FEMAEach element within this planning document serve to guide through the MHMP
process as it follows FEMA guidelines. The sections in this plan are organized as
follows:
•
Element A: Planning Process
•
Element B: Hazard Identification and Risk Assessment
•
Element C: Mitigation Strategy
•
Element D: Plan Updates
•
Element E: Assurances and Plan Adoption
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 2 of 224
Acknowledgements and Executive Summary
This mitigation plan was developed solely by the Confederated Tribes of the Siletz
Indians. The Federal Emergency Management Agency (FEMA) provided no funding for
this document. State of Oregon employees from DOGAMI, State Hazard Mapping, and
Matt Williams, alongside FEMA Region X office provided technical support throughout
the process. Amanda Siok and others at FEMA were instrumental in initial planning
and formation of a Steering Committee and to instruct Tribal Employees in the planning
process. This valuable information helped the Tribe develop a plan that would meet
Federal mandates established by the Stafford Act.
Many people contributed to this plan and to the creation of the following document.
Many community and Tribal Employee hours were given to reach Tribal Membership
and gain an understanding of what the Tribal Communities needs were and are. The
following list is not meant to be entirely inclusive to the many people who helped with
this plan.
The final plan was created primarily by the Confederated Tribes of Siletz Indians
Planning department. The following people had an important role in creation of this
document:
Ian Keene- GIS Analyst/Research Planner – Ian Keene is the primary author and
project manager of this document. Ian Keene performed the research, data, and
document collection and review, map creation, field research, and compilation of the
information for this plan. He also served as the GIS Analyst/DOGAMI and FEMA Point
of Contact/Photographer/and Final Editor for the plan.
Michael Gallagher- Environmental Planner – Michael provided valuable property
information along with contributions to portions of the final document, particularly in
the editing and writing process with important Environmental perspectives on capacity
of the Tribal Planning process and departmental knowledge with NEPA and federal
environmental guidance.
Bonnie Peterson- as Assistant General Manager, Bonnie assembled the Steering
Committee, met initially with personnel to guide the process of the team working with
the FEMA personnel and process, attended meetings, appointed additional members,
and administered some of the Steering Committee meetings.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 3 of 224
Pam Barlow-Lind- Tribal Planner- Pam leads the Planning Department, and provides
endless knowledge and editing expertise in documentation and historical and timely
processes for plan creation and is an endless source of inspiration. Pam helped guide
the authors and the planning process throughout.
Max Hoover- Public Works Supervisor- Max provided expertise on many historical
events, as well as being an active Steering Committee member. Max provided insight in
to past events and instrumental understanding of municipal systems and utilities that
are inherently important to the Tribe.
Eli Grove- Emergency Preparedness Coordinator- Eli provided hours of community
outreach and planning for natural hazards since his hiring in 2018. He was an active
member of the Steering Committee, headed the Emergency Planning Committee, and
contributed greatly to getting Tribal Membership input throughout the planning
process. Eli regularly presented findings to Tribal Council and Department Managers
through his ongoing training in Emergency Preparedness and Response work, and
outreach.
Cherity Bloom-Miller- As a Steering Committee member, Cherity participated in many
meetings providing knowledge of human health issues, public outreach, concerns
regarding families in the hazard areas, and a myriad of additional insights in to the
importance of a community being prepared.
RC Mock- As then Siletz Valley Fire Chief, RC provided emergency preparedness
expertise and first responder insight in to the many issues that surround being prepared
for fire.
April Middaugh- April provided continual administrative support to planning
processes and was an active Steering Committee member. April participated in FEMA
trainings and kept meeting minutes.
Glen Sakamura- IS Department- Glen provided many hours of effort of mitigation
planning for the Tribe. He provided great effort in order to train and implement
emergency protocols for various departments and Tribal personnel. Glen was an active
member of the Steering Committee and was part of the FEMA regional training process
and participated with Region X personnel at FEMA trainings. He provided the steering
committee with many details of the trainings he attended as well.
Brenda Bremner, General Manager – Brenda contributed in the guiding, administrative,
and final editing process.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 4 of 224
ELEMENT A: PLANNING
Overall Intent: A successful planning process involves bringing tribal members, such as
tribal leaders, tribal elders, and other partners together to discuss their knowledge, their
perception of risk, and how to meet their needs as part of the process. This inclusive
process works within the traditions, culture, and methods most suitable to a tribal
government, so that participants better understand the unique vulnerabilities to the
tribal planning area6 and can develop relevant mitigation actions.
FEMA recognizes that public participation may be different for each tribal government.
Leadership (including elders and cultural leaders), staffing, and in-house expertise in
the tribal government may fluctuate over time. The planning process description serves
as a permanent record that explains how decisions were reached. This planning process
description documents that the plan was developed with input from tribal members
and other partners. Leaders can rely on this documentation to continue to make
decisions in a pre-and post-disaster environment to decrease vulnerability to hazards.
Documentation of the current planning process is required for both new and updated
plans. - FEMA
Executive Summary:
The purpose of the Confederated Tribes of the Siletz Indians (CTSI) Multi-Hazard
Mitigation Plan (MHMP) is to guide current and future efforts to effectively and
efficiently mitigate natural hazards on all CTSI Reservation lands, in coordination with
other jurisdictions as appropriate, to mitigate and respond to natural hazards that are
generated off the reservation lands, and tribally owned fee lands, or that cross these
boundaries.
The Confederated Tribes of Siletz Indians finds that natural hazards on the Tribal lands
have a direct, serious, and substantial effect on the political integrity, economic security,
health, and welfare of the Tribal lands, its members, and all persons present on Tribal
lands. Further, CTSI finds that those activities that potentially increase the frequency or
severity of damages from natural hazards, if left unaddressed, could cause such
damages. Accordingly, the Confederated Tribes of Siletz Indians Administration and
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 5 of 224
Tribal Council, Planning Department, Human Resources Department (HR), and Natural
Resources Department (NR) helped develop this update to the MHMP for the Siletz
Tribe.
The goals of the CTSI MHMP are to:
1.
Increase Tribal and community members’ knowledge of natural hazards;
2.
Reduce the threats to public health and safety posed by natural hazards;
3.
Reduce structural damages caused by natural hazards;
4.
Reduce the environmental impacts of natural hazards, mitigation actions, and
future development activities;
5.
Increase the effectiveness of mitigation actions; and
6.
Reduce the long term costs resulting from natural hazards and their mitigation.
The objectives of the MHMP are the following:
1.
Ensure that development occurs in such a way that the risk is minimized in areas
that are vulnerable to natural hazards;
2.
Protect or alter existing development in hazardous areas to make it less
susceptible to damage;
3.
Ensure that the solution chosen to protect existing development is the most cost-
effective available; protects or enhances cultural resources, natural resources, and
sensitive terrestrial, riparian, or coastal habitats; and is consistent with applicable land
use plans and regulations, codes, and in general, promotes an economically and
ecologically sound Tribe.
4.
Ensure that the benefits of maintaining existing facilities outweigh their costs; if
not, redesign facilities to make them less susceptible to damage or implement some
other type of solution at the site;
5.
Redesign existing projects and/or change maintenance practices to protect or
enhance riparian or coastal habitats;
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 6 of 224
6.
Manage floodplains, rivers, streams, and other water resources for multiple uses,
including flood and erosion hazard reduction, fish and wildlife habitat, finfish and
shellfish harvesting, open space, recreation, water supply, and cultural/traditional
practices;
7.
Improve coordination and consistency between CTSI and other jurisdictions, as
appropriate, in management activities for floodplain and coastal areas;
8.
Increase public awareness of natural hazards and improve appropriate
preparation for and response to such hazards; and
9.
Improve hazard warning and emergency response systems.
Tribal Multi-Hazard Mitigation Plan
Table of Contents
1. Introduction and Executive Summary ...................................................................
Authority to Plan ....................................................................................................
Grant Eligibility ......................................................................................................
Adoption ..................................................................................................................
Assurances ...............................................................................................................
2. Organization of the Plan ........................................................................................
Planning Process ........................................................................................................
Plan Preparation .....................................................................................................
Plan Participation ...................................................................................................
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 7 of 224
MHMP Steering Committee ........................................................................................
Tribal Membership Participation ................................................................................
Tribal Council, Local and Regional Participation......................................................
Project Timeline ...........................................................................................................
Program Integration ..................................................................................................
3.Community Profile ......................................................................................................
Introduction to the Siletz Tribe ..................................................................................
Tribal History .........................................................................................................
Governance ...................................................................................................................
Geography .............................................................................................................
Geology ........................................................................................................................
Siletz River Gorge
Minerals and Soils .......................................................................................................
Rivers ............................................................................................................................
Tribal Lands and Property ........................................................................................
Historic Sites ...................................................................................................................
Climate .....................................................................................................................
Demographic .........................................................................................................
Economic ...............................................................................................................
Services and Special Districts .............................................................................
Buildings and Critical Facilities ..................................................................................
Buildings ............................................................................................................................
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 8 of 224
Critical Facilities ................................................................................................................
Infrastructure ...........................................................................................................
Transportation ..................................................................................................................
Utilities ...............................................................................................................................
4. Risk Assessment and GIS and Hazard Mapping Data
...................................................................................
Risk Assessment........................................................................................................
Introduction ................................................................................................................
Hazards Profiled ..................................................................................................................
Cultural and Historic Sites ..................................................................................................
Tribal Critical Facilities, Exposure and Vulnerability .....................................................
Future Land Use ..................................................................................................................
Earthquake ..................................................................................................................
Definitions ............................................................................................................................
General Background ............................................................................................................
Tribal Multi-Hazard Mitigation Plan Natural Hazard Section
5.a Hazard Profile ......................................................................................................................
Vulnerability .......................................................................................................................
Flooding .....................................................................................................................
Definitions ..........................................................................................................................
General Background ..........................................................................................................
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 9 of 224
Hazard Profile ....................................................................................................................
Vulnerability .......................................................................................................................
Landslide ...................................................................................................................
Definitions ..........................................................................................................................
General Background ..........................................................................................................
Hazard Profile ....................................................................................................................
Vulnerability .......................................................................................................................
Severe Weather .........................................................................................................
Definitions ..........................................................................................................................
General Background ..........................................................................................................
Hazard Profile ....................................................................................................................
Vulnerability .......................................................................................................................
Wildland Fire .............................................................................................................
Definitions ..........................................................................................................................
General Background ..........................................................................................................
Hazard Profile ....................................................................................................................
Vulnerability .......................................................................................................................
Mitigation Strategy .....................................................................................................
Goals and Objectives ...................................................................................................
Identification & Analysis of Tribal Mitigation Actions ..............................................
Review of Local/Regional Mitigation Actions .............................................................
5Implementation of Mitigation Actions ........................................................................
Prioritization ........................................................................................................................
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 10 of 224
Implementation ...................................................................................................................
Administration .....................................................................................................................
5.b
Prioritized Mitigation Actions .....................................................................................
Capability Assessment ..........................................................................................
Tribal Capabilities ...........................................................................................................
Federal/Regional Capabilities ..........................................................................................
Current and Potential Funding Sources ....................................................................
Current ...............................................................................................................................
Potential .............................................................................................................................
6. Plan Maintenance Process ..........................................................................................
Responsibility for Plan Maintenance ...........................................................................
Monitoring, Evaluating and Updating the Plan ..........................................................
Monitoring Progress of Mitigation Actions .................................................................
Incorporation into Existing Planning Mechanisms .................................................
Continued Public Involvement .....................................................................................
7. Repetitive Loss Strategy .............................................................................................
8. Citation/References (Omitted during Draft Process)
.....................................................................................................
1. Introduction
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 11 of 224
The Confederated Tribes of Siletz Indians Tribal Multi-Hazard Mitigation Plan (MHMP)
has been prepared to guide current and future efforts to effectively and efficiently
mitigate natural hazards on the Confederated Tribes of Siletz Indians lands and
properties. The MHMP is for the Siletz Indian Reservation, trust and fee lands and other
areas of Tribal interest including, but not limited to, its 1855 Coast Reservation
Boundary, traditional hunting and fishing areas and all other ceded and non-ceded
lands since the inception of the Tribe.
Hazard mitigation is any sustained action taken to reduce or eliminate the long-term
risk to human life and property from hazards. Mitigation activities may be
implemented prior to, during, or after an incident. However, hazard mitigation is most
effective when based on an inclusive, comprehensive, long-term plan that is developed
before a disaster occurs. The mitigation planning process encourages coordination
among tribal authorities and other governmental agencies, tribal members, local
residents, businesses, academia, and non-profit groups and promotes their participation
in the plan development and implementation process. This broad-based approach
enables the development of mitigation actions that are supported by tribal members
and other stakeholders and that reflect the needs of the Tribal government as a whole.
This Tribal Multi-Hazard Mitigation Plan establishes goals, lists objectives necessary to
achieve the goals, and identifies policies, tools, and actions that will help meet the
objectives. These short- and long-term actions will reduce the potential for losses to the
Tribe due to natural hazards. This plan is intended to help create a disaster-resistant
community by reducing the threat of natural hazards to life, property, emergency
response capacities and capabilities, economic stability, and infrastructure, while
encouraging the protection and restoration of natural and cultural resources.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 12 of 224
The natural hazards that have affected the Confederated Tribes of Siletz Indians in the
past and will affect the Tribe in the future include riverine flooding from the Siletz,
Yaquina, Salmon, and other Rivers and their tributaries on the Mid Oregon Coast,
earthquakes, and severe winter storms including high winds. Landslides and wildfires
are also potential hazards. Winter Storms are the most frequent hazard on the MidOregon Coast, and may include flooding, high winds, snow flurries, landslides due to
heavy rains, loss of infrastructure and roads due to landslides, and a myriad of effects
on the livelihoods of tribal membership through these deleterious effects.
The Confederated Tribes of Siletz Indians Tribal Government published these following
Constitutional Objectives:
Upon restoration, the Siletz Indians established a membership and adopted the
Constitution of the Confederated Tribes of Siletz Indians. The Constitution symbolizes
the incessant desire of the tribal government to alleviate past hardship endured by the
Siletz Indians, through spiritual, cultural, social, personal, and economic enhancement,
as indicated below:
1. Continue forever, with the help of God, our unique identity as Indians and as the
Confederated Tribes of Siletz Indians of Oregon, and to protect that identity from forces
that threaten to diminish it;
2. Protect our inherent rights as Indians and as a sovereign Indian tribe;
3. Promote our cultural and religious beliefs and to pass them on in our own way to our
children, grandchildren and grandchildren’s children forever;
4. Help our members achieve their highest potentials in education, physical and mental
health and economic development;
5. Maintain good relationships with other Indian tribes, the United States, the State of
Oregon and local governments;
6. Support the Government of the United States and encourage our members to be loyal
citizens;
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 13 of 224
7. Acquire, develop and conserve resources to achieve economic and social selfsufficiency for our tribe;
8. Insure that our people shall live in peace and harmony among themselves and with
all other peoples
Goals & Objectives
The goals and objectives for the Multi-Hazard Mitigation Plan for the Confederated
Tribes of Siletz Indians were identified in short above, and are elaborated upon below
in the form of a planning process and analysis. These goals and objectives were
developed to coordinate with the Tribe’s aforementioned Constitutional Objectives, as
well as coincide from direction of the Administration through the Mission Statement of
Administration which reads as follows:
Confederated Tribes of Siletz Indians
It is the mission of the Administration Department to provide administrative support to
Tribal Programs and Tribal Government for efficient delivery of programs and services
to Tribal Membership and clients.
