Hopi Hazard Mitigation Planning Team
Tribal code
Ask Donna
What actually matters in this document.
Text
HAZARD
MITIGATION PLAN
October 2015
Prepared by the
Hopi Hazard Mitigation Planning Team
Hopi Tribe Hazard Mitigation Plan
2015
THIS PAGE INTENTIONALLY LEFT BLANK
ii
Hopi Tribe Hazard Mitigation Plan
2015
TABLE OF CONTENTS
Section 1: Introduction .................................................................................................... 1
1.1
Purpose................................................................................................................................1
1.2
Background and Scope ........................................................................................................1
1.4
Tribal Assurances ................................................................................................................3
1.5
Plan Description..................................................................................................................3
Section 2: Community Description ................................................................................... 4
2.1
Section Changes ..................................................................................................................4
2.2
Introduction .......................................................................................................................4
2.3
Demographics .....................................................................................................................4
2.4
Economy................ .............................................................................................................4
2.5
Topography/Climate ...........................................................................................................7
2.6
Water Resources .................................................................................................................8
2.7
Traditional Culture and Archaeology ................................................................................. 11
2.8
Land Use.. ......................................................................................................................... 12
2.9
Public Infrastructure ......................................................................................................... 13
2.10 Emergency Medical Services.............................................................................................. 14
2.11 Development Trends ......................................................................................................... 15
2.12 Cultural and Sacred Sites ................................................................................................... 15
Section 3: Planning Process ........................................................................................... 16
3.1
Section Changes ................................................................................................................ 16
3.2
Points of Contact .............................................................................................................. 16
3.3
Planning Team and Activities............................................................................................. 16
3.4
Public and Stakeholder Involvement ................................................................................. 18
3.5
Program Integration.......................................................................................................... 18
Section 4: Risk Assessment............................................................................................. 21
4.1
Section Changes ................................................................................................................ 21
4.2
Risk Assessment................................................................................................................ 21
4.3
Hazard Profiles.................................................................................................................. 27
4.3.1
Drought ...................................................................................................................... 27
iii
Hopi Tribe Hazard Mitigation Plan
2015
4.3.2
Flooding ..................................................................................................................... 33
4.3.3
Landslide and Rockfall ............................................................................................... 41
4.3.4
Severe Wind ................................................................................................................ 45
4.3.5
Winter Storm .............................................................................................................. 48
Section 5: Mitigation Strategy ....................................................................................... 56
5.1
Section Changes ................................................................................................................ 56
5.2
Goals and Objectives ......................................................................................................... 56
5.3
Mitigation Actions/Projects............................................................................................... 56
5.4
Capability Assessment ...................................................................................................... 59
Section 6: Plan Maintenance ......................................................................................... 64
6.1
Section Changes ................................................................................................................ 64
6.2
Monitoring, Evaluating and Updating ................................................................................ 64
6.3
Monitoring Progress of Mitigation Activities ...................................................................... 64
6.4
Incorporation into other Planning Mechanisms ................................................................. 65
6.5
Past and Continued Member and Stakeholder Involvement ............................................... 66
Tables
Table 2-1: Keams Canyon Average Monthly Climate (1948-2005) ...................................... 7
Table 3-1: Planning Team ............................................................................................... 16
Table 3-2: Existing Plans, Studies, Reports ...................................................................... 19
Table 4-1: Hazard Identification ..................................................................................... 21
Table 4-2: Executive Order Declarations ......................................................................... 22
Table 4-3: Calculated Priority Risk Index (CPRI) ............................................................... 23
Table 4-4: CPRI Values by Hazard ................................................................................... 24
Table 4-5: Critical and Non-Critical Facilities ................................................................... 25
Table 4-6: Estimated Replacement Costs ........................................................................ 25
Table 4-7: Drought Related Executive Order Declarations ............................................... 28
Table 4-8: Vulnerability & Potential Losses due to Drought ............................................. 30
Table 4-9: Flooding Related Executive Order Declarations .............................................. 37
Table 4-10: Vulnerability & Potential Losses due to Flooding .......................................... 38
iv
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-11: Vulnerability & Potential Losses due to Landslide & Rock Fall ....................... 42
Table 4-12: Vulnerability & Potential Losses due to Severe Wind .................................... 45
Table 4-13: Winter Storm Related Executive Order Declarations ..................................... 49
Table 4-14: Vulnerability & Potential Losses due to Severe Winter Storm ....................... 53
Table 5-1: Current Mitigation Strategy ........................................................................... 58
Table 5-2: Capability Assessment ................................................................................... 60
Appendix
Appendix A - Planning Process Documentation............................................................... 68
Appendix B - Public Involvement Documents ................................................................. 74
Appendix C - Assessment of Previous Plan’s Mitigation Strategy ..................................... 80
v
Hopi Tribe Hazard Mitigation Plan
2015
THIS PAGE INTENTIONALLY LEFT BLANK
vi
Hopi Tribe Hazard Mitigation Plan
2015
Flagstaff
Winslow
Springerville
vii
Hopi Tribe Hazard Mitigation Plan
2015
THIS PAGE INTENTIONALLY LEFT BLANK
viii
Hopi Tribe Hazard Mitigation Plan
2015
SECTION 1: INTRODUCTION
1.1
Purpose
This Plan will guide and organize
current and future efforts to
effectively and efficiently mitigate
hazards on the Hopi Main and
Moenkopi District Reservations.
This Plan is intended to help create
disaster-resistant Reservations by
reducing the threat of hazards to
life, property, emergency response
capabilities, economic stability, and
infrastructure, while encouraging
the protection and restoration of
natural and cultural resources.
A Vision of Hopi
Hopi should be a place where:
Hopi culture and religion are strong;
Sacred sites are protected;
Cultural and environmentally sensitive development occurs;
The land is looked after;
There are jobs and businesses;
Quality infrastructure serves everyone;
Everyone has their own quality home;
The hazards identified for this
Public service facilities serve all needs.
planning effort have affected the
Reservations in the past and are
likely to affect the Reservations in
the future. These hazards include dam failure, drought, flooding, landslide/rockfall, severe wind and
winter storm.
This Plan will enable the Hopi Tribe to apply for FEMA grants for further mitigation planning and
mitigation projects. This eligibility will allow the Hopi Tribe to continue mitigation efforts to further
ensure the protection of the people and property of the Reservations.
The main purpose and goals of this Plan are:
1.2
Reduce the threats to public health and safety posed by hazards;
Reduce structural damages caused by hazards;
Reduce the environmental impacts of hazards, mitigation actions, and future development
activities; and
Reduce the costs resulting from disasters.
Background and Scope
Nationwide, billions of dollars are spent annually to help communities, organizations, businesses,
and individuals recover from disasters. These monies only partially reflect the true cost of disasters,
because additional expenses to insurance companies and nongovernmental organizations are not
reimbursed by tax dollars. Many disasters are predictable, and much of the damage caused by these
events can be alleviated or even eliminated.
Hazard mitigation is defined by FEMA as “any sustained action taken to reduce or eliminate longterm risk to human life and property from a hazard event.” The results of a three-year
congressionally mandated independent study to assess future savings from mitigation activities
1
Hopi Tribe Hazard Mitigation Plan
2015
provides evidence that mitigation activities are highly cost-effective. On average, each dollar spend
on mitigation saves society an average of $4 in avoided future losses in addition to saving lives and
preventing injuries (National Institute of Building Science Multi-Hazard Mitigation Council 2005).
Examples of hazard mitigation measures include, but are not limited to the following:
Development of mitigation standards, regulations, policies, and programs
Land use/zoning policies
Strong building code and floodplain management regulations
Dam safety program, seawalls, and levee systems
Acquisition of flood prone and environmentally sensitive lands
Retrofitting/hardening/elevating structures and critical facilities
Relocation of structures, infrastructure, and facilities out of vulnerable areas
Public awareness/education campaigns
Improvement of warning and evacuation systems
Hazard mitigation planning is the process through which hazards that threaten communities are
identified, likely impacts of those hazards are determined, mitigation goals are set, and appropriate
strategies to lessen impacts are determined, prioritized, and implemented. This Plan documents the
planning process employed by the Planning Team. The Plan identifies relevant hazards and risks, and
identifies the strategy that will be used to decrease vulnerability and increase resiliency and
sustainability.
This Plan was prepared pursuant to the requirements of the Disaster Mitigation Action of 2000 and
the implementing regulations set forth in the Federal Register (hereafter, these requirements will be
referred to collectively as the DMA2K). While the act emphasized the need for mitigation plans and
more coordinated mitigation planning and implementation efforts, the regulations established the
requirements that hazard mitigation plans must meet in order to be eligible for certain Federal
disaster assistance and hazard mitigation funding under the Robert T. Stafford Disaster Relief and
Emergency Act.
Information in this Plan will be used to help guide and coordinate mitigation activities and decisions
for future land use. Proactive mitigation planning will help reduce the cost of disaster response and
recovery to the community and its property owners by protecting structures, reducing exposure and
minimizing overall community impacts and disruption. The community has been affected by hazards
in the past and is thus committed to reducing future disaster impacts and maintaining eligibility for
Federal funding.
1.3
Plan Objectives
Assess and guide regulation of new development in areas that are vulnerable to hazards or
ensure that development occurs in a manner so that risk is minimized;
Protect or alter existing development in hazardous areas to make it less susceptible to
damage;
2
Hopi Tribe Hazard Mitigation Plan
1.4
2015
Ensure that the solutions to protect existing development are the most cost-effective
available; protects or enhances cultural and natural resources and sensitive to wildlife and
riparian habitats; and is consistent with applicable land use plans, regulations, and natural
resources management;
Ensure that the benefits of maintaining existing facilities outweigh their costs; if not
redesign facilities to make them less susceptible to damage or implement other solutions at
the site;
Manage natural resources including floodplains, wetlands and other resources for multiple
uses in line with the existing;
Improve coordination and consistency between the Hopi Tribe and Navajo Nation and other
jurisdictions, as appropriate, in management activities for floodplain areas;
Increase public awareness of hazards and improve appropriate preparation for and response
to such hazards;
Increase Reservation-wide and Tribal responsibility and support for hazard mitigation for the
Reservations; and
Organize and Improve hazard warning and emergency response systems.
Tribal Assurances
The Hopi Tribe will comply with all applicable Federal statutes and regulations in effect for those
periods when the Tribe receives grant funding per the DMA2K requirement §201.7(c)(6).
1.5
Plan Description
Tribal officials recognize that hazards pose a significant threat at varying degrees of magnitude and
frequency, to the safety and economic stability of the Tribe and its residents. Tribal officials
understand that not addressing the risk can result in increased costs, both in terms of financial and
human losses. Accordingly, the Hopi Tribe has prepared the 2015 Hopi Tribe Hazard Mitigation
Plan (the Plan) with a desire to become more aware of the Tribe’s vulnerability to those hazards and
to develop mitigation strategies that reduce the risks associated with them.
This plan is arranged and prepared to satisfy Tribal level planning requirements mandated by the
Disaster Mitigation Act of 2000 (DMA2K). DMA2K requirements are provided as appropriate in each
section. The plan is divided into sections as follows:
Section 1 – Introduction
Section 2 – Community Description
Section 3 – Planning Process
Section 4 – Risk Assessment
Section 5 – Mitigation Strategy
Section 6 – Plan Maintenance
3
Hopi Tribe Hazard Mitigation Plan
2015
SECTION 2: COMMUNITY DESCRIPTION
2.1
2.2
Section Changes
Maps and graphs that were determined to be irrelevant or to not contribute to the
effectiveness of the Plan were removed.
Extraneous detail was removed from the ‘Economy’ and ‘Ecological Zones’ sections
and was updated in a more clear and concise manner.
Introduction
Hopi Indian Tribal Lands today encompass two Federal Trust lands reservations located in the high
desert of northeastern Arizona on the Colorado Plateau. These two reservations were established
by different means and like many Indian Tribes in the United States, fall short of the entire breadth
of indigenous land claims and former land use. The Hopi people have a longstanding occupation
within the Southwestern United States being descendants of the various archaeologically identified
pre-historic cultures and complexes known as Anasazi, Mogollon, Sinagua, Salado, Hohokam and
Hakataya. An occupational time span of over a millennium characterizes the nature of the oldest
Hopi pueblo villages and their members. It is important for us to understand the nature of
occupation for the Hopi people on their lands so that our planning effort reflects the current
challenges and sensitivities pertinent to the unique Hopi communities.
The main Hopi Indian reservation has been more recently established following from the original
1882 Executive Order Reservation created by President Chester Arthur and finalized through the
1974 Navajo-Hopi Land Settlement Act to include over 1.6 million acres and recognition of Hopi land
management units District Six and the Hopi Partitioned Lands under full control of the Hopi Tribe.
Land management unit District Six encompasses 15 units at the core of the main reservation with
most of the Hopi villages and communities listed here from east to west: Keams Canyon, Polacca,
First Mesa Villages of Walpi, Sichomovi, and Tewa; Second Mesa Villages of Shungopavi,
Mishongnovi and Sipaulovi; Kykotsmovi, and the Third Mesa Villages of Oraibi, Hotevilla and Bacavi.
The Hopi Partitioned Lands make up the outer areas of the main reservation with a total of 36
numbered range units which includes various scattered home sites, ranch homes and the charter
community of Yuwehloo Pahki Community established in March 27, 2000 in Range Units 567 & 568.
The second Hopi reservation was more currently established and recognized the longstanding
occupation of the Hopi village of Moenkopi. The Moenkopi District was established through
litigation of a Congressional Act of 1934 that expanded the Navajo Indian Reservation without due
recognition of Hopi occupation and land use. The ceded land acquisition has re-established 61,604
acres for use by the Hopi Tribe and Moenkopi villages including important irrigation and agricultural
uses.
2.3
Demographics
The Hopi Tribal population as of August 2014, of enrolled Hopi members total 13,990. Living on the
Reservation: 7,769 and living off the Reservation: 6,221.
2.4
Economy
The Hopi Reservation economy consists of a formal and informal or traditional economy. The formal
sector is defined as organized, business-like activity meant to create jobs and personal income. The
informal economy consists of goods and services produced for household consumption or for
exchange in social and cultural settings.
4
Hopi Tribe Hazard Mitigation Plan
2015
The annual monetary value of the formal economy on the Hopi Reservation is approximately $44.8
million. This economy produces 2,941 reservation jobs. In addition, the Kayenta Mine is located on
or adjacent to the Reservation provide another 24 Hopi jobs.
Tribal government operations are funded by about $70 million in recurring annual revenue. About
95% of this revenue is derived from the three sources:
Contracts, grants, awards and indirect costs recovery from the federal government and
State of Arizona
Coal royalties and water sales from the Peabody Coal; and
Earning from financial investments
Other revenue sources include business leases and rents; fees, fines and forfeitures, and
miscellaneous sources. The tribe also generates enterprise-type revenues from the Hopi Tribe
Economic Development Corporation, which accounts for the following Hopi owned businesses: Hopi
Cultural Center Motel and Restaurant, a motel in Sedona, Arizona, Hopi, and two shopping centers
located in Flagstaff, Arizona, and a Truck Stop Center near Holbrook, Arizona.
5
Hopi Tribe Hazard Mitigation Plan
2015
Map 2-1: Hopi Reservations
6
Hopi Tribe Hazard Mitigation Plan
2.5
2015
Topography/Climate
The Hopi Reservation is located within the Great Basin Desert, on the Colorado Plateau,
encompassing and extending beyond the southern edge of Black Mesa. Black Mesa consists of
sandstone belonging to the Mesa Verde Group, underlain by Mancos Shale. The southern
escarpment breaks off sharply to form the broad, flat Little Colorado River Valley. The southern
scarp of Black Mesa forms discontinuous, finger-like projections called Antelope Mesa, First Mesa,
Second Mesa, Third Mesa, Howell Mesa and Coalmine Mesa.
Five major washes cross the Hopi Reservation: Moenkopi, Dinnebito, Oraibi, Polacca, and Jeddito
along with contributing channels of Keams Canyon and Wepo. All the five major washes are
tributaries of the Little Colorado River, and flow in a generally northeast to southwesterly direction.
While the majority of the flow of washes is ephemeral, intermittent and perennial reaches exist in
some areas, primarily as a result of groundwater discharge.
The climate of the Hopi Reservation is semiarid, with precipitation ranging from 6 to 10 inches per
year in the lower elevations, and 10 to 14 inches per year in the higher elevations. The majority of
the precipitation occurs July through October. Snow accumulates most heavily in January and
decreases steadily into May. The average seasonal snowfall is 14 inches. The climate is characterized
by mild to hot summers, and cold winters. In summer the average temperature is 70°F, and the
average daily maximum temperature is 87°F, as recorded at Keams Canyon.
Elevations within the planning area range between 4,500-7,500 feet above mean sea level.
Table 2-1: Keams Canyon Average Monthly Climate (1948-2005)
Jan Feb Mar Apr May Jun Jul
Aug Sep Oct
Nov
Dec
Max Temp (F)
43.3 49
55.3 64.7 73.4
84.9 89.1 85.4 79.3 68.6 54.7 44.5
Min Temp (F)
16.2 21.1 25.1 30.9 38.9
47.1 55.3 54.6 46.9 35.9 25.2 16.8
Precipitation (in) .77
.80
.88
.56
.39
.30
1.20 1.62 .88
1.01 .68
.88
Snowfall (in)
2.4
1.8
0.4
0.0
0.0
0.0
0.7
10.1
1.4
0.0
0.1
3.2
Source: Western Regional Climate Center website (http://www.wrcc.dri.edu/), July 22, 2014.
