Continuity of Operations Plan

Tribal code

Ask Donna

What actually matters in this document.

Text

Hoopa Valley Tribe

Continuity of Operations Plan

Hoopa Valley Tribe Continuity of Operations Plan

i|Page

Hoopa Valley Tribe Continuity of Operations Plan

TABLE OF CONTENTS

HOOPA VALLEY TRIBE CONTINUITY PLAN APPROVALS ................................................... 1

HOOPA VALLEY TRIBE CONTINUITY OF OPERATIONS PLAN ............................................ 2

I.

EXECUTIVE SUMMARY................................................................................................... 2

II.

INTRODUCTION ............................................................................................................... 3

III.

PURPOSE & ASSUMPTIONS .......................................................................................... 3

IV.

APPLICABILITY AND SCOPE ......................................................................................... 4

V.

ESSENTIAL FUNCTIONS ................................................................................................ 5

VI.

AUTHORITIES AND REFERENCES ................................................................................ 6

VII. CONCEPT OF OPERATIONS .......................................................................................... 7

A.

Phase I: Readiness and Preparedness .............................................................................................. 7

B.

Phase II: Activation and Relocation.................................................................................................. 7

C.

Phase III: Continuity Operations ..................................................................................................... 10

D.

Phase IV: Reconstitution ................................................................................................................. 12

VIII. CONTINUITY PLANNING PROGRAM RESPONSIBILITIES ...........................................13

IX.

LOGISTICS ......................................................................................................................13

X.

COOP MAINTANANCE ...................................................................................................14

XI

ANNEXES TO AGENCY CONTINUITY PLANS ..............................................................16

ii | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

HOOPA VALLEY TRIBE CONTINUITY PLAN APPROVALS

The Hoopa Valley Tribe adopted a Constitution and Bylaws (Tribal Constitution)

on June 20, 1972 which was approved by the Commissioner of Indian Affairs on

August 18, 1972 and ratified by Congress on October 31, 1988, and the purpose of

the Tribal Constitution is to protect and promote the interests of the Hoopa Valley

Indians. The Hoopa Valley Tribal Council is the governing body of the Hoopa

Valley Tribe pursuant to Article V of the Tribal Constitution and in accordance

with requirement 44 CFR 201.4(c)(6) the Hoopa Valley Tribal Council has

adopted by tribal resolution number 16-XXX, dated XXXX, XX, XXXX, the

approved Hoopa Valley Tribal, Continuity of Operations Plan.

_____________________________

Ryan Jackson, Chairman

Hoopa Valley Tribal Council Members

Leilani Pole, Council Woman

Hostler/ Matilton District

Joseph LeMieux, Councilman

Campbell Field

Diana Ferris-McCovey, Councilwoman

Norton Field

Oscar Billings,Vice Chairman

Agency Field

Shane McCullough, Councilman

Soctish/ Chenone District

Vivenna Orcutt, Councilwoman

Mesket Field

Gary Risling, Councilman

Bald Hills District

1|Page

Hoopa Valley Tribe Continuity of Operations Plan

HOOPA VALLEY TRIBE CONTINUITY OF OPERATIONS PLAN

I. EXECUTIVE SUMMARY

The Hoopa Valley Tribal Government along with The Hoopa Valley Tribes Office of Emergency

Services considers a fast response to an emergency event critical to the health and safety of

tribal members as well as the sustainable of the Hoopa Valley Tribe. In order to ensure a quick

response and ensure that all essential functions can be performed by the Tribal Government it

has been decided to develop a Continuity of Operations Plan (COOP) for the Hoopa Valley

Government. The Continuity of Operations Plan (COOP), as defined in the National Continuity

Policy Implementation Plan (NCPIP) and the National Security Presidential Directive51/Homeland Security Presidential Directive-20 (NSPD-51 /HSPD-20), will be referenced for the

development of this plan, is an effort within individual Hoopa Tribal executive departments,

agencies, and programs to ensure that Essential Functions continue to be performed during a

wide range of emergencies, including localized acts of nature, accidents, and technological or

attack-related emergencies.

The main purpose of the COOP is to ensure a fast response to an emergency event to get

essential functions up and running for an individual department or the entire Tribal Government.

To do this a set of policies and procedures have been developed so that each department can

describe their plan to reestablish operations if an emergency threatens. This COOP identify

each departments essential functions, and then develops a four-part plan to ensure continuing

functions. These four parts are: Phase I: Readiness and Preparedness, Phase II Activation and

Relocation, Phase III: Continuity Operations, and Phase IV: Reconstruction. The Hoopa Valley

Tribe COOP contains key elements of emergency actions, operations and procedures by

incorporating these basic elements.

1. Identify lines of succession and delegation of authorities

2. Determine essential functions, records, communications, facilities, and human

resources that will need to be maintained or quickly reestablished operations so that

the Hoopa Valley Tribe can maintain all functional operations

3. Determine best way to reconstitute operations with line of succession and

successors for key personnel to ensure full departmental functions

4. Determine a test, training, and exercise regime to ensure that the COOP is up to

date an actionable in the face of an emergency

The Continuity of Operations Plan is a continual process and is considered a living document.

As the Tribal government and its departments grow and change over time so must the COOP.

To this end a plan for update and maintenance has also been developed to keep the COOP

active and viable.

2|Page

Hoopa Valley Tribe Continuity of Operations Plan

II. INTRODUCTION

The Hoopa Valley Tribe and its departments have essential functions and services it

needs to perform in order to maintain a level of service. In the event of an emergency,

these essential functions can be disrupted can disrupt those function. These essential

functions and services must either be maintained through the emergency or quickly

reestablished shortly into the lifecycle of the emergency. This quick resumption of

functions and services is to reduce and help mitigate the impact of an emergency on the

tribal members, facilities, other individuals, and the overarching mission of the Hoopa

Valley Tribal government. To achieve this goal, the Hoopa Valley Tribal Government

has developed a Continuity of Operations Plan (COOP).

This COOP development is driven by the National Continuity Policy; National Security

Presidential Directive-51/Homeland Security Presidential Directive-20 (NSPD-51/HSPD20), directive issued in May of 2007. This directive to help establish and maintain a

comprehensive and effective method to ensure the preservation of Government under

the constitution and the ability to continue to perform National Essential Functions

regardless of the conditions.

In addition to complying with National Continuity Policy it is “The elected leadership of

each jurisdiction is legally responsible for ensuring that necessary and appropriate

actions are taken to protect people and property from the consequences of

emergencies and disasters.” Meaning that a COOP plan is simply a good practice for All

aspects of the Tribal government as well as local businesses to develop an overall

continuity framework that will allow for a way to protect Health and safety, vulnerable

populations, resources and infrastructure.

III. PURPOSE & ASSUMPTIONS

A. Purpose

The purpose of this COOP is to describe how the Hoopa Valley Tribe and its

departments will continue to operate in the event an emergency incapacitates one or

more tribal governmental functions or departments. These emergencies have been

listed and prioritized in the Hoopa Valley Tribe Multi-Hazard Mitigation Plan (2014)

and the Hoopa Valley Threat Identification and Risk Assessment (THIRA) (2015)

(see Annex A). Mandated by the Hoopa Valley Tribal Council and in accordance

with guidelines established by Continuity Guidance Circular 1, Continuity Guidance

for Non-Federal Entities (States, Territories, Tribal, and Local Government

Jurisdictions and Private Sector Organizations), this document will:

5. Identify lines of succession and delegation of authorities

6. Determine essential functions, records, communications, facilities, and human

resources that will need to be maintained or quickly reestablished operations so that

the Hoopa Valley Tribe can maintain all functional operations

7. Determine best way to reconstitute operations with line of succession and

successors for key personnel to ensure full departmental functions

3|Page

Hoopa Valley Tribe Continuity of Operations Plan

8. Determine a test, training, and exercise regime to ensure that the COOP is up to

date an actionable in the face of an emergency

This COOP allows the Hoopa Valley Tribal Government to provide critical services if

threatened or impacted by any natural hazard through the 4 main phases.

Phase I: Readiness and Preparedness

Phase II Activation and Relocation

Phase III: Continuity Operations

Phase IV: Reconstruction

These phases are described in detail in the update Hoopa Valley Tribe Emergency

Operations Plan.

B. Assumptions

The Hoopa Valley Tribe Continuity of Operations Plan is based on the following

assumptions:

•

•

•

•

•

•

•

•

•

Emergencies or threats may affect the Hoopa Valley Tribe’s ability to

provide essential departmental services and to provide support to other

agencies

Personnel and other resources from Hoopa Valley Tribe’s affected

departments will be made available to continue essential departmental

services

Emergencies and threats will be prioritized based upon their perceived

impact on operations and the public

An emergency may require the transfer of essential services to other

personnel and possibly relocation sites

Staff levels may be significantly reduced. The lives of staff may be lost

due to significant mortality associated with injury or disease

Remaining workers may be psychologically affected by disaster, disease,

family concerns, concerns about economic loss or fear

Information and communications systems that support essential functions

during normal day to day operations may not be available

If an emergency occurs during business hours, any building impacted will

be evacuated according to the building’s facility evacuation plan

In compliance with the National Incident Management System (NIMS),

and Homeland Security Presidential Directive (HSPD) - 5, all COOP

program activities shall incorporate the principles of the National Incident

Management System (NIMS) and the Incident Command System (ICS)

The Hoopa Valley Tribe COOP, which is applicable too all-hazards or threats, has been

developed to ensure that the Hoopa Valley Tribe is prepared to provide critical services

in an event that has threatened, diminished or incapacitated Hoopa Valley Tribe

operations.