Responsibilities:
The Administrative Manager oversees Accounting, Fringe Benefits, Information
Systems, Public Works Department, Property and Procurement, Facilities and Fleet, and
Administrative staff. Duties also include serving as plan administrator and trust officer
for the Tribe. The Tribal Government exists to protect its people, property, natural
environment, natural resources and economic vitality. The Tribe intends this while
upholding its sovereignty, identity, and self-governance. Identifying future projects and
programs for the Tribe that, upon implementation, would eliminate, reduce or
otherwise mitigate the vulnerability of the Tribe’s people, property, natural resources
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 14 of 224
and economic vitality which may result from impacts of future disasters is the Tribal
Governments duty wherever possible. Future economic planning and development to
include natural hazard risk assessment as a component of future economic planning
and development and helps to promote a disaster resilient community.
Grant Eligibility
Indian Tribal governments with an approved Tribal Mitigation Plan in accordance with
44 CFR 201.7 may apply for assistance from FEMA as a grantee. If the Indian Tribal
government coordinates with the State for review of their Tribal Mitigation Plan, then
the Indian Tribal government also has the option to apply as a sub-grantee through a
State or another tribe. A grantee is an entity such as a State, territory, or Indian Tribal
government to which a grant is awarded and that is accountable for the funds provided.
A sub-grantee is an entity, such as a community, local, or Indian Tribal government;
State-recognized tribe; or a private nonprofit organization to which a sub-grant is
awarded and that is accountable to the grantee for use of the funds provided.
If the Indian Tribal government is eligible as a grantee or sub-grantee because it has an
approved Tribal Mitigation Plan and has coordinated with the State for review, it can
decide which option it wants to take on a case-by-case basis with respect to each
Presidential Disaster Declaration, and for each grant program under a Declaration, but
not on a project-by-project basis within a grant program. For example, an Indian Tribal
government can participate as a sub-grantee for Public Assistance (PA), and also as a
grantee for the Hazard Mitigation Grant Program (HMGP) under the same Declaration.
However, the Indian Tribal government would not be able to request grantee status
under HMGP for one HMGP project, then request sub-grantee status for another
HMGP project under the same Declaration. - FEMA Tribal Multi-Hazard Mitigation
Planning Guidance
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 15 of 224
Under the Stafford Act and the National Flood Insurance Act, Indian Tribal
governments must have an approved, adopted Tribal Mitigation Plan to meet the
eligibility requirements types of assistance, which may differ depending on whether the
Indian Tribal government intends to apply as a grantee or sub-grantee, as outlined in
the following table.
Purpose
Mitigation Planning is the process used by tribal, state, and local government leaders to
understand risks from natural hazards and to develop long-term strategies to reduce
the impacts of future events on people, property, and the environment. The purpose of
this Tribal Mitigation Plan Review Guide (or Guide) is to help the Federal Emergency
Management Agency (FEMA) assess tribal governments’ mitigation plans in a fair and
consistent manner and to ensure that approved tribal mitigation plans meet the
requirements of the Stafford Act and Title 44 of the Code of Federal Regulations (CFR).1
Specifically, the Stafford Act requires states, tribes, territories, and local governments to
develop and adopt FEMA-approved hazard mitigation plans as a condition for
receiving certain types of non-emergency disaster assistance. (See Section 1.5, Eligibility
for FEMA Assistance).
Interpreting requirements for enhanced tribal mitigation plans. Enhanced tribal
mitigation plans document a sustained and proven commitment to hazard mitigation
and result in eligibility for increased funding under the Hazard Mitigation Grant
Program. The regulations in 44 CFR Section 201.3 allow for tribal governments to
pursue enhanced mitigation plan status by meeting the state requirements for enhanced
plans established in 44 CFR Section 201.5. The intent of this MHMP is for the
Confederated Tribes of Siletz Indians to obtain FEMA funding for various mitigation
activities.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 16 of 224
-FEMA
Small, impoverished communities are eligible for up to a 90 percent Federal cost share
for their mitigation planning and project sub-applications in accordance with the
Stafford Act. A small, impoverished community must:
Be a community of 3,000 (Siletz is currently shown at 1,278 (American Fact Finder data
2018) with 741 Tribal Members residing in Siletz and 1,242 residing in Lincoln County)
or fewer individuals identified by the State as a rural community that is not a remote
area within the corporate boundaries of a larger city
Be economically disadvantaged, with residents having an average per capita annual
income not exceeding 80 percent of the national per capita income, based on best
available data. For the most current information, go to the Bureau of Economic Analysis
website at https://www.bea.gov
Have a local unemployment rate that exceeds by 1 percentage point or more the most
recently reported, average yearly national unemployment rate. For the most current
information, go to the Bureau of Labor Statistics website at
https://www.bls.gov/eag/eag.us.htm
Meet other criteria required by the Applicant in which the community is located.
Native American Tribal governments meeting the definition of a small, impoverished
community that apply to FEMA directly as Applicants are eligible for a 90 percent
Federal cost share for their planning, project, and management costs subapplications,
which make up their overall PDM grant application. Applicants and subapplicants who
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 17 of 224
apply as an impoverished community must request the Federal cost share amount up to
90 percent in the Cost Share section of their planning, project, and management costs
subapplication(s). Applicants must certify small, impoverished community status and
provide documentation with the subapplication(s) to justify up to a 90 percent Federal
cost share. If documentation is not submitted with the subapplication, then FEMA will
provide no more than 75 percent Federal cost share of the total eligible costs. For insular
areas, including American Samoa, Guam, the Northern Mariana Islands, and the U.S.
Virgin Islands, FEMA automatically waives the non-Federal cost share when the nonFederal cost share for the entire grant is under $200,000. If the non-Federal cost share for
the entire grant is $200,000 or greater, FEMA may waive all or part of the cost share. If
FEMA does not waive the cost share, the insular area must pay the entire non-Federal
cost-share amount, not only the amount over $200,000. More detailed information is
provided in Part III, C, Cost Sharing, of the HMA Guidance, available on the FEMA
website at https://www.fema.gov/media-library/assets/documents/103279.
1. Introduction to Tribal Mitigation Planning
The Confederated Tribes of Siletz Indians Tribal Multi-Hazard Mitigation Plan (MHMP)
has been prepared to guide current and future efforts to effectively and efficiently
mitigate natural hazards on the Confederated Tribes of Siletz Indians lands and
properties. The MHMP is for the Siletz Indian Reservation, trust and fee lands and other
areas of Tribal interest including, but not limited to, it’s 1855 Coast Reservation
Boundary, traditional hunting and fishing areas, and all other ceded and non-ceded
lands since the inception of the Tribe.
Hazard mitigation is any sustained action taken to reduce or eliminate the long-term
risk to human life and property from hazards. Mitigation activities may be
implemented prior to, during, or after an incident. However, hazard mitigation is most
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 18 of 224
effective when based on an inclusive, comprehensive, long-term plan that is developed
before a disaster occurs.
The mitigation planning process encourages coordination among tribal authorities and
other governmental agencies, tribal members, local residents, businesses, academia, and
non-profit groups and promotes their participation in the plan development and
implementation process. This broad-based approach enables the development of
mitigation actions that are supported by tribal members and other stakeholders and
that reflect the needs of the Tribal government as a whole.
This Tribal Multi-Hazard Mitigation Plan establishes goals, lists objectives necessary to
achieve the goals, and identifies policies, tools, and actions that will help meet the
objectives. These short- and long-term actions will reduce the potential for losses to the
Tribe due to natural hazards. This plan is intended to help create a disaster-resistant
community by reducing the threat of natural hazards to life, property, emergency
response capacities and capabilities, economic stability, and infrastructure, while
encouraging the protection and restoration of natural and cultural resources.
The natural hazards that have affected the Confederated Tribes of Siletz Indians in the
past and will affect the Tribe in the future include riverine flooding from the Siletz,
Yaquina, Salmon, and other Rivers and their tributaries on the Mid Oregon Coast,
earthquakes, and severe winter storms including high winds. Landslides and wildfires
are also potential hazards. Winter Storms are the most frequent hazard on the MidOregon Coast, and may include flooding, high winds, snow flurries, landslides due to
heavy rains, loss of infrastructure and roads due to landslides, and a myriad of effects
on the livelihoods of tribal membership through these deleterious effects.
The Confederated Tribes of Siletz Indians Tribal Government published these following
Constitutional Objectives:
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 19 of 224
Upon restoration, the Siletz Indians established a membership and adopted the
Constitution of the Confederated Tribes of Siletz Indians. The Constitution symbolizes
the incessant desire of the tribal government to alleviate past hardship endured by the
Siletz Indians, through spiritual, cultural, social, personal, and economic enhancement,
as indicated below:
1. Continue forever, with the help of God, our unique identity as Indians and as the
Confederated Tribes of Siletz Indians of Oregon, and to protect that identity from forces
that threaten to diminish it;
2. Protect our inherent rights as Indians and as a sovereign Indian tribe;
3. Promote our cultural and religious beliefs and to pass them on in our own way to our
children, grandchildren and grandchildren’s children forever;
4. Help our members achieve their highest potentials in education, physical and mental
health and economic development;
5. Maintain good relationships with other Indian tribes, the United States, the State of
Oregon and local governments;
6. Support the Government of the United States and encourage our members to be loyal
citizens;
7. Acquire, develop and conserve resources to achieve economic and social selfsufficiency for our tribe;
8. Insure that our people shall live in peace and harmony among themselves and with
all other peoples
Goals & Objectives
The goals and objectives for the Multi-Hazard Mitigation Plan for the Confederated
Tribes of Siletz Indians are identified below. These goals and objectives were developed
to coordinate with the Tribe’s aforementioned Constitutional Objectives, as well as
coincide from direction of the Administration through the Mission Statement which
reads as follows:
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 20 of 224
Confederated Tribes of Siletz Indians
It is the mission of the Administration Department to provide administrative support to
Tribal Programs and Tribal Government for efficient delivery of programs and services
to Tribal Membership and clients.
Responsibilities:
The Administrative Manager oversees Accounting, Fringe Benefits, Information
Systems, Public Works Department, Property and Procurement, Facilities and Fleet, and
Administrative staff. Duties also include serving as plan administrator and trust officer
for the Tribe. The Tribal Government exists to protect its people, property, natural
environment, natural resources and economic vitality. The Tribe intends this while
upholding its sovereignty, identity, and self-governance. Identifying future projects and
programs for the Tribe that, upon implementation, would eliminate, reduce or
otherwise mitigate the vulnerability of the Tribe’s people, property, natural resources
and economic vitality which may result from impacts of future disasters is the Tribal
Governments duty wherever possible. Future economic planning and development to
include natural hazard risk assessment as a component of future economic planning
and development and helps to promote a disaster resilient community.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 21 of 224
Adoption
The Confederated Tribes of Siletz Tribal Council previously formally adopted the
Confederated Tribes of Siletz Tribal Multi-Hazard Mitigation Plan in 2009 as Resolution
2009- 357.
The Resolution adopting the current plan will be attached to said document and filed in
Tribal Council records and with Legal, Planning, and Central Administration
Departments respectively.
Assurances
The Confederated Tribes of Siletz Indian Tribe assures that it will continue to comply
with all applicable Federal statutes and regulations in effect with respect to the periods
for which it receives grant funding, in compliance with 44 CFR 13.11(c). The Tribe will
amend its plan whenever necessary to reflect changes in Tribal or Federal laws and
statutes as required in 44 CFR 13.11(d).
Organization of the Plan
The Confederated Tribes of Siletz Tribal MHMP is divided into eight sections plus
appendices:
• Section 1 is this introduction and Executive Summary;
• Section 2 describes how the Tribal MHMP was prepared including the planning
process and public involvement;
• Section 3 describes the land use, socioeconomic conditions, and physical
characteristics of the Confederated Tribes of Siletz Tribe’s 1855 Reservation Boundary,
CTSI properties in Lincoln County and the surrounding area;
• Section 4 presents an assessment of hazard risks to Confederated Tribes of Siletz
Tribal Lands;
• Section 5 presents the Confederated Tribes of Siletz Tribe’s mitigation strategy;
• Section 6 describes the Tribal MHMP maintenance process;
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 22 of 224
• Section 7 describes the Tribe’s Repetitive Loss Plan (in development).
The references cited in this plan are footnoted and any additional references are listed in
Section 8.
Additional materials, such as Resolutions adopting the plan, meeting notes and survey
results are located in the Appendices.
2. Planning Process
This section will discuss the planning process used to develop the Confederated Tribes
of Siletz Multi-Hazard Mitigation Plan.
The planning process is an extremely important aspect in the development of a hazard
mitigation plan. It is crucial for the success of the plan to have the public ask questions
and comment on the plan. Involving the public in the planning process is necessary and
it increases the public’s awareness of the hazards affecting the Confederated Tribes of
Siletz Tribal Members, buildings and properties, Tribal and Culturally significant areas,
and also informs them about the importance of natural hazard mitigation planning.
Having public involvement in the planning process also allows the plan to reflect the
public’s views and opinions. The Confederated Tribes of Siletz Tribe defines “public” as
its Tribal Membership, Tribal Government and employees. The majority of the
surrounding local communities such as Siletz, Newport, Depoe Bay, Lincoln city, and
Waldport are all a part of CTSI’s community, and vice versa. Lincoln County, and the
State of Oregon both also have hazard mitigation plans. Federal agencies, and relevant
non‐government organizations have adopted the both national, regional, and State of
Oregon mitigation plans. The Tribe maintains final authority on decision making
related to this Plan.
The following sections will detail who was responsible for developing and producing
the plan, and other associated activities such as coordinating the planning process; a
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 23 of 224
listing of participating departments and agencies; and a timeline of the plan
development process, dating back to 2004, the Siletz Tribe has had Multi-Hazard
Mitigation Plans approved by FEMA on a continual basis and ending with the adoption
of the Tribal MHMP by the Confederated Tribes of Siletz Tribal Council and Final
FEMA approval. This section will also discuss opportunities the Public was given to
comment and give suggestions on the Plan during development.
Plan Preparation
Plan preparation was led by the Confederated Tribes of Siletz Tribe’s Planning
Department and specifically, Ian Keene, GIS Analyst/Research Planner, Pam BarlowLind, Tribal Planner, General Manager Brenda Bremner and Central Administration,
and the Tribe’s Legal Department with assistance from both a Steering Committee
(CTSI Personnel and Local First Responders including Fire Chief RC Mock and
emergency personnel, and with FEMA experts from National, Regional, and State
offices with experience in developing tribal hazard mitigation plans. The Planning
Department led in the drafting of the Plan and worked with the Tribe in preparing the
different components and meeting FEMA requirements necessary for a successful and
approved Plan.
The Tribe decided to hire an emergency planning coordinator to assist with the
development of the Plan and to do public outreach for the last year in late 2018. The
Tribe selected a trainee in winter of 2018. Planning began in May of 2018 with an initial
completion date of October of 2018. This date was later moved up to October 2019 due
to outreach requirements and other necessary timelines to follow to allow for public
input and for research and planning time. Later this date was extended out to include
more a detailed building inventory and hazard assessment, as well as additional public
comment and to provide the emergency planning coordinator position to attend
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 24 of 224
training, conferences, and outreach events, both for the Tribal Administration, and for
Tribal outreach to members and the community.
Internally the Tribe put together a Multi-Hazard Mitigation Plan Steering Committee
(listed below). In addition the Steering Committee, the Tribe selected an Emergency
Planning Committee that met and communicated to discuss various components of the
Plan as well as gather data and planning documents and to review the Plan.
A first draft of the Plan was submitted by Ian Keene for review internally to the Tribal
Planner. A final draft was submitted to both the General Manager Brenda Bremner and
Tribal Council in October 2019.
The Steering Committee met throughout 2018-2019
A Final draft that included most current data on tribal buildings and inventory was
prepared and submitted to the Confederated Tribes of Siletz Multi-Hazard Steering
Committee by the Planning Department and GIS Analyst Ian Keene on October 11th,
2019.
