wisconsin, March 12, 2008.

Graef, Anhalt, Schloemer & Associates, Inc. (2008). Additional Monitoring Well/Geoprobe

Drilling Soils and Groundwater Observations – Oneida Cemetery

Groundwater/Stormwater Corrections. Prepared for Oneida Tribe of Indians of

Wisconsin, July 8, 2008.

Graef, Anhalt, Schloemer & Associates, Inc. (2008). Ground/Storm Water Corrections Drawing

Sheet Set. Prepared for Oneida Tribe of Indians of Wisconsin, July 2008.

Chan, G.Soo, Scafe, M. and Emami, S., (1992) Cemeteries and Groundwater an Examination of

the Potential Contamination of Groundwater by Preservatives Containing

Formaldehyde. Ontario Ministry of the Environment, February 1992.

Midwest Engineering Services (2001). Test Pit Observations and Limited Site Feasibility

Analysis – Proposed Non-Denominational Cemetery, Adam Drive and County Highway

U, Town of Hobart, Wisconsin. Prepared for Oneida Tribe of Indians of Wisconsin, July

31, 2001.

Midwest Engineering Services (2014). Test Pit Observations and Limited Site Feasibility

Analysis – Proposed Non-Denominational Cemetery, Adam Drive and County Highway

U, Town of Hobart, Wisconsin. Prepared for Oneida Tribe of Indians of Wisconsin, July

31, 2001.

PSI USA (2016). Boring Logs and Well Construction Forms. Prepared for Oneida Tribe of

Indians of Wisconsin, February 9, 2016.

United States Department of Agriculture, Soil Conservation Service (1974), Soil Survey of

Brown County, Wisconsin.

United States Department of Agriculture, Soil Conservation Service (1978), Soil Survey of

Outagamie County, Wisconsin.

GEI Consultants, Inc.

Page 114 of 342

Tables

Table 1 Summary of Mitigation Alternatives

GEI Consultants, Inc.

Page 115 of 342

Table 1

Summary of Groundwater Mitigation Alternatives: Oneida Cemetery Hydrogeology Study, Oneida, WI

Mitigation Alternative

Maintain Typical Burial Practices

Raise Surface Elevations and Provide Additional Drainage

Expand Existing Subsurface Drainage System

Install additional drain tile throughout portions of the site designated as

Place imported fill across strategic portions of the site to provide a

Perform burials under existing site conditions recognizing the water

family plots with additional drain lines added for future need.

gently sloping grade to limit surface water ponding while raising surface

table will likely exceed the burial depth during certain times of the year.

Additional drain lines located south of the access road could be installed

elevations to increase burial depth. Therefore, implementation of this

Practice excavation dewatering as necessary and using sealed concrete

to drain to the existing header pipe. Drain pipe installed north of the

option includes the addition of vertical drainage features to provide

vaults for grave sites with high water table conditions.

access road may require an active lift station consisting of a manhole

drainage paths for pore water in clay.

and discharge pump.

The comparative degree the alternative will achieve a consistent

condition of an unsaturated burial depth of five to six feet. The

relative practicality of each alternative.

3

Rank

Implementability

The comparative technical and administrative feasibility of

alternatives related to the ease or difficulty and complexity of

implementation including the availability of materials and services as

well as permitting requirements. The relative level of future

maintenance required to sustain the alternative.

The comparative timeliness of the alternatives in terms of achieving

conditions under which continued use of the cemetery can proceed.

1

1

Rank

Site Disturbance

The relative qualitative impact to the property as a result of the

remedy selection considering aesthetic quality and general public

perception. The comparative degree to which the remedy preserves

natural features and limits site disturbance.

1

Rank

Economic

Comparative direct and indirect costs of implementing the

alternative, including costs related to design, permitting,

construction, equipment, site preparation, labor, and reporting.

Includes comparative costs associated with maintenance, and costs

of performance evaluations, including monitoring and performance

reporting.

Rank

Total Rank

Total Weighted Rank

Notes:

This option does not meet the criteria of establishing a consistent

unsaturated burial depth.

1

Rank

Implementation Schedule

Replace clay subsoil with sandy soil generated from the Oneida lake

expansion. Expand the existing subsurface drainage system and

construct a surface cover constructed of less permeable clay material.

Weight

Evaluation Criteria

Effectiveness

Replace Clay Subsoil With More Peremable Fill and Provide Additioal

Drainage

1

Importing additional fill without providing a means for draining excess

The success of this alternative in creating a permanent unsaturated

Subsurface drainage piping can lower the groundwater table to achieve

pore water is not recommended. With proper drainage systems

burial depth largely depends on the effectiveness of the surface cap and

a burial depth of 6 feet provided the pipe spacing is adequate and

installed, raising surface elevations is expected to create a permanenent

drainage system. Limiting infiltration and properly draining the subsoil

discharge capacity is available.

solution.

will result in a permanent condition.

4

2

The existing subsurface drainage system is functioning but the influence

This alternative is comparatively simple to implement but may not be Resources are avaliable, including imported fill material. The pore water of this system is limited. The lowest practical spacing for the drainage

socially accceptable. Implemetation of this alternative may require the

drainage system would require specialty construction methods and

pipe is likely the dimension of each burial plot, approxiamtely 8 to 10

use of sealed concrete vaults at most burial locations.

subgrade construction.

feet. Resources are available to complete construction. Off site surface

discharge or construction of an on‐site lift station are possible.

4

2

This option could be implemented relatively quickly,

The unsaturated burial depth should be achieved relatively quickly

following completion of this alternative. Settlement and pore water

drainage will be accelerated through the vertical wick drains.

4

3

No site disturbance under this alternative. Some temporary dewatering

may be necessary.

3

3

Resources available to complete the excavation and import sand is

available from the Oneida lake project. Some areas of deeper

excavation may require dewatering prior to backfilling.

1

Responsiveness of the clay subsoil to the expanded drainage system will Longer construction period required due the the extensive earthwork

be slow due to the low permeability. Once achieved, discharge from requirements. Sandy subsoil will be more resonsive to drainage systems

the system should be reduced and groundwater elevations maintained.

and changes in groundwater elevations will be accelerated.

2

1

Implementing this alternative will disturb the surface of the burial

locations at which the grades are raised and require time for restoration. Due to the narrow spacing of the drain lines, significant site work will be

Significant site disturbance will be required. Site work may extend over

Landscaping and other site improvements should be considered to

necessary during construction. Once the system is installed, the

multiple construction seasons.

preserve the natural aesthetics and soften the visual impact of the grade

presence of the drainage system should not be visually apparent.

changes.

4

2

3

1

Operation and maintence costs are not expected to increase from

current conditions. Additional costs will be incurred for the use of

sealed concrete vaults.

Will require earthwork and construction of a subsurface drainage

system. Total earthwork is estimated to be less than 15,000 cyds.

Maintenance costs will include groundwater monitoring and

maintenance of surface outfall.

Operation and maintenance costs related to this alternative include

operating a lift station that manages the volume of water which could

be generated under this alternative.

