DEPARTMENT OF THE INTERIOR

Bureau of Indian Affairs

Final Environmental Assessment for the proposed Lost Creek 2026 Forest Management

Project on the Colville Reservation, Okanogan County, Washington

AGENCY: Bureau of Indian Affairs

ACTION: Notice of Availability

SUMMARY: This notice is to advise interested parties that the Bureau of Indian Affairs (BIA)

as lead federal agency, with the Confederated Tribes of the Colville Reservation, has prepared a

final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the

Lost Creek 2026 Forest Management Project on the Colville Reservation, Okanogan County,

Washington. This notice also announces the EA is now available in hard copy at the addresses

below.

ADDRESSES: You may request a hard copy of the EA and FONSI by writing the BIA Colville

Agency, PO BOX 111, Nespelem, Washington, 99155.

FOR FURTHER INFORMATION CONTACT: Randall Friedlander, BIA Colville Agency

Superintendent, at (509) 634-2316 and Chasity Swan, Colville Tribe Integrated Resource

Management (IRMP) Coordinator, at (509) 722-7656.

SUPPLEMENTAL INFORMATION: The Colville Tribe, through contractual obligations to the

BIA, has proposed the Lost Creek 2026 Forest Management Project. The activities under the agency

proposed action to harvest approximately 23.7 million board feet of timber on approximately 3,096

acres and hazard fuel reduction treatments on 6,723 acres of tribally owned lands within the

Omak/Nespelem District of the Colville Reservation in Okanogan County, Washington. The activities

will occur under guidelines in the Colville Confederated Tribes of the Colville Indian Reservation

Integrated Resource Management Plan (IRMP)(CTCR 2015) and associated Final Programmatic

Environmental Impact Statement (FEIS)(CAR 2018).

Authority: This notice is published pursuant to 43 CFR 46.305 of the Department of Interior

Regulations (43 CFR Part 46), the procedural requirements of the National Environmental Policy

Act of 1969, as amended (42 U.S.C. 4371 et seq.), and is in accordance with the exercise of

authority delegated to the Assistant Secretary – Indian Affairs by 209 DM 8.

Randall Friedlander

Colville Agency Superintendent

Bureau of Indian Affairs

U.S. Department of the Interior

Date

Finding of No Significant Impact

Lost Creek 2026 Forest Management Project

Colville Reservation, Okanogan County, Washington

Based on the attached final Environmental Assessment’s (EA) for the Lost Creek 2026 Forest

Management Project for a proposal to harvest 23.7 million board feet of timber on approximately 3,096

acres and 6,723 acres of hazard fuel reduction treatments on tribally owned lands in the Omak/Nespelem

District of the Colville Reservation in Okanogan County, Washington, I have determined that by

implementation of the agency proposed action and environmental mitigation measures as specified in

the EA, the proposed Lost Creek 2026 Forest Management Project, will have no significant impact on

the quality of the human environment. In accordance with Section 102 (2) (c) of the National

Environmental Policy Act of 1969, as amended, an Environmental Impact Statement will not be

required.

This determination is supported by the following:

1. Agency and Tribal Interdisciplinary Team involvement was conducted and environmental issues

related to development of the Lost Creek 2026 Forest Management Project were identified.

Alternative courses of action and mitigation measures were developed in response to environmental

concerns and issues. Tribal community outreach was conducted (CTCR Integrated Resource

Management Plan (IRMP) (2015) and associated Final Programmatic Environmental Impact

Statement (FEIS)(2018). A public field tour was given of the project area in June of 2025 (EA

section 1.6).

2. The EA discloses the environmental consequences of the “proposed action” and “no action”

alternatives.

3. Protective measures will be levied to protect air (Clean Air Act as amended 42 USC 7401 et seq.),

noise, and water quality (Clean Water Act of 1977, 33 U.S.C. 1251 et seq.), as outlined in the

Mitigation Measures (Section 4.7 of EA), CTCR Forest Practices Handbook (Colville Tribal Law

and Order Code Title 4-7), CTCR IRMP (CTCR 2015) and associated FEIS (CAR 2018). In order

to reduce impacts to air quality burning operations will only be conducted when conditions are

present that will reduce smoke accumulation.

4. The proposed action will not jeopardize threatened and endangered species (Threatened and

Endangered Species Act of 1983, as amended, 16 U.S.C. 1531 et seq.) (EA Section 4.3, and

Appendix B).

5. There are no adverse effects on historic properties (National Historic Preservation Act, as amended

16 U.S.C. 470) for the purpose of 36 CFR 800.9 (b) by preserving archeological value through

conduct of appropriate research in accordance with applicable standards and guidelines. Should

undiscovered archeological remains be encountered during project ground-disturbing activities,

work will stop in the area of discovery and the stipulations 36 CFR 800.11 be followed. The BIA

Regional Archaeologist and Tribal Historic Preservation Officer (THPO) were consulted for this

project (EA Section 4.4, Appendix B).

Lost Creek 2026 Forest Management Project

BIA-NWR-CTCR-EA-26-08

6. The proposed action will not affect public health or safety.

7. The proposed action will not cause a significant effect to energy resources (Energy Policy Act of

2005), water resources, wetlands (E.O. 11990), or flood plains (E.O. 11988). The Lost Creek 2026

Forest Management Project will not result in discharge of pollutants into waters of the U.S. or in

surface water quality issues (Clean Water Act, as amended, 33 U.S.C. 1251 et seq.) Mitigation

measures to reduce sediment delivery have been outline in the EA (EA section 5).

8. The cumulative effects to the environment are mitigated to avoid or minimize effects of

implementation of the proposed project (EA Section 5).

9. The proposed action will not affect unique characteristics of the geographic area such as the

proximity to park lands, wild and scenic rivers, or ecologically critical areas.

10. It is unlikely that timber harvesting would have any detrimental effect on the functional integrity of

the land classification and the CTCR does not have future plans to develop the prime farmland

within this project area.

12. There are approximately 278 acres of mapped wetlands within the project area footprint. All

wetlands and surface water are buffered to minimize impacts of the project to these water systems

(CTC Chapter 4-7 Forest Practices, Section 5 of EA).

13. The Lost Creek 2026 Forest Management Project will not have significant impacts on natural and

unique geographic features such as historic or cultural resources; park, recreation, or refuge lands;

wilderness areas; wild and scenic rivers; national natural landmarks; sole or prime drinking water

aquifers; national monuments; eagles and migratory birds, and other ecologically significant areas.

14. The proposed action will not produce highly controversial effects on the quality of the human

environment and will not have unresolved conflicts concerning alternate uses of available

resources.

15. The proposed action will not have highly uncertain effects on the human environment or involve

unique or unknown risks.

16. The proposed action will not establish a precedent for future actions with significant effects or

represent a decision in principle about a consideration.

17. The Lost Creek 2026 Forest Management Project is not related to other actions with individual

insignificant but cumulatively significant environmental effects.

18. The proposed action will not affect American Indian Religious Freedom (42 U.S.C. 1996). The

action will not limit access to, and ceremonial use of, Indian sacred sites on federal lands, by

Indian religious practitioners, and/or adversely affect the physical integrity of such sites (Native

American Graves Protection and Repatriation Act, 25 U.S.C. 32).

Lost Creek 2026 Forest Management Project

BIA-NWR-CTCR-EA-26-08

19. Logging and related activities can introduce new invasive species to a site via uncleaned

equipment and soil disturbing activities or cause currently present invasive species to spread more

rapidly. In order to insure the action will not contribute to the introduction, continued existence, or

spread of noxious weeds or non-native invasive species known to occur in the area, or promote the

introduction, growth, or expansion of the range of such species, cleaning equipment prior to using

on site, washing equipment in a centralized area, re-seeding heavily disturbed sites such as skid

trails and landings is required. Monitoring of understory recovery would occur and if monitoring

determines a need, inputs in the form of native plant seeding and/or herbicide treatment should be

considered to assist recovery, giving a competitive advantage to desired plant species. (EA Section

5)

20. The proposed action will not contribute to the disposal of solid or hazardous waste (Resource

Conservation and Recovery Act of 1976; 43 U.S.C. 6901, et seq.).

21. The proposed action will not be a violation of federal, state, local, or tribal law or requirements

imposed for the protection of the environment.

Date

Randall Friedlander, Superintendent

Colville Agency

Bureau of Indian Affairs

U.S. Department of the Interior

Lost Creek 2026 Forest Management Project

BIA-NWR-CTCR-EA-26-08

Final

LOST CREEK 2026 FOREST MANAGEMENT PROJECT

ENVIRONMENTAL ASSESSMENT

The Bureau of Indian Affairs and the Confederated Tribes of the Colville Indian Reservation

propose the harvest of approximately 23.7 million board feet (MMBF) of timber from 3,096

acres and conduct hazard fuel reduction utilizing prescribed on 6,723 acres of tribal land in the

Omak/Nespelem District of the Colville Reservation.

Prepared by:

The Bureau of Indian Affairs and the Colville Confederated Tribes of the Colville Indian

Reservation.

Official Decision Maker: Randy Friedlander, Superintendent, Colville Agency, BIA

For further information:

Chasity Swan

IRMP Coordinator

PO BOX 150 Nespelem, WA 99155

(509) 722-7656

Chasity.Swan.bia@colvilletribes.com

April 14, 2026

BIA FILE NO: NWR-BIA-EA-26-08

Table of Contents

1.0 Purpose and Need ................................................................................................1

1.1 Introduction ................................................................................................................... 1

1.2 Purpose and Need for Action ........................................................................................ 1

1.3 Objectives ..................................................................................................................... 1

1.4 Compliance with Other Codes and Regulations ........................................................... 2

1.5 Determination ............................................................................................................... 2

1.6 Public Involvement ....................................................................................................... 3

2.0 Alternatives Considered .......................................................................................3

2.1 General Discussion: Alternative Design ....................................................................... 3

2.2 Alternative A: No Action .............................................................................................. 4

2.3 Alternative B: Proposed Action .................................................................................... 4

3.0 Affected Environment ..........................................................................................7

3.1 Forestry ......................................................................................................................... 7

3.2 Hydrology ..................................................................................................................... 8

3.3 Fish and Wildlife........................................................................................................... 9

3.4 Cultural Resources ...................................................................................................... 12

3.5 Range Management .................................................................................................... 15

3.6 Air Quality .................................................................................................................. 15

4.0 Environmental Consequences ............................................................................. 15

4.1 Forestry ....................................................................................................................... 16

4.2 Hydrology ................................................................................................................... 17

4.3 Fish and Wildlife......................................................................................................... 23

4.4 Cultural Resources ...................................................................................................... 25

4.5 Range Management .................................................................................................... 26

4.6 Air Quality .................................................................................................................. 27

4.7 Social and Economic Impacts ..................................................................................... 28

5.0 Mitigation for Resource Protection ..................................................................... 28

6.0 List of Preparers ................................................................................................. 32

7.0 Literature Cited .................................................................................................. 32

8.0 Appendices ........................................................................................................ 34

8.1 Appendix A: Project Maps and Activity Table ........................................................... 34

8.2 Appendix B: Consultation........................................................................................... 43

8.3 Appendix C: Preliminary Transportation Analysis ..................................................... 52

8.4 Appendix D: Army Corp of Engineers BMPs ............................................................ 55

8.5 Appendix E: CTCR Holistic Goal and Desired Future Conditions ............................ 57

1.0 Purpose and Need

1.1 Introduction

The following Environmental Assessment (EA) analyzes the impacts of Lost Creek 2026 Forest

Management Project. The Bureau of Indian Affairs (BIA) and the Confederated Tribes of the

Colville Indian Reservation (CTCR) propose the harvest of approximately 23.7 MMBF of timber

from approximately 3,096 acres of Tribal land in the Omak/Nespelem District (OND) of the

Colville Indian Reservation in Okanogan County, Washington State. This harvest would require

about 9.49 miles of road construction and about 38.9 miles of road reconstruction. Hazard fuel

reduction (HFR) treatments will utilize prescribed under burning on 6,723 acres and require

6,292 fireline.

The federal action (40 CFR 1508.18) is the BIA approval of the Lost Creek 2026 Forest

Management Project, which triggers BIA’s National Environmental Protection Act (NEPA)

compliance review of the project 42 USC § 4321- 4347) and associated regulations found in 40

CFR 1500-1508 (as amended) and 43 CFR 46.

1.2 Purpose and Need for Action

The purpose of the action is to be able to implement the activities under the federal action to

meet the primary need meeting the goals outline in the CTCR 2015 Integrated Resource

Management Plan (IRMP). The CTCR IRMP has set an annual harvest level of 77.1 million

board feet (MMBF)(CTCR 2015). An integrated management approach wherein Fire

Management and Forestry work closely together to plan and implement Forest Management

Projects to restore fire to the ecosystem, reduce fuels already present and created by forest

management activities and create a more resilient ecosystem.