The Plan was distributed internally within the Tribal government for comment with the
comment period ending December 1st 2019. The Steering Committee will meet on
November 5th 2019 to discuss comments and corrections to the draft plan.
The Committee will vote whether to recommend the Plan and chose to move forward
on submitting the Plan to FEMA for review. A public review period was provided
during October-November of 2019, and a 30 day comment period during November
was advertised in the newspaper. After the conclusion of the comment period, the Tribe
moved to have the Tribal Council formally adopt the Plan. Comments and corrections
will be sent to the Planning Department to prepare a final draft for FEMA and Public
review as well as Council adoption.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 25 of 224
GIS and Hazard Mapping Data
The Tribe’s GIS Research Analyst and Planner, Ian Keene, alongside the Tribal Planner,
Pam Barlow-Lind, with effective direction from Tribal Council and the General
Manager, Brenda Bremner, gathered hazards data to better identify exposure and
vulnerability to tribal lands and structures. The data was analyzed for discussion and
maps were created for the Risk Assessment. Flood inundation data from the Tribe’s
administration and reservation areas in and around Siletz and FEMA Floodplain data
was provided by the Tribe. Other hazards data including Wildfire Risk, Past Wildfires,
and Locations of Past Landslides, were gathered online from the Oregon Geospatial
Enterprise Office and the Oregon Department of Forestry. Winter storm data, both
geospatial and tabular, were gathered from Oregon State University, the National
Oceanic and Atmospheric Administration, and more. The Planning Department
updated GIS databases of tribal lands and properties, current to November 2019, and
tribal buildings and infrastructure, are also current to November 2019.
Plan Participation
The planning process was led by the Confederated Tribes of Siletz Tribal Multi-Hazard
Mitigation Planning Steering Committee, Planning Department, Emergency Planning
Committee, FEMA Representative Amanda Siok, and led in the formulation of goals
and objectives through conducting meetings with Tribal Membership and Tribal
Council; identification of hazards and past events; and the identification of Mitigation
Actions from the Tribe’s previous plans, with ultimate approval resting upon the
Confederated Tribes of Siletz Tribal Council and General Manager Brenda Bremner.
Efforts to include broad public participation included the development of community
surveys, formation of an external stakeholder outreach effort, site tours with tribal staff,
meetings with tribal, county and state officials, and informal discussions amongst tribal
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 26 of 224
staff and membership. Emergency Management Personnel and Planning Department
personnel attended Tribal Council Meetings, performed public outreach, and attended
conferences. Planning Department personnel attended the Oregon Tsunami annual
conference, Infrastructure and transportation conferences, and participated in FEMA
webinars and trainings. The Emergency Planning Coordinator sent out surveys through
the mail to the entirety of Tribal Membership to inform and ask for feedback on the
MHMP, as well as selecting critical assets for the Tribe. Tribal personnel attended
annual Tribal Enrollment meetings to inform Tribal Membership of the MHMP.
Geospatial and Environmental Planning
Future Land Use and Capacity Building
The Confederated Tribes of Siletz Tribe is committed to expanding its land holdings,
developing affordable housing that is consistent with goals of sustainability, and
government services for its Tribal members. The Siletz Tribe is always pursuing
developing its business enterprises, all done with a consideration of the impact natural
hazards will have on this continued development, and what role the Tribe has
environmentally, always pursuing sustainability, ecological, and social justice.
The Tribe is committed to developing outside of hazard areas. When not possible to
develop outside of hazard areas, the Tribe will implement mitigation measures, such as
building to or exceeding the highest building code standards, or reducing wildfire fuel
loads near structures that will minimize the vulnerability of that development. Where
possible and applicable, each hazard section will discuss future land use in relation to
that hazard. The Siletz Tribe adopted the 2012 International Building Codes and
support Codes for all construction on Sept. 16, 2011. The resolution including the
support codes is listed as Tribal Council Resolution 2011-302. That is a minimum code
requirement. In some cases the State of Oregon Residential Code and State of Oregon
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 27 of 224
Structural Code is more specific to higher structural standards then the International
Code. For instance when we have buildings designed, we have to comply with the
seismic zone D2 and wind load of 110 mph in Lincoln County, both are higher than the
valley ratings like Polk, Marion, Yamhill and Linn counties for example.
Environmental Planning
CTSI’s current Environmental Planning and Realty, Environmental Protection, Land
Use –Transportation-Engineering, Natural Resources, Housing, Cultural, and Legal
department specialists are holistically integrated in many practical ways to provide lifecycle support for Tribal actions involving a wide range of environmental concerns and
programs. The Tribe’s staff is well versed and skilled in the following topics, guidance,
and activities that are important to Emergency Preparedness:
•
Long-term to short-term/project specific planning for Tribal housing,
transportation, roads, natural and cultural resources preservation/protection, and
economic development.
•
Extensive public and agency engagement, often considering a wide range of
sensitive issues
•
Plan development and implementation
•
Indian Housing Plan
•
Siletz Tribal Transit Services
•
Siletz Tribe Comprehensive Plan/Planning
•
Several plans related to transportation services (such as the Siletz Tribal Transit
Services, Siletz Reservation Transportation Improvement Program, Indian Reservation
Road Transportation Program, etc.)
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 28 of 224
•
Forest Resource Management Plan
•
Construction and engineering project development, contracting and oversight
contract
•
Property (land, structures, infrastructure) acquisition and management
•
Environment Management
•
National Environmental Policy Act (NEPA)
•
Extensive staff experience managing or disciplinary specialist/preparing
successful Categorical Exclusions, Environmental Assessments, Environmental Impact
Statements, and support documents involving, e.g. but not limited to:
•
Interagency coordination
•
U.S. Entities -Federal Highway Administration U.S. Department of
Transportation (Federal Highways Administration, Federal Transit Administration,
Federal Aviation Administration, Federal Rail Administration), U.S. Army Corps of
Engineers, U.S. Department of Agriculture (U.S. Forest Service, Natural Resources
Conservation Service, Rural Housing Service, Rural Utilities Service), U.S. Department
of Interior (Bureau of Indian Affairs, Bureau of Land Management, Bureau of
Reclamation; U.S. Department of Commerce (National Oceanic and Atmospheric
Administration); U.S. Department of Defense ( Air Force, Army .
•
Oregon Entities - Oregon Department of Transportation, Oregon State Historic
Preservation Office, Department of Land Conservation and Development, Military
Department, Department of State Lands, Department of Fish and Wildlife
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 29 of 224
•
Local jurisdictions: To some level with all jurisdictions within the Tribes
Ancestral Homelands, and extensively within its historic 1855 Siletz Coast Reservation
area.
•
Subject Features: Housing, transportation facilities (roads/bridges, railroads),
resource use/harvesting, manufacturing, clean up (small site to large Superfund areas),
power-generation, water reservoirs, stormwater facilities, wastewater treatment
facilities, mineral extraction, timber harvest, conservation areas, etc.
•
Environmental Protection Oversight Programs for Specific Topics (Participant
in):
•
Pacific Northwest Tribal Climate Change Network
•
Portland Harbor Superfund Site Cleanup Stakeholders
•
Upper Willamette River Conservation and Recovery Plan For Chinook Salmon
and Steelhead.
•
Key Permitting/Compliance Support particularly for projects in Oregon’s
designated Coastal Zone, e.g, (but not limited to):
•
Federal Coastal Zone Management Act
•
Oregon Land Use Planning Goals (not applicable if Federal (Indian) Trust Land),
especially Goals 1-Citizens Involvement, Goal 7- Areas Subject to Natural Hazards,
Goal 99 – Economic Development, Goal 10 – Housing, Goal 11 Public Facilities and
Services, Goal 12 Transportation, and coastal goals 16 – 19, Estuarine Resources, Coastal
Shorelands, Beaches and Dune, and Ocean Resources.
•
Contamination and Toxic Substances
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 30 of 224
•
Endangered Species Act
•
National Historic Preservation Act, Section 106
•
Floodplain Management, Executive Order 11988
•
Estuarine Areas Executive Order 11190
https://www.archives.gov/federal-register/codification/executive-order/11190.html
•
Wetlands – Oregon Removal-Fill Law (ORS 196.795-990); Federal Clean Water
Act Section 404 Permit
Property/Realty Acquisition and Management
Various Tribal departments and associated Tribal entities such as the Siletz Tribe’s
Chinook Winds Casino and Resort, Siletz Tribal Business Council seek property to meet
their land-based, economic and community goals.
Generally, the Tribe’s Environmental Planner (EP) is responsible for conducting the
basic footwork related to the Tribe’s property acquisition process. Nonetheless, the EP
coordinates extensively with other Tribal employees and consultants as needed when
considering the range of each property’s potential uses and the Tribal staff who would
be engaged in realizing those uses should the property be acquired. As the acquisition
study process advances, more close coordination between the Tribe’s Housing, Public
Works, Legal, financial/accounting, planning and administrative staff and Tribal
Council likely occurs.
The Environmental Planner typically leads the process of:
•
Monitoring property availability
•
Conducting suitability research and reporting
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 31 of 224
•
Initial property inspection to assess its opportunities and constraints
•
Documentary background research and initial field inspections for cultural
resources presence/absence and need for further research by federally and statequalified archaeologists and/or historic built-environment professionals
•
Developing and overseeing necessary cultural resource contracting; conducting
contract product sufficiency assessments
•
Initial online investigations regarding a wide range of environmental concerns
•
Seeking, securing, and either overseeing staff support and/or managing needed
contracts regarding, but not limited to:
•
Cultural resources
•
Land survey
•
Title search
•
Phase I Environmental Site Assessment
•
Natural resource surveys
•
Transportation planning support
Basic design schematics of potential uses
The Environmental Planner then Prepares a Property Evaluations to facilitate the
Tribal Council’s review and support their acquisition decisions.
•
Facilitating finance packaging as needed
•
Property Transfer recordation(s) with the County and if appropriate with the
BIA should the property be proposed for or in federal Trust status.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 32 of 224
Steering Committee/Emergency Planning Committee
The Emergency Planning Committee was composed of representatives from the Legal
Department, Tribal Administration, the Health Clinic, Risk Management, GIS and tribal
membership. See Table 2-1 for a list of members on the Committee.
Table 2-1: Confederated Tribes of Siletz Tribal MHMP Steering Committee
*Name/Title/Department
Ian Keene
GIS Research Analyst and Planner
Planning Department
Pam Barlow-Lind
Tribal Planner
Planning Department
Art Fisher, J.D.
General Legal Counsel
Legal
Max Hoover
Public Works Department Supervisor
April Middaugh
Administrative Assistant
Administration
Eli Grove
Emergency Preparedness Coordinator Trainee
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 33 of 224
Administration
Bonnie Peterson
Assistant General Manager
Outside Agency
RC Mock
Past Siletz Valley Fire Chief
Outside Agency
Alison McGrath
Siletz Valley Fire
Emergency Planning Committee
Eli Grove
Max Hoover
Jenifier Leakes
Bonnie Petersen
April Middaugh
Ian Keene
Cherity Bloom-Miller
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 34 of 224
The Confederated Tribes of Siletz Indians Tribal Council
Reggie Butler Sr.
Lillie Butler
Alfred “Bud” Lane III
Angela Ramirez
Loraine Butler
Delores Pigsley
Gloria Ingle
Robert Kentta
Tribal Membership Participation
A great effort was made to gain participation and input from the Confederated Tribes of
Siletz Tribal membership. Many tribal staff are also Tribal members, and many were
able to participate in either the Emergency Planning Committee, the Steering
Committee, or in meetings for enrollment, planning, and Tribal Council. Other efforts
include notification about the plan and other emergency preparedness efforts in the
CTSI tribal newsletter, as well as information, the draft plan, mail outs to Tribal
Membership, and the comment period at the Siletz Library, Administration Buildings,
and on the tribal website. http://www.ctsi.nsn.us/
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 35 of 224
Local and Regional Participation
The Tribe also invited local and regional partners to participate in the comment period
as well as Tribal Personnel participating in local and regional basecamp and mitigation
planning. This included tribal representatives from the Emergency Planning Committee
as well.
External Stakeholder Participants
Agency
Title
Name
Siletz Valley Fire District
Fire Chief
RC Mock
Region X FEMA Tribal Liason
Erin Ward
Region X FEMA Rep
Amanda Siok
Lincoln County Planning Department
Director
Onno Husing
Oregon Office of Emergency Management
GIS Program Coordinator
Daniel Stoelb
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 36 of 224
State of Oregon, DOGAMI
Althea Rizzo
Oregon Office of Emergency Management
GIS Manager
Matt Williams GIS and Remote Sensing Section Supervisor
Oregon Department of Geology and Mineral Industries
Oregon Department of Forestry
Lincoln County Unit Forester
Lincoln County Sheriff’s Office
Emergency Manager
Virginia Demaris
City of Siletz
Mayor
Willy Worman
Newport Samaritan Hospital Personnel
Siletz Health Clinic Representative
Lincoln Co. Health Services
Administrator
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 37 of 224
2. Project Timeline
2000-2009: Confederated Tribes of Siletz Tribe finalized our last FEMA MHMP plan in
2009. The first MHMP plan was completed in 2004. The second was completed in 2009
by the Planning Department.
April 2018: Begin project to update previous Siletz Tribal MHMP. Steering Committee
members were appointed based upon experience, training, and education. Steering
Committee members come from varied backgrounds, and some of the members
participated in initial emergency trainings, initial site visits to some locales that had
previous mitigation work completed and/or will need mitigation planning to be
considered. Along with the Tribe’s Assisstant General Manager, Bonnie Peterson,
FEMA personnel and the Steering Committee held initial meetings discussing the
experience each person had with Natural Hazard Mitigation Planning and with FEMA,
and additional relevant information. The group gained insight and met to discuss the
Tribe’s Mitigation Goals, potential hazard areas, critical issues and work at selecting
critical facilities.
Mitigation Activities completed from 2009 Plan include updates to water conservation
planning documents, engaging in water and sewer system upgrades on Tribal
residential and commercial buildings to be up to a more strenuous level of hazard
resilience, land use planning and hazard planning, committing funds to promote hires
for emergency planning, outreach, Tribal Member outreach and education concerning
natural hazards, and much more. The Siletz Tribe continues to strive for planning
excellence and to excel and exceed expectations for hazard resilience and to promote a
safer environment, economy, and infrastructure for all Tribal Members and community
profiles within the communities that CTSI operates within. The Tribe will continue it’s
commitment to excellence in all areas of emergency planning and outreach.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 38 of 224
March 22, 2018: Confederated Tribes of Siletz Administration and department
personnel meet and later form the Steering Committee and Emergency Planning
Committee meets to discuss comments and revisions to Plan.
April-August 2018: Initial data gathering, formation of planning committees,
development of survey, review of local and regional plans for integration and risk
assessment, identification of potential mitigation actions. Identification of critical assets
ongoing and decisions made on what stakeholders were chosen to be a part of the plan.
June/July/August 2018: Workgroup Meeting, discussion of hazard issues, critical
facilities, review and discussion of mitigation actions, mitigation training for multiple
staff members.
April 2018: Draft Plan made available to Public, including External Stakeholders, for
review and comment. Plan also submitted to FEMA for pre-review compliance.
May-November, 2018: Tribal staff engages in FEMA training sessions with Region X
personnel, and begins updating all GIS/geospatial/data related information for MHMP.
DOGAMI, FEMA, and CTSI personnel complete HAZUS analysis of CTSI structures
and properties.
July – August, 2018: Internal review and prioritization of Mitigation Goals, Objectives
and Actions. Selection of Critical Facilities. August 2018: Mitigation Goals, Objectives
and Actions adopted by Tribal Council.
August, 2018: Begin drafting of Plan document.
