WHITE EARTH BAND OF OJIBWE (2021)

Tribal code

Ask Donna

What actually matters in this document.

Text

Case No. ___

WHITE EARTH BAND OF OJIBWE

IN TRIBAL COURT OF APPEALS

MINNESOTA DEPARTMENT OF NATURAL RESOURCES, et al.,

Defendants-Appellants,

vs.

MANOOMIN, et al.,

Plaintiffs-Respondents.

RESPONDENTS’ MOTION FOR INJUNCTION

AND EXHIBITS A-L

TO: Oliver J. Larson and Colin P. O’Donovan, Assistant Attorney Generals,

445 Minnesota Street, Suite 1400, St. Paul, Minnesota 55101-2131, and

White Earth Tribal Appellate Court Administration.

Pursuant to the White Earth Appellate Court Rules of Procedure 17 (D)(2)

and (3), Respondents herein move this Appellate Review Panel to provide for an

injunction as originally requested August 23, 2021, at Tribal Court below, to

provide an order appropriate to preserve the existing state of affairs because the

DNR will not stop the unlawful uses of surface and ground and unlawful discharge

of waters by Enbridge’s Line 3 project.1 The actual issue at stake in this case is the

DNR intentionally circumventing notice to tribal leaders and unilaterally issuing

See Exhibit A, Enbridge violated water protection rules again while MNDNR stands by – by

Jeffrey S. Broberg, LPG, MA, Minnesota Licensed Professional Geologist dated September 22,

2021. Mr. Broberg will be available as an Expert Witness in this instant Manoomin v DNR case.

1

Line 3 an after-the-fact 5 billion gallons dewatering permit up 10 fold from the

original Line 3 water permit of about 500 Million gallons of water, so as to avoid

public notice, scrutiny and evidentiary hearing . . . during an extreme drought!

The DNR obviously knew making the public and tribes aware of the 5 (five)

billion water appropriation request by Enbridge after December 2020, was going to

be challenged.2 Consequently, the DNR officials intentionally took steps to avoid

a contested case proceeding for the excessive dewatering demand (as compared to

the original 0.5B/gallons Line 3 DNR alleged water need). The DNR waited until

May 14, 2021, then to only email contact only, some tribal natural resource people,

but not Chippewa elected leaders directly, much less with an actual Notice or

Opportunity to be heard, or right to participate in an evidentiary hearing and DNR

decision.3 An evidentiary hearing would have alerted the public and tribes to the

aquifer breach months ago. An evidentiary hearing would have alerted the public

and tribes to the DNR not verifying compliance by Enbridge Line 3 and

completely missing the aquifer breach months ago and still releasing 100,000

gallons a day. The June 4, 2021 DNR permit for 5 billion gallons of water and the

2

Enbridge was issued permit no. 2018-3420 on December 8, 2020 for a total of 510.5 million

gallons water permit.

3

See Exhibit B, ENBRIDGE LINE 3 REPLACEMENT PROJECT Water Appropriation Permit

Amendment No. 2018 – 3420 (Construction Dewatering), FINDINGS OF FACT,

CONCLUSIONS AND ORDER, Water Appropriation Permit No. 2018-3420 Enbridge Line 3

Replacement Project June 4th, 2021. See also report at DNR website

https://files.dnr.state.mn.us/features/line3/decisions/04june2021-update-trench-wateringdecisions.pdf

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 2

September 16, 2021, DNR $3.3 million fine for Enbridge Line 3, report and

remedial plan are both smoking gun memorandums outlining who knew what and

when as explained in more detail in Exhibit A, by Broberg.

Background

Last Thursday (9/16), the DNR issued a News Release DNR Orders

Enbridge Energy to Pay $3.32 Million for Failure to Follow Environmental Laws

while constructing Line 3 saying

[‘]DNR is committed to its role as a regulator on this project and is

taking seriously our responsibility to protect and manage natural

resources within existing state law[‘] said DNR Commissioner Sarah

Strommen. [‘]Enbridge’s actions are clear violations of state law and

also of public trust. This never should have happened, and we are

holding the company fully accountable.’4

As part of the Information Release the DNR has also referred this matter to the

Clearwater County Attorney for criminal prosecution. The DNR has determined

that Enbridge Energy violated Minnesota Statute 103G.141, subdivision 1, which

makes it a crime to appropriate “waters of the state without previously obtaining a

permit from the commissioner.”5

4

See Exhibit C, https://www.dnr.state.mn.us/line3/index.html Minnesota Department of Natural

Resources Orders Enbridge Energy to Pay $3.32 Million for Failure to Follow Environmental

Laws, 9-16-21.

5

See Exhibit D, https://files.dnr.state.mn.us/features/line3/restoration-order-enbridge-energy-916-21.pdf DNR Restoration Order Enbridge Energy 09/16/21 and

Exhibit E https://files.dnr.state.mn.us/features/line3/administrative-penalty-order-enbridgeenergy-9-16-21.pdf online DNR attachments to Exhibit A.

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 3

Here, Enbridge’s civil violations and alleged criminal conduct does not

result in a stop work order for many months. See Exhibit A, Ex. 1: Chronology of

Violation and Regulatory Failure Derived from MNDNR Violation History and

Barr Flow Remediation Plan starting page 10. Instead,

to ensure that violations haven’t occurred elsewhere, the DNR is

requiring Enbridge to fund a re-inspection of any and all areas along

the entire route where construction depths deviated from plans (as

they did at the Clearbrook Terminal site).

Enbridge, their Line 3 contractors and Independent Environmental Monitors

(IEM) all collectively, circumvented and intentionally violated important

environmental laws meant to protect Minnesota starting in January 2021. DNR

says no one from Enbridge’s construction workers or IEMs made any reports for

months, to the DNR.

DNR failed to do its job, and DNR’s failures resulted in zero Enbridge

compliance with any construction plans or contact protocols right at the beginning

of construction. When Enbridge encountered two (2) known-to-be-existing oil

pipelines in unexpected circumstances, and unique artesian aquifer, Enbridge

guessed poorly, decided in secret, to keep the breach secret. To this day the

artesian aquifer is still, continuing to release over 100,000 gallons of aquifer water

per day into Enbridge Line 3 pipeline construction trench and likely into adjacent

wetlands like before.

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 4

Consequently, exigent circumstances exist and the need to stop any and all

water use and discharges by Enbridge for Line 3 must happen immediately.

Respondents herein (Plaintiffs in Tribal Court below) respectfully request this

Appellate Court to issue a preliminary injunction to establish status quo and

prevent on-going wanton waste of precious natural resources, and the nibi (the

waters) we all who actually live here . . . rely upon. Manoomin et al need

cessation (an injunction) to stop unconscionable water use and unlawful discharge

with really independent review before any other DNR permitted activities are

allowed for Line 3. This injunction would then stop frac-outs if Line 3 drilling and

construction was stopped. But frac-outs have not stopped and a new frac-out has

been reported6. The DNR has new protection plans established without the public

and tribes participation . . . again . . . that enables and allows Enbridge to proceed

after violating permits and causing irreparable harms to the aquifer.7

6

See Exhibit F, Line 3 Presentation - Facts and Footage of Frac-Outs & Violations FINAL by

Ron Turney of IEN. See also https://www.ienearth.org/new-frac-out-reported-from-themississippi-river-headwaters-from-line-3-construction/ New Frac-Out Reported from the

Mississippi River Headwaters From Line 3 Construction, by Ron Turney, Indigenous

Environmental Network, September 24, 2021. Video from Sept. 17, 2021. Mr. Turney will be

available as a Witness.

7

See ABC Nightly News Environmental activists call on White House to halt pipeline

construction Sept. 23, 2021, https://www.youtube.com/watch?v=USQFA_NcYsg (including

Sam Strong from Red Lake Band Tribal Council interviewed in 6 minute story which includes

the $3.3M DNR orders.)

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 5

Water Protectors

By coincidence, Water Protectors named in the full caption of this case had

established a Camp at a Mississippi River Line 3 crossing north of Palisade. In the

early winter 2020, Winona LaDuke8 and Tania Aubid had established an

Anishinabe spiritual lodge near the shore of the Mississippi River, on public forest

lands along the route where the pipeline horizontal drilling under the Mississippi

River was expected to occur.9

In December 2020, Enbridge and Aitkin pipeline funded state law

enforcement and the DNR Conservation Officers discovered that spiritual lodge

could not be destroyed or removed without violating the American Indian

Religious Freedoms Act. The spiritual lodge was protected and Anishinabe people

had a right to travel, use and occupy that lodge, including their invited guests …

other water protectors. This spiritual lodge told Enbridge that DNR and

legislatively criminalizing civil rights cannot stop tribal water protectors from

exercising their religious freedoms on public lands where Line 3 was being

8

See Newsweek https://www.newsweek.com/tribal-nations-take-oil-giant-battle-against-line-3pipeline-1631772

9

See Exhibit G, Declaration of Winona LaDuke in Support of Plaintiff’s Motion for an

Injunction Pending Appeal (Exhibit J) in Red Lake, White Earth et al v U.S. Army Corps of

Eng’rs, Case No. 20-cv-03817, in DC federal circuit. Id. See also Exhibit H, Declaration of

Jaime Arsenault in Support of Plaintiff’s Motion for an Injunction Pending Appeal (Exhibit G),

Arsenault is the Tribal Historic Preservation Officer (“THPO”) for the White Earth Band of

Ojibwe (“White Earth Band” or “Band”).

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 6

constructed. Unfortunately, Enbridge’s private security10 and local law

enforcement continue to harass and coordinate surveillance for information stops,

searches, arrests, strip searches and engaged in other civil rights violations against

water protectors. The only state laws being enforced since the January Line 3

breach of the artesian aquifer and irreparable damage, were against water

protectors, by Enbridge paid security, DNR and other state law enforcement. DNR

is either unwilling or incapable of stopping Enbridge environmental destruction11 .

. . at any price.

Standards for Preliminary Injunction

The test used by the courts for evaluating a motion for a Temporary

Restraining Order (TRO) and Preliminary Injunction (PI) is generally the same.

Although the test for obtaining a TRO or PI may vary slightly across jurisdictions,

generally a plaintiff seeking preliminary injunctive relief must satisfy a four-factor

test: (1) that he or she is likely to succeed on the merits of his claims; (2) that he or

she is likely to suffer irreparable harm without preliminary relief; (3) the balance of

10

See Amazon's Former Security Chief Is Now Guarding the Line 3 Oil Pipeline, Opponents of

oil transport company Enbridge say that the company is using military-style counter-insurgency

tactics against protesters by Tom McKay, Sept. 22, 2021, https://gizmodo.com/amazons-formersecurity-chief-is-now-guarding-the-line-1847724615

11

See Newsweek To Protect Their 'Sacred Water,' Tribal Nations Take On an Oil Giant by Julia

Rock, THE DAILY POSTER on 9/23/21 https://www.newsweek.com/tribal-nations-take-oilgiant-battle-against-line-3-pipeline-1631772

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 7

equities between the parties support an injunction; and (4) the injunction is in the

public interest.

These factors were recently discussed in an identical request for injunction

filed August 23, 2021, with the Tribal Court below. The recent disclosure 9-16-21

by DNR and $3.3M fines and restoration plans, combine with the 5 billion gallons

dewatering permit 6-4-21, are shown together with the Chronology in Exhibit A by

Broberg. This Chronology reveals choices Enbridge and so-called Independent

Environmental Monitors chose oil capitalism over tribal interests and the public

interest. Manoomin and the people are suffering, on-going irreparable harms by the

conspiracy to cover-up, ignore and sellout water and all the creatures which depend

on water. Water is Life.

DNR has filed in Federal District Court of Minnesota against the White

Earth Tribal Court exercising jurisdiction over this instant case, seeking injunction

to prevent the exercise of tribal sovereignty and protection of nature, our relative.

The DNR no longer has an urgent desire to resolve tribal jurisdiction or these water

rights issues, rights of manoomin and rights of treaty beneficiaries to be considered

in tribal court.

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 8

Instead the DNR compounds delay by filing again for appeal of the

Honorable Judge Wright’s orders12 and injunction against White Earth Band of

Ojibwe and Chief Judge DeGroat in the 8th Circuit Court of Appeals. Last week,

DNR was denied preliminary injunction request by the Eighth (8th) Circuit,

pending DNR’s appeal at the Eighth Circuit.13

The balance of the equities are more weighted in favor of the injunction

every day the DNR stalls against the on-going aquifer breach, frac-outs and climate

change concerns for the manoomin (wild rice) and nibi (water). Only an injunction

against DNR’s any and all surface water and aquifers permits and unlawful

discharges and dewatering of construction permits for trenches and related areas.

The DNR waited until September 13, 2021 to file its notice of appeal for

White Earth Tribal Court of Appeals and 8th Circuit Court of Appeals. The DNR’s

legal tactics appears more focused on federal court appeal expediency and delay in

See Exhibit I, Order Denying Plaintiffs’ Motion for Preliminary Injunction and Dismissing

Complaint without Prejudice by Honorable Judge Wright Case No. (0:21-cv-01869-WMW)

dated 9-3-21. See also Exhibit J Order Denying Plaintiffs’ Letter Request for Permission to File

a Motion to Reconsider by Honorable Judge Wright dated 9-10-21.

13

See Exhibit K, Order by the Eighth Circuit dated 9-21-21, Case No: 21-3050 in Minnesota

Department of Natural Resources, et al. v. The White Earth Band of Ojibwe and Hon. David A.

DeGroat, in his official capacity as judge of the White Earth Band of Ojibwe Tribal Court,

Appeal from U.S. District Court for the District of Minnesota (0:21-cv-01869-WMW). (DNR’s

request for Preliminary Injunction denied).

12

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 9

White Earth Tribal Court. Time is of the essences, Enbridge has nearly completed

construction according to its weekly Status Report14 dated 9-23-21.

Conclusion

Based on the files, records and other evidence, along with the reasons set

forth above and in the original Request for Preliminary Injunction in Tribal Court

dated August 23, 2021, Respondents herein request the White Earth Appellate

Tribal Court grant an immediate emergency injunction against the DNR from

issuing or permitting any further water or dewatering allocations to the Enbridge

Line 3 pipeline construction project15 until truly independent and reliable

investigators verify all of the environmental damages along the pipeline

construction corridor and any other relief deemed fair, just and equitable.

Dated: September 24, 2021

14

____/s/ Frank Bibeau______

Frank Bibeau, Tribal Attorney

Joe Plumer, Tribal Attorney

For the Manoomin, et al

See Exhibit L, Enbridge Status letter and Exhibits letter to Mr. Will Seuffert, Minnesota

Public Utilities Commission, Re: In the Matter of the Enbridge Energy, Limited Partnership for a

Route Permit Line 3 Replacement Project in Minnesota from the North Dakota Border to the

Wisconsin Border MPUC Docket No. PL9/PPL-15-13

15

See Exhibit M, DNR map of Line 3 Existing and Proposed Corridor 2020

DNR v Manoomin Appeal

Respondents’ Motion for Injunction

Sept. 24, 2021, Page 10

Exhibits for

Motion for Preliminary Injunction

9-24-21

Exhibit A

Jeffrey S. Broberg, LPG, MA

Minnesota Licensed Professional Geologist

11596 Person Drive, St. Charles, MN 55972

Elbabroberg1@gmail.com c 507-273-4961

September 22, 2021

Frank Bibeau

Honor the Earth

PO Box 63, 607 Main Ave.