IV. APPLICABILITY AND SCOPE

A. Applicability

4|Page

Hoopa Valley Tribe Continuity of Operations Plan

The Hoopa Valley Tribal Council has reviewed and approved this plan for operational

activities during emergency/disaster events. This plan is designed to reduce/minimize

loss of essential services by the Hoopa Valley Tribal Government until normal operations

can be restored. This plan is intended for all emergency circumstances, from short term

localized issues to long enduring regional/national emergencies that can impact only a

single department or the entire Tribal government and departments. This includes all

natural, technological, and man-made events/disasters as described in Annex A. This

plan is intended to compliment the Hoopa Valley Tribe Emergency Operations Plan.

B. Scope

The intent of the Hoopa Valley Tribe COOP is to ensure that resources, personnel and

therefore capability exists to continue essential functions of Tribal government and Tribal

departments in the event of an emergency event. To do this the COOP will:

•

•

•

•

•

•

•

•

•

•

•

Identify and ensure essential functions operations for each Department of the

Hoopa Valley Tribal government to mitigate disruptions to operations

Establish Delegation of Authority and lines of succession for each department

Identify all personnel needed to perform essential functions

Determine and protect critical documents, equipment, and other defined assets

for all essential functions per department

Identify possible alternate locations for each department to continue operations

Reduce potential loss of life, damages, and losses while minimizing disruptions

to operations

Identify means of communication internal to each Tribal Department, between

Tribal departments, with other non-tribal entities and the public

Help establish the ability to resume full operations in a timely manner from an

emergency event

Allow Tribal departments with required essential functions to be operating from

an alternate location within twelve (12) hours of the emergency event onset and

for a period of up to thirty (30) days

Determine a plan of action for any limitations or vulnerabilities that may be

uncovered in the COOP development process

Establish requirements for development, maintenance and biannual review of the

COOP

V. ESSENTIAL FUNCTIONS

The identification and prioritization is one of the main components of COOP planning as it

establishes Tribal department functions that must be maintained during an emergency when

resources may be scarce. The Hoopa Valley Tribe recognizes its commitment to Tribal and

community members to ensure that essential operational functions are maintained in the event

of an emergency. Departmental Essential functions are broken down into the following

categories:

•

Category 1: Services that cannot be interrupted

5|Page

Hoopa Valley Tribe Continuity of Operations Plan

•

Category 2: Services that must be operational as soon as possible but no later than

twelve (12) hours after event

•

Category 3: Services that can be restored after twelve (12) hours and may be

considered non-essential and not restored until after the event

Categories 1 and 2 are considered essential functions while category 3 are determined based

on type of services and allowable time of disruption.

All Tribal Government Departments are identified on the Hoopa Valley Tribal Government

Organization Chart in Annex B. Each department will review their organizational missions and

determine those that are essential. Misidentification or failing to identify a department as

essential could hinder the Hoopa Valley Tribal Government from providing essential service.

The Hoopa Valley Tribe has had each department identify and prioritize essential functions in

Annex C as well as the timelines, critical personnel, and resources to do these critical functions.

VI. AUTHORITIES AND REFERENCES

The Hoopa Valley COOP has been developed with the full endorsement of the Hoopa Valley

Tribal Council, Hoopa Valley Tribe Office of Emergency Services. The COOP as defined in

defined in The National Continuity Policy Implementation Plan (NCPIP) and the National

Security Presidential and Directive-51/Homeland Security Presidential Directive-20 (NSPD-51

/HSPD-20) will be referenced for the development of this plan.

The Constitution and Bylaws of The Hoopa Valley Indian Tribe and Compact of Self

Governance between The Hoopa Valley Indian Tribe and The United States of America ensure

the allowance of designation of temporary locations for Tribal Government Departments as well

as allow for designation of authority for all departments.

Multiple reference documents were used in the development plan but below are the two main

resources used.

A listing of available FEMA COOP documents can be found here:

https://www.fema.gov/continuity-operations

A listing of the State of California’s COOP documents can be found here:

http://www.caloes.ca.gov/cal-oes-divisions/planning-preparedness/continuity-planning

The Hoopa Valley COOP complies with applicable Tribal Council regulations, Executive

Order(s), State Regulations, and County Ordinances. Please see Annex D for a complete listing

Authorities and References.

6|Page

Hoopa Valley Tribe Continuity of Operations Plan

VII.

CONCEPT OF OPERATIONS

The intent of the Hoopa Valley Tribe’s continuity plan is intended to ensure the continuation or

rapid resumption of essential functions in the aftermath of an emergency. Hoopa Valley Tribe

has endeavored to develop National Incident Management System (NIMS) and the Incident

Command System (ICS) compliant processed determination of the best course of action. This

section explains how Hoopa Valley Tribe will implement its Continuity Plan including the plans to

address each critical continuity element.

There are four phases to the continuity implementation process.

A. Phase I: Readiness and Preparedness

B. Phase II: Activation and Relocation

C. Phase III: Continuity Operations

D. Phase III: Reconstitution (end of event/return to normal operations)

The intent of the concept of operations is to plan for longer term (greater than twelve (12) hours)

situations where access to facilities will be barred due to emergency events. The plan will

include the key personnel, critical documents and equipment, communications, and if necessary

alternate locations so that essential services may be continued. The alternate locate if deemed

necessary will support key staff for up to thirty (30) days including communications, IT support,

supplies and materials in a secure environment.

A.

PHASE I: READINESS AND PREPAREDNESS

Readiness is the ability of an organization to respond effectively to any event that

threatens its ability to continue mission-critical functions and services. To this end the

Hoopa Valley Tribe has produced a Multi-Hazard Mitigation Plan (2014), Community

Wildland Fire Protection Plan (CWPP) (2015), Threat Hazard Identification and Risk

Assessment (THIRA) (2015), and are in the process of updating the Emergency

Operations Procedures (EOP). These plans were developed to continue readiness,

preparedness and mitigation activities so that the Hoopa Valley Tribe can respond to and

event with a best course of action. This COOP has taken into account these documents in

developing Hoopa Valley Tribes complete concept of operations.

B.

PHASE II: ACTIVATION AND RELOCATION

Emergency events that would trigger the continuity plan can occur at any time. Hoopa

Valley Tribe Departmental employees may be affected at work or away from work when

the COOP is activated. The activation may involve the closing of any individual or multiple

buildings which would require the relocation of essential services.

1. Decision Process

a. If an event occurs that impacts a department to the extent that it cannot

perform its essential functions, the Departments COOP will be activated

by the appropriate Department head or designee.

b. If the event that situation effects the entire Hoopa Valley Reservation the

Tribal Chairman or designee will activate all Tribal Department COOPs.

7|Page

Hoopa Valley Tribe Continuity of Operations Plan

c. If advanced warning is provided of a potential event the COOP can be

implemented. This will be communicated to the appropriate Department

Heads by the Tribal Chairman or designee.

If a department’s facilities are nonfunctional the department will be relocated

according to locations listed in Annex E: Alternate Facilities, so the department

can continue with essential functions.

2. Alert, Notification, and Implementation Process

Once the decision has been made to activate the COOP for a Hoopa Valley Tribe

Department(s). The department heads or his/her designee will follow the

departmental Emergency Action Plan (EAP) if available (See Annex O for a EAP

template).

The Department Head and designated staff are responsible for notifications of

Department employees for both activation and deactivation of the continuity plan.

Employees will be notified using best available method (telephone, cellular

phone, two-way radio, text and/or email) of any change in status of the COOP.

Department employees will be based on their roles in the essential functions.

Employees involved in Category 1 or 2 essential functions will be notified first.

All other Department employees will be contacted secondarily. See Annex F for

the key department personal and contact information.

3. Leadership

Lines of Succession/Delegations of Authority:

Each Tribal Department will identify the lines of succession (Three deep if

possible). This will allow each Department to manage its essential functions in

case there is a disruption in the Department Hierarchy. The succession will occur

if the Key person for that Department/Function is unavailable or incapacitated.

See Annex G for the Listing of the Lines of Succession. The defined Department

head is the delegated person of authority with the Tribal Chairman having

authority over all departments. See Annex B for the full Organizational Chart

listing by Department and Annex H for the listing of Delegations of Authority for

each Department.

4

Devolution:

In a worst case scenario, the Tribal Departments leadership is incapacitated and

therefore operations of essential functions must be taken over by another Tribal

Department or the Tribal Council. The Hoopa Valley Tribal Council has

overarching authority to transfer and delegate authority for the Tribal Government

and all departments. The intent for the COOP is to facilitate devolution planning

following the constitution and bylaws of the Hoopa Valley Indian Tribe.

8|Page

Hoopa Valley Tribe Continuity of Operations Plan

5. Continuity Facilities/Relocation

Relocation of facilities to allow for continuing essential functions is a critical step

in the continuity plan. Each department will identify alternate operating facilities

as part of their COOP planning and discuss/prepare all personnel for the

eventuality of an unplanned relocation of essential functions to defined facility.

Each department should have their emergency action plan that includes all

actions to allow for quick transition of all required personnel, equipment and

supplies to the alternate facility. This plan will also allow for non-essential

personnel to be contacted and informed of their status through the event. This

should include alternate communications/IT as well as any testing of

equipment/resources to allow for personnel to do their essential functions as

directed.