Earthwork and surface restoration costs will be greater than other

alternatives. Drainage system will manage a similar quantity of water

although the subgrade piping will be less than other alternatives.

4

2

3

1

17

13

13

7

19

21

17

13

Mitigation alternatives are ranked relative to one another on a scale of 1 = least favorable to 4 = most favorable.

Highest total rank indicates most favorable mitigation alternative.

Page 116 of 342

Figures

Figure 1 Site Location Map

Figure 2 Geoprobe and Monitoring Well Location Diagram

Figure 3 Groundwater Contour Map 3/12/2008

Figure 4 Groundwater Contour Map 4/6/2016

Figure 5 Cross Section A-A’

Figure 6 Cross Section B-B’

Figure 7 Depth to Groundwater, Average 3rd Quarter

Figure 8 Depth to Groundwater, Average 1st, 2nd and 4th Quarter

Figure 9 Probability of Depth to Groundwater Greater Than 6 Feet

Figure 10 Cemetery Site Plan

GEI Consultants, Inc.

Page 117 of 342

Legend

Parcel Boundary

Approximate Wetland Boundary

07-JUL-2016

K:\Oneida Tribe of Indians of WI\1603850_Oneida Cemetery Hydro Study\01_GIS\MXDs\1603850_figure01_SITE LOCATION MAP.mxd

CEF

FEMA Floodplain Limit (Brown County)

Site Location

Copyright:© 2013 National Geographic Society, i-cubed

Coordinate System: NAD 1983 StatePlane Wisconsin Central FIPS 4802 Feet

®

2,000

1,000

DRAFT

Note: Parcel boundary, FEMA_Floodplains_20110304_AutoCAD_DWG_Format

and WI DNR Wetland Boundaries downloaded from Brown County Land Information Office

Oneida Cemetery Improvements Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

0

2,000

Feet

Site Location Map and General Site Features

1603850

July 2016

Figure 1

Page 118 of 342

2443040 .2

2443440 .2

D MW-5

E

h

Well 4

h

Well 2

D

E

GP22

h

! GP4

A

!

A

!

A

Well 1 h

Well 3 hE

D

(

!

OP 1

h

Well 9 MW-3

h

Well 10

E MW-1

D

(

!

OP 4

(

!

OP 3

(

!

OP 2

!

A

GP9 MW8

A

@

D

E

MfB OP!( 5

GP3

h

Well 7

GP20

GP12

!

A

237873 .9

GP1

(

!

!

A

GP7

2008 Geoprobe

A

@

2008 Geoprobe and Monitoring Well

GP15

!

A

MeB

D

E

2008 Monitoring Well

h

Well 8

GP6

!

A

!

A

!

A

!

A

!

A

!

A

GP25

GP19

GP11

OP 6

GP18

GP10

!

A

!

A

GP5

!

A

237473 .9

USDA Web Soil Survey Data

237473 .9

Approximate Location of Tiling

4 inch Perforated/Corrugated Pipe

6 inch PVC

6 inch Perforated/Corrugated Pipe

Parcel Boundary

Notes:

Parcel boundary downloaded from Brown County Land Information Department

2008 Geoprobes and Monitoring Wells digitized from Graef Anhalt Schloemer and Associates Inc., 2006-2032.00, 2008

Soil Key:

KhB - Keewaunee silt loam

MfB - Manistee fine sandy loam

MeB - Manistee loamy fine sand

2441440 .2

0

®

DRAFT

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the

GIS User Community

2441840 .2

200

400

1 inch = 200 feet

Coordinate System: NAD 1983 StatePlane Wisconsin Central FIPS 4802 Feet

2442240 .2

Feet

800

2442640 .2

2443040 .2

2443440 .2

2444240 .2

GEOPROBE AND MONITORING WELL LOCATION

DIAGRAM (FROM 2007, 2008, 2014 AND 2016)

Oneida Cemetery Improvements - Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

2443840 .2

237073 .9

CEF

K:\Oneida Tribe of Indians of WI\1603850_Oneida Cemetery Hydro Study\01_GIS\MXDs\1603850_figure02_location diagram.mxd

07JUL2016

!

A

A

@

2014/2016 Observation Pipe

A

@

GP16

KhB

Type

GP26 MW10

!

A

GP2 MW9

2014/2016 Monitoring Well

!

A

!

A

h

GP8

Legend

GP24

GP17

!

A

Well 5

!

A

!

A

h

(

!

!

A

GP21

GP13

MW-2

Well 11

GP23

MW-6

D

E

h

h

2444240 .2

GP14

Well 12

MW-7

238273 .9

MW-4

D

E

Well 6

2443840 .2

238673 .9

2442640 .2

238273 .9

2442240 .2

237873 .9

2441840 .2

238673 .9

2441440 .2

1603850

DATE: July 2016

Figure 2

Page 119 of 342

702.35

689.38

696.38

699.35

D

E

699

698

697

696

695

700

694

693

692

701

690

691

237861 .2

238661 .2

A

@

GP25

!

A

GP19

GP11

!

A

!

A

!

A

GP15

!

A

!

A

!

A

GP18

!

A

GP5

!

A

237461 .2

!

A

695.31

!

A

A

@

GP1

GP26 MW10

GP16

GP10

237461 .2

Legend

Type

!

A

2008 Geoprobe

A

@

2008 Geoprobe and Monitoring Well

D

E

2008 Monitoring Well

1ft Groundwater Elevation Contours (03/12/2008)

Parcel Boundary

®

DRAFT

Notes:

Parcel boundary downloaded from Brown County Land Information Department

2008 Geoprobes and Monitoring Wells digitized from Graef Anhalt Schloemer and Associates Inc., 2006-2032.00, 2008

2441383 .2

0

2441783 .2

200

400

1 inch = 200 feet

Coordinate System: NAD 1983 StatePlane Wisconsin Central FIPS 4802 Feet

2442183 .2

Feet

800

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the

GIS User Community

2442583 .2

2442983 .2

2443383 .2

Oneida Cemetery Improvements - Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

2443783 .2

2444183 .2

237061 .2

CEF

!

A

696

K:\Oneida Tribe of Indians of WI\1603850_Oneida Cemetery Hydro Study\01_GIS\MXDs\1603850_figure03_2008_GWC.mxd

706

705

704

703

702

701

07JUL2016

!

A

GP2 MW9

GP6

GP20

GP12

!

A

GP7

!

A

!

A

GP8

697.61

GP24

GP17

!

A

69

8

703.15

A

@

GP3

5

69

705.21

MW-3

E MW-1

D

GP21

!

A

!

A

GP9 MW8

!

A

D

E

GP13

D

E

GP23

MW-6

MW-2

706.72

!

A

!

A

! GP4

A

702

70

0

D

E

689

D

E

2444183 .2

GP22

GP14

MW-4

3

70

MW-7

238261 .2

D MW-5

E

2443783 .2

238261 .2

703.58

2443383 .2

237861 .2

2442983 .2

69

5

2442583 .2

697

2442183 .2

69

9

2441783 .2

238661 .2

2441383 .2

GROUNDWATER CONTOUR MAP - (03/12/2008)

1603850

DATE: July 2016

Figure 3

Page 120 of 342

2442801 .5

2443201 .5

703

703

h

h

Well 2

Well 1 h

(

!