October, 2019: First draft submitted to Tribe for review. After review, it was determined
that a more detailed inventory (including geo-locations) of Tribal structures was needed
for the risk assessment to better identify and demonstrate vulnerability to hazards,
particularly flooding. Forwarded to Tribal Council for review and adoption.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 39 of 224
October 2019: Insurance statement of values was given to Planning Department Staff
from Accounting, listing all Tribal structures and values according to insurance policies.
The planning department created a GIS database of structures with policy amounts and
through HAZUS for analysis and to be included in the risk assessment.
September/October 2019: Final draft submitted to Tribe for internal review and
comment. The Plan was distributed internally to members of the Emergency Planning
Committee and other Tribal staff for comment.
November 2019- Committee is satisfied with the ongoing Plan and agrees to move
forward on submitting the Plan for FEMA review as well as releasing it for public
comment. The committee will seek formal adoption of the Plan by the Tribal Council.
Comments were due December 1st 2019.
Emergency Preparedness Coordinator
Trainings Attended From 12/3/18-10/8/19
IS 100, IS 200, IS 700, IS 800
ICS 300
ICS 400
Oregon Prepared Emergency Conference
Tribal Emergency Managers Coalition
Disaster Behavioral Health
Lincoln County Wildfire
Exercise/Simulation
NW Tribal Public Health Emergency
Preparedness Training & Conference
Electricity & Wildfire Conference
Statewide Medical Countermeasures
Exercise
Crisis Communication for the Non-PIO
CTSI Community Clinic Annual TrainingWildfire preparedness, defensible space,
evacuations. Go bag training/education.
CTSI Summer Safety Kickoff-Fire
Upcoming
Tsunami Resiliency Work Group (3x)
Storm Ready Community Meeting-Siletz
Emergency Preparedness Team Meeting
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 40 of 224
Season/Regulated Use.
Statewide Fuel Planning Workshop.
Community Recovery Planning AWR-356
AWR-232 Mass Fatalities Planning &
Response for Rural Communities.
MGT 403 Access & Functional Needs
Preparedness Planning for Rural
Communities.
MGT-403 Access & Functional Needs
Preparedness Planning for Rural
Communities.
Siletz Community Meeting
Eugene Community Meeting.
Salem Community Meeting.
-Tracy Bailey and Ian Keene attended the Oregon Tsunami Conference
-Pam Barlow –Lind attended many regional Transportation and Infrastructure
conferences including the 2018 and 2019 ATNI conferences, National BIA and DOI
Conferences, and more
-Max Hoover and Eli Grove attended the Oregon Prepared Conference
-Cherity Bloom-Miller and Eli Grove attended the Oregon Prepared Conference
Program Integration
Every effort was made to integrate this planning process into other Tribal planning
processes. The Tribe has a planning portfolio that includes comprehensive planning,
transportation water, water planning, and housing plans. The Tribe will integrate this
plan into current and future planning efforts such as the yearly budgeting process and
in annual reviews by the Committees responsible for this plan. This plan will also be
incorporated into the Emergency Operations Plan as it is developed and updated.
During the planning process of previous multi-hazard mitigation plans, and in
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 41 of 224
conjunction with the Steering Committee, and through tribal departments, it was
agreed that current and future planning efforts will integrate the Tribal Natural Hazard
Mitigation Plan in to the plans that would simultaneously have an effect on one
another. Effort will be made so that this Plan will also be integrated into other FEMA
programs and initiatives that the Tribe is involved in, such as potential participation in
the National Flood Insurance Program or any other mitigation actions that the Tribe
would become a part of.
The plans and documents reviewed for integration include:
Tribal Comprehensive Plan
Emergency Operations Plan
Natural Resources Department Plans (Forestry, WWMP, et al.)
This Plan currently has:
No direct Emergency Action Plan for Residential Developments (Siletz, Lincoln City,
Salem, Eugene, Portland, et al.
• Emergency Response Plan for Tribal Health Clinic; Gwee Shut Rd.
• Evacuation Procedures for CTSI employees from all Administration Buildings; and
• Emergency Response Plan for Departments within the Chinook Winds Casino.
The Mitigation Plan will be incorporated into the Emergency Operations Plan as the
Mitigation component.
The tribal mitigation planning regulations are established in Title 44 Code of Federal
Regulations (CFR) §201.7 Tribal Mitigation Plans. In addition, Title 44 CFR §201.3(e)(3)
indicates that, “In order to be considered for the increased HMGP funding, the Tribal
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 42 of 224
Mitigation Plan must meet the Enhanced State Mitigation Plan criteria identified in
§201.5.” Those Enhanced State Regulations can be found in Title 44 CFR §201.5
Enhanced State Mitigation Plans.
Local
Lincoln County Natural Hazards Mitigation Plan, Revised 2017
https://www.co.lincoln.or.us/planning/page/natural-hazards-mitigation-plan
Lincoln County Community Wildfire Protection Plan, latest update, 2018
https://www.co.lincoln.or.us/planning/page/community-wildfire-protection-plan
State or Oregon Multi-Hazard Mitigation Plan
https://www.oregon.gov/lcd/NH/Pages/Mitigation-Planning.aspx
https://oregonhazardmitigationplan.weebly.com/index.html
https://www.oregon.gov/oem/hazardsprep/Pages/Hazard-Mitigation.aspx
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 43 of 224
3. Community Profile
Introduction
History and Culture
The Confederated Tribes of Siletz is a federally recognized confederation of 27 bands,
originating from Northern California to Southern Washington. Termination was
imposed upon the Siletz by the United States government in 1955. In November of 1977,
we were the first tribe in the state of Oregon and second in the United States to be fully
restored to federal recognition. In 1992, our tribe achieved self-governance, which
allows us to compact directly with the US Government. This gives us control and
accountability over our tribal programs and funding. We occupy and manage a 3,666
acre reservation located in Lincoln County, Oregon. We manage several resources,
including water, timber and fish.
Artifacts and historical documents are stored and displayed at the Siletz Tribal
Community (Cultural) Center. Our Cultural Specialist is Robert Kentta and the rest of
the Siletz Tribe Culture Department also is housed in the Community Center.
The Confederated Tribes of Siletz Indians is one of nine federally recognized Indian
Tribal Governments in the State of Oregon. The Confederated Tribes of Siletz Indians,
located in western Oregon, has 5,468 members who are governed by an elected nine
member council known as the Tribal Council. The Confederated Tribes of Siletz have a
rich history in Western Oregon that reflects hard work, perseverance and the desire to
be self-reliant. The Tribal Council consists of nine members elected by the General
Council to terms of three years. The Tribal Council shall elect from its membership a
Tribal Chairman, Vice Chairman, Secretary and Treasurer. The Tribal Council is
empowered to exercise all legislative authority, except that vested in the General
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 44 of 224
Council, and executive authority of the government, including the right to delegate
authorities as it deem appropriate. Said authority shall include, but is not limited to the
power to employ legal counsel, the choice of counsel and fixing of fees to be subject to
the approval of the Secretary of the Interior; to prevent the sale, disposition, lease or
encumbrance of tribal lands, interests in land, or other tribal assets without the consent
of the tribe; and to negotiate with the Federal, State and local governments.
See Figure 3-1 for a map of the Tribe’s location.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 45 of 224
Map drawing from BIA Superintendent Joel Palmer ca. 1854
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 46 of 224
This section will discuss the geographic and climatic setting of the Tribe’s homeland
and define and discuss its lands, properties, facilities and infrastructure. This section
will also discuss the Tribe’s history, demographics and economy. This background
information is vital to understanding the Tribe’s exposure to natural hazards and its
resiliency in mitigating, preparing, responding and recovering from disasters.
Geographic Areas of Interest Tribal Ordinance- Siletz Tribal Code § 7.2
From the Siletz Tribal Code General Purpose of Interest
Statement of Purpose: The Confederated Tribes of Siletz Indians is a federally
recognized Indian Tribe (referred to as the "Siletz Tribe" for some purposes) which is
comprised of Indian tribes and bands and members of Indian tribes and bands who
were settled by the federal government on the "Siletz" or "Coast" Reservation
(hereinafter "Siletz Reservation"), from 1855 forward. Those tribes, bands, and persons
which were settled on the Siletz Reservation were and are possessed of legal and
customary rights of possession and use to those geographic areas in which they
historically resided and occupied, in addition to legal rights associated with such
tribes’, bands’ and persons’ settlement on the Siletz Reservation. These legal and
customary rights arise from many sources including, but not limited to, AngloAmerican legal principles. The Siletz Tribe is asserting and will assert these legal and
customary rights on behalf of the Tribe and tribal members.
(b) Standard of Interest. The Siletz Tribe has conducted an intensive investigation of the
historical and legal circumstances of the Tribe and of the tribes, bands, and persons who
make up the Siletz Tribe and its membership. The Siletz Tribe declares its interest in
those geographic areas where its investigation has shown a justifiable scientific and/or
legal connection to such areas.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 47 of 224
Definitions
(a) "Ancestral lands" shall mean the traditional historical area of occupation of an Indian
tribe or band, and shall include the terms "ancestral lands," "aboriginal area" or
"aboriginal territory," and "ancient tribal lands" or "ancient tribal boundaries."
(b) "Pre-treaty times" shall mean that period of time pre-dating the negotiation of
treaties by the federal government with tribes, bands, and other groups of Indians
which occupied the lands of western Oregon, northwest California and southwest
Washington. For purposes of this Ordinance, pre-treaty times shall be defined as any
period of time prior to 1851.
(c) "Occupied" or "occupation" shall mean those lands upon which an Indian tribe, band
or group resided upon or used on a permanent, seasonal, or periodic basis. Use of such
lands includes regular or sustained use for any societal purpose, including but not
limited to residence; hunting, fishing, gathering, or other resource utilization; travel or
passage; ecosystem protection or health; culture; religious; and political purposes. It
shall not be a negation of occupation of lands under this section if a geographic area
was used only on an episodic basis or was not used for years at a time. "Occupation"
need not have been exclusive to any specific tribe, band or group of Indians, but must
have been of substantial importance to such tribe, band or group.
Governance
Once the Confederated Tribes of Siletz Tribe regained Tribal sovereignty, the Tribe
established the Constitution of the Confederated Tribes of Siletz Tribe and a structure of
ordinances, charters, and committees to guide their newly regained jurisdiction over
Tribal lands, businesses and community members. A nine member elected Tribal
Council (“Tribal Council” or “Council”) is the governing authority for the Tribe's
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 48 of 224
legislative and executive functions. The Board-appointed Chief Judge of the Tribal
Court oversees the Tribe's judicial matters. The Staff Attorney oversees all other legal
matters for the Tribe. The Tribe also has outside legal counsel.
One of the primary responsibilities of the Tribal Council is to ensure that all of the
Tribe's governmental functions are in accordance with Tribal law. Elected by Tribal
members at least 18 years of age, Council members serve staggered three year terms.
Tribal officers include a Tribal Chairperson, a Vice-Chair, a Secretary and a Treasurer,
any of whom can act as a spokesperson for the Tribe and Council. The Tribal Council
has authority to establish directives, committees, and advisory appointments when
appropriate to conduct Tribal functions. The Tribe has a Council appointed Tribal
Administrator (General Manager Brenda Bremner) and appoints this position to run the
Tribe's daily affairs. The positions appointed by Council, however, remain under the
Council’s general authority.
Elected Officials and Special Districts
The Confederated Tribes of Siletz is generally served by local and county services for
schools, police, and fire protection and emergency services. The Tribe utilizes local
utility providers such as Central Oregon Coast PUD for electrical and some water, City
of Siletz for water and sewer services in the City of Siletz, and a myriad of other
providers for additional services.
Elected Representation outside of the Tribal Council and Administration:
State of Oregon Governor
The Honorable Kate Brown - Democrat
Congressional District 5,
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 49 of 224
National:
Senior Senator
Ron Wyden
Democrat
Since Jan 1, 1996
Next Election in 2022
Junior Senator
Jeff Merkley
Democrat
Since Jan 6, 2009
Next Election in 2020
United States Representative in Congress, 5th District
Kurt Schrader - Democrat, Independent
Note these are the representatives for the Tribe’s lands within the Siletz, Newport, and
Lincoln County area. The Tribe’s Usual and Accustomed areas may be served by
additional districts and representatives.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 50 of 224
3. Geography
The Confederated Tribes of Siletz Tribe current Reservation is located in present day
Lincoln County, with current tribal lands centered along the main stem of the Siletz
River, with Administration Buildings and Tribal Government also located along the
Siletz River in the City of Siletz as well, and communities existing between Siletz,
Newport, Toledo, Lincoln City, and timberlands within Lincoln County to the north
down to Waldport and beyond in the south and up the Alsea River. Lincoln County is
located in Western Oregon and covers an area of 1,194 square miles. Principal
industries of the county are travel (primarily tourism), trade, health services and
construction. Paper manufacturing and fishing are still important although they
contribute proportionally less to the county's employment than they used to. Newport
is one of the two major fishing ports of Oregon that ranks in the top twenty nationally
of fishing ports by fish landed and processed. Newport has averaged 105 million
pounds (48,000 tons) of fish landed in recent years. Newport is home of Oregon State
University's Hatfield Marine Science Center, as well as the Oregon Coast Aquarium,
and their fleet of ocean-going vessels. It is the federal West Coast hub for NOAA, EPA,
and USFWS Pacific Fleet and marine studies. Of the many protected areas within
Lincoln County, some include Oregon Islands National Wildlife Refuge, Siletz Bay
National Wildlife Refuge, and part of the Siuslaw National Forest. Over 50% of the land
area in Lincoln County is owned by the federal government. The US Forest Service and
the Bureau of Land Management manage most of these lands, alongside the United
States Fish and Wildlife Service managing a significant amount of the Coastal wetland
and estuarine environments, including Siletz Bay.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 51 of 224
Fig. above Confederated Tribes of Siletz Land Ownership within 1855 Boundary
The Confederated Tribes of Siletz Tribal lands are generally defined as its 1855
Reservation Boundary, which includes part of the Tribe’s traditional pre-contact lands,
in addition to its Treaty Ceded lands (including Table Rock and southern Oregon Tribal
Areas at the mouth of the Illinois and Rogue Rivers, which were defined and ceded in
the 1850 era Treaties (including the 1851-1853 treaties, 1855 treaty, et al.) with the
United States, and its current Reservation and lands, which are Trust lands and other
properties, comprised of parcels mainly in Lincoln County.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 52 of 224
Geology
Lincoln County is comprised of five to six major geologic types according to OGDC and
DOGAMI geospatial data. Four of the geological types converge near some of the main
land holdings in and around Siletz, Newport, and the rest of the Reservation lands in
the immediate area. The County wide area shows a larger diversification of geological
and land form, parent material, and soil types. See Figures ________________
Parent material and Soil maps located on CTSI website and maps attached in
appendices. The Natural Resources Conservation Service (NRCS) also provides the Web
Soil Survey (WSS), which was completed for this MHMP, and is also available through
the CTSI website, or at this locale https://websoilsurvey.nrcs.usda.gov/app/
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 53 of 224
Minerals and Soils
The soils present in Lincoln County are the acidic and leached products of weathering
in a moist temperate maritime climate under mixed species compositions and
coniferous forest cover. Sedimentary processes with tectonic events over epochs have
formed Siletzia, and other formations along the coastal areas in Lincoln County.