The Lost Creek Project Area contains timber stands that present a high risk of sustaining losses

to several forest insect and disease agents.

A detailed discussion of the forest health issues on the Colville Reservation and the need for

treatment can be reviewed in the 2023 Forest Management Plan (FMP). Environmental impacts

from the management of CTCR Natural Resources under the FMP and IRMP have been

analyzed in the Final Programmatic Environmental Impact Statement (FEIS) (CAR 2018).

1.3 Objectives

The following are issues or concerns that the Interdisciplinary Team (3P Team) has identified as

being relevant to the discussion of the “no action” and the “proposed action” alternatives.

Forestry Objectives

Capture the volume of dead and dying trees, provide income and employment for the CTCR. Bring

commercial forest acres into regulation.

Indicators:

a. Acres salvaged by each alternative

b. Estimated stumpage produced by each alternative

c. Estimated volume of timber harvested per alternative

Lost Creek 2026 Forest Management Project

1

BIA-NWR-CTCR-EA-26-08

Fuels/Fire Control Objectives

To minimize and alter the characteristics of available (burnable) fuels.

Indicators:

a. Acres of hazard fuel reduction

Hydrology Objectives

To minimize erosion and sediment delivery to surface waters and prevent streambank/wetland

disturbance. Maintain ecological function of soils and prevent landslides.

Indicators:

b.

c.

d.

e.

f.

g.

h.

Harvest proximity/adjacency to surface water

Acres likely experiencing increased hydrologic response

Acres likely experiencing increased sediment delivery to surface water

Road construction/use within 200ft of surface water

Acres likely experiencing increased soil loss to surface water

Slope stability and failure risk, soil burn severity

Proximity of known and identified mass wasting sites

Fish and Wildlife Objectives

To maintain and restore critical forest structure, old growth forests, deciduous stands and

wetlands. Ensure wildlife and fish habitat needs are maintained, including large woody debris.

Indicators:

a.

b.

c.

d.

e.

Wetland and stream adjacency acres

Block size and adjacent acres

Road density, miles/square mile

Miles of road construction

Miles of stream adjacent road

1.4 Compliance with Other Codes and Regulations

This project is designed to be compliant with CTCR Forest Practices Code (208), CTC 4-9:

Hydraulic Project Permitting, 4-10: Water Resources Use and Permitting, the Endangered

Species Act, Clean Water Act, National Environmental Policy Act, Tribal Forest Protection Act,

National Indian Forest Resources and Management Act, National Historic Preservation Act,

Clean Air Act and other applicable Tribal and Federal Regulations.

1.5 Determination

The Colville Agency BIA Superintendent with the concurrence of the Colville Business Council

(CBC) would determine which alternative is selected for implementation.

a) To take no action (Alternative A).

b) To approve the proposed action (Alternative B).

c) To direct an additional alternative be created.

Lost Creek 2026 Forest Management Project

2

BIA-NWR-CTCR-EA-26-08

The BIA Superintendent would also determine whether the environmental consequences are

significant and prepare either a Finding of No Significant Impact (FONSI) or determine that

Environmental Impact Statement (EIS) would be required.

1.6 Public Involvement

In the process updating of the IRMP which provides goals and objectives to manage the Tribes’

natural resources a Colville Reservation Community survey was conducted to document the

priorities, preferences and concerns regarding the management of the Tribes’ natural resources

(Center for Applied Research [CAR] 2015). A total of 1,026 individuals participated.

Respondents indicated the forests provide essential revenue source (47%) and jobs (52%) for the

tribal membership and community. The strongest response on forest management (54%) was for

forest-wide thinning of insect and fire prone tree stands and to treat forest health issues. Many

community meetings were held to help shape the CTCR management strategy during the 2001

and 2015 IRMP planning processes.

The Lost Creek Forest Management Project was presented to the 3P Team in March of 2025.

The 3P Team and public also had a field tour of the project area in June of 2025. This project is a

part of that 15-year plan for Forest Resource Management on the Reservation (CTCR 2015).

Figure 1. Lost Creek Project Area on the Colville Indian Reservation.

2.0 Alternatives Considered

2.1 General Discussion: Alternative Design

The National Environmental Policy Act (NEPA) and the Council on Environmental Quality

(CEQ), the Department of the Interior (DOI) and the BIA have developed regulations that

Lost Creek 2026 Forest Management Project

3

BIA-NWR-CTCR-EA-26-08

require that a reasonable range of alternatives be considered in NEPA documentation, including

the “Proposed Action” and “No Action” alternatives.

For this project, Alternative A (No Action) is included to fulfill the requirements of NEPA and to

provide baseline values by which to measure the effects of other alternatives. For the purposes of

this document, “no action” means that no harvest or other resource manipulation would occur if

this alternative were adopted.

All alternatives are designed to meet all legal and procedural requirements to which the CTCR

and the BIA must adhere.

2.2 Alternative A: No Action

The “No Action Alternative” includes the BIA not approving the Lost Creek 2026 Project and/or

the BIA and Tribe not implementing activities under the project. Under this alternative no timber

harvest, road reconstruction, or other manipulation of resources would take place. Fuel reduction

treatments would not take place.

2.3 Alternative B: Proposed Action

The Proposed Action Alternative includes the BIA approving the Lost Creek 2026 Forest

Management Project and the BIA and CTCR implementing the activities under the proposal.

This Alternative does meet the Purpose and Need of the project. This alternative was proposed

by OND Foresters to meet forest health needs and provide volume for the Annual Allowable Cut

(AAC) of 77.1 MMBF outlined in the IRMP (2015).

Timber Harvest of roughly 23.7 MMBF from 3,096 acres of timber harvest blocks. Non timber

harvest activities included in this Proposal are: 663 acres of Pre-Commercial Thin (PCT) and

6,723 acres prescribed fire are proposed to reduce the risk of catastrophic wildfire by eliminating

the amount of dead and down fuel on the ground.

• Individual block prescriptions given in this document are given in good faith and are

appropriate for data collected and field review notes up to this point. However,

prescriptions may be adjusted when entire block is evaluated through the timber cruise

and marked for harvest.

• Pre-Commercial Thinning would be completed with traditional chainsaw thinning or a

piece of heavy equipment such as an excavator may also be used to achieve the desired

spacing of residual stand.

• Tree planting may require additional scarification using a piece of heavy equipment such

as an excavator and/or broadcast burning.

• In the case of broadcast burning there is an estimated total of 6,292 of total dozer

constructed fireline. 2,272 ft is on a restored road which will be put back in restored

condition at completion of burn.

Table 1. Prescription Summary for Alternative B.

Prescription- Non-Commercial Harvest

Pre-commercial Thin (PCT)

Mastication (PCT)

Tree Planting- Artificial Regeneration

Prescription- Commercial Harvest

Regeneration with Reserves (RRT)

Lost Creek 2026 Forest Management Project

Acres

527

135.5

543.9

Acres

543.9

4

BIA-NWR-CTCR-EA-26-08

Seed Tree / Overstory Removal (ST/OR)

Seed Tree (ST)

Shelterwood (SW)

Sanitation (SANI)

Improvement Cut (IC)

Commercial Thin (CT)

Overstory Removal (OR)

Total Commercial Harvest

1,063.6

392.2

69.1

0

969.2

28.1

30.1

3,096.2

Table 2. Alternative B harvest systems.

Logging Method

Acres

Tractor

Tether

Total

2,855

241.2

3,096.2

Table 3. Hazard Fuel Reduction blocks utilizing prescribed underburn.

Block

875

876

877

Acres

2555 Acres

2456 Acres

1712 Acres

Treatment/Rx

Underburn

Underburn

Underburn

Tabbl 4. Alternative B road construction and reconstruction and use.

PROPOSED (new)

RECONSTRUCT

BIA

COUNTY

LOST CREEK 2026 ROADS

9.49 Miles (all within sale boundary)

38.9 Miles (2.19 miles outside of sale boundary)

12.03 Miles (5.92 miles outside of sale boundary)

6.94 Miles (3.64 miles outside of sale boundary)

Road Closure Plan

All newly constructed roads would be closed following post-harvest activities in accordance with

forest practices 4-7-60 2(E). However, closure may be delayed allowing for planned Forest

Development Activities. There are approximately 20 miles of road that would be temporarily

closed via tank traps.

Other Project Design Features

There are many other project design features that are included in this alternative. These are

included to help protect other resources such as fish and wildlife, and riparian areas. Some of

these design features are outlined below. These design features would help mitigate most of the

issues and concerns raised by Fish and Wildlife, Soils and Hydrology. These design features

would make the project meet the standards of the IRMP and Forest Practices Code and help to

mitigate some of the potential negative impacts of the project.

•

•

Habitat patches would be left in the large units to break up the “continuity” on the

landscape and provide refuge for wildlife.

Scattered over-story trees would be left on all units to provide a future source of snags

and down woody debris.

Lost Creek 2026 Forest Management Project

5

BIA-NWR-CTCR-EA-26-08

•

•

•

•

•

•

Streams and wetlands would be buffered as required by the current CTCR Forest

Practices.

A combination of cable logging and ground-based systems would be used, depending on

steepness of the units and road placement.

Archeological sites would be buffered and protected from logging damage.

Corridors would be in place on the landscape to allow wildlife to travel across the project

area while being secure.

Continued monitoring for specific wildlife species would occur and operational

adjustments can be made if needed.

Skid trails would be spaced at least 100 feet to reduce soil compaction and displacement.

When timber harvest takes place, Best Management Practices (BMP’s) outlined in the Colville

Confederated Tribes Forest Practices Handbook (208 Handbook), dated 2023, would be

employed. Timber contract compliance by the Timber Sale Officer (TSO) would be the foremost

method ensuring that the BMP’s are followed and implemented. Proper maintenance of roads

and skid trails after logging operations would be implemented to reduce erosion. Designated skid

trails and cable assisted logging would help reduce impacts to the soil resources. Slash

treatments, on the ground and at the landings, would be either lop & scattered, slash, excavator

piled & burned, prescribed burned or left on site. The continual management of the stands

including monitoring from initial stand development to the maturity of the stand would be

completed by various forestry staff such as Silviculturists, Timber Sale Officers, and forest

development staff. The monitoring would ensure the individual stands are going down the

anticipated pathway to the desired future conditions.

Culverts would be replaced at certain locations depending on the necessity which would be

determined by the TSO’s, District Officer, the Road Engineer, or Non-Point Source Coordinator.

Also, new culverts would be installed to allow the continual flow of water to remain in the same

established channel and accommodate the estimated discharge of a 100-year flood event. Water

sources would be identified on the FPA/HPA application as potential sites to obtain water for

road watering, dependent on approval from the Water Administrator. Calcium chloride may be

used on sections of road as an alternative to road watering.

Riparian Management Zones (RMZ) would be identified in the planning process using stream

classification maps and determined by Presales Department personnel during block boundary

layout. RMZ buffers would follow requirements of the Forest Practices Code (CTC 4-7), dated

2023. During implementation of road construction activities and logging operations, some trees

may need to be harvested, if they present a safety hazard.

Fire and smoke management will utilize the strategy outlined in the CTCR Fire Management

Plan (2016). A written Prescribed Fire Plan will be approved prior to prescribed fire actions. The

Fire Management Officer or Burn Boss will take into consideration the following factors: Wind

direction and speed, fuel type, fuel loading, current visibility and the location of the burn project.

The risk of fire escaping into reserve stands will be assessed and a recommended category of

mop-up will occur. The burn boss will prepare a report covering the completeness of burn,

potential problems, re-burn possibilities and other concerns to provide to technician directly

responsible for patrol and mop-up.

Lost Creek 2026 Forest Management Project

6

BIA-NWR-CTCR-EA-26-08

Fire Control will evaluate dispersion conditions to minimize exposure of smoke and will inform

the public. Smoke warnings of reduced visibility will be utilized if smoke threatens visibility on

a highway.

3.0 Affected Environment

3.1 Forestry

Figure 2. Ariel View of Proposed Lost Creek Project Area.

General Discussion

The Lost Creek project is located approximately 20 miles north of Nespelem, WA, within the

Upper Lost Creek Watershed Management Unit (WMU) and the Lower Lost Creek WMU. The

Colville Reservation boundary is the north boundary of the project area. The project area has

common, adjacent boundaries with the following Watershed Management Units: west of the

Loony Creek; northwest of the Upper Gold Creek; north of the following WMU’s: Clark Creek,

Hayden Creek, and Swimptkin Creek; northeast of the Lost Creek Creek; and east of Brown Pass

Project Boundary. Little Moses Mountain is part of the south boundary and a landmark of the

Lost Creek Project boundary. Crawfish Lake is a landmark, part of the north boundary of the

project.

Forest Health

Lost Creek 2026 Forest Management Project

7

BIA-NWR-CTCR-EA-26-08

Past management practices of fire suppression, reduction in grazing, and single tree selection had

the cumulative effect of creating a forest that is very different ecologically than the historically.