Ecological Zones
The Hopi Reservation covers diverse ecological zones. These various ecological zones support plant
communities that Hopi continue to harvest and manage for a number of needs and applications,
since prehistoric times. As part of Hopi stewardship, plant resources are key to sustaining the many
domestic and religious needs of Hopi society. Prior to widespread grazing land use, native
vegetation supported wildlife such as small and big game, resident and migratory birds, insects,
reptiles, amphibians, and many others that made up the source of annual gathering harvests for
Hopi needs.
Ecological zones within the Hopi Reservation are classified based on climate, vegetation, and soil
criteria. There are five zones: Semi-Desert Grassland, Mixed Grassland, Sagebrush-Grassland,
Pinyon-Juniper Woodland, and Wetlands.
Semi-Desert Grassland occurs below 5,500 feet in elevation and receives average annual
precipitation of 5-8 inches. It occupies 264,353 acres, or 17% of the Reservation. Vegetation in this
7
Hopi Tribe Hazard Mitigation Plan
2015
zone is predominantly grasses and is a nearly treeless area, with the exception of riparian areas, or
where soil moisture is concentrated.
Mixed Grassland occurs between 5,500 and 6,200 feet in elevation, and receives average annual
precipitation of 8-12 inches. It occupies 993,907 acres, or 64% of the Reservation. This zone is
dominated by grasses when in good range condition.
Sagebrush-Grassland occurs between 6,200 and 7,000 feet and receives average annual
precipitation of 12-15 inches. It occupies 285,738 acres, or 18% of the Reservation.
Pinyon-Juniper Woodland occurs between 6,500 and 7,500 feet elevation, and receives average
annual precipitation of 15-17 inches. Pinyon-juniper canopy is the dominant feature. This zone
occupies only 9,543 acres or less than 1% of the Reservation.
Wetlands are not elevation specific ecological zones; neither do they receive more or less
precipitation than surrounding environments. However, they are characterized by the presence of
water, for some or all of the year, hydric soils, and wetland vegetation. This zone occupies an
estimated 8,000 acres, or less than 1% of the Reservation.
2.6
Water Resources
Paavahu, Water resources, are highly valued by the Hopi as a main source of life in a harsh and arid
environment. The central focus in Hopi ceremonial life is the propitiation of moisture in its various
forms. Moisture provides for the domestic and agricultural needs of Hopi people as well as the
supernatural and spiritual essence of Hopitutskwa, the Hopi indigenous lands. As a valuable natural
resource to the Hopi people, water must be protected and conserved so that we may all fulfill our
ultimate stewardship responsibility: the needs of our children and future generations for this life
giving resource.
Historically, Hopi people relied on a dense network of springs for their water. However, growing
population and modern development have increased the demand for water beyond the capacity of
these springs and compelled Hopi to look for alternative sources. The Hopi now rely primarily on
subsurface aquifers for both human and livestock use.
Many growing communities in northeast Arizona use these same aquifers and the surface drainages
of the Little Colorado River and its tributaries. Since the area's constrained water supply has to
support a growing population, there is negotiation and litigation surrounding water use rights.
Additionally, human impacts are compromising the quality of the region's water, both above and
belowground. Since aquifers depend on infiltration of surface water for recharge, they are
vulnerable to overuse, drought, contamination and harmful human activities. Source water for the
Hopi Reservation is in dire straits for a variety of reasons.
Surface Water Resources
The surface water resources of the Hopi Reservation include the five major washes, Jeddito, Polacca,
Oraibi, Dinnebito, and Moenkopi, which traverse the Hopi Reservation from a northeast to
southwest direction. All of the Hopi washes are listed as impaired under the Hopi Tribe’s Clean
Water Action Plan Unified Watershed Assessment, due to sediment load, chemical contamination,
and presence of coliform bacteria. The only known current utilization of surface water on the Hopi
Reservation is for cattle watering through diversions to off-stream storage and cattle ponds on
tributaries to the washes. Under the settlement proposal in the Little Colorado River Adjudication,
the Hopi and Navajo Tribe would share in the waters of these washes equally, according to a
formula regulating impoundment storage volumes.
8
Hopi Tribe Hazard Mitigation Plan
2015
Ground Water Resources
Perched aquifers - are sand deposits which lie within a confining soil and rock layer. These aquifers
are easily contaminated by livestock, game, and human occupation. The Tuba City Landfill
contaminates one of the perched zones and another is contaminated by the Thriftway/Sunwest
gasoline station spills at Tuba City and Moenkopi. These aquifers may yield water to seeps, springs
and windmills. They are limited in extent and poor in quality.
Quaternary Alluvial Deposits - sand and soil are deposited along the washes by fluvial action and
wind. These deposits may contain water of variable quality and production. D.B. Stephens and
Associates dug four wells into the alluvium in 1993 as part of the ongoing water source inventory
conducted by the Hopi Water Resources Program. A well dug into the alluvium along upper Wepo
Wash was very good in quality and production. A well dug into the alluvium near Polacca Airport
was moderate in quality. Two wells dug into the alluvium along Oraibi Wash were moderate to poor
in quality. Two boreholes attempted in the alluvium along upper and lower Dinnebito Wash were
dry. A windmill near Polacca is dug into the alluvium and used for water hauling for drinking and
livestock water. The quality is unknown.
Wepo Sandstone Aquifer - this uppermost aquifer is a rock unit high on the Hopi mesas near the
Peabody Coal Company Black Mesa Mine lease. A few windmills are drilled into this aquifer, mostly
on the Navajo Partitioned Lands. It is limited in extent and storage, and little is known about the
quality of the water.
Toreva Sandstone Aquifer (T-Aquifer) - this aquifer outcrops along the edges of the Hopi Mesas, and
supplies the springs traditionally used for drinking water supply and garden irrigation near the
villages. Water supply wells have been drilled into this aquifer at First Mesa and a hand-dug well
was drilled into it at Kykotsmovi early in the 20th Century. Water quality ranges from very good
(potable) to poor (due to metals and bacterial contamination), production is fair. At Hotevilla and
Bacavi, the water contains radioactive gas (radon) in excess of the proposed maximum contaminant
level. The exact extent of the aquifer is unknown due to poor well logs at Hopi. This aquifer is easily
contaminated by human occupation, due to its nearness to the ground surface in inhabited areas.
Dakota Sandstone Aquifer (D-Aquifer) - this aquifer consists of the Dakota Sandstone and Entrada
Sandstone water-bearing units. It is extensively used for windmills in cattle watering. Some people
may haul water from these windmills. The aquifer water quality ranges from very good to poor.
Springs in the Keams Canyon area discharging from this aquifer may contain arsenic and other
metals. Saline water from this aquifer may contaminate drinking water wells in the Polacca and Hopi
High School areas due to poor well construction and/or natural inter-formational leakage and
seepage. The Spider Mound well is thought to penetrate this aquifer and contains fluoride in excess
of the MCL. The exact extent of this aquifer is unknown due to poor well logs at Hopi. Production
ranges from poor to fair. The Entrada Sandstone is unsaturated in the south Oraibi basin.
Navajo Sandstone Aquifer (N-Aquifer) - this aquifer consists of the Navajo Sandstone, the Kayenta
Mudstone and the Windgate Sandstone. It is the primary drinking water aquifer on the Hopi
Reservation, being the source for all village wells, except Spider Mound. In many areas, the water is
sufficiently pure to use in steam irons (nearly distilled water quality). The production rate is
generally good, ranging from 20-600 gallons per minute. Contamination is possible from interformational leakage through faults and fractures in the overlying rock. The exact extent of this
aquifer is unknown due to poor well logs at Hopi.
9
Hopi Tribe Hazard Mitigation Plan
2015
Coconino Sandstone Aquifer (C-Aquifer) - this aquifer consists of the Coconino Sandstone and Supai
formations. It is known to underlie the Hopi Reservation. It extends throughout the Little Colorado
River Basin and is used for drinking water supply in the nearby cities of Flagstaff, Winslow, Holbrook,
St. Johns, and others. The quality ranges from very good (at Peabody) to very poor. The production
rate is very good at Winslow and very poor at the Peabody Mine. An oil exploration well in the
southern part of the Hopi Reservation (Oraibi Wash Basin) was once used for water supply. This
aquifer is under intense investigation by Hopi Water Resources Program Staff and D.B. Stephens and
Associates for water supply in the southern portion of the Hopi Reservation and at Moenkopi.
Exploration wells may be drilled into this aquifer in the next several years at Moenkopi. Another
study is soon to be published for the southern part of the aquifer by the US Geological Survey.
Muav Limestone and Redwall Limestone Aquifer – this aquifer is used for water supply in the City of
Sedona and at the Hualapai and Havasupai Indian Reservations, but is nearly 4,000 feet deep at
Hopi. It is not considered a viable or affordable source of water for Hopi.
The Hopi Tribe is engaged in a water rights adjudication of the Little Colorado River Basin. Due to
court-ordered confidentiality rulings, and not to endanger the position of the Tribe in litigation and
settlement activities, Tribal programs cannot utilize nor have access to a significant amount of
technical data and analyses. Unfortunately, some of the most applicable information for resource
planning purposes has been developed for the adjudication, at great expense to the Hopi Tribe and
the Bureau of Indian Affairs acting as trustee for the Tribe, and is not available to programs for use
in the development of projects.
Data suggests that the major surface water problem is sediment generated from extensive soil
erosion. However, it has not been determined if this is a natural phenomenon or aggravated by
improper management of soils. Most range soils are sandy loam, yet a significant percentage of
sediment is clay, indicating that eroding Mancos shale could be a significant source of this
sedimentation.
Hydro-geological data and analyses required for the delineation of aquifers and water bearing
alluvial deposits is normally derived from well logs and pump tests. The Indian Health Service (IHS)
and the Bureau of Indian Affairs (BIA) drilled wells for over 50 years without adequate well logs or
pump tests. Since over 90% of the wells were not logged, little information is available to assist in
locating new wells, estimating the cost of new wells in the proximate area, or determining water
quality. A lack of data regarding a geological fault line that runs through the southeastern corner of
the Hopi Reservation led to a number of wells being drilled that produced inferior water. Lack of
data also inhibits the ability to plan for future water use on the reservation.
To date, little is known about the C-aquifer, the deepest feasible aquifer underlying the Hopi
Reservation, extending south of Interstate 40. Data that is available for evaluating ground water
resources is contained in databases that cannot be accessed without expensive sort-retrieve
programming.
Water quality data is sparse and expensive to collect. The Hopi Tribe has invested a significant dollar
amount in USGS data collection, with little return, in part because the USGS Water Wells database
uses different locator identity information from that of the Tribe’s.
Current data cannot directly link health problems to possible water contamination however, risk
assessments for water contamination change as advances are made in technology. In most cases,
acceptable levels of contamination are decreased as more information is learned. While this raises
questions regarding current acceptable levels, this also directly conflicts with Hopi philosophy that
any level of contamination is unacceptable.
10
Hopi Tribe Hazard Mitigation Plan
2015
The major implication of limited water data is that the Hopi Tribe is also unable to do good planning,
due to the unavailability of data. More research is needed to avoid expensive mistakes, for example,
in selection of well drilling locations.
2.7
Traditional Culture and Archaeology
The Hopi Reservations are a place rich in traditional cultural activity and archaeological sites. There
are numerous Hopi shrines, sacred springs, eagle and snake gathering areas not only on the Hopi
Reservation but throughout Hopi indigenous lands. Many of these places are still visited and used
during the Hopi ceremonial cycles to fulfill traditional obligations. There are approximately 2,500
recorded archaeological sites on the reservation ranging from scatters of ceramics and stone tools
to prehistoric villages. Hopi people have lived in this area for over a millennium.
Archaeological and cultural resources on the Hopi reservation encompass many sites and places that
are extremely valuable to Hopi culture and history. The Hopi view archaeological sites as footprints,
physical evidence, of indigenous occupation and believe that ancestral remains still physically and
spiritually inhabit those places. Just as important are other sites labeled Traditional Cultural
Properties (TCPs) such as petroglyph panels, religious shrines, resource collection areas, which are
considered living elements of Hopi culture and identity. Many Hopi clans and religious societies still
carry out responsibilities that center around archaeological sites and TCPs related to all Hopi
villages. Unfortunately the full breadth of archaeological sites and TCPs affiliated with Hopi
prehistory do not fall within the jurisdiction of Hopi stewardship and political control. The Hopi are
culturally affiliated with many of the prehistoric cultures which have been labeled as Anasazi,
Fremont, Sinagua, Mogollon, Hohokam, Salado, and others including Paleo-Indian remains being
currently researched and identified.
The Hopi Tribe, through the establishment of the Office of Cultural Preservation (CPO) in 1982,
works with four federal acts that address the protection of cultural properties on federal trust land:
the Native American Graves Protection and Repatriation Act (NAGPRA) of 1990, Archaeological
Resources Protection Act (ARPA) of 1976, American Antiquities Act of 1906, and the National Historic
Preservation Act of 1945. While not specifically designed to protect cultural resources, the National
Environmental Policy Act (NEPA) requires archaeological surveys to be performed for projects
receiving federal funds, or requiring federal action. As a local measure, the Hopi Tribe enacted
Ordinance No. 26, the Ordinance for the Protection of Places and Objects of Sacred, Historical and
Scientific Interest on the Hopi Reservation in 1974. Ordinance No. 26 specifies its intent, which is:
To provide for the protection of places and objects of sacred, historical and scientific
interest on the Hopi Reservation; To provide a means of enforcing these protective
measures; and To provide for the licensing of all scientific and historical exploration
or excavation on the Reservation.
Although numerous, these protective measures do not address all aspects of cultural resource
protection. They each face significant obstacles in their implementation, through such limitations as
insufficient monitoring and tribal prosecution capabilities. Also, conflicts often occur when
protecting archaeological sites within the context of a living culture. A great number of issues
therefore face cultural and archaeological resources, both from within the tribal government and
external organizations.
11
Hopi Tribe Hazard Mitigation Plan
2015
Restoration of traditional Hopi architecture home in the
village of Shungopavi on Second Mesa. Homes such as
these represent great value to the community and continue
the Hopi tradition and identity.
2.8
Land Use
Four major categories of land use can be identified on the Hopi Reservations, these are agricultural
and range, recreational, industrial, and community mixed use which includes residential,
institutional, and commercial uses all located in clustered configurations locally referred to as village
and communities.
By far the most prevalent use of the Reservations trust land is agricultural and range land use,
approximately 1,565,590 acres. The principal activity on this land is livestock grazing. In support of
this use, the Hopi tribal government maintains a range management program with a maintenance
budget for range improvements and infrastructure. Other activities for agricultural and range land
include Hopi traditional corn agriculture, traditional gathering, low density rural residential (Navajo
home sites in Hopi Partitioned Lands), and infrastructure rights-of-way.
In 1992, the Hopi Tribal Council designated the Blue Canyon Special Management Area, an area of
approximately 36,860 acres located in the northwestern part of the reservation, dedicated to
outdoor recreation and conservation purposes. It is currently the subject of watershed rehabilitation
projects and traditional gathering.
There are four areas of industrial land use located on the tribal trust land. These are the Western
Peabody Coal Mine lease located in the northeastern part of the Main Reservation, the solid waste
facility on the main reservation, and the Hopi Winslow Property. These three areas total
approximately 6,290 acres. Another area of industrial use (unmapped) is the former BIA dump
located in the Moenkopi District near the Moenkopi villages.
The community mixed use category, approximately 14,600 acres, consists of areas of residential,
commercial and public facilities development. It is within these areas that the bulk of the Hopi
resident population lives. Public service facilities, specifically the Hopi Tribal government complex,
the Hopi Veterans Memorial Center, Hopi Wellness and Conference Center, the Hopi Jr/Sr High
School, and new IHS ambulatory health care center are just outside the community areas.
Contemporary Hopi people, like their ancestors, continue to live in the high desert of the Colorado
Plateau of northeastern Arizona. While they retain many of their traditions particularly their
religious beliefs and ceremonies, their modern life has changed in many dramatic ways from the
12
Hopi Tribe Hazard Mitigation Plan
2015
traditional Hopi life of just one hundred years ago. The twelve contemporary villages and
communities reflect a growth in community settlement patterns. Instead of living in highly compact,
multi-story pueblos, many Hopi families now live in single family detached houses laid out in cul-desac subdivisions. Many families, particularly in the First Mesa area, have moved from the mesa tops
onto the lower flood plains and valleys. Many modern Hopi participate in the local and regional cash
economy as well as grow crops and herd livestock for household consumption. A tribal constitution
was adopted in 1936 and under its authority a tribal government was formed. Several villages have
adopted elected forms of government to replace their former traditional oligarchies and others have
not. Most Hopi people have come to understand the benefits and conveniences of the modern
world with domestic water and wastewater systems, electricity, telephones, automobiles and other
forms of technology. These are but a few of the changes that have occurred over the past hundred
years and they point in the direction of continual change as the Hopi move into the second
millennium of occupation on the high desert mesas of the Colorado Plateau.