“Siletzia is the massive formation of early to middle Eocene epoch marine basalts and
interbedded sediments in the forearc of the Cascadia subduction zone; this forms the
basement rock under western Oregon and Washington and the southern tip of
Vancouver Island.[1] It is now fragmented into the Siletz and Crescent terranes. Siletzia
corresponds geographically to the Coast Range Volcanic Province (or Coast Range
basalts),but is distinguished from slightly younger basalts that erupted after Siletzia
accreted to the continent and they differ in chemical composition. The Siletzia basalts
are tholeiitic, a characteristic of mantle-derived magma erupted from a spreading ridge
between plates of oceanic crust. The younger basalts are alkalic or calc-alkaline,
characteristic of magmas derived from a subduction zone.This change of composition
reflects a change from marine to continental volcanism that becomes evident around 48
to 42 Ma (millions of years ago), and is attributed to the accretion of Siletzia against the
North American continent.
Various theories have been proposed to account for the volume and diversity of
Siletzian magmatism, as well as the approximately 75° of rotation, but the evidence is
insufficient to determine Siletzia's origin; the question remains open. The accretion of
Siletzia against the North American continent approximately 50 million years ago
(contemporaneous with the initiation of the bend in the Hawaiian-Emperor seamount
chain) was a major tectonic event associated with a reorganization of the earth's tectonic
plates.[8] This is believed to have a caused a shift in the subduction zone, termination of
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 54 of 224
the Laramide orogeny that was uplifting the Rocky Mountains, and major changes in
tectonic and volcanic activity across much of western North America. (Wells)
Much of the montaine soil in Lincoln County is characterized by variable thickness of
parent material, moderate to rapid runoff, and moderate to extreme erosion hazard in
some locales. Siletz Volcanics and Tyee soil formation along terraces above the riparian
zone soils have some area of high to moderate runoff and slight to high erosion
potential depending on the steepness of slope and vegetative characteristics. Lowland
soils in the Siletz Valley are the products of ongoing accretion and depositional events,
adfluvial depositional events, and oceanic deposition events on high wind high water
winter storm events. The deep alluvial soils are rich in minerals and Siletz volcanics
from from 50 mya provide some consistency to soil formation and loss along the
riverscape. (NRCS) The soils that are closer to the coastline have hazard qualities that
are far different than inland soils, due to the erosional properties of sand and the
physical characteristics of the parent material (e.g. tensile strength, porosity of coastal
parent material, liquefaction, weathering, etc.)
Potential soil related hazards include; landslides, shallow soils to water table, shallow
soils subject to deterioration and when they are inundated, towards mass erosion and
liquefaction, an earthquake related hazard where sandy silt soils turn from a solid state
to a liquid state as a result of stress and pressure.
Extraction based industrial forest management has created some additional landslide
and liquefaction areas wherein tree plantations have removed parent material
composition that allows for higher sheer and sheet stresses at shallower root
development locations. SLIDO data from the State of Oregon maps are shown in
exhibits ______
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 55 of 224
Rivers
Within the boundary of Lincoln County lies the majority of the Siletz River drainage
basin. The basin covers an area of approximately 373 square miles. This is unique for a
county boundary to entirely encompass a major river watershed. See Figure 3-3.
The Siletz Basin has a myriad of minor and major streams. The Siletz River, which
meanders westward and joins the Pacific Ocean near (south of) Lincoln City, Oregon.
The Siletz River flows roughly 67 miles from the headwaters at and above Valsetz . The
River drains an area of approximately 373 square miles. There are many major streams,
and some of the major tributaries include Eagle Creek, Buck Creek, Cedar Creek, Elk
Creek, Sunshine Creek, Palmer Creek, Baker Creek, Mill Creek, Euchre Creek, Big Rock
and Little Rock Creeks, Reed Creek, and many other smaller order streams. Stream size,
depths, discharge, and gradients in the basin vary greatly.
The Siletz River broken down in to sections for gradient, discharge, and classes:
Section: Moonshine Park to Sam Creek Bridge
Class: I II
Station #:14305500
USGS ID #:14305500
NWS ID: SILO3
Latitude: 44.71511720 Longitude:-123.88733480
Length : 7 miles
Gradient: 12 feet/mile
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 56 of 224
Elevation Lost: 84feet
Low Flow: 300 CFS
High Flow: 4000 CFS
Section: Elk Creek to Buck Creek
Class: III IV
Length: 4.5 miles
Gradient: 20 feet/mile
Elevation Lost: 100feet
Low Flow: 750 CFS
High Flow: 5000 CFS
Section: Buck Creek to Moonshine Park
Class: III IV V
Length: 6.5 miles
Gradient: 40 feet/mile
Elevation Lost: 260feet
Low Flow: 1000 CFS
High Flow: 6000 CFS
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 57 of 224
Section: Sam Creek
Class: I
Length: 10 miles
Gradient: 10 feet/mile
Elevation Lost: 100feet
Low Flow: 400 CFS
High Flow: 2000 CFS
On the Siletz, there is a gentle average gradient from Hee Hee Illahee at Siletz, to the
confluence of the Siletz River and Millport Slough, Drift Creek, and Schooner Creek at
Siletz Bay.
Tribal Lands and Property
The Tribe’s historical, culturally significant, and aboriginal Lands span all of Western
Oregon, parts of Northern California, and beyond. The original Coast Reservation is an
area approximately 1.1 million acres in size, spanning from Cape Lookout in the North
due east to the 8th Township line, and south to the mouth of the Siltcoos River. The
Tribe’s treaty ceded land is generally defined as the 1855 Coast Reservation (or the
Confederated Tribes of Siletz original Reservation, Coast Reservation, et al.) The Siletz
River basin between Siletz and the Salmon and Yaquina Watersheds is about 942 miles
in size (as estimated using georeferenced ESRI data and simple measuring of the
watersheds by CTSI GIS Staff).
Current Tribal Lands & Reservation
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 58 of 224
As of 2018-, Confederated Tribes of Siletz Tribal lands total about 15,800 acres
comprising 313 parcels. Properties are located in the towns and unincorporated areas
between Siletz, Lincoln City, Newport, Toledo, rural Lincoln County, Salem, Portland,
Eugene, and Douglas County. Most properties and development are located in the
Lincoln County area. Tribal housing developments are located in Siletz and Lincoln
City. Currently the Tribe has 15,147 acres of forest lands, and an additional 86 acres of
vacant/undeveloped land.
Trust Status
Historic Sites
The Confederated Tribes of Siletz Tribe’s aboriginal areas span all of Western Oregon to
Northern California. The lands have been inhabited since time immemorial, and until
the last several hundred years, the Tribes and Bands were interconnected by a vast and
established system of social and ecological balances with other tribes and trade and
potlatch society was regular with a network of routes joining the Pacific Northwest’s
Indigenous Peoples. For this plan, particular historical cultural locations are not
specifically identified for hazard analysis, although some of them lay within the
boundaries of the 1855 reservation, and also fall in to known critical analysis areas. The
Siletz Tribe and the many bands that makeup the Tribe have been here since time
immemorial, and the waters and land that make up Western Oregon area all sacred to
the Tribe.
Climate
In the Siletz Valley, the maritime influence from the Pacific Ocean creates the localized
climate for seasonal temperatures and rainfall. The precipitation and weather events
blow over the Coast Range, through the inland valleys, and up to the Cascade
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 59 of 224
Mountains. The maritime climate provides ample precipitation over the wet season, and
has high variability when considering the El Nino Southern Oscillation (ENSO) and
Pacific Decadal Oscillation (PDO). The coastal areas have the most moderate fluctuality
in between seasons, while the inland areas in Lincoln County have higher temperatures
in summer, and much lower, and often freezing and snowy winters in to the Coast
Range. The inland valleys experience the hottest summer sun, while the Cascades to the
East witness the most extreme winter temperatures and storms.
The ocean winds lose some of their velocity, and much of their moisture as they climb
the Coast Range and enter the inland valleys. Coastal Lincoln County receives the most
rainfall, reporting 100+/- inches per year at Cascade Head Scenic Research Area, and
over 100 inches per year in many locales within the Coast Range. Newport receives on
average 67 +/- inches of rain, and Siletz (as recorded) is near 70 inches per annum.
In summer, the average countywide temperature ranges between 52 and 70 degrees
Fahrenheit. In winter, the average temperature does not drop to far below 40 degrees
Fahrenheit very often, although some winter storms typically bring several inches of
snow every year. This temperature climate is due, in part, to the oceanic and maritime
climate brought by winds from the Eastern Pacific Ocean oscillations including the
(PDO). The protected coastal valleys are home to Elk, Deer, Black Bear, Cougar, Pine
Marten, and many other species. Dominant tree cover type remains Sitka Spruce,
Western Hemlock, Red Alder, Coastal Douglas Fir (including industrial tree plantation),
Western Red Cedar, and Big Leaf Maple. Here rainfall averages 67+ inches annually.
There is a steep gradient of rainfall differences from north to south in Lincoln County,
ranging from 100+ inches at Cascade Head Scenic Research Area in the North, to the
low 60’s south of Newport. This gradient is caused by topography and localized
oscillations off the Pacific Ocean. This maritime rainforest climate is marked with
comfortable winters with regular winter storms and winds reaching 100 mph, followed
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 60 of 224
by mild and wet Spring, and temperatures rarely reaching 100 in the Summer. Days
without frost generally occur between April and October. The first hard frost usually
does not arrive until December.
3. Tribal History
Today's members of the Confederated Tribes of Siletz Tribe are descendants of a people
who for thousands of years lived in the watersheds of the entirety of the Oregon Coast,
and areas far north and south of the Siletz River. Siletz Tribal ancestors signed a
number of treaties between 1851 & 1855 with the United States Government. The
earliest of these treaties to become ratified was the Rogue River Treaty of September 10,
1853. Nine days after this Rogue River Treaty was signed, a treaty was concluded with
our ancestors living in the Cow Creek drainage. The two treaties went side by side
through the complete process of being ratified by the U.S. Senate and being proclaimed
law by the President. They were both ratified on April 12, 1854 and proclaimed on the
5th of February 1855.The ancestral territory included more than 1,100,000 acres, which,
as part of their Treaty with the United States, was ratified on November 9 th, 1855.
Finally, all of the correspondence and comments on BIA Superintendent Joel Palmer's
original request fell into place, and the Coast Reservation was established by an
Executive Order signed by President Franklin Pierce. This Treaty left the Tribe with the
entirety of the lands that span from Cape Lookout in the North, to the 8 th Township line,
and south, to the mouth of the Siltcoos River. Shortly after signing the treaties, the
Confederated Tribes of Siletz people were forced onto already established reservation
lands; the Siletz Indian Reservation and the Grande Ronde Indian Reservation, north of
the Confederated Tribes of Siletz Tribe's traditional territory.
In 1954, the federal government terminated the Confederated Tribes of Siletz Tribe
before it gained official recognition and without prior notice to the Tribe. The
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 61 of 224
Confederated Tribes of Siletz Tribe, however, was recognized by the United States for
purposes of involuntary termination by the government. This resulted in the
Confederated Tribes of Siletz Tribe being restored in November 1977 by public law 95195. The Confederated Tribes of Siletz Tribe has subsequently made several land
purchases, and today the Tribe owns 15,780 acres of land in Oregon.
The Confederated Tribes of Siletz Indians offers many programs and services to eligible
tribal members. These services include housing, education, health, social and
employment services. Some programs and services have an income and/or residency
requirement to access. Others are provided, regardless of income or residency. Some of
the most common programs are listed in the tabs below. The Confederated Tribes of
Siletz has numerous services to offer our tribal members.
From Confederated Tribes of Siletz Written History: (Robert Kentta) It is difficult to say
who the earliest European was to spot our coastline from the deck of his sailing ship.
Whoever that first European was, it is possible that there had already been significant
changes our people had undergone, because of hemisphere-wide epidemics resulting
from Columbus' contact with native people on the east coast in 1492. Many foreign
governments competed for several centuries to explore & map the surface of the earth,
building vast empires by claiming "discovery rights" to all lands & resources they
encountered which didn't already have a strong, recognized European presence.
There is currently a debate going on about whether Sir Francis Drake's vessels made it
this far north in 1579. There is some pretty compelling evidence (Elizabethan coins
found in this area, etc.) and there are also lots of firsthand accounts & "pioneer folk
tales" of fifteenth century English swords and other paraphernalia being found here
locally. Whatever the earliest provable direct contact with our people was, it is clear that
if the people weren't already impacted by the influences (diseases) that contact on the
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 62 of 224
East Coast had transmitted, our ancestors were very soon to experience the ravages of
catastrophic deadly pandemics.
In an epidemic, there is a significant number of the population affected. In a pandemic,
all or nearly all of the population is affected. Beginning by at least the 1770's there were
a good number of direct contacts made between our people on the coast and the trade &
exploration ships. Smallpox was one of several diseases transmitted during these visits.
Our people had no resistance to these diseases, we have all heard this, but I don't know
if any of us can really understand the physical, social, cultural & political devastation
that was the effect. It is estimated that during each of the major pandemic episodes,
from 75% to 90% of the population was killed. In some localized areas, whole large
villages disappeared.
Although most of the trading contacts were in themselves peaceful, the Europeans, did
not consider the fact that they were in a foreign land and subject to local laws and
customs. Being very ethnocentric in their dealings with our people, and communicating
entirely through signs and gestures, misunderstandings quickly arose and the result
was sometimes bloodshed. The often rude manners of the visitors coupled with the fact
that it probably did not take our ancestors long to recognize the source of the
pandemics, probably quickly developed into a building and intense resentment among
many of our people. There are also signs of many of our ancestors being fairly forgiving
and endlessly friendly to the visitors, soon to be invaders. Trade along the coast
continued and intensified at intervals.
The first overland journey into our country was the Lewis & Clark Expedition in 1805.
They made many notes on the locations of major villages along the lower Columbia
River, their populations and other information. They noted that there were villages that
had been totally de-populated by disease. The houses were left standing, with the
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 63 of 224
people's bodies scattered about. No one was even left to bury the dead. It is hard to
relate to a disease carrying people off that quickly, but a tribal ancestor Hoxie Simmons
made comments that were recorded that told the story. He said that the people would
begin to feel ill, and would go into the sweathouse to try to break the fever. Then, as
was the custom, they would go jump in the river to cool off. The disease moved so
quickly, that he said many did not even make it back from the river.
The Fur Trade Era is often described as a friendly period of "free trade." That may have
been true in some cases, especially in the earliest phases. But, as soon the trappers got to
know the lay of the land & how to get from one place to another, they began engaging
us in economic warfare by running their own trap lines in our country, instead of
depending upon our people selling them furs. These were some of the early signs of
things to expect of the foreigners - taking without permission or apology.
In the early trade on the coast, the Spanish & Russians (as well as the British, Americans
& others) had been involved to some degree, but by the mid 1820's, the only two
remaining fur trade competitors were the Hudson Bay Co (British) and the Pacific Fur
Co. (USA). Fort Astoria (P.F. Co.) & Fort Vancouver (H.B. Co.) had been built as signs of
the political posturing that was the reality of the day. There were also many smaller
outposts & trap lines that were manned by employees of the fur companies.
While the US Constitution recognized our native people's right to our homelands
(Aboriginal Title), the United States also participated in constitutionally contradictory
political practices & subscribed to the same European concepts that permitted
colonization of foreign lands & peoples and empire building by European nations.
In 1832 there was an attack ordered on the Yaquinas by John McLaughlin, Chief Factor
at the Hudson Bay Co. post at Ft. Vancouver. This attack was brought on because two
HBC trappers were running a trap line in the Yaquina/Alsea territory without
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 64 of 224
permission of our local people. The trappers paid for their disrespect with their lives.
When news of their deaths reached Ft. Vancouver, John McLaughlin ordered some HBC
employees to teach the natives of the north central coast a lesson. He wasn't sure who
was even responsible, but thought that a reprisal anywhere in the neighborhood, issued
with sufficient force, would deliver the desired message.
This attack on a village at Yaquina Bay in 1832 (well documented in both HBC records
and our tribal oral histories) was brutal enough that it (combined with the epidemics)
was given as a reason that so few Yaquina people survived into the reservation period.