Calloway, MN, 56521

FOR IMMEDIATE RELEASE

RE: Enbridge violated water protection rules again while MNDNR stands by.

Dear Mr. Bibeau:

Environmental and water resource protections fail without sincere

prevention efforts, without clear plans that follow the rules, without the early

detection of problems, or transparent acts.

Can you imagine a massive pipeline project designed to move millions of

barrels of tar sands crude where the pipeline fails to follow approved construction

plans? Or can you imagine a project subject to detailed State and Federal

Environmental Permits that violates the terms of the permits then fails to disclose

its intentional violations until all the work is done? Or can you imagine a State

regulator who trusts the Contractor enough not to review inspection records for

five months and misses severe and possibly irreversible environmental damage?

These scenarios are now the latest chapter of the story of Enbridge Line 3 and

MNDNR oversight.

Last January, Enbridge, its contractors, consultants, and “independent”

inspectors minimized severe problems and took advantage of Minnesota’s lack of

timely regulatory oversight. The Minnesota Department of Natural Resources did

not learn of the severe aquifer issues for many months and did not take action to

stop the problems for eight months.

1

Following the recent disclosures of unreported “frac outs” releasing drilling

mud to the Clearwater and Mississippi Headwaters and the June surprise of Line

3’s 50-fold increase in water use in an extreme drought, we find Minnesota’s

groundwater is being impaired by Line 3 while we watch. Once again, the

environment has suffered, and we and Minnesota’s water-dependent ecosystems

must settle for our regulators granting forgiveness to Enbridge because they failed

to protect our water resources.

Enbridge contractors ruptured a sensitive and timeless artesian aquifer on

land in mid-winter. Clearbrook’s artesian aquifers form springs in the Lost River

headwaters of Assiniboine ceded territory (1889 Chippewa Treaty). The springs

never freeze, and pure, cold, clear water flows the medicine of life to the surface

year-round.

Last January, the ruptured aquifer welled up with water along in the deep

trench of the petroleum pipeline, and the aquifer started to lose its natural flow in

the springs, and the is losing the flow into the rare calcareous fens. The

uncontrolled groundwater flow and the pipeline springs have continued unabated

for eight months.

The loss of pure groundwater has now totaled 24.2 million gallons, 106,000

gallons a day, enough to sustain multiple springs and many acres of groundwaterdependent wetlands and extreme drought. On September 16, the Minnesota

Department of Natural Resources (MNDNR) finally issued a Restoration Order to

fix the rupture within 30 days and restore the drought-stricken fen, hoping to

restore all the nearby springs to keep the clean water out of the pipeline trench.

Upwelling hydraulic forces and geologic factors make restoring a ruptured

aquifer complex uncertain, and Enbridge or the MNDNR seem never to address the

cultural value attached to the water from the ancient natural artesian springs.

After a multi-year history of regulatory permit failures from the MNDNR

and MPCA, the stage was set for another disaster when Enbridge willfully ignored

design documents, regulatory warnings and ignored permit conditions at the

Clearbrook pipeline crossings. The next six months left a legacy of inspectors

failing to report alarming water and quicksand hazards, leaving regulators unaware

of another Line 3 water disaster. The litany of regulatory failures and unabated

environmental problems draws us to conclude that the Line 3 pipeline should have

never been permitted. Line 3 construction has already proven to be a clear and

present danger to the future of our water resources.

2

Enbridge, the Independent Environmental Monitors, and the MNDNR have

proven not to be trustworthy stewards of our water. Considering the litany of

failures and lack of transparency, the only reasonable outcome is to stop all activity

except inspections and corrective actions. Because of the history of regulatory

default, all Line 3 construction and pipeline activation activity should be seized

under the control of the Court.

The Nature and Hazards of Confined Artesian Aquifers at Clearbrook

Terminal

In the headwaters of Silver Creek/Lost River/Clearwater River Watersheds,

deeply buried bedrock are draped by alternating layers of impervious glacial till

and highly permeable beds of glacial sands and gravel that give rise to artesian

springs. The Line 3 route at Clearbrook is on the northern margins of Minnesota’s

Groundwater Province 4, with ground moraines of glacial till and where buried

sands and gravels from artesian aquifers and sustain fens, springs, wetland seeps,

lakes, and streams.

A review of the water well records from the Minnesota Well Index and

geotechnical borings along Line 3 shows the Line 3 route has a 35-to-50-foot layer

of impervious, clay-rich glacial till at the surface over a thick layer of sand and

gravel. The sands and gravels are highly productive artesian aquifers. To control

the upwelling pressure, thirty- and fifty-foot-deep wells in the immediate area are

drilled with heavy drilling mud. Deep excavations or wells drilled without heavy

mud are often lost during construction when the water pressure pushes to the

surface and quickly turns the wellbore into quicksand as the water moves upward

to the surface. Entire Townships around Clearbrook demonstrates upwelling

hydraulic pressure where the surrounding lands are known for artesian wells,

springs, groundwater-supported wetlands, and calcareous fens.

Deep excavations that rupture the seal formed by the 30-foot thick glacial till

rapidly become a construction hazard. Artisan water appears to boil to the surface

and liquify the surrounding soils into mud and quicksand. The breach of powerful

artesian forces threatens to swallow heavy equipment and become an immediate

and uncontrollable hazard. A new unnatural “boiling sand” spring formed in the

pipeline trench.

On January 21, the Enbridge contractors excavated within ten feet of the top

of the Clearbrook Artesian Aquifer. The over pressured aquifer ruptured near the

existing pipelines, and uncontrollable water rushed to the surface. The Contractor

3

lost all ability to contain the water, and project managers faced a significant

problem.

To install the pipeline, Enbridge contractors needed an 18-foot-deep bore

pit. The Contractor installed a 28-foot-deep steel sheet pile wall to control the

artesian flow, a 110-foot wall on either side of the pipeline route, and a steel plate

on the east end where the boring would tunnel under the existing hot pipes. With

five dewatering wells, they could lower the water level in the walled-off trench and

install the Line 3 connection to the Clearbrook terminal. But once they stopped

dewatering, the soils between the sheet piles again turned to quicksand, and a large

boiling sand spring appeared. Once they pulled the sheet pile, a new aquifer

rupture occurred 60 feet west of the original rupture—the difficulty of stopping the

uncontrolled flow magnified.

Water appropriation and water quality discharge standards were violated,

and the prospect of quickly restoring the sealed cap over the artesian aquifer

diminished by the day. In my 35 years of Minnesota groundwater management

experience, the uncontrolled artesian flow has repeatedly proven to be among the

most challenging construction hazards to solve.

Irregular Design, Permitting, Construction, Inspection, and Reporting

During the Line 3 water appropriations permitting, the MNDNR raised

concerns about groundwater-supported wetlands and artesian aquifers, especially

the risk on rare calcareous fens located just east of the Clearbrook terminal. In

November 2020, the MNDNR reviewed the local construction plans and issued a

“No Effect Concurrence” to Enbridge for the Clearbrook area fens. Enbridge gave

assurances that the groundwater flows sustaining the fens would be protected

because the approved design called for an 8- to 10-foot-deep bore pit, 20 to 28 feet

above the top of the pressured aquifer.

In less than 50 days, Enbridge Project Managers and contractors faced the

prospect that the designed bore pit at the Clearbrook Terminal was not deep

enough to allow boring beneath two existing pipelines. Line 3 had to make a “hot

crossing” beneath two high-pressure pipelines, and they needed a 16 to 18-foot

bore pit in a 50-foot-long trench box. Reality-based field decisions overrode the

approved design plans and permits. The 18-foot-deep trench immediately ruptured

the artesian aquifer as it approached the east end of the trench near the hot

crossings.

4

Rather than reporting the aquifer breach, the massive water appropriations,

and the muddy water discharge to the surrounding stream and wetlands,

Independent Environmental Monitors (IEM’s) overlooked the design changes and

permit violations. The Monitors did not report any changed conditions other than

“difficult dewatering.”

Enbridge’s failure to report the aquifer breach violated their water

appropriation permits, water discharge permits, and wetland permits.

The approved Environmental Monitor Control Plan (EMCP) required the

IEM’s to notify the State Agencies of “Modified Construction Activities” and

Modification to Permit Requirements.” The failure to report and revise permits

violated the letter and intent of the EMPC and violated multiple environmental

permits. (Section 6.0, pg. 15 of EMPC. Section 6.1, pg. 15-16 of EMPC)

Attached as Exhibit 1, a timeline for the ruptured aquifer, the 28 reported

frac-outs, and the amended water appropriations is a chronological compilation of

unauthorized Enbridge activities and MNDNR inactivity. The chronology

demonstrates obfuscation by both the company and their “Independent” monitors

keeping information from State Agencies while allowing continuing uncontrolled

water appropriation and shows just how slow the MNDNR was to respond.

The history of the aquifer rupture, frac-outs, and excessive water

appropriations in the drought reveals an intentional and blatant disregard for the

permits and protecting Minnesota waters.

Permitting and Regulatory Failures:

Enbridge and MNDNR Disconnection Puts and Aquifers at Risk

The core principles of environmental and water resource protection are

prevention guided by accurate plans, design and permit compliance, and early

detection and reporting of problems. All three principals failed at the Clearbrook

terminal, Line 3 aquifer rupture, frac-outs, and water appropriation amendments.

The MNDNR was faced with a massive undertaking and failed.

MNDNR permit conditions for water use, MPCA permits for water

discharge, and Corps of Engineer permits for wetlands were designed based on

accurate design and operation standards submitted in advance by the applicant.

These factors are meaningless if permit conditions are not understood, ignored, or

intentionally violated by the Permit holder. Permits and regulatory tools and are

5

just as useless if regulators fail to make the permits and rules understandable to

both permit holders and inspectors. If contractors look away from permit

conditions, the regulators are in the dark. If the regulations are either unaware or

waived permits, there can be no enforcement and no deterrence against future

violations. The actions of both Enbridge, their “Independent Monitors,” and the

MNDNR produce mistrust that can only be resolved with an effective and

independent third-party review. The independent monitors need proper knowledge

and rules to assess the environmental damage and restoration needs. The

Clearbrook artesian aquifer breach demonstrates that we should distrust all the

actors because every level of permit and regulatory failure has occurred.

The hydrologic conditions at Clearbrook Terminal were well understood

after decades of local groundwater investigations and Line 3 geotechnical borings.

MNDNR, MPCA, and Enbridge say they know the risks to groundwater-dependent

wetlands and calcareous fens, but that knowledge has never translated to adequate

protections.

Line 3 developers requested routine and moderate dewatering permits that

never addressed the likely uncontrolled flow with deep excavations or the need for

larger volumes of water with frequent frac-outs. The result is hundreds of

thousand gallons a day disgorging from Clerbrook’s shallow artesian aquifer or

pumped into the ground when doing the pipeline borings.

While MNDNR understood the aquifer and fen risks, they granted a “no

impact concurrence” for the fen because only shallow excavations were

envisioned. It is unclear whether the MNDNR reviewed the artesian character of

the Clearbrook artesian aquifer with Enbridge and the Independent Environmental

Monitors failing to advise contractors on preventing an uncontrolled aquifer

disaster.

At the same time, Enbridge Project Managers and contractors should have

known the necessity of deeper excavation to cross existing pipelines. They should

have known and anticipated the artesian pressure from the Clearbrook aquifer. The

deep bore pit plans were not in the Enbridge design review documents. While

permit writers and hydrologists relied on the design documents, prevention failed

again when contractors changed plans without considering the known artesian

risks.

Prevention requires high situational awareness and accurate reporting;

contractors, inspectors, and regulators need to be constantly apprised of onsite

6

conditions, especially in high-risk settings, and they must report related problems.

The approved Environmental Monitoring Plan requires Inspectors to routinely

upload Inspection records to a password-protected portal that regulators can

review. Failures occur whenever inspection reports are not timely, when they are

not accurate, when the inspection reports obfuscate the facts, and when regulators

fail to do a timely review. The same problems occurred when the aquifer ruptured,

frac-outs, and 50-fold expansion in water appropriations during a drought. The

institutional measures to prevent and minimize environmental impact failed with

the aquifer rupture.

Digging deep pits in artesian settings and near groundwater-dependent

ecosystems was the first compliance failure that went unreported. Poor project

design calling for bore pits to cross actively flowing pipelines set up the

disappointment that could have been prevented. Appropriate well-designed

modifications that protect the environment. Many consultants, contractors, and the

MNDNR have experience controlling subsurface flow. Onsite drillers controlled

the flow with heavy drilling mud designed to contain the pressure, and excavators

either dewater the risky area in advance, surcharge the flow or create a grouted seal

over the top of artesian aquifers. Appropriate modifications can only be approved

if the Permitted party discloses the changes required in the permit; here, permit

compliance failed.

When the water came welling up and created quicksand in the pipeline

trench, the Contractor abandoned the deep bore pit effort in fear of losing their

equipment. The failure to report the problem was a severe violation where the

blame is shared by Enbridge, the Contractor, the Independent Environmental

Monitors, and the MNDNR regulators. The Contractor trying to avoid stop-work

orders or design delays first made a hasty decision and then felt compelled to hide

the problem from regulators for months. The environmental monitors failed their

regulatory responsibility to identify and report the aquifer breach forcing a ninemonth delay in restoring the aquifer.

As a geologist with pipeline construction experience, I can envision the

Contractor hoping the artesian pressure would rapidly decline as it often does in

minor confined aquifers with limited volume. But hope is not a regulatory

compliance strategy, proven when dealing with a large regional aquifer with over

25 feet of head pressure.

7

Other serious violations occurred at Coldbrook, which are regulated by the

MPCA and the Corp of Engineers. Discharge of silt and mud into streams and

wetlands violates Construction Site Stormwater Permits and wetland protections.

Failure to timely notify the pollution is a violation itself; continuing the work

compounds the violations.

In addition serious violations have assaulted our aquifers with the frac-outs

and 5 billion gallons of water appropriations during a drought.

Conclusion: Failed Promises Destroy Trust

Eight months of large volume flows from a ruptured regional aquifer are

now exceeding 100,000 gallons per day, depleting the aquifer, reducing the

hydraulic head threatening groundwater-dependent ecosystems. Frac-outs have a

yet undefined risk to aquifers and surface water resources, and massive water

withdrawals during extreme drought may impact both aquifers and surface waters.

The attached chronology was compiled from Permit history, the MNDNR timeline

in the Clearbrook Restoration Order, the Clearbrook Remedial Action Plan, the

frac-outs, and amended Water Appropriation Permits. As an experienced

environmental risk manager, I see the public documents as sanitized versions of a

severe violation and a complete failure to protect our water resources.

Enbridge, their contractors and consultants, the Independent Environmental

Monitors, and the MNDNR regulators failed to meet their obligations and created

an ongoing risk. Even with the failures, there are only minor consequences related

to the actual costs of fixing the problem; there are no penalties for over five months

of evasion and no deterrence that makes it risky to violate the law.

The only fix to the abuses is for a Court or a Regulator to put a hard stop to

all activities except independent inspection, remote sensing for upwelling water

from aquifer ruptures and frac-outs, and disclosing all irregular design changes.