Another aspect of forest health is that of direct damage to trees by insects, diseases, and parasitic

plants. The forest condition is described in detail in the 2023 CTCR Forest Management Plan

and 2015 IRMP. Please refer to that those plans to understand the forest health issues occurring

on the Colville Reservation.

The Lost Creek Project Area was last managed around 2011. Previous harvest history shows a

mix of intermediate cuts such as Commercial Thins and Improvement Cuts such as

Seedtree/Overstory removals and RRTs. Maintenance treatments are planned in some of these

same blocks this entry. The Tunk Block and Northstar Fires of 2015 had a major impact on the

project area.

Most stands are overstocked, with a closed canopy of young trees that are in need of thinning.

Some have a multi-storied structure due to seeding in from over story trees. The risk of

catastrophic wildfire is greater in these stands than would have normally occurred, due to dense

stocking or ladder fuel conditions that would allow fire to spread into the forest canopy.

Fire Condition Class

Condition class is used to categorize the degree to which site conditions have departed/altered

from what would be considered their normal historic range and the risk of losing key ecosystem

components. There are three fire condition class categories.

Due to the past activities in the Lost Creek Project Area the condition class of the sites have

some departure from the normal historic range. Condition Class 2 (moderately altered /moderate

risk) is the most prevalent within the project area at 9,582 acres within the treatment areas, with

5,929 Acres of Condition Class 1(slightly altered/low risk), and 938 acres in Condition Class

3(significantly altered/high risk). 211 acres of Condition Class 1 and 487 acres of Condition

Class 2 are proposed to be treated that fall in the Haden Project area. 672 acres of Condition

Class 1, 544 acres of Condition Class 2, and 1216 acres of Condition Class 3 fall in the Clark

Creek Project area. Please note that Condition Class acres do not equal treated acres due to the

classifications of Barren and Sparsely Vegetated are not included in Fire Regime Condition Class

calculations, and the total is of the project acres, not treated acres. As a result of these past

harvest treatments condition class has improved and stand conditions are closer to their normal

historic range.

3.2 Hydrology

The Lost Creek project area is contained within the Lost Creek Resource Management Unit

(RMU), which contains Upper and Lower Lost Creek WMUs. Lost Creek flows north off of the

Reservation into the West Fork San Poil River in the Aenaes Valley, before flowing back onto

the Reservation and into the San Poil River. Tunk Creek WMU bounds the project area to the

west, though Tunk Creek itself flows north, off the Reservation and towards the Okanogan

River, without influencing Lost Creek. To the southwest, the Swimptkin and Stapaloop drainages

flow into Omak Creek, away from Lost Creek. The Haden Creek, South Fork Lost Creek, and

Moses Creek WMUs are located directly south of the project area and contain streams of the

same names that contribute to Lost Creek. Likewise, Loony Creek and Sheep Creek to the east

flow into Lost Creek below the confluence with Haden Creek. The Stepstone Creek and Upper

Gold Creek WMUs form a portion of the southeastern boundary, though Little Moses Mountain

Lost Creek 2026 Forest Management Project

8

BIA-NWR-CTCR-EA-26-08

forms the major drainage divide between the Lost Creek RMU, the Nespelem River RMU, and

the West Fork San Poil River RMU.

In addition to direct impacts in the Lost Creek watershed, landscape-scale impacts from activity

in the Lost Creek project area would be detected in the West Fork and the main stem of the San

Poil River. Generally, timber sales are active for five years after approval, resulting in five years

of direct impacts from timber harvest, though indirect impacts can last longer. In the past five

years (since 2020), one other green timber sale has occurred in the Lost Creek RMU: Haden

Creek (2020). Additionally, although few acres in the Lost Creek RMU have burned in the last 5

years, 9,317 acres of the RMU burned in the 2015 Northstar and Tunk fires, followed by salvage

harvest.

Water resources in the project area include 77.5 miles of streams and 277.6 acres of wetlands, as

well as an unknown number of seeps and springs. Lost Creek is the major watercourse through

the project area, flowing generally west to east across the project area before flowing off of the

Reservation. Tributaries to Lost Creek include South Fork Lost Creek (Type 2), multiple

unnamed type 3 streams, which are generally perennial and fish-bearing, and type 4 streams,

which are generally intermittent, high-gradient headwater streams. Lost Creek is perennial and

fish-bearing.

Water quality is monitored on the mainstem of Lost Creek (site ID: LOS040), downstream of the

confluence with Loony Creek. Water quality monitoring and analysis from 2018-2023 identified

exceedances of the standards outlined in Colville Tribal Code 4-8 Water Quality Standards

(Axthelm 2024). Lost Creek exceeded the dissolved oxygen standard for Class II waters (8.0

mg/L) on 6/28/2021 and 7/27/2021, with measurements of 7.4 and 4.4 mg/L respectively.

Additionally, temperature exceedances of the standard for Class II waters (18°C) were recorded

on 7/29/2019 (19.1°C), 6/24/2020 (18.2°C), and 6/28/2021 (18.1 °C). These water quality

metrics are often associated, as warmer water can hold less dissolved oxygen than cooler water;

notably, water quality standard exceedances of these metrics align on 6/28/2021. Lab metrics

(fecal coliform, e.coli, ammonia, nitrate/nitrite, TKN and orthophosphates) were only monitored

at LOS040 during 2018; however, during that time, there were multiple measurements of fecal

coliform and e.coli in exceedance of the Tribal Water Quality Standards.

Table 5. Hydrologic features within the Lost Creek Project Area footprint.

Hydrologic Feature

Potentially Affected Size

Mapped Streams

77.5 mi

Mapped Wetlands

277.6 ac

3.3 Fish and Wildlife

Wildlife

The Lost Creek project area supports habitat for a variety of birds including Northern goshawks,

great gray owls, other raptors, pileated woodpeckers and other cavity nesters, gold and bald

eagles, owls, and a wide range of songbirds. Habitat components that provide requirements for

the highest concentration of birds are found in and around riparian areas and areas with

deciduous vegetation. Other critical habitat components include large diameter trees, snags and

an abundance of large woody debris.

Lost Creek 2026 Forest Management Project

9

BIA-NWR-CTCR-EA-26-08

Other Species

The Northern goshawk (Accipiter gentilis) is a large forest raptor, strongly associated with

mature forests where there is dense and closed canopy cover, open understory for flyways, and

multiple canopy layers for protection. These attributes are critical for nesting and foraging

Northern goshawks. Great gray owls (Strix nebulosi) share similar habitat requirements as the

Northern goshawk with the additional requirement of open meadows for hunting. Pileated

woodpeckers (Hylatomus pileatus) and white-headed woodpeckers (Picoides albolarvatus) are

residents of the project area. Woodpeckers seek habitat that contains large diameter trees and

mature stands of timber with an abundance of woody debris.

The Lost Creek Timber Sale 2026 Project Area contains habitat that meets the life requirements

of a variety of mammal species including snowshoe hares (Lepus americanus), mice (Cricetidae

spp.), voles (Cricetidae spp.), beaver (Castor canadensis), several species of bat (Chiroptera

spp.), coyotes (Canus latrans), black bears (Ursus americanus), bobcats (Lynx rufus) and

cougars (Puma concolor). Retainment of coarse woody debris, in particular large trees/stumps,

provide rich denning habitat for black bears, as well as micro habitat for many insects and

reptiles. Reptiles and amphibians are also residents of the project area and are sensitive to habitat

changes. Areas used for reproduction are among the most important areas to protect for these

species. Each of these species would react differently to the impacts of logging operations but

maintaining species diversity and structural complexity would ensure the continuance of the

greatest suite of species.

Mule deer (Odocoileus hemionus), White-tailed deer (Odocoileus virginianus), Rocky mountain

elk (Cervus elaphus nelsoni), and Moose (Alces alces) are culturally significant species to tribal

members for both subsistence and ceremonial uses and are found within and adjacent to the

project area throughout the year. Additionally, aerial big game surveys have documented winter

range for elk, white-tailed deer, mule deer, and moose within the perimeter of the project area.

Mule deer can be found throughout the area from steep forested ridges to lowland shrub-steppe

habitat at all elevations. White-tailed deer are primarily found using riparian-associated habitat

adjacent to streams, rivers, meadows, or agriculture at elevations below 3,500 feet. Elk are

known to use portions of the area throughout the year, including calving grounds and winter

range.

The Colville Reservation is currently home to eight known wolf packs. Gray wolves (Canis

lupus) as an apex predator play an important role in ecosystem function, preying primarily on

ungulates such as deer, elk and moose. Currently, there is a wolf pack utilizing the Lost Creek

area, with habitat and prey existing to support wolves. This area provides travel habitat and

movement for resident and migrant wolves. Wolves in Eastern Washington are state threatened

species, but not a federal listed species.

It is likely that Canada lynx (Lynx canadensis) are present in the Lost Creek Timber Sale 2026

Project Area due to its elevation and habitat type. Additionally, it has been recorded that Canada

lynx have used this area as an island to connect to their western Sinlahekin range. As originally

proposed, the Lost Creek project May Effect , unlikely to adversely affect Canadian Lynx.

Fish

The Lost Creek Project area is located in the headwaters of the Sanpoil River Basin including a

large portion of the Lost Creek drainage. Within the project area, several fish bearing streams are

Lost Creek 2026 Forest Management Project

10

BIA-NWR-CTCR-EA-26-08

present, including Lost Creek itself as well as several smaller type 3 and 4 streams. These

streams are home to native redband rainbow trout Oncorhynchus mykiss gairdneri, a culturally

significant species to the CTCR tribal membership, brook trout Salvelinus fontinalis, native

minnows (Leucisidae), and sculpins (Cottidae). Ecological responses from the proposed actions

may include elevated sediment production, sediment delivery to stream channels, and an altered

hydrograph, and these responses are correlated with ground disturbing actions. Sedimentation of

streams may be abated by increased buffers and/or piling of slash on skid trails. It is

recommended that the RMZ buffers be maintained and protected, and where possible, sediment

abatement measures be instated accordingly.

The Lake Roosevelt drainage area, including the Sanpoil River Basin, is included in the

Northeast Washington Research Needs Area of the Mid-Columbia Recovery Unit for bull trout

(S. confluentus; USFWS 2002). Bull trout Threatened and Endangered Species federal status is

currently listed as “threatened” while Washington State considers bull trout a candidate for

listing. Bull trout in the Lost Creek Project Area and surrounding areas are extremely rare and

believed to be extirpated. Historically, populations likely occurred in several tributaries to the

Columbia River above Grand Coulee Dam (Lake Roosevelt). However, currently, no spawning

populations exist within the Northeast Washington Research Needs Area. Since 2011, fewer than

25 bull trout have been documented in the mouths of tributaries to Lake Roosevelt or in Lake

Roosevelt/Columbia River itself. In 2012, a single adult bull trout was documented in the lower

Sanpoil River Arm of Lake Roosevelt. Bull trout observation data within the Northeast

Washington Research Needs Area is not well tracked, is sporadic, and often anecdotal, although

they are rarely encountered during large-scale standardized fishery surveys. Bull trout present in

the Northeast Washington Research Needs Area likely derive from local populations in the

Coeur d’Alene/Spokane River or Pend Oreille River basins, or from tributaries to the Columbia

River in Canada and have been entrained over dams. Therefore, while bull trout have been rarely

encountered in Lake Roosevelt, bull trout are very unlikely to be impacted by this project.

Federally Threatened or Endangered Species

Section 7 of the Endangered Species Act (ESA; 16 U.S.C. 1531 et seq.) of 1973 as amended, and

its implementing regulations found at 50 CFR 402, require federal agencies to insure that any

action authorized, funded, or carried out by such agency is not likely to jeopardize the continued

existence of any endangered species or threatened species or result in the destruction or adverse

modification of habitat. The project would not directly or indirectly impact on any living

resources. Information for Planning and Conservation was acquired from the United States

Department of Interior Fish and Wildlife Service (USDOI-FWS) for Endangered Species Act

Species List. An Official Species List from the United States Department of Interior Fish and

Wildlife Service (USDOI-FWS) consultation code is included below (Appendix B). The

following species, listed in Table 6, have no critical habitat and no potential to occur within or

adjacent to the project site based on the appropriate USGS 7.5- minute quadrangle map.

Table 6. US-DOI-Fish and Wildlife Service: Official Species List.

Species

Canada Lynx

Yellow-billed Cuckoo

Monarch Butterfly

Suckley’s Cuckoo Bumble Bee

Scientific Name

Lynx canadensis

Coccyzus americanus

Danaus plexippus

Bombus suckleyi

Lost Creek 2026 Forest Management Project

11

Status

Threatened

Threatened

Proposed Threatened

Proposed Endangered

BIA-NWR-CTCR-EA-26-08

Bull Trout

Whitebark Pine

Salvelinus confluentus

Pinus albicaulis

Threatened

Threatened

Upon review of the location of the proposed action, consultation with the BIA and Tribal

Wildlife Biologist determined that the proposed actions and associated activities would have

‘May Effect, unlikely to adversely affect” Canada Lynx. This project will have “No Effect” to

the remaining species’ to threatened or endangered species, or candidate or proposed species, or

suitable or critical habitat within the action area. Documentation is found in Appendix B.

