DEPARTMENT OF THE INTERIOR

Bureau of Indian Affairs

Final Environmental Assessment for the proposed Simpson Lake 2026 Forest Management

Project on the Colville Reservation, Ferry County, Washington

AGENCY: Bureau of Indian Affairs

ACTION: Notice of Availability

SUMMARY: This notice is to advise interested parties that the Bureau of Indian Affairs (BIA)

as lead federal agency, with the Confederated Tribes of the Colville Reservation, has prepared a

final Environmental Assessment (EA) and Finding of No Significant Impact (FONSI) for the

Simpson Lake 2026 Forest Management Project on the Colville Reservation, Ferry County,

Washington. This notice also announces the EA is now available in hard copy at the addresses

below.

ADDRESSES: You may request a hard copy of the EA and FONSI by writing the BIA Colville

Agency, PO BOX 111, Nespelem, Washington, 99155.

FOR FURTHER INFORMATION CONTACT: Randall Friedlander, BIA Colville Agency

Superintendent, at (509) 634-2316 and Chasity Swan, Colville Tribe Integrated Resource

Management (IRMP) Coordinator, at (509) 722-7656.

SUPPLEMENTAL INFORMATION: The Colville Tribe, through contractual obligations to the

BIA, has proposed the Simpson Lake 2026 Forest Management Project. The activities under the

agency proposed action to harvest approximately 10.6 million board feet of timber on approximately

1,342 acres of tribally owned lands within the Inchelium District of the Colville Reservation in Ferry

County, Washington. The activities will occur under guidelines in the Colville Confederated Tribes of

the Colville Indian Reservation Integrated Resource Management Plan (IRMP)(CTCR 2015) and

associated Final Programmatic Environmental Impact Statement (FEIS)(CAR 2018).

Authority: This notice is published pursuant to 43 CFR 46.305 of the Department of Interior

Regulations (43 CFR Part 46), the procedural requirements of the National Environmental Policy

Act of 1969, as amended (42 U.S.C. 4371 et seq.), and is in accordance with the exercise of

authority delegated to the Assistant Secretary – Indian Affairs by 209 DM 8.

Digitally signed by RANDALL FRIEDLANDER

Date: 2026.02.19 14:29:45 -08'00'

Randall Friedlander

Colville Agency Superintendent

Bureau of Indian Affairs

U.S. Department of the Interior

Date

Finding of No Significant Impact

Simpson Lake 2026 Forest Management Project

Colville Reservation, Ferry County, Washington

Based on the attached final Environmental Assessment’s (EA) for the Simpson Lake 2026 Forest

Management Project for a proposal to harvest 10 million board feet of timber on approximately 1,342

acres of tribally owned lands in the Inchelium District of the Colville Reservation in Ferry County,

Washington, I have determined that by implementation of the agency proposed action and

environmental mitigation measures as specified in the EA, the proposed Simpson Lake 2026 Forest

Management Project, will have no significant impact on the quality of the human environment. In

accordance with Section 102 (2) (c) of the National Environmental Policy Act of 1969, as amended, an

Environmental Impact Statement will not be required.

This determination is supported by the following:

1. Agency and Tribal Interdisciplinary Team involvement was conducted and environmental issues

related to development of the Simpson Lake 2026 Forest Management Project were identified.

Alternative courses of action and mitigation measures were developed in response to environmental

concerns and issues. Tribal community outreach was conducted (CTCR Integrated Resource

Management Plan (IRMP) (2015) and associated Final Programmatic Environmental Impact

Statement (FEIS)(2018). A public field tour was given of the project area in June of 2025 (EA

section 2.1).

2. The EA discloses the environmental consequences of the “proposed action” and “no action”

alternatives.

3. Protective measures will be levied to protect air (Clean Air Act as amended 42 USC 7401 et seq.),

noise, and water quality (Clean Water Act of 1977, 33 U.S.C. 1251 et seq.), as outlined in the

Mitigation Measures (Section 4.7 of EA), CTCR Forest Practices Handbook (Colville Tribal Law

and Order Code Title 4-7), CTCR IRMP (CTCR 2015) and associated FEIS (CAR 2018).