701

703

704

706.17

(

!

702

705

h

699.59

700

705

OP 2

Well 10

700

699.19

705.1

h

Well 9

699.33

(

!

OP 4

(

!

OP 3

699.02

(

!

OP 5

704.95

h

Well 5

703.32

h

Well 7

07JUL2016

237841

237841

701.11

(

!

OP 6

Legend

h

(

!

2014/2016 Monitoring Well

2014/2016 Observation Pipe

1ft Groundwater Elevation Contours (04/06/2016)

703.72

Approximate Location of Tiling

h

4 inch Perforated/Corrugated Pipe

Well 8

6 inch PVC

6 inch Perforated/Corrugated Pipe

Parcel Boundary

®

DRAFT

Notes:

Parcel boundary downloaded from Brown County Land Information Department

2008 Geoprobes and Monitoring Wells digitized from Graef Anhalt Schloemer and Associates Inc., 2006-2032.00, 2008

2441601 .5

0

2442001 .5

150

300

1 inch = 150 feet

Coordinate System: NAD 1983 StatePlane Wisconsin Central FIPS 4802 Feet

2442401 .5

Feet

600

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the

GIS User Community

2442801 .5

2443201 .5

Oneida Cemetery Improvements - Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

2443601 .5

237441

K:\Oneida Tribe of Indians of WI\1603850_Oneida Cemetery Hydro Study\01_GIS\MXDs\1603850_figure04_2016_GWC.mxd

CEF

OP 1

h

Well 12

h

Well 3 701.95

705

706

238241

702

Well 11

Well 4

704.57

706

706.75

h

h

Well 6 703.41

704.95

706.45

705.99

698.83

2443601 .5

238641

2442401 .5

238241

2442001 .5

238641

2441601 .5

GROUNDWATER CONTOUR MAP - (04/06/2016)

1603850

DATE: July 2016

Figure 4

Page 121 of 342

B

A'

A'

PLAN-SECTION A-A''

SCALE: NTS

EAST

A

WEST

A'

720

720

GP-24

(2008)

MW-5

(2014)

TOPSOIL (ML)

SAND FILL

TOPSOIL (ML)

SILTY SAND (SM)

TOPSOIL (ML)

710

ELEVATIONS (FT)

MW-10 MW-3

(2016) (2014)

SILTY CLAY

TO CLAYEY

SAND (CL-SC)

MW-7

(2007)

GP-13

(2008)

SILTY CLAY (CL)

SILTY SANDY CLAY (CL)

SILTY CLAY (CL)

SILTY CLAY (CL)

SILTY SAND (SM)

ACCESS ROAD

SILTY CLAY (CL)

SILTY CLAY (CL)

CLAYEY SILTY

SAND (SC-SM)

SILTY

CLAY

(CL)

700

CLAYEY SILT (ML)

SANDY CLAY (CL)

MW-7

(2014)

GP-21

(2008)

GP-17

(2008)

EOB

SILTY SAND (SM)

SILTY CLAY (CL)

SILTY SAND (SM)

EOB

SILTY SAND

(SM)

CLAYEY SILT (ML)

EOB

EOB

SILTY SAND (SM)

SILTY CLAY (CL)

SILTY

SAND

(SM)

EOB

SILTY SAND (SM)

EOB

700

EOB

EOB

EOB

690

690

ELEVATIONS (FT)

MW-1

(2014)

SILTY CLAY (CL)

SILTY SAND (SM)

SILTY CLAY (CL)

EOB

SILTY SAND (SM)

680

680

DRAFT

CROSS-SECTION A-A'

HORIZONTAL SCALE: 1"=200'

VERTICAL SCALE: 1"=10'

Oneida Cemetery Improvements Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

CROSS-SECTION A-A'

Project 1603850

July 2016

Figure 5

J:\2016\1603850-ONEIDA-CEM\DWG\1603850 xs A

Page 122 of 342

B

B'

PLAN-SECTION B-B'

SCALE: NTS

720

MW-12

(2016)

MW-5

(2007)

MW-3

(2014)

SOUTH

B'

MW-10

(2016)

720

SILTY SAND (SM)

TOPSOIL (ML)

SILTY CLAY (FILL)

TOPSOIL (ML)

SAND (FILL)

MW-8

(2014)

SAND TRACE GRAVEL (FILL)

ELEVATIONS (FT)

710

SILTY CLAY (CL)

SILTY

CLAY

(CL)

SILTY SAND (SM)

SILTY SAND (SM)

700

690

710

TOPSOIL (ML)

LEAN CLAY, TRACE SAND

& GRAVEL (CL)

CLAYEY SAND (SC)

SANDY CLAY (CL)

EOB

SILTY CLAY TO

CLAYEY SILT

(CL)

SILTY

CLAY

(CL)

EOB

EOB

SILTY

SANDY

CLAY (CL)

EOB

SILTY CLAYEY

SAND (SM-SC)

SILTY SAND (SM)

SILTY CLAY TO

CLAYEY SILT

(CL-ML)

700

ELEVATIONS (FT)

NORTH

B

DISCHARGE PIPE AT ELEV. 700

SANDY SILT (ML)

SANDY CLAYEY

SILT (ML)

DRAFT

EOB

690

CROSS-SECTION B-B'

HORIZONTAL SCALE: 1"=100'

VERTICAL SCALE: 1"=10'

Oneida Cemetery Improvements Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

CROSS-SECTION B-B'

Project 1603850

July 2016

Figure 6

J:\2016\1603850-ONEIDA-CEM\DWG\1603850 xs A

Page 123 of 342

2443040 .2

D MW-5

E

h

Well 2

h

Well 4

D

E

h

h

(

!

OP 1

4

h

3.6! GP4

A

h

(

!

Well 10

7.46

(

!

6.47

(

!

Well 9 MW-3

5.24

OP 4

GP21

D

E

(

!

5.21

OP 5

A

@6.86

h

Well 5

GP3

Well 7

GP20

GP12

!

A

GP16

237873 .9

OP 6

GP1

!

A

!

A

!

A

GP7

GP15

!

A

!

A

Legend

GP18

GP10

h

!

A

2008 Geoprobe

A

@

2008 Geoprobe and Monitoring Well

D

E

2008 Monitoring Well

!

A

!

A

6.49

Well 8

GP6

!

A

GP5

!

A

237473 .9

237473 .9

version

new

Approximate Location of Tiling

4 inch Perforated/Corrugated Pipe

6 inch PVC

6 inch Perforated/Corrugated Pipe

0

Parcel Boundary

®

DRAFT

Notes:

Parcel boundary downloaded from Brown County Land Information Department

2008 Geoprobes and Monitoring Wells digitized from Graef Anhalt Schloemer and Associates Inc., 2006-2032.00, 2008

Groundwater elevation data from March 2014 through May 2016

2441440 .2

0

2441840 .2

200

400

1 inch = 200 feet

Coordinate System: NAD 1983 StatePlane Wisconsin Central FIPS 4802 Feet

2442240 .2

Feet

800

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the

GIS User Community

2442640 .2

2443040 .2

2443440 .2

2444240 .2

DEPTH TO GROUNDWATER AVERAGE 3RD QUARTER

Oneida Cemetery Improvements - Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

2443840 .2

237073 .9

CEF

K:\Oneida Tribe of Indians of WI\1603850_Oneida Cemetery Hydro Study\01_GIS\MXDs\1603850_figure07_DTGW_Q3AV.mxd

6.14

!