Some of the fur trappers & traders took Indian wives, such as Jean Baptiste Garnier on
the Umpqua River, and many of the fur company employees who stayed on in the
Willamette Valley. This eased some of the relationships in local areas, but strangers
stomping through our lands with little respect or humility were not welcomed.
As the fur trade era faded, many of the trappers turned farmer, & by the late 1830's
there were various missionary settlements revolving around the main Methodist
Mission at what is now Willamette University (Salem). A mission school for our
children of the valley was one of the first non-Indian structures in that part of the
valley. The relationships between our tribal people & the settlers changed slightly or
radically depending on the rate of population influx, and the main activity of the new
population, as the focus switched in different areas from fur trade to permanent
settlement activities.
It doesn't appear that our ancestors resisted settlement to the point that they thought
that all foreigners needed to be kept out, but instead tried to accommodate settlers who
were respectful. However, each year our people grew weaker in number as the
strangers grew stronger in number and presence. The signing of a treaty between Great
Britain and the United States in 1846, and the subsequent establishment Oregon
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 65 of 224
Territory, & a provisional government as a part of the United States would change the
form and direction that all future encroachment on our homelands would take.
– CTSI Historical Text
Tribal Member Population and Area Numbers
There are not accurate historical population counts available for many bands in the
early recorded history of the Tribe, it is however known those interactions with fur
trappers and traders and other Europeans in the 1700 and early 1800’s decimated entire
villages by introducing various diseases. According to a study of the Tribe’s population,
as of 2019, the Tribe included 5,468 members.
Of the 5,468 Tribal Members, the median age was 30. Of the 5,468 Tribal Members,
many resided in Lincoln County, 23% or 1,242 of the total population. A total of 3,187
Tribal Members live within the eleven county service area (Map of 11 county in
appendices) and more Tribal Members live in several other Oregon Counties (which
together with Lincoln County comprise the Tribe’s Service Area include all of Oregon)
as follows:
Clackamas County (188 members)
Multnomah County (299 members)
Washington County (121 members)
Marion County (654 members)
Polk County (74 members)
Yamhill County (61 members)
Benton County (76 members)
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 66 of 224
Lane (322 members)
Linn (135 members)
Tillamook (15 members)
Economic
In May of 1995, the Tribe completed the building of Chinook Winds Casino and Resort.
After intense planning and three years of negotiation at the local, state and federal level,
the Siletz Tribe opened a 10,000 square foot temporary facility known affectionately as
“The Tent.” With only 250 slots, 12 card tables and a small deli, “the tent” opened under
the name “Chinook Winds Gaming Center.” Meanwhile, just north of the temporary
facility, construction began on Chinook Winds’ current home. Just over one year later,
the grand opening of Chinook Winds Casino Resort’s permanent facility took place on
June 28, 1996. Later, STGC and STBC were established and created to take the lead in
making the Tribe economically self-sufficient. Working closely with the Tribal Council,
STBC manages and administers the Tribe's business ventures. And CWCR and STGC
are the most financially productive venue and single entity the Tribe owns.
The Confederated Tribes of Siletz Tribe is the largest employer in Lincoln County,
employing over 1,000 people. As of October 2019, about 73% of the Tribe's employees
work at Chinook Winds Casino and Resort (including the Golf Club and CWCR Hotel).
Tribal businesses account for one in every 20 jobs in Lincoln County, according to
census numbers of total jobs within Lincoln County.
Tribal Holdings, Facilities, and Administration Breakdown
Chinook Winds Casino and Resort
Tribal Administration (Buildings I and II in Siletz)
Area Office Buildings (Salem Area, Eugene Area, Portland Area)
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 67 of 224
Confederated Tribes of Siletz Health Clinic
Tenas Illahee Child Care Center
Siletz Tribal HeadstartChinook Winds Casino Resort
Chinook Winds Hotel
Chinook Winds Golf Resort
CTSI
Lincoln Shores Office Building
Salem Commercial Building (Harbor Freight Bldg)
The following are owned and/or operated by STBC:
Hee Hee Illahee RV Park
Logan Road RV Park
Toledo Mill Property
Depoe Bay Building
Salem Flex Office Building
Eugene Office Building
Gift shop in Lincoln City
Employees by Tribal Agency
CWCR/Golf Club/Hotel- 769
CTSI – 255 (Which includes temps, IAD, and non-employee Tribal Council members)
TICC - 17
STBC - 4
STGC – 11
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 68 of 224
A brief on Tribal Oral History and sharing on Hazards in the Tribe’s Aboriginal
Lands
There are lots of stories on natural disasters/phenomena handed down through the
generations of Siletz Tribal Members.
Landslides: Apparently even more recently in history than the devastating Ozette
landslide that suddenly covered and killed part of the Ozette Village in NW
Washington, there is at least one similar incident that covered/killed an entire village at
Whales Head on the SW Oregon Coast. An old woman was the first one up in the
village to the South one morning, and noticed there wasn’t any smoke visible, as should
have/always had been coming from that next village up the coast. She rousted others
and pointed that out. All the men went in canoes up the coast, and found that a
landslide had come down and covered/smooshed out into the creek-bed the entire
village - apparently during the night, as people were asleep - and so suddenly, that
nobody escaped. It was a place avoided afterwards. It was so shocking to the people
who found it - because they did not see an immediate cause - it just happened. The
story teller who passed this down in the 1940’s said: those people thought “perhaps the
Illahee shake, but they did not know it” (maybe there was an earthquake that they
didn’t feel) - in trying to justify the loss of a whole village that way..... when it was not
an overly rainy period, etc. The people in the village to the south became known as
Nalh-Tene-Tun-ne (movement+trail+place+people (of)).... the trail that used to go from
that village to Whales Head Village was discontinued....and the new trail skirted
around that place, avoiding the whole area, instead going to the next village north.
There is another location up the Rogue where an apparently much older village site
deposit is eroding out from under a thick layer of “clay bank” - another apparent
devastating, village-killing landslide episode.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 69 of 224
Floods/Tsunamis- Of course the Siletz People have flood stories - some so bizarrely
epic, that they may refer back to witnessing the Missoula Floods (a series of extreme
Flood events that inundated the Willamette Valley, over a thousand years or so - when
gigantic ice dams broke in what is now Montana, sending millions of acre-feet of water
rushing down the Columbia. Those floods, created the broad, flat, Willamette Valley
floor, dropping an unimaginable combined sediment load - accumulating in-totals of
hundreds of feet in some places. Ice-Age megafauna remains (Mammoth, etc.) are
frequently found deep in these sediments, sometimes appearing to have been deposited
there as dis-articulated (ripped apart) megafauna, who were caught in the flood and
killed, their corpses being shredded by the violence, and body parts washing up, or
sinking to the bottom when waters stilled..... and being trapped in the new sediments and hence good preservation - yet of not-complete individual animals.
Stories like “The Inland Whale” - also may harken to extreme flood events.
Many of what are told as “Flood” stories may also be Tsunami remembrances - because
that is how they are usually experienced - as a (seemingly) never-ending incoming
tide.... some Tribal origin stories lay down the foundation of creation - the time of
people being created, and then at some (Later) time period, an epic flood or tide comes
and floods nearly the entire known “world” mountaintops and canoes are the refuge of
a few individuals who come together after this event and form the foundations of all
future generations for those people.
South Wind Woman: Out most violent winds are generally associated with weather
events/storm systems coming out of the South. Tillamook people oral traditions call this
“South Wind Woman” in stories. A character who wreaks havoc.
Wildfires: many wildfires are recorded in our oral histories. Extreme 1846-48 Wildfires
in the Siuslaw/Alsea district, and some of our Alsea people being trapped on the coast CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 70 of 224
nearly roasted alive on the bare rocks at mouth of Cape Creek near (now) Heceta
Lighthouse..... (Lhtowaisk - “the protected place”) are recorded in an (eye witness) oral
history collected at Siletz in the early 1900’s and published in Alsea Texts by Leo J.
Frachtenburg.
Our old people of early settlement period knew wild-fires. Much more of the country
had been maintained with “prescribed burns” used to keep berry picking places
cleaned up and in peak production, hunting areas/forage good, traditional food patches
such a Camas, Tarweed Seed, Acorns (and many others) in peak production. The
epidemics reduced populations so drastically that much of the country was suddenly
not Maintained - became quickly brushy - full of accumulating ladder fuels - that had
been frequently handled with low intensity burns at appropriate seasons before.
Early settlers in the inland valleys caused many of the devastating fires that came in this
period - clearing land, clearing land - was their cause. They set fires at inappropriate
times to create new/better forage for livestock, clear brush and timber for homes and
farms, didn’t care what havoc or loss of life it meant for Tribal peoples in the Coast
Range, or Cascades.
Our people burned for many reasons, at different and appropriate seasons, often setting
low, crawling/scorching fires that were set so frequently (most years annually) and as
the people were leaving mountain berry picking grounds for the year in the Fall (for
instance) - that there were low fuel loads, and wet weather and eventually snow
controlled and put out these fires over the Fall/Winter, even if they crawled into denser
fuels before going out.
Today’s conifer forest oriented - tree farming practices have thrown this whole region
into an unsafe condition. Meadows are non-existent or not maintained as fuel breaks,
mountain ridge berry grounds are not maintained as open fuel breaks, headlands on the
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 71 of 224
coast want to have million dollar homes with multi-million dollar views, rather than
leave those as open (maintained by fire) coastal hillside prairies....
Confederated Tribes of Siletz Indians Asset Inventory
ASSET INVENTORY
Developing an asset inventory is the first step of a vulnerability analysis. CTSI assets
that may be affected by hazard events include population, residential and
nonresidential buildings, critical facilities, and infrastructure. Only specific facilities
need insurance due to CTSI's limited infrastructure and widely dispersed locations;
these facilities were identified within each hazard's profile.
The asset inventory delineates the Tribe’s existing building and infrastructure assets
and insured values and are identified in detail. Asset Inventory listed below portrays
the population and residential and non-residential structures numbers and values, and
their potential vulnerability by hazard type (where available).
3. Buildings and Critical Facilities
Buildings
Using the Tribe’s Insurance Statement of Values for 2019, an analysis of tribal buildings
and facilities was conducted by GIS Analyst Ian Keene and DOGAMI/FEMA personnel.
In total, it was determined that the Tribe had 234 buildings valued at approximately $
72,987,378. These 234 buildings, including Chinook Winds Casino and Resort, Toledo
Mill Site, Administration Buildings in Lincoln City and Siletz, HUD-built homes for
tribal members, and other residences and Tribal Buildings are all located in Lincoln
County, and do not include the Siletz Tribe’s Portland, Salem, and Eugene real estate
holdings. Other structures include the Tribal Administration & Health Clinic buildings
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 72 of 224
in Siletz, USDA and Fleet Vehicle, Public Works Shops and Buildings, and the Fish
Hatchery Buildings and infrastructure.
The remaining structures are used for tribal businesses, investments and facilities.
These buildings include office buildings in Lincoln City and Depoe Bay, residential
tracts in Siletz, barns and other farm related structures on several properties towards
Logsden, storage facilities at the Dundas Property on Logsden Road, other homes with
garages and sheds, back-up generators and other miscellaneous structures. The most
valuable structure is the $44,990,000 Chinook Winds Casino and Resort, with the
remaining structures worth about $28,600,000 (according to HAZUS analysis of value,
Insurance Values are considerably higher)a.
The Fish Hatchery and associated Timber Lands in Lincoln County were not a part of
the Critical Facilities list, nor are the Timberlands associated with economic losses
within the HAZUS software platform and subsequent analysis performed for
consideration while pursuing FEMA funding for hazard mitigation planning.
Planning and Technical Meetings
The Steering Committee along with FEMA personnel held technical review meetings in
May, June, July, August, September, and October of 2018
As an example of what was reviewed during these workshops below is from July
meeting
From July 17, 2018
FEMA Technical Assistance Workshop #2
Technical Assistance Workshop #1 recap:
Described the hazard mitigation planning process and FEMA requirements
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 73 of 224
Defined mitigation
Began to identify critical facilities, essential infrastructure, and locations of
cultural value
Distributed the Capability Assessment Worksheet to be completed by members
of the planning team
Standalone Plan:
It was agreed upon by the planning team and tribal council that the tribe will
update its own, standalone Tribal Hazard Mitigation Plan
It was agreed upon that tribal lands and properties in the Portland, Salem, and
Eugene areas are adequately covered by existing hazard mitigation plans for
those areas and will not be a part of the planning area for this plan
Risk Assessment:
Ian Keene passed out demographic data, a report by CTSI Planning, and an
Oregon State University report on climate change impacts describing potential
hazards to water resources
Ian displayed GIS-based hazard information with the planning team to identify
areas at risk to various hazards. He provided additional materials (maps, data,
reports, etc.) to the planning team via e-mail at the end of the workshop
Analysis for next steps:
The planning team needs to complete the hazard inventory and risk assessment
work:
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 74 of 224
o See the Risk Assessment notes taken by Amanda Siok (FEMA, Mitigation
Planner), to support the plan’s update to the risk assessment
Homework:
o Complete and compile the capability assessment discussed during
workshop 1
o Develop “Problem Statements” in advance.
o
Determine how/when the public will be engaged in the planning process
(required for FEMA hazard mitigation plan approval). The group
discussed potential public input opportunities as:
Ask the public (via booth at existing event) what hazard/disaster
the tribe should be more resilient to
Ask the public for suggestions on how to reduce the risk to ____
Hazards (planning team chooses 1-3 hazards for public input).
(Bullet 1 and 2 could be combined for one outreach activity)
Ask the public to vote on the top 5-10 mitigation strategies
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 75 of 224
Critical Facilities
"Critical facilities" are defined as those structures from which essential services and
functions for victim survival, continuation of public safety actions, and disaster
recovery are performed or provided. Shelters, emergency operation centers, public
health, public drinking water, sewer and wastewater facilities are examples of critical
facilities. Though not explicitly included in the definition, supporting life-line
infrastructure essential to the mission of critical facilities must also be included in the
inventory when appropriate. Some essential economic-generating facilities may also be
considered.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 76 of 224
For this inventory, the Tribe’s critical facilities are shown in the Table below
Critical Assets List for Tribal Council Meeting (5/17/19)
In the table below is a comprehensive list of critical assets that the Multi Hazard
Mitigation Plans’ Steering Committee compiled. These assets were compiled by tribal
member survey responses, steering committee survey responses and previous listed
assets on our previous MHMP.
*Note - Future plan updates can list additional assets if CTSI administration, Tribal
Council, and/or Tribal Staff consider that a critical asset has either been omitted, built,
and/or added to the Tribal list of assets
ASSETS
Chinook Winds Hotel
Casino
Lincoln Shores (STBC/STGC)
Administration Bldg. 1
Administration Bldg. 2
USDA Bldg.
Gas Station
Community Center
SR 229
Siletz Community Health Clinic
Tribal Housing Units
Water Distribution System
Cultural Repository
Public Works Bldg.
Siletz Charter School & Head Start
Child Care Center
Siletz Valley Fire Department
Number of Committee Votes
7
6
5
8
5
5
6
6
6
12
6
9
6
7
9
5
7
*Please note that these facilities may include multiple structures.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 77 of 224
4. Risk Assessment
Introduction
This chapter will identify the potential natural hazards that could affect the
Confederated Tribes of Siletz Tribal Members and Administration Area within the
Coastal Counties, namely and mainly Lincoln County, but not to be limited to Coos,
Tillamook, Linn, Benton, Lane, Marion, Polk, and more. The plan is to assess the
vulnerabilities of its people, property and natural environment, simultaneously for
CTSI, Siletz Tribal Business Corporation (STBC), and the Siletz Tribal Gaming
Commission (STGC).