Our water resources are at risk; no other actions should be allowed. Once the total

damages have been restored, heavy fines and penalties must be levied for every

unreported infraction.

Sincerely:

Jeffrey S. Broberg, LPG, MA, Minnesota Licensed Professional Geologist #13009

8

CC: Steve Morse and Sara Wolff, Minnesota Environmental Partnership

References:

MNDNR Restoration and Replacement Order

Barr Engineering Remedial Action Plan

Enbridge Environmental Monitoring Plan

Minnesota Well Index well logs

Enbridge Dewatering Permit 2018-****

9

Exhibit 1:

Chronology of Violation and Regulatory Failure

Derived from MNDNR Violation History and Barr Flow

Remediation Plan

10

Dec. 2019: Approval of Environmental Monitor Control Plan. Enbridge Energy

Limited partnership – Line 3 Replacement Project.

December 28, 2020: MNDNR issued Water Appropriations Permit 2018-3420 to

Enbridge for 510,000,000 Gallons.

November 12, 2020, MNDNR issued Enbridge “No Effect Concurrence” for

excavation 8-10 feet deep that would have an impact on the hydrology of fen

January 21, 2021: Enbridge abandons plans for shallow excavation due to

existing pipelines and dug to 18 feet and ruptured artesian aquifer creating

uncontrolled flow.

January 26, 2021: IEM noted “unmanageable dewatering conditions” and the

need for SWPPP to direct new flow across the roadway

February 2, 2021: Borehole excavation or entry pit encountered “excessive GW

infiltration.”

February 8, 2021: 110-foot sheet pile wall installed within wetland dewatered

with five wells, installed 50-foot long trench box in bore pit for “hot crossing” of

existing pipelines.

Trench water discharged to dewatering bags and dewatering structures

Enbridge installed Line 3 “hot crossing” of two pipelines in dewatered sheet

pile and trench box area

Uncontrolled flow area expands with the removal of the sheet pile wall

February 20, 2021. IEM notes “turbid water discharge for five well points.”

Discussed with the lead inspector, environmental monitor, and ERM

technical director

March 13, 2021. IEM documented sediment flow to wetlands and discussed with

EI Team

March 15, 2021. IEM and Lead Env Inspector conducted site review and

documented 2” of clay

March 16, 2021, Enbridge “issued an unacceptable report for improper dewatering

structure” No cleanup and continued pumping

11

“Following months,” according to MNDNR, Enbridge cleaned sediment

from wetland but did not resolve uncontrolled flow

Failure to identify the problem as uncontrolled flow or aquifer rupture

No notifications of Level 2 modifications or need for amended permits

June 4, 2021: MNDNR issues Amended Water Appropriations Permit #2018-3420

for 4,982,768,568 gallons, 9.8 times larger than the original permit request.

June 15, 2021, MNDNR staff discussed the potential for uncontrolled flow

June 16, 2021, MNDNR email to Enbridge requesting information on uncontrolled

flow and restoration plan

On June 17, 2021, MNDNR noticed Enbridge not recommencing work at

Clearbrook hot crossing until the uncontrolled flow plan was approved. (Note that

the line segments were already completed by the time DNR sent notice.)

June 2021: Five unreported Frac-outs

July 7, 2021, Merjent disclosed 3.8 million gallons of uncontrolled flow since

January and disclosed 45 ftX12 ft X18’ excavation and sheet pile installation

response to 6-16 DNR request described as “findings of fact #13.”

July 8, 2021, Lead IEM and MNDNRr reviewed and summarized inspection

reports to date and discovered the initial January 26 report and disclosure of

completion of pipeline boring but no backfill due to uncontrolled flow.

July 8, 2021, Enbridge submitted Groundwater Investigation Plan to MNDNR for

comment and review

Enbridge reported a second surface emergence of uncontrolled flow from

outside the former sheet pile area 60 feet northwest of the original

uncontrolled flow.

Enbridge reported uncontrolled overland flow at ground level elevation

1339. Surface flow is 28 feet above the artesian aquifer.

Uncontrolled flow created the risk of bank sloughing, road overtopping, and

water quality concerns from the release of turbid water

Enbridge reported uncontrolled flow reached a nearby stream

Uncontrolled flow extends from Milepost 909.1 to 910

12

July 12, 2021, Enbridge submitted the revised GW Investigation Plan

On July 14, 2021, DNR informed Enbridge to deny the request to continue

work in the area until the uncontrolled flow plan was approved.

July 27-Aug 4, 2021 Drilling 6 borings in area of uncontrolled flow. two borings

penetrated the artesian aquifer

July 2021: 19 unreported frac-outs

August 1-4: Two unreported Frac-outs

Aug 5-Aug 21, 2021: water level monitoring

August 9: MNDNR reveals 28 unreported frac-outs from June 1 to August 4.

August 15, 2021, Draft Remedial Action Plan for ruptured aquifer submitted to

MNDNR

Aug 17-18, 2021Enbridge/Barr Final Remedial Action Plan report on an

uncontrolled flow mitigation plan

RAP shows fens are supported by upwelling artesian water

Uncontrolled flow is upgradient of fens

RAP proposes installing high-volume wells in the artesian aquifer to stop the

flow at the surface and reduce upward pressure in the aquifer allowing grout

injection into the ground to stop the flow

September 6, 2021. uncontrolled flow reported to be 24,200,000 gallons from

January 21 to September 5, 227 days, (Avg flow of 106,608 gallons/day from an

area measuring 1400 to 1650 square feet)

September 16, 2021, MNDNR Restoration and Replacement Order

By October 16, 2021, complete all work to stop the uncontrolled flow

Notify MNDNR Commissioner within 24 hours of completion

By October 16, 2021, Enbridge, to report a revised estimate of water loss

from March 19 to September 16, must continue groundwater monitoring

following cessation of flow.

By October 16, 2021, submit Draft Calcareous Fen Management Plan for

MNDNR review and approval

13

By October 16, 2021. Submit $250,000 in mitigation funds to MNDN for

independent monitoring of calcareous fens

By October 16, 2021, Submit $300,000 in mitigation funds to MNDNR for

initial mitigation of direct loss of groundwater resources

By October 16, 2021. End of the appeal period.

By November 1, 2021, Submit $2,750,000 on “one or more single order

instruction escrows for the benefit of MNDNR to use at its sole discretion to

provide funds to perform restoration actions” for fens and compensatory

mitigation with conditions for withdrawal

The order provides for the addition of escrow funds if necessary

By December 1, 2021. Enbridge must demonstrate that it has visually

reinspection all locations across the entirety of Line 3 where Enbridge

deviated from planned or permitted construction trench depths. Must

identify additional unidentified breaches of artesian aquifers.

Monitor for uncontrolled flow for 12 months after cessation of uncontrolled

flow

14

Exhibit B

Permit Number

MNDNR PERMITTING AND REPORTING SYSTEM

2018-3420

Amended

Water Appropriation Permit

Expiration Date: 06/04/2022

Pursuant to Minnesota Statutes, Chapter 103G, and on the basis of statements and information contained in the permit

application, letters, maps, and plans submitted by the applicant and other supporting data, all of which are made part

hereof by reference, PERMISSION IS HEREBY GRANTED to the applicant to perform actions as authorized below. This

permit supersedes the original permit and all previous amendments.

Project Name:

L3R GW Segments and Pump

Stations

Purpose of Permit:

County:

Clearwater,

Hubbard,

Cass,

Aitkin,

Kittson,

St. Louis,

Marshall,

Red Lake,

Polk

Watershed:

Resource:

Clearwater River; Mississippi

River - Headwaters; Crow Wing

River; Pine River; Mississippi

River - Grand Rapids; Red River

of the North - Tamarac River;

St. Louis River; Snake River

Groundwater

Authorized Action:

Construction Dewatering

Withdrawal of up to 4982.7 million gallons of water per year for

construction dewatering.

Authorized actions at each construction dewatering spread are

listed below.

All volume amounts and appropriation pumping rates must be

followed.

A total of 4,982,768,568 gallons is authorized by this permit.

The permittee shall not exceed the total gallons authorized.

The spread installations are an estimate of the amount of

construction dewatering needed at each installation.

• Installation #1: Pipeline trench from Minnesota/North Dakota

border to Donaldson pump station, Kittson County (12.6 miles)

– estimate of 31,448 gallons

• Installation #2: Donaldson pump station, Kittson County (0.10

miles) – estimate of 829,726 gallons

• Installation #3: Pipeline trench from Donaldson pump station

to Viking pump station, Kittson & Marshall Counties (33.6

miles) – estimate of 1,466,134 gallons

• Installation #4: Viking pump station, Marshall County (0.10

miles) – estimate of 870,179 gallons

• Installation #5: Pipeline trench from Viking pump station to

Plummer pump station, Marshall, Pennington & Red Lake

Counties (28.8 miles) – estimate of 3,667,555 gallons

• Installation #6: Plummer pump station, Red Lake County

(0.10 miles) – estimate of 1,065,538 gallons

• Installation #7: Pipeline trench from Plummer pump station to

end of Construction Spread 1, Red Lake and Polk Counties,

(19.1 miles) – estimate of 5,475,038 gallons

• Installation #8: Pipeline trench from end of Construction

Spread 1 to Clearbrook Terminal, Polk & Clearwater Counties,

(13.1 miles) – estimate of 9,063,781 gallons

• Installation #9: Clearbrook pump station, Clearwater County

(0.10 miles) – estimate of 24,856,814 gallons

• Installation #10: Pipeline trench from Clearbrook pump station

to Hubbard County line, Clearwater County (36.4 miles) –

estimate of 784,197,013 gallons

• Installation #11: Pipeline trench from Hubbard County line to

Two Inlets pump station, Hubbard County (13.3 miles) –

estimate of 34,416,969 gallons

• Installation #12: Two Inlets pump station, Hubbard County

(0.10 miles) – estimate of 896,473 gallons

• Installation #13: Pipeline trench from Two Inlets pump station

to end of Construction Spread 2, Hubbard County (9.0 miles) –

estimate of 42,203,185 gallons

• Installation #14:Pipeline trench from end of Construction

Spread 2 to Backus pump station, Hubbard, Cass & Wadena

Counties (41.5 miles) – estimate of 2,837,033,847 gallons

• Installation #15: Backus pump station, Cass County (0.10

miles) – estimate of 44,965,514 gallons

• Installation #16: Pipeline trench from Backus pump station to

end of Construction Spread 3, Cass & Crow Wing Counties

(31.3 miles) – estimate of 244,752,992 gallons

• Installation #17: Pipeline trench from end of Construction

Spread 3 to Swatara pump station, Cass & Aitkin Counties (6.9

miles) – estimate of 3,570,484 gallons

• Installation #18: Swatara pump station, Aitkin County (0.10

miles) – estimate of 4,077,316 gallons

• Installation #19: Pipeline trench from Swatara pump station to

end of Construction Spread 4, Aitkin & St. Louis Counties (37.5

miles) – estimate of 128,663,927 gallons

• Installation #20: Pipeline trench from end of Construction

Spread 4 to North Gowan pump station, St. Louis County (9.6

miles) – estimate of 230,024,353 gallons

• Installation #21: North Gowan pump station, St. Louis County

(0.10 miles) – estimate of 1,685,052 gallons

• Installation #22: Pipeline trench from North Gowan pump

station to Minnesota/Wisconsin border, St. Louis & Carlton

Counties (34.1 miles) – estimate of 577,093,383 gallons

• Hill City pipeline maintenance station (PLM), Aitikin County -estimate of 1,861,846 gallons

All appropriations from the above listed construction dewatering

installations (spreads) will follow all relevant plans per the

original final Application dated November 8, 2020 and the

Environmental Protection Plan (EPP) received November 08,

2020. All changes in requested water volumes included in the

permit amendment application dated May 12, 2021 and the

updated Stormwater Pollution Prevention Plan (SWPPP) dated

May 2021 required by the MPCA Construction Stormwater

General Permit must be followed for this permit to be valid.

All installation volumes are estimates per the spreads and the

total volume authorized is 4,982,768,568, the permittee is not

allowed to go over the total volume authorized by this permit.

Permittee:

Authorized Agent:

ENBRIDGE ENERGY, LIMITED PARTNERSHIP

CONTACT: HAHN, BOBBY, (218) 522-4751

26 E SUPERIOR ST.

SUITE 125

DULUTH, MN 55802

(218) 464-5621

To Appropriate From:

MERJENT, INC.

CONTACT: LENZ, KRISTIN, (763) 913-4740

1 MAIN STREET SE

SUITE 300

MINNEAPOLIS, MN 55414

(612) 746-3660

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 319032m east, 5284954m north

NESE of Section 29, T149N, R37W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 335917m east, 5238205m north

SENE of Section 24, T144N, R36W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 337053m east, 5217752m north

NWNW of Section 29, T142N, R35W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 336583m east, 5203482m north

SESE of Section 6, T140N, R35W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 382773m east, 5181950m north

NESE of Section 12, T138N, R31W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 428061m east, 5189817m north

NWNW of Section 14, T139N, R26W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 438108m east, 5192494m north

SWNW of Section 2, T139N, R25W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 197299m east, 5402845m north

Section 4, T160N, R50E

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 497094m east, 5192819m north

NWSW of Section 20, T51N, R21W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 511379m east, 5189971m north

SENE of Section 34, T51N, R20W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 511384m east, 5189786m north

SENE of Section 34, T51N, R20W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 454059m east, 5204182m north

SESW of Section 14, T52N, R26W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 210009m east, 5387076m north

NWNW of Section 25, T159N, R49W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 244838m east, 5345488m north

SESE of Section 28, T155N, R45W

Sump : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 300417m east, 5294895m north

SWSW of Section 28, T150N, R39W

Groundwater : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 337143m east, 5217783m north

NENW of Section 29, T142N, R35W

Groundwater : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 382905m east, 5181869m north

SWSW of Section 7, T138N, R30W

Groundwater : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 447690m east, 5190730m north

NWNE of Section 31, T51N, R26W

Groundwater : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 210118m east, 5386991m north

NWNW of Section 25, T159N, R49W

Groundwater : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 244450m east, 5345588m north

SWSE of Section 28, T155N, R45W

Groundwater : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 274106m east, 5310131m north

NENW of Section 15, T151N, R42W

Groundwater : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 274133m east, 5310053m north

NENW of Section 15, T151N, R42W

Groundwater : by means of a portable pump at a rate not to exceed 800 gpm

Point(s) of Taking

UTM zone 15N, 319120m east, 5284952m north

NESE of Section 29, T149N, R37W

Issued Date:

06/04/2021

Authorized Issuer:

Title:

Randall Doneen

Effective Date:

Conservation Assistance

& Regulations Section

Manager

06/04/2021

Email Address:

Expiration Date:

randall.doneen@state.mn.us

06/04/2022

Phone Number:

651-259-5156

This permit is granted subject to the following CONDITIONS:

LIMITATIONS: (a) Any violation of the terms and provisions of this permit and any appropriation of the waters of the state

in excess of that authorized hereon shall constitute a violation of Minnesota Statutes, Chapter 103G. (b) This permit shall

not be construed as establishing any priority of appropriation of waters of the state. (c) This permit is permissive only. No

liability shall be imposed upon or incurred by the State of Minnesota or any of its employees, on account of the granting

hereof or on account of any damage to any person or property resulting from any act or omission of the Permittee relating

to any matter hereunder. This permit shall not be construed as estopping or limiting any legal claims or right of action of

any person other than the state against the Permittee, for any damage or injury resulting from any such act or omission,

or as estopping or limiting any legal claim or right of action of the state against the Permittee, for violation of or failure to

comply with the provisions of the permit or applicable provisions of law. (d) In all cases where the doing by the Permittee

of anything authorized by this permit shall involve the taking, using, or damaging of any property, rights or interests of any

other person or persons, or of any publicly owned lands or improvements thereon or interests therein, the Permittee,

before proceeding therewith, shall obtain the written consent of all persons, agencies, or authorities concerned, and shall

acquire all property, rights, and interests necessary therefore. (e) This permit shall not release the Permittee from any

other permit requirements or liability or obligation imposed by Minnesota Statutes, Federal Law, or local ordinances

relating thereto and shall remain in force subject to all conditions and limitations now or hereafter imposed by law. (f)

Unless explicitly specified, this permit does not authorize any alterations of the beds or banks of any public (protected)

waters or wetlands. A separate permit must be obtained from the Department of Natural Resources prior to any such

alteration.