Table 7. US-DOI-Fish and Wildlife Service: Migratory Birds List. USFWS Birds of Conservation Concern

(BCC); Continental USA and Alaska (CON).

Species

Cassin’s Finch

Rufous Hummingbird

Evening Grosbeak

Bald Eagle

Golden Eagle

Lewis’s Woodpecker

Long-Eared Owl

Olive-Sided Flycatcher

Scientific Name

Carpodacus cassinii

Selasphorus rufus

Coccothraustes verpertinus

Haliaeetus leucocephalus

Aquila chrysaetos

Melanerpes lewis

Asio otus

Contopus cooperi

Status

BCC Rangewide (CON)

BCC Rangewide (CON)

BCC Rangewide (CON)

Non-BCC Vulnerable

Non-BCC Vulnerable

BCC Rangewide (CON)

BCC Rangewide (CON)

BCC Rangewide (CON)

Habitat

The project area supports a variety of cottonwood and aspen (Populus spp.) stands possessing

multiple stand characteristics. Riparian areas within the project area are associated with seeps

and springs, intermittent and perennial streams, and wetlands. There are many seeps and springs

in this area that may not be visible until the ground is disturbed; this along with soil type and

slope could result in washouts and landslides. Deciduous trees and shrubs are present in the

lower elevations of the project and in the saddles and draws of the higher elevations; these areas

are considered riparian habitat if they are linked to a seasonal or perennial water source.

Within the project there are areas that contain sufficient woody debris both in the uplands and

riparian habitats. These areas would be impacted by the removal of large recruitment trees, the

reduction of snags and the removal of downed wood due to site prep and equipment operation.

3.4 Cultural Resources

National Historic Preservation Act (NHPA)

Section 106 of the National Historic Preservation Act (NHPA) as amended, and its implementing

regulations found at 36 CFR Part 800, require federal agencies to identify cultural resources for

federal action. The significance of the resource must be evaluated using established criteria

outlined at 36 CFR 60.4. If a resource is determined to be a historic property, Section 106 of the

NHPA requires that effects of the undertaking on the resource be determined. A historic property

is “…any prehistoric or historic district, site, building, structure or object included in, or eligible

for inclusion in the National Register of Historic Places, including artifacts, records, and material

remains related to such a property…” (NHPA, 16 USC 470w, Sec. 301[5]).

“Cultural resources” include archaeological sites, standing structures, and locations or landforms

that are important to the identity of the indigenous people of the area (i.e., traditional cultural

Lost Creek 2026 Forest Management Project

12

BIA-NWR-CTCR-EA-26-08

properties [TCPs]). For more details on the affected cultural environment, please consult the

CCT Cultural Resource Management Plan (CCT 2007), the cultural resources overview for the

Colville Reservation (Gough 1990), and the FEIS for the IRMP (CAR 2018).

The Lost Creek Forestry Project is within the ancestral lands of the Okanogan Tribe, who can

identify their ancestry, back over a thousand years in this area. The languages of the twelve tribes

comprising the CTCR have been grouped into general Salishan and Sahaptian language families.

The majority spoke the Interior Salish languages of nxaɁamcín and nsləxcín, though the

Sahaptian languages of the Nez Perce (nímípuɁ) and Palus (palús) were also spoken. The

language of the Okanogan is nsləxcín.

For the purposes of consultation with the Tribal Historic Preservation Officer (THPO) under

Section 106 of the National Historic Preservation Act, the timber treatment areas and attendant

landings, any road construction and reconstruction as well as all existing roads utilized for

logging operations shall be considered the Area of Potential Effect (APE).

Approximately 516 acres were previously surveyed within and immediately adjacent to the Lost

Creek Forestry Project area (Gough 1990, Marchand 2008). These inquiries have resulted in

documentation twelve archaeological sites and three Traditional Cultural Properties within or

immediately adjacent to the Lost Creek Forestry area and a review of the Colville Confederated

Tribe History/Archaeology.

A search of Bureau of Land Management/General Land Office (BLM/GLO) records indicates

that there is one historic Indian allotment, seven land patents, two mining prospects, one historic

road in the approximate location of the current Moses Meadows/Lyman Lake road, and one

historic trail now known as Colby Trail Road documented within the project area.

For the current project, a predictive model (Hess 2001) was used to select areas within the Lost

Creek Project area for a cultural resource survey. One new archaeological site and one

significant cultural plant population was documented during this survey.

All TCPs and archaeological sites must meet at least one of the following criteria to be

considered eligible for evaluation to the National Register: A) the must be associated with events

that have made a significant contribution to the broad patterns of history, B) they must be

associated with the lives of persons significant to our past, C) they must embody the distinctive

characteristics of a type, period, or method of construction or they represent the work of a

master, or that possess high artistic values, or that represent a significant and distinguishable

entity whose components may lake individual distinction, or D) they must have yielded, or be

likely to yield, information important in prehistory or history. Additionally, to be a “property” a

TCP must have tangible boundaries (36 CFR 60.4; Parker & King 1998).

Shannon and Moura (2007) have aptly observed that due to the unique nature of TCPs, the

standards identified above must also be evaluated with perception of Native American history.

When reviewing TCPs for continued use of at least 50 years, for instance, it must be recalled that

federal and state policies common in the 1800s restricted, regulated and denied access to

property to Tribal people which had previously been in their exclusive territory. Oftentimes,

Indian people may shift their area of use to adjacent or nearby locations if a previously utilized

Lost Creek 2026 Forest Management Project

13

BIA-NWR-CTCR-EA-26-08

property suddenly (and beyond Tribal control) became unavailable. Therefore, a location may

still retain value and continue to be a TCP when access is restored (Shannon & Moura 2007).

In pre-contact and historic times, the knowledge of these TCPs and their locations and use

provided people with a means for subsistence and important cultural items for personal use or

trade, cultural practices which continue to this day. Additionally, the nature of these sites and

their close proximity to other documented cultural resources, including pre-contact, historic and

additional TCP sites increase their potential to yield important information to the CTCR.

Oral history accounts of the region identify the general areas of Moses Meadows, Lost Creek ,

Haden Creek and Crawfish Lake as possessing traditional value. It is the position of the CTCR

that “A place is significant due to its location and the meaning assigned to it, not the language of

the name by which it is known. While recording place names in the original languages is of

immeasurable value, the places would continue to have meaning and significance regardless of

the language used to describe them (George 2011).

It is likely that cairns, rock alignments, and other rock features may be found throughout the area

due to the prominent landscape of the mountains in the area. Small pre-contact camps may be

present on the upland areas adjacent to springs or creeks, or in sheltered canyons, where people

would have camped while taking advantage of upland resources. Evidence of early historicperiod occupation, logging and mining features and\or graves may be present within the project

area. It is also likely that eagle feather collection areas are utilized by current Tribal members,

given the proximity to the Columbia River.

The project area is located within the Lost Creek Watershed, which contains all or portions of

Lost Creek, Haden Creek, Loony Creek, Moses Creek, and Crawfish Lake. Water-based

activities occur in equal amounts during the fall, spring and summer within this watershed. This

area is documented as the principle gathering location for at least eight plant species for

consumption, construction and religious purposes (Table 8). One spring, which the CCT attribute

significant cultural value to, are documented within this watershed. Four locations within this

watershed have been documented as important areas for water-related resource use, legendary

landscapes, or spiritual areas. Some of these are associated with the Moses Meadows and Lost

Creek.

Table 8. Traditional Cultural Plants gathered within the Lost Creek Watershed (Marker et al. 2011).

Valerian,

Wild Strawberry,

Lodogepole Pine,

Valerina spp

Fragaria vesca

Pinus contorta

Fir,

Red Willow (Dogwood),

xusxus (Canby’s Lovage),

Multiple Species

Conrus stolonifera

Ligusticum canbyi

Western Larch,

Cedar,

Larix occdentalis

Thuja plicata

Lost Creek 2026 Forest Management Project

14

BIA-NWR-CTCR-EA-26-08

3.5 Range Management

Range Program Operations

Within forest project areas grazing is a secondary land use but is important to CTCR livestock

owners for success in their economic venture. Grazing can also provide positive impacts by

reducing accumulated fuel and reinvigorating grasses. Rangeland structural resources such as

fences, watering facilities, and cattle guards are an important component to the sustainable

stewardship of land designated for grazing and are very expensive to replace. The proposed

treatment blocks for this project are located within the Northern portion of Range Unit 5. The

Range Programs infrastructure GIS layer indicates quite a few structural assets associated with

RU 5 that would likely be encountered during this project. Fences and cattle guards are of

particular concern. CTCR Range Program asks that when range infrastructure is encountered

such as cattle guards, watering facilities, and fences they be avoided as much as possible. If

range infrastructure is damaged during project activity the project proponent would be

responsible for notifying the Range Program and seeing that damage is repaired in a timely

manner. If cattle guards are located on roads that need to be used for heavy traffic, they should

be assessed for the ability to handle the weight of large trucks and equipment. The Range

Program can assist with that if contacted in a timely manner. If it is determined the cattle guard

does not meet specifications for the anticipated weight of the traffic, and there is no way to

bypass it, the cattle guard may need to be temporarily removed. If this is the case it is essential

the Range Program be notified 48 hours prior to the removal. The removed cattle guard would be

reinstalled by the proponent of the project unless other arrangements are made with the CTCR

Range Program.

The impacted Range Unit 5 has approximately 300 head of livestock permitted on it. Range Unit

fences need to remain functional, with any gates closed and damage to fences quickly repaired.

The Range Program needs to be notified if an infrastructure problem becomes apparent. The

Range Program would also be notified when burning occurs in the forest project area before the

turnout date of May 15th so the Range program can move livestock to an area on the range unit

that would not be affected.

3.6 Air Quality

This project is located within the Okanogan River Airshed. Air quality is generally good, with

the primary reason for lower air quality is smoke from wildfires, however, the majority of days

are in the least polluted air quality category. (CAR 2018)

4.0 Environmental Consequences

Summary Table of Issues Indicators

Table 9. Summary table of issue indicators for goals and objectives.

Resource Issue

Issue Indicator

Alt. A

Alt. B

Vegetation Forest Health

/Timber

Acres Treated

0

3,096 ac

Lost Creek 2026 Forest Management Project

15

BIA-NWR-CTCR-EA-26-08

Support of Tribal

Wood Processing

Timber Volume

for Processing

0

23.7 MMBF

Tribal Income

Projected

Stumpage

$0

$7 Million

4.1 Forestry

Impacts to Forestry Resources Alternative A: No Action

•

•

•

•

•

•

•

•

No profits for Colville Tribe and would not meet the AAC of 77.1 MMBF.

Forest management would not receive the 10% funds.

No timber industry employment would be generated.

Forest health would decline.

No Improvements in forest roads.

Area would move farther away from the Desired Future Condition’s in the Integrated

Resource Management Plan.

No new acres would be added to the regulated forest.

Catastrophic wildfire would not be reduced.

Under this alternative, no conifer trees would be harvested. No timber stumpage revenue would

be generated. No Forest Management Deduction (10%) funds would be generated. No logging

industry employment would be generated. No silvicultural treatments would be implemented.

Forest health issues and concerns could possibly worsen, and the desired objectives would not be

achieved in regard to desired future conditions. Overstocking of forest stands; predominance of

climax tree species, over mature trees, tree mortality, competing vegetation, forest insects and

diseases problems and other current forest conditions would continue to affect the overall forest

health. The potential forest site-productivity may never be achieved in some locations.

The effect of No action on historic and desired future fire regimes would be to allow site

conditions to continue to depart from historic conditions and further increase the probability of a

wildfire scenario that would likely cause stand replacement on a considerable portion of the

project area. Fire suppression activities would continue as in the past. Although much of this

area historically burned at 35-100 year intervals, current policy dictates that this would not occur.

North facing shaded aspects would have a high severity stand replacement if a wildfire occurred.

South facing aspects would have mixed severity results. The exclusion of fire has resulted in an

overabundance of vegetation. More fire prone species such as Douglas fir and lodge pole pine

have dominated the understory and created an abundance of ladder fuel, mixed with the amount

of dead and downed material from any fuels reductions activities. These areas would continue to

develop the stand composition and structure that makes them more prone to stand replacement

events.

Forest roads would not be maintained and/or reconstructed and potentially upgraded by culvert

installation and erosion control which would affect the access and use of resources by the

Colville Tribe and public. Under-sized culverts and plastic culverts would not be replaced.