4. The proposed action will not jeopardize threatened and endangered species (Threatened and

Endangered Species Act of 1983, as amended, 16 U.S.C. 1531 et seq.) (EA Section 4.3, and Appendix

B).

5. There are no adverse effects on historic properties (National Historic Preservation Act, as amended

16 U.S.C. 470) for the purpose of 36 CFR 800.9 (b) by preserving archeological value through

conduct of appropriate research in accordance with applicable standards and guidelines. Should

undiscovered archeological remains be encountered during project ground-disturbing activities,

work will stop in the area of discovery and the stipulations 36 CFR 800.11 be followed. The BIA

Regional Archaeologist and Tribal Historic Preservation Officer (THPO) were consulted for this

project (EA Section 4.4, Appendix B).

6. The proposed action will not affect public health or safety.

7. The proposed action will not cause a significant effect to energy resources (Energy Policy Act of

2005), water resources, wetlands (E.O. 11990), or flood plains (E.O. 11988). The Simpson Lake

2026 Forest Management Project will not result in discharge of pollutants into waters of the U.S. or

in surface water quality issues (Clean Water Act, as amended, 33 U.S.C. 1251 et seq.) (EA section

4.2).

8. The cumulative effects to the environment are mitigated to avoid or minimize effects of

implementation of the proposed project (EA Section 4.6).

9. The proposed action will not affect unique characteristics of the geographic area such as the

proximity to park lands, wild and scenic rivers, or ecologically critical areas.



10. It is unlikely that timber harvesting would have any detrimental effect on the functional integrity of

the land classification and the CTCR does not have future plans to develop the prime farmland

within this project area.



12. There are approximately 500 acres of mapped wetlands within the project area footprint. All

wetlands and surface water are buffered to minimize impacts of the project to these water systems

(CTC Chapter 4-7 Forest Practices, Section 4.2 of EA).

13. The Simpson Lake 2026 Forest Management Project will not have significant impacts on natural

and unique geographic features such as historic or cultural resources; park, recreation, or refuge

lands; wilderness areas; wild and scenic rivers; national natural landmarks; sole or prime drinking

water aquifers; national monuments; eagles and migratory birds, and other ecologically significant

areas.

14. The proposed action will not produce highly controversial effects on the quality of the human

environment and will not have unresolved conflicts concerning alternate uses of available

resources.

15. The proposed action will not have highly uncertain effects on the human environment or involve

unique or unknown risks.

16. The proposed action will not establish a precedent for future actions with significant effects or

represent a decision in principle about a consideration.



17. The Simpson Lake 2026 Forest Management Project is not related to other actions with individual

insignificant but cumulatively significant environmental effects.



18. The proposed action will not affect American Indian Religious Freedom (42 U.S.C. 1996). The

action will not limit access to, and ceremonial use of, Indian sacred sites on federal lands, by

Indian religious practitioners, and/or adversely affect the physical integrity of such sites (Native

American Graves Protection and Repatriation Act, 25 U.S.C. 32).



19. Logging and related activities can introduce new invasive species to a site via uncleaned

equipment and soil disturbing activities or cause currently present invasive species to spread more

rapidly. In order to insure the action will not contribute to the introduction, continued existence, or

spread of noxious weeds or non-native invasive species known to occur in the area, or promote the

introduction, growth, or expansion of the range of such species, cleaning equipment prior to using

on site, washing equipment in a centralized area, re-seeding heavily disturbed sites such as skid

trails and landings is required. Monitoring of understory recovery would occur and if monitoring

determines a need, inputs in the form of native plant seeding and/or herbicide treatment should be

considered to assist recovery, giving a competitive advantage to desired plant species. (EA Section

4.7)



20. The proposed action will not contribute to the disposal of solid or hazardous waste (Resource

Conservation and Recovery Act of 1976; 43 U.S.C. 6901, et seq.).