A

6

07JUL2016

GP25

GP19

GP11

Type

A

@

!

A

A

@

2014/2016 Monitoring Well

GP26 MW10

!

A

6

!

A

(

!

!

A

!

A

h

GP8

GP24

GP17

!

A

6.2

GP2 MW9

2014/2016 Observation Pipe

!

A

!

A

!

A

GP9 MW8

6

h

(

!

GP23

MW-6

GP13

h

OP 3

OP 2

GP22

!

A

!

A

5

Well 3 hE

D

5.71

7

2444240 .2

GP14

MW-2

Well 11

Well 1 h MW-1

D

E

6.58

7.13

MW-4

D

E

Well 6

2443840 .2

D

E

Well 12

MW-7

238273 .9

3.54

5.34

2443440 .2

238673 .9

2442640 .2

238273 .9

2442240 .2

237873 .9

2441840 .2

238673 .9

2441440 .2

1603850

DATE: July 2016

Figure 7

Page 124 of 342

2443040 .2

D MW-5

E

238273 .9

2.71

Well 2

4

MW-7

2

h

2.67

h

6

Well 1 h MW-1

D

E

3.88

7.13

(

!

OP 1

7

1.78

h

Well 4

3

(

!

7.46

GP22

h

1.64! GP4

A

!

A

!

A

Well 3 hE

D

4.63

4.75 h

Well 10

6.47

OP 2

(

!

6

h

(

!

Well 9 MW-3

5.24

OP 4

5

D

E

(

!

5.21

OP 5

A

@5.67

h

Well 5

!

A

!

A

GP9 MW8

GP3

Well 7

GP20

GP12

!

A

237873 .9

GP11

GP1

!

A

GP7

GP15

!

A

GP18

!

A

2014/2016 Observation Pipe

2008 Geoprobe

A

@

2008 Geoprobe and Monitoring Well

D

E

2008 Monitoring Well

GP5

!

A

237473 .9

Type

!

A

!

A

!

A

3.96

GP6

!

A

!

A

!

A

GP10

237473 .9

1,2,4th Quarter Average Depth to Groundwater (ft)

Approximate Location of Tiling

4 inch Perforated/Corrugated Pipe

0

6 inch PVC

6 inch Perforated/Corrugated Pipe

Parcel Boundary

®

DRAFT

Notes:

Parcel boundary downloaded from Brown County Land Information Department

2008 Geoprobes and Monitoring Wells digitized from Graef Anhalt Schloemer and Associates Inc., 2006-2032.00, 2008

Groundwater elevation data from March 2014 through May 2016

2441440 .2

0

2441840 .2

200

400

1 inch = 200 feet

Coordinate System: NAD 1983 StatePlane Wisconsin Central FIPS 4802 Feet

2442240 .2

Feet

800

Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the

GIS User Community

2442640 .2

2443040 .2

2443440 .2

2444240 .2

DEPTH TO GROUNDWATER AVERAGE 1, 2 AND 4TH QUARTERS

Oneida Cemetery Improvements - Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

2443840 .2

237073 .9

CEF

K:\Oneida Tribe of Indians of WI\1603850_Oneida Cemetery Hydro Study\01_GIS\MXDs\1603850_figure08_DTGW_Q124AV.mxd

07JUL2016

GP25

GP19

!

A

2014/2016 Monitoring Well

A

@

!

A

A

@

6.14

OP 6

h

GP26 MW10

!

A

GP16

6

Well 8

!

A

!

A

h

GP2 MW9

(

!

GP24

GP17

!

A

4.03

GP8

h

(

!

!

A

GP21

GP13

3

!

A

Legend

GP23

MW-6

D

E

MW-2

OP 3

2444240 .2

GP14

h

5

Well 11

MW-4

D

E

Well 6

2443840 .2

Well 12

3.52

D

E

2443440 .2

238673 .9

2442640 .2

238273 .9

2442240 .2

237873 .9

2441840 .2

238673 .9

2441440 .2

1603850

DATE: July 2016

Figure 8

Page 125 of 342

Quarter

1

2

3

4

Quarter

1

2

3

4

Well 11

4%

10%

Well 1

24%

2%

66%

18%

Well 2

13%

0%

34%

5%

Well 2

237992 

Quarter

1

2

3

4

Well 12

0%

10%

h

Well 4

2%

0%

5%

0%

Well 6

h

Well 4

h

h

Well 11

Well 3

h Well 9

h

h Well 10

Well 1 h

Quarter

1

2

3

4

(

!

OP 3

(

!

Well 3

27%

7%

34%

11%

OP 4

(

!

OP 2

Quarter

1

2

Well 10

31%

36%

Quarter

1

2

(

!

OP 5

2443828 

Quarter

1

2

3

4

Well 6

0%

0%

3%

2%

Quarter

1

2

3

4

Well 5

34%

23%

91%

53%

2444228 

Well 7

h

Well 5

h

Quarter

1

2

3

4

Well 9

0%

7%

Well 7

10%

3%

61%

23%

(

!

OP 6

Quarter

1

2

3

4

Legend

h

(

!



 



 

874<

8:472

'055



 



 

- ;

0: >

,<

487490

Approximate Location of Tiling



47. 30: 18:, <

0/ 

8::=2, <

0/ 490



47. 3&



47. 30: 18:, <

0/ 

8::=2, <

0/ 490

, :. 05

8=7

/ , :A



2441828 







47. 3





100<

Well 8

6%

0%

81%

25%

®

DRAFT

8<

0;





, :. 05

- 8=7/ , :A

/ 8?758, / 0/ 

1:86 

:8?7

8=7<

A

, 7/ 



718:6 , <

487

09, :<

6 07<

 

089:8- 0;



, 7/ 

874<

8:472

'055;



/ 424<

4B0/ 

1:86 

:, 01

73, 5<



#. 35806 0:

, 7/ 

;

;8. 4, <

0;





7. 





 

 







2441428 

Well 8

237592 

h

88:/ 47, <

0

#A;

<

06 





 

#<

,<

0 5, 70

'4;

. 87;

47

07<

:, 5

# 

00<

2442228 

00<



#8=:. 0



;

:4



424<

, 558- 0



08A0



, :<

3;

<

, :

082:, 934. ;





#

4:- =;



#



%#



%##



(



0<

6 , 99472



0:82:4/ 















;

?4;

;

<

898



, 7/ 

<

30



#

%;

0:

86 6 =74<

A

2442628 

2443028 

2443428 

2444228 

"



$)



 $

$

"%'$"

"$"

$C



#%")

)

!%"$"

704/ , 

06 0<

0:A



6 9:8>06 07<

;





A/ :8208582A

#<

=/ A

704/ , 

$:4- 0

81



7/ 4, 7;

81

'4;. 87;47

2443828 

237192 

237592 

+142=:0+$'+ "

6 @/ 













2443428 

Well 12

OP 1

+704/ , 

06 0<

0:A

A/ :8

#<

=/ A*

+

#*

(;*



Quarter

1

2

h

(

!