Impacts to Forestry Resources Alternative B: Proposed Action

•

$7 million dollars of profit for the Colville Tribe with a harvest of 23.7 MMBF

Lost Creek 2026 Forest Management Project

16

BIA-NWR-CTCR-EA-26-08

•

•

•

•

•

•

Forest health would improve, diseased trees would be lessened, and disease-resistant

species would be regenerated naturally and with planting.

Understory Douglas-fir, Subalpine/Grand Fir, Lodgepole Pine encroachment would be

piled and/or burned, reducing the likelihood of catastrophic fire and prepare site for

regeneration of desirable species.

6,723 acres will undergo prescribed underburn reducing the risk of catastrophic wildfire.

Density would be reduced in overstocked stands, creating a healthier forest.

Desired Future Condition’s outlined in the IRMP would be met over time.

38.9 miles of existing roads and 12.03 miles of BIA roads would be improved.

Thinning/logging would increase the dead and down fuel loading but will be mitigated with

under burning. Returning fire to the ecosystem would increase resilience of function. Fire on the

landscape increases fire adapted vegetation species occupying these sites supporting healthy

resilient plant communities. The target of this treatment is to increase the crown base height,

reduce dead and down fuel loading, and crown bulk density to decrease the probability of

supporting a crown fire.

Some of the potential negative impacts that a timber sale may create, include the following:

Visual landscape changes or disturbances would occur. Man-made “signs” (ribbon, tags, paint)

are introduced into the area to guide the forest management. Noise and dust are created from

logging operations. Existing vegetation is temporarily disturbed, but their resiliency to

disturbances would allow them to come back. Skid trails and landings are created. Woody slash

material is created.

4.2 Hydrology

Impacts to Hydrology Resources Alternative A: No Action

The No Action alternative would allow for the natural ecological process to continue. Stream

channel hydraulics and associated riparian vegetation would not be impacted by harvest related

activities. Effective ground cover and hydraulic roughness would remain, continuing to provide

overland flow attenuation and prevent nonpoint source pollutant delivery to downslope

watercourses. Retention of mature vegetation would continue to provide canopy interception and

reduced rain splash erosion. Infiltration would remain high, and rill and scour erosion would

remain minimal. Additionally, soil structure would be maintained in the current state. All

methods of timber harvest, ground- or cable-based, result in some amount of soil disturbance.

Soil compaction generally occurs in locations where machinery tracks have traveled (particularly

in wet conditions), while destruction of soil structure and subsequent sediment mobilization

generally occurs because of ground-based operation on steep slopes and a lack of traction.

Transport of trees by logging equipment also results in soil disturbance and transportation. These

effects would be avoided through the No Action Alternative, maintaining soil structure, density,

and productivity.

Road density would be maintained at the current level under the No Action Alternative. Existing

road density in all Watershed Management Units (WMUs) in the project area are higher than the

desired condition outlined in the IRMP (desired: 4.0 mi/mi2; current: Upper Lost Creek: 5.47

mi/mi2, Lower Lost Creek: 6.03 mi/mi2), but lower than the density that would be achieved as a

result of the preferred alternative. The No Action Alternative would also not involve

reconstruction of any existing roads, allowing existing vegetative cover and stability to be

Lost Creek 2026 Forest Management Project

17

BIA-NWR-CTCR-EA-26-08

maintained. Maintaining the lowest road density (i.e. the existing condition) would provide the

closest approximation of natural hydrologic conditions, between the two scenarios. High road

densities are detrimental to watershed hydrology primarily due to the interception and diversion

of water from natural flow paths. When water flowing down a hillslope is intercepted by a road

prism, ditch, blocked or undersized culvert, or other infrastructure, that water is generally

diverted or lost to evaporation, rather than continuing as overland, shallow subsurface, or

groundwater flow. As climate change advances, it becomes increasingly important to retain

water on the landscape. High road density contributes to the loss of water on the landscape

through decreased infiltration and increased evaporation, and each additional road increases

these effects.

Existing roads in the Lost Creek project area are maintained to various levels of stability. 37

existing segments, with a total length of 12.17 miles, were identified for review; segments were

selected for review if they were within or adjacent to swales, draws, wetlands, streams, or other

aquatic resources. Additionally, some segments had previously received restoration treatment,

and were identified to prevent unauthorized use. Under the No Action Alternative, none of these

segments would be reconstructed, and use would not increase. However, segments that have not

been maintained may continue to be at risk of failure, and crossings obstructing flow and fish

passage would continue to do so.

Impacts to Hydrology Resources Alternative B: Proposed Action

•

•

•

4.22 miles of new construction and 7.54 miles of reconstruction within 200 ft of

hydrologic features

Harvest activities within 200 ft of streams – 305.38 ac

Harvest activities within 200 ft of wetlands – 59.30ac

The proposed action would involve 3,097 acres of timber harvest. Throughout the project area,

these activities overlap and abut streams and wetlands, with 364.68 acres of harvest activities

within 200 feet of wetlands and streams.

Harvest operations, including the use of heavy machinery to fell and skid timber, cause soil

compaction and erosion; additionally, as a result of decreased vegetation, interception,

infiltration and water use are decreased, and a greater volume of water occurs as overland flow.

This can result in great sediment transportation to downslope streams and wetlands, resulting in

decreased water quality. Additionally, harvest operations create linear features such as skid trails.

If oriented parallel to the slope, or located in swales and topographic low points, these linear

features channelize water, and lead to rill and gully erosion, sediment transportation, and road

failure. These effects can be minimized by locating skid trails perpendicular to slope direction,

and through the use of cable logging rather than ground-based harvest systems, particularly on

steeper slopes.

All road construction and use associated with proposed timber harvest activities would lead to

soil disturbance and loss as well as alteration of watershed hydrology (Hunner 2014).

Specifically, road miles within 200 ft. of surface water are statistically likely to deliver

sediment/erosion to surface water (Dubé et al 2004). Road reconstruction and new construction

effects on water quality, hydrologic processes, and aquatic habitat would be the longest-ongoing, longest-lasting, and highest-degree negative impacts resulting from the proposed action.

The use of heavy machinery to create and redo roads would result in immediate sediment

delivery to adjacent waterbodies. Additionally, reconstruction results in soil compaction and

Lost Creek 2026 Forest Management Project

18

BIA-NWR-CTCR-EA-26-08

disturbance, both of which are significant causes of decreased soil health, eventual runoff

channelization and continued erosive losses. Repeated improper reconstruction procedures that

fail to reincorporate disturbed material into the road prism create linear features that channel

water away from natural water features. When these features are created adjacent to streams,

heavy flow events can cause the relocation of the active channel into the road prism, creating a

safety hazard, and drastically altering the natural hydrology of the area.

The impacts from the proposed project to the affected environment are multi-faceted. Harvest

impacts include alterations in flow paths due to skid trail creation and machinery operation;

reduced infiltration and increased erosion due to soil compaction from machinery operation;

increased sediment and nutrient delivery to surface waters; loss of wetland and riparian

vegetation; and potential delivery of herbicide to surface waters, among others.

Prior to initiation of harvest, calculation of exact miles of skid trails is not feasible. However,

impacts can be estimated through looking at the number of blocks and acreage of harvest

impacts. 3,097 acres, across 46 blocks, are proposed for ground based (tractor and cable assist)

harvest. Assuming an average block width of approximately 2,000 feet (a conservative

estimation), with average skid trail spacing of 100 feet (as required by Colville Tribal Code 4-7

Forest Practices), over 900 skid trails would be created in blocks prescribed for ground-based

harvest. 2022 aerial imagery from previous sales, including the 2020 Hayden Creek timber sale,

was determined to be closer to an average of roughly 50 foot spacing. With this knowledge, we

can assume that skid trail creation could be as much as double what is estimated above in

ground-based harvest blocks. Additionally, 364.68 acres of proposed ground-based harvest

would occur within 200 feet of hydrologic features. The potential for sediment and nutrient

delivery to surface water via skid trail creation is elevated in these acres.

Tethered logging involves the use of a winch for assistance in machinery operation of slopes, is

proposed for 241.2 acres of blocks. Existing Tribal Code does not allow for operation of groundbased harvest systems on slopes over 35% due to potential soil impacts, recognizing the

increased magnitude of machinery impacts as slope increases. However, tethered logging has

been adopted for use on slopes up to 70%, to increase efficiency and decrease costs of harvest.

Where any ground-based harvest system is used on vulnerable soils, the potential for compaction

and erosion is increased. When these factors are combined with steep slopes and proximity to

aquatic resources, the potential for sediment delivery and resource damage is significant. 9.7 of

these acres are located within 200 feet of hydrologic features (streams and wetlands), increasing

the potential for sediment delivery due to the combination of ground-based operation and steep

slopes.

Road development and use impacts include alterations in flow paths due to the creation of linear

landscape features (roads) perpendicular to natural slopes; reduced infiltration and increased

erosion due to the creation of impervious or resistant surfaces; and increased transport of vehicle

associated contaminants (including 6PPD-q, hydrocarbons and carbon monoxide from exhaust,

etc.), among others.

Proposed reconstruction and new construction in the Lost Creek project area would occur on

48.39 miles of road. The proposed haul route for logging vehicles to transport logs to the mills

would utilize Moses Meadows Road, and then north off the reservation through Aeneas Valley

on to Highway 20. According to the Transportation Planner, there is a small possibility that the

haul route would go down to Highway 155, if logs were being sent to Cle Elum. 11.76 miles of

Lost Creek 2026 Forest Management Project

19

BIA-NWR-CTCR-EA-26-08

reconstruction and new construction would occur within 200 feet of surface water. High road

densities detrimentally affect water retention on the landscape, creating interception points that

redirect flow from reaching creeks, streams, and wetlands. Abandonment and revegetation of

roads can mitigate some of the effects of high road density, improving infiltration and decreasing

overland flow, but retention of road prisms, nonnative roadbed material, and artificial crossing

structures such as culverts would continue to alter hillslope hydrology regardless of vegetation

establishment. Additionally, studies have shown that the chemical 6PPD-quinone, used in the

manufacture of rubber tires, can cause acute mortality in salmonids, including rainbow trout

(Oncorhynchus mykiss), found in streams across the Colville Reservation. Roads in proximity to

salmonid bearing waters may result in 6PPD-q related effects.

Therefore, the action in this area would have direct physical changes on the environment. The

Proposed Action Alternative approval would have cumulative effects resulting from road

construction and timber harvest. The associated effects are discussed in Section 5.6 of this EA.

Surface Water:

The proposed alternative would generate sediment through the creation of skid trails, increase

overland flow through the removal of vegetation, and create interception points through the

construction and reconstruction of roads. A minimum of 54 culverts would be installed or

replaced during this project. Road miles and road density in the project area would increase due

to the 9.49 miles of new road construction.

Direct Impacts Short-Term

Timber harvest activities are likely to result in short term impacts to surface water quality

through the removal of vegetation. Temperature and dissolved oxygen standards have been

exceeded at the Lost Creek water quality monitoring site on multiple occasions during the

previous monitoring period. Increased heating of surface water, particularly in headwaters and

tributaries, is likely, due to removal of vegetative cover. Degradation of temperature and

dissolved oxygen metrics would likely be short term impacts of timber sale activities.

Additionally, although turbidity has previously not been a metric of concern in Lost Creek,

ground-based timber harvest is likely to result in sediment generation and transport to surface

water through soil disturbance and creation of linear flow paths. Water quantity is the main stem

of Lost Creek may increase in the short term, due to removal of vegetation and reduction of

transpirative losses. However, much of this water would travel as overland flow, becoming

vulnerable to evaporation and interception from road prisms, skid trails, and other anthropogenic

alterations. Water distribution across the landscape is likely to change for this reason. Road

construction and reconstruction is responsible for interruption of natural landscape hydrology,

creating diversion points perpendicular to hillslopes. These diversions result in altered flow

paths, increased evaporation, and increased sedimentation. Short term water quality would likely

decrease for these reasons as well. These impacts would be sustained over the duration of the

project, approximately five years.

Direct Impacts Long-Term

Long term impacts to surface water would continue until vegetation is established and disturbed

areas are stabilized. As skid trails and roads are seeded with herbaceous vegetation, soils would

become more stable, and water quality would gradually return to pre-harvest conditions. As

larger vegetation and trees establish, surface water quantity would decrease with increased

Lost Creek 2026 Forest Management Project

20

BIA-NWR-CTCR-EA-26-08

evapotranspiration. Depending on the duration and severity of impacts to natural hillslope

hydrology, flow paths may be permanently altered by the creation of skid trails and roads.

Additionally, roads would not be deconstructed at the conclusion of the sale. Therefore, road

density impacts on interception and diversion would persist, and road use would continue into

the foreseeable future. Crossing structures would also not be removed and impacts from

improperly installed or sized structures would continue to impact water quality in the long term.

Additionally, any road use over streams would continue to deliver sediment and contaminants to

the surface water at the crossing.