Historic Land Use
The Hopi people, like their ancestors, have a longstanding agrarian way of life and developed a
unique form of farming the arid lands that continues to sustain them. Since their ancestral
occupation of the Greater Southwest and the local Hopi region, the Hopi brought with them a set of
domesticated crops and farming methods that were adapted to the arid lands, ephemeral washes
and soils to ensure an annual sustainable crop harvest. To complement these domestic crops was
the knowledge of plant gathering, hunting and trapping wildlife resources, manufacturing
construction materials, medicinal needs and other socio-cultural developments that formed the
nexus of Hopi villages and their survival. The local ecosystems made available a variety of resources
to be found along with more distant areas such as the ponderosa pine forests of the San Francisco
Peaks area about eighty miles to the west. Life on the Colorado Plateau necessitated the use of even
distant regional ecosystems and a large land base had provided the Hopi people with access to
resources to continue their way of life and customs. Beyond farming within the lower floodplains
and gardening the mesa tops and terraces, a large regional trade network of relationships with
Eastern Pueblos (Zuni, Jemez, Rio Grande Pueblos, etc.) in what is now New Mexico, Hualapai and
Havasupai near the Grand Canyon, Southern Paiute and other tribes formed an economy that the
Hopi participated in and benefited from.
The local farming tradition is controlled by village traditional governments with village boundaries
generally agreed to along with some resource collection boundaries. These village land use practices
continue to exist into contemporary times.
The arrival of European and Old World explorers and settlers brought in another system of Spanish
colonialism which was ended with the Pueblo Revolt of 1680 and subsequent conflicts with Spanish
missionaries and conquistadores. They were driven from the Hopi region and never re-established
rule over the Hopi villages again. Many productive tools and crops were brought by this Spanish and
later Euro-American contact and trade. These have been added to the repertoire of the Hopi
farmers and also began another form of economy and subsistence with livestock herds and work
animals.
2.9
Public Infrastructure
Reservation infrastructure development and infrastructure land uses, with the exception of roads
and range improvements for livestock, tend to be located in association with community mixed land
use areas. Most village and community settlements have some public utilities—water, wastewater,
electricity, and phone. Coal, wood, and propane are used for heating and cooking. Private utility
13
Hopi Tribe Hazard Mitigation Plan
2015
companies provide electricity, propane, and telephone service. A number of homes have solar
power. Water and wastewater systems were developed with federal assistance in cooperation with
villages and communities which in turn operate and maintain them. Despite the progress made,
some villages still do not have water and wastewater systems in place including electricity and
telephone.
This limited network of developed public service infrastructure, especially reliable electrical supply,
is perceived as severely constraining to both economic development and new housing on the
reservations. The only sources of electrical power are provided by Arizona Public Service from the
Cholla Power Plant in Joseph City, AZ. Another source serving the Yu Wehloo Pahki (Spider Mound)
Community and several residents in the Teesto area is provided by the Navajo Utility Authority
(NTUA).
The existing infrastructure systems are not without problems. Water and wastewater service within
villages is not comprehensive, and most villages systems are in dire need of upgrading. Many water
systems cannot meet village needs, and most village wastewater system lagoons are poorly sited
and severely overloaded. Septic systems are still a prevalent mode of wastewater treatment on the
reservation, even in and around village areas.
There is currently a water contamination issue relating to high levels of Arsenic in Keams Canyon,
First Mesa and Second Mesa, which has caused the US Environmental Protection Agency (USEPA) to
enforce compliance with the Safe Drinking Water Regulations on the Bureau of Indian Affairs-Hopi
Agency and the villages. To meet compliance, Reverse Osmosis (RO) systems have been installed
and bottled water is distributed for human consumption.
To remedy this water problem, the Hopi-Tribe Water Resource Program and Indian Health ServiceOffice of Environmental Health have implemented the Hopi Arsenic Mitigation Project (HAMP),
which entails the drilling of two (2) N-aquifer wells and water to be piped to the First and Second
Mesa villages, and to Keams Canyon.
2.10
Emergency Medical Services
The emergency medical services are provided by the Hopi Emergency Medical Services. Hopi EMS is
a full-time tribal EMS program based at the Hopi Health Care Center just west of Polacca. Hopi EMS
operates from the Health Care Center and the Wildland Fire Building (Paawiki) located at
Kykotsmovi Village to cover both the west and east areas of the Hopi Land, Tewa village, Spider
Mound Community and several outlying Navajo Nation communities.
The Hopi EMS program provides both Basic and Advanced Life Support pre-hospital emergency care
along with other services including vehicle extrication and high angle mesa rescue.
Currently the Hopi EMS program employs 10 basic EMTs and 10 paramedics, all of who hold local
(Arizona Department of Health Services, Bureau of EMS & Trauma Systems) and national (National
Registry of Emergency Medical Technicians) certifications. The Hopi EMS Basic EMTs receive their
medical control through the Hopi Health Care Center while the Paramedics receive theirs through
the Flagstaff Medical Center Pre-Hospital Care Program. The Hopi EMS program runs with 2-3 fully
stocked ambulances staffed by ALS/BLS crews for 911 calls and inter-facility transports. The Hopi
EMS is dispatched through the BIA/LES 911 dispatch system and is under the Department of Public
Safety & Emergency Services of the Hopi Tribe.
14
Hopi Tribe Hazard Mitigation Plan
2.11
2015
Development Trends
The Tribe has developed and the Hopi Tribal Council has adopted the Hopi Tribal Council of the Hopi
the Strategic Land Stewardship; an Integrated Resource Management Plan for the Hopi Tribe 2001.
Both of these plans reflect the desire of the Tribal government to promote the Hopi economy,
community growth quality infrastructure and the overall general welfare of the Reservation in a
culturally and environmentally sensitive manner guided by Hopi values.
The plans provide guidance and actions that will help achieve the planning goals and objectives that
are important to the environmentally sensitive and quality development of the Reservation for the
future of the Hopi Tribe. The 2015 Hopi Tribe Hazard Mitigation Plan is conducive to the efforts of
assessing the vulnerability of the Reservation to hazard events and will provide another tool to
Tribal land use planning in determining quality development.
Any development of Tribal lands over the past several years has been guided by the oversight of the
Tribal Council. The Tribe has been proactive in mitigation planning and will continue to do so for
future development. The hazard profiles contain specific discussions regarding mitigation
opportunities or perceived requirements regarding possible future growth and development of
Tribal lands.
The Hopi Tribe values keeping the land in its pristine natural environment. It is unlikely that the tribe
will experience significant grow in population and developed areas.
2.12
Cultural and Sacred Sites
In the previous Plan, there was little discussion of the tribe’s cultural and sacred sites. Therefore, the
discussion begins here with the Planning Team describing these sites in basic form, their upkeep and
where additional information can be found.
Hopi Ordinance #26 provides for the protection of places and objects of sacred, historical and
scientific interest on the Hopi Reservation. The Hopi Cultural Preservation Office sponsors The Hopi
Cultural Advisory Team which is comprised of a group of tribal members. The team makes annual
visits to all significant cultural and sacred sites to pay their respects as well as maintain and provide
continued protection. Those sites will not be discussed in detail in this Plan, however can be found
at the Hopi Cultural Preservation Office.
15
Hopi Tribe Hazard Mitigation Plan
2015
SECTION 3: PLANNING PROCESS
3.1
Section Changes
This entire section was reformatted for improved clarity.
A ‘Program Integration’ subsection was added. This requirement was not addressed in the
Tribe’s previous Plan.
3.2
Points of Contact
Primary Contact:
Public Health Emergency Preparedness
Velleda R. Sidney
The Hopi Tribe
P.O. Box 123
Kykotsmovi, AZ 86039
Office Phone: (928) 734-3664
Email: vsidney@hopi.nsn.us
Secondary Contact:
Emergency Management Coordinator
Paul V. Saufkie
The Hopi Tribe
P.O. Box 123
Kykotsmovi, AZ 86039
Office Phone: (928) 734-3663
Email: psaufkie@hopi.nsn.us
The authorities responsible for adoption of the Plan include:
3.3
Herman G. Honanie, Chairman
Alfred Lomahquahu, Jr., Vice-Chairman
Hopi Tribal Council
Planning Team and Activities
At the beginning of the update process, the Primary Point of Contact identified potential members
for the Planning Team by extending invitations to, all Indian Tribal government department leads,
tribal and public and private organizations and businesses, local utility companies and regional,
federal and state organizations. These agencies included those such as: Hopi government
departments and agencies; BIA agencies, CERT Teams, all Hopi villages/communities via their
Community Service Administrator, the Hopi Health Care Center and the AZ Dept of Emergency and
Military Affairs.
There was a good response to the invitations and the Planning Team members are listed below and
those who participated in this update as well as the previous version of this Plan are indicated in
bold print.
Table 3-1: Planning Team
Name
Title
Agency/Organization
Role/Responsibilities
Herman Honanie
Hopi Chairman
Office of Chairman
Approve Executive Orders & major
mitigation projects
Velleda Sidney
PHEP, Coordinator
Hopi Public Health Emergency
Preparedness
Plan update lead.
16
Hopi Tribe Hazard Mitigation Plan
2015
Betty Poley
Supervisor Geodesist
Land Information Systems
Keep this plan updated with maps,
tables and graphs.
Paul V. Saufkie
Dept. of Public Safety & EM
Services – EM Coordinator
Assist in making revisions to the
Plan & quarterly updates.
Edison J. Tu’tsi
Director
Hopi Lands
Keep this plan updated with tribal
lands pertaining to the hazards.
Wendell Honanie,
Superintendent
Hopi BIA
Keep this plan updated with BIA
policies.
Lance Honeyestewa
Paramedic Supervisor
Hopi EMS
Provide hazard and response
information.
Laverne Dallas
Program Manager
Hopi Dept. of Health Services
Provide information on impacts to
health from hazards.
Clayton Honyumptewa
Director DNR
Dept. of Natural Resources (DNR) Oversee Plan update.
Sam Yazzie
BIA Wildland Fire
Provide information on wind
speeds and wildfire conditions.
Michael Poleahla
Maintenance Technician
Spider Mound Community
Provide information on issues and
damage impacts within the specific
community.
Claude Pahona
Maintenance Technician
Village of Tewa
Provide information on issues and
damage impacts within the specific
community.
Carlene Tenakhongva
Staff Assistant
Chairman’s Office
Keep the Chairman apprised of the
plan update process.
Fred Shupla
Hopi Office of Community
Planning & Economic
Development
Provide information from other
planning mechanisms that help
guide this Plan update.
Roger Tungovia
Director
Dept. of Public Safety and
Emergency Services
Oversee Plan update.
Hazard mitigation planning for the Indian Tribe began in July 2014, with the first Planning Team
Meeting. An overview of the current Plan was provided. The current hazards were analyzed as well
as others that threaten the reservation. The hazards were also ranked and prioritized as well as new
hazards added. Assignments were discussed and were sent to the Team after the meeting.
To better understand the mitigation planning process, representatives from the Hopi Tribe attended
a Hazard Mitigation and THIRA Workshop as well as FEMA’s G393 Mitigation for Emergency
Managers two-day course in October 2014.
The Primary Point of Contact provided mitigation plan update presentations to the Hopi Emergency
Response Team (HERT) at their monthly meetings. Some of the HERT members also serve on the
mitigation planning team.
17
Hopi Tribe Hazard Mitigation Plan
2015
In January and April of 2015 the state planner assisting the tribe on this Plan, met with the Tribe’s
Mitigation Planning team and worked on compiling updated material in the Plan. At that time,
detailed work of developing the various elements of the Plan by reaching out to specific subject
matter experts in various areas was performed. These areas included: hazard profile, identification
of capabilities, and mitigation strategy development and plan maintenance. Planning
documentation such as agendas, minutes and sign-in sheets are in the Appendices of this Plan.
3.4
Public and Stakeholder Involvement
The term “public” is defined by the Tribe as, “All people that reside or visit within the exterior
boundaries of the Hopi Reservation or any new acquired lands”. Members of the community, not
specifically participating on the planning team or employed by the community, can prove to be great
assets to the hazard mitigation planning process. The Planning Team employed the following
strategy to solicit public and stakeholder involvement and input to the planning process:
Newspaper article was placed in the Hopi Tutuveni, December 6, 2014. The article explained
the plan update process, the hazards being examined and the benefits of having a plan. It
also gave contact information for questions or input.
Bulletins explaining the planning process and need for a Plan were posted on March 9, 2015
at six locations among the villages across the Reservation. With the bulletins, a copy of the
current Plan was placed there along with a notebook for questions and comments.
There was one comment on the current Plan regarding rockfalls.
The Planning Team employed the following strategy to solicit public and stakeholder involvement
and input to the Plan during the draft review period prior to submission to FEMA:
A newspaper article was published in the Hopi Tutuveni on August 4, 2015. The article
explained the importance of the plan and the most significant threats to the tribe. It also
provided information on where to review the plan and contact information for
comment/input.
Bulletins and printed plans were placed at six locations across the Reservations for the
period of July 20-August 17, 2015. This provided the public the opportunity to review and
comment on the Plan update draft.
There were no comments on the Plan update draft.
Copies of these documents and any comments, questions or input can be found in the Appendices
of this Plan.
3.5
Program Integration
The Hopi Tribe encourages utilizing existing information and activities to integrate data, mitigation
strategies and other resources that support the mitigation goals of this Plan. The Tribe believes this
practice will ensure we are working toward common goals and assist in the effective
implementation of this Plan as well as other plans.
Below is a list of current tribal resources either related to, referenced in, and/or parallel to the Plan.
As appropriate, the Tribe will also reference the Plan when developing new plans to associate the
Tribe’s overall mitigation goals.
18
Hopi Tribe Hazard Mitigation Plan
2015
Table 3-2: Existing Plans, Studies, Reports
Plan/Study Name
Hopi Wildland Fire
Management Plan
Hopi Integrated Woodlands
Management Plan for the
Hopi Reservation
Hopi Emergency Response
Plan
Hopit Potskwaniat (Hopi
Tribal Consolidated Strategic
Plan)
Hopi Tustsqua Makiwa’yta
(Hopi Land Stewardship An
Integrated Plan for the Hopi
Reservation)
Hopi Tunatya’at (Community
and Economic Plan)
Ordinance #26 – Protection of
places and objects of sacred,
historical and scientific
interest on the Hopi
Reservation
Ordinance #47 – The Hopi
Tribe Woodland Ordinance
Description
Integration Characteristics
Date
Completed or
Implemented
BIA Wildland Fire Mgmt 2005 Adopted
Office
by Tribe
Hopi Dept .of Natural
Resources, USDA
Forest Service and BIA
2006
Plan/Study Author
Defines what the BIA Wildland Fire Agency will respond to and manage fires on the Reservations.
Sets management direction for the Hopi Indian Reservation woodland forest. The Plan is specific
to woodland forest management as well as other natural resources with the forest ecosystem.
Guides the proper protection of environment and land.
Defines how the responders and response teams will respond to disaster events. The plan
outlines the intended protocols for managing disaster incidents.
The Plan helps to define what the hazards are that most threaten the Reservation.
Defines the vision for the Tribe’s future and addresses specific needs to promote the welfare of
the Hopi and Tewa people. It also provides a means to a better quality of life and provides a
framework for organizing our efforts.
Provides direction for all planning mechanisms to follow to ensure cohesive movement forward.
Defines the rules by which the Hopi are to utilize natural resources and provide conservation
efforts for environmental health.
Provides guidelines by which to use and protect the Hopi natural resources against hazards.
A guide that sets the standards for land and environmental use based upon Hopi values.
Will help ensure minimal development in hazard-prone areas.
Provides a means of enforcing these protective measures; and provide for the licensing of all
scientific and historical exploration or excavation on the Reservation.
Guides information to use when looking at potential projects that will protect the cultural and
sacred sites and assets.
Provides and adequate and flexible system for the protection and conversation of the woodland
resource on the Hopi Reservation while providing an opportunity to utilize the resource. It
regulates the taking and transporting of forest products, prescribes enforcement sanctions and
19
Hopi Emergency
Response Team (HERT)
2005
Hopi Tribe
2011
Dept. of Natural
Resources
Community and
Economic Development
Office
2001
2000
Cultural Preservation
Office (CPO)
1974
Hopi Tribe
1993
Hopi Tribe Hazard Mitigation Plan
2015
establishes a woodland fund for rehabilitation and conservation efforts.
Ordinance #48 – The Hopi
Tribe Wildlife Ordinance
Hopi Drought Contingency
Plan
Emergency Action Plan for
Pasture Canyon Dam
Hopi Tribe Watershed Study
Threat and Hazard,
Identification and Risk
Assessment (THIRA)
The purpose is to ensure the proper management and protection of the Hopi Wildlife Resource
while providing the opportunity for the Hopi people to utilize the resource.
Purpose of Plan is to assist the Tribe with early drought warning, preparedness, mitigation and
responsiveness.
Helps define drought issues and mitigation goals.