 % 













*

704/ , 

$:4- 0

81



7/ 4, 7;

81

'

*



2443028 

238792 

2442628 

238392 

238392 

Quarter

1

2

2442228 

237992 

2441828 

238792 

2441428 





$



=5A



42=:0



07JUL2016

K:\Oneida Tribe of Indians of WI\1603850_Oneida Cemetery Hydro Study\01_GIS\MXDs\1603850_figure11_cemetary site plan.mxd

CEF

Page 126 of 342

®

DRAFT

Oneida Cemetery Improvements - Hydrogeology Study

Oneida Tribe of Indians of Wisconsin

1603850

DATE: July 2016

Not to Scale

CEMETERY SITE PLAN

Figure 10

Page 127 of 342

Oneida Cemetery Improvements – Hydrogeologic Study

Oneida Cemetery

Oneida, Wisconsin

July 2016

Appendix A

Groundwater Elevation Records

Drainage System Discharge Records

Precipitation Data

DRAFT

GEI Consultants, Inc.

Page 128 of 342

Table A.1

Groundwater Elevation Data From 2007-2008: Oneida Cemetery Hydrogeology Study, Oneida, WI

Well 1

4/23/2007

551798.5

55436.91

706.51

706.69

Well 2

4/23/2007

551852.04

55866.3

707.73

708.14

Well 3

4/23/2007

551769.89

56262.07

704.2

704.75

Well 4

4/23/2007

552041.07

56368.34

702.67

702.88

Well 5

4/23/2007

552086.59

55873.94

706.29

706.65

Well 6

4/23/2007

551950.35

56952.28

716.66

713.33

Well 7

4/23/2007

551937.63

54640.24

699.16

696.01

Well 8

3/4/2008

Well 9

3/3/2008

Well 10

3/5/2008

Installation Date

Brown County Northing

Coordinates

Easting

Top of Casing Elevation (ft)

Ground Surface Elevation

Top of Filter Pack Sand

706.2

706.6

703.3

700.4

705.2

706.3

694.5

3.1

bgs

8

bgs

8.6

bgs

Elevation (ft)

704.2

706.1

702.8

698.4

704.7

703.3

694

Top of Screen Elevation (ft)

4

bgs

9

bgs

9

bgs

695.2

695.8

692.9

689.6

694.7

693.3

681.1

Bottom of Screen Elevation

14

bgs

19

bgs

19

bgs

Date

Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft)

5/4/2007

1.02

705.49

1.23

706.50

0.93

701.74

2.59

703.70

18.59

698.07

7.25

691.91

6/22/2007

2.91

703.60

2.30

705.43

2.45

701.75

2.75

699.92

4.53

701.76

19.12

697.54

9.28

689.88

7/20/2007

5.87

700.64

3.90

703.83

5.78

698.42

4.15

698.52

6.54

699.75

19.36

697.30

11.44

687.72

8/17/2007

9.34

697.17

5.83

701.90

8.51

695.69

7.38

695.29

9.21

697.08

20.20

696.46

13.78

685.38

10/29/2007

10.45

696.06

3.85

703.88

7.05

697.15

4.95

697.72

7.45

698.84

20.85

695.81

14.65

684.51

11/28/2007

10.65

695.86

5.59

702.14

7.89

696.31

5.69

696.98

9.11

697.18

20.99

695.67

14.88

684.28

1/9/2008

4.55

701.96

1.24

706.49

0.73

703.47

1.19

701.48

4.43

701.86

21.04

695.62

2/13/2008

3.70

702.81

2.52

705.21

2.83

701.87

1.10

701.57

4.08

702.21

20.39

696.27

12.25

686.91

3/12/2008

1.30

705.21

1.01

706.72

1.05

703.15

0.32

702.35

2.71

703.58

20.28

696.38

9.78

689.38

5.84

699.35

11.36

697.61

12.17

695.31

4/18/2008

0.14

706.37

0.60

707.13

(0.38)

704.58

(0.08)

702.75

1.50

704.79

18.62

698.04

4.95

694.21

2.32

702.87

7.85

701.12

10.42

697.06

5/19/2008

1.95

704.56

2.46

705.27

1.76

702.44

1.96

700.71

3.63

702.66

17.85

698.81

6.03

693.13

4.67

700.52

8.41

700.56

10.34

697.14

7/2/2008

2.95

703.56

2.97

704.76

2.60

701.60

3.95

698.72

4.74

701.55

17.61

699.05

6.62

692.54

5.15

700.04

8.81

700.16

10.01

697.47

DRAFT

Page 129 of 342

Table A.2

Groundwater Elevation Data From 2014-present: Oneida Cemetery Hydrogeology Study, Oneida, WI

Installation Date

WI State Plane

Northing

Central Coordinates Easting

Top of Casing Elevation (ft)

Ground Surface Elevation (ft)

Well 1

2/20/2014

238204.121

2442278.515

708.99

707.25

Well 2

2/20/2014

238413.961

2442544.793

707.78

706.77

Well 3

2/20/2014

238255.165

2442718.364

710.65

708.84

Well 4

2/20/2014

238432.61

2443033.284

707.03

705.29

Well 5

2/20/2014

238163.59

2443283.245

708.48

706.56

Well 6

3/3/2014

238459.255

2443377.535

706.11

703.63

Well 7

3/3/2014

238140.114

2443408.624

707.77

705.71

Well 8

3/3/2014

237621.57

2442896.827

707.72

705.58

Well 9

2/9/2016

238245.539

2443062.181

710.4

708.31

Well 10

2/9/2016

238210.03

2442680.817

712.77

710.5

Well 11

2/8/2016

238289.651

2442357.365

713.35

710.86

Well 12

2/9/2016

238367.948

2442693.99

713.07

710.48

704.25

707.25

707.86

707.48

707.86

697.36

Depth (ft)

Elevation (ft)

707.48

696.98

Depth (ft)

Elevation (ft)

Top of Filter Pack Sand

Elevation (ft)

704.25

707.25

Top of Screen Elevation (ft)

693.75

697

Bottom of Screen Elevation (ft)

Date

Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft) Depth (ft) Elevation (ft)