It is understood that adequate continuity facilities are available on the Hoopa

Valley Indian Reservation and that some relocation facilities will be based on

available space and extent of the emergency. It is with this understanding that

any alternate location should meet these minimum requirements:

•

•

•

•

•

Have sufficient space/infrastructure to meet essential function

requirements

Allow for the determined minimal interruption of operations

Have all required logistical and service support to meet essential function

requirements

Should consider the health, safety, security, and emotional wellbeing of

all essential personnel

The ability to have all equipment either in place or transported to location

to carry out essential functions

If equipment is not set up or available in a timely manner, essential personnel

should be prepared to perform essential function manually and a supply of any

needed forms and manuals should be included in an employee “Go Kit”. If

possible secondary cellular batteries and car chargers could be included as well

to make sure potential communications is maintained. This will allow personnel

to perform essential functions even without power available.

Upon relocation to alternate facilities a review of required security and existing

procedures will need to be undertaken and revised as necessary. This will allow

the department to meet essential function criteria while still providing any

necessary external public contact.

9|Page

Hoopa Valley Tribe Continuity of Operations Plan

C.

PHASE III: CONTINUITY OPERATIONS

The Continuity Phase II section should outline the activation procedures for the Continuity

Plan. It should also include information about the relocation procedures, from the primary

facility to the alternate facility; and guidance for non-relocating personnel.

1. Mission Critical Systems, Equipment, and Supplies

To engage and properly complete essential functions, Departments will need

access to certain systems, equipment and supplies. These include but are not

limited to IT, communications, payroll and bookkeeping systems, Internet,

Computers, printers, printer paper, notepads, and pens. Mission critical systems

needed to support essential functions are listed Annex I. These systems and or

equipment should identify any Memorandums of Understanding (MOUs) or

Memorandums of Agreement (MOAs) that govern its access or use. The critical

equipment list will also explain how the item is to be relocated (In place prior to

relocation "Hand-Carried", or Needs To Be Transported).

Internet access is a critical system for almost all departments of the Hoopa Valley

Tribe. It is currently supplied to the entire tribe via a single vendor, Velocity

Wireless and managed through the Hoopa Valley Tribe IT Department. To

ensure access at continuity facilities departments need to work with Hoopa

Valley Tribe IT Department and Velocity Wireless to ensure IT access if required

for essential functions.

IT Service Vendor

Address

Phone

Velocity Wireless

829 4th Street Eureka, CA 95501

707-268-3671

It is also noted that all Hoopa Valley IT employees are considered essential to all

other departments continuing operations.

Essential supplies not considered to be equipment is listed in Annex J. These

are supplies that should be either stored, carried or transported to the alternate

location and are needed to complete essential function. This list should include

all supplies needed if computers and backups are not available.

2. Essential Files, Records, and Databases

The identification, protection and access to digital and hard copy documents,

manuals, references, and forms is a critical component in the support of essential

functions. The Hoopa Valley Tribe Departments will identify, duplicate and store

critical records and electronic files at a remote location as described in the IT

policy. These backups will allow for the continuity of operations of essential

function if original files and records are damaged or unavailable.

10 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Critical records could include but are not limited to the following:

Essential function records: records, databases, manuals and forms that are

required for the essential operations of the department in the event of the COOP

activation

Legal and Financial (Rights and Interests) Records: Records that are critical for

the legal, financial interests of the Hoopa Valley Tribe. These are also the files

that will protect the rights of tribal members and any other individual that is

affected by the departments day to day operations. Annex C lists essential

functions and Annex K lists critical documents for each essential function.

It should be noted that culturally import documents should also be taken into

consideration when looking at backups and remote storage of critical information

for a department even though it may not be considered important for a

department’s essential functions.

When the COOP is activated the Department head or designee will be

responsible for the collection and relocation of the essential records stored either

on site or as backups to defined alternate location and any necessary set up to

be ready to continue operations.

3. Continuity Communications

Hoopa Valley Tribe Departments will be responsible for the determination of

continuity communications for essential functions. These may take the form but

not limited to Mobile Telephones, Satellite Telephones, Two-way radios, Internet

connection for email and web access, and facsimile machines. Communication

devices are listed in the critical equipment Mission Critical Systems, Equipment

Annex I.

4. Human Resources (Protection of Government Resources)

During the activation of the COOP for a department all essential Personnel

resources should be handled according to the guidelines set forth by the Hoopa

Valley Department of Human Resources.

Departments should consider developing a grab-and-go kit. These kits should

include everything the department needs to conduct business elsewhere. This kit

could include but not be limited to:

11 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

󲐀 Pens, Pencils, Erasers, Paper Clips

󲐀 Copier Paper

󲐀 Note Pads

󲐀 Toiletries or other supplies for personnel

󲐀 Forms specific to the department

󲐀 Plans and other documents that the department will need

󲐀 Deposit slips for any income the department will have

󲐀 Hardcopy contact information specific to the department

󲐀 Copy of the Departments Policies and Procedures

󲐀 Copy of the Hoopa Valley Tribe Organizational Chart and department call list

󲐀 Copy of Continuity of Operations Plan (COOP) for the department

󲐀 Copy of Continuity of Operations Plan (COOP) for the Hoopa Valley Tribe

Individuals need to be prepared in case of emergency events so that they be

assist the Tribe and department by having personal concerns handled and

everyone safe. The ready.gov (https://www.ready.gov/) website has a

comprehensive set of paths for personal preparedness. From developing

emergency action plans to prepare for specific hazards. The Hoopa Valley Tribe

recommends every employee develop their own emergency plan so that as a

people we will be better prepared to handle any emergency event.

4. Essential Vendors and Agencies

During the activation of the COOP departments will need to secure supplies or

work with essential vendors and partners to continue essential operations. These

vendors will need to be notified of COOP activation and alternative site location.

If possible MOUs or MOAs should be put into place before event to ensure

critical deliveries of supplies will happen in the event of COOP activation. To

support this Annex L will be a list of all critical vendors by department for the

essential functions. This allows for a quick and easy reference should the

continuity plan be activated.

D.

PHASE IV: RECONSTITUTION

Reconstitution is the phase where the Department or Hoopa Valley Tribe has declared

an end to the event and the departs start to transition back to “normal” operations.

Depending on the severity and size of the event the Hoopa Valley Tribe or Department

heads will implement the plan for return to business as usual. Department heads or

designee will contact all employees to de-activate the COOP based on essential

functions priorities. The department will have developed and act on the de-activation

plan to prep and transport all critical equipment, records, and supplies necessary back to

normal business location. A second designee will follow up with all vendors to notify of

COOP de-activation and resumption of business as usual. The reconstitution may be

phased to restart essential functions initially and then all non-essential functions to

ensure a smoother transition.

Within four (4) weeks of reconstitution of the department an After Action Report (AAR)

will be completed. The report will review the COOP as well as individual departments

emergency action plans and procedures for efficiency and effectiveness. Notations of

12 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

areas of concern and recommendations of change will also be made for changes in this

report. This AAR will allow for update both the departmental and Hoopa Valley Tribe

COOPs to improve.

VIII.

CONTINUITY PLANNING PROGRAM RESPONSIBILITIES

Each Department is responsible for the for the development, maintenance, activation, and deactivation of its portion of the overall COOP plan. The Tribal Chairman and secondarily the

Tribal Council map activate the COOP but all processes for the COOP by department are with

the department head and designees. These are listed in the Annex H: Delegation of Authority.

There may be other departments that will need to be involved in activation and de-activation of

another department and that should be noted in mission critical systems. The IT department is

an example of a department that will be involved in the activation and de-activation of most

other departments continuity plan. The IT department will review and follow their Technology

Recovery Plan (TRP) for all departments to assist in the recovery from the event.

IX. LOGISTICS

It is the understanding by the Hoopa Valley Tribe that a portion or all of the Tribal Governments

normal operations may be disrupted by an emergency event. Therefore, the entire Tribal

Government or just affected departments may need to activate the COOP. To ensure a smooth

transference of essential functions as described in the COOP all departments should have plans

in place to manage the transitions and potential need to recover key resource (via backups for

example) to compliment the Hoopa Valley COOP. The intent if for each of the key resources

described in the COOP to be available for up to 30 days for all essential functions. These will

include but are not limited to: Space requirements, human resource support requirements, such

as food provisions, sleeping arrangements, transportation, etc.; and MOUs, MOAs and

Provisioning Contracts.

A. Continuity Facilities

The Hoopa Valley Tribe understands the importance of determining alternate facilities in

the event normal operations are disrupted. Each department is involved in the

determination of the need for either a fixed alternate location or the ability for flexible

relocation. This is due in part to the limited brick and mortar options available to the

Hoopa Valley Tribe. Annex E describes the current alternate location type, address if

fixed, agreement if any, and any notes for each department. If the Hoopa Valley Tribe

decides to pursue cooperative agreements for facilities external to the reservation in the

future the COOP Annex H will be updated to reflect this.

B. Mission Critical Systems, Equipment, supplies, Files and Records

Hoopa Valley Tribal Departments have identified Mission Critical Systems, Equipment,

supplies, Files and Records that are needed in order to continue essential functions for

that department. Personnel access to these is critical for continuity operations and to

allow for operation within twelve (12) hours for up to thirty (30) days. Annexes I, J, and K

13 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

contain information on Essential Equipment and Systems, Supplies, and Critical

Documents respectively.

C. Continuity Communications

Each Department in the Hoopa Valley Tribal Government is responsible for determining

the best choice for alternate communications in the event of COOP activation. The

forms of communication that may be available are: These may take the form but not

limited to Mobile Telephones, Satellite Telephones, Two-way radios, Internet connection

for email and web access, and facsimile machines.