Assists the Tribe, BIA and others in safeguarding lives and reducing damage to property in the
event of an emergency with the dam. Identifies roles and responsibilities that will help
communities in planning emergency response activities. Plan to guide the emergency response
notification and operation procedures that will be implemented to save lives, reduce damages to
property and structures and minimize impacts to the environment during emergency situations
affecting Pasture Canyon Dam.
Hopi Tribe
1993
Hopi Tribe and
contractor
2000
BIA, U.S. Dept of
Interior, DIA, Div of
Water & Power
2012
Assists with understanding the flood hazard as it pertains to the tribe.
Hopi Tribe
Designed to inform the community of and provide an understanding of risks and estimate
capability requirements.
Hopi Tribe (In
development)
20
Hopi Tribe Hazard Mitigation Plan
2015
SECTION 4: RISK ASSESSMENT
4.1
4.2
Section Changes/Notes
The hazard of Severe Wind has been added to this Plan.
Note: when data or information deficiencies exist in this Plan, it is likely attributed to lack of
resources/funding. Those and other deficiencies related to this Plan will be addressed as
resources and funding become available.
Risk Assessment
Planning Area
The planning area referred to in this Plan is described in the Community Description section. The risk
assessment for the Tribe was performed for the entire Reservation, with the information input and
development being accomplished by the Planning Team and the appropriate subject matter experts,
when necessary.
Hazard Identification/Profiles
The hazards identified in the previous plan, Drought, Flood, Landslide/Rock Fall, and Winter Storm
have been analyzed and updated and now includes Severe Wind. Those considered but not profiled
in the previous Plan are: Power/Utility Failures, Fuel/Resource Shortages, Hazardous Materials
Incidents, Transportation Accidents, and Explosion/Fires were found to not be of significant enough
nature to the Tribe for inclusion in this Plan. Dam Failure was carefully considered regarding Pasture
Canyon Dam near the Village of Moenkopi. The Planning Team determined there was not a
significant enough history of breach or failure to warrant including it in this Plan, however it will be
considered at each revision of this Plan. The Tribe’s Department of Land Operations maintains an
emergency action plan for the tribe’s only dam.
Information acquired from the identification process above was also utilized in determining the
vulnerability of the Reservations assessment areas to each hazard. This information included the
probability, the likelihood of the severity, the warning time, and the duration of the hazard
situation. The estimated relative levels of vulnerability for each hazard assessment area were based
on the following factors:
Probability of damage resulting from a hazard event;
Magnitude and/or severity of the hazard
Warning time prior to the arrival of the hazard
Duration of the hazard on the Hopi Reservation
The relative probability of hazard occurrence (span between hazards) is variable and mostly derived
at this point from local historical accounts and emergency action events. The current vulnerability
assessment is aided by mapping done previously by the Hopi Tribal programs that lends itself to
illustrating the local understanding and prioritization of vulnerable areas.
2010 Plan Hazards
Drought
Table 4-1: Hazard Identification
2014 Plan Hazards
Drought
21
Hopi Tribe Hazard Mitigation Plan
Flood
Landslide/Rockfall
Winter Storm
2015
Flood
Landslide/Rockfall
Severe Wind
Winter Storm
Below is a listing of the most recent hazard events and their impacts on the reservation. This
information was provided by the Tribal Office of Emergency Management.
Table 4-2: Executive Order Declarations
Declaration Date
Cause
Damages
June 26, 2014
Extreme Fire Danger
State of Extreme Fire Danger
None
March 7, 2014
Protection Of Livestock/Calves
Control of Livestock And Grazing; Ordinance 43, Section 108
None
August 13, 2013
For Hopi Reservation And Surrounding Areas
Due to Heavy Rain; Rock And Mudslides, Flooding & Damages
to Water & Sewer Systems
$100,000
May 28, 2013
Extreme Fire Danger
State of Extreme Fire
None
January 16, 2013
Severe Cold Weather Created Water Emergencies For First
Mesa Consolidated Villages And Hopi Villages
Due To Severe Cold Freezing Weather
$60,000
September 12, 2012
For Upper And Lower Moenkopi Villages And Surrounding
Hopi Reservations
Heavy Rain Storms
$15,000
July 12, 2012
Extreme Drought Conditions and Illegal Water Hauling
State of Extreme Drought
$10,000
June 11, 2012
Extreme Fire Danger
High winds pose extreme wildfire threats
None
January 21, 2010
Emergency Situation and Natural Disaster Area
Severe Winter Storms, Muddy Conditions, Damaged Roads
$358,000
22
Hopi Tribe Hazard Mitigation Plan
2015
Hazard Ranking
For the purpose of ranking the identified hazards in this Plan, the Planning Team utilized the
Calculated Risk Priority Index (CPRI), which is a tool used to assess hazards based on a system that
considers probability, magnitude/severity, warning time, and duration. The CPRI value is obtained
by assigning varying degrees of risk to each of the four categories for each hazard, and then
calculating a value based on a weighting scheme. The CPRI uses the weighing criteria below.
Table 4-3: Calculated Priority Risk Index (CPRI)
CPRI
Category
Degree of Risk
Level ID
Unlikely
Possible
Probability
Likely
Highly Likely
Negligible
Limited
Magnitude/
Severity
Critical
Catastrophic
Warning
Time
Duration
Less than 6 hrs
6 to 12 hrs
12 to 24 hrs
More than 24 hrs
Less than 6 hrs
Less than 24 hrs
Description
Extremely rare with no documented history of occurrences or events.
Annual probability of less than 0.001.
Rare occurrences with at least one documented or anecdotal historic
event.
Annual probability that is between 0.01 and 0.001.
Occasional occurrences with at least two or more documented historic
events.
Annual probability that is between 0.1 and 0.01.
Frequent events with a well documented history of occurrence.
Annual probability that is greater than 0.1.
Negligible property damages (less than 5% of critical and non-critical
facilities and infrastructure).
Injuries or illnesses are treatable with first aid, no deaths.
Negligible quality of life lost.
Shut down of critical facilities for less than 24 hours.
Slight property damages (greater than 5% and less than 25% of critical and
non-critical facilities and infrastructure).
Injuries or illnesses do not result in permanent disability, no deaths.
Moderate quality of life lost.
Critical facilities shut down for more than 1 day and less than 1 week.
Moderate property damages (greater than 25% and less than 50% of
critical and non-critical facilities and infrastructure).
Injuries or illnesses result in permanent disability, at least 1 death.
Critical facilities shut down for more than 1 week & less than 1 month.
Severe property damages (greater than 50% of critical and non-critical
facilities and infrastructure).
Injuries or illnesses result in permanent disability & multiple deaths.
Shut down of critical facilities for more than 1 month.
Self explanatory.
Self explanatory.
Self explanatory.
Self explanatory.
Self explanatory.
Self explanatory.
Index
Value
Assigned
Weighting
Factor
1
2
45%
3
4
1
2
30%
3
4
4
3
2
1
1
2
23
15%
10%
Hopi Tribe Hazard Mitigation Plan
Less than 1 week
More than 1 week
Self explanatory.
Self explanatory.
2015
3
4
The table below summarizes the CPRI values for the hazards identified in this Plan.
Hazard
Drought
Flooding/Flash Flood
Severe Wind
Wildfires
Table 4-4: CPRI Values by Hazard
Magnitude
Probability
Severity
Warning Time
Likely
Limited
24+ hours
Likely
Limited
6-12 hours
Likely
Limited
6-12 hours
Likely
Critical
6-12 hours
Duration
More than one week
Less than 24 hours
More than 24 hours
More than one week
CPRI
2.50
2.60
2.60
3.10
Note: Maximum value is 4.00
Vulnerability Assessment
The vulnerability assessment builds upon the previously developed hazard information by
identifying the community assets and development trends and intersecting them with the hazard
profiles to assess the potential amount of damage that could be caused by each hazard event.
Some of the information may have changed slightly, however due to minimal changes in population
and development there were no significant changes to record in this Plan. For the Plan, the
following tasks were performed as a part of the vulnerability assessment and can be found in this
section’s hazard profiles.
Asset Inventory
For the purpose of this Plan, an asset is defined as:
Any natural or human-caused feature that has value, including, but not limited to people; buildings;
infrastructure like bridges, roads, and sewer and water systems; lifelines like electricity and
communication resources; or environmental, cultural, or recreational features like parks, dunes,
wetlands, or landmarks.
Assets are identified by either critical or non-critical facilities and infrastructure. Critical facilities
and infrastructure are those systems within the reservation whose incapacity or destruction would
have a debilitating impact on the Tribe’s ability to recover following a major disaster, or to defend
the people and structures of the Tribe from further hazards. To identify facilities and infrastructure
for this Plan, the Tribe utilized the following criteria:
1.
Telecommunications Infrastructure
5.
Transportation Networks
2.
Electrical Power Systems
6.
Water Supply Systems
3.
Gas and Oil Facilities
7.
Government Services
4.
Banking and Finance Institutions
8.
Emergency Services
Other assets such as public libraries, schools, museums, parks, recreational facilities, historic
buildings or sites, churches, residential and/or commercial subdivisions, apartment complexes, and
24
Hopi Tribe Hazard Mitigation Plan
2015
so forth, are classified as non-critical facilities and infrastructure, as they are not necessarily
“critical”. They are however, very important to the Tribe and critical and non-critical should not be
interpreted as meaning important and non-important.
The Planning Team performed a detailed asset inventory including collecting data such as the
facility’s physical location, description, and replacement cost. Those data sets are compiled in a
separate document that, for security reasons, will not be generally distributed to the public. The
asset inventory was performed in the planning process for the prior Plan and will remain in the
updated plan as there have been no significant changes.
Table 4-5: Critical and Non-Critical Facilities
Facility Type
Indian Tribe Totals
Critical Facilities and Infrastructure
Telecommunications Infrastructure
3
Electrical Power Systems
2
Gas and Oil Facilities
1
Banking and Finance Institutions
0
Transportation Networks
2
Water Supply Systems
7
Governmental Services
2
Emergency Services
2
Non-Critical Facilities and Infrastructure
Cultural
1
Government Facilities
2
The table below summarizes the total replacement costs for Indian Tribe. Replacement costs were
estimated using insurance and/or current market value estimates. Since there is unlikely to be
damage to buildings as a result of drought, that hazard was not included in the analysis.
Table 4-6: Estimated Replacement Costs
Community
Residential
Potential
Economic
Impact (x$1000)
Commercial
Building Count
Industrial
Building Count
76
$8,865
$4,435
$13,300
0
0
$13,300
93
$9,300
4,650
$13,950
-
-
$13,950
Total Building
& Content
Exposure
(x$1000)
Total Estimated
Loss (x$1000)
Residential
Content Value
(x$1000)
Tribe Totals
*Tribe
Totals
Flood
Total Estimated
Replacement Cost
$9,360,510
Residential
Building Value
(x$1000)
HAZUS
Summary
Percent of
All Facilities
100%
Residential
Building Count
Indian Tribe Total
Number of
Facilities
22
25
Hopi Tribe Hazard Mitigation Plan
High Risk
*High Risk
Wildfire
High Risk
Medium Risk
2015
0
28
$23
$2,800
$12
$1,400
$35
$4,200
0
0
0
0
$35
$4,200
$2
$210
22
54
$2,638
$6,227
$1,320
$3,115
$3,958
$9,342
0
0
0
0
$3,958
$9,342
$792
$467
Loss Estimations
In addressing the impacts of hazard events, vulnerability and losses, The Hopi Office of Facilities
Management & Risk Management (OFRMS) retains a listing of tribal buildings & property that
represents buildings currently utilized as general office functions Village Community Centers, and
other buildings & property received from OFRMS reflects a 15% overall increase in replacement
costs.
For potential loss estimates, the analysis was performed for the previous Plan and replacement
costs were based on current Consumer Price Index (CPI) rates that are subject to change. Specialized
systems and non-existing infrastructure utilities will increase cost, based on location and regulatory
compliance.
The OFRMS has limited information from past experiences in relationship to actual cost for repairs
based on records data from 1997 when CPI monies became available including storm related
incidents that impact both mechanical and structural repairs.
The average costs of determining potential losses to Hopi Reservations village and community
residential structures was derived from the HUD Hopi Tribal Housing Authority average construction
costs for the Hopi Reservations. These potential loss estimates are based on replacement costs for
structures within the hazard areas and are understood that they may or may not be close to actual
replacement costs as there are many variables that can affect each individual structure.
Various records for residents of the Hopi villages and communities are derived from US Census 2000
records as well as Bureau of Indian Affairs Police census records.
The value of religious / non-profit and village government structures was derived from average
renovation and repair records.
Like other parts of the Risk Assessment/Vulnerability Analysis, the loss estimations were not
updated for this Plan as there has been minimal population growth or development within the tribal
boundaries.
26
Hopi Tribe Hazard Mitigation Plan
4.3
Hazard Profiles
4.3.1
Drought
2015
Introduction/History
Drought is a normal, recurrent feature of climate, although many erroneously consider it a rare and
random event. It occurs in virtually all climatic zones, but its characteristics vary significantly from
one region to another. Drought is a temporary aberration; it differs from aridity, which is restricted
to low rainfall regions and is a permanent feature of climate.
Drought is an insidious hazard of nature. Although it has scores of definitions, it originates from a
deficiency of precipitation over an extended period of time, usually a season or more. This
deficiency results in a water shortage for some activity, group, or environmental sector. Drought
should be considered relative to some long-term average condition of balance between
precipitation and evapotranspiration (i.e., evaporation + transpiration) in a particular area, a
condition often perceived as “normal”. It is also related to the timing (i.e., principal season of
occurrence, delays in the start of the rainy season, occurrence of rains in relation to principal crop
growth stages) and the effectiveness (i.e., rainfall intensity, number of rainfall events) of the rains.
Other climatic factors such as high temperature, high wind, and low relative humidity are often
associated with it in many regions of the world and can significantly aggravate its severity.
Depending on its severity, a drought can have widespread impact on the human & natural
environment and economy of the Hopi Reservations. These impacts are significant especially in such
an arid environment and can be seen in short and long term losses. The Hopi Drought Contingency
Plan provides a profile, vulnerability analysis and potential losses as well as mitigation, monitoring &
maintenance, review and funding sources.
The Hopi Drought Contingency Plan provides an analysis and reports on precipitation indices.
Drought Summary Based on 24-month SPI and SSWI, a regional indication identifies drought
conditions for the Keams Canyon station located in the eastern portion of the Main Reservation
providing readings of drought beginning in 1946, 1950, 1954, 1962, 1972, 1975, and 1989 of variable
durations. A look at regional drought indicators may also present locations and information that
would be pertinent to conditions on the reservation as Flagstaff, Tuba City, Ganado and Winslow
stations are located within a 90 mile radius of the Hopi Reservations. The drought reporting from
the Keams Canyon station on the Main Hopi Reservation for the most part coincides with La Niňa
weather patterns seen throughout the State. A Hopi Drought Plan Chart of Spatial Patterns of
Drought illustration also represents our latest drought conditions beginning in 1996 through 2004.
All of these illustrations and methods can be found in the Hopi Drought Monitoring Plan as part of
the Hopi Drought Contingency Plan. No updated information available.
Official declarations and responses to drought from the tribal government are listed in the following
table and highlight a more recent trend toward recognizing and mitigating the onset and impacts of
drought. Such as livestock reduction and water hauling restrictions.
27
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-7: Drought Related Executive Order Declarations
Declaration Date
Cause
Damages
Sept 2014
Extreme Fire Danger due to below average
precipitation, severe drought
Burning restrictions
None
May 2013
Extreme Fire Danger due to below average
precipitation, severe drought
Burning restrictions
None
July 2012
Extreme Drought and Illegal Water Hauling
$10,000
October 2012
Extreme Fire Danger due to below average
precipitation, severe drought
Burning restrictions
None
June 2012
Extreme Fire Danger due to below average
precipitation, severe drought
Burning restrictions
None
July 2009
Extreme Fire Danger due to below average
precipitation, severe drought
Burning restrictions
None
Vulnerability
The Hopi Tribe, as a sovereign nation, is responsible for protecting and managing Tribal natural
resources in accordance with established cultural and economic values. Reduction of the already
limited water supply, over an extended period of time, could result in devastating impacts to the
Hopi people. This vulnerability assessment has been derived by determining the current status of
water supply and use, and projecting future demands on the water resources as found in the Hopi
Drought Contingency Plan. The Hopi Drought Monitoring Plan Table, Assessment of drought
Vulnerability, provides characteristics of various drought categories and their degree of
vulnerability. The potential risk reduction actions are also part of this table. Our planning effort has
only reaffirmed the importance of this Plan’s continuing inclusion of drought hazard identification
and mitigation for this arid environment. The current planning process has provided us with a
prioritization of vulnerable areas as follows that draws on the information found in the Hopi
Drought Plan and again, the plan vulnerability assessment provides more detail along with
mitigation.