The geographic focus of the Risk Assessment was the Tribe’s Lincoln County holdings,
but also including in this plan is analysis that included areas within the Tribe’s 1855
Coast Reservation boundary. The HAZUS and data analysis is also namely Lincoln
County area land holdings. The Siletz River watershed and the remainder of
watersheds in Lincoln County with attention and analysis focused on the Siletz,
Newport, Toledo, and Lincoln City areas along the Highway 101 corridor, and in the
Township of Siletz, where the majority of Tribe’s facilities and properties are located.
Hazards Profiled
Risk assessments that provide the factual basis for activities proposed in the strategy
portion of the mitigation plan. Statewide risk assessments must characterize and
analyze natural hazards and risks to provide a statewide overview. This overview will
allow the Tribe to compare potential losses throughout the Tribe’s known area, and to
determine our priorities for implementing mitigation measures under the strategy, and
to prioritize jurisdictions for receiving technical and financial support in developing
more detailed local risk and vulnerability assessments. The risk assessment shall
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 78 of 224
include the following (Per FEMA CFR [67 FR 8848, Feb. 26, 2002, as amended at 67 FR
61515, Oct. 1, 2002; 69 FR 55096, Sept. 13, 2004; 72 FR 61565, 61738, Oct. 31, 2007; 79 FR
22883, Apr. 25, 2014; 79 FR 76085, Dec. 19, 2014; 80 FR 59551, Oct. 2, 2015]
(i)
An overview of the type and location of all natural hazards that can affect the
Tribe, including information on previous occurrences of hazard events, as
well as the probability of future hazard events, using maps where
appropriate;
(ii)
An overview and analysis of the State's vulnerability to the hazards described
in this paragraph (c)(2), based on estimates provided in local risk assessments
as well as the Lincoln County risk assessment performed by Matt Williams
and DOGAMI and Oregon State risk assessment. The State shall describe
vulnerability in terms of the jurisdictions most threatened by the identified
hazards, and most vulnerable to damage and loss associated with hazard
events. State owned or operated critical facilities located in the identified
hazard areas shall also be addressed;
(iii)
An overview and analysis of potential losses to the identified vulnerable
structures, based on estimates provided in local risk assessments as well as
the State risk assessment (HAZUS performed by CTSI and State employees).
The State shall estimate the potential dollar losses to State owned or operated
buildings, infrastructure, and critical facilities located in the identified hazard
areas.
ASSET INVENTORY
Developing an asset inventory is the first step of a vulnerability analysis. CTSI assets
that may be affected by hazard events include population, residential and
nonresidential buildings, critical facilities, and infrastructure. Only specific facilities
need insurance due to CTSI's limited infrastructure and widely dispersed locations;
these facilities were identified within each hazard's profile.
The asset inventory delineates the Tribe’s existing building and infrastructure assets
and insured values and are identified in detail in Tables ________ portray the
population and residential and non-residential structures numbers and values, and
their potential vulnerability by hazard type (where available).
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 79 of 224
Siletz Tribal Business Cooperation (STBC)
Buildings and Critical Facilities
Buildings
Using the Tribe’s Insurance Statement of Values for 2019, an analysis of tribal buildings
and facilities was conducted by GIS Analyst Ian Keene and DOGAMI/FEMA personnel.
In total, it was determined that the Tribe had 234 buildings valued at approximately
$72,987,378. These 234 buildings, including Chinook Winds Casino and Resort, Toledo
Mill Site, Administration Buildings in Lincoln City and Siletz, HUD-built homes for
tribal members, and other residences and Tribal Buildings are all located in Lincoln
County, and do not include the Siletz Tribe’s Portland, Salem, and Eugene real estate
holdings. Other structures include the Tribal Administration & Health Clinic buildings
in Siletz, USDA and Fleet Vehicle, Public Works Shops and Buildings, and the Fish
Hatchery Buildings and infrastructure.
The remaining structures are used for tribal businesses, investments and facilities.
These buildings include office buildings in Lincoln City and Depoe Bay, residential
tracts in Siletz, barns and other farm related structures on several properties towards
Logsden, storage facilities at the Dundas Property on Logsden Road, other homes with
garages and sheds, back-up generators and other miscellaneous structures. The most
valuable structure are the $44,990,000 Chinook Winds Casino and Resort, with the
remaining structures worth about $28,600,000 (according to HAZUS analysis of value,
Insurance Values are considerably higher). The total values listed for the HAZUS data
analysis were mentioned above, and do not reflect the values listed with CTSI insurance
policies, and are not considered to be a valuation of CTSI holdings.
The Fish Hatchery and associated Timber Lands in Lincoln County were not a part of
the Critical Facilities list, nor are the Timberlands associated with economic losses
within the HAZUS software platform and subsequent analysis performed for
consideration while pursuing FEMA funding for hazard mitigation planning.
Below is a list of Property names owned by CTSI: (for further information on individual
properties relating to Mitigation Planning contact the CTSI Planning Department)
Siletz Area
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 80 of 224
Aldridge
Bagley
Bishop (part of "BBS")
Briley (part of "BBS"
Burnham
Burnham 2
Collson
Crawford (Buford)
Dickenson (Oak Flats)
Oak Flats Development
Dundas
Eight-Plex
Faulkner
Faulkner House
Gomes
Government Hill
Grimstad
Grooms
Hueth
Hursh
Jebert
Judd
Silatchee Development
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 81 of 224
Chetco Playground
Cell Tower
Judd Siding Replacement
Judd Home Wat. Meters Replmnt.
STHD 17 Units
Judd Sidewalks
Silatchee Park & Tootootney Improvements
Mitchell
Metcalf
Miller
Muschamp
Nashif
Paul Washington Cemetery
Seitz (part of "BBS")
Sexton
Trask (Meat Lockers)
Vearl Ray
Wood (Mini Mart)
Lincoln City Area
Chinook Winds Resort
Hemstreet Parking Lots
Lakeside Golf Course
Lakeside Village
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 82 of 224
Lincoln Shores (Casino)
Lincoln Shores Offices
Logan Road
Lot 57
Mast
Morris Cemetery (Lincoln City Cemetery)
Otis Cemetery
Teeny
Toledo Area
Toledo Mill
Depoe Bay Area
Neptune's Reserve
Seal Rock Area
Lyford
Portland
Portland Area Office
Salem
Chemawa
Robertson
Wyant
Wyant 2
Eugene
Eugene Area Office
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 83 of 224
Timberlands
229 West (Fisher)
Arnold Creek
Arnold II
Camp 12 (Cutsforth)
Coop (Bulls Bag)
Hatchery I & II
Lower 5 Mile
Reed Creek
Tahkenitch A
Tahkenitch B
Tahkenitch C
Tahkenitch D
Tahkenitch E
Timberlands
South Diamond
North Diamond
Blue Jay, Gunn Creek, Lower Gorge, Red Ant
North Fork Falls
South fork,
Sugas Hill
Burbank Creek
Mill Creek
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 84 of 224
Cerine Creek
Headwaters
Dry Creek
Brush Creek
Little Rock Creek
Bryant Creek
Sam Creek
Twin Bridges
Section Eight
Northon Hill #1 & #2
Long Sam
Long Prairie #` & #2
Thayer Creek
Thornton Creek
Bale Creek
Yaquina
Long Tom
Twenty Three Creek
Pioneer Mountain
Ollala
Cook Creek
Truman - Calhoun
Other Areas
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 85 of 224
Harney/Evans Cemetery
Medicine Rock
Collamer 1/2 Interest
Bishop
Gas Station
The first step in preparing a risk assessment for the Confederated Tribes of Siletz is to
identify which natural hazards affect the Tribe. Numerous documents, including the
Lincoln County Natural Hazards Mitigation Plan, The Fire Planning documents from
Lincoln county and Oregon Department of Forestry, the State of Oregon Natural
Hazard Planning documents, and more were reviewed. The County encompasses most
of the Salmon, Siletz, and Yaquina Rivers and watersheds and thus the County Plan
analyzes Tribal areas within the scope of this plan as well. The jurisdiction of the Siletz
Tribe is not limited to the scope of this mitigation planning document, nor is this
mitigation planning document limiting the area in which the Tribe will choose to
operate in the future. Instead, like all planning documents, this mitigation plan update
is designed to offer a planning framework in which to operate from in the coming few
years.
Natural Hazard Risk Assessment
Fundamental to effective hazard mitigation is general and specific information related
to the nature, distribution, probabilities of occurrence, frequency, and severity of
historic hazard events. When linked to demographic, economic, infrastructure,
structural, and other societal data, risk evaluations and vulnerability assessments can be
performed. The amount, availability, and quality of information about different
hazards vary widely. Limited information for some hazards results in greater
uncertainty in the risk assessment for those hazards. This Multi-Hazard Mitigation
Plan is focused on natural hazard mitigation, and a separate effort to develop spill
prevention and response plan to address human-caused hazards on tribal property is
also needed.
The following assessment of natural hazard risks describes the nature and location of
past and potential natural hazard events, assesses the vulnerability of properties to each
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 86 of 224
hazard, estimates the value of structures and/or property in areas that are vulnerable to
hazards, and provides an analysis of the risk to life, property, economic activity, and the
environment that may result from natural hazard events on Tribal property. In the first
subsection, the natural hazards on Tribal property are identified. Each hazard is then
defined; past hazard events are described; the vulnerability of structures and facilities is
assessed; and the potential losses to these structures are estimated. In the final
subsection, the relative vulnerability of tribal property is summarized.
The Pre Disaster Mitigation program rules require tribes that are submitting a plan to
assess hazard risks by jurisdiction. Since the Siletz Tribe only has jurisdiction over land
held in trust by the US Government for the Tribe, this MHMP defines properties that
are currently owned by the Tribe including Reservation and non-reservation lands and
assesses and compares the relative hazard risks with each property. Furthermore, the
lack of other local jurisdictions including Lincoln County, City of Siletz, Lincoln City to
produce a hazard mitigation plan has prompted the Siletz Tribe to include tribally
owned lands under the jurisdiction of local governments in the hazard assessment.
Background information regarding risks to specific natural hazards was obtained from
the Oregon Emergency Management and Local Emergency management officials. These
documents were used to help determine the Tribe’s risk to each hazard.
After a brief description of the methods used to identify hazards in each assessment
area and the methods used to conduct a vulnerability assessment for each hazard, the
remainder of this section addresses each of the natural hazards of concern on all Tribal
properties. Profiles of past events, an assessment of vulnerability, and potential losses
are presented for each of the natural hazards.
Hazard Identification and Vulnerability Assessment Methodologies and Analysis
The Planning Department took the following steps to identify hazards that have
affected the CTSI Properties in the past and/or can be expected to affect CTSI properties
in the future:
Review of past state and federal disaster designations;
Review of regional hazard information and analyses prepared by state, federal,
and reports prepared by university researchers at multiple Universities in the Pacific
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 87 of 224
Northwest; including the use of HAZUS and FEMA software coninciding with
DOGAMI/USGS/NOAA/OSU/USFWS/BLM/USFS/et al. Geospatial databases
Review of Internet web sites containing regional hazard information;
Review of the Oregon State Natural Hazards Mitigation Plan 2015, the FEMA
Region X analysis documents and interactive webmaps, and the Lincoln County
Vulnerability Analysis (DOGAMI 2019) and many regional planning documents (as
aforementioned wildfire plans from ODF and Lincoln County Fire, et al.)
Review of the Revised Preliminary 1990 Flood Insurance Rate Maps and Digital
Q3 Data (FEMA 1990); Siletz River Flood History (State of Oregon 2017); Siletz Bay
Conservation Plan 2013, et al.
Information acquired from the materials listed above was also used to estimate the
vulnerability of CTSI properties to each hazard. This information included the
probability of occurrence of hazard events, the types of damage associated with a
hazard, and the relative vulnerability of each property. After compiling this hazard
information, areas vulnerable to the hazards were identified. The estimated relative
levels of vulnerability for each hazard assessment area were based on the following
factors:
•
Probability of damage resulting from a large hazard event;
•
Types of damage associated with the hazard;
•
Historic and/or potential severity of damage;
•
Potential damage relative to other hazards; and
•
Vulnerability of each property.
The relative probability of hazard occurrence (between hazards) is not reflected in the
vulnerability assessments. For example, although the floodplain assessment area was
rated as having a high vulnerability to both floods and earthquake, it is much more
likely to be affected by floods. The ratings for each hazard therefore reflect the
estimated vulnerability if a large hazard event occurs. In addition, the amount of
development in each assessment area was not factored into the estimated vulnerability
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 88 of 224
for an area. Different levels of development are reflected in the estimated potential
losses for each area, highly developed areas have greater potential losses.
The Lincoln County MHMP analyzed hazards to see if they affected the county region.
The Tribe chose to analyze much of the same hazards, as they coincide territorially and
contiguously. CTSI hazards chosen were as follows:
• Flood
• Severe Winter Storms
• Earthquake
• Tsunami
• Windstorm
• Wildfire
• Landslide
• Coastal Erosion (where applicable, and not a full HAZUS analysis was conducted for
this hazard)
State of Oregon NHMP:
https://www.oregon.gov/lcd/nh/pages/mitigationplanning.aspx?utm_source=LCD&utm_medium=egov_redirect&utm_campaign=https%
3A%2F%2Foregon.gov%2Flcd%2Fhaz%2Fpages%2Fnhmp.aspx
Further analysis was conducted to identify which of these hazards specifically affect the
Confederated Tribes of Siletz Tribe. The study was conducted by analyzing data and
maps from a wide range of sources, including State of Oregon GIS hazard data layers
and FEMA floodplain maps, and by interviewing Tribal, county, and local officials.
The Tribe’s main Administration buildings and Tribal residential areas are located in a
river valley, with some part of the buildings located in the 500 year floodplain. The
administration sits 4 miles inland from the coast and, at Siletz, the majority of the
township is at or above 100 feet elevation above sea level. Severe Winter Weather and
Windstorms, Wildfire, Tsunami, Landslide/Liquefaction, and Flooding all with having
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 89 of 224
some sort of potential overlap in both data manipulation depending on the model, and
or in the essence of a winter storm, usually flooding, landslide, and other hazards may
be compounding factors.
Each hazard profile is broken down into the following sections:
Definitions: a primer of some of the key terms used in the study of the hazard, as listed
and analyzed by CTSI, or other federal agencies and defining bodies.
General Background: a general overview of the causes and effects of the hazard,
focusing on the geological and climatological conditions needed to create the hazard.
Hazard Profile: A detailed profile of the hazard as it affects the Tribe. It is broken down
into the following headings:
Location: Where in the study area the hazard could impact people, property and the
natural environment;
Extent: How severe or destructive the event could be to CTSI properties and or
infrastructure, buildings, or other critical facilities to Tribal Members and the
surrounding area.
Past Events: A review of past hazard events in the study area; and
Probability: How often a severe event can occur and the likelihood it will occur in the
future.
Vulnerability Assessment: This section will describe the Tribe’s vulnerability to each
hazard, including its impact on the Tribe’s infrastructure, buildings, houses and critical
facilities. The amount, type and values of structures will be discussed if information is
available. Land use, current and future, within the hazard area will also be discussed.
Cultural and Historic Sites
For MHMP planning, both this Plan and CTSI’s previous plans, specific cultural and
historic sites are not identified specifically or analyzed for hazard exposure and
vulnerability. This is both for reasons of keeping classified and confidential sites still
classified, and also to protect those sites from intrusion. Certain locations, such as
Medicine Rock, cultural fishing sites that are published, family burial grounds and
other known areas, were mentioned by some survey respondents in listing as critical
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 90 of 224
assets, during Steering Committee meetings and in additional surveys as areas of
concern or areas that some members would like listed. Those cultural sites and areas of
concern are regardless, held by the Tribe and members to be critical as assets even when
not listed explicitly.