3/11/2014

6.36

700.89

4.99

701.78

5.59

703.25

4.26

701.03

6.48

700.08

2.92

700.71

5.64

700.07

4.86

700.72

3/17/2014

4.56

702.69

2.59

704.18

4.79

704.05

0.86

704.43

5.48

701.08

0.52

703.11

3.14

702.57

3.86

701.72

3/21/2014

4.76

702.49

3.2

703.57

4.69

704.15

1.01

704.28

5.58

700.98

0.52

703.11

3.11

702.6

3.86

701.72

3/24/2014

3.76

703.49

2.16

704.61

5.19

703.65

0.51

704.78

4.33

702.23

0.52

703.11

3.6

702.11

3.86

701.72

3/27/2014

4.43

702.82

2.16

704.61

6.67

702.17

2.33

702.96

5.33

701.23

0.35

703.28

3.36

702.35

4.19

701.39

4/1/2014

2.93

704.32

1.41

705.36

3.61

705.23

0.59

704.7

5.25

701.31

0.35

703.28

2.77

702.94

2.78

702.8

4/7/2014

2.76

704.49

1.41

705.36

3.44

705.4

0.68

704.61

5.33

701.23

0.42

703.21

3.11

702.6

2.69

702.89

4/14/2014

2.09

705.16

1.41

705.36

1.48

707.36

0.39

704.9

4.08

702.48

0.19

703.44

1.19

704.52

1.53

704.05

4/17/2014

2.26

704.99

1.07

705.7

3.11

705.73

0.43

704.86

4.87

701.69

0.27

703.36

2.36

703.35

2.03

703.55

4/24/2014

3.26

703.99

2.07

704.7

4.36

704.48

1.34

703.95

5

701.56

1.19

702.44

3.86

701.85

3.03

702.55

4/25/2014

2.59

704.66

1.19

705.58

4.19

704.65

0.68

704.61

4.83

701.73

0.52

703.11

3.61

702.1

2.44

703.14

4/30/2014

2.43

704.82

1.16

705.61

3.44

705.4

0.49

704.83

4.08

702.48

0.52

703.11

2.52

703.19

5/8/2014

2.97

704.28

1.7

705.07

4.27

704.57

0.89

704.4

5.41

701.15

0.9

702.73

3.82

701.89

2.69

702.89

5/13/2014

2.34

704.91

1.24

705.53

4.27

704.57

0.51

704.78

5.08

701.48

0.35

703.28

2.19

703.52

2.03

703.55

5/20/2014

2.68

704.57

1.16

705.61

3.73

705.11

0.59

704.7

5.58

700.98

0.52

703.11

3.19

702.52

3.65

701.93

5/27/2014

4.01

703.24

3.16

703.61

4.94

703.9

2.26

703.03

6

700.56

2.31

701.32

4.69

701.02

3.65

701.93

7/16/2014

6.26

700.99

5.74

701.03

6.19

702.65

4.18

701.11

6.58

699.98

4.27

699.36

6.27

699.44

5.94

699.64

8/7/2014

7.76

699.49

6.66

700.11

6.61

702.23

5.01

700.28

7.58

698.98

4.52

699.11

6.77

698.94

6.86

698.72

9/16/2014

4.59

702.66

3.07

703.7

4.94

703.9

1.59

703.7

6.08

700.48

2.1

701.53

5.02

700.69

5.86

699.72

10/21/2014

3.93

703.32

1.91

704.86

4.19

704.65

1.09

704.2

6

700.56

1.85

701.78

4.94

700.77

5.28

700.3

12/26/2014

3.59

703.66

1.66

705.11

3.94

704.9

0.59

704.7

5.33

701.23

0.77

702.86

3.44

702.27

3.28

702.3

1/27/2015

5.93

701.32

4.99

701.78

6.69

702.15

4.01

701.28

6.75

699.81

3.27

700.36

4.61

701.1

4.86

700.72

3/9/2015

7.26

699.99

6.99

699.78

7.19

701.65

5.26

700.03

5.91

700.65

4.52

699.11

5.61

700.1

5.86

699.72

3/16/2015

6.26

700.99

5.99

700.78

6.19

702.65

4.26

701.03

6.33

700.23

3.52

700.11

5.52

700.19

4.86

700.72

3/23/2015

6.51

700.74

5.82

700.95

5.94

702.9

4.01

701.28

6.83

699.73

3.35

700.28

5.77

699.94

5.03

700.55

3/30/2015

6.26

700.99

5.57

701.2

5.44

703.4

3.93

701.36

6.41

700.15

3.27

700.36

5.61

700.1

4.86

700.72

4/6/2015

5.26

701.99

4.24

702.53

5.19

703.65

2.68

702.61

6.08

700.48

2.02

701.61

5.02

700.69

4.19

701.39

4/13/2015

3.43

703.82

1.91

704.86

4.69

704.15

1.01

704.28

5.66

700.9

0.77

702.86

4.36

701.35

3.36

702.22

4/20/2015

4.18

703.07

2.32

704.45

4.86

703.98

1.26

704.03

5.75

700.81

1.1

702.53

4.61

701.1

3.53

702.05

5/4/2015

5.43

701.82

4.41

702.36

5.44

703.4

3.18

702.11

6.41

700.15

3.44

700.19

5.69

700.02

4.61

700.97

5/11/2015

5.76

701.49

4.82

701.95

5.69

703.15

3.43

701.86

6.41

700.15

3.77

699.86

5.69

700.02

4.69

700.89

5/26/2015

6.09

701.16

5.07

701.7

5.02

703.82

3.18

702.11

6.08

700.48

2.35

701.28

5.36

700.35

3.86

701.72

8/10/2015

8.09

699.16

6.82

699.95

5.77

703.07

4.68

700.61

7.5

699.06

4.77

698.86

6.77

698.94

7.11

698.47

9/11/2015

6.18

701.07

4.41

702.36

5.02

703.82

2.26

703.03

6.58

699.98

2.35

701.28

6.19

699.52

6.69

698.89

10/22/2015

7.76

699.49

6.24

700.53

6.52

702.32

4.51

700.78

7.75

698.81

5.1

698.53

7.36

698.35

7.11

698.47

12/2/2015

2.59

704.66

1.41

705.36

4.19

704.65

0.68

704.61

6.58

699.98

1.52

702.11

4.94

700.77

5.53

700.05

12/16/2015

1.59

705.66

0.99

705.78

2.77

706.07

0.47

704.82

4.83

701.73

0.19

703.44

2.19

703.52

3.06

702.52

1/21/2016

3.93

703.32

2.32

704.45

4.86

703.98

2.51

702.78

6.08

700.48

2.72

700.91

5.14

700.57

5.28

700.3

2/23/2016

3.84

703.41

2.24

704.53

5.02

703.82

2.01

703.28

5.08

701.48

0.72

702.91

3.02

702.69

3.53

702.05

3/9/16

1.26

705.99

0.24

706.53

3.44

705.40

0.68

704.61

4.66

701.90

0.19

703.44

2.02

703.69

2.11

703.47

3.08

705.23

7.23

703.27

3/17/16

1.26

705.99

0.32

706.45

2.77

706.07

0.18

705.11

4.58

701.98

0.19

703.44

1.19

704.52

1.78

703.80

2.49

705.82

4.73

705.77

3/23/16

2.01