Priority Group 1: Primary Hopi Villages and Communities
First Mesa Villages: Walpi, Sichomovi, Tewa and Polacca
Keams Canyon Community
Second Mesa Villages: Shungopavi, Sipaulovi, Mishongnovi
Second Mesa Community
28
Hopi Tribe Hazard Mitigation Plan
Kykotsmovi Village
Third Mesa Villages: Oraibi, Hotevilla and Bacavi
Moenkopi District Hopi Villages: Upper Moenkopi and Lower Moenkopi
2015
These villages and communities provide the primary source of potable drinking water and serve the
needs of the Hopi population. Vulnerability is high in terms of distribution infrastructure
inadequacies that are exacerbated during drought. These villages serve as key areas for water in any
situation and drought demands readily exhibit inadequacies that may not be remedied during
normal years. These villages also have local surface outcropping springs that come from the
sandstone aquifers and are the historic sources of water for Hopi villages and are valuable assets.
These springs are used for cultural, agricultural and domestic needs and are highly vulnerable to
drought and can go dry in drought years. The following Existing Hopi Public Water Supply Systems
illustration which does not take into account the new or non-tribal maintained water services in
Yuweeloo Pahki, Keams Canyon, Hotevilla, and Bacavi.
The following is an excerpt from the Hopi Strategic Land Use and Development Plan, describing the
Tribal Hydrologist assessment of water resources on Hopi:
Current per capita water use is estimated to be 40 gallons per person per day, or a reservation
demand of 400 acre-feet per year. It is expected that this demand will increase to between 160 to
200 gallons per day as running water, modern appliances and light industry become more
widespread across the reservation. Current projections estimate that both the increase in total
gallons used per person and the growing population will create an annual demand of 3,800 acre-feet
by 2020. This demand which includes both municipal and agricultural use is an almost 10-fold
increase in water consumption in 20 years. Existing water supplies available on the Hopi Reservation
cannot meet this projected demand.
Priority Group 2: Outlying Communities and Residences
Yuweeloo Pahki Charter Community
Hopi Partitioned Lands: Hopi Home sites & Navajo Accommodation Agreement Home sites
The outlying community of Yuweeloo Pahki is currently installing a new domestic water well and
pump distribution system although water quality and treatment is still an issue for this as well as
other established primary village systems. Water hauling and access to water sources provides a
vulnerability situation if they are forced to compete with livestock and agricultural demands on
domestic water systems.
Priority Group 3: Hopi District Six and Hopi Partitioned Lands Range Units
Livestock & Agriculture
Surface and Groundwater Infrastructure
The major land use of the Hopi Reservations is livestock grazing in various range units across the
Reservations. Vegetation and water resources to support this economic activity are vulnerable to
drought. A major focus of the Hopi Drought Contingency Plan was the cost estimation of drought
impacts and mitigation for water resources and infrastructure supporting livestock grazing. The
Hopi Drought Plan Table, Range Unit Carrying Capacity, Usability and Watering Facilities and Hopi
Drought Range Well Locations Map help to illustrate the vulnerable areas in this section and current
infrastructure.
29
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-8: Vulnerability & Potential Losses due to Drought
Assessment Area
Estimated
Vulnerability
Priority Yuhweeloh Pahki
Group Charter Community High
1
Hopi Partitioned
Lands Residences
Priority Keams Canyon
Group Community
2
Number of
Structures
Public Water
System
Dependent on
High to Extreme Group 1, 2, &3
Structure
Losses
Contents
Losses
Location
Comment
Costs and mitigation
projects are detailed in Eastern Reservation
the Hopi Drought
Outer Area of
Contingency Plan
Reservations
BIA & Public Water
System & Springs
Eastern Reservation District Six
First Mesa Villages
of Walpi, Sichomovi
& Tewa
High
(2) Public
Water System &
Springs
District Six
Polacca Community High
Public Water
System
District Six below First
Mesa
High
30
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-8: Vulnerability & Potential Losses due to Drought
Assessment Area
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Contents
Losses
Location
Comment
Second Mesa
Villages of
Shungopavi,
Sipaulovi &
Mishongnovi
High
Second Mesa
Community
High
Kykotsmovi Village
High
Public Water
System
District Six below Third
Mesa
Third Mesa Villages
of Oraibi, Hotevilla
and
Bacavi
High
(2) Public Water
System & Springs
District Six
Moenkopi District:
Upper & Lower
Moenkopi
Villages
Extreme
(2) Public
Water System &
Springs
Moenkopi District
Tribal Government
& Services Facilities
Low
(2) Public Water
Systems
Kykotsmovi & Other
Villages
Hopi Health Care
Center Complex &
EMS
Low
(3) Public
Water System &
Springs
District Six
District Six below
Second Mesa
Hopi Walpi Housing Low
First Mesa
Elementary School
Low
Priority
Group
3
Livestock &
Agriculture
High
8,000 Current
Livestock and
Animal Units
$4,398,400
Reservation-wide.
Estimated Capital
(Voluntary reduction Livestock Value @
in 2006 results:
$800.00 per head of
11,000 - 8,000)
livestock average
Livestock located in
Hopi Partitioned Lands
and District 6.
$550,000 Hopi Annual
Economic
Income from
Livestock &
Agriculture
31
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-8: Vulnerability & Potential Losses due to Drought
Assessment Area
Surface water,
Groundwater &
Other Agricultural
Infrastructure
Estimated
Vulnerability
Moderate
Number of
Structures
Range Unit
Fencing.
Windmill &
Infrastructure
(158) total.
Springs
(211) total.
Earthen Tanks
(556) total.
Structure
Losses
Contents
Losses
Range Unit
Fencing
$2,000-5,000 per mile.
Windmill &
Infrastructure
$75,000 each.
Earthen Tanks
Repair Costs
Location
Comment
Hopi Partitioned
Lands, District 6 and
Moenkopi District.
$900,000.00
Annual Tribal
Maintenance Budget.
See Appendix for
Tribal Windmill
Inventory.
The impact of drought on the Hopi Reservations has been detailed in the Hopi Drought Contingency
Plan. The Hopi Tribe will expand on the impact of drought as required during the update and plan
maintenance identified in the Drought Plan. This Plan will help to further refine and identify the
Reservation-wide impact of drought hazard events and will be aided by mitigation planning grant
funding to integrate these two documents.
Hopi Tribe Water Code
The instrument that is hereby referenced as the Hopi Tribe Water Code is made up of the following
documents:
Hopi Tribe Water Quality Standards
Wellhead Protection Manual
Standard Specification for Well Construction and Pump Installation
This Code was tribally adopted on October 14, 1997 with the passage of Tribal Council Resolution H107-97. These documents were developed in accordance with principles of sound water
management and protection, and incorporate conservation principles and practices in order to
protect the source water and producing water supply for the residents of the Hopi Reservation and
to safeguard health, resources, and property in the vicinity of existing and potential water supply
wells and springs (2010 WRP Director).
32
Hopi Tribe Hazard Mitigation Plan
4.3.2
2015
Flooding
Introduction/History
Flooding on the Hopi Reservations is limited to storm events that bring significant rainfall and
precipitation resulting in storm water run-off that fills the ephemeral washes and natural drainage
channels of the Hopi Reservations.
There are three major precipitation zones across the reservation, which bisect diagonally from
northwest to southeast. The lowest precipitation zone, which receives between six and eight inches
annually, is found in the southwestern corner and western reaches of Moenkopi Wash on the Main
Reservation, and across most of the Moenkopi District. The most prevalent precipitation zone,
which receives between eight and ten inches annually, extends in a northwest to southeast band
across the middle of the Main Reservation. Areas receiving between ten and twelve inches per year
are found in areas of higher elevation on the reservation. Extremely limited areas receive between
12 and 14 inches per annum, and are found in the northeast and extreme east of the Hopi
Partitioned Lands.
The major wash channels of the Hopi Reservations are listed here from east to west:
Jeddito Wash
Keams Canyon Wash
Polacca Wash
Wepo Wash
Oraibi Wash
Dinnebito Wash
Moenkopi Wash flows in northwestern Main Reservation through the northern Moenkopi
District
The precipitation map and illustrations of the major washes and drainages on the Hopi Reservations
provide information on the general southwesterly flow of storm-water runoff from the higher
elevations in the northeast with 12 to 14 inches of precipitation per annum to the lower
southwestern area with only eight to ten inches of precipitation per annum.
The main areas of flash flooding are within and along the major wash channels of the Hopi
Reservations including slopes along the mesas where storm water can accumulate. The Hopi villages
and residences were historically located above the floodplains that were fed by these major washes
but more recent development (over the last 100 years) has led to potentially vulnerable site
development. Roads and trails crossing these major washes are also highly vulnerable to flash
flooding and washouts. Other areas such as the floodplains that were historically fed by these major
wash channels are still prone to flooding if and when the flood waters overflow the channels or
otherwise breach flood control installations such as dikes, dams or berms.
Many of the floodplain areas served by the major washes had been utilized by Hopi farmers in
situating their fields of corn and other crops. Significant erosion and channel cutting have
contributed to the intensity of flash flooding which previously was more of a surface flow over a
larger floodplain area. Dikes, berms and dams constructed in the last 100 years have tried to control
this surface floodplain flooding and major flash flooding from the major washes.
33
Hopi Tribe Hazard Mitigation Plan
2015
FIGURE 18.0.
The major washes of the Hopi
Reservations
FIGURE 18.0
The major washes of the
Hopi Reservations
FIGURE 18.0.
The major washes of the Hopi
Reservations
pi
Moenko
W
Tuba City
as
h
160
Y
#
Y
#
T
$
Pino n
Y
#
Moe nk op i
sh
Wa
264
T
$
Di
nn
eb
it
o
Ky k ots m ov i
T
$
Y
#
Wa
sh
T
$
Y
#
i
W
as
h
Ke am s Can yo n
loc
h
ca
Je
dd
ito
Po
2
as
W
T
$
Or
aib
GIS\7075.2\PROJECT (PR OJECT = RANGE-C7_13_00.APR) (VIEW EXTENTS = A-SIZE) (VIEW NAME = 4) (LAYOUT = 5)
General pattern of
storm water run-off
flow and main areas of
water channeling and
drainages across the
Reservations.
Gauging stations are
indicated by ▲.
Data was unavailable
due to time constraints.
Monitored by the US
Geologic Survey and
Hopi Water Resources
Program.
77
87
N
0
5
10
Mi le s
Expla na ti on
T
$
#
Y
Proposed soil m ois ture station
Regional tow n
Hopi land boundary
Riv er /w ash
Major road
Agricultural land
34
Hopi Tribe Hazard Mitigation Plan
2015
35
Hopi Tribe Hazard Mitigation Plan
2015
Flash floods usually coincide with the two major precipitation seasons in the Hopi region, winter
(Dec—March) and summer monsoon (late July—early Sept) seasons. These include a majority of the
winter storm events and summer monsoon events that are capable of producing storm water runoff that have major impacts in the region.
Overall, the slopes and grades of the Hopi mesa canyon country and the topography of the
Reservation provide ample evidence of the continuing hazard of storm events that lead to flash
flooding in a very short duration. In many cases communities and travelers are unprepared, carrying
away cars and lives along roadways and compromised bridges. The deteriorating and unmaintained
dikes, dams and berms are leading to an event that can impact major critical facilities and homes
within the developing floodplain areas below the Hopi mesas.
Vulnerability
A lack of regional flood plain mapping and identification of flood zones across Hopi Reservations has
precluded us from being able to definitely identify key areas of vulnerability. The Planning Team has
local knowledge of old flood control structures along with major flood problem areas so this had
driven our vulnerable areas assessment. The need to develop and establish this flood plain and
zone mapping is critical to the further definition of flash flood hazard vulnerability and mitigation
measures for the Hopi Reservations.
Some flood mapping of major development areas have been established such as in the planning of
the Hopi Health Care Center, Second Mesa Day School, First Mesa Elementary School, Hopi Veterans
Memorial Center Wellness Center, Hopi Tribal Housing Authority Housing Developments, etc. These
flood plain mapping data are available from the site authorities but not included in this Plan. The
data is site specific and would only reflect flooding relative to the new sites (approximately 2-30
acres each) that are developed and not comprehensive reservation studies. The potential for further
mapping will be addressed as funding and resources become available.
Priority Group 1: Primary Hopi Villages and Community Areas
Keams Canyon Community
Beaver & Twin Dams located and the top and midpoint of Keams Canyon
Polacca Community
First Mesa Villages: Walpi, Sichomovi, Tewa and Polacca
Second Mesa Community
Second Mesa Villages: Shungopavi, Sipaulovi, Mishongnovi
Kykotsmovi Village
Third Mesa Villages: Oraibi, Hotevilla and Bacavi
Moenkopi District Hopi Villages: Upper Moenkopi and Lower Moenkopi
Pasture Canyon Dam located within Pasture Canyon above Moenkopi Villages
Tribal Government & Services Facilities
Second Mesa Day School
First Mesa Elementary School
Hopi Health Care Center, Air Strip, & Emergency Medical Services
Hopi Walpi Housing
36
Hopi Tribe Hazard Mitigation Plan
2015
Flash flooding and flooding in general can affect the new developments of these communities in the
lower floodplain areas below the Hopi mesas. Another key vulnerability is the location of three dam
structures above the communities of Keams Canyon and Moenkopi Villages. Other village
infrastructure such as older constructed wastewater lagoons were located within the flood prone
major washes or along mesa slopes that have lead to breaches or damages resulting in wastewater
flows into the washes and Hopi farmlands. Lack of maintenance and planning of quality
infrastructure has resulted in these poor development location choices as well as a lack of space
within village communities themselves. Dikes, berms and dams have provided for some level of
flood control yet the continuing lack of maintenance and engineering plans in their initial
construction may outweigh any benefit as storm events continue to deteriorate them.
Many of the roads, highways and trails that access the Hopi villages and communities are impacted
by flash flooding especially along the major washes and mesa slopes. An ongoing study funded by
the Hopi Transportation Task Team and conducted by an outside consultant will provide inventory
information on roads that have or can be impacted by flash flooding.
Priority Group 2: Hopi District Six and Hopi Partitioned Lands Range Units
Blue Canyon Special Management Area (along Moenkopi Wash)
Agriculture: Hopi Farmlands along Major Washes
Priority Group 3: Outlying Communities and Residences
Yuweeloo Pahki Charter Community
Hopi Partitioned Lands: Hopi Home sites & Navajo Accommodation Agreement Home sites
Table 4-9: Flooding Related Executive Order Declarations
Declaration Date
Cause
Damages
August 2013
Heavy Rain
Roadways damaged and impassable
$30,000
September 2012
Heavy Rain Storms
Roadways damaged and impassable
$70,000
July 2010
Heavy Rain Storms
Several homes flooded, damaged roads, water & sewer lines
damaged telephone lines down
$200,000
January 2010
Rain and Snow Storms
Roads damaged and impassable
$368,000
Potential Losses
The impacts of flash flooding and flooding in general are at this point focused on the areas that have
historically been affected including areas within floodplain or mesa slopes. The potential losses are
listed in following and impact various sectors of the Hopi Reservations.
37
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-10: Vulnerability & Potential Losses due to Flooding
Estimated
Vulnerability
Number of
Structures
Low
20
None
Low
20
$ 1,633,500
Undetermined
Moderate
29
Beaver & Twin Dams
within Keams
Canyon
Unknown
High
3
In Keams Canyon above Keams Canyon
Community
First Mesa Village of
Walpi
High
10
$ 250,000
Undetermined
First Mesa Village of
Sichomovi
High
Unreported
First Mesa Village of
Tewa
High
32
$ 160,000
Undetermined
Polacca Community
Moderate
Second Mesa Village
of Shungopavi
High
2
$ 216,690
Undetermined
Second Mesa Village
of
Sipaulovi
High
37
$ 100,000
Undetermined
Second Mesa Village
of Mishongnovi
High
87
$ 3,089,000
Undetermined
36
$ 1,910,000
Undetermined
Undetermined
Assessment Area
Priority Yuhweeloh Pahki
Group Charter Community
3
Hopi Partitioned
Lands Residences
Priority Keams Canyon
Group Community
1
Structure
Losses
Contents
Losses
Location
Comment
Included in First Mesa
Administration
Second Mesa
Community
Moderate
Kykotsmovi Village
Moderate
Third Mesa Villages
of Oraibi and
Hotevilla
High
Third Mesa Village
of Bacavi
High
9
$ 288,000
Moenkopi District:
Lower Moenkopi
Villages
Moderate
7
$370,000
Undetermined
38
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-10: Vulnerability & Potential Losses due to Flooding
Assessment Area
Moenkopi District:
Moenkopi Villages
Moenkopi District:
Pasture Canyon
Dam
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Contents
Losses
Moderate
High
2
Unknown.