FLOW METER: The Permittee shall equip each installation for appropriating or using water with a flow meter, unless

another method of measuring the quantity of water appropriated to within ten (10) percent of actual amount withdrawn is

approved by the Department.

WATER USE REPORTING: Monthly records of the amount of water appropriated or used shall be recorded for each

installation. Such readings and the total amount of water appropriated or used shall be reported annually to the Director of

DNR Ecological and Water Resources, on or before February 15 of the following year, via the MNDNR Permitting and

Reporting System (MPARS) at www.mndnr.gov/mpars/signin. Any processing fee required by law or rule shall be

submitted with the records whether or not any water was appropriated during the year. Failure to report shall be sufficient

cause for terminating the permit 30 days following written notice.

Page 7 - Permit Number 2018-3420

CONDITIONS continued on next page...

CONDITIONS (Continued from previous page)

MODIFICATION: The Permittee must notify the Commissioner in writing of any proposed changes to the existing permit.

This permit shall not be modified without first obtaining the written permission from the Commissioner.

TRANSFER OR ASSIGNMENT: Any transfer or assignment of rights, or sale of property involved hereunder shall be

reported within 90 days thereafter to the Director of DNR Ecological and Water Resources. Such notice shall be made by

the transferee (i.e., new owner) and shall state the intention to continue the appropriation as stated in the permit. This

permit shall not be transferred or assigned except with the written consent of the Commissioner.

COMMISSIONER'S AUTHORITY: (a) The Commissioner may inspect any installation utilized for the appropriation or use

of water. The Permittee shall grant access to the site at all reasonable times and shall supply such information

concerning such installation as the Commissioner may require. (b) The Commissioner may, as he/she deems necessary,

require the Permittee to install gages and/or observation wells to monitor the impact of the Permittee's appropriation on

the water resource and require the Permittee to pay necessary costs of installation and maintenance. (c) The

Commissioner may restrict, suspend, amend, or cancel this permit in accordance with applicable laws and rules for any

cause for the protection of public interests, or for violation of the provisions of this permit.

PUBLIC RECORD: All data, facts, plans, maps, applications, annual water use reports, and any additional information

submitted as part of this permit, and this permit itself are part of the public record and are available for public inspection at

the offices of DNR Ecological and Water Resources. The information contained therein may be used by the Division as it

deems necessary. The submission of false data, statements, reports, or any such additional information, at any time shall

be deemed as just grounds for revocation of this permit.

MONITORING REQUIREMENTS: Minnesota Statutes 103G.282 authorizes the Department of Natural Resources to

require permittees to install and maintain monitoring equipment to evaluate water resource impacts from permitted

appropriations. You may be required to modify or install automated measuring devices and keep records for each

installation. The frequency of measurements and other requirements will be based on quantity of water appropriated,

source of water, potential connections to other water resources, nature of concern, and other relevant factors.

DROUGHT PLANNING: In accordance with M.S. 103G.293, all permits must be consistent with the drought response

plan detailed in the Statewide Drought Plan at

http://files.dnr.state.mn.us/natural_resources/climate/drought/drought_plan_matrix.pdf.

LAND NOT OWNED BY PERMITTEE : This permit authorizes appropriation of water from land that is not owned by the

permittee. The volume authorized is valid only as long as an agreement is in effect for lands included under this permit that

are not owned by the permittee.

WELL SEALING: The permittee shall notify the Minnesota Department of Health prior to sealing, removing, covering,

plugging or filling the well(s) from which the authorized appropriation was made. The well(s) must be sealed by a licensed

well driller and in accordance with the procedures required under Minnesota Statutes 103I and Minnesota Rules 4725 as

administered by the Minnesota Department of Health.

WATER USE CONFLICT: If notified by the DNR that a water use conflict is suspected and probable from your

appropriation, based on confirmation of a formal well interference complaint or a preliminary hydrologic assessment, all

appropriation authorized by this permit must cease immediately until the interference is resolved. The permittee may be

required to obtain additional data to support the technical analysis, such as domestic well information within a radius of

one and one-half miles of the production well. The permittee and impacted party may engage in a negotiated settlement

process and there may be modifications made to this permit in support of conflict resolution.

SUSPENSION: The Department may require the suspension of appropriation during periods of low water in order to

maintain minimum water levels within the basin/watercourse/watershed.

CONTINGENCY: If directed by DNR Ecological and Water Resources to cease pumping, the permittee agrees to

withstand the results of no appropriation as stated in the contingency statement submitted with the application.

INTAKE: All pump intakes must be screened to prevent fish from being drawn into the system.

INVASIVE SPECIES - EQUIPMENT DECONTAMINATION: All equipment intended for use at a project site must be free

of prohibited invasive species and aquatic plants prior to being transported into or within the state and placed into state

waters. All equipment used in designated infested waters, shall be inspected by the Permittee or their authorized agent

and adequately decontaminated prior to being transported from the worksite. The DNR is available to train inspectors

and/or assist in these inspections. For more information refer to the "Best Practices for Preventing the Spread of Aquatic

Page 8 - Permit Number 2018-3420

CONDITIONS continued on next page...

CONDITIONS (Continued from previous page)

Invasive Species" at http://files.dnr.state.mn.us/publications/ewr/invasives/ais/best_practices_for_prevention_ais.pdf.

Contact your regional Invasive Species Specialist for assistance at www.mndnr.gov/invasives/contacts.html. A list of

designated infested waters is available at www.mndnr.gov/invasives/ais/infested.html. A list of prohibited invasive species

is available at www.mndnr.gov/invasives/laws.html#prohibited.

INFESTED WATERS - WATER TREATMENT REQUIREMENTS: Surface water appropriation from waters listed as

containing invasive species (see http://www.mndnr.gov/invasives/ais/infested.html) are required to contact 651-259-5100 or

1-888-MINN-DNR to obtain information from the DNR Division of Ecological and Water Resources on specific invasive

species water treatment requirements.

WATER CONSERVATION: All practical and feasible water conservation methods and practices must be employed to

promote sound water management and use the least amount of water necessary, such as reuse and recycling water,

water-saving devices, and water storage.

DISCHARGE AUTHORIZATION: This permit is valid only in conjunction with all required discharge authorizations from

local, state, or federal government units.

CONSTRUCTION DEWATERING DISCHARGES: No discharges are allowed at known state-listed threatened and

endangered species location. All discharges should be completed per the specifics in the Environmental Protection Plan

(EPP) dated November 2020, received on November 08, 2020. Dewatering activities will be conducted as described in the

Construction Stormwater general permit and the revised May 2021 SWPPP, approved by MPCA and as described in the

June 3, 2021 letter “Supplemental Information for an Individual Water Appropriation Permit Amendment for Construction

Dewatering Reference No. 2018-3420”. There shall be continuous on-site monitoring of dewatering activities by qualified

staff to ensure that discharges prevent aquatic habitat degradation.

TIMING DEVICES AND FLOW METERS: All pumps in the construction trench must be instrumented with timing devices

or flow meters. All pumps used at the pump station facilities and well point systems must be instrumented with flow

meters. Timing devices are not allowed at the pump station facilities and well point systems as authorized under this

permit.

APPROPRIATION AND DISCHARGE RATES: All appropriation and discharge pump rates in construction dewatering

trenches and the pump station facilities must be between 400 gallons per minute (gpm) and 800 gpm. Pump rates must

not exceed 800 gpm. Appropriation and discharge pump rates for the well point systems must be set to a maximum of

1,500 gpm.

CHESTER 24 FEN PIEZOMETER AND MONITORING: The permittee shall monitor the existing well nest installed by

Enbridge near the RSV8 valve site on June 21, 2020. The well and piezometer should be instrumented at least a day

before dewatering for Line 3 construction starts with a datalogger programmed to take water levels every minute. A vented

logger is preferred but an absolute logger paired with a barologger on site, taking measurements at the same frequency, is

acceptable. The exact time of the start and end of dewatering in the area should be noted. Water levels should be

collected in this well nest until they recover to pre-pumping levels or after construction is completed and the area is

restored; whichever is longer. The piezometer construction information (well depth, screen length, casing length, top of

casing elevation, and well boring record), water level data, pump on/off times, pumping rates and volumes, along with the

length of pumping (time) should be submitted to DNR following completion of the project. Once water levels recover, and

with DNR prior approval, the piezometer and well could then be properly abandoned. If further information or coordination is

needed on installing and monitoring this piezometer, please contact Michele Walker, DNR Hydrologist,

michele.walker@state.mn.us, 218-308-2464.

Page 9 - Permit Number 2018-3420

CONDITIONS continued on next page...

cc: Tom Groshens, EWR District Manager

Simonson, Barry, Contact; Enbridge Energy, Limited Partnership

Ronayne, Angela, Contact; Merjent, Inc.

Lipps, Hannah, Contact; Merjent, Inc.

Hansen, Shannon, Contact; Merjent, Inc.

Fisher, Linda, Contact; Merjent, Inc.

Mike Findorff, MPCA

Mike Kelly, DNR Fisheries, Park Rapids Area

Edie Evarts, DNR Fisheries, Bemidji Area

Thomas Hutchins, Conservation Officers, Crookston

Jeremy Woinarowicz, Conservation Officers, Thief River Falls #1

Jacob Willis, Conservation Officers, Brookston

Ryan Brown, Conservation Officers, Karlstad

Taylor Hochstein, Conservation Officers, Hill City

Calie Kunst, Conservation Officers, Remer

Chelsey Best, Conservation Officers, Pequot Lakes

Nick Baum, Conservation Officers, Park Rapids

Hannah Mishler, Conservation Officers, Bemidji #2

Tim Gray, Conservation Officers, Bagley

Kevin Molloy, MPCA

Steve Hofstad, BWSR Wetland Specialists, Polk

Steve Hofstad, BWSR Wetland Specialists, Red Lake

Matt Johnson, BWSR Wetland Specialists, Marshall

Erin Loeffler, BWSR Wetland Specialists, St. Louis

David Demmer, BWSR Wetland Specialists, St. Louis

Matt Johnson, BWSR Wetland Specialists, Kittson

David Demmer, BWSR Wetland Specialists, Aitkin

Matt Johnson, BWSR Wetland Specialists, Cass

Matt Johnson, BWSR Wetland Specialists, Hubbard

Matt Johnson, BWSR Wetland Specialists, Clearwater

Andrew Herberg, DNR Regional Nongame Specialists, Region 2

Gaea Crozier, DNR Regional Nongame Specialists, Region 2

Amy Westmark, DNR Regional Nongame Specialists, Region 1

Margi Coyle, DNR Regional Environmental Assessment Ecologist, Region 2

Jaime Thibodeaux, DNR Regional Environmental Assessment Ecologist, Region 1

Emily Hutchins, DNR Wildlife, Crookston

Doug Franke, DNR Wildlife, Thief River Falls

Chris Balzer, DNR Wildlife, Cloquet

Jason Wollin, DNR Wildlife, Karlstad

Russ Reisz, DNR Wildlife, Aitkin

Christine Reisz, DNR Wildlife, Brainerd

Erik Thorson, DNR Wildlife, Park Rapids

Nathan Olson, DNR Fisheries, Detroit Lakes Area

Deserae Hendrickson, DNR Fisheries, Duluth Area

Phil Talmage, DNR Fisheries, Baudette Area

Rick Bruesewitz, DNR Fisheries, Aitkin Area

Marc Bacigalupi, DNR Fisheries, Brainerd Area

Jake Snyder, County, Polk

Kurt Casavan, County, Red Lake

Josh Johnston, County, Marshall

Mark Lindhorst, County, St. Louis

Barb O'Hara, County, Kittson

Becky Sovde, County, Aitkin

Andrew Carlstrom , County, Aitkin

John Ringle, County, Cass

Scott Navratil, County, Cass

Kelly Condiff, County, Cass

Jenny Blue, County, Cass

Page 10 - Permit Number 2018-3420

Levy Bergstrom, County, Cass

Eric Buitenwerf, County, Hubbard

Daniel Hecht, County, Clearwater

Kyle Schlomann, Watershed District, Middle Snake Tamarac WD

Danny Omdahl, Watershed District, Middle Snake Tamarac WD

Morteza Maher, Watershed District, Middle Snake Tamarac WD

Dan Money, Watershed District, Two Rivers WD

Myron Jesme, Watershed District, Red Lake WD

Corps of Engineers, Corps of Engineers, Polk

Corps of Engineers, Corps of Engineers, Red Lake

Corps of Engineers, Corps of Engineers, Marshall

Corps of Engineers, Corps of Engineers, St. Louis (South)

Corps of Engineers, Corps of Engineers, Kittson

Corps of Engineers, Corps of Engineers, Aitkin

Corps of Engineers, Corps of Engineers, Cass

Corps of Engineers, Corps of Engineers, Hubbard

Corps of Engineers, Corps of Engineers, Clearwater

Rachel Klein, SWCD, East Polk SWCD

Tanya Hanson, SWCD, Red Lake SWCD

Danny Thorstad, SWCD, Marshall SWCD

R.C. Boheim, SWCD, St. Louis SWCD - South

Justin Muller, SWCD, Kittson SWCD

Steven Hughes, SWCD, Aitkin SWCD

John Ringle, SWCD, Cass SWCD

Jessica Manifold, SWCD, Cass SWCD

Kelly Condiff, SWCD, Cass SWCD

Crystal Mathisrud, SWCD, Hubbard SWCD

Chester Powell, SWCD, Clearwater SWCD

Lori Buell, SWCD, Clearwater SWCD

Page 11 - Permit Number 2018-3420

Exhibit C

We only use cookies that are necessary for this site to function, and to provide you with the best experience. Learn

more in our Cookie Statement. By continuing to use this site, you consent to the use of cookies.

DNR Orders Enbridge Energy to Pay $3.32 Million for Failure to

Follow Environmental Laws

Having trouble viewing this email? View it as a Web page.

Minnesota Department of Natural Resources Orders

Enbridge Energy to Pay $3.32 Million for Failure to

Follow Environmental Laws

The Minnesota Department of Natural Resources (DNR) has ordered

Enbridge Energy to pay $3.32 million for failure to follow environmental

laws. Enbridge breached the confining layer of an artesian aquifer, resulting

in an unauthorized groundwater appropriation during the construction of the

Line 3 replacement project near Enbridge’s Clearbrook Terminal.