21. The proposed action will not be a violation of federal, state, local, or tribal law or requirements

imposed for the protection of the environment.

Digitally signed by RANDALL FRIEDLANDER

Date: 2026.02.19 14:28:42 -08'00'

Date

Randall Friedlander, Superintendent

Colville Agency

Bureau of Indian Affairs

U.S. Department of the Interior



Simpson Lake 2026 Forest

Management Project

Environmental Assessment

The Bureau of Indian Affairs and the Colville Confederated Tribes

of the Colville Indian Reservation

Proposed Action: The Bureau of Indian Affairs and the Confederated Tribes of the Colville Indian

Reservation propose the Simpson Lake 2026 Project. The project area lies within the Inchelium

District of the Colville Indian Reservation. This project would harvest approximately 10 million

board feet of timber from harvest on 1,342 acres and 951 acres of non-harvest stand improvement

treatments in the Simpson Lake project area. This project would require 3.62 miles of road

construction and 18.22 miles of road reconstruction.

Official Decision Maker:

For further information:

Randall Friedlander, Superintendent, Colville Agency, BIA

Chasity Swan

IRMP Coordinator

PO BOX 150

Nespelem, WA 99155

Chasity.swan.bia@colvilletribes.com

February 18, 2026

1

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Table of Contents

1.0 Purpose and Need ........................................................................................................ 3

1.1 Introduction ............................................................................................................................3

1.2 Purpose and Need for Action .................................................................................................3

1.3 Issues, Concerns and Objectives ............................................................................................3

2.0 Alternatives Considered .............................................................................................. 4

2.1 General Discussion: Alternative Design ................................................................................4

2.2 Alternative A: No Action .......................................................................................................4

2.3 Alternative B: Proposed Action .............................................................................................5

3.0 Affected Environment .................................................................................................. 5

3.1 Forestry...................................................................................................................................5

3.2 Hydrology...............................................................................................................................6

3.3 Cultural Resources .................................................................................................................7

3.4 Range Management..............................................................................................................10

4.0 Environmental Consequences ................................................................................. 11

4.1 Forestry.................................................................................................................................11

4.2 Hydrology.............................................................................................................................12

4.3 Fish and Wildlife ..................................................................................................................18

4.4 Cultural Resources ...............................................................................................................21

4.5 Range Management..............................................................................................................22

4.6 Cumulative Impacts..............................................................................................................24

4.7 Mitigations……………………………………………………...…………………….……24

5.0 List of Preparers.......................................................................................................... 29

6.0 Literature Cited ............................................................................................................ 30

7.0 Appendixes .................................................................................................................. 32

7.1 Project Map and Activity Table ...........................................................................................32

7.2 Consultation .........................................................................................................................34

7.3 F&W Road Closures and ETD Preliminary Transportation Analysis .................................44

7.4 Army Corp of Engineers Road BMPs ..................................................................................48

2

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

1.0 Purpose and Need

1.1 Introduction

Foresters of the Inchelium District of the Confederated Tribes of the Colville Reservation (CTCR)

propose harvest of timber from the Simpson Lakes 2026 Project Area. This would entail removal

of about 10 million board feet (MMBF) of timber from about 1,342 acres of tribally managed lands

in the Simpson Lakes 2026 Project Area. This harvest would require about 3.64 miles of road

construction and about 18.55 miles of road reconstruction.

1.2 Purpose and Need for Action

The federal action (40 CFR 1508.18) is the Bureau of Indian Affairs (BIA) approval of the

Simpson Lake 2026 Forest Management Project, which triggers compliance with the National

Environmental Policy Act (NEPA; 42 USC § 4321-4375) and associated regulations (40 CFR

1500-1508, 43 CFR 46). This Environmental Assessment is prepared to meet BIA’s NEPA

responsibilities. The purpose of the action is to be able to implement the activities under the federal

action to meet the primary need of revenue for the Tribe.