Cumulative Impacts

As discussed above, one other timber sale has occurred in the Lost Creek RMU in the past 5

years. This timber sale, Haden Creek, occurred in the WMU of one of the major Lost Creek

tributaries; in the year the sale was initiated, temperature and dissolved oxygen measurements

were in exceedance of the water quality standards on several occasions. While harvest operations

are likely complete, impacts from loss of cover and soil disturbance would continue to impact

water quality in Lost Creek. The Lynx Mountain Sale would add an additional 3,097 acres of

timber harvest in the drainage. Additionally, 9,317 acres of the Lost Creek RMU burned during

the North Star and Tunk Fires, followed by salvage harvest. Each acre of timber harvest results

in sediment generation, nutrient transport, and hydrologic alteration.

Wetlands:

The proposed forestry activities would impact wetland ecosystems through soil disturbance,

hydrological alteration, and disruption of vegetative community. 59.30 acres of harvest activities

occur within 200 feet of wetlands and forestry associated road work includes 2.11 miles of new

road and 2.01 miles of road reconstruction within 200 feet of wetlands.

Direct Impacts Short-Term

Extensive tree removal adjacent to the Lost Creek associated Freshwater Emergent Type 2

Wetland, W.LC_013, in the RRT Rx Block 160-085 and adjacent to Freshwater Emergent Type

3 Wetland, W.LC_061, in the Seed Tree/Overstory Removal Rx Blocks 163-084 and 163-101are

predicted to contribute to short-term rise in local water tables which influence the timing and

seasonal persistence of surface water, interrupt pollutant processing capacity of the wetlands, and

disrupt growth habits of wetland vegetation. Environmental Trust has received verbal

confirmation that a previously unmapped wetland (W.LC133e) in RRT Rx Block 160-024 would

be buffered with a 50 ft RMZ, but mapping as of 12/4/25 does not show this indication. There

remains a direct impact potential and this wetland must be buffered based on on-ground

conditions.

Direct Impacts Long-Term

There are 2.11 miles of new road and 2.01 miles of road reconstruction within 200 feet of

wetlands indicated in the Lost Creek Forestry Project with 12 incidences totaling 0.8 miles of

reconstructed road within Wetland RMZ buffers. Over the long-term the construction and use of

forestry-related roads contribute to sedimentation in wetlands, aiding in nutrient and pollutant

delivery as well as degrading wetland function, water quality, and habitat.

Cumulative Impacts

Lost Creek 2026 Forest Management Project

21

BIA-NWR-CTCR-EA-26-08

Increased runoff and sedimentation associated with ground-based harvest systems and road

construction, reconstruction, and forestry related road use are expected to have cumulative

systemic impacts to the wetlands adjacent to harvest blocks as well as the downstream wetlands

associated with Lost Creek and its associated streams. The Lost Creek 2026 Forestry Harvest

Project would occur simultaneously with BIA Land Operations grazing permits in Range Unit 5

and adjacent to Range Units 10 and 12. There are no grazing controls identified for range

practices along Lost Creek and the associated wetlands or isolated wetlands throughout the

project area. Cattle impacts including wetland soil disruption and biological impacts would be

exacerbated by forest practices contributing to excess sedimentation and nutrient inputs. In order

to address these issues the CTCR Wetland Specialist is going to work with the Land Operations

Program in evaluating each Range Unit to identify resource protections during the next grazing

cycle renewal process.

Floodplains:

NOAA mapping indicates an extensive 100-year floodplain associated with Lost and Haden

Creek, including in the upper reaches of Lost Creek. Lower typed tributaries tend not to have

associated floodplain due to topography and slopes within the project area. Blocks and roads

proposed for this project do not encroach on the 100-year floodplain of Lost or Haden Creek,

with the exception of existing road approaches.

Water Resource Impact Conclusions

Table 10. Water Resource Impact Summary from proposed action.

Water Resource

Type

Surface Water

Wetlands

Short-Term Direct

Impacts

Yes

Yes

Long-Term Direct

Impacts

Yes

Yes

Cumulative

Impacts

Yes

Yes

The project would result in short term impacts to soil and surface water, particularly within the

top 12-24 inches. Long term impacts (after the conclusion of the project) would be minimal as

vegetation reestablishes and stabilizes slopes. However, the cumulative impact of the project, in

conjunction with previous timber sale and wildfire impacts, would impact water quality and

quantity throughout the Lost Creek RMU. The Proposed Action would result in short term and

cumulative impacts to water resources including surface water and wetlands.

Resource Use Patterns

Transportation Networks:

The existing transportation network on the Reservation consists of nearly 10,000 miles of road

managed under multiple jurisdictions, maintained to varying degrees of stability. Within the

Omak/Nespelem district, major travel corridors include State Route 155 (Washington State

DOT), Cache Creek Road (Okanogan County Public Works), and Columbia River Road (BIA

DOT), among others (Tribal DOT, etc.). Additionally, the district contains multiple thousands of

miles of forest roads, which do not fall under any of the above jurisdictions, and therefore do not

receive any maintenance. These roads are primarily used for timber harvesting, fire suppression,

and member access for hunting, fishing, and gathering. In addition to this multi-jurisdictional

network, there are over 3,300 stream crossings.

Direct Impacts Short-Term

Lost Creek 2026 Forest Management Project

22

BIA-NWR-CTCR-EA-26-08

The Lost Creek timber sale project proposes the construction of 9.49 miles of new road, and 38.9

miles of reconstruction of existing forest road. The use of these roads for timber sale operations

would result in short-term impacts to the existing transportation network through physical

degradation of roads. Large vehicles carrying heavy machinery and loads of logs cause road

quality to deteriorate. This would occur throughout the life of the project.

Direct Impacts Long-Term

The existing roads network is not well maintained; creation of new roads and reconstruction of

existing roads would decrease the amount of maintenance that can be allocated to existing

segments, and cause road quality to deteriorate over time.

Indirect Impacts

No indirect impacts from this project are likely to impact the transportation network.

Cumulative Impacts

In addition to the Lost Creek timber sale, one other timber sale has occurred in the Lost Creek

RMU in the past five years. This results in cumulative stress on the existing and proposed

transportation network through the use of heavy machinery and large vehicles.

Short- and long-term direct, and cumulative impacts to water resources have been identified with

the proposed Lost Creek Timber Sale project. Implementing the proposed action would result in

new and cumulative significant impacts to water quality and wetlands. Mitigation measures to

attenuate these impacts are outlined in Section 5.

4.3 Fish and Wildlife

Impacts to Fish and Wildlife Resources Alternative A: No Action

The “no action” alternative would not have adverse effects on fish and wildlife habitat in the

project area. Leaving the timber intact would allow the area to follow natural succession patterns

and would benefit wildlife species both terrestrial and aquatic. Fires and/or insect/disease die offs

could affect the project area but the timing and severity of these disturbances is not known.

Natural disturbances may even benefit fish and wildlife species by increasing habitat values.

Overstocked and diseased stands may show a decline in value for some species of wildlife.

Impacts to Fish and Wildlife Resources Alternative B: Proposed Action

Bald and Golden Eagle Protection Act and the Migratory Bird Treaty Act

The Bald and Golden Eagle Protection Act (16 U.S.C. 668-668c), of 1940, as amended, and

Migratory Bird Treaty Act (16 U.S.C. 703-712), of 1918, as amended, prohibits anyone, without

a permit, from “Taking” eagles or any bird, including their parts, nests, or eggs. Within this Act,

eagles/nests/eggs/young are not to be “Disturbed” including agitated or bothered. Aerial surveys

have been conducted in the past by the Colville Tribe to identify eagle and raptor nests. All

known nests are buffered and have seasonal restrictions.

Within the Lost Creek Timber Sale Project boundary there is no known bald eagle (Haliaeetus

leucocephalus) or golden eagle (Aquila chrysaetos) territories. Per code 4-7-68 a minimum of

two reserve trees per acre, well distributed, shall be left standing (CTCR 2006). Due to this being

suitable habitat for eagle species it is requested that these reserve trees consist of the largest

Lost Creek 2026 Forest Management Project

23

BIA-NWR-CTCR-EA-26-08

diameter and tallest living trees. If during harvest activities a bald or golden eagle nest is thought

to have been found, please contact the 3P wildlife biologist immediately.

Within the project area there is no known active great gray owl territories. One northern goshawk

was observed in the pre-synthesis within the Lost Creek project area, and the nest was located

(119.1980109°W 48.4632165°N). There shall be no harvest activity buffer of 660 feet, which

would be put into place, with a 0.5-mile seasonal (March 1- August 31) buffer to protect

fledgling activities. If at any time during harvest activities, goshawks or great gray owls are

observed, contact the OND wildlife biologists.

Other Fish and Wildlife Species

The Proposed Action would have impacts on fish and wildlife species and habitat within the

project area. Removal of timber from 3,096 acres could have negative impacts on wildlife

populations that use the project area habitat to meet their life requirements. Impacts to the habitat

within the project area would include but are not limited to: an increase in soil compaction and

ground disturbance, an increase and introduction of noxious weeds, the creation of large

openings, a decrease in water quality, degradation of instream and riparian habitats, a reduction

and loss of large diameter snags, future snags and large diameter downed wood, a deterioration

or loss of mature and old growth coniferous forest, a loss of large diameter trees, a decline or loss

of wildlife travel corridors, a decrease in hiding, escape and thermal cover, and a reduction in

canopy cover. However, when timber management occurs, it opens the forest floor, increasing

sunlight and precipitation for grass, forb, and shrub species, thereby amplifying forage

opportunities for several wildlife species.

These changes to habitat structures and functions within the project area would affect a variety of

wildlife species. The implementation of this project would decrease effective wintering, calving

and summer/fall range for resident and migrant big game species, reduce the amount of suitable

habitat for pileated and white-headed woodpeckers, reduce the quality and quantity of instream

and riparian habitat, and impact the ecological function of aspen stands, wetlands, seeps, and

springs.

Infrastructure (culverts) should allow for the passage of fish, flow, sediment, and debris.

Undersized culverts may lead to channel avulsion, head cutting, and/or complete failure of the

structure. Constricting flow through undersized culverts may contribute to velocity barriers

limiting the instream movement of resident fish at early or all life stages. The failure of

inadequately sized structures typically occurs long after work has been completed.

Protection Measures

Wildlife buffers create travel corridors for wildlife and maintain blocks of habitat designed as

thermal cover. There are a total of four wildlife buffers that act as travel corridors and help

provide cover for larger open areas. The buffers are located linearly between all northern RRT

blocks in the Lost Creek Timber Sale Project area.

In the Lost Creek Timber Sale 2026 Project Area, there are approximately 1,172 acres of blocks

that are adjacent to streams; that is, of the 49 blocks in the Lost Creek 2026 Project Area, 11

(22%) contain or are adjacent to streams. These bodies of water include but are not limited to

Lost Creek, Moses Creek, Hayden Creek, and several unnamed type 3 and type 4 tributaries, and

all contributing streams in each watershed. It is to be noted that this sale is on a large lake in the

WMU, which includes Crawfish Lake. Harvesting close to or near these bodies of water would

Lost Creek 2026 Forest Management Project

24

BIA-NWR-CTCR-EA-26-08

allow for increased sedimentation, temperature, decreased supply of woody debris for

invertebrates, and an increase in turbidity, all of which would reduce fish habitat and water

quality. These streams and their riparian habitat have some of the highest fish and wildlife

richness and diversity and are extremely susceptible to environmental change.

Table 11. Fish and Wildlife Objectives for Proposed Action.

IRMP

Objective

Issue

Indicator

Units

Existing

Condition

Alternative

A

Alternative B

F&W

Objective 1

Wetland/

stream

adjacency

Acres

n/a

No Change

1,142 acres

3.68mi/mi2

F&W

Objective 2

Road

construction

and use

Miles

(Lower

Lost Creek)

3.71 mi/mi2

(Upper

Lost Creek

WMU)

9.49 mi New Construction

No Change

38.9 mi Reconstruction

433 ac buffers in western half

(zones 8/9).

F&W

Objective 3

Buffers

Added

Acres

n/a

No Change

Blocks Removed:

38,42,41,47,45,56

80 ac of buffers in eastern half

Portion of blocks (zone 5)

Blocks partially removed :

111,102, 117

4.4 Cultural Resources

Impacts to Cultural Resources Alternative A: No Action

Although there may be a number of direct and indirect effects to the Reservation’s resources

from the implementation of Alternative A, it is important to recognize that cultural resources are,

for the most part, non-renewable resources. The ‘No Action’ alternative would have a number of

various effects to the known cultural resources identified within the project area.

The historic exclusion of fire on the Reservation has resulted with an overabundance of

vegetation. Although Alternative A would leave the timber intact and allow for natural

succession patterns; overstocked and diseased stands have increased ladder fuels which must be

addressed by current management practices.