D. Personnel

Key personnel to essential functions and lines of succession have been identified for

each department of the Hoopa Valley Tribe. The personnel are identified in Annex F

Essential Functions Departmental Personnel, Annex G: Lines of Succession, and Annex

H: Delegation of Authority.

E. Essential Vendors and Agencies

Key Vendors and or agencies will also need to be notified upon activation of the COOP.

Each department is responsible to maintain a list of critical vendors and agencies

required for essential functions. Those lists will be communicated and incorporated into

the COOP plan to ensure easy access to all required external groups. Notification

methods will be using normal methods like phone or email. Annex L lists all department

Vendors and Agencies that need contact to complete essential functions.

X. COOP MAINTANANCE

The Director of the Office of Emergency Services or designee in conjunction with Department

Heads or Designee will review and update the Hoopa Valley Tribe COOP every two (2) years.

The development of individual Department COOPS however should be an ongoing process to

improve the over preparedness of each department should an emergency call for coop

activation. See Annex M for COOP Maintenance Assignments.

Though the main COOP should be updated Every two (2) years smaller maintenance and

updates along with testing should occur during the time between the review. The Director of the

Department of Emergency Services or Designee will along with Department Heads or designee

review and update the following:

Monthly

•

Update Annexes for Essential Personnel, Lines of Succession, Review Status of

Critical Records, Files, and Databases and Delegations of Authority

14 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

•

Review with departs any significant changes in other Annexes and update

accordingly

Annually

•

•

•

•

•

Test COOP alert, notification and activation procedures

Test COOP communications equipment

Test vital records backup and recovery plan

Conduct COOP Awareness and training for essential personnel

Test infrastructure if defined alternate location for each department

Along with this review of the COOP an annual exercise will be done by each department along

with an after action report in conjunction with the Department of Emergency Services to review

the departments preparedness and the overall functions of the COOP. An After Action Report

will also be generated after the COOP exercise and the COOP updated accordingly.

15 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

XI

ANNEXES TO AGENCY CONTINUITY PLANS

The Hoopa Valley Tribe COOP Annexes contain the necessary information for each department

to enact the COOP should an emergency situation threaten. Some of the annexes as described

in this report are the templates that were used to develop the actual annexes which are spate

spreadsheets that can be maintained and updated in a clean and convenient manor (Completed

Annexes are available in “HVT COOP Annexes 9-6-2016.xlsx” Excel Workbook).

Annex A: Risk Assessment

Annex B: 2016 Tribal Government Organization Chart

Annex C: Essential Functions (Template)

Annex D: Authorities and References

Annex E: Continuity Facility/Alternate Work Site Information (Template)

Annex F: Essential Functions Departmental Personnel (Template)

Annex G: Lines of Succession (Template)

Annex H: Delegation of Authority (Template)

Annex I: Essential Equipment and Systems (Template)

Annex J: Supplies (Template)

Annex K: Critical Documents (Template)

Annex L: Vendors and Agencies (Template)

Annex M: Maintenance Assignments (Template)

Annex N: Emergency Action Plan Template

Annex O: Continuity Planning Glossary & Acronyms

16 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex A: Risk Assessment

Natural Hazards are commonly defined as events not related to human activity and derived by natural

processes (meteorological and geophysical as examples). These include but are not limited to

earthquakes, tsunamis, wildfires, landslides, hurricanes, and severe storms. Even though the initiation,

severity, and duration of some of these events may be influenced or modified by the acts of humans

they are still considered to be natural in occurrence.

Technological Hazards are events caused by the intentional or unintentional acts of humans. These

could be in design, construction, or intentional sabotage and include damn failure, hazardous material

spill, arson, and/or acts of terrorism.

Below is a listing of all natural and technological hazards as defined in the updated Hoopa Valley Tribe

Hazard Mitigation Plan (2014).

A. Coastal Storms: The Hoopa Valley Indian Reservation is located in the Northeast corner of

Humboldt County, which is located on the Northwest corner of California. This north coast

region experiences some of the most severe storms in California.

B. Severe Winter Storms: Some of the heaviest rain that falls on the northwest occurs over the

coastal range where mountains rise two to four thousand feet. Four to six inches of rain within a

twenty-four-hour period are common.

C. Summer Thunder Storms: Thunder storms are common in the northeast region. During the

summer months, including late spring and early fall, thunderstorms are of particular hazard to

the Reservation and community.

D. Wind Storms: Extremely strong windstorms are also common in this region. Winds in excess of

50 miles per hour are normal occurrences and winds over 70 mph are not uncommon.

E. Dam Failures: The Trinity River flows through the full length of the Reservation. The valley floor

on both sides of the river houses the majority of the Reservation’s population. The Trinity River

has two dams approximately 100 miles upstream, the Trinity Dam and the Lewiston Dam. There

are several dams on the Klamath River, which flows along the north edge of the reservation. The

Trinity River flows into the Klamath River at the far north end of the valley.

a. Lewiston Dam: The Lewiston Dam is the smallest of the two Trinity River earth filled

dams and has a gross storage capacity of 14,660 acre-feet of water with a maximum

controlled release of 33,000 cubic feet per second (CFS). A breach of this dam would

result in a column of water approximately 40 feet above the water height in the river at

the time of breach. If the river is already at flood stage, 38 feet, the resulting water

would increase the water height to 88 feet.

b. Trinity Dam: The Trinity Dam has a gross storage capacity of 2,448,000 acre feet also

with a controlled maximum release of 33,000cfs. A breach of this dam would also cause

17 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

a breach of the smaller down river Lewiston Dam. The results would flood the valley

with a column of water 110 feet to 160 feet high depending of the height of the water in

the river at the time.

c. Klamath River Dams: A breach of the any one of or all of the Klamath River dams would

cause a back flow of water where the Trinity River flows into the Klamath. If the breach

of these dams occurred during a flood stage, the back flow and subsequent damming

effect would totally flood and destroy the valley

F. Drought: Although the north coast normally is a high rainfall area, drought cycles occur

approximately every 7 to 11 years. Drought would have an adverse effect on the community as

a result of a shortage of drinkable water that is taken from the Trinity River and processed by

the Public Utility District. Additional effects from drought would be low levels of available and

drinkable water from creeks and streams, increased large wildfire potential, agriculture, wildlife,

and livestock, as well as other environmental impacts.

G. Earthquakes: Earthquakes are considered to be one of the most potentially destructive threats

to life and property. The triple junction, the Cascadia Subduction Zone and numerous smaller

thrust and strike-slip faults makes Humboldt County the most active region in California. A

moderate to severe seismic incident on any of the numerous fault zones will cause:

• Extensive property damage, particularly to older structures, structures located on

liquefaction soil, and mobile homes;

• Significant number of causalities with some fatalities

• Damage to water and sewage systems;

• Broken propane cylinders resulting in hazardous conditions and fires;

• Disruption of surface transportation

• Competing requests for scarce mutual aid response resources

Northern California, Oregon, Washington and British Columbia are the site of the Cascadia

Subduction Zone where an oceanic tectonic plate is being pulled and driven beneath the

continental plate. Evidence leads to the conclusion that an earthquake is large as 9 on the

Richter scale will devastate the area. Historical evidence indicates that this mega thrust hits

every 300 years and the most recent occurred 300 years ago. A mega thrust quake could trigger

reactivity of one or both areas volcanoes, Mount Lassen and Mount Shasta.

The South Fork Mountain thrust fault located along the west boundary of the reservation and

the newly discovered Pine Creek fault bisecting the valley can rupture independently or in

conjunction with one of the major faults. A complete study of the potential destruction needs to

be conducted.

H. Explosions: There are numerous chemicals used and stored on the Reservation in sufficient

quantities that could cause an explosion of a magnitude so as to cause a disaster. Home and

business propane tanks under the right circumstances, wildfire, earthquake or accident could

18 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

cause a tank to BLEVE (boiling liquid expanding vapor explosion) thus resulting in a devastating

explosion.

I.

Fire: Availability of the firefighting resources on the Reservation is dependent upon the time of

the year, the current fire situation, and the other emergency response activities occurring at the

time. The Hoopa Tribes firefighting capability is composed of two programs. A Wildland Fire

program, which is seasonal, is tasked with the protection of life, the environment, and all

natural resources. A Volunteer Fire program which is a year around program and is tasked with

all-risk protection, which includes structure fires, medical aid, vehicle accidents, rescue, and

hazardous materials incidents. With the high rate of Wildland and structural arson fires, and

consideration of the type of topography, vegetation, extreme weather conditions, the wildland/

urban intermix, and the limited water supply for firefighting purposes, the Reservation is

considered to be at high risk. Any moderate sized fire or incident will quickly deplete either Fire

Department’s resources to a minimal draw down level and the success of the incident will be

dependent upon assistance (mutual aid) from outside agencies. Mutual aid resources available

within a reasonable geographical area are also dependent upon the time of the year, the current

fire situation and other emergency response activities in their respective direct protection areas

(DPA). Further reduction of the mutual aid resources may be caused by accessibility into the

Reservation either by roadway or air due to the type and nature of the disaster or emergency

that has affected the Reservation: i.e., flood, earthquake, hazardous material spills or a major

conflagration.

J.