DNR’s civil enforcement orders require Enbridge to pay mitigation and

penalty funds of $3.32 million. This includes a restoration order requiring

$300,000 in initial mitigation funds to pay for the loss of groundwater

resources, $250,000 for DNR monitoring of calcareous fen wetlands near

the area of the aquifer breach and a $20,000 administrative penalty order

(the maximum allowed under state law). The DNR has also ordered

Enbridge to place $2,750,000 in escrow for restoration and mitigation of any

damage to the calcareous fen wetlands. DNR will determine what

restoration and mitigation is required.

DNR’s restoration order also requires Enbridge to implement a restoration

plan to stop the unauthorized groundwater flow within 30 days. The order

requires the company to conduct additional groundwater and site monitoring

and report the results, as well as to develop a Calcareous Fen Management

Plan. Additionally, to ensure that violations haven’t occurred elsewhere, the

DNR is requiring Enbridge to fund a re-inspection of any and all areas along

the entire route where construction depths deviated from plans (as they did

at the Clearbrook Terminal site).

Separately, the DNR has also referred this matter to the Clearwater County

Attorney for criminal prosecution. The DNR has determined that Enbridge

Energy violated Minnesota Statute 103G.141, subdivision 1, which makes it

a crime to appropriate “waters of the state without previously obtaining a

permit from the commissioner.”

The criminal referral and civil enforcement orders resulted from an

investigation of Line 3 construction activities near Enbridge’s Clearbrook

Terminal. Should the company violate the DNR’s restoration order, it would

be subject to additional misdemeanor charges under state law.

“DNR is committed to its role as a regulator on this project and is taking

seriously our responsibility to protect and manage natural resources within

existing state law,” said DNR Commissioner Sarah Strommen. “Enbridge’s

actions are clear violations of state law and also of public trust. This never

should have happened, and we are holding the company fully accountable.”

Background

Enbridge began work at the Clearbrook Terminal site in early 2021 but did

not follow the construction plans it had provided to DNR. The DNR relied

upon these plans in determining that proposed work at the Clearbrook

Terminal could proceed without effecting nearby calcareous fen wetlands. A

calcareous fen is a unique type of wetland, with stringent statutory

protections, that relies upon upwelling of mineral rich groundwater to thrive.

The company’s plans called for the use of traditional trench construction

methods at a depth of 8-10 feet. The company instead constructed the

trench at a depth of approximately 18 feet with sheet piling installed to a

depth of 28 feet. This deviation led to a breach of the confining layer of an

artesian aquifer, resulting in an uncontrolled flow of groundwater into the

trench. Enbridge failed to notify DNR of the groundwater situation at the

Clearbrook Terminal.

Independent Environmental Monitors (IEMs), working on behalf of DNR and

Minnesota Pollution Control Agency (MPCA), first observed unusual

amounts of water in the trench at the construction site in late January 2021.

This and subsequent inspections over the next several months focused on

managing the water in the trench. Under the Public Utilities Commission’s

(PUC) route permit, the IEMs’ role is to monitor compliance with the terms

and conditions of the PUC, DNR, and MPCA permits. They do not monitor

construction plans. Therefore, these inspections did not identify that

Enbridge’s construction activities had deviated from the company’s plans,

breaching the aquifer’s confining layer.

On June 15, 2021, during discussions with the IEMs, the DNR identified that

there was a potential breach of the aquifer’s confining layer at the

Clearbrook Terminal construction site. The DNR immediately commenced

an investigation and informed Enbridge that it must suspend construction at

the location until DNR had approved a plan to stop the flow of groundwater.

Resolving an uncontrolled flow from an artesian aquifer is technically

complex and requires good data and a comprehensive plan. The DNR

required Enbridge to investigate the groundwater conditions at the site and

submit a plan to correct the unauthorized flow conditions. On July 8,

Enbridge submitted a Groundwater Investigation Plan that the DNR

approved in revised form on July 12. On August 15, using the results of the

groundwater investigation, Enbridge submitted a Remedial Action Plan

outlining actions needed to stop the groundwater flow conditions. The DNR

approved this plan on August 18.

Through September 5, 2021, this violation has resulted in an estimated

release of approximately 24.2 million gallons of groundwater from the

aquifer. This water has been pumped from the trench, treated to remove

sediment and released to a nearby wetland.

Restoration Order Enbridge Energy 09/16/21 (PDF)

Administrative Penalty Order Enbridge Energy 09/16/21 (PDF)

Minnesota Department of Natural Resources | mndnr.gov

Email us: info.dnr@state.mn.us | Call 651-296-6157 or 888-646-6367

SUBSCRIBER SERVICES:

Manage Preferences | Unsubscribe | Help | Sign-up for other Minnesota DNR notifications

Subscribe to updates from Minnesota Department of Natural Resources

Email Address

Subscribe

Share Bulletin

Powered by

Privacy Policy | Cookie Statement | Help

e.g. name@example.com

Exhibit D

Exhibit E

September 16, 2021

VIA EMAIL TO LEO.GOLDEN@ENBRIDGE.COM ON SEPT. 16, 2021

VIA CERTIFIED MAIL, RETURN RECEIPT REQUESTED ON SEPT. 17, 2021

Leo Golden

Vice President, Major Projects

Enbridge Energy, LLP

26 East Superior Street

Suite 125

Duluth, Minnesota 55802

RE:

Administrative Penalty Order

Line 3 Replacement Project

Dear Mr. Golden:

The Department of Natural Resources (“DNR”) is issuing the enclosed Administrative Penalty Order

(APO) to Enbridge Energy, Limited Partnership for violations of Minnesota’s natural resource laws.

Please read the APO carefully. You must take action within 30 days after you receive this letter. You

must take corrective action and document your corrective action to the DNR, or you must pay the

invoiced amount, however, failure to take the required corrective action may result in the issuance of

additional penalties. If DNR determines your corrective action is not sufficient, you must pay the

invoiced amount within 20 days of receipt of the non-sufficiency notice from the DNR.

You have a right to formally dispute this action within 30 days after receiving the APO. Instructions are in

the RIGHT TO REVIEW section of the APO.

If you have questions or need assistance, contact me by phone at (651) 259-5119 or by email at

ann.pierce@state.mn.us .

Sincerely,

Ann Pierce

Deputy Division Director

Ecological and Water Resources

Enclosure: Administrative Penalty Order

cc:

Sherry Enzler, General Counsel

Jill Nguyen, Senior Staff Attorney

STATE OF MINNESOTA

DEPARTMENT OF NATURAL RESOURCES

ADMINISTRATIVE PENALTY ORDER

Enbridge Energy, Limited Partnership

26 East Superior Street

Suite 125

Duluth, Minnesota 55802

APO-001

Line 3 Replacement Project

This Administrative Penalty Order (APO) is issued by the Department of Natural Resources (DNR)

Commissioner pursuant to Minn. Stat. § 103G.299 for the violations listed below. This APO requires

Enbridge Energy, Limited Partnership (Enbridge) or (Regulated Party) to take action to correct the

violations.

************

VIOLATIONS

1. 103G.271 APPROPRIATION AND USE OF WATERS.

Subdivision 1. Permit required. (a) Except as provided in paragraph (b), the state, a person,

partnership, or association, private or public corporation, county, municipality, or other political

subdivision of the state may not appropriate or use waters of the state without a water-use

permit from the commissioner.

Subd. 4. Minimum-use exemption and local approval of low-use permits.

(a) Except for local permits under section 103B.211, subdivision 4, a water-use permit is not

required for the appropriation and use of less than 10,000 gallons per day and totaling no more

than 1,000,000 gallons per year, except as required by the commissioner under

section 103G.287, subdivision 4, paragraph (b).

103G.287 GROUNDWATER APPROPRIATIONS.

Subd. 5. Sustainability standard. The commissioner may issue water-use permits for

appropriation from groundwater only if the commissioner determines that the groundwater use

is sustainable to supply the needs of future generations and the proposed use will not harm

ecosystems, degrade water, or reduce water levels beyond the reach of public water supply and

private domestic wells constructed according to Minnesota Rules, chapter 4725.

Beginning on about January 21, 2021, and continuing through the date of this APO, Enbridge has

violated Minn. Stat. § 103G.271 and Minn. Stat. § 103G.287 Subd. 5 by the ongoing

appropriation or use of 10,000 or more gallons per day or more than one million gallons per

year of waters of the state without a water appropriation permit. By breaching the confining

layer of an artesian aquifer, Enbridge caused an uncontrolled release of groundwater

(uncontrolled flow) during the construction of the Line 3 Pipeline Replacement Project

(“Project”) at or near the Clearbrook Terminal, in Clearwater County Minnesota. This

uncontrolled flow is not authorized by any of Enbridge’s water appropriation permits for the

Project and Enbridge failed to notify the DNR that the breach of the aquifer had occurred. The

estimated volume of the uncontrolled flow is 24.2 million gallons through September 5, 2021.

1

The unpermitted appropriation of groundwater is a waste of Minnesota’s water resources and

threatens to harm or degrade the Leon 33 calcareous fen (Steenerson and Deep Lake Fens) and

two public waters, Deep Lake (ID15009000) and Steenerson Lake (ID15008900).

2. 103G.223 CALCAREOUS FENS.

(a) Calcareous fens, as identified by the commissioner by written order published in the State

Register, may not be filled, drained, or otherwise degraded, wholly or partially, by any activity,

unless the commissioner, under an approved management plan, decides some alteration is

necessary or as provided in paragraph (b). Identifications made by the commissioner are not

subject to the rulemaking provisions of chapter 14 and section 14.386 does not apply.

(b) The commissioner may allow water appropriations that result in temporary reductions in

groundwater resources on a seasonal basis under an approved calcareous fen management

plan.

Beginning on about January 21, 2021, and continuing through the date of this APO, Enbridge has

violated Minn. Stat. § 103G.223 by causing reductions in groundwater resources available to the

Leon 33 calcareous fen (Steenerson and Deep Lake Fens) (calcareous fens) without an approved

calcareous fen management plan. In 2020, Enbridge informed DNR, in its request for a no effect

concurrence, that its construction activities were unlikely to negatively impact the nearby

calcareous fens because Enbridge intended to excavate about an eight foot deep trench.

Instead, when Enbridge constructed the pipeline at or near the Clearbrook Terminal, Enbridge

excavated an eighteen foot deep trench and installed sheet piling to a depth of 28 feet. Because

Enbridge deviated from its plans, Enbridge breached an artesian aquifer, causing uncontrolled

flow of groundwater. The uncontrolled flow affects the same aquifer that upwells into the Leon

33 calcareous fen (Steenerson and Deep Lake Fens) and is located approximately 4,800 feet

northwest of the calcareous fens. Enbridge failed to submit a calcareous fen management plan

for DNR approval prior conducting an activity that may drain, or otherwise degrade, wholly or

partially, a calcareous fen.

*************

CORRECTIVE ACTION REQUIRED

Pursuant to Minn. Stat. § 103G.299, Subd. 4, the Regulated Party is required to correct all the violations

listed in this APO. The Regulated Party must document to the Commissioner, within 30 days after receipt

of this APO and in writing that the Regulated Party has taken the corrective actions listed below, unless

the Regulated Party seeks review of this APO as described below (Right to Review).

1. Complete all restoration work according to the DNR approved Remedial Action Plan dated August 18, 2021 to

stop the uncontrolled flow. If this plan does not succeed in stopping the uncontrolled flow, additional measures

will be required to address conditions at the site.

2. Enbridge must contact the DNR Director of Ecological and Water Resources within 24 hours of successfully

completing the work to stop the uncontrolled flow.

2

3. Enbridge shall;

a.

Provide the DNR with a revised estimate of water loss from March 19, 2021, to the date of this

APO. This estimate must be within +/- 10 percent of actual loss.

b. Submit to the DNR documentation of the ongoing measurement of discharge rates required under

the Remedial Action Plan. These measurements must include the current flow rate and any changes

in flow rates. These measurements must continue until the uncontrolled flow is stopped.

Documentation of the method of measurement must also be submitted to DNR. These

measurements must be within +/- 10 percent of actual flow rates.

c. Submit for DNR's approval a plan to continue to monitor groundwater for a 12-month period

following cessation of the uncontrolled flow. The plan shall include all pertinent methodological

information and a schedule for reporting results to the DNR. The duration of required groundwater

monitoring may be extended at the DNR's sole discretion.

Submit for DNR's approval a plan to conduct visual monitoring for break-through groundwater

discharges for a 12-month period following cessation of the uncontrolled flow. The plan shall

include all pertinent methodological information and a schedule for reporting results to the DNR.

The duration of required visual monitoring may be extended at the DNR's sole discretion.

4. Enbridge must submit a draft Calcareous Fen Management Plan (CFMP) for DNR review and approval. This plan

must include a description of ongoing monitoring of water levels and the plant communities that will occur to

determine if the loss of water has impacted the nearby Leon 33 calcareous fen (Steenerson and Deep Lake

Fens). The plan must provide site access for the DNR and/or its contractors to conduct and observe onsite fen

monitoring activities. The plan must also provide access for Tribal monitors to observe fen monitoring activities

if they choose to participate. The results of monitoring after implementation of the Remedial Action Plan and

Calcareous Fen Management Plan may result in additional requirements, restoration and/or mitigation as

directed by the DNR.

If the Enbridge has any questions about the corrective actions required, please contact the DNR staff

person identified below for assistance.

*************

PENALTY: $ 20,000.00

The Regulated Party is hereby assessed a penalty of $20,000.00 for the violations cited above. In

determining the amount of the penalty, the Commissioner considered whether Regulated Party gained

economic benefit as a result of the violation, whether there is a history of past violations, the number of

violations, and the gravity of the violations, including the potential harm caused by the violation, the

deviation from compliance, the potential damage to the public interest, the potential damage to natural

resources of the state and other factors as justice may require. The DNR determined that these

violations represent a severe potential for harm because the ongoing and unpermitted appropriation

has caused a reduction in groundwater resources available to calcareous fen, which are rare natural

resource, as well as other nearby public waters and because Enbridge failed to report the incident and

take timely action to stop the uncontrolled flow.

3

*************

Pursuant to Minn. Stat. § 103G.299, Subd. 5, if the Regulated Party performs and documents all the

corrective action requirements listed above to the satisfaction of the Commissioner, within 30 days after

the receipt of the APO the penalty shall be:

FORGIVABLE: $20,000.00

If the Regulated Party fails to perform and document all of the corrective action requirements listed

above to the satisfaction of the Commissioner, within 30 days after receipt of the APO, the $20,000

penalty plus shall be immediately due and payable in accordance with the requirements of Minn. Stat. §

103G.299, Subd. 5. Interest, at the rate established in section 549.09, begins to accrue on penalties on

the 31st day after the order with the penalty was received. Payment shall be made by check payable to

the Minnesota Department of Natural Resources within 31 days after receipt of the APO unless the

Regulated Party seeks review of this APO. The check should be mailed to the attention of Randall

Doneen, Supervisor Conservation Assistance and Regulation, Minnesota Department of Natural

Resources, 500 LaFayette Road, St. Paul, MN 55155. Mailed payments will be deemed to have been

remitted on the 31st day after receipt of the APO if they are postmarked on the 31st day after receipt of

the APO.