705.24

1.24

705.53

4.11

704.73

1.05

704.24

5.91

700.65

0.94

702.69

3.27

702.44

2.69

702.89

3.58

704.73

4.98

705.52

DRAFT

3/31/16

4/6/16

4/14/16

4/20/16

4/26/16

5/10/16

0.43

1.26

1.66

2.66

3.06

4.36

5.51

2.51

3.76

705.35

708.35

707.10

3.33

2.41

2.99

707.15

708.07

707.49

706.82

0.24

706.53

2.94

705.90

1.18

704.11

4.41

702.15

1.02

702.61

0.86

704.85

1.28

704.30

2.41

705.90

4.56

705.94

3.01

707.85

1.41

709.07

705.99

705.59

704.59

704.19

702.89

0.32

0.79

2.69

2.69

3.39

706.45

705.98

704.08

704.08

703.38

6.89

4.09

4.49

4.69

5.19

701.95

704.75

704.35

704.15

703.65

0.34

0.56

1.56

1.66

2.86

704.95

704.73

703.73

703.63

702.43

1.61

5.08

5.38

5.58

5.78

704.95

701.48

701.18

700.98

700.78

0.22

-0.18

1.42

1.32

2.62

703.41

703.81

702.21

702.31

701.01

2.39

2.84

3.44

3.64

4.34

703.32

702.87

702.27

702.07

701.37

1.86

2.26

2.86

2.86

3.46

703.72

703.32

702.72

702.72

702.12

3.21

3.31

4.41

4.91

5.91

705.1

705

703.9

703.4

702.4

4.33

5.03

5.43

6.13

7.13

706.17

705.47

705.07

704.37

703.37

4.11

4.11

4.61

5.01

6.31

706.75

706.75

706.25

705.85

704.55

5.91

3.01

3.51

3.91

5.51

704.57

707.47

706.97

706.57

704.97

Page 130 of 342

Table A.3

Drain Tile Discharge Data From 2014-present: Oneida Cemetery Hydrogeology Study, Oneida, WI

Date

3/11/2014

3/14/2014

3/19/2014

3/21/2014

3/26/2014

3/28/2014

3/31/2014

4/7/2014

4/14/2014

4/17/2014

4/24/2014

4/25/2014

4/30/2014

5/8/2014

5/13/2014

5/20/2014

7/16/2014

8/7/2014

9/16/2014

10/21/2014

12/26/2014

1/27/2015

3/9/2015

3/16/2015

3/23/2015

3/30/2015

4/6/2015

4/13/2015

4/20/2015

5/4/2015

5/11/2015

5/26/2015

8/10/2015

9/11/2015

10/22/2015

12/2/2015

12/16/2015

1/21/2016

2/23/2016

3/9/2016

3/17/2016

3/23/2016

3/31/2016

4/6/2016

4/14/2016

4/20/2016

4/26/2016

5/10/2016

GPM

4.0

5.0

7.0

7.3

8.0

13.3

18.0

23.0

44.0

24.0

15.0

22.0

26.0

17.0

28.0

20.0

1.8

1.0

5.5

6.0

18.0

4.0

2.0

4.0

4.0

3.0

5.5

15.0

10.0

6.0

5.5

8.5

1.0

3.0

0.3

12.0

49.0

5.0

10.0

43.0

42.0

16.2

42.5

28.3

21.5

15.4

15.8

10.0

DRAFT

Page 131 of 342

Table A.4

Rainfall Data From April 2007 to July 2008 and from March 2014 to present: Oneida Cemetery Hydrogeology Study, Oneida, WI

Date

4/1/2007

4/2/2007

4/3/2007

4/4/2007

4/5/2007

4/6/2007

4/7/2007

4/8/2007

4/9/2007

4/10/2007

4/11/2007

4/12/2007

4/13/2007

4/14/2007

4/15/2007

4/16/2007

4/17/2007

4/18/2007

4/19/2007

4/20/2007

4/21/2007

4/22/2007

4/23/2007

4/24/2007

4/25/2007

4/26/2007

4/27/2007

4/28/2007

4/29/2007

4/30/2007

5/1/2007

5/2/2007

5/3/2007

5/4/2007

5/5/2007

5/6/2007

5/7/2007

5/8/2007

5/9/2007

5/10/2007

5/11/2007

5/12/2007

5/13/2007

5/14/2007

5/15/2007

5/16/2007

5/17/2007

5/18/2007

5/19/2007

5/20/2007

5/21/2007

5/22/2007

5/23/2007

5/24/2007

5/25/2007

5/26/2007

5/27/2007

5/28/2007

5/29/2007

5/30/2007

5/31/2007

6/1/2007

6/2/2007

6/3/2007

6/4/2007

6/5/2007

6/6/2007

6/7/2007

6/8/2007

6/9/2007

6/10/2007

6/11/2007

6/12/2007

Daily Precipitation (in.)

0.16

0

0.07

0.02

0

0

0.03

0

0.12

0

0.3

0.08

0

0

0

0

0.01

0.01

0

0

0

0

0.11

0

0.01

0.54

0.08

0

0

0.18

0.55

0

0

0

0

0

0

0

0.01

0

0

0

0.05

0.04

0.64

0

0

0

0.02

0

0.09

0

0

0.22

0

0.12

0

0

0

0.08

0.57

0.01

0.35

1.39

0.25

0.06

0.07

0.47

0

0

0

0

0

Note: Weather Underground

obtained daily rainfall data from

Austin Straubel International

Airport. Website:

https://www.wunderground.co

m/history/airport/KGRB

DRAFT

Page 132 of 342

Table A.4

Rainfall Data From April 2007 to July 2008 and from March 2014 to present: Oneida Cemetery Hydrogeology Study, Oneida, WI

6/13/2007

6/14/2007

6/15/2007

6/16/2007

6/17/2007

6/18/2007

6/19/2007

6/20/2007

6/21/2007

6/22/2007

6/23/2007

6/24/2007

6/25/2007

6/26/2007

6/27/2007

6/28/2007

6/29/2007

6/30/2007

7/1/2007

7/2/2007

7/3/2007

7/4/2007

7/5/2007

7/6/2007

7/7/2007

7/8/2007

7/9/2007

7/10/2007

7/11/2007

7/12/2007

7/13/2007

7/14/2007

7/15/2007

7/16/2007

7/17/2007

7/18/2007

7/19/2007

7/20/2007

7/21/2007

7/22/2007

7/23/2007

7/24/2007

7/25/2007

7/26/2007

7/27/2007

7/28/2007

7/29/2007

7/30/2007

7/31/2007

8/1/2007

8/2/2007

8/3/2007

8/4/2007

8/5/2007

8/6/2007

8/7/2007

8/8/2007

8/9/2007

8/10/2007

8/11/2007

8/12/2007

8/13/2007

8/14/2007

8/15/2007

8/16/2007

8/17/2007

8/18/2007

8/19/2007

8/20/2007

8/21/2007

8/22/2007

8/23/2007

8/24/2007

8/25/2007

0

0

0

0

0

0.98

0

0.13

0

0

0

0

0

0

0

0

0

0

0

0.02

1.09

0

0.35

0

0

0

0.46

0.02

0.07

0.31

0

0.02

0

0.01

0.01

0

0

0

0

0

0

0

0

0.05

0

0

0

0

0

0

0

0

0

0.01

0

0

0

0

0

0

0.43

0

0.04

0

0

0

0.38

0.88

0.36

0.02

0.22

0

0.12

0.01

DRAFT

Page 133 of 342

Table A.4

Rainfall Data From April 2007 to July 2008 and from March 2014 to present: Oneida Cemetery Hydrogeology Study, Oneida, WI