The CTCR have designated a commercial land base where timber is grown for profit. Timber

growing, harvesting and processing are major sources of income for the Colville Reservation, the

tribal membership and other groups in the local population. The Colville Tribes’ 2015 Integrated

Resource Management Plan (IRMP) calls for an annual harvest of 77.1 MMBF of timber and calls

the capture as much mortality volume as possible.

1.3 Issues, Concerns and Objectives

The following are issues or concerns that the Interdisciplinary Team (3P Team) has identified as

being relevant to the discussion of the “no action” and the “proposed action” alternatives. The

issues, concerns and objectives of the CTCR are outlined in the 2015 CTCT IRMP and will not be

discussed in detail in this document.

Forestry Objectives

1. Capture the volume of dead and dying trees, provide income and employment for the

CTCR. Bring commercial forest acres into regulation.

Indicators:

a. Acres harvested by each alternative

b. Estimated stumpage produced by each alternative

c. Estimated volume of timber harvested per alternative

Hydrology Objectives

1. To minimize erosion and sediment delivery to surface waters and prevent

streambank/wetland disturbance. Maintain ecological function of soils and prevent

landslides.

3

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Indicators:

a.

b.

c.

d.

e.

f.

g.

Harvest proximity/adjacency to surface water

Acres likely experiencing increased hydrologic response

Acres likely experiencing increased sediment delivery to surface water

Road construction/use within 200ft of surface water

Acres likely experiencing increased soil loss to surface water

Slope stability and failure risk, soil burn severity

Proximity of known and identified mass wasting sites

Fish and Wildlife Objectives

1. To maintain and restore critical forest structure, old growth forests, deciduous stands and

wetlands. Ensure wildlife and fish habitat needs are maintained, including large woody

debri.

Indicators:

a. Wetland and stream adjacency acres

b. Block size and adjacent acres

c. Road density, miles/square mile

d. Miles of road construction

e. Miles of stream adjacent road

2.0 Alternatives Considered

2.1 General Discussion: Alternative Design

The National Environmental Policy Act (NEPA) and the Council on Environmental Quality (CEQ)

have developed regulations that require that a reasonable range of alternatives be considered in

NEPA documentation, including the “Proposed Action” and “No Action” alternatives.

For this project, Alternative A (No Action) is included to fulfill the requirements of NEPA and to

provide baseline values by which to measure the effects of other alternatives. For the purposes of

this document, “no action” means that no harvest or other resource manipulation would occur if

this alternative were adopted.

Alternative B (the Proposed Action) was created to fulfill the purpose and need.

A public field tour of the project area was conducted in June of 2025. Project goals and objectives

were discussed and input from the tribal membership was obtained.

2.2 Alternative A: No Action

The “No Action Alternative” includes the BIA not approving the Simpson Lake 2026 Project at

this time and/or the BIA and Tribe would not be implementing activities under the project. Under

this alternative no timber harvest, road construction, or other manipulation of resources would take

place.

4

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

2.3 Alternative B: Proposed Action

The Proposed Action Alternative includes the BIA approving the Simpson Lake 2026 Project and

the BIA and Tribe implementing the activities under the project. This Alternative does meet the

Purpose and Need of the project.

The Proposed Action includes timber harvest of roughly 10 MBF from 1,342 acres with 3.62 miles

of road construction and 18.55 miles of road reconstruction. A considerable amount of road

belonging to Ferry County (21.0 miles) would also be used to transport logs out of the vicinity, as

would 14.8 miles of BIA System roads.

Approximately 949 acres of the proposed harvest would be regeneration harvest designed to

replace existing stands with young, thrifty, evenaged stands of more well-adapted species. Of this,

603 acres are proposed for seed tree cutting (ST), 346 acres would be shelterwood cutting (SW)

and 189 acres would be overstory removal (OR).