The tribe’s Natural Resource and Culture Department will continue to identify areas
and locations of Tribal cultural and historic value and will identify, internally, any
potential hazards exposure and vulnerability. In general, all historic and cultural sites
are considered exposed and vulnerable to all of the hazards discussed in this Risk
Assessment.
Tribal Critical Facilities, Exposure and Vulnerability
Table ________ discusses the exposure and vulnerability of tribal structures to natural
hazards. Vulnerability was ranked by
High: high probability, high risk to damages from natural events
Moderate: has some risk from natural events, either located in hazard area or has
structural issues
Low: infrequent risk, newer structures and/or located outside of zones
Comments about vulnerability for each structure (if applicable) are also shown in the
Table.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 91 of 224
Tribal Facilities Exposure & Vulnerability Assessment
*The following tabular format will show properties listed under the Tribes
HAZUS and Geospatial analysis conducted by CTSI GIS Anaylst Ian Keene and
DOGAMI Personnel at the State of Oregon *Data analyzed using HAZUS
Earthquake
Earthquake Damage from CSZ M9.0
Number of
Total Number of
Total Estimated
Sum of
Buildings
Building Value
Economic Loss
Loss Ratio
Community
Percent of
Total
Displaced
Displaced
Population
Population
Population
Depoe Bay
1
193,440
52,352
27%
0
0
0%
Lincoln City
25
44,990,275
8,432,106
19%
60
9
15%
Siletz
167
21,450,304
5,631,692
26%
432
177
41%
Timberlands
3
22,669
2,548
11%
0
0
0%
Toledo
17
868,404
527,822
61%
0
0
0%
Regional Offices
5
5,462,286
N/A
N/A
0
0
0%
Total
218
72,987,378
14,646,520
22%
492
186
38%
Definitions
Cascadia Subduction Zone from USGS
Two Contrasting Models of Lithospheric Structure
The subduction of the Juan de Fuca plate beneath North America changes markedly
along the length of the subduction zone, notably in the angle of subduction, distribution
of earthquakes, volcanism, geologic and seismic structure of the upper plate, and
regional horizontal stress. To investigate these characteristics, we conducted detailed
density modeling experiments of the crust and mantle along two transects across the
Cascadia subduction zone. One crosses Vancouver Island and the Canadian margin,
and the other crosses the margin of central Oregon. Both density models were
constructed independently to a depth of approximately 50 km. We gathered all possible
geologic, geophysical, and borehole data to constrain the density calculations. The final
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 92 of 224
densities for the Oregon and Vancouver lithosphere models were obtained from gravity
inversions.
Our results confirm that the downgoing slab of the Cascadia subduction zone dips
significantly steeper beneath Oregon than beneath Vancouver Island, lending support
to the idea that the Juan de Fuca plate is segmented from north to south. In addition,
our gravity models indicate that the mantle wedge beneath western Oregon (i.e., below
the western Cascades) is lighter than the mantle beneath the Canadian continental crust.
This low density agrees with the low mantle velocities observed in the mantle and the
present day extensional regime of the Pacific Northwest.
A gravity low at the deformation front of the Oregon margin, absent along the
Vancouver margin, can be explained by the different bathymetry of the two regions and
by the depth to the top of the subducting Juan de Fuca plate. If the accretionary prisms
along these profiles were modeled with equal densities, a density inhomogeneity in the
lower part of the models would be necessary. Thus that the density of the accretionary
prism for the Vancouver profile must be approximately 0.1-0.2 g/cm3 greater than that
for Oregon. A density difference within the accretionary prisms also agrees with other
data. We note that the volume of accreted sediments is approximately twice as large
along the Vancouver profile than along the Oregon profile, and the prism reaches a
greater depth (approximately 20 km as compared with 12 km for the Oregon profile).
This implies that the sediments within the accretionary prism at Vancouver Island are at
a higher metamorphic grade, and therefore have higher densities.
We find that a substantial part of the coastal gravity maxima for both lines is caused by
increasing density with depth in the subducting plate. In the proposed model, the
maximum possible density of the slab was used to satisfy constraints for the average
density of the near coastal crust for both profiles. If a density increase with depth is not
introduced into the model, very high densities would be required for the near surface
coastal and continental crustal blocks.
Benioff Zone Earthquake: Sometimes called “deep quakes,” or Intraplate, these occur in
the Pacific Northwest when the Juan de Fuca plate breaks up underneath the
continental plate, approximately 30 miles beneath the earth’s surface.
Crustal Earthquake: Crustal quakes occur at a depth of 5 to 10 miles beneath the earth’s
surface and are associated with fault movement within a surface plate.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 93 of 224
Earthquake: An earthquake is the shaking of the ground caused by an abrupt shift of
rock along a fracture in the earth such as a fault or a contact zone between tectonic
plates. Earthquakes are measured in both magnitude and intensity.
Intensity: Intensity is a measure of the effects of an earthquake. It is measured by the
Modified Mercalli scale and is expressed in Roman numerals.
Liquefaction: Liquefaction is the complete failure of soils, occurring when soils lose
shear strength and flow horizontally. It is most likely to occur in fine grain sands and
silts, which behave like viscous fluids when liquefaction occurs. This situation is
extremely hazardous to development on the soils that liquefy, and generally results in
extreme property damage and threats to life and safety.
Magnitude: Magnitude (M) is the measure of the strength of an earthquake, and is
typically measured by the Richter scale. As an estimate of energy, each whole number
step in the magnitude scale corresponds to the release of about 31 times more energy
than the amount associated with the preceding whole number value.
Peak Ground Acceleration: Peak Ground Acceleration (PGA) is a measure of the highest
amplitude of ground shaking that accompanies an earthquake, based on a percentage of
the force of gravity.
Subduction Zone Earthquake:
This type of quake, also called Interplate, occurs along two converging plates, attached
to one another along their interface. When the interfaces between these two plates slips,
a sudden, dramatic release of energy results, propagated along the entire fault line.
General Background
An earthquake is a sudden movement of the Earth, caused by the abrupt release of
strain that has accumulated over a long time. Sometimes the movement is gradual. At
other times, the plates are locked together, unable to release the accumulating energy.
When the accumulated energy grows strong enough, the plates break free. If the
earthquake occurs near populated areas, it may cause many deaths and injuries, and
extensive property damage.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 94 of 224
Location
Oregon is affected by the Cascadia Subduction Zone where the Juan de Fuca plate slides
underneath the North American plate. While earthquakes along this zone occur
infrequently, plate movement can produce major earthquakes. In addition, Western
Oregon is underlain by a large and complex system of faults that can produce
damaging earthquakes; these smaller faults produce lower magnitude events, but their
ground shaking can be strong and damage can be great to structures nearby. Taken
from USGS/Dogami/OSU
@ Old River Road marking the Landslide that occurred after flooding in 2012 Siletz, OR
Imagery captured by CTSI Planning Department August 2019
The erosion of bluffs is dependent on multiple factors including: ocean wave impact,
variations in ground water levels, vegetation cover, bluff slope and bluff material
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 95 of 224
properties. When coupled with the varied geologic composition of the Oregon coastline,
this wide range of eroding mechanisms makes the task of estimating how fast the bluffs
are eroding very complicated with large amount of uncertainty. Thus, there is no "onesize-fits-all" approach that can be applied coast wide and assessments are typically
made on a case by case basis.
Catastrophic Hazards
Catastrophic hazards are associated with earthquakes and related tsunamis. The
eastward-moving Juan de Fuca tectonic plate dives under the westward-moving North
American plate just off the Oregon coast at the Cascadia Subduction Zone. Powerful
earthquakes up to magnitude 7 can take place in either the North American or the Juan
de Fuca plates. The Cascadia Subduction Zone, however, is capable of generating even
larger earthquakes — up to magnitude 9.
From State of Oregon Hazard Publication on Cascadia
The Cascadia Subduction Zone is a 600-mile fault that runs from northern California up
to British Columbia and is about 70-100 miles off the Pacific coast shoreline. There have
been 41 earthquakes in the last 10,000 years within this fault that have occurred as few
as 190 years or as much as 1200 years apart. The last earthquake that occurred in this
fault was on January 26, 1700, with an estimated 9.0 magnitude. This earthquake caused
the coastline to drop several feet and a tsunami to form and crash into the land. What is
most surprising is that evidence for this great earthquake also came from Japan.
Japanese historic records indicate that a destructive distantly-produced tsunami struck
their coast on January 26, 1700. By studying the geological records and the flow of the
Pacific Ocean, scientists have been able to link the tsunami in Japan with the great
earthquake from the Pacific Northwest. Native American legends also support to the
timing of this last event.
Oregon has the potential for a 9.0+ magnitude earthquake caused by the Cascadia
Subduction Zone and a resulting tsunami of up to 100 feet in height that will impact the
coastal area. There is an estimated 2-4 minutes of shaking or rolling that will be felt
along the coast line with the strength and intensity decreasing the further inland you
are.
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 96 of 224
The Cascadia Subduction Zone has not produced an earthquake since 1700 and is
building up pressure where the Juan de Fuca Plate is subsiding underneath the North
American plate. Currently, scientists are predicting that there is about a 37 percent
chance that a megathrust earthquake of 7.1+ magnitude in this fault zone will occur in
the next 50 years. This event will be felt throughout the Pacific Northwest.
With the current preparedness levels of Oregon, we can anticipate being without
services and assistance for at least 2 weeks, if not longer, when the Cascadia Subduction
Zone earthquake occurs. While this will be difficult to overcome, our citizens,
businesses, schools, government, and communities as a whole can take steps to get
prepared. Take action now by actively planning and preparing yourself and your
community to be ready for two weeks for disasters. In the event of a Cascadia
Subduction Zone earthquake and tsunami, coastal populations will become isolated
into “islands” due to landslides, liquefaction, and damaged infrastructure like bridges.
The Office of Emergency Management’s “Island Mapping Pilot Project” mapped coastal
populations in relation to likely infrastructure damage after an earthquake and tsunami.
These maps show where transportation infrastructure will be damaged (bridge failure,
landslide, liquefaction) causing populations to be isolated into “islands”. Workshops
were held in coastal communities during the summer of 2016. Our audience for these
workshops were city/county officials, public works, and others able to advise on road
damage and who lives/works/plays in the “islands”. The results of this project are
available for download and through RAPTOR.
For general inquiries about the project, contact Althea Rizzo at althea.rizzo@state.or.us.
For the GIS data, contact Daniel Stoelb at daniel.stoelb@state.or.us.
https://earthquake.usgs.gov/hazards/
https://earthquake.usgs.gov/hazards/hazmaps/
Tsunamis
A tsunami is a series of ocean waves most often generated by disturbances of the sea
floor during shallow, undersea earthquakes. Less commonly, landslides and volcanic
eruptions can also trigger these wave events. Although infrequent in occurrence,
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 97 of 224
tsunamis are the most dangerous natural hazard affecting the Oregon Coast. In the
deep water of the open ocean, tsunami waves can travel at speeds up to 800 km (500
miles) per hour and are imperceptible to ships because the wave height is typically less
than a few feet.
However, as a tsunami approaches the coast it slows dramatically and its height may
multiply by a factor of 10 or more, having catastrophic consequences to people living at
the coast. As a result, people on the beach, in low-lying areas of the coast, and near
estuary mouths or tidal flats face the greatest danger from tsunamis.
Earthquakes can trigger other geologic and soils failures that contribute to damage.
While surface fault rupture can produce damage to facilities and infrastructure astride
the fault, losses from this are minor compared to those resulting from strong ground
shaking and associated ground failures. These include landslides and slope failures,
lateral spreading and slumping, and liquefaction.
Probability
Although the Confederated Tribes of Siletz Tribe has not had a recorded earthquake
within its traditional lands, it is 100% likely that the Tribe will feel the effects of an
earthquake from regional sources in the future. Evidence shows that Magnitude 9.0
Cascadia Subduction Zone quakes have occurred on average once every 350+/- years
(with major events every 500 to 600 years, with some gaps between events as little as
200 years and as large as 1,000 years Goldfinger OSU)
Vulnerability
Although the Confederated Tribes of Siletz Tribe’s people, property and facilities are
exposed to earthquakes, the vulnerability is low to moderate. The tribe has a limited
amount of facilities and many were built after Seismic Building Codes for Oregon were
strengthened in 1993. The Confederated Tribes of Siletz Tribe’s area is encompassed in
Seismic Zone 3 of the State Building Code map.
The Tribe’s newer structures, such as the Health Clinic Building, are built to highest
seismic standards and would experience minimal structural damage (estimated through
HAZUS). The Tribe’s utility systems that depend upon other outside agencies are not so
unsusceptible. The water and wastewater systems in Siletz are far out of date for
upgrades and are not built to the highest standards and have redundancies for a worstCONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 98 of 224
case scenario. After a significant event, all Tribal facilities and infrastructure will be
inspected for damage.
Structures most vulnerable would be its older commercial facilities in Siletz, Newport,
and Lincoln County.
The Tribe’s biggest concern will be the lack of access along the state highways 229, 20,
34, and connecting to either Highway 101 or to the I5 corridor. Many publications
provide that Siletz and many coastal areas will effectively become “island”
communities due to being cut off from damage to local, county and state infrastructure,
such as bridges, roads, etc. due to the earthquake or secondary hazards such as
landslides.
Known models show that regular disruption of critical services will also be an issue for
tribal operations, especially in the immediate aftermath of an Cascadia event and/or
following tsunami/earthquake.
Flooding
Floods
In general, three types of flooding occur in this region: (1) riverine, (2) ocean flooding
from high tides and wind-driven waves, and (3) flooding associated with a tsunami
event. Flooding in riverine systems is a natural occurrence that results when runoff
from rain or snowmelt exceeds the carrying capacity of river channels, ditches, drains,
reservoirs, and other water bodies. There are two distinct periods of riverine flooding in
this region, winter and early spring. The most serious flooding occurs during
November, December, January, and February. The situation is especially severe when
riverine flooding, caused by prolonged rain and melting snow, coincides with high
tides and coastal storm surges. In short, the rivers back up and flood the lowlands.
There are other circumstances, as well. Several coastal rivers carry heavy silt loads that
originated in areas burned during the “Tillamook Burn” fires (1933 to 1951).
Consequently, some rivers may actually be elevated above local floodplains, which
increases flood hazards. The costs and long-term benefits of dredging these rivers have
CONFEDERATED TRIBES OF SILETZ INDIANS MULTI-HAZARD MITIGATION PLAN 99 of 224
not been determined. In this section, past riverine and coastal flood events, flood
vulnerability, and potential flood losses to CTSI properties are described.
Potential Flood Event Areas
Flood events on tribal lands can be divided into 3 broad categories: flooding of the
Siletz River, flooding of the Toledo Mill property along the Yaquina River, and coastal
flooding of the properties on the coast line and near Devils Lake in Lincoln City. The
majority of the damage witnessed in past flood events were primarily along the Siletz
River.
Lincoln County has experienced ten major floods since 1964. Four of these resulted in
presidential declarations. Past flooding occurred on the Alsea, Siletz, Yaquina rivers
between November and March. Flooding also occurs in low-lying areas along the ocean
and Devils Lake during high tides and heavy rain. The county estimates that 10 percent
of the population and 10 percent of the property would be affected by such a flood
event.
Effects of Recent Floods
Siletz River Floods
In February 1996, December 1998, and November 1999 Lincoln County experienced
damaging flood events. The 1996 flood event affected communities throughout western
Oregon, with floodwater exceeding the “100-year” level in a number of locations. In
Lincoln County, however, the 1996 event was of a lower magnitude, with floodwater
reaching a level of 24.5 feet on the Sil