Will impact
floodplain,
Hwy 160 and Pasture Canyon above Moenkopi Villages
Moenkopi
See Reference to Pasture Canyon
Villages
Emergency Action Plan
Priority
Group
1
$10,000
$20,000
$10,000
$10,000
Tribal Government
& Services Facilities
Moderate
8
$125,697
$655,200
$234,000
$315,000
Hopi Health Care
Center & EMS
Ambulatory Facility
Moderate-High
2
$30,000,000 $125,000
Undetermined
Hopi Walpi Housing
Complex
Moderate-High
74
$505,000
$6,777,484
Priority Agriculture: Hopi
Group 2 Farmlands along
Location
Comment
Zone I
Keams Canyon Wash:
Modular Buildings:
Veterinary Clinic
Tribal Court(Probation)
Domestic Violence
Tribal Prosecutor
Zone II
Second Mesa Steep
Mesa Slope:
Hopi Guidance Center
Buildings (4)
Undetermined
High
Major Drainages
Village Roads &
Trails along Major
Drainages & Slopes
High
BIA Routes along
Major Drainages
(Bridges &
Crossings)
High
Further
Research & Study
required to determine
costs and potential
losses (Will be addressed
as resources/funding
become available)
ADOT Hwy 264
Moderate-High
Along Major
Drainages (Bridges &
Crossings)
39
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-10: Vulnerability & Potential Losses due to Flooding
Assessment Area
Blue Canyon Special
Management Area
along Moenkopi
Wash
Estimated
Vulnerability
High
Number of
Structures
Structure
Losses
Contents
Losses
Location
Comment
Archaeological Sites, Wetlands, Rehabilitation
Projects, Wildlife, Habitat Support Projects
40
Hopi Tribe Hazard Mitigation Plan
4.3.3
2015
Landslide and Rockfall
Introduction/History
A landslide is the movement of rock, soil, and/or other debris down a slope that occurs when the
materials comprising the slope can no longer resist gravity. In the case of the Hopi Reservations the
known probable and usual occurrences are rock avalanches on the steep sloped sandstone mesas
and canyons that comprise a large area of Hopi lands. Erosion can also occur along many of the
lower floodplain areas as well as along the major drainage channels which can affect slope stability
or even undercutting that may impact major roads or facilities.
Landslides encompass a wide range of slope movements, from small rock falls to debris flows to the
failure of entire mesa sides and multiple landslides types can occur within a single event. In general,
most steep slopes are at some risk of slope failure, and some soil/geologic formations are
particularly susceptible to landslide activity, even on relatively gentle slopes. For example, when
layers of sand and gravel lie above less permeable silt and clay layers, ground water can accumulate
and zones of weakness can develop. This can be a cause of the local landslides / rockfalls in the Hopi
mesas wherein sandstone formations (Mesa Verde Group) overlay siltstone and clay shale of the
Mancos Shale Formation in the Cretaceous Geologic Unit.
The primary landslide & rockfall hazard areas that threaten public safety and structures on the
Reservations occur along the Hopi mesa sandstone outcrops mainly affecting the primary Hopi
villages and communities located along AZ State Highway 264.
The Hopi Strategic Land Use and Economic Development Plan provides a Reservations Slope map
with an identification of grades from 5% on above 10% reflecting vulnerable areas along many of the
high slopes of the sandstone mesas near villages and communities. These higher grade areas also
show areas of steep-walled canyons and high country areas in the northern portion of the main
reservation.
Landslides and rock fall can occur from natural conditions such as wind, erosion, and flooding but
can be caused by human activity as well as poor planning. The natural geologic formations of the
Hopi mesas and Reservations have attributed to problems and hazard events that have resulted in
losses and injuries in the past. Mitigation actions by the Bureau of Indian Affairs occurred in the
First Mesa Villages access road to the mesa top, stabilizing rock walls with anchoring and
monitoring. The Arizona Dept of Transportation redesigned and constructed a portion of the major
highway including a wide right of way drainage/ditch to capture falling rocks. These are mitigation
projects that prioritize local health and safety after numerous concerns were issued from the
reservation population. The effort will continue and mitigation efforts must be realized in these
priority areas well in advance of loss of property or life.
Vulnerability
The vulnerability of the assessment areas is prioritized with the high grade slopes and known history
of landslide & rock fall hazards known to occur. Almost 84% of the land within the reservation
boundary is less than 5% slope. The most rugged areas are found in the northern one-third of the
reservation while the southern two thirds are dominated by areas with gentle slopes under 10% and
most under 5%. The predominant slope direction (43%) is westerly.
41
Hopi Tribe Hazard Mitigation Plan
2015
Priority Group 1: Primary Hopi Villages and Communities
First Mesa Villages: Walpi, Sichomovi, Tewa and Polacca
Second Mesa Villages: Shungopavi, Sipaulovi, Mishongnovi
Third Mesa Villages: Oraibi, Hotevilla and Bacavi
Moenkopi District Hopi Villages: Upper and Lower Moenkopi
Agriculture: Hopi Mesa Terrace Gardens
Village Roads & Trails
Bureau of Indian Affairs Roads
Arizona Department of Transportation Highway 264 & 77
Keams Canyon Community
Polacca Community
Second Mesa Community
Kykotsmovi Village
Landslide and rock fall hazards can impact many areas within the villages themselves. Affecting
homes, infrastructure such as power lines, water & wastewater lines, village support structures
(retaining walls), trails, roads and other sites such as cultural sites like springs that have been totally
covered by rock falls.
Priority Group 2: Hopi District Six and Hopi Partitioned Lands Range Units
Blue Canyon Special Management Area
Surface and Groundwater Infrastructure
Priority Group 3: Outlying Communities and Residences
Yuweeloo Pahki Charter Community
Hopi Partitioned Lands: Hopi Homesites & Navajo Accommodation Agreement Homesites
Potential Losses
The impacts of landslides and rock fall focused on the areas that have historically been affected
including areas along mesa escarpments and mesa slopes identified through the planning process
identification. The potential losses are listed in the table below and impact various sectors of the
Hopi Reservations including key critical facilities of the Tribe that lie within along areas of the major
Hopi mesas and slope areas.
Table 4-11: Vulnerability & Potential Losses due to Landslide & Rock Fall
Assessment Area
Priority Yuhweeloo Pahki
Group Charter Community
3
Hopi Partitioned
Lands Residences
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Contents
Losses
Low
2
$ 66,000
Undetermined
Low
10
$ 192,500
Undetermined
Location
Comment
42
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-11: Vulnerability & Potential Losses due to Landslide & Rock Fall
Number of
Structures
Structure
Losses
Contents
Losses
Moderate
29
$ 10,000
(3)
structures
only
Undetermined
First Mesa Villages
of Walpi
High
27
$ 681,000
First Mesa Village
of Sichomovi
High
Unreported
First Mesa Village
of Tewa
High
62
Assessment Area
Priority
Group
Keams Canyon
1
Community
Polacca Community
Estimated
Vulnerability
$
2,890,000
Location
Comment
Undetermined
Included in First
Mesa Village
Administration
Moderate
Second Mesa
Village of
Shungopavi
High
14
$608,040
Undetermined
Second Mesa
Village of Sipaulovi
High
37
$ 624,375
Undetermined
Second Mesa
Village of
Mishongnovi
High
52
$ 969,000
Undetermined
Second Mesa
Community
Moderate
Kykotsmovi Village
Moderate
21
$ 74,000
Undetermined
Third Mesa Villages
of Oraibi and
Hotevilla
High
Third Mesa Village
of Bacavi
High
2
$ 168,000
Undetermined
Moenkopi District:
Lower Moenkopi
Village
Moderate
1
$20,000
Moenkopi District:
Upper Moenkopi
Village
Moderate
43
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-11: Vulnerability & Potential Losses due to Landslide & Rock Fall
Assessment Area
Tribal Government
& Services Facilities
Priority
Group Agriculture: Hopi
Mesa Terrace
2
Gardens
Village Roads &
Trails
BIA Routes along
Villages and Hopi
Mesas
Estimated
Vulnerability
Number of
Structures
Low
3
High
(3) Main
Villages with
Terrace
Gardens
High
Undetermined
Moderate-High Undetermined
ADOT Hwy 264
Along Hopi Villages
& Mesas
Moderate-High Undetermined
Beaver & Twin
Dams in Keams
Canyon
Moderate
Structure
Losses
$87,000
Contents
Losses
$13,000
Location
Comment
Kykotsmovi &
Other Sites
Appendix
Further
Research & Study
required to
determine costs &
potential losses
(Will be addressed
as
resources/funding
become available)
Undetermined
44
Hopi Tribe Hazard Mitigation Plan
4.3.4
2015
Severe Wind
Introduction/History
Severe winds result from extreme pressure gradients (such as the Santa Ana winds in southern
California), or from thunderstorms. Thunderstorms occur in Arizona in all seasons, and are
associated with cold fronts in the winter, monsoon activity in the summer, and tropical storms in the
late summer or early fall. In Arizona, thunderstorms occasionally spawn tornadoes, which also cause
severe wind damage. According to the National Climatic Data Center (NCDC), there were 234
tornadoes ranging from F0 to F3 on the Fujita scale recorded across Arizona between 1950 and
2013. The total property damage was approximately $47.9 million with 3 fatalities and 147 injuries.
The Fujita scale ranks tornados by wind speed. Since 1950 there have been three F3 tornadoes in
Yavapai, Maricopa and Coconino Counties but none in Navajo County or on the Hopi Reservation.
In a microburst the wind speeds are highest near the location where a downdraft reached the
surface, and are reduced as they move outward due to the friction of objects at the surface. Typical
damage from microbursts includes uprooted trees, downed power lines, mobile homes knocked off
their foundations, block walls and fences blown down, and porches and awnings blown off homes.
Thunderstorms are also capable of producing straight line winds at speeds of 75 mph or higher. As
thunderstorms reach the mature stage, cold air downdrafts reach the ground and move outward
from the storm, creating straight line surface winds. In the most extreme case, this would be a
microburst or macroburst as discussed above. However, these winds tend to be sustained and are
frequently responsible for generating dust storms and sand storms, reducing visibility and creating
hazardous driving conditions.
In the past, wind events on the Hopi Reservation have caused structure roofs to be damaged and/or
removed, power line damage and/or failure, land erosion that has exposed water lines, rock falls,
transportation accidents due to low visibility and health issues for those who have respiratory
problems.
Vulnerability
The majority of the Reservation is open and has many unpaved roads which create hazardous
conditions to most residents and structures during wind events.
Power failures are of significant concern to the tribe as there are residents with health issues that
require power to medical equipment. In the past, power failures have lasted up to 48 hours. Since
those occurrences there have been no significant improvements to the systems and infrastructure
so it is expected to happen in the future. Power failures happen on an average of once a year.
Potential Losses
Table 4-12: Vulnerability & Potential Losses due to Severe Wind
Assessment Area
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Contents
Losses
Low
20
$ 300,000
Undetermined
Location
Comment
Priority Yuhweeloh Pahki
Charter Community
45
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-12: Vulnerability & Potential Losses due to Severe Wind
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Contents
Losses
Low
66
$ 1,270,500
Undetermined
Low
29
First Mesa Village of
Walpi
Moderate
80
$ 2,406,000
Undetermined
First Mesa Village of
Sichomovi
Moderate
136
$ 3,994,000
Undetermined
First Mesa Village of
Tewa
Moderate
200
$1,330,000
Undetermined
Assessment Area
Location
Comment
Group 1 Hopi Partitioned Lands
Residences
Priority Keams Canyon
Group 2 Community
Polacca Community
Included in First
Mesa Village
Administration
Low
Second Mesa Villages of
Shungopavi
Moderate
150
$4,721,643
Undetermined
Second Mesa Villages of
Sipaulovi
Moderate
48
$ 710,000
Undetermined
Second Mesa Village of
Mishongnovi
Moderate
159
$4,434,000
Undetermined
270
$1,984,000
Undetermined
Second Mesa
Community
Low
Kykotsmovi Village
Moderate
Third Mesa Villages of
Oraibi & Hotevilla
Moderate
Third Mesa Village of
Bacavi
Moderate
100
$ 5,112,000
Undetermined
Moenkopi District:
Lower Moenkopi Village
Moderate
34
$680,000
Undetermined
Moenkopi District:
Upper Moenkopi Village
Moderate
Tribal Government &
Services Facilities
Moderate
8
$87,000.00
$13,000.00
Hopi Health Care Center
& EMS Ambulatory
Facility
Moderate
2
$30,000,000
Undetermined
Kykotsmovi &
Other Sites
46
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-12: Vulnerability & Potential Losses due to Severe Wind
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Contents
Losses
Hopi Walpi Housing
Complex
Moderate
74
$ 6,777,484
Undetermined
New First Mesa
Elementary School
Low
15
$ 20,000,000
Structure and
Undetermined Housing Complex
Hopi Reservation
Roads: ADOT, BIA &
Tribal
Moderate
Assessment Area
Areas within
Priority Areas Undetermined
Priority Beaver and Twin Dams
Group
3
in Keams Canyon
Moenkopi District:
Pasture Canyon Dam
Moderate
Moderate
Location
Comment
Further Study
Required
Unknown
Located in Keams
Canyon
Unknown
Located above US
Route 160 &
Moenkopi Villages
Range unit
Windmill &
fencing
infrastructure $2,000-5,000
(158) total
per mile
Located in Hopi
Partitioned Lands,
District 6, and
Moenkopi District.
Springs
(211) total
$900,000.00
Annual Tribal
Maintenance
Budget.
3
1
Range unit
fencing
Surface water,
Groundwater & Other
Agricultural
Infrastructure
Low
Windmill &
infrastructure
$75,000 each
Earthen tanks
(556) total
Earthen tanks
repair Costs
47
Hopi Tribe Hazard Mitigation Plan
4.3.5
2015
Winter Storm
Introduction/History
Severe winter storm events affecting the Hopi Reservations can be comprised of a mixture of
meteorological conditions including heavy snowfall, heavy rainfall, blizzards, high winds, and hail
and freezing temperatures. These conditions can immobilize many parts of the Hopi Reservations by
simply affecting the main transportation corridors which in turn disrupts many other services
including emergency and utility services. In considering that most of the Hopi Reservation areas are
mostly rural in nature with limited paved roadways and a lack of centralized services within each
community area, severe winter storms can have Reservations-wide impacts. As may be found in
many Indian Nations, the Hopi Reservations are not financially capable of providing infrastructure
and economies that can support mitigation and emergency responses to this type of hazard.
Communications and utility services are often compromised and even small accumulations of ice
can impact those major transportation routes. Extreme cold temperatures and prolonged exposure
to cold affects homes and structures that are representative of the high percentage of low income &
poverty level households & communities that define Hopi socio-economics.
The Hopi Reservations are located on the arid high desert of the Colorado Plateau and local weather
and precipitation patterns present us with two main annual seasons of major precipitation: the
winter season (Dec-Mar) and summer monsoon season (late July-early Sept). The winter season
provides the Hopi Reservations with the major precipitation amounts that can result in blizzard
conditions and immobilization of communities and services from heavy snow and rainfall.
The magnitude of these winter storm events vary from heavy snow and rainfall to freezing
temperatures. They have also impacted the Reservations in different ways from snowbound
isolation to inaccessible muddy conditions. In 2010 among other areas, the Hopi Reservations
experienced one of the nastiest storms in the State’s history. Much of the Reservations were
covered with 5 – 8 foot snow drifts, making road travel impossible. They also experienced power
outages, collapsed roofs and mud conditions resulting in disruptions and stuck vehicles. This storm
was so severe, food, water and other supplies were airlifted in and even that operation was
temporarily stalled due to heavy fog and clouding and other dangerous conditions.
Based on historical information/events and the location of the reservations, it is certain the Tribe
will continue to experience a variety of winter storms. The severity and impacts of previous and
future winter storm events have and will most likely continue to vary. Additionally, the impacts may
be increased by the lack of quality infrastructure throughout the Reservations resulting in problems
both for government and tribal facilities as well as private business and residents. The early
historical accounts, prior to 1967, of severe winter storms resulted in requests for assistance from
local BIA, county governments, public and private organizations and companies to provide aid
though no official tribal executive declaration was prepared. This lack of tribal executive
declarations in this early period and later has been mainly due to lack of information of sources of
emergency aid and relief. The Hopi Tribe has always looked out for the best interest and emergency
needs of their members and this planning effort allows us to be more fully capable of reaching those
resources to assist them.
48
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-13: Winter Storm Related Executive Order Declarations
Declaration Date
Cause
Damages
January 2013
Severe Cold freezing Weather
Water issues
$60,000
January 2010
Rain and Snow Storms
Muddy and damaged roads impacting general transportation $358,000
and emergency health services transport
Vulnerability
Winter storms on the Hopi Reservations can be either localized or large-scale events. The following
three assessment areas can be exposed to severe winter storms to a similar degree. The biotic
communities, elevations and precipitation zone mapping across the Reservations provide us with
vulnerability assessment tools along with the condition of infrastructure and roads located in those
areas. Lack of quality infrastructure to handle the impacts of severe winter storms plays a prominent
role in the vulnerability of areas to these natural hazard events. This lack of quality infrastructure
can be seen in undeveloped roads, old water & wastewater systems, lack of building codes, poor
economic resources for buildings and homes, old agricultural infrastructure, under maintained
roads, under maintained buildings, etc. that all represent why severe winter storms with significant
precipitation can impact the Reservations. The following vulnerability assessment areas are listed
according to prioritization. There are three priority groupings, based on the need for a response
effort in the event of a severe winter storm. The highest priority are the outlying communities in the
Hopi Partitioned Lands, second are the primary villages and communities and third is Hopi
agriculture, livestock, and Water Infrastructure.