360 acres of the proposed harvest would consist of intermediate treatments. These are designed

to improve species composition, reduce stocking in overstocked stands, reduce insect and/or

disease occurrence, provide a monetary return, and harvest imminent mortality. These treatments

would include 204 acres of commercial thinning (CT) and 189 acres of overstory removal (OR).

This proposal also includes treatments that would not yield any merchantable wood volume – 951

acres of stand culture is also proposed in the project area. These treatments are intended to further

improve stand conditions, much like the intermediate treatments above but no timber volume

would be harvested. Treatments include: 167 acres of precommercial thinning; 22 acres of

planting; 204 acres of combined rehabilitation, scarification and sanitation (accompanied by

girdling of diseased overstory trees); and 498 acres of sanitation.

The above treatments are accompanied by 2,378 acres of proposed slash disposal/site preparation.

3.0 Affected Environment

3.1 Forestry

General Discussion

The Simpson Lakes Project Area is on the Inchelium District of the Colville Reservation located

in northeastern Washington State. The location and general condition of the project is shown

above in the Proposed Action. In short, this 20,000 acre project area is proposed to yield about

10 MMBF of lumber, in this entry. The project area contains parts of several stream drainages in

the extreme northeast corner of the Colville Reservation. The project area is intermixed

ownership with the Colville Tribes, the Bureau of Reclamation, and fee simple lands.

Table 1. Ownership of acres in Simpson Lake project area.

Total Acres in project area

20,000

Allotted Lands

1,283

Fee Lands

6,900

Freeboard Lands

420

Total =

8,603

Remainder (Tribal Trust) =

11,397

5

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Current Forest Conditions

The forest ecosystems of the mountain west evolved in the presence of fire. The general health of

the forest – its ability to sustain itself – is dependent on periodic fire. Although specific natural

fire cycles vary from site to site, fire has influenced every stand in the region since the last retreat

of the glaciers 12,000 to 14,000 years ago.

Beginning about 100 to 120 years ago, forestry organizations have suppressed fires with increasing

effectiveness. In addition, grazing has been sharply curtailed on the landscape. These conditions

are true of the Simpson Lakes 2021 project area. The result is that fire has been artificially

excluded as a force in ecosystem development and maintenance. Fire exclusion especially impacts

vegetation on the ponderosa pine, Douglas-fir, and grand fir plant communities within the Simpson

Lakes area. Exclusion of fire: (1) increases the ingrowth of plant species that are less adapted to

the site, (2) increases stocking (total living vegetative biomass) far above historic levels, (3)

increases fuel loading, and (4) encourages the development of fuel ladders (which lead fires from

the ground to the crowns resulting in hot fires of long duration and damage to the soil resource and

therefore the productivity of the site). The resulting is - vegetation that is stressed from

competition and therefore more susceptible to insects and disease. The subsequent increase in

fuels and the development of “ladder” fuels in the absence of fire, produces stands of vegetation

that are more likely to sustain catastrophic, stand-replacing wildfires.

These at-risk, plant communities make up 100% of the Project Area. About 22% of those are

currently in a “high hazard” condition.

Another aspect of forest health – that of direct damage to trees by insects, diseases, and parasitic

plants – is apparent in the project area. The most prevalent damaging agents are:

x

x

x

x

Douglas-fir beetle (present in 3.25% of the project area)

Ponderosa pine bark beetles (3.62% of the project area)

Root disease (39.2% of the project area)

Dwarf mistletoe (Arceuthobium spp )

o 2.3 % of the acres are infected with ponderosa pine dwarf mistletoe

o 3.0% of the acres are infected with western larch dwarf mistletoe

o 76% of the acres are infected with Douglas-fir dwarf mistletoe

3.2 Hydrology

The present condition of the affected environment is variable across the project area. The affected

environment is influenced by the Simpson Lakes project area in the Inchelium District of the

Colville Reservation located in northeastern Washington State. This project area contains the entire

Barnaby Creek, Columbia River 01, Columbia River 02, Columbia River 03, Little Jim Creek

Watershed Management Units (WMU).