Floods: The region’s topography and geology as discussed in coastal storms can cause flash

floods, mud flows and riverine flooding. Although small in nature, flash floods can cause

extensive damage to housing, roadways and can catch recreational activities unprepared. The

potential for mudflows, caused by geography and massive quantities of water, has just been

discovered and requires further study. Riverine flooding is the primary threat to life and

property as evidenced the 1955 and 1964 floods. Even “normal” winters can produce damaging

floods as happened in the winters of 1993 and 1996. Thus, flooding is the most likely hazard to

create emergency conditions within the reservation. Flood plains at different heights need to be

determined, mapped and appropriate course of mitigation studied.

K. Fuel Shortages: Fuel shortages, heating and transportation, can be caused by many of the

described events through the closure of the roads. Quantities of transportation fuel are limited

and if not replenished on a regular basis would soon be depleted reducing response and

recovery capabilities and risking human safety and life.

L. Hazardous Materials Incidents: The Tribal Environmental Protection Agency is the

“Administering Agency” with respect to hazardous materials incidents and investigations. The

Hoopa Fire Department and the Public Works District provide assistance. Response, however, is

limited to incidents that can be mitigated utilizing level “B” and “C” chemical protection.

Incidents requiring a level “A” protective clothing or major incidents will require mutual aid. The

19 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

potential for accidental incidents are always present. Of highest concern are incidents that could

involve the schools, senior resident homes or the medical center. Vehicular accidents involving

automobiles, tanker trucks or commodes trucks create the highest potential of incidents. The

possibility of an illegal dump, drug lab or industrial waste, are always a possibility and if released

into a stream or the river could be disastrous to both life and the environment. The Tribe’s

response to hazardous materials incidents is outlined in detail in the Haz-Mat Response Plan.

M. Landslides: Due to the geology of the mountains, landslides are common. During the wet

winters or earthquakes, landslides continually close roads into and out of the valley. Increased

potential of landslides has just been discovered during a recent geological study. The effects to

housing, property, and roads are still to be studied. A potential massive landslide of the bluffs at

the north end of the Valley could dam the Trinity River. If this occurs during periods of high river

flow, flooding of the valley floor will occur within minutes. This potential landslide needs to be

studied and if necessary emergency evacuation communications systems developed.

N. Power Failures: Loss of electrical power can be caused by equipment failures, traffic accidents

or by nature. The Hoopa Valley and the small community of Willow Creek to the south are on

the same circular link. During the winter storms of 1995/96 one outage affected over 800

residences and businesses for over 6 ½ days. Over the past 6 years, nine outages were of nearly

24 hours and two of them were multiple days. There are insufficient generators within the

Reservation to produce emergency electrical power for the medical center, first aid stations, the

EOC department, or evacuation center.

O. Radiological Incidents: A nuclear power plant owned by Pacific Gas & Electricity is located south

of Eureka on the edge of Humboldt Bay. Even though the power plant has not been operational

for years and the fuel rods removed, the plant has not been decontaminated. The potential of

an incident form the plant in its present operational status is remote but if an incident did occur,

the southerly winds could cause a shelter-in-place response. Shelter-in-place is directing people

to quickly go inside a building or other structure, closing all doors and windows, and remaining

inside until the hazard passes. Highway 299, south of the Reservation, and Highway 96, which

follows the Trinity River through the Valley, requires special permits from the Highway Patrol

and Cal-Trans in order to transport any nuclear or any hazardous radiological products.

P. Terrorism, Acts of: Violence caused for political causes, hate crimes or other causes cannot be

predicted nor prevented. It is hoped that an incident as experienced in schools throughout the

country or a bomb incident like Oklahoma City will never occur in the Reservation. But if an

incident does occur, the emergency management system of this plan will provide the necessary

organization to mitigate the event.

Q. Transportation Accidents: Aircraft and ground transportation vehicles pose the most risk for

disastrous multiple casualty incidents. Narrow roads, cliffs, and inaccessibility coupled with

limited resources could cause an incident to immediately task resources. 40 Trauma patients

20 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

must be transported by ambulance 50 miles over mountain roads to the nearest hospital.

Airlifting of the injured is difficult due to the non-illuminated Hoopa airport, winter storms, high

altitude fog and mountainous terrain. A school bus incident on Hwy 96 a few years ago

presented such a logistic nightmare. Transportation accidents always present a potential for

hazardous materials incident.

R. Tsunami: A tsunami generated by a Cascadia Mega Thrust earthquake or a triple junction

earthquake, though disastrous to coastal Humboldt County, will not effect the Reservation.

Reservation resources, however, will respond per mutual aid agreements.

S. Volcano: Two volcanoes, Mount Shasta and Mount Lassen, to the east of the Reservation have

not been active for decades. A 9+ mega thrust earthquake could reactivate one or both

volcanoes. The resulting ash plume will cause an air pollution health problem in the Valley if the

wind blows from the east. A shelter-in-place response would be initiated. There would be some

voluntary evacuation.

T. War, Acts of Nuclear: Humboldt County and the Hoopa Indian Reservation are assumed to be a

low risk category with respect to the direct effects of nuclear weapons and radioactive fallout.

Response actions consist of shelter-in-place protection, upgrading of homes and existing

shelters, and spontaneous evacuation (absent of government direction).

U. Water Supply: Except for some isolated privately owned ground water wells, the water used by

the reservation is supplied from streams. Windy mountain roads parallel most streams. A

vehicle accident, chemical spill, or an illegal drug lab could immediately contaminate a portion

of the Valley’s water supply. A long drought causing the streams to dry up could also reduce the

supply of usable water to dangerous levels.

21 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex B: 2016 Tribal Government Organization Chart

22 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex C: Essential Functions

This Annex Contains the complete listings of essential functions for each Hoopa Valley

Tribal Government Department.

Department

Essential

Function

Cat 1

Cat 2

Cannot be

interrupted

0 - 12

hours

Category 3

Up to

1 day

Up to

2 days

Up to

3 days

Up to

7 days

Up to

30 days

Title of

responsible

position

23 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex D: Authorities and References

♦ Robert T. Stafford Disaster Relief and Emergency Relief Act, PL 93-288, as

amended

♦ Code of Federal Regulations, Title 44, 2002

♦ Federal Preparedness Circular 65, June 15, 2004

♦ National Response Framework, 2008

♦ Federal Public Law 99-499, SARA, Title III, as amended

♦ National Continuity Policy Implementation Plan (NCPIP), 2007

♦ National Security Presidential and Directive-51/Homeland Security Presidential

Directive-20 (NSPD-51 /HSPD-20)

♦ FEMA Continuity Plan Template and Instructions for Non-Federal Governments,

2013

♦ California Department of OES Continuity Planning Guidance and Plan Template,

2009

♦ Continuity Guidance Circular 1 (CGC 1), Continuity Guidance for Non-Federal

Governments, 2013

♦ Continuity Guidance Circular 2 (CGC 2), Continuity Guidance for Non-Federal

Governments: Mission Essential Functions Identification Process, 2013.

♦ Centers for Disease Control and Prevention Emergency Preparedness and

Response Emergency Action Plan Template, 2016

♦ Hoopa Valley Tribal Constitution and Bylaws, amended 2003

♦ Hoopa Valley Tribe Emergency Operations Plan Update, 2016 (In Development)

♦ Hoopa Valley Tribe Community Wildfire Protection Plan (CWPP), 2011

♦ Hoopa Valley Tribe Multi Hazard Mitigation Plan, 2006

♦ Hoopa Valley Tribe Multi Hazard Mitigation Plan Update, 2014

♦ Hoopa Valley Tribe Threat Hazard Identification and Risk Assessment plan

(THIRA), 2015

24 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex E: Continuity Facility/Alternate Work Site Information

The Continuity Facility/Alternate Work Site Information for the Hoopa Valley Tribe. It will

include whether relocation facility is fixed or variable.

Department

Relocation Facility

Variable Location

Facility Address

Agreement Type

& Date

Notes

25 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex F: Key Departmental Personnel

Annex F will list key department personnel for each essential function so that an easy to

use contact information sheet is generated.

Department

Employee

Name

Position

Essential

Function

Email

Address

Work Phone

Number

Home

Phone

Number

Cell

Number

Fax

Number

26 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex G: Lines of Succession

Annex G lists lines of succession for each department of the Hoopa Valley Tribe by title (if

available) up to 3 positions deep

Department

Position 1

Position 2

Position 3

27 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex H: Delegation of Authority

Annex H contains the Delegations of authority for each department with contact

information.

Department

Name

Position

Phone

Address

Email

28 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex I: Essential Equipment and Systems

Annex I contains the listing of all essential equipment and systems that are required for each

departments essential functions.

Essential Systems

Department

Name

Type/Primary

Role

Vendor/Contractor

Location

Name

Phone

Contact

29 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex J: Supplies

This annex contains a list of needed supplies for a department to meet essential function.

Some examples of these supplies are:

Example Supplies

⃞

Pens

⃞

Readable/Writeable CD’s

⃞

Batteries

⃞

Pencils

⃞

Pre-printed forms

⃞

Trash Cans

⃞

Staples

⃞

Post-Its

⃞

Clipboards

⃞

Stapler

⃞

Highlighters

⃞

Hole punch

⃞

Copy Paper

⃞

Notebooks/Legal pads

⃞

File Folders

⃞

Rubber bands

⃞

⃞

Calendars

Sanitizer – Purel

⃞

Printer ink cartridges

⃞

Paper clips

Department

Supplies or

Consumables

Quantity

In place prior

to relocation

HandCarried

Needs To Be

Transported

30 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex K: Critical Documents

Annex K contains a listing if all critical documents and methods of backup for a

department. This includes all required documents to complete a departments essential

functions.

Department

Type

Format

Location

Who updates

document?