*************

RIGHT TO REVIEW

Pursuant to Minn. Stat. § 103G.299, subds. 6 and 7, the Regulated Party has a right to seek review of this

APO. The following description is intended only to aid the Regulated Party’s understanding of the review

process and does not constitute legal advice. The Commissioner strongly advises the Regulated Party to

review the law itself carefully before proceeding. A decision by Enbridge to contest this APO will not be

deemed to have stayed or relieved Enbridge of any other obligations or corrective actions issued by the

DNR pursuant to Minn. Stat. §§ 103G.2372, 103G.251, and 103G.141.

The Regulated Party has a right to have an expedited hearing before an administrative law judge to

contest this APO or the Commissioner’s determination that the Regulated Party’s corrective action was

unsatisfactory.

EXPEDITED HEARING (Administrative Law Judge Hearing) - To obtain an expedited hearing, the following

steps must be taken in a timely manner:

•

•

•

the Regulated Party must request review within 30 days after receipt of this APO or within 20 days

after receipt of the Commissioner’s determination that the Regulated Party’s corrective action is

unsatisfactory. The Regulated Party must ensure that any review request is received by the DNR

before 4:30 p.m. on the last day of the 30-day period if the Regulated Party is contesting the

issuance of the APO and before 4:30 on the last day of the 20-day period if the Regulated Party is

contesting a determination that the corrective action was unsatisfactory. The 30-day period begins

the first calendar day after the Regulated Party receives the APO. The 20 day period begins the first

calendar day after the Regulated Party receives the corrective action determination. If the appeal

period ends on a weekend or holiday, the appeal period is extended to 4:30 p.m. on the next day

the DNR is open for business;

the request must be in writing;

the request may be sent by U.S. mail;

4

•

•

•

the request must identify the APO or the corrective action determination that the Regulated Party

wants to contest and must specifically state the reasons why the Regulated Party wants the APO to

be reviewed, including any facts upon which the Regulated Party relies;

the Regulated Party must send or deliver the request to the DNR at the following address: General

Counsel, Minnesota Department of Natural Resources, 500 Lafayette Road North, St. Paul,

Minnesota 55155.; and

to ensure expeditious processing of the request, please send or deliver copies of the request to:

Randall Doneen, Supervisor Conservation Assistance and Regulation, Minnesota Department of

Natural Resources, 500 Lafayette Road, St. Paul, Minnesota, 55155 and to Oliver Larson, Manager,

Natural Resources Division, Attorney General’s Office, Bremer Tower, 445 Minnesota Street, Suite

900, St. Paul, Minnesota, 55101-2127.

The DNR will schedule an expedited hearing at the Office of Administrative Hearings if the above steps

are completed in the time frames indicated.

In the case of an expedited hearing, if the Regulated Party’s request is found to be frivolous or filed

solely for the purpose of delay, the Regulated Party may be required to pay the cost of the

administrative hearing in addition to the administrative penalty.

This APO becomes a final order after 30 days unless the Regulated Party requests a hearing as provided

above. If the Regulated Party fails to comply with the APO when it is a final order, the DNR may collect

the penalty in any manner provided by law for the collection of a debt.

STATE OF MINNESOTA

DEPARTMENT OF NATURAL RESOURCES

September 16, 2021

Date signed

Ann Pierce

Deputy Division Director

Ecological and Water Resources

Address questions and submittals requested above to:

Randall Doneen Minnesota Department of Natural Resources

500 Lafayette Road

St. Paul, MN 55155

651-259-5156

randall.doneen@state.mn.us

5

Exhibit F

Exhibit G

Case 1:20-cv-03817-CKK Document 2-12 Filed 12/24/20 Page 2 of 9

UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF COLUMBIA

RED LAKE BAND OF CHIPPEWA INDIANS,

WHITE EARTH BAND OF OJIBWE, HONOR

THE EARTH, and SIERRA CLUB,

Plaintiffs,

Case No. 1:20-cv-3817

v.

UNITED STATES ARMY CORPS OF

ENGINEERS,

Defendant.

DECLARATION OF WINONA LADUKE IN SUPPORT OF PLAINTIFFS’

MOTION FOR PRELIMINARY INJUNCTION

I, Winona LaDuke, declare and state as follows:

1.

My name is Winona LaDuke. I am 61 years old, a mother of six and grandmother

of nine. I am a widow, and I am the primary source of support for much of my extended

family.

2.

I am an enrolled member of the Minnesota Chippewa Tribe. The White Earth

Band of Ojibwe (“White Earth”) is one of six Chippewa bands comprising the Minnesota

Chippewa Tribe, and I have spent most of my life on the White Earth Reservation.

1

Case 1:20-cv-03817-CKK Document 2-12 Filed 12/24/20 Page 3 of 9

3.

In l993, I helped to found Honor the Earth in response to the pressing need for

national work on environmental issues facing Native people. Today, I serve as Honor the

Earth’s Executive Director.

4.

Honor the Earth is an Indigenous-led organization that centers its work around

advocating for and providing financial support to Native communities. Honor the Earth

works with Indigenous peoples in the United States and around the world, including

Indigenous communities harmed by the so-called pipeline “replacement” project at issue

in this case (“Line 3 Project”). In Honor the Earth’s more than 25 years of operation,

Honor the Earth has re-granted more than two million dollars to over 200 Native

American communities.

5.

Honor the Earth has participated in other water quality litigation as an amicus due

to tribal concerns about excessive row crop farms, fertilizer and pesticide use, and the

changing of the characteristics of the natural landscape from forests to crop production,

which also draws much underground water for nourishment.

6.

With our White Earth community, I also created the White Earth Land Recovery

Project 31 years ago because it is extremely difficult for people without land to be able to

carry on our agricultural and harvesting traditions. Over the past three decades, we have

been able to secure l400 acres of land held as a land trust within the reservation.

Additionally, culturally significant land is held outside of the reservation boundaries in

the l855 treaty territory.

2

Case 1:20-cv-03817-CKK Document 2-12 Filed 12/24/20 Page 4 of 9

7.

I am a traditional harvester of wild rice, medicinal plants, maple syrup, fish and

other animals, and I live from this land. Indakiingimin. This is the land to which I

belong.

8.

I have been a member of the Midewin society, our healing and religious society,

for most of my life. I am responsible for preserving cultural traditions including our

language. Our mino-bimaatisiiwin, the good life. I continue to practice and live within

the instructions of my ancestors and carry on those traditions for future generations.

9.

I attended Harvard University and have a degree in economics. I was a vice-

presidential candidate in 1996 and 2000 with the Green Party, serving as the running

mate for Ralph Nader.

10.

I have studied many disciplines in an effort to help improve economic

circumstances for the Chippewas or Anishinaabe people, and I have been an active

ceremonial and cultural member of my community. I am also a member of the 1855

Treaty Authority and a part of the group that helped create the Rights of Manoomin tribal

code for the 1855 Ceded territory.

11.

The Anishinaabe universe is made up of layers above and layers below, and it

consists of land and waters. Our world is half water and half land, and as such our

dodaem, or clan systems and teachings, comprise those of water, land, and air. The

waters or Midewaaboo of our territory—including the waters of lakes, rivers, and

underground springs—are full of manitoowag, or spirits, with whom we reaffirm our

relationship through ceremony throughout the year.

3

Case 1:20-cv-03817-CKK Document 2-12 Filed 12/24/20 Page 5 of 9

12.

In 2014, when I became aware of a prior pipeline project—known as the

Sandpiper pipeline—proposed by Enbridge Energy, Limited Partnership (“Enbridge”),

the company at issue in this case, Honor the Earth immediately engaged as a party at the

Minnesota Public Utilities Commission (“PUC”). Part of the Sandpiper pipeline’s route is

identical to the original Line 3 route.

13.

I am deeply concerned and afraid that Enbridge is preparing to ram the Line 3

Project through before the Chippewas have fully exercised our rights of appeals and legal

challenges to an obviously flawed environmental review process. In fact, I see that

happening already. Although Enbridge should have a cultural resource monitor ahead of

any pipeline work, we have already observed that no such person has been present on the

banks of the Mississippi River.

14.

On behalf of Honor the Earth, I worked very hard with residents of the White

Earth Reservation and members of the Minnesota Chippewa Tribe to develop the

Anishinaabe Cumulative Impact Assessment (“ACIA”) for the Line 3 Project and

pipeline route. This was intended to provide the lens of the Anishinaabe people and to

begin to articulate the complexity of the interconnected Anishinaabe Akiing world for the

state and federal regulatory process. The ACIA was filed with the PUC in 2018. Red

Lake, White Earth, and the 1855 Treaty Authority adopted resolutions choosing the No

Build alternative from the ACIA and filed and gave notice to the PUC.

15.

The Chippewas of the Mississippi have forever depended on the natural fresh

waters of the upper Mississippi River itself and all the interconnected water systems for

our sustenance and economic livelihood. Within and in close proximity to these waters, I

4

Case 1:20-cv-03817-CKK Document 2-12 Filed 12/24/20 Page 6 of 9

and my fellow tribal members hunt large and small game, migratory waterfowl, and fish

of many species and kinds; we gather wild rice and other edible plants, harvest medicinal

plants, and make maple syrup for food and for sale. This land is the medicine chest of the

Anishinaabe and represents some of the most biodiverse parts of Minnesota and the Great

Lakes region.

16.

The Line 3 Project’s path crosses hundreds of streams, rivers, wetlands, and

aquifers in this area. Construction and operation of the Line 3 Project, as permitted by

the U.S. Army Corps of Engineers (“the Corps”), will imminently and permanently

damage the freshwater resources that are essential to sustain my and my fellow tribal

members’ treaty reserve foods of wild rice, fish, and maple syrup. Wild rice is the most

important part of the Chippewa traditions, and it is central to our cultural practices and

spirituality.

17.

If the Line 3 Project is not immediately stopped, and the Corps’ permit remains in

place, Honor the Earth likely will divert significant financial resources to Native

American communities that will be harmed to help them protect their legal,

environmental, and cultural interests in the hundreds of acres of waterbodies and

wetlands that will be damaged or destroyed by the pipeline’s construction and operation.

As a result, Honor the Earth will be unable to invest in other Indigenous communities that

are also in critical need of help and resources.

18.

I am aware that pipeline construction workers at Standing Rock bulldozed land to

construct a pipeline before a legally valid environmental review process had been

completed. I am afraid that history will repeat itself here. In fact, the problem already

5

Case 1:20-cv-03817-CKK Document 2-12 Filed 12/24/20 Page 7 of 9

has begun. Enbridge’s initial moves in constructing sections of the Line 3 Project are

creating a swath of destruction moving towards our rivers including the Shell, Crow

Wing, Willow, and Mississippi.

19.

I am afraid for my children and grandchildren, and I particularly fear that the gifts

from the Creator are being put into extreme danger and risk by this pipeline. The pipeline

will have tremendously negative environmental impacts on our incredibly abundant

freshwater resources and more. Water and oil do not coexist, and this territory is the land

of life and spirits.

20.

I am particularly anxious and fearful about the Line 3 Project because I know that

the existing pipeline caused the largest inland oil spill in U.S. history in Grand Rapids,

Minnesota, in 1991. Enbridge also set fire to an oil spill near the Mississippi river in

Cohasset to try to control it, with devastating effects, in Minnesota in 2002. And the

Enbridge pipeline at Clearbrook had a fire and explosion during repair work that killed

individuals in 2007. In addition, I am distinctly aware of the Kalamazoo oil spill that

occurred in 2010, when an Enbridge-operated pipeline burst. And I know that in 2018,

TC Energy’s Keystone pipeline was responsible for a 383,000 gallon leak of tar sands oil

in North Dakota, just as experts predicted.

21.

I think everybody who is aware of this damning history and Enbridge’s terrible

record should choose to stand with the water, the land, and our environment to support

the ecosystems on which we rely. Every part of our Anishinabe natural world in northern

Minnesota is being put at risk by new pipelines.

6

Case 1:20-cv-03817-CKK Document 2-12 Filed 12/24/20 Page 8 of 9

22.

I know the Corps did not do an environmental impact statement under the

National Environmental Protection Act to rigorously assess the damage this pipeline

construction project will cause. I am very concerned that the Corps, which approved the

permits at stake in this case, has no adequate mechanism for holding Enbridge

accountable and, thus, has created a dangerous situation for our Anishinaabe

communities.

23.

More than that, the approval has resulted in the influx of thousands of temporary

workers, mostly from out of state, into our high risk Anishinaabe communities during a

pandemic. I am stressed by the fact that the Corps apparently thinks that Enbridge

workers are more important than tribal impacts and protecting the people of Red Lake

and White Earth from COVID-19, protecting our treaty rights, preserving our clean

water, and reducing climate change impacts to Minnesota.

24.

I am so concerned that I set up my spiritual lodge to pray near the proposed

projects route. Instead of noting my lodge, the Enbridge survey crew placed a stake in

the middle of the lodge, without demarcation for protection. I was charged with

trespassing at my own lodge.

25.

It is very apparent to me that our resources are not being safeguarded by

government decision-makers. Worse, it looks like the Corps is not concerned about

protecting our tribal rights. The Corps has now granted a permit to Enbridge that will

allow it to damage and destroy waterbodies and wetlands that provide essential food and

spiritual resources to me and my fellow tribal members. I support this challenge to the

7

Case 1:20-cv-03817-CKK Document 2-12 Filed 12/24/20 Page 9 of 9

Corps’ permit, and I believe that Enbridge needs to be immediately stopped from harming

the waters that are so essential for our survival.

26.

Miigwech.

I declare under penalty of perjury that, to the best of my knowledge, the foregoing is true

and correct. Executed this 24th day of December 2020, in Ponsford, Minnesota.

__________________________________________

Winona LaDuke

8

Exhibit H

Case 1:20-cv-03817 Document 2-9 Filed 12/24/20 Page 2 of 6

UNITED STATES DISTRICT COURT

FOR THE DISTRICT OF COLUMBIA

RED LAKE BAND OF CHIPPEWA INDIANS,

WHITE EARTH BAND OF OJIBWE, HONOR

THE EARTH, and SIERRA CLUB,

Plaintiffs,

Case No. 1:20-cv-3817

v.

UNITED STATES ARMY CORPS OF

ENGINEERS,

Defendant.

DECLARATION OF JAIME ARSENAULT

IN SUPPORT OF PLAINTIFFS’ MOTION FOR PRELIMINARY INJUNCTION

I, Jaime Arsenault, declare and state as follows:

1.

I am the Tribal Historic Preservation Officer (“THPO”) for the White Earth Band

of Ojibwe (“White Earth Band” or “Band”). In this role, I am the official Tribal representative

for historic and cultural resource preservation. I am also the official Tribal representative under

multiple federal laws, including the National Historic Preservation Act, American Indian

Religious Freedom Act, Archaeological Resource Protection Act, and National Environmental

Policy Act (“NEPA”). Among other things, I maintain review authority over federal

undertakings under NEPA both on and off Tribal land.

2.