8/26/2007

8/27/2007

8/28/2007

8/29/2007

8/30/2007

8/31/2007

9/1/2007

9/2/2007

9/3/2007

9/4/2007

9/5/2007

9/6/2007

9/7/2007

9/8/2007

9/9/2007

9/10/2007

9/11/2007

9/12/2007

9/13/2007

9/14/2007

9/15/2007

9/16/2007

9/17/2007

9/18/2007

9/19/2007

9/20/2007

9/21/2007

9/22/2007

9/23/2007

9/24/2007

9/25/2007

9/26/2007

9/27/2007

9/28/2007

9/29/2007

9/30/2007

10/1/2007

10/2/2007

10/3/2007

10/4/2007

10/5/2007

10/6/2007

10/7/2007

10/8/2007

10/9/2007

10/10/2007

10/11/2007

10/12/2007

10/13/2007

10/14/2007

10/15/2007

10/16/2007

10/17/2007

10/18/2007

10/19/2007

10/20/2007

10/21/2007

10/22/2007

10/23/2007

10/24/2007

10/25/2007

10/26/2007

10/27/2007

10/28/2007

10/29/2007

10/30/2007

10/31/2007

11/1/2007

11/2/2007

11/3/2007

11/4/2007

11/5/2007

11/6/2007

11/7/2007

0

0.06

0.16

0.03

0

0

0

0

0

0

0

0.21

1.43

0

0

0.18

0.01

0

0.02

0

0

0

0.02

0

0

0

0.46

0

0

0.08

0.58

0

0.01

0

0

0.16

0.21

0.39

0

0

0.08

0

0

0

0

0.11

0

0

0

0.16

0.1

1.51

0.17

0.81

0.04

0

0

0

0.01

0

0

0.01

0.02

0

0

0

0

0

0

0

0.02

0.01

0

0

DRAFT

Page 134 of 342

Table A.4

Rainfall Data From April 2007 to July 2008 and from March 2014 to present: Oneida Cemetery Hydrogeology Study, Oneida, WI

11/8/2007

11/9/2007

11/10/2007

11/11/2007

11/12/2007

11/13/2007

11/14/2007

11/15/2007

11/16/2007

11/17/2007

11/18/2007

11/19/2007

11/20/2007

11/21/2007

11/22/2007

11/23/2007

11/24/2007

11/25/2007

11/26/2007

11/27/2007

11/28/2007

11/29/2007

11/30/2007

12/1/2007

12/2/2007

12/3/2007

12/4/2007

12/5/2007

12/6/2007

12/7/2007

12/8/2007

12/9/2007

12/10/2007

12/11/2007

12/12/2007

12/13/2007

12/14/2007

12/15/2007

12/16/2007

12/17/2007

12/18/2007

12/19/2007

12/20/2007

12/21/2007

12/22/2007

12/23/2007

12/24/2007

12/25/2007

12/26/2007

12/27/2007

12/28/2007

12/29/2007

12/30/2007

12/31/2007

1/1/2008

1/2/2008

1/3/2008

1/4/2008

1/5/2008

1/6/2008

1/7/2008

1/8/2008

1/9/2008

1/10/2008

1/11/2008

1/12/2008

1/13/2008

1/14/2008

1/15/2008

1/16/2008

1/17/2008

1/18/2008

1/19/2008

1/20/2008

0

0

0

0

0

0

0

0

0

0

0

0.01

0.04

0

0

0

0

0

0

0.01

0.01

0

0.01

0.57

0.09

0

0.09

0.03

0.03

0.01

0

0

0

0.01

0

0

0

0.06

0

0

0

0

0

0

0.24

0.77

0

0

0.07

0.1

0.41

0

0.05

0.01

0.01

0

0

0

0

0

0.79

0.89

0

0.05

0.15

0.18

0.46

0

0

0.01

0.32

0

0

0

DRAFT

Page 135 of 342

Table A.4

Rainfall Data From April 2007 to July 2008 and from March 2014 to present: Oneida Cemetery Hydrogeology Study, Oneida, WI

1/21/2008

1/22/2008

1/23/2008

1/24/2008

1/25/2008

1/26/2008

1/27/2008

1/28/2008

1/29/2008

1/30/2008

1/31/2008

2/1/2008

2/2/2008

2/3/2008

2/4/2008

2/5/2008

2/6/2008

2/7/2008

2/8/2008

2/9/2008

2/10/2008

2/11/2008

2/12/2008

2/13/2008

2/14/2008

2/15/2008

2/16/2008

2/17/2008

2/18/2008

2/19/2008

2/20/2008

2/21/2008

2/22/2008

2/23/2008

2/24/2008

2/25/2008

2/26/2008

2/27/2008

2/28/2008

2/29/2008

3/1/2008

3/2/2008

3/3/2008

3/4/2008

3/5/2008

3/6/2008

3/7/2008

3/8/2008

3/9/2008

3/10/2008

3/11/2008

3/12/2008

3/13/2008

3/14/2008

3/15/2008

3/16/2008

3/17/2008

3/18/2008

3/19/2008

3/20/2008

3/21/2008

3/22/2008

3/23/2008

3/24/2008

3/25/2008

3/26/2008

3/27/2008

3/28/2008

3/29/2008

3/30/2008

3/31/2008

4/1/2008

4/2/2008

4/3/2008

0.15

0.06

0

0

0.07

0.09

0

0

0.39

0.02

0.01

0.02

0.18

0

0.27

0

0.01

0

0.08

0.01

0

0

0.02

0

0.26

0.01

0

1.09

0.13

0

0

0

0

0

0

0.01

0

0

0.02

0.19

0

0.78

0.18

0

0

0

0

0

0

0

0

0.09

0.04

0

0

0

0.05

0.1

0

0

0

0

0

0.03

0.04

0

0

0

0

0

1.21

0.02

0

0

DRAFT

Page 136 of 342

Table A.4

Rainfall Data From April 2007 to July 2008 and from March 2014 to present: Oneida Cemetery Hydrogeology Study, Oneida, WI

4/4/2008

4/5/2008

4/6/2008

4/7/2008

4/8/2008

4/9/2008

4/10/2008

4/11/2008

4/12/2008

4/13/2008

4/14/2008

4/15/2008

4/16/2008

4/17/2008

4/18/2008

4/19/2008

4/20/2008

4/21/2008

4/22/2008

4/23/2008

4/24/2008

4/25/2008

4/26/2008

4/27/2008

4/28/2008

4/29/2008

4/30/2008

5/1/2008

5/2/2008

5/3/2008

5/4/2008

5/5/2008

5/6/2008

5/7/2008

5/8/2008

5/9/2008

5/10/2008

5

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Phone: (920)869-2214 (2016) | Frix