(Position title)

Do you

have backup

copies?

Where are

backup copies

located?

Format of

Backup

Copies

31 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex L: Vendors and Agencies

Annex L contains a listing of essential vendors and Agencies for each department’s

essential functions.

Department

Name

Contact Information

Service

Point of Contact

Address

Email

Main Phone

Cell Phone

32 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex M: Maintenance Assignments

Annex M contains the designated maintenance assignments for the Hoop Valley Tribe’s

COOP. The updated files names and location of both hardcopy and digital updates

should be recorded

Responsibility

Position\Person Responsible

Date

reviewed\updated

Updated filename(s)

and location

Monthly

Update Annexes for Essential Personnel, Lines

of Succession, Review Status of Critical

Records, Files, and Databases and Delegations

of Authority

Review with departs any significant changes in

other Annexes and update accordingly

Annually

Test COOP alert, notification and activation

procedures

Test COOP communications equipment

Test vital records backup and recovery plan

Conduct COOP Awareness and training for

essential personnel

Test infrastructure if defined alternate location

for each department

Every Two Years

Overall Review of Hoopa Valley Tribe COOP

33 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex N: Emergency Action Plan Template

This Emergency Action Plan Template is from the Center for Disease Control and

Prevention(CDC).

34 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

EMERGENCY ACTION PLAN

for

Facility Name:

Facility Address:

DATE PREPARED:

/

/

EAP 1 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

EAP 2 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

EMERGENCY PERSONNEL NAMES AND PHONE NUMBERS

DESIGNATED RESPONSIBLE OFFICIAL (Highest Ranking Manager at

site, such as

,

Name:

, or

):

Phone: (

)

EMERGENCY COORDINATOR:

Name:

Phone: (

)

AREA/FLOOR MONITORS (If applicable):

Area/Floor:

Name:

Phone: (

Area/Floor:

Name:

Phone: (

)

)

ASSISTANTS TO PHYSICALLY CHALLENGED (If applicable):

Name:

Phone: (

Name:

Phone: (

Date

/

)

)

/

EAP 3 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

EVACUATION ROUTES

•

Evacuation route maps have been posted in each work area. The following

information is marked on evacuation maps:

1.

2.

3.

4.

a.

•

Emergency exits

Primary and secondary evacuation routes

Locations of fire extinguishers

Fire alarm pull stations’ location

Assembly points

Site personnel should know at least two evacuation routes.

EAP 4 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

EMERGENCY PHONE NUMBERS

FIRE DEPARTMENT:

PARAMEDICS:

AMBULANCE:

POLICE:

FEDERAL PROTECTIVE SERVICE:

SECURITY (If applicable):

BUILDING MANAGER (If applicable):

EAP 5 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

UTILITY COMPANY EMERGENCY CONTACTS

(Specify name of the company, phone number and point of contact)

ELECTRIC:

WATER:

GAS (if applicable):

TELEPHONE COMPANY:

Date:

/

/

EAP 6 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

EMERGENCY REPORTING AND EVACUATION PROCEDURES

Types of emergencies to be reported by site personnel are:

•

MEDICAL

•

FIRE

•

SEVERE WEATHER

•

BOMB THREAT

•

CHEMICAL SPILL

•

STRUCTURE CLIMBING/DESCENDING

•

EXTENDED POWER LOSS

•

OTHER (specify)

(e.g., terrorist attack/hostage taking)

EAP 7 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

MEDICAL EMERGENCY

•

Call medical emergency phone number (check applicable):

D

Paramedics

D

Ambulance

D

Fire Department

D

Other

Provide the following information:

a. Nature of medical emergency,

b. Location of the emergency (address, building, room number), and

c. Your name and phone number from which you are calling.

•

•

Do not move victim unless absolutely necessary.

Call the following personnel trained in CPR and First Aid to provide the required

assistance prior to the arrival of the professional medical help:

Name:

Phone:

Name:

Phone:

•

•

If personnel trained in First Aid are not available, as a minimum, attempt to provide the

following assistance:

1.

Stop the bleeding with firm pressure on the wounds (note: avoid

contact with blood or other bodily fluids).

2.

Clear the air passages using the Heimlich Maneuver in case of

choking.

In case of rendering assistance to personnel exposed to hazardous materials, consult the

Material Safety Data Sheet (MSDS) and wear the appropriate personal protective

equipment. Attempt first aid ONLY if trained and qualified.

Date

/

/

EAP 8 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

FIRE EMERGENCY

When fire is discovered:

Activate the nearest fire alarm (if installed)

Notify the local Fire Department by calling

If the fire alarm is not available, notify the site personnel about the fire emergency

by the following means (check applicable):

•

•

•

D

Communication

Voice

D

Phone Paging

D

Radio

D

Other (specify)

.

Fight the fire ONLY if:

•

•

•

•

The Fire Department has been notified.

The fire is small and is not spreading to other areas.

Escaping the area is possible by backing up to the nearest exit.

The fire extinguisher is in working condition and personnel are trained to use it.

Upon being notified about the fire emergency, occupants must:

•

•

•

Leave the building using the designated escape routes.

Assemble in the designated area (specify location):

Remain outside until the competent authority (Designated Official or designee)

announces that it is safe to reenter.

Designated Official, Emergency Coordinator or supervisors must (underline one):

Disconnect utilities and equipment unless doing so jeopardizes his/her safety.

•

•

Coordinate an orderly evacuation of personnel.

•

Perform an accurate head count of personnel reported to the designated area.

•

Determine a rescue method to locate missing personnel.

•

Provide the Fire Department personnel with the necessary information about the facility.

•

Perform assessment and coordinate weather forecast office emergency closing procedures

Area/Floor Monitors must:

•

Ensure that all employees have evacuated the area/floor.

•

Report any problems to the Emergency Coordinator at the assembly area.

Assistants to Physically Challenged should:

•

Assist all physically challenged employees in emergency evacuation. Date___/___/_____

EAP 9 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

EXTENDED POWER LOSS

In the event of extended power loss to a facility certain precautionary measures should be taken

depending on the geographical location and environment of the facility:

•

•

•

•

Unnecessary electrical equipment and appliances should be turned off in the event

that power restoration would surge causing damage to electronics and effecting

sensitive equipment.

Facilities with freezing temperatures should turn off and drain the following lines in the

event of a long term power loss.

·

Fire sprinkler system

·

Standpipes

·

Potable water lines

·

Toilets

Add propylene-glycol to drains to prevent traps from freezing

Equipment that contain fluids that may freeze due to long term exposure to freezing

temperatures should be moved to heated areas, drained of liquids, or provided with

auxiliary heat sources.

Upon Restoration of heat and power:

•

•

Electronic equipment should be brought up to ambient temperatures before

energizing to prevent condensate from forming on circuitry.

Fire and potable water piping should be checked for leaks from freeze damage after

the heat has been restored to the facility and water turned back on.

EAP 10 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

CHEMICAL SPILL

The following are the locations of:

Spill Containment and Security Equipment:

Personal Protective Equipment (PPE):

MSDS:

When a Large Chemical Spill has occurred:

•

•

•

•

•

•

Immediately notify the designated official and Emergency Coordinator.

Contain the spill with available equipment (e.g., pads, booms, absorbent powder,

etc.).

Secure the area and alert other site personnel.

Do not attempt to clean the spill unless trained to do so.

Attend to injured personnel and call the medical emergency number, if required.

Call a local spill cleanup company or the Fire Department (if arrangement has been

made) to perform a large chemical (e.g., mercury) spill cleanup.

Name of Spill Cleanup Company:

Phone Number:

•

Evacuate building as necessary

When a Small Chemical Spill has occurred:

•

•

•

•

•

Notify the Emergency Coordinator and/or supervisor (select one).

If toxic fumes are present, secure the area (with caution tapes or cones) to prevent

other personnel from entering.

Deal with the spill in accordance with the instructions described in the MSDS.

Small spills must be handled in a safe manner, while wearing the proper PPE.

Review the general spill cleanup procedures. Date___/___/____

EAP 11 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

STRUCTURE CLIMBING/DESCENDING EMERGENCIES

List structures maintained by site personnel (tower, river gauge, etc.):

No.

Structure Type

Location (address, if

applicable)

Emergency

Response

Organization* (if available

within 30-minute response

time)

Emergency Response Organization(s):

Name

Phone Number

Name

Phone Number

(Attach Emergency Response Agreement if available)

* -

N/A. If no Emergency Response Organization available within 30-minute response time

additional personnel trained in rescue operations and equipped with rescue kit must

accompany the climber(s).

EAP 12 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

TELEPHONE BOMB THREAT CHECKLIST

INSTRUCTIONS: BE CALM, BE COURTEOUS. LISTEN. DO NOT INTERRUPT THE CALLER.

YOUR NAME:

TIME:

CALLER'S IDENTITY SEX: Male

Female

ORIGIN OF CALL: Local

Long Distance

Adult

VOICE CHARACTERISTICS

Loud

High Pitch

Raspy

Intoxicated

Soft

Deep

Pleasant

DATE:

Juvenile

APPROXIMATE AGE:

Telephone Booth

SPEECH

Fast

Distinct

Stutter

Slurred

LANGUAGE

Slow

Distorted

Nasal

Excellent

Fair

Foul

Good

Poor

Other

Other

Other

ACCENT

MANNER

BACKGROUND NOISES

Local

Not Local

Calm

Angry

Factory

Trains

Foreign

Region

Rational

Irrational

Machines

Animals

Coherent

Incoherent

Music

Quiet

Deliberate

Emotional

Office

Voices

Righteous

Laughing

Machines

Airplanes

Street

Party

Traffic

Atmosphere

Race

BOMB FACTS

PRETEND DIFFICULTY HEARING - KEEP CALLER TALKING - IF CALLER SEEMS

AGREEABLE TO FURTHER CONVERSATION, ASK QUESTIONS LIKE:

When will it go off? Certain Hour

Time Remaining

Where is it located? Building

Area

What kind of bomb?