For over two decades, I have worked with indigenous communities across the

country on issues involving grave protection and repatriation, food sovereignty, community

health, and protection of community knowledge. In addition to my position with the White Earth

Band, I currently sit on several committees and advisory boards including the Smithsonian

1

Case 1:20-cv-03817 Document 2-9 Filed 12/24/20 Page 3 of 6

National Museum of Natural History’s Repatriation Review Committee. Through this public

service, I continue to assist with the respectful return of Ancestors/human remains and other

cultural resources, while always striving to protect Indigenous cultural knowledge.

3.

Northern Minnesota is very much my home. Like many others, this is the place

where I rice, fish, gather medicines, and attend ceremonies.

4.

White Earth Band members depend on the natural resources of the White Earth

Reservation and surrounding areas. They participate in a variety of culturally significant

subsistence activities, including harvesting wild rice and maple syrup, fishing, and gathering

edible and medicinal plants. Harvesting wild rice is particularly significant. Wild rice is central

to the migration story of the Ojibwe people. This food remains an essential feature of

ceremonies practiced throughout Minnesota, and it is considered a sacred food. In addition, wild

rice is important to the White Earth Band’s food security, economic stability, quality of life, and

overall health.

5.

I am aware that the U.S. Army Corps of Engineers (“Corps”) has issued permits

allowing Enbridge Energy, Limited Partnership (“Enbridge”) to construct a pipeline that will

transport crude oil from the tar sands region in Alberta, Canada through northern Minnesota to

Wisconsin. This pipeline will pass within three miles of the White Earth Reservation’s

boundaries, and it will cross or otherwise affect lands and waters that Band members use and

rely upon for hunting, gathering, fishing, and harvesting wild rice, along with other cultural

purposes. Many of these lands and waters are within the White Earth Band’s historical territory,

and the Band’s ability to use these lands and waters is protected under various treaties. The

White Earth Band opposes this pipeline, and Band members are concerned that the Corps failed

to comply with federal law in issuing the necessary permits.

2

Case 1:20-cv-03817 Document 2-9 Filed 12/24/20 Page 4 of 6

6.

I am very concerned that an oil leak or spill from the pipeline will permanently

interfere with the White Earth Band’s ability to engage in culturally significant subsistence

activities on and off the White Earth Reservation. I know that pipeline leaks occur, and

Enbridge’s pipelines have leaked and spilled in the past with lasting impacts. Wild rice is a very

sensitive plant, and slight changes in water quality or sulfate levels could have disastrous effects.

Given Enbridge’s track record, I am worried that leaks or spills from the pipeline will damage

the White Earth Band’s ability to harvest this sacred food and access clean water.

7.

In addition, I understand that the Corps has authorized Enbridge to destroy 10

acres of wetlands and permanently alter 230 additional acres. This imminent destruction and

permanent alteration will damage habitat and interfere with the White Earth Band’s culturally

important subsistence activities.

8.

Construction and operation of the pipeline has already threatened one important

cultural site, and I fear that it will threaten others. On December 5, 2020, an Enbridge

construction crew discovered a ceremonial lodge in Palisade, Minnesota, on the banks of the

Mississippi River. Enbridge failed to notify me about the discovery; instead, I found out about it

through social media. Enbridge also failed to send a cultural resource monitor to the site to

ensure that it was protected. Leaving a cultural site unprotected risks damage to the site.

9.

I visited the site and determined that this lodge is a ceremonial lodge and modeled

after other lodges found throughout Minnesota. While these lodges are reconstructed every few

years per cultural protocol, the practice of reconstructing lodges is historic. Ceremonial and

healing activities take place within such structures, and unmarked burials are often located

nearby.

3

Case 1:20-cv-03817 Document 2-9 Filed 12/24/20 Page 5 of 6

10.

During my visit, I saw that the Enbridge crew had placed a stake right in the

center of the lodge. This is disrespectful, and it suggests that the crew planned to destroy the

lodge without adequate consultation or review.

11.

It is my assessment that the lodge is a culturally significant area where traditional

cultural practices are still occurring. Thus, I have recommended that Enbridge leave the lodge

intact, stop clearing trees near it, and conduct an archaeological review of the area using nondestructive review methods. But, despite my assessment and recommendation, it is my

understanding that construction near the lodge is ongoing.

12.

Destruction of this cultural site is damaging and disrespectful to the White Earth

Band and other Native communities here in Minnesota. Any potential destruction of nearby

burial areas would cause further irreparable harm.

13.

The lodge is located in an area known as Sandy Lake, which is one of the most

significant cultural crossroads of the Chippewa people, including White Earth Band members.

Sandy Lake is rich in cultural and historical sites that require protection. If construction

continues in this area, additional sites will likely be destroyed.

14.

If this Court were to enjoin pipeline construction, White Earth Band members

could continue to engage in culturally significant subsistence activities without interference. In

addition, I would feel more confident that culturally important sites will not be destroyed in

reliance on a legally infirm permit.

4

Case 1:20-cv-03817 Document 2-9 Filed 12/24/20 Page 6 of 6

I declare under penalty of perjury that, to the best of my knowledge, the foregoing is true

and correct. Executed this 24th day of December 2020.

__________________________________________

Jaime Arsenault

5

Exhibit I

CASE 0:21-cv-01869-WMW-LIB Doc. 20 Filed 09/03/21 Page 1 of 6

UNITED STATES DISTRICT COURT

DISTRICT OF MINNESOTA

Minnesota

Department

Resources et al.,

of

Natural

Case No. 21-cv-1869 (WMW/LIB)

Plaintiffs,

ORDER DENYING PLAINTIFFS’

v.

MOTION FOR PRELIMINARY

INJUNCTION AND DISMISSING

The White Earth Band of Ojibwe and COMPLAINT WITHOUT PREJUDICE

Hon. David A. DeGroat, in his official

capacity as judge of the White Earth Band

of Ojibwe Tribal Court,

Defendants.

This matter is before the Court on Plaintiffs’ motion to preliminarily enjoin

Defendants from proceeding in the matter Manoomin v. Minnesota Department of Natural

Resources, Case No. GC21-0428 (White Earth Band of Ojibwe Tribal Ct.). (Dkt. 5.) For

the reasons addressed below, the Court denies Plaintiffs’ motion for a preliminary

injunction and dismisses Plaintiffs’ complaint without prejudice for lack of subject-matter

jurisdiction.

BACKGROUND

Plaintiffs are the Minnesota Department of Natural Resources (DNR) and its

officials. Defendants are the White Earth Band of Ojibwe (Band) and Hon. David A.

DeGroat, Chief Judge of the White Earth Band of Ojibwe Tribal Court (Tribal Court).

CASE 0:21-cv-01869-WMW-LIB Doc. 20 Filed 09/03/21 Page 2 of 6

On August 5, 2021, the Band and several other parties1 (collectively Band Parties)

filed suit against the DNR and its officials in the Tribal Court. In the Tribal Court matter,

the Band Parties allege that, by granting water-use permits to a company in conjunction

with that company’s operation of an oil pipeline in northern Minnesota, the DNR violated

the Band Parties’ rights. In particular, the Band Parties allege that the DNR’s conduct

violates the First, Fourth, Fifth, and Fourteenth Amendments to the United States

Constitution, the American Indian Religious Freedom Act (AIRFA) and treaties between

the United States of America and the Chippewa and other tribes, among other claims. In

their lawsuit in the Tribal Court, the Band Parties seek declaratory and injunctive relief.

The DNR moved to dismiss the Band Parties’ tribal lawsuit, arguing that the Tribal

Court lacks subject-matter jurisdiction due to the non-member status of the DNR and its

officers, the DNR’s sovereign immunity and the fact that the contested actions did not take

place on reservation land. Chief Judge DeGroat of the Tribal Court denied the DNR’s

motion to dismiss, holding that the DNR’s arguments regarding sovereign immunity and

subject-matter jurisdiction “must give way” to the Band’s “vital” interests.

On August 19, 2021, Plaintiffs commenced this action, seeking declaratory and

injunctive relief against the Band and Chief Judge DeGroat. Plaintiffs argue that the Tribal

Court lacks subject-matter jurisdiction over the dispute currently pending in the Tribal

Court. Plaintiffs also contend that sovereign immunity protects them from the Band Parties’

1

The plaintiffs in the tribal court proceeding are Manoomin (wild rice), the Band,

members of the Band’s tribal council, and other individuals including members of the

Band, members of other tribes and individuals who are not members of any tribe.

2

CASE 0:21-cv-01869-WMW-LIB Doc. 20 Filed 09/03/21 Page 3 of 6

lawsuit. Plaintiffs request that this Court preliminarily enjoin the Band and Chief Judge

DeGroat from proceeding with the matter currently pending in the Tribal Court.

ANALYSIS

Preliminary injunctive relief is an extraordinary remedy that is never awarded as of

right. Winter v. Nat. Res. Def. Council, Inc., 555 U.S. 7, 24 (2008). The purpose of a

preliminary injunction is to maintain the status quo. Devose v. Herrington, 42 F.3d 470,

471 (8th Cir. 1994). The burden rests with the moving party to establish that injunctive

relief should be granted. Watkins Inc. v. Lewis, 346 F.3d 841, 844 (8th Cir. 2003). When

determining whether preliminary injunctive relief is warranted, the district court considers

four factors: (1) the movant’s likelihood of success on the merits, (2) the threat of

irreparable harm to the movant, (3) the state of balance between the harm to the movant

and the injury that granting an injunction will inflict on other parties to the litigation, and

(4) the public interest. Dataphase Sys., Inc. v. C L Sys., Inc., 640 F.2d 109, 114 (8th Cir.

1981).

The first and most important Dataphase factor is the movant’s likelihood of success

on the merits. Craig v. Simon, 980 F.3d 614, 617 (8th Cir. 2020) (stating that “[t]he

likelihood of success on the merits is the most important of the Dataphase factors”)

(internal quotation marks and brackets omitted). A party seeking a preliminary injunction

need not demonstrate actual success on the merits, but that party must demonstrate a

likelihood of success. Amoco Prod. Co. v. Village of Gambell, 480 U.S. 531, 546 n.12

(1987). When a court concludes that a plaintiff has “failed to establish a substantial

likelihood of success on the merits, [the court] will not address the other prerequisites of

3

CASE 0:21-cv-01869-WMW-LIB Doc. 20 Filed 09/03/21 Page 4 of 6

preliminary injunctive relief.” Church v. City of Huntsville, 30 F.3d 1332, 1342 (11th Cir.

1994).

“Tribal sovereign immunity is a jurisdictional threshold matter.” Fort Yates Pub.

Sch. Dist. No. 4 v. Murphy ex rel. C.M.B., 786 F.3d 662, 670 (8th Cir. 2015) (internal

quotation marks omitted). “As a matter of federal law, an Indian tribe is subject to suit

only where Congress has authorized the suit or the tribe has waived its immunity.” Kiowa

Tribe of Okla. v. Mfg. Techs., Inc., 523 U.S. 751, 754 (1998). “A tribe’s sovereign

immunity may extend to tribal agencies, including the Tribal Court.” Fort Yates, 786 F.3d

at 670–71 (internal quotation marks and brackets omitted); accord Hagen v. SissetoWahpeton Cmty. Coll., 205 F.3d 1040, 1043 (8th Cir. 2000) (observing that it is

“undisputed that a tribe’s sovereign immunity may extend to tribal agencies”). “The

Supreme Court has made clear . . . that a tribe’s sovereign immunity bars suits against the

tribe for injunctive and declaratory relief.” Fort Yates, 786 F.3d at 671 (citing Mich. v. Bay

Mills Indian Cmty., 572 U.S. 782 (2014) and Santa Clara Pueblo v. Martinez, 436 U.S. 49

(1978)).

Plaintiffs commenced this action against the Band and Chief Judge DeGroat in his

official capacity.2 These parties, a tribe and a tribal court, however, are both protected

2

Although Plaintiffs have not sued the Tribal Court, they have sued Chief Judge

DeGroat in his official capacity. Counsel for Plaintiffs asserted at the September 1, 2021

hearing that they sued Chief Judge DeGroat exclusively in his official capacity because the

Chief Judge of the Tribal Court is the appropriate defendant for the purposes of an officialcapacity suit. As such, Plaintiffs effectively seek declaratory and injunctive relief against

the Band and the Tribal Court.

4

CASE 0:21-cv-01869-WMW-LIB Doc. 20 Filed 09/03/21 Page 5 of 6

from suit by tribal sovereign immunity.3 Id. at 670–71. And Plaintiffs do not allege that

Defendants have waived their sovereign immunity or that Congress has authorized this

lawsuit. Because both Defendants are immune from suit and Plaintiffs have not identified

an applicable waiver or abrogation of tribal sovereign immunity, this Court lacks the

authority to enjoin Defendants.

Plaintiffs, therefore, have failed to demonstrate a

likelihood of success on the merits, and the Court need not analyze the remaining

Dataphase factors.

In summary, Plaintiffs are not entitled to injunctive relief because this Court lacks

the authority to enjoin the Defendants in this case. Moreover, in light of Defendants’ tribal

sovereign immunity, the Court also concludes that it lacks subject-matter jurisdiction over

this case and must dismiss the complaint without prejudice.4 See Fed. R. Civ. P. 12(h)(3)

(“If the court determines at any time that it lacks subject-matter jurisdiction, the court must

dismiss the action.”).

ORDER

Based on the foregoing analysis and all the files, records and proceedings herein, IT

IS HEREBY ORDERED that:

1.

Plaintiffs’ motion for a preliminary injunction, (Dkt. 5), is DENIED.

“Of course, the Tribe’s sovereign immunity does not necessarily protect Tribal

officials from suit,” id. at 671 n.8, nor does it protect other individuals. But Plaintiffs have

not sued any person in his or her individual capacity.

3

4

Because this Court lacks jurisdiction over Defendants based on their sovereign

immunity, the Court declines to address whether the Tribal Court has jurisdiction over

Plaintiffs pursuant to Montana v. United States, 450 U.S. 544 (1981), as such an opinion

would be an improper advisory opinion, see U.S. Const. art. III, § 2.

5

CASE 0:21-cv-01869-WMW-LIB Doc. 20 Filed 09/03/21 Page 6 of 6

2.

Plaintiffs’ complaint, (Dkt. 1), is DISMISSED WITHOUT PREJUDICE

for lack of subject-matter jurisdiction.

LET JUDGMENT BE ENTERED ACCORDINGLY.

Dated: September 3, 2021

s/Wilhelmina M. Wright

Wilhelmina M. Wright

United States District Judge

6

Exhibit J

CASE 0:21-cv-01869-WMW-LIB Doc. 25 Filed 09/10/21 Page 1 of 3

UNITED STATES DISTRICT COURT

DISTRICT OF MINNESOTA

Minnesota Department of Natural

Resources et al.,

Case No. 21-cv-1869 (WMW/LIB)

Plaintiffs,

v.

The White Earth Band of Ojibwe and

Hon. David A. DeGroat, in his official

capacity as judge of the White Earth Band

of Ojibwe Tribal Court,

ORDER DENYING PLAINTIFFS’

LETTER REQUEST FOR

PERMISSION TO FILE A MOTION

TO RECONSIDER

Defendants.

Before the Court is Plaintiffs’ September 5, 2021 letter requesting permission to file

a motion to reconsider this Court’s September 3, 2021 Order denying Plaintiffs’ motion for

a preliminary injunction and dismissing the complaint for lack of subject-matter

jurisdiction. (Dkt. 21.)