Priority Group 1: Outlying Communities and Residences
Yuweh loo Pahki Community
Hopi Partitioned Lands: Hopi Homesites & Navajo Accommodation Agreement Homesites
The Spider Mound Community roads received aggregate and gravel covering and construction of
drainage culverts in 2008 to better the quality for the residents. The Hopi Partitioned Lands are
particularly vulnerable in the quality of the roadways, mainly accessibility (mostly grade & drain
under-maintained dirt roads) and lack of infrastructure & equipment to support the residents during
severe winter storm events. Previous State responses to local emergencies have shown that
“mudlifts” and “airlifts” are needed for isolated citizens and communities when medical, food,
water, and fuel services are needed.
Priority Group 2: Primary Hopi Villages and Communities
Keams Canyon Community
First Mesa Villages: Walpi, Sichomovi, Tewa and Polacca Community
Second Mesa Villages: Shungopavi, Sipaulovi, Mishongnovi
Second Mesa Community
Kykotsmovi Village
Third Mesa Villages: Oraibi, Hotevilla and Bacavi
49
Hopi Tribe Hazard Mitigation Plan
2015
Moenkopi District Hopi Villages: Upper and Lower Moenkopi
The proximity of the Hopi villages and communities alongside Arizona State Highway 264 allows for
a low and moderate priority ranking for response, Moenkopi villages are located at the westernmost
extent of Highway 264 near the junction of AZ State Highway 160 across from Tuba City. Yet, most of
the mesa-top villages still have accessibility issues along AZ State Highway 264, BIA Routes, and
villages roads and trails. Village and residential structures that can be affected by storm events is
also part of why accessibility needs to be maintained along with upgrading of roads. Applicable
Reservation-wide, structures themselves reflect the low economic status and lack of building codes
susceptible to storm events. Mesa-top villages are supported by retaining walls along access routes,
public areas, mesa slopes or other residential areas that often are compromised or deteriorate due
to storm events.
Tribal facilities and property can be located within villages as well, key to the critical facilities that
need to be addressed in storm events. Utilities such as water well pumping & distribution systems,
wastewater systems (lagoons), electricity, and communication are also susceptible to storm event
damages and the conditions they present. A newspaper article in the Hopi Tribal newspaper,
Tutuveni, on April 14, 2005 highlights the Arizona Corporation Commission’s deadline for a required
assessment of the electric utility company, Arizona Public Service to increase reliability that affects
most of the reservation, known to occur especially during winter storm events. The disabling of
Tribal & government services, emergency medical & hospital services, home heating, local radio
service & equipment damage, and other hampered services and equipment damages were testified
to by local representatives who experience documented unreliable, “dirty power, spikes and
surges.”
Priority Group 3: Hopi District Six and Hopi Partitioned Lands Range Units
Livestock & Agriculture
Surface and Groundwater Infrastructure
Beaver and Twin Dams in Keams Canyon
Pasture Canyon Dam in Moenkopi area
These areas of vulnerability for the Hopi Reservations are the major land use of Hopi tribal members
in traditional farming and livestock grazing. A number of the early historic winter storm accounts in
1941 and 1954 resulted in a shift for many livestock owners from sheep flocks to cattle herds. The
shift was due to the impact of snow drift depths, lack of emergency feed, freezing temperatures and
frozen water sources. Although the Hopi cattle herds at the time did suffer losses they were much
less significant than those of the Hopi sheep flocks. Cattle were seen as being physically hardier and
tolerated the snowstorms along with the ease to move from snowdrift packed, muddy or frozen
areas so that clearer areas for grazing could be found. Today many of the range units are potentially
vulnerable to severe winter storm events having older infrastructure and again poor quality
accessibility with mostly under-maintained grade and drain dirt roads. Livestock grazing accounts
for a majority of land use on the Hopi Reservations and severe winter storms can take a toll with a
lack of accessibility, as well as prior maintenance, during times of heavy snow and rainfall to care for
livestock and infrastructure with possible damage.
50
Hopi Tribe Hazard Mitigation Plan
2015
51
Hopi Tribe Hazard Mitigation Plan
2015
Mesa-top Village Retaining Walls
Mesa-top villages require road access support structures
such as those pictured above along with areas that may
require trail access or residential/village structure support
as provided by these sandstone retaining walls below.
52
Hopi Tribe Hazard Mitigation Plan
2015
Potential Losses
There are many areas of losses that can occur from winter storm damages on the Reservations.
Damage to roofing from heavy snow accumulations and rainfall depends on the quality of
construction and loads. Frozen water facilities and distribution pipes have been known to occur
especially at water spigots for water hauling. Any number of factors could combine at various
degrees of severity to produce the total structural damages that may result from a winter storm.
Recovery from winter storms often requires assistance from emergency responders from public
safety and tribal programs though they are limited in their funding and capability. The costs of these
services can quickly add up for the governments or providers and they may not have a sufficient
reserve in place to cover the costs.
Many of the local utilities may also be damaged with services hampered. Power outages that occur
in one area will affect every community beyond that area since the electric transmission lines are
not looped in the main Hopi Reservation. Extended outages may require community buildings be
opened to help those in need or to share weather & public safety information.
The economic losses caused by a winter storm may frequently be greater than structural damages.
This can be reflected in the accessibility issues and snow or rainfall damages to roads with
employees and others unable to attend work or get to jobsites. Many times schools are unable to
accommodate extra heating or damages to their structures along with student pickup on rural,
impassable bus routes which can mire down buses with students. The Hopi Tribal offices are often
in a state of uncertainty when major power outages occur in a different part of the reservation.
These major power outages can affect the ability of the Tribe along with all other public health and
safety services (police, fire & rescue, air landing strip, hospital, etc.). Overall, winter storms can
result in significant human, economic and property losses & damages on the Reservations.
Table 4-14: Vulnerability & Potential Losses due to Severe Winter Storm
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Contents
Losses
High
20
$ 300,000
Undetermined
High
66
$ 1,270,500
Undetermined
Low
29
Walpi
Moderate
80
$ 2,406,000
Undetermined
First Mesa Village of
Sichomovi
Moderate
136
$ 3,994,000
Undetermined
First Mesa Village of
Tewa
Moderate
200
$1,330,000
Undetermined
Assessment Area
Priority Yuhweeloh Pahki
Group Charter Community
1
Hopi Partitioned Lands
Residences
Priority Keams Canyon
Group Community
2
First Mesa Village of
Location
Comment
53
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-14: Vulnerability & Potential Losses due to Severe Winter Storm
Assessment Area
Polacca Community
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Contents
Losses
Location
Comment
Included in First
Mesa Village
Administration
Low
Second Mesa Villages of
Shungopavi
Moderate
150
$4,721,643
Undetermined
Second Mesa Villages of
Sipaulovi
Moderate
48
$ 710,000
Undetermined
Second Mesa Village of
Mishongnovi
Moderate
159
$4,434,000
Undetermined
270
$1,984,000
Undetermined
Second Mesa
Community
Low
Kykotsmovi Village
Low
Third Mesa Villages of
Oraibi & Hotevilla
Moderate
Third Mesa Village of
Bacavi
Moderate
100
$ 5,112,000
Undetermined
Moenkopi District:
Lower Moenkopi Village
Moderate
34
$680,000
Undetermined
Tribal Government &
Services Facilities
Low
8
$87,000.00
$13,000.00
Hopi Health Care Center
& EMS Ambulatory
Facility
Moderate
2
$30,000,000
Undetermined
Hopi Walpi Housing
Complex
Moderate
74
$ 6,777,484
Undetermined
New First Mesa
Elementary School
Low
15
$ 20,000,000
Structure and
Undetermined Housing Complex
Areas within
Priority Areas Undetermined
Further Study
Required (Will be
addressed as
resources/funding
become available)
Moenkopi District:
Upper Moenkopi Village
Hopi Reservation
Roads: ADOT, BIA &
Tribal
Moderate
Priority Beaver and Twin Dams
in Keams Canyon
Moderate
3
Unknown
Kykotsmovi &
Other Sites
Located in Keams
Canyon
54
Hopi Tribe Hazard Mitigation Plan
2015
Table 4-14: Vulnerability & Potential Losses due to Severe Winter Storm
Assessment Area
Estimated
Vulnerability
Number of
Structures
Structure
Losses
Group
Moenkopi District:
3
Pasture Canyon Dam
Moderate
1
Unknown
8,000 Current
Livestock and
Animal
Grazing Units
Reservationwide
Livestock & Agriculture
High
$4,398,400
Estimated
Capital
Livestock
Value @
(Voluntary
$800.00 per
reduction in
head of
2006 results: livestock
11,000- 8,000) average
Contents
Losses
Location
Comment
Located above U.S.
Route 160 &
Moenkopi Villages
Livestock located
in Hopi Partitioned
Lands and District
6.
$550,000 Hopi
Annual Economic
Income from
Livestock &
Agriculture
Range Unit
Fencing
Surface water,
Groundwater & Other
Agricultural
Infrastructure
Moderate
Range Unit
Windmill &
Fencing
Infrastructure $2,000-5,000
(158) total
per mile
Located in Hopi
Partitioned Lands,
District 6, and
Moenkopi District.
Springs
(211) total
$900,000.00
Annual Tribal
Maintenance
Budget.
Windmill &
Infrastructure
$75,000 each
Earthen Tanks
(556) total
Earthen Tanks
Repair Costs
55
Hopi Tribe Hazard Mitigation Plan
2015
SECTION 5: MITIGATION STRATEGY
5.1
Section Changes
The Local Capability Assessment, Local Assistance Prioritization Criteria and Local Mitigation
Planning Coordination sections were omitted from the Plan. The previous Plan was based on
and those topics were required under the State Plan requirements. This Plan is based on and
those topics are not required under FEMA’s official Tribal Multi-Hazard Mitigation Plan Review
Crosswalk, April 2010.
5.2
Goals and Objectives
The goals and objectives from the previous Plan were reviewed and the Planning Team decided to
refine them to provide clarity and ease of understanding for all. This was accomplished by
developing one main, all encompassing goal and objectives to define main areas of focus for the
activities that may benefit the tribe and its citizens. The new objectives look similar to the goals
from the previous Plan. The current goal and objectives are:
Goal:
To reduce and/or eliminate the risk to the people and property of the Hopi Reservations from
hazard events.
Objectives:
1. Protect the health and safety of our community members;
2. Protect existing and future structures and infrastructure;
3. Reduce environmental impacts and future development activities within hazard-prone
areas;
4. Increase public awareness and education of hazard risks.
5.3
Mitigation Actions/Projects
Mitigation measures are activities identified by a jurisdiction, that when implemented, are intended
to reduce and/or eliminate the community’s exposure and risk to the particular hazard(s) being
mitigated. This is intended to reduce response needs and shorten the recovery time/process.
The process for redefining the list of mitigation measures for this Plan was accomplished in steps.
First, an assessment of the measures identified in the previous Plan was performed, wherein each
was evaluated to determine the current status and disposition. Second, a new list of measures was
developed by combining those deemed as ‘keepers’ from the previous Plan as well as new
measures.
Current Mitigation Actions/Projects
Reviewing the previous Plan’s mitigation strategy, the Planning Team realized there were several
actions/projects that were too vague to understand what the projects was or was meant to
accomplish. It was also discovered that many of them were representative of hazards not identified
in the Plan. Therefore, considering this information and the results of the vulnerability analysis, the
capability assessment, and the goals and objectives, the Planning Team formulated a list of
measures for mitigation of the identified hazards within the community.
The mitigation measures developed for this Plan include the following information:
56
Hopi Tribe Hazard Mitigation Plan
2015
New or Existing – Indicates if the measure is a carryover from the previous Plan or new in this
Plan.
Hazard(s) Mitigated – Indicates which of this Plan’s identified hazards the measure will
potentially mitigate against.
Project Name – The identifying name or title of the measure.
Project Description – Description of the proposed measure, may include reason for activity
and/or phases of activity.
Estimated Cost – An estimate of the cost related to implementing the proposed measure based
on the knowledge about the project at the time of Plan development.
Lead Agency – A lead agency that will be responsible for the measure’s development and
implementation.
Estimated Timeframe – An implementation schedule was developed to specify the anticipated
completion dates and/or timeframe.
Potential Funding Source(s) – Potential sources of funding that might be available for
implementation.
Although it is conceivable to think all nine mitigation measures in this Plan could be implemented
concurrently as the responsibilities vary among agencies, we have made an effort to prioritize them.
The mitigation measures were prioritized using a High, Medium and Low rating using the following
criteria:
High Priority – Measure could likely lead to preservation of life.
Medium Priority – Measure could possibly or indirectly lead to preservation of life and property.
Low Priority – Measure could possibly improve quality of life now and in the future.
57
Hopi Tribe Hazard Mitigation Plan
2015
New or
Existing
Table 5-1: Current Mitigation Strategy
N
N
E
E
N
E
E
E
Hazard(s)
Mitigated
Severe Wind
Severe Wind
Landslide/Rockfall
Winter Storm
Winter Storm
Flood
Flood
Drought
Estimated
Cost &
Completion
Date
Description
HIGH PRIORITY
Research building/utility codes for the Hopi Tribe to determine they
adequately protect our people and property.
Continue to enforce Ordinance 55 that ensures buildings are constructed
to a standard.
Monitor the roads near first, second & third mesa areas identified as
potentials of slope and mesa erosion.
Conduct outreach program to have residents develop a 72- hour
emergency kit.
Coordinate and identify alternative routes for emergencies.
Identify the floodplains of Hopi land holdings.
MEDIUM PRIORITY
Identify possible improvements to low-water crossings and culverts on
Indian Reservation Road. (IRR)
LOW PRIORITY
Research and assess the need for a drought response plan.
58
Lead Agency
Potential
Funding
Source(s)
Ongoing
OCPED
N/A
Ongoing
OCPED
N/A
Ongoing
N/A
Ongoing
2 years
Ongoing
HDOT
DPSES, PHEP, Villages,
DNR & DHHS
HDOT
DNR Planner
Ongoing
HDOT / DNR Programs
N/A
Staff Time
Ongoing
ORM/Land Operations
N/A
N/A
N/A
N/A
Hopi Tribe Hazard Mitigation Plan
5.4
2015
Capability Assessment
A capability assessment provides information that is helpful in assessing the Tribe’s ability to
mitigate against hazards. The Planning Team reviewed and evaluated the Tribe’s resources and
capabilities in the following areas:
Planning and Regulatory
Administrative and Technical
Financial
Education and Outreach
In the previous Plan only funding sources for mitigation were discussed. For this Plan three other
capability/resource areas were explored (listed above). The tables list the capabilities/resources of
primarily the Tribe itself. However, following the tables is a discussion of other funding sources that
are known, applied for or previously utilized.
The capabilities and resources of the Hopi Tribe are summarized in the following tables.
59
Hopi Tribe Hazard Mitigation Plan
2015
Table 5-2: Capability Assessment
PLANS
Capital Improvements Plan
Community Wildfire Protection Plan
Comprehensive/Master Plan
Drought Contingency Plan
Economic Development Plan
Emergency Operations Plan
Stormwater Management Plan
Environmental Strategic Plan
Strategic Land Use and Development Plan
BUILDING CODES, PERMITTING, INSPECTIONS
Building Codes
Site plan review requirements
LAND USE PLANNING & ORDINANCES
Floodplain ordinance
Subdivision ordinance
Zoning ordinance
ADMINISTRATION
Mutual aid agreements
Planning Commission
TECHNICAL STAFF
Community Planner
Emergency Manager
PLANNING and REGULATORY
Does the plan address hazards?
Yes/No
Does the plan ID projects to include in the mitigation strategy?
Year
Can the plan be used to implement mitigation actions?
No
Yes
The Hopi Wildland Fire Management Plan. Addresses wildland fire.
No
Yes
Addresses drought. Yes, it can be useful for mitigation measures.
No
No
No
Yes
More of a guidance document. Not instrumental in mitigation measures.
Yes
What type of codes?
Yes/No
Are codes adequately enforced?
No
No
Is the ordinance effective for reducing hazard impacts?
Is the ordinance adequately administered and enforced?
No
No
No
ADMINISTRATIVE and TECHNICAL
Describe capability.
Yes/No
Is coordination effective?
No
No
Is staff trained on hazards and mitigation?
Yes/No
Is coordination between agencies and staff effective?
FT/PT
Have skills/expertise been used to assess/mitigate risk in the past?
Yes
Director, Hopi Lands. Yes, knowledgeable on hazards and on the community itself.
Yes
Yes, trained and knowledgeable and continuing education and training. Fairly effective.
60
Hopi Tribe Hazard Mitigation Plan
Engineer
Floodplain Manager/Administrator
GIS/HAZUS Coordinator
Yes
No
Yes
Grant writer
Yes
FINANCIAL
Capital improvements project funding
Community Development Block Grant
Authority to levy taxes for specific purposes
Impact fees for new development
Incur debt through special tax bond
Incur debt through general obligation bonds
FEMA mitigation grant funding
PROGRAM / ORGANIZATION
Community Bulletins
Yes/No
No
Yes
No
No
No
No
Yes
Access /
Eligibility
(Yes/No)
Yes
Hopi Emergency Response Team (HERT)
Yes
Citizen groups focused on emergency
preparedness, environmental protection, etc.
Public education/information programs (fire
safety, household preparedness, responsible
water use, etc)
No
Yes
2015
Yes, again, knowledgeable on community and mitigation needs.