Potential impacts of Alternative A include vegetation encroachment to sites which exhibit

surface features. This encroachment may reduce visibility of the site, potentially affecting its

integrity and increasing the likelihood of adverse effects to it from wildland or prescribed fire.

Invasive non-native plant species within this area would likely perpetuate and increase,

competing with native plant species of traditional and cultural significance. The ‘No Action’

alternative may also cause physical damage to sites from snags or trees falling upon them,

Lost Creek 2026 Forest Management Project

25

BIA-NWR-CTCR-EA-26-08

dismantling, destroying or otherwise impacting surface features. Fallen trees may also expose

buried subsurface cultural materials, which otherwise would have remained intact.

Impacts to Cultural Resources Alternative B: Proposed Action

There are currently sixteen known cultural resources recorded in the Lost Creek Forestry project

area. Although there has been no official determination of National or Colville Register

eligibility for these sites, all appear to be eligible. These sites may be considered eligible for the

National Register of Historic Places, as described in 36 CFR Part 60.4. One TCP is within the

project’s APE, and is not expected to be impacted by project implementation. The area

delimitated with a significant population of a culturally significant plant was removed from the

proposed sale block. The ‘Proposed Action’ would result in No Adverse Effect to these sites as

long as the prescriptions remain the same and that ground disturbance stays to minimum.

4.5 Range Management

Impacts to Range Resources Alternative A: No Action

This alternative would have no disturbance impact on the current plant community condition.

The No Action Alternative, being a management decision, would also not address the forest

health concerns identified in the proposal. Degraded forest plant communities would remain in a

degraded state.

Impacts to Range Resources for Alternative B: Proposed Action

Harvest disturbance within forested plant communities often benefits plant community health by

reducing potential for disease, insects, and wildfire effects. Reducing canopy densities can also

release understory plants that have been suppressed by overstocked conditions. Desirable natural

understory plants are usually adept at recovery with the type of soil disturbance that normally

occurs with harvest. Areas of concern may be landings, skid trails, roads, and pile burning sites,

all areas where activity may create highly disturbed soil conditions or a change in soil fertility

properties. The potential of increased soil disturbance in these areas may hinder the recovery of

desirable understory plants and increase the possibility of establishing new invasive and noxious

weed populations.

The annual precipitation for the blocks in this proposal is 20” to 36” annually. This broad range

of average annual precipitation can cause variable potentials for the rapid recovery of forest

native understory species. Areas of high soil disturbance in the lower end of the precipitation

range can be slow in recovering naturally allowing more competitive invasive noxious weed

populations the opportunity to become established. Once established many invasive and noxious

weeds can outcompete the natural vegetation. If highly competitive undesirable plants become

established, they are often hard to eliminate. New patches of persistent competitive invasive

weeds also provide a future seed source for further spread in the area.

The most common forest habitat type represented in the project blocks is Douglas-fir/common

snowberry with pinegrass as a major component understory grass species. Pinegrass is also very

common in the other habitat types represented in the treatment blocks. Pinegrass is a resilient

species and should naturally recover except where the soil profile has been highly mixed. Also

common in this area is, Idaho fescue, Columbia brome, and blue wildrye. If seeding should be

determined to be needed to assist in recovery Idaho fescue, and Columbia brome should be

considered for a seed mix depending on the forest habitat type targeted.

Lost Creek 2026 Forest Management Project

26

BIA-NWR-CTCR-EA-26-08

Post treatment monitoring of understory recovery should occur. If monitoring determines a need,

inputs in the form of native plant seeding and/or herbicide treatment should be considered to

assist in the recovery. Intermediate wheatgrass and Siberian wheatgrass should not be used for

ground cover as they are nonnative, persistent, and highly competitive. These nonnative species

although classified as forage plants seem to be less preferred to wildlife and livestock. Grazing

animals would go to the preferred native plants first increasing the grazing pressure on those

plants. If something is needed to quickly provide ground cover, there are alternatives to consider

that are less competitive and do not persist for more than a couple years. These alternatives may

also provide a nurse crop benefit to native plants that germinate from native seed planted. If the

project manager determines the need for herbicide treatment and/or seeding the Land Operations

department can offer suggestions for herbicide treatment and seed mix if assistance is needed.

Noxious Species

Logging and related activities can introduce new invasive species to a site via uncleaned

equipment and soil disturbing activities or cause currently present invasive species to spread

more rapidly. In order to insure the action would not contribute to the introduction, continued

existence, or spread of noxious weeds or non-native invasive species known to occur in the area,

or promote the introduction, growth, or expansion of the range of such species, cleaning

equipment prior to using on site, washing equipment in a centralized area, re-seeding heavily

disturbed sites such as skid trails and landings is required. Monitoring of understory recovery

should occur and if monitoring determines a need, inputs in the form of native plant seeding

and/or herbicide treatment should be considered to assist recovery, giving a competitive

advantage to desired plant species. If the project manager determines a need for herbicide

treatment and/or seeding the Land Operations department can offer suggestions for herbicide

treatment and seed mix if assistance is needed.

4.6 Air Quality

Impacts to Air Resources for Alternative B: Proposed Action

Timber harvesting, a critical component of forest management, significantly influences air

quality, particularly through the emission of particulate matter (PM). PM, a blend of solid

particles and liquid droplets, permeates the air, originating from both natural and human-made

sources.

Smoke from wildland fires can contribute to short-term and intermediate health effects. The health

effects are generally reversible with the short term exposure this burn would create. Little data exists

confirming or denying a higher risk for wildland fire personnel. Individuals with asthma, allergies, or

the capacity to develop reactive airways are more likely to be susceptible to the effects of smoke

(Sharkey 1997). Visibility reduction from wildland fire can impact scenic vistas, as well as create

hazards along transportation routes. Of particular concern are low-lying areas near bodies of water

(e.g., lakes, stream and river corridors) that are prone to the development of fog. These same areas

can be geographic locations where SMOG can form, a mixture of smoke particulates and fog

moisture droplets.

The Air Quality Program will work with Mt. Tolman Fire Control to minimize exposure to fire

smoke and provide outreach to the public.

Lost Creek 2026 Forest Management Project

27

BIA-NWR-CTCR-EA-26-08

4.7 Social and Economic Impacts

The median household income on the Reservation according to the 2010 US Census was $35,

534. The CTCR’s natural resource management plays an important role in the local regional

economy on and off the Reservation. The Forestry, logging and milling industry accounts for

20% of the working population in the Region of Okanagan and Ferry Counties (CAR 2018). The

CTCR itself is the single largest employer in both Ferry County and Okanogan County (CAR

2019). The communities benefit from the CTCR Natural Resource Management not only directly

through employment but also the social programs funded directly from Tribal expenditure of

funds generated through Timber Harvest. More detailed discussion of the population dynamics

and social and economic impacts of CTCR’s natural resource management can be found in the

CTCR IRMP FEIS (CAR 2018).

5.0 Mitigation for Resource Protection

Soil and Water Mitigations

Operators must ensure that all Best Management Practices (BMP) and standards for timber

harvest identified in Colville Tribal Code (CTC) Chapter 4-7: Forest Practices are followed in

order to minimize hydrologic disturbance resulting from actions taken under this alternative.

During road construction and reconstruction Planners and Operators must ensure that new/reconstructed roads meet the BMPs and standards for roads identified in CTC Chapter 4-7: Forest

Practices, and CTC Chapter 4-9 Hydraulic Projects if doing any culvert/bridge work. By meeting

these BMPs Planners and Operators would minimize the water quality, hydrologic process, and

aquatic habitat degradation associated with roads as a result of the actions taken under this

alternative. The transportation plan developed by the OND Transportation Planner incorporated

input from the Environmental Trust Department regarding stream adjacent roads, new road

locations, and culvert sizing and placement. The Forest Roads Engineer should continue to work

with the Watershed Restoration Program to remove any unnecessary road construction, and

determine where roads can be closed or decommissioned to reduce road density.

A preliminary transportation memo was distributed on 3/17/25 identifying roads that should not

be used due to stream or wetland adjacency. These segments were then field verified, and

adjustments were made accordingly. Several segments identified for review overlapped with

roads proposed for use in the sale; however, after field assessment, most of these segments were

deemed to not pose a risk to aquatic resources.

A layer was also provided of all restored roads within the project area, including

decommissioning, closure, and permanent abandonment. In the original preliminary

transportation memo, the following was stated: “The Restoration Program has completed

restoration work in and around this timber sale area, including as part of the 2020 and 2021 Lost,

Loony, and Haden Creeks Watershed Restoration projects. 83 road segments included in the

2020 and 2021 project are within or directly adjacent to the Lost Creek timber sale project area;

these roads have been decommissioned or permanently abandoned, and are not available for

use.”

In order to mitigate for impacts to soils from compaction, as well as risks to aquatic resources

from sediment mobilization and transportation to surface water from ground-based harvest

methods (including tethered logging), the following mitigations were developed:

Lost Creek 2026 Forest Management Project

28

BIA-NWR-CTCR-EA-26-08

Table 12. Mitigations developed for harvest to mitigate for soil and water resources.

Block

ID

Acres

163-111

163-117

163-102

161-169

82.7

80.5

87.7

70.5

RX

Skid System Mitigations

IC C

Maintain dead and down trees over 10" DBH to reduce

soil impacts.

Bring slash onto skid trails at conclusion of harvest.

Summer harvest only.

ST C

Maintain dead and down trees over 10" DBH to reduce

soil impacts.

Bring slash onto skid trails at conclusion of harvest.

Summer harvest only.

Recommend block 117 is harvested after blocks 102 and

111, to provide additional sediment interception.

Additional 50 foot Riparian Management Zone (RMZ)

(total: 175' foot RMZ) on Lost Creek.

IC C

Maintain dead and down trees over 10" DBH to reduce

soil impacts.

Bring slash onto skid trails at conclusion of harvest.

Summer harvest only.

IC T

Block boundary has been amended to reflect wetland

mapped in field.

Road previously included to access northwestern portion

of block should be ended at new northern extent of block.

160-085

35.0

RRT T

Road indicated within mapped wetland buffer. However,

ground conditions allow for construction of road in this

location due to topography.

163-137

50.7

ST/OR T

Block can be taken to topographic break in field, instead

of mapped buffer.

Additionally, prescribed burning is proposed for the Lost Creek project area. Block 101 proposes

to utilize a restored road as a control line. The Fuels program has proposed that this does not

have to become a full road in order to be utilized, and line width can be minimized by utilizing

smaller machinery for line construction. Additionally, this road would be brought back to the

current restored condition, with recontouring and material placement on the historic prism; this

restoration would comply with specifications provided by the Restoration Program.

Per Colville Confederated Tribes Law and Order Code [CCT 4-7-67(e)] Riparian Management

Zone buffers are required for wetlands. No harvest activities, movement of equipment or

vehicles, nor staging of materials or waste, should occur within the wetland or wetland RMZ

buffer. Wetland ecosystem presence and extent proximate to proposed harvest blocks has been

derived from National Wetlands Inventory (NWI) data. NWI mapping is a service of the U.S.

Fish and Wildlife Service and is conducted via remote sensing techniques which require field

verification for jurisdictional purposes. The project proponent is responsible for assuring all

wetlands are properly buffered based on ground conditions.

Lost Creek 2026 Forest Management Project

29

BIA-NWR-CTCR-EA-26-08

Table 13. Wetland RMZ requirements.

RMZ

Comp Block Wetland

Location

CCT Water

Type

(applied to each side

of wetland)

160

011

W.LC_026

NW corner of Block

III

100 feet

160

011

W.LC_005

NE corner of Block

III

100 feet

160

024

W.LC_001

western edge, southern

portion of Block

III

100 feet

160

024

W.LC_133e northern portion of Block

IV

50 feet

160

028

W.LC_026

W edge of Block

III

100 feet

160

028

W.LC_007

center of Block

IV

50 feet

160

042

W.LC_003

western edge of Block

II

125 feet

160

064

W.LC_022

western edge of Block

III

100 feet

160

084

W.LC_013

southern edge of Block

II

125 feet

160

085

W.LC_013

southern edge of Block

II

125 feet

161

169

W.LC_080e northern edge, topo change

III

100 feet

163

078

W.LC_061

eastern edge of Block

III

100 feet

163

084

W.LC_061

western edge of Block

III

100 feet

163

101

W.LC_061

western edge of Block

III

100 feet

163

115

W.LC_123

SW corner of Block

II

125 feet

163

120

W.LC_079

western edge of Block

III

100 feet

163

137

W.LC_128

western edge of Block

III

100 feet

163

137

W.LC_064

northern edge of Block

II

125 feet

163

137

W.LC_083

SW edge of Block

III

100 feet

163

137

W.LC_079

SE edge of Block

III

100 feet

Mitigation for Fish and Wildlife, Alternative B: “Proposed Action”

Several impacts have been identified for the proposed action, and thus mitigation is required or

degradation in wildlife habitat is anticipated to affect a variety of species and therefore the

following mitigation measures apply:

Lost Creek 2026 Forest Management Project

30

BIA-NWR-CTCR-EA-26-08

Table 14. Fish and Wildlife Mitigations.