Pursuant to Local Rule 7.1(j), a party may receive permission to file a motion for

reconsideration only by showing “compelling circumstances.” LR 7.1(j). “Motions for

reconsideration serve a limited function: to correct manifest errors of law or fact or to

present newly discovered evidence.” Hagerman v. Yukon Energy Corp., 839 F.2d 407,

414 (8th Cir. 1988) (internal quotation marks omitted). Absent a manifest error of law or

fact, a motion for reconsideration cannot be employed to repeat arguments previously made,

introduce evidence or arguments that could have been made, or tender new legal theories

for the first time. See id.

CASE 0:21-cv-01869-WMW-LIB Doc. 25 Filed 09/10/21 Page 2 of 3

Plaintiffs argue that the Court erroneously concluded that Defendant Hon. David A.

DeGroat, Chief Judge of the White Earth Band of Ojibwe Tribal Court (Tribal Court), is

protected from suit by sovereign immunity. Plaintiffs argue that Chief Judge DeGroat may

be sued under Ex Parte Young. The Ex Parte Young doctrine “rests on the premise—less

delicately called a fiction—that when a federal court commands a state official to do

nothing more than refrain from violating federal law, he is not the State for sovereignimmunity purposes. The doctrine is limited to that precise situation.” Va. Off. for Prot. &

Advoc. v. Stewart, 563 U.S. 247, 255 (2011) (internal citations and quotation marks

omitted). The doctrine “does not apply when the state is the real, substantial party in

interest, as when the judgment sought would expend itself on the public treasury or domain,

or interfere with public administration.” Id. When determining whether the sovereign is

the real party in interest, “courts may not simply rely on the characterization of the parties

in the complaint, but rather must determine in the first instance whether the remedy sought

is truly against the sovereign.” Lewis v. Clarke, 137 S. Ct. 1285, 1290 (2017). “[T]he

general criterion for determining when a suit is in fact against the sovereign is the effect of

the relief sought.” Pennhurst State Sch. & Hosp. v. Halderman, 465 U.S. 89, 107 (1984).

“The general rule is that relief sought nominally against an officer is in fact against the

sovereign if the decree would operate against the latter.” Hawaii v. Gordon, 373 U.S. 57,

58 (1963). Such a suit is barred “regardless of whether it seeks damages or injunctive

relief.” Pennhurst, 465 U.S. at 101–02.

Here, Plaintiffs sued Chief Judge DeGroat in his official capacity. But the relief

Plaintiffs seek is an injunction preventing the Tribal Court from acting. To be effective,

2

CASE 0:21-cv-01869-WMW-LIB Doc. 25 Filed 09/10/21 Page 3 of 3

the injunction Plaintiffs seek necessarily would have to operate against the Tribal Court

rather than simply against an individual judge. Otherwise, Chief Judge DeGroat’s recusal

from the tribal court proceeding would have mooted the injunction Plaintiffs sought. For

these reasons, Plaintiffs’ suit against Chief Judge DeGroat was one in which the Tribal

Court was the real, substantial party in interest.

Plaintiffs have failed to demonstrate that the Court committed any manifest errors

of law or fact in concluding that Plaintiffs’ suit was, in effect, against the Tribal Court, and

thus barred by sovereign immunity. For these reasons, the Court denies Plaintiffs’ request

for permission to file a motion to reconsider the Court’s September 3, 2021 Order.

ORDER

Based on the foregoing analysis and all the files, records and proceedings herein, IT

IS HEREBY ORDERED that Plaintiffs’ request for permission to file a motion to

reconsider, (Dkt. 21), is DENIED.

Dated: September 10, 2021

s/Wilhelmina M. Wright

Wilhelmina M. Wright

United States District Judge

3

Exhibit K

UNITED STATES COURT OF APPEALS

FOR THE EIGHTH CIRCUIT

No: 21-3050

Minnesota Department of Natural Resources, et al.

Appellants

v.

The White Earth Band of Ojibwe and Hon. David A. DeGroat, in his official capacity as judge of

the White Earth Band of Ojibwe Tribal Court

Appellees

______________________________________________________________________________

Appeal from U.S. District Court for the District of Minnesota

(0:21-cv-01869-WMW)

______________________________________________________________________________

ORDER

Appellants’ motion for injunction pending disposition of its motion for injunctive relief

and the motion for injunction pending appeal are denied without prejudice. Appellants’ motion

for an expedited appeal is granted, and the following briefing schedule is established:

Appellants’ Brief and Addendum

October 18, 2021

Appendix (Joint or Appellants’ Separate

Appendix)

October 18, 2021

Appellees’ Brief (and Separate Appendix if

Required)

Twenty-one days from the date the

Court issues the Notice of Docket

Activity Filing Appellants’ Brief

Appellants’ Reply Brief

Ten days from the date the Court

Issues the Notice of Docket Activity

Filing Appellees’ Brief

The court will submit the case during the January, 2022 session of court.

September 21, 2021

Order Entered at the Direction of the Court:

Clerk, U.S. Court of Appeals, Eighth Circuit.

____________________________________

/s/ Michael E. Gans

Appellate Case: 21-3050

Page: 1

Date Filed: 09/21/2021 Entry ID: 5078974

Exhibit L

Jason Risdall

Manager Regulatory Affairs

tel

218-522-4705

Jason.Risdall@enbridge.com

Enbridge Energy, Limited

Partnership

11 E Superior Street

Suite #125

Duluth, MN 55802

September 23, 2021

VIA ELECTRONIC FILING

Mr. Will Seuffert

Executive Secretary

Minnesota Public Utilities Commission

121 7th Place East, Suite 350

St. Paul, MN 55101-2147

Re:

In the Matter of the Enbridge Energy, Limited Partnership for a Route Permit Line 3

Replacement Project in Minnesota from the North Dakota Border to the Wisconsin

Border MPUC Docket No. PL9/PPL-15-137

Dear Mr. Seuffert:

Enclosed for filing with the Minnesota Public Utilities Commission please find the weekly public status

report for Enbridge Energy, Limited Partnership (Enbridge) Line 3 Replacement Project.

Route Permit Condition 4.9 requires the submission of weekly status reports during Project

construction or restoration activities.

If you have any questions about the information in this filing, please feel free to contact me

at 218-522-4705.

Sincerely,

Jason Risdall

Manager, Regulatory Affairs

Enbridge Energy, Limited Partnership

Encl.

1

Line 3 Replacement Project (PL-9/PPL-15-137)

Route Permit Public Status Report

Line 3 Replacement Project Spread Overview Map

Report #:

46

Report Dates: 09-12-2021 to 09-18-2021

Enbridge shall report to the Minnesota Public Utilities Commission on progress during finalization of the route and construction of the pipeline. Enbridge

shall report weekly. If there is any period of time where no construction activity is occurring, restoration of the prior phase of the project has been

completed, and the overall project is not yet completed, Enbridge need only provide status reports monthly.

For additional information please go to the Line 3 website: https://www.enbridge.com/line3us

Page 1 of 4

Line 3 Replacement Project (PL-9/PPL-15-137)

Route Permit Public Status Report

Report #:

46

Report Dates: 09-12-2021 to 09-18-2021

Information included in this report is provided pursuant to the Company's obligations under the Route Permit issued by the MPUC. The information included herein is accurate only as of the dates covered by this report and is not

necessarily indicative of the Company's expected results or progress that may be reflected in future reports. The Company cautions readers against placing undue reliance on the information provided in this report beyond its

intended use, as it is not a guarantee of future performance. Readers are directed to the filings of Enbridge Inc. with Canadian and United States securities regulators for additional information.

Spread 1 - Major Mainline Construction Milestones Since Last Report (MP 789.4 to MP 896)

Clearing

Top Soil Grading

Stringing

Welding

Coating

Trenching

Backfill

Tie-Ins

Initial Clean-up

Final Clean-up

HDD

Bore

Progress

This Week Total

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.1% 100.0%

0.1% 100.0%

0.0% 100.0%

0.0% 100.0%

Spread 2 - Major Mainline Construction Milestones Since Last Report (MP 896 to MP D968.3)

Clearing

Top Soil Grading

Stringing

Welding

Coating

Trenching

Backfill

Tie-Ins

Initial Clean-up

Final Clean-up

HDD

Bore

Progress

This Week Total

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0% 100.0%

0.0%

99.5%

19.5%

89.2%

25.2%

77.0%

0.0% 100.0%

0.0% 100.0%

Spread 3 - Major Mainline Construction Milestones Since Last Report (MP D968.3 to MP D1048.1)

Progress

This Week Total

Clearing

0.0% 100.0%

Top Soil Grading

0.0% 100.0%

Stringing

0.0% 100.0%

Welding

0.0% 100.0%

Coating

0.0% 100.0%

Trenching

0.0% 100.0%

Backfill

0.0% 100.0%

Tie-Ins

0.0% 100.0%

Initial Clean-up

7.6%

98.5%

Final Clean-up

24.1%

98.0%

HDD

0.0% 100.0%

Bore

0.0% 100.0%

Spread 4 - Major Mainline Construction Milestones Since Last Report (MP D1048.1 to MP D1085.6)

Clearing

Top Soil Grading

Stringing

Welding

Coating

Trenching

Backfill

Tie-Ins

Initial Clean-up

Final Clean-up

HDD

Bore

Progress

This Week

Total

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

0.0%

100.0%

6.6%

98.0%

9.1%

97.4%

0.0%

100.0%

0.0%

100.0%

Spread 5 - Major Mainline Construction Milestones Since Last Report (MP D1085.6 to MP D1129/1084)

Progress

This Week

Total

Clearing

0.0%

100.0%

Top Soil Grading

0.0%

100.0%

Stringing

0.0%

100.0%

Welding

0.0%

100.0%

Coating

0.0%

100.0%

Trenching

0.0%

100.0%

Backfill

0.0%

100.0%

Tie-Ins

0.0%

100.0%

Initial Clean-up

5.5%

59.5%

Final Clean-up

3.2%

53.5%

HDD

0.0%

100.0%

Bore

0.0%

100.0%

Major Facilities Construction Milestones Since Last Report

Donaldson

Viking

Plummer

Clearbrook

Two Inlets

Backus

Swatara

Gowan North

Progress

This Week

Total

2.1%

95.2%

2.5%

96.8%

2.4%

97.0%

0.8%

97.0%

0.7%

98.8%

0.7%

97.4%

0.3%

98.8%

0.4%

99.0%

Page 2 of 4

Line 3 Replacement Project (PL-9/PPL-15-137)

Route Permit Public Status Report

Overall Summary Major Environmental Milestones Since Last Report

Number of Waterbody Crossings Complete

Number of Wetland Crossings Complete

Percent of Areas meeting final stabilization (revegetation) criteria

Progress

Total

Construction Updates to Note Since Last Report:

223

841

This Week

0.0%

0.0%

12.4%

Total

Mainline:

100.0% - Daily protest activity continues

99.8% - Commissioning work continuing

85.2%

Spread 1 - Major Environmental Milestones Since Last Report (MP 789.4 to MP 896)

Number of Waterbody Crossings Complete

Number of Wetland Crossings Complete

Mainline and Facilities:

- COVID protocols are in place and working as intended

Progress

Total

Crossings This Week

104

0.0%

240

0.0%

Total

100.0%

100.0%

0.1%

100.0%

Progress

Total

Crossings This Week

37

0.0%

213

0.0%

25.2%

Total

100.0%

99.1%

77.0%

Percent of Areas meeting final stabilization (revegetation) criteria

Spread 2 - Major Environmental Milestones Since Last Report (MP 896 to MP D968.3)

Number of Waterbody Crossings Complete

Number of Wetland Crossings Complete

Percent of Areas meeting final stabilization (revegetation) criteria

Spread 3 - Major Environmental Milestones Since Last Report (MP D968.3 to MP D1048.1)

Progress

Total

This Week

Number of Waterbody Crossings Complete

24

0.0%

Number of Wetland Crossings Complete

218

0.0%

Percent of Areas meeting final stabilization (revegetation) criteria

24.1%

Spread 4 - Major Environmental Milestones Since Last Report (MP D1048.1 to MP D1085.6)

Progress

Total

Crossings This Week

Number of Waterbody Crossings Complete

30

0.0%

Number of Wetland Crossings Complete

79

0.0%

Percent of Areas meeting final stabilization (revegetation) criteria

9.1%

Spread 5 - Major Environmental Milestones Since Last Report (MP D1085.6 to MP D1129/1084)

Progress

Total

Crossings This Week

Number of Waterbody Crossings Complete

28

0.0%

Number of Wetland Crossings Complete

91

0.0%

Percent of Areas meeting final stabilization (revegetation) criteria

3.2%

Report #:

46

Report Dates: 09-12-2021 to 09-18-2021

Facilities:

- Commissioning work is substantially complete

- Energization continues

Environmental Updates to Note Since Last Report

Total

- On September 12, 2021, Enbridge reported an event where turbid water entered a waterbody after pipeline

100.0% installation. Upon identification, corrective measures were implemented, including additional erosion controls.

100.0% Agency notification occurred for this event.

98.0% - On September 16, the MDNR issued Enbridge a Restoration Order and Administrative Penalty Order. Enbridge

continues to work with the MDNR and is implementing the previously approved remedial action plan.

Total

100.0%

100.0%

97.4%

Total

100.0%

100.0%

53.5%

Page 3 of 4

Line 3 Replacement Project (PL-9/PPL-15-137)

Route Permit Public Status Report - Construction Photos

Report #:

46

Report Dates: 09-12-2021 to 09-18-2021

Spread 1 (MP 789.4 to MP 896)

Spread 4 (MP D1048.1 to MP D1085.6)

Photo Caption: Restoration

Photo Caption: Clean-up/ Pulling Mats

Spread 2 (MP 896 to MP D968.3)

Spread 5 (MP D1085.6 to MP D1129/1084)

Photo Caption: Backfilling/ Restored Right of Way

Photo Caption: Maintaining ECD/ Pulling Mats

Spread 3 (MP D968.3 to MP D1048.1)

Facilities

Photo Caption: Finished Valve Pad/ Final Restoration

Photo Caption: Installing Fan Duct/ Installing Supports

Page 4 of 4

Exhibit M

#

*Clearbrook Terminal

!

!

(

(

!

(

Bemidji

!

Mississippi

!

( Headwaters

Grand Rapids

F

G

!

Park Rapids

Moorhead

!

!

(

!

(

!

(

(!

Huntersville

Line 3 Pipeline

Existing Main Line Corridor

Minnesota State Trails

Fond du Lac Reservation

F

G

!

(

Hill River

Land O'Lakes (

!

!

!

(

(

!

( !

(!

!

!

(

(

!

(

( !

(!

(!

!

(

(!

!

(

(!

!

!

!

!

!

(

(

(

(!

(

(

(!

Foot Hills

Intersecting Aquatic Management Areas (AMA)

Fond du Lac Reservation

(

!

(!

Savanna

!

(

Fond du Lac

F

G

Duluth

Superior Terminal

#

*

State of Minnesota

0

12.5

25

50 Miles

Intersecting School Trust Lands

Intersecting State Forests

Copyright 2020, State of Minnesota Department of Natural Resources (DNR).

Data was provided by the State of Minnesota and Enbridge Inc.

³