What kind of package?

EAP 13 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

How do you know so much about the bomb?

What is your name and address?

If building is occupied, inform caller that detonation could cause injury or death.

Activate malicious call trace: Hang up phone and do not answer another line. Choose same

line and dial *57 (if your phone system has this capability). Listen for the confirmation

announcement and hang up.

Call Security at

and relay information about call.

Did the caller appear familiar with plant or building (by his/her description of the bomb location)?

Write out the message in its entirety and any other comments on a separate sheet of paper and

attach to this checklist.

Notify your supervisor immediately.

EAP 14 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

SEVERE WEATHER AND NATURAL DISASTERS

Tornado:

•

When a warning is issued by sirens or other means, seek inside shelter. Consider the

following:

Small interior rooms on the lowest floor and without windows,

Hallways on the lowest floor away from doors and windows, and

Rooms constructed with reinforced concrete, brick, or block with no windows.

Stay away from outside walls and windows.

Use arms to protect head and neck.

Remain sheltered until the tornado threat is announced to be over.

•

•

•

Earthquake:

Stay calm and await instructions from the Emergency Coordinator or the designated

•

•

•

•

official.

Keep away from overhead fixtures, windows, filing cabinets, and electrical power.

Assist people with disabilities in finding a safe place.

Evacuate as instructed by the Emergency Coordinator and/or the designated

official.

Flood:

If indoors:

Be ready to evacuate as directed by the Emergency Coordinator and/or the

•

designated official.

Follow the recommended primary or secondary evacuation routes.

•

If outdoors:

•

Climb to high ground and stay there.

•

Avoid walking or driving through flood water.

•

If car stalls, abandon it immediately and climb to a higher ground.

Hurricane:

•

The nature of a hurricane provides for more warning than other natural and weather

disasters. A hurricane watch issued when a hurricane becomes a threat to a coastal

area. A hurricane warning is issued when hurricane winds of 74 mph or higher, or a

combination of dangerously high water and rough seas, are expected in the area within

24 hours.

Once a hurricane watch has been issued:

• Stay calm and await instructions from the Emergency Coordinator or the designated

•

•

•

•

official.

Moor any boats securely, or move to a safe place if time allows.

Continue to monitor local TV and radio stations for instructions.

Move early out of low-lying areas or from the coast, at the request of officials.

If you are on high ground, away from the coast and plan to stay, secure the building,

moving all loose items indoors and boarding up windows and openings.

EAP 15 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

•

•

Collect drinking water in appropriate containers.

Be ready to evacuate as directed by the Emergency Coordinator and/or the

designated official.

Leave areas that might be affected by storm tide or stream flooding.

•

During a hurricane:

• Remain indoors and consider the following:

• Small interior rooms on the lowest floor and without windows,

• Hallways on the lowest floor away from doors and windows, and

• Rooms constructed with reinforced concrete, brick, or block with no windows.

Blizzard:

If indoors:

•

•

•

•

Stay calm and await instructions from the Emergency Coordinator or the designated

official.

Stay indoors!

If there is no heat:

Close off unneeded rooms or areas.

Stuff towels or rags in cracks under doors.

Cover windows at night.

Eat and drink. Food provides the body with energy and heat. Fluids prevent

dehydration.

Wear layers of loose-fitting, light-weight, warm clothing, if available.

•

If outdoors:

•

•

Find a dry shelter. Cover all exposed parts of the body.

If shelter is not available:

Prepare a lean-to, wind break, or snow cave for protection from the wind.

Build a fire for heat and to attract attention. Place rocks around the fire to

absorb and reflect heat.

Do not eat snow. It will lower your body temperature. Melt it first.

If stranded in a car or truck:

•

•

Stay in the vehicle!

Run the motor about ten minutes each hour. Open the windows a little for

fresh air to avoid carbon monoxide poisoning. Make sure the

exhaust pipe is not blocked.

•

Make yourself visible to rescuers.

Turn on the dome light at night when running the engine.

Tie a colored cloth to your antenna or door.

Raise the hood after the snow stops falling.

Exercise to keep blood circulating and to keep warm.

•

EAP 16 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

CRITICAL OPERATIONS

During some emergency situations, it will be necessary for some specially assigned personnel to remain at

the work areas to perform critical operations.

Assignments:

Work Area

•

•

Name

Job Title

Description of Assignment

Personnel involved in critical operations may remain on the site upon the permission

of the site designated official or Emergency Coordinator.

In case emergency situation will not permit any of the personnel to remain at the

facility, the designated official or other assigned personnel shall notify the appropriate

offices to initiate backups.

This

information can be obtained from the Emergency Evacuation Procedures included in

the

Manual.

The following offices should be contacted:

Name/Location:

Telephone Number:

Name/Location:

Telephone Number:

Name/Location:

Telephone Number:

EAP 17 | P a g e

Hoopa Valley Tribe Emergency Action Plan Template

TRAINING

The following personnel have been trained to ensure a safe and orderly emergency

evacuation of other employees:

Facility:

Name

Title

Responsibility

Date

EAP 18 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Annex O: Continuity Planning Glossary & Acronyms

*The terms with an asterisk in front are those used in both the Disaster Recovery and Continuity

Planning Programs. These definitions are aligned to create a standard, common usage for recovery

and continuity planning efforts.

*Activation – The implementation of capabilities, procedures, activities, and plans in response to an

emergency or disaster declaration; the execution of the emergency response plan and or/business

recovery plan.

*Activation Team – An identified group of trained personnel who will be convened upon the

occurrence of a situation that affects the continuation of agency or department’s essential and/or

mission critical business functions. The team will assess the situational information and make a

determination or recommendation regarding the continuation of essential or mission critical business

functions. This type of team may operate under several different names such as Crisis Management

Team, Activation Team, Executive Team, or Continuity Team.

Agencies – State Executive Branch agencies, departments, and independent organizations.

Agency Head – The highest-ranking official of the primary occupant agency or a successor or

designee selected by the official.

Agency Representative – A person assigned by a primary, assisting, or cooperating Federal, State,

tribal, or local government agency, or nongovernmental or private organization, that has been

delegated authority to make decisions affecting that agency's or organization's participation in

incident management activities following appropriate consultation with the leadership of that agency.

*Alternate Facility – Also referred to as a continuity facility, it can have any one of the following

meanings: (1) A location, other than the normal facility, designated to be used to carry out essential

or mission critical business functions. (2) An alternate operating location to be used by business

functions when the primary facilities are inaccessible. (3) Another location, computer center or work

area designated for recovery. (4) Location, other than the main facility, that can be used to conduct

business/essential functions. (5) A location, other than the normal facility, used to process data

and/or conduct critical business functions in the event of a disaster. (6) Alternate or continuity

facilities refer to not only other locations, but also nontraditional options such as working at home

(“Teleworking”), telecommuting, and mobile-office concepts.

Automated Data Processing (ADP) Equipment – Equipment that performs data processing largely

by automatic means.

Collateral Damage – Injury to personnel or damage to facilities that are in unaffected parts of a

facility, including damage to equipment or contents as a result of fire or flood.

*Command and Control – Commands the local Emergency Operations Center (EOC) reporting up

to senior management on the recovery process. Has the authority to invoke the local recovery plan.

Consumable Office Supplies – General supplies that are consumed in office use.

53 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Continuity – An uninterrupted ability to provide services and support, while maintaining viability,

before, during and after an event.

Continuity Guidance Circular (CGC) – The CGC 1 is a guidance document that provides direction to

non-federal entities for developing continuity plans and programs.

*Continuity of Government (COG) – The preservation, maintenance, or reconstitution of the

institution of government. It is the ability to carry out an organization’s constitutional responsibilities.

This is accomplished through succession of leadership, the pre-delegation of emergency authority,

and active command and control.

Continuity of Government Readiness Condition (COGCON) – For the state executive branch, the

COGCON system establishes readiness levels in order to provide a flexible and coordinated

response to escalating threat levels or actual emergencies, focusing on possible threats to the

Sacramento Capital Region. The COGCON system is a means to establish, measure, and report the

readiness of California’s executive branch continuity programs independent of other state or federal

government readiness systems.

*Continuity of Operations (COOP) – The activities of individual departments and agencies and their

sub-components to ensure that their essential functions are continued under all circumstances. This

includes plans and procedures that delineate essential functions; specify succession to office and the

emergency delegation of authority; provide for the safekeeping of essential records and databases;

identify alternate operating facilities; provide for interoperable communications; and validate the

capability through tests, training, and exercises.

Continuity of Operations Plan – A plan to ensure the safety of employees and the resumption of

time-sensitive operations and services following an emergency.

Continuity Communications – Alternate communications both internal and external that provide

the capability to perform essential functions, in conjunction with other agencies, until normal

operations can be resumed.

Continuity Event – This refers to any event that requires an agency or department to relocate

resources or operations to an alternate site to assure the continuation of its essential functions.

Continuity Planning – Historically, the federal government defined continuity efforts using the terms

“COOP” and “COG.” These were often separate and compartmentalized activities. This old

organizational framework has changed and the new program uses instead the reference to

“Continuity Planning” as an overlapping integration of continuity of operations and continuity of

government concepts.