Project Managers on staff at Community and Economic Development Dept
Director of Land Info Systems. Knowledgeable on local hazards and risks. Fair
coordination.
Use dept staff as required.
FINANCIAL
Has the funding resource been used in past and for what type of activities?
Could the resource be used to fund future mitigation actions?
Used after 2010 disaster event.
Used after 2010 disaster event.
This can be a source of future funding following a disaster (Hazard Mitigation Grant
Program).
EDUCATION and OUTREACH
Describe program/organization and how it relates to disaster resilience and
mitigation.
Could the program/organization help implement future mitigation activities?
This program will be used to keep the communities informed about hazards, risks and
mitigation efforts.
This team’s monthly meetings are used to delivery on-going mitigation updates and
engage other individuals and departments in mitigation related activities.
Structural Fire, Hopi Environmental Protection Office, (HEPO), Water Resources, and
Department of Public Emergency Services, (DPSES) - (CERT).
61
Hopi Tribe Hazard Mitigation Plan
2015
From the previous Plan and now, there have been no significant changes in the
capabilities/resources of the Tribe. Although plans may have been updated, there is no significant
change with them or the Tribe’s ordinances, codes and regulations. There has however, over time
been a significant change in the government funding for programs including disaster response.
Consequently there has been there is a growing need to consider better partnering with neighboring
tribes, counties, local jurisdictions and the State.
The Hopi Office of Planning and Evaluation administers the land use planning input and control of a
tribal regulatory measure as contained within the Hopi Tribal Planning Ordinance No. 55. This
ordinance provides a Land Development Review within its regulations in Chapter 4. Land
Development Review. The applicability section does identify projects and developments with
exceptions to the review although mitigation of hazards should apply to these exceptions in order to
identify vulnerable areas and provisions for mitigation. Most of the guidance and rules established
in Ordinance 55 are conducive to developing and implementing mitigation strategies and actions.
In the past, the Hopi Reservations have received funding directly and indirectly from local and State
governments for disaster relief. The Hopi Tribe has received funding from FEMA and looks to further
the opportunity for disaster and mitigation funding with the acceptance of this Plan.
Local potential funding sources for pre-disaster mitigation activities and emergency response to
disasters has been very limited. It is critical that the Hopi Tribal Council continue with the
established Emergency & Disaster Response Contingency Fund so that responses to disaster events
are not drawn out and unresponsive to the needs of the Hopi people. Coordination and planning
should be well supported so the efficiency and organization is executed to the highest degree during
these disaster events. The Hopi Tribe is faced with a major reduction of government financial
revenues to continue the fund. Therein, planning and grant funding should be a priority for support
from the Tribe due to this financial constraint, including the development of this Plan. As a result,
financial support for hazard mitigation projects will largely rely on off-Reservation sources in the
foreseeable future.
Upon receipt of a presidential disaster declaration, the Tribe will develop a Public Assistance
Administration Plan and a Hazard Mitigation Grant Program Administration Plan. Both plans will be
used to identify the roles and responsibilities of the Tribe in administering the FEMA Public
Assistance (PA) and Hazard Mitigation Grant Programs (HMGP), and to outline staffing requirements
and the policies and procedures to be used. A result of developing these plans will be to further
focus Tribal resources on the importance of hazard management and mitigation planning.
Staff resources in several Tribal departments/programs, working under the auspices of the Council
collectively provide hazard mitigation for the Tribe. The Tribe often hires consultants to conduct the
necessary technical studies and analyses to determine both risk and mitigation alternatives.
Current financial resources available to the Tribe for hazard mitigation planning and projects include
potential disaster and mitigation funds through FEMA are post-disaster Public Assistance and HMGP,
and the annual Pre-Disaster Mitigation grant program. Potential sources of funds may include any
of the previously mentioned resources and others such as the U.S. Department of Interior (Bureau
of Reclamation, Bureau of Indian Affairs, U.S. Geological Survey, Bureau of Land Management), U.S.
Army Corps of Engineers, U.S. Housing and Urban Development, U.S. Department of Health and
Human Services (Indian Health Service), and the U.S. Department of Agriculture (U.S. Forest Service,
Natural Resources Conservation Service).
62
Hopi Tribe Hazard Mitigation Plan
2015
In summary, the Hopi Tribe currently has in place regulatory mechanisms for mitigation of hazards,
with most being directed at new construction and development. Staff resources and/or consultants
are available for the identification, development and implementation of mitigation measures.
Financially, the Tribe applies for Community Development Block Grants, obtains Capital
Improvement Project funding, and has the authority to levy taxes for specific purposes, however, all
of these mechanisms require political approval.
63
Hopi Tribe Hazard Mitigation Plan
2015
SECTION 6: PLAN MAINTENANCE
6.1
Section Changes
6.2
The previous Plan was based on the State Plan requirements which did not include
Incorporation into Existing Planning Mechanisms and Continued Member and Stakeholder
Involvement. Those elements are now included in this Plan.
Monitoring, Evaluating and Updating
The responsibility for ensuring the plan maintenance and update procedures are performed belongs
to the Department of Public Safety and Emergency Services. For evaluation purposes, the Planning
Team shall review the Plan once a year, on or around the approval anniversary date.
Each evaluation shall include, but not be limited to the following:
Risk Assessment – Analyze changes in the type, nature or magnitude of risks.
Goals and Objectives – Ensure they address current and expected conditions.
Mitigation Strategy – Review mitigation activity progress and available resources to
implement.
The results of the evaluation shall be documented and kept with the Plan. The review
documentation and any other related materials will be reviewed and considered during the next
update process.
A summary of the evaluation shall also be presented as an informational item to the Hopi
Emergency Response Team (HERT) on at least an annual basis as well as performing periodic
presentations to the team to keep the Plan ‘alive’ and active. The evaluations of the previous were
not performed as discussed in the Plan. This is due mostly to staff turn-over and lack of awareness of
the Plan and the commitments within. We feel we now have a much better understanding and are
currently educating several government departments on the Plan and will continue to do so in the
future. The process has been modified to encourage adherence.
The Plan requires updating and re-approval from FEMA every five years. The plan update will adhere
to the set schedule using the following procedure:
6.3
One year prior to the plan expiration date, the Planning Team will convene to review and
assess the Plan and areas for potential change.
The Planning Team will update and/or revise the Plan according to the requirements in
FEMA’s Tribal Plan Review Crosswalk and reproduce the Plan.
The updated Plan will be presented to the Tribal Council for review and approval.
The updated Plan will be submitted to FEMA for review, comment and approval.
Once the Plan is determined ‘approvable’ by FEMA, the Plan will be presented to the Tribal
Council for adoption via Tribal resolution.
The signed resolution will be sent to FEMA.
Monitoring Progress of Mitigation Activities
The Hopi Hazard Mitigation Planning Team will discuss, on at least an annual basis, the Mitigation
Strategy progress. Representatives of the Planning Team will report on the progress made by their
64
Hopi Tribe Hazard Mitigation Plan
2015
respective departments. Other departments or programs will be invited, as necessary to report or
present data relative to the Plan or mitigation measures implemented by their departments. The
implementation of mitigation measures will be monitored by the Planning Team on an on-going
basis until implementation is complete. Due to the vague and/or unrelated nature of the previous
Plan’s mitigation measures, the monitoring was not executed as discussed. However, with a clearer
and more concise Plan the probability of a better understanding, resulting in a higher level of
success in implementing mitigation measures is likely.
For FEMA supported projects, progress reports are required on a quarterly basis throughout the
project duration. The degree of quarterly reporting will be dependent upon the type of project, its
funding source, and the associated requirements. At a minimum, the quarterly report shall address:
Project Completion Status
Project Challenges/Issues (If any)
Budgetary Considerations (Cost Overruns or Underruns)
Detailed Documentation of Expenditures
Upon completion of projects, a member of the Planning Team will visit the project location to view
the final results. A closed project will also change status to “Completed” and will then be monitored
for effectiveness in the intended are of mitigation. FEMA supported project closeouts will include
an audit of the project financials as well as other guidelines/requirements set forth under the
funding or grant rules, and any attendant administrative plans developed by the Tribe.
6.4
Incorporation into other Planning Mechanisms
In the past, this Plan has not been successfully incorporated with our other tribal efforts. The Plan
was not highly publicized nor was it organized in a manner that lent itself to easily see the
opportunity for integration/incorporation. However with the improved format of this Plan, there is
likely to be greater opportunity to use the material in this Plan to inform other tribal efforts, projects
and planning mechanisms. This Plan will be publicized and made available to all tribal members,
departments and agencies. It will also be discussed regularly with community members and updates
presented at the Hopi Emergency Response Team (HERT) meetings. We believe this will give the
Plan improved on-going exposure resulting in a higher level of awareness of its benefits and how it
may be utilized for current and future tribal ventures ensuring its members a sustained high quality
of life for generations to come. It is our hope and intent that when plans, ordinances, regulations,
etc., are developed, reviewed or updated, the information from this Plan will be used where
appropriate. The responsibility of encouraging that practice will be owned by the Office of
Emergency Management.
The plans the tribe will, as appropriate incorporate this Plan’s information, data and mitigation
practices into are as follows:
PLANS
Hopit Potsqwani’at Goals and Objectives 2001
Hopi Tunatya’at : Strategic Land Use and Development Plan 2000
LAND USE
Hopi Emergency Response Plan 2005
Hopi Drought Contingency Plan 2000
65
Hopi Tribe Hazard Mitigation Plan
2015
Hopi Water Code 1997
Hopi Wildland Fire Management Plan 2005
Hopi Integrated Woodlands Management Plan 2006
Hopi Integrated Resources Management Plan 2001
CODES AND REGULATIONS
Ordinance 55: Hopi Tribal Planning
Ordinance 26: Protection of place and objects of sacred historical
and scientific interest on the Hopi Reservation
Hopi Emergency Response Team ERP 2005
Hopi Emergency Operations Structure (with Tribal Declaration)
EMERGENCY
OPERATIONS
Hopi Incident Command Structure (at Incident Scenes)
Hopi Risk Management—Emergency Evacuation Plan
Hopi Environmental Protection Office—Leaking Underground
Storage Tank Program
BIA—Volunteer Structural Fire Response
Community Emergency Response Team (CERT)
PROGRAMS
Hopi Tribe Watershed Study 2009
Hopi Solid Waste Program
Hopi Cultural Preservation Office
LAND USE
Hopi Environmental Protection Office
Hopi Range Management Program
Hopi Wildlife Ecosystem Management Program
Hopi Resources Enforcement Services
6.5
Past and Continued Member and Stakeholder Involvement
During the previous Plan cycle of 2010 to 2015 the Tribe has not been involved as is planned for the
next five years. Having a more established program now and the development of this update has
been a learning lesson for the Tribe on how they can be more involved with the community. Other
than presenting at community meetings and schools some of the community events the program
did participate in were a Community Family Night Out sponsored by the BIA. The event was for first
responders and the public to learn and become more aware of how to protect themselves and the
community. They also participated in the Domestic Violence Month Conference which was hosted
66
Hopi Tribe Hazard Mitigation Plan
2015
by tribal agencies and departments. The hosts set up booths with information to help educate the
public on their programs and the hazard information was presented at that time.
The Tribe is committed to keeping the public informed about the reservations’ risks and hazards and
their resulting mitigation planning efforts. In order to accomplish this, the Planning Team will
pursue the following opportunities for public involvement and dissemination of information
whenever possible and appropriate:
Continue to develop and disseminate flyers to the public via community bulletin boards.
These flyers discuss a wide range of topics such as safe winter preparedness and driving tips,
elder and functional needs care/preparation, National Preparedness Month information,
Ready.gov, winterizing vehicles, emergency kits, etc. The intent is to continue to publish the
flyers monthly and focus on seasonal topics.
Educate the public on the risk and potential impacts of the hazards that threaten the
community and their villages at fairs, educational events and special community events.
Presentations will continue to be delivered to the Hopi Emergency Response Team (HERT) at
their monthly meetings. The intention of the on-going updates is to keep the Plan ‘alive’ and
engage other departments and individuals in the on-going mitigation efforts of the tribe.
The Tribe will continue to explore other opportunities to be more involved with the community and
will attend them whenever possible.
67
Hopi Tribe Hazard Mitigation Plan
2015
Appendix A - Planning Process Documentation
68
Hopi Tribe Hazard Mitigation Plan
2015
69
Hopi Tribe Hazard Mitigation Plan
2015
70
Hopi Tribe Hazard Mitigation Plan
2015
71
Hopi Tribe Hazard Mitigation Plan
2015
72
Hopi Tribe Hazard Mitigation Plan
2015
73
Hopi Tribe Hazard Mitigation Plan
2015
Appendix B - Public Involvement Documents
74
Hopi Tribe Hazard Mitigation Plan
2015
75
Hopi Tribe Hazard Mitigation Plan
2015
76
Hopi Tribe Hazard Mitigation Plan
2015
Public comment on Landslide/Rock Fall:
Mr. Lloyd Ami from Polacca member of the Tewa Village called my desk phone wanted to share his
comments and concerns regarding the 2010 Mitigation Plan the hazard for Landslide/Rock Fall and
recommendations for the 2015 Mitigation Plan updates.
Mr. Ami is addressing the Polacca Mesa “Gap” area. He, rock continues to fall after heavy rain and
snow storms and is he is concerned this being a hazard for loss of lives and safety of the people.
Mr. Ami suggested for the planning team to continue to work with a Yanter Company from Salt Lake
City to stabilize the rocks and installment of embankments. Mr. Ami feels that the Yanter Company
would be knowledgeable of the Polacca Mesa area because they have collected vibrations maps,
and this company may have other useful records and documentation of the information collected
during that time.
After 15+years after the stabilization and anchoring of rocks it continues to be very unstable and
erosion is occurring causing the rocks to fall in large chucks after a storm or high winds pass through
the area.
Mr. Ami is willing to work with Tewa CD to assist the staff with the knowledge his has regarding the
Polacca Mesa “Gap” Project. There they can also include the Sichomovi and Walpi Community
Development Offices to come together and work on small projects to start addressing the problem.
Each project can build upon one another so the work on the Polacca Mesa can be continuous for the
safety of the people.
Velleda’s comments:
I recommend in the projects/action sections we can started with listing out a beginning phase to
address the landslide/ rock fall hazard. This will include Community Development Office and Cultural
Preservation office and the Hopi Department of Transportation since they now have the BIA 638
contract for Road Maintenance. To start a phase one for the next five years for the Polacca Area this
will include all three villages to work together to start developing a plan. This cost will be paid with
Transportation funds from the 638 contract and Village Allocation funds, the villages can start
working on grant funding to cover their cost.
Next, we can do this same idea of phases for the other villages that have high landslide rock fall
areas. We can work on this landside/rock fall projects in phase one, two and three for all villages.
Llyod Ami
P.O. Box 154
Polacca, Arizona 86039
(928) 737-2379; (928) 928-313-6100
77
Hopi Tribe Hazard Mitigation Plan
2015
78
Hopi Tribe Hazard Mitigation Plan
2015
79
Hopi Tribe Hazard Mitigation Plan
2015
Appendix C - Assessment of Previous Plan’s Mitigation Strategy
80
2015
Drought
Incentive program to install water
saving devices
Drought
Drought
Drought
Winter
Storm
Winter
Storm
Winter
Storm
Infestation
Infestation
Installation of water meters and
billing rates
Assess/upgrade primary and village
water systems. Perform village
surveys to determine needs
Building of central water
supply/storage for First and Second
Mesas villages to alleviate arsenic in
water sources
Installation of emergency generators
at critical structures and
communication towers
Outreach program to have residents
have one week of emergency
supplies
Strengthen/retrofit Tribal roof
structures
Partner with Dept of Agriculture &
Land Mgmt for prevention treatment
programs
Education outreach addressing
human infestations
On-going
X
Potential Funding
Source(s)
Part of in-place
program budgets
RSWA, Facilities Mgmt,
Village CSA, VUMC
IHS, Home Depot,
Lowes, Water
Resources Agency
X
X
IHS
X
X
Explanation
Too vague, will revise and place in
update to cover multiple hazards.
Villages manage their own water
systems & projects like these
would be different village to
village.
Again, villages manage their own
water systems. Projects like these
are up to the individual villages.
IHS
X
X
Description too vague, no one
recognized project.
Annually
$20M
10 years
IHS
$30,000
5 years???
Facilities/Risk Mgmt
Dept., Village CSA
Staff Time
On-going
CRS, CHR, ASEM, BIO
$50,000
On-going
X
Lead Agency
Village CSA, CHR, IHS,
PSEM, BIO
Water Co., Coops,
Village CSA
Natural Resources
Dept., IHS, Village CSA,
BIA
On-going
Revise
Community education outreach
Keep
Drought
Action
Complete
Description
Estimated
Cost &
Completion
Time
In Progress
Hazard
Status
No Action
Assessment of Previous Plan’s Mitigation Measures
Delete
Hopi Tribe Hazard Mitigation Plan
Facilities/Risk Mgmt
Dept., Villages
Dept of Range Mgmt,
IHS, Tribal Health
Resources
CHR, Village CSA, IHS,
ASEM, BIO
IHS, EPA
Hopi Tribe, BIA, IHS,
Red Cross,