Mitigation Measure

Natural Resource Protected

Reserve Patches for Blocks 164-012 (7+

Acres), 162-026, 160-064 (7+ Acres).

Thermal Cover and Travel Corridor for

Wildlife.

Entire timber sale has a high potential for

Goshawk and Great Gray owl nesting activity.

None besides the above mentioned area with

(1) confirmed goshawk nest. Please notify

OND biologist if any additional Goshawk or

Great Gray Owl found.

Mitigation for Cultural Resources

The Tribal Archaeologist would brief the TSO and others working in the Lost Creek Project

Area regarding the steps to be taken to identify and report cultural resources. If resources are

found, the TSO shall insure that all work stops in the vicinity of the find, that steps are taken to

protect the find, and that the Tribal Archaeologist is called immediately. No work shall resume

until the Tribal Historic Preservation Officer (THPO) has approved a management plan.

Mitigations for Range Operations

Within forest project areas grazing is a secondary land use but is important to CTCR livestock

owners for success in their economic venture. Grazing can also provide positive impacts by

reducing accumulated fuel and reinvigorating grasses. Rangeland structural resources such as

fences, watering facilities, and cattle guards are an important component to the sustainable

stewardship of land designated for grazing and are very expensive to replace. The proposed

treatment blocks for this project are located within the Northern portion of Range Unit 5. The

Range Programs infrastructure GIS layer indicates quite a few structural assets associated with

RU 5 that would likely be encountered during this project. Fences and cattle guards are of

particular concern. CTCR Range Program asks that when range infrastructure is encountered

such as cattle guards, watering facilities, and fences they be avoided as much as possible. If

range infrastructure is damaged during project activity the project proponent would be

responsible for notifying the Range Program and seeing that damage is repaired in a timely

manner. If cattle guards are located on roads that need to be used for heavy traffic, they should

be assessed for the ability to handle the weight of large trucks and equipment. The Range

Program can assist with that if contacted in a timely manner. If it is determined the cattle guard

does not meet specifications for the anticipated weight of the traffic, and there is no way to

bypass it, the cattle guard may need to be temporarily removed. If this is the case it is essential

the Range Program be notified 48 hours prior to the removal. The removed cattle guard would be

reinstalled by the proponent of the project unless other arrangements are made with the CTCR

Range Program.

The impacted Range Unit 5 has approximately 300 head of livestock permitted on it. Range Unit

fences need to remain functional, with any gates closed and damage to fences quickly repaired.

The Range Program needs to be notified if an infrastructure problem becomes apparent. The

Range Program would also be notified when burning occurs in the forest project area before the

turnout date of May 15th so the Range program can move livestock to an area on the range unit

that would not be affected.

Lost Creek 2026 Forest Management Project

31

BIA-NWR-CTCR-EA-26-08

6.0 List of Preparers

Name

Shay Logue, Leland Wellons, Megan Crim

Marcus McClung, Ossian Laspa

Kevin Manuel

Bryan Jones

Jessica Utt, Brandton Harvey

Charlotte Axthelm

Stacy King

Guy Moura

Amanda Hoke

Chasity Swan

Contributions

Forestry

Wildlife

Fuels/Fire Management

Fish

Range/Noxious Weeds

Hydrology

Wetlands

History/Archaeology

History/Archaeology

Editor

7.0 Literature Cited

Axthelm, Charlotte. 2024. Water Quality Assessment Report for the Confederated Tribes of the

Colville Reservation 2018-2023. Technical. Nespelem, WA. CTCR.

Bureau of Land Management (BLM). 2018. General Land Office Patent Records. Available

online at http://www.glorecords.blm.gov/Center for Applied Research, Inc.

(2014) Resource Assessment, Confederated Tribes of the Colville Reservation, 2015

Integrated Resource Management Plan.

Center for Applied Research, Inc (CAR). 2018. Final Programmatic Environmental Impact

Statement. Confederated Tribes of the Colville Reservation, 2015 Integrated Resource

Management Plan.

Center for Applied Research, Inc (CAR). 2015. Results of the 2014 Colville Reservation

Community Survey.

Colville Confederated Tribes. 2023. Forest Practices Handbook. Colville Tribal Code

Chapter 4-7 Forest Practices. Nespelem, WA. 89 pp.

Colville Confederated Tribes (CCT). 2007. Cultural Resource Management Plan of the

Confederated Tribes of the Colville Reservation. Prepared by the CCT

History/Archaeology Program. Nespelem, WA.

CTCR 2016. Wildland Fire Management Plan for the Colville Indian Reservation. Prepared by

the CTCR Land and Property Management and Revised by Mt. Tolman Fire Control.

Nespelem, WA.

CTCR. 2015. Integrated Resource Management Plan 2015. Prepared by The Center for Applied

Research, Inc.

CTCR. 2023. Forest Management Plan for the Colville Indian Reservation. Prepared by Jeremy

Hunt. Approved June 23, 2023.

Dubé, K., Megahan, W., McCalmon, M. 2004. Washington road surface erosion model prepared

for the Washington Department of Natural Resources. Olympia, WA.

George, Matilda (ed.). 2011. Traditional Cultural Property Overview Report and Native

American Place Name Document for Traditional Territories of the Confederated Tribes

Lost Creek 2026 Forest Management Project

32

BIA-NWR-CTCR-EA-26-08

of the Colville Reservation, Grand Coulee Dam project area, North Central Washington.

CCT History/Archaeology Program. Nespelem, WA.

Gough, Stan. 1990. A Cultural Resources Overview, Sampling Survey, and Management Plan,

Colville Indian Reservation, Okanogan and Ferry Counties, Washington. Eastern

Washington University Reports in Archaeology and History 100-74. Archaeological and

Historical Services. Cheney, WA.

Hess, Sean. 2001. Predictive Model for Use on the Colville Indian Reservation. On file at the

CCT History/Archaeology Program. Nespelem, WA.

Hunner, Walt. 2014. Hydrology Report. Technical. Nespelem, WA: CTCR.

Hunt, Clair. 1916. Diminished Colville Indian Reservation (map). General Land Office,

Department of the Interior.

Logue, Shay. March 24, 2025. Project Proposal Form: Lost Creek Timber Sale 2026 PPF.

Nespelem, WA. BIA

Marker, D., R. Thomon, T. Bosworth, T. Li and C. Tornow. 2012 Upper Columbia River Site

Remedial Investigation and Feasibility Study Tribal Consumption and Resource Use

Survey. Final Draft Report. Prepared for the US Environmental Protection Agency,

Region 10. Westat. Rockville, MD.

Marchand, A. 2008. A Cultural Resources Survey Report for the Lost Creek Forestry

Management Project. On file at the CCT History/Archaeology Program. Nespelem, WA.

NMFS (National Marine Fisheries Service). 2009. Biennial Report to Congress on the Recovery

Program for Threatened and Endangered Species – October 1, 2006 - September 30,

2008. 184 pp. Available at: http://www.nmfs.noaa.gov/pr/pdfs/laws/esabiennial2008.pdf

Parker, Patricia L. & T.F. King. 1998. Guidelines for Evaluating and Documenting Traditional

Cultural Properties. National Register Bulletin #38, United States Department of the

Interior, National Park Service.

Shannon, D. & G. Moura. 2007. Chief Joseph Dam and Rufus Woods Lake Traditional Cultural

Property Research 2006 Technical Report. Prepared for the United States Army Corps of

Engineers, Seattle District. Prepared by CCT History/Archaeology Program. Nespelem,

WA.

U.S. Fish and Wildlife Service. 2002. Chapter 23, Northeast Washington Recovery Unit,

Washington. 73 p. In: U.S. Fish and Wildlife Service. Bull Trout (Salvelinus confluentus)

Draft Recovery Plan. Portland, Oregon.

Lost Creek 2026 Forest Management Project

33

BIA-NWR-CTCR-EA-26-08

8.0 Appendices

8.1 Appendix A: Project Maps and Activity Table

Lost Creek 2026 Forest Management Project

34

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

35

BIA-NWR-CTCR-EA-26-08

Unit Activity Table Lost Creek 2026– Harvest Blocks

Block

Acres

Rx

160-011

160-024

160-025

160-028

160-042

160-064

160-081

160-084

160-085

161-069

161-074

161-159

161-161

161-163

161-164

161-169

162-026

162-068

163-013

163-078

163-084

163-086

163-096

163-097

163-099

163-101

163-102

163-104

163-106

163-108

163-111

163-115

163-117

163-118

163-119

163-120

163-137

164-003

164-012

164-019

164-027

164-031

164-032

165-014

165-020

165-308

308.9

66

70.3

100.4

79.8

179.2

42

38.5

27.1

48.3

28.1

24.2

73.2

45.4

63.3

49.7

128.3

129.3

30.1

39.3

58.7

16.8

51.1

37.1

50.4

48.9

60

43

93.7

47

59.8

40.3

46.3

37.6

34.2

62.4

36.1

75.1

125.6

50.7

69.1

88.9

60

85.2

47.7

99.1

IC

RRT

ST/OR

RRT

IC

RRT

RRT

ST/OR

RRT

IC

CT

RRT

IC

IC

ST/OR

IC

ST/OR

IC

OR

ST/OR

ST/OR

RRT

RRT

RRT

ST/OR

ST/OR

IC

IC

ST/OR

ST/OR

IC

ST/OR

ST

IC

IC

ST/OR

ST/OR

ST

ST

ST/OR

SW

ST/OR

ST

ST

ST/OR

ST/OR

Skid Type

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tether

Tractor

Tractor

Tether

Tether

Tether

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tether

Tractor

Tether

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Tractor

Slash Disposal

Lop and Scatter

Pile/Burn

Lop and Scatter

Pile/Burn

Lop and Scatter

Pile/Burn

Pile/Burn

Lop and Scatter

Pile/Burn

Lop and Scatter

Lop and Scatter

Pile/Burn

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Slash/Burn

Slash/Burn

Slash/Burn

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Lop and Scatter

Pile/Burn

Pile/Burn

Lop and Scatter

Pile/Burn

Lop and Scatter

Pile/Burn

Pile/Burn

Lop and Scatter

Lop and Scatter

Site Prep

ExPile

ExPile

ExPile

ExPile

ExPile

ExPile

RxB

RxB

RxB

ExPile

ExPile

ExPile

ExPile

ExPile

Whole

Tree

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

No

Yes

Yes

No

No

Yes

Yes

Yes

No

No

Yes

Yes

No

No

Yes

No

Yes

Yes

Yes

Yes

Yes

Yes

Yes

No

Yes

No

Yes

Yes

No

No

PCT

Evaluate

Evaluate

PLANT

Yes

Yes

Yes

Yes

Yes

Yes

Evaluate

Evaluate

Yes

Evaluate

Yes

Yes

Yes

Yes

Evaluate

Evaluate

Evaluate

Evaluate

Evaluate

Evaluate

Evaluate

Evaluate

Evaluate

Evaluate

Evaluate

3,096

Lost Creek 2026 Precommercial Thinning Blocks

Lost Creek 2026 Forest Management Project

36

BIA-NWR-CTCR-EA-26-08

BLOCK

ACRES

RX

158-020

39.5

PCT

158-150

15.8

PCT

160-033

21.7

PCT

162-030

79.9

PCT

163-013

30.1

PCT

163-023

13.9

PCT

163-028

34.3

PCT

163-103

8.1

PCT

163-123

9.8

PCT

163-127

28.1

PCT

164-024

27.6

PCT

164-025

9.3

PCT

165-302

5.7

PCT

166-070

203.2

PCT

160-060

39.4

MASTICATION

160-061

14.9

MASTICATION

160-065

4.5

MASTICATION

160-076

76.7

MASTICATION

TOTAL

662.5

Lost Creek 2026 Forest Management Project

37

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

38

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

39

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

40

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

41

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

42

BIA-NWR-CTCR-EA-26-08

8.2 Appendix B: Consultation

Lost Creek 2026 Forest Management Project

43

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

44

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

45

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

46

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

47

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

48

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

49

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

50

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

51

BIA-NWR-CTCR-EA-26-08

8.3 Appendix C: Preliminary Transportation Analysis

Lost Creek 2026 Forest Management Project

52

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

53

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

54

BIA-NWR-CTCR-EA-26-08

8.4 Appendix D: Army Corp of Engineers BMPs

Lost Creek 2026 Forest Management Project

55

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

56

BIA-NWR-CTCR-EA-26-08

8.5 Appendix E: CTCR Holistic Goal and Desired Future

Conditions

Lost Creek 2026 Forest Management Project

57

BIA-NWR-CTCR-EA-26-08

Lost Creek 2026 Forest Management Project

58

BIA-NWR-CTCR-EA-26-08