Critical Infrastructure Protection (CIP) – Risk management actions intended to prevent a threat

from attempting to, or succeeding at, destroying or incapacitating critical infrastructures. Critical

infrastructures are those systems and assets so vital to the Nation that their incapacity or destruction

would have a debilitating impact on national security, national economic security, and/or national

public health or safety.

*Data Recovery – The restoration of data from backup media to restore programs and production

data to the state that existed at the time of the last safe backup.

54 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Delegation of Authority – Specifies who is authorized to act on behalf of the agency or department

head and other key officials for specific purposes.

*Dependency – The reliance, directly or indirectly, of one activity or process upon another, including

internal/external dependencies and IT/Non-IT dependencies.

Devolution – The capability to transfer the authority and responsibility for essential functions from

an agency's primary operating staff and facilities to other employees and facilities, and to sustain

that operational capability for an extended period.

Disaster Service Worker – Per the California Government Code, Section 3100, all public

employees are declared to be disaster service workers subject to such disaster service activities as

may be assigned to them by their superiors or by law.

Technology Recovery Plan (formerly known as Disaster Recovery Plan) – Technology

Recovery is the technical recovery plan for networks, systems, applications, data, and

communications, both voice and data. Technology Recovery Planning provides for the recovery

and restoration of an agency’s information technology and telecommunications infrastructure in

support of critical business functions, to minimize decision-making during an event, thus producing

the greatest benefit from the remaining limited resources, and achieves a systematic and orderly

migration toward the resumption of all computing services within an agency following a business or

governmental disruption.

Drive-Away Kit – A kit prepared by, and for, an individual who expects to deploy to an alternate

location during an emergency. It contains items needed to minimally satisfy personal and

professional needs during deployment. This is also referred to as “Go Kits.”

*Emergency Operating Records – Records that support the execution of an agency's essential or

mission critical business functions, such as plans and directives, lines of succession, delegations of

authority, and references for performing essential or mission critical business functions.

Enduring Constitutional Government (ECG) – A cooperative effort among the

Executive, Legislative, and Judicial branches of government, coordinated by the President, to

preserve the capability to execute constitutional responsibilities in a catastrophic emergency.

Emergency Response Group (ERG) – An identified group of trained personnel assigned the

responsibility of relocating to the designated alternate facility to continue essential functions upon a

Continuity Plan Activation.

*Essential Functions – Functions that enable the agency or department, on behalf of the state, to

provide vital services, exercise civil authority, maintain the safety and well-being of the general

populace, and sustain the industrial/economic base in an emergency.

* Essential Records – Electronic and hardcopy documents, references, and records needed to

perform and support essential or mission-critical functions, including those records essential to

protecting the legal and financial rights of that organization and of the individuals directly affected by

its activities.

Essential Resources – Resources that support the agency or department’s ability to provide vital

services, exercise civil authority, maintain the safety and well-being of the general populace, and

sustain the industrial/economic base in an emergency.

55 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

*Event – A sudden, unplanned catastrophic disruption causing unacceptable damage or loss, which

may impact or interrupt services.

Executive Agent – A term used to indicate a delegation of authority by a superior to a subordinate

to act on behalf of the superior. An executive agent may be limited to providing only administrative

support or coordinating common functions, or it may be delegated authority, direction, and control

over specified resources for specified purposes.

Federal Continuity Directive (FCD) – A document developed and promulgated by DHS which

directs the Executive Branch departments and agencies to carry out identified continuity planning

requirements and assessment criteria.

Incident – An occurrence or event, either human-caused or by natural phenomena, that requires

action by emergency response personnel to prevent or minimize loss of life or damage to property

and/or natural resources.

Interagency Agreements – A written agreement entered into between agencies that require

specific goods or services to be furnished or tasks to be accomplished by one agency in support of

the other.

Interoperability – (1) The ability of systems, personnel, or agencies to provide services to and

accept services from other systems, personnel, or agencies and to use the services so exchanged to

enable them to operate effectively together. (2) The condition achieved among communicationselectronic systems or items of communications-electronics equipment when information or services

can be exchanged directly and satisfactorily between them and/or their users.

Legal and Financial Records – Records that are needed to protect the legal and financial rights of

the government and of the persons affected by its actions.

*Lines of Succession – Provisions for the assumption of senior agency offices and other key

positions during an emergency in the event that any of those officials are unavailable to execute their

legal and/or essential duties.

Logistical Support Services – Personnel who have the skills and authority to coordinate the

provision of resources and services.

*Mission Critical Data – Information essential to supporting the execution of an agency's essential

or mission critical business functions.

*Mission Critical Resources –The minimum resource requirements needed to perform or restore

an agency’s essential or mission critical business functions. Critical resources could include

facilities, communication systems, personnel, essential records and databases, vital systems and

equipment, key vendors, and other government agencies. Worksheet 3: Resource Requirements for

Essential Functions may be used to capture an agency’s mission critical resources.

*Mission Critical Systems – Information Technology equipment essential to supporting the

execution of an agency’s essential or mission critical business functions, including hardware,

software, networking components, etc.

Multi-Year Strategy and Program Management Plan – A multiple-year process to ensure the

maintenance and continued viability of Continuity Plans.

56 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

Occupant Emergency Plan (OEP) – A short-term emergency response program that establishes

procedures for safeguarding lives and property directly following an emergency. Also known as

Facility Emergency Plans or Evacuation Plans.

Primary Operating Facility – The site of normal, day-to-day operations; the location where an

employee usually goes to work.

*Priority Classifications – The act or process of classifying actions, operations, or tasks to specific

groups or categories according to established criteria, such as precedence or merit of attention

before competing alternatives.

Procedures – A document that outlines a series of action steps taken to accomplish a desired end

result.

Processes – To put through the steps of a prescribed procedure: a series of actions, changes, or

functions.

Provisions – The act of supplying or fitting out, or a stock of necessary supplies.

*Reconstitution – The process by which agency personnel resume (transition back to) normal

agency operations from the alternate location back to the primary or replacement primary operating

facility.

Risk Analysis – The identification and assessment of hazards and the frequency of occurrence.

Senior Activation Team – A pre-identified group of trained personnel who are convened following

an event which affects the continuation of agency/departmental essential functions. The team will

assess situational information and make a determination or recommendation regarding the

continuation of essential functions. This type of team may operate under several different names

such as Crisis Management Team, Activation Team, Executive Team, or Continuity Team.

Telecommuting – When an employee carries out their work duties at their residence or another

convenient site rather than their official duty station.

Telecommuting locations – These locations may be set up with computers and telephones to

enable employees to work at a location closer to their residence rather than their official duty station.

*Test, Training, and Exercises (TT&E) – Measures to ensure that an agency's continuity program

is capable of supporting the continued execution of its essential or mission critical business functions

throughout the duration of an event.

Virtual offices – A location or environment where an employee performs work through the use of

portable information technology and communication packages.

Vital Databases – Information systems needed to perform and support essential functions during a

continuity event.

57 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

CONTINUITY PLANNING PROGRAM ACRONYMS

AAR

After Action Report

ADP

Automated Data Processing

AI

Avian Influenza

BCM

Business Continuity Management

BCP

Business Continuity Plan

BIA

Business Impact Assessment

BRP

Business Resumption Plan

CIP

Critical Infrastructure Protection

CGC

Continuity Guidance Circular

COG

Continuity of Government

COOP

Continuity of Operations

DHS

Department of Homeland Security

58 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

DRP

Disaster Recovery Plans

DSW

Disaster Service Worker

EMAC

Emergency Management Assistance Compact

EMAP

Emergency Management Accreditation Program

ERG

Emergency Relocation Group

EOC

Emergency Operations Center

EOP

Emergency Operations Plan

ERG

Emergency Relocation Group

FEMA

Federal Emergency Management Agency

FCD

Federal Continuity Directive

FOUO

For Official Use Only

FPC

Federal Preparedness Circular

GEOEC

Governor’s Emergency Operations Executive Council

HR

Human Resources

HSPD

Homeland Security Presidential Directive

HVT

Hoopa Valley Tribe

IC

Incident Commander

ICS

Incident Command System

IT

Information Technology

MOA

Memorandum of Agreement

59 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

MOU

Memorandum of Understanding

MYSPMP

Multi-year Strategy and Program Management Plan

NEF

National Essential Functions

NIMS

National Incident Management System

NRP

National Response Plan

NSPD

National Security Presidential Directive

OA

Operational Area

OASIS

Operational Area Satellite Information System

ODP

Office of Domestic Preparedness

OEP

Occupant Emergency Plan

OES

Office of Emergency Services

ORP

Operational Recovery Plans

OS

Operations Specialists

PI

Pandemic Influenza

POC

Point of Contact

PPD

Presidential Policy Directive

REOC

Regional Emergency Operations Center

RFP

Request for Proposal

RIMS

Response Information Management System

RTO

Recovery

Time

Objectives

60 | P a g e

Hoopa Valley Tribe Continuity of Operations Plan

SAT

Senior Activation Team

SEF

State Essential Functions

SEMS

Standardized Emergency Management System

SEP

State Emergency Plan (California)

SIMM

Statewide Information Management Manual

SOC

State Operations Center

SOP

Standard Operating Procedure

SPF

Single Point of Failure

TA

Technical Assistance Program

TT&E

Tests, Training, and Exercises

WMD

Weapons of Mass Destruction

61 | P a g e

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.