The Simpson Lakes project area is contained within the Hall Creek Resource Management Unit

(RMU); this drainage is not influenced by any drainages on the Reservation. The Hall Creek RMU

contains ten WMUs in addition to the five within the project area; these WMUs are separated from

the project area by Rainy Ridge. WMUs to the west of the project area flow west into Hall Creek,

while the watercourses in the project area do not feed Hall Creek before flowing into the Columbia

River.

6

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

In addition to direct impacts in the Little Jim Creek and Barnaby Creek watersheds, landscapescale impacts from activity in the Simpson Lakes project area would be detected in the Columbia

River. Generally, timber sales are active for five years after approval, resulting in five years of

direct impacts from timber harvest, though indirect impacts can last longer. In the past five years

(since 2020), four other green timber sales have occurred in the Hall Creek RMU: Elbow Lake

(2020), Sleepy Hollow (2021), Hall Creek (2023), and Lynx Mountain (2024). Additionally,

49,018.3 acres in the Hall Creek RMU have burned in the last 5 years, most of which occurred

during the Inchelium Complex (2020), Summit Trail (2021), and Lynx Mountain (2025) fires. Of

these major fires, only 117 acres of the Summit Trail fire, and 693 acres of the Inchelium Highway

fire burned within the project area. All of these major fires were followed by salvage harvest within

the Hall Creek RMU, though none within the Simpson Lakes project area or any watersheds

influencing it. A portion of the Simpson Lakes project area is located within Range Unit 69.

Water resources in the project area include 61.85 miles of streams and 501.75 acres of wetlands,

as well as an unknown number of seeps and springs. Little Jim Creek and Barnaby Creek are the

major watercourses through the project area, flowing northwest to southeast before joining the

Columbia River. Tributaries to Little Jim and Barnaby Creek include type 3 streams, which are

generally perennial and fish-bearing, and type 4 streams, which are generally intermittent, highgradient headwater streams. Little Jim Creek and Barnaby Creek are both perennial and fishbearing.

Water quality is monitored at the mouth of Barnaby Creek, immediately upstream of the

confluence with the Columbia River. Water quality monitoring and analysis from 2018-2023

identified exceedances of the standards outlined in Colville Tribal Code 4-8 Water Quality

Standards (Axthelm 2024). Barnaby Creek exceeded the temperature standard for Class II waters

(18°C) on 7/29/2020 (19.4°C), and again on 6/21/2021 (18.6°C). Under the pH standard for Class

IIl waters, Barnaby Creek should maintain a pH between 6.5 and 8.5. Values of 8.54 and 8.68 were

recorded on 10/31/2018 and 10/21/2019, respectively. Additionally, during the analysis period

Barnaby Creek did not record a mean turbidity in exceedance of the 6.45 NTU turbidity standard

(5 NTU above background, 1.45); however, in 11 out of 33 observations (33%), individual

turbidity values exceeded the standard, with a high value of 46.6 on 5/2/18. There were no recorded

exceedances of the dissolved oxygen standard, and lab metrics (fecal coliform, e.coli, ammonia,

nitrate/nitrite, TKN and orthophosphates) were not analyzed at this location.

3.3 Cultural Resources

National Historic Preservation Act (NHPA)

“Cultural resources” include archaeological sites, standing structures, and locations or landforms

that are important to the identity of the indigenous people of the area (i.e., traditional cultural

properties [TCPs]). For more details on the affected cultural environment, please consult the CTCR

Cultural Resource Management Plan (CCT, 2007), the cultural resources overview for the Colville

Reservation (Gough, 1990), and the FEIS for the CTCR 2015 IRMP (CAR, 2018).

The Simpson Lakes Forestry Project is within the ancestral lands of the s[ࡊ‫އ‬L\í‫ݦ‬áS (Colville) Tribe,

who can identify their ancestry back over a thousand years in this area. The languages of the twelve

tribes comprising the CTCR have been grouped into general Salishan and Sahaptian language

IDPLOLHV7KHPDMRULW\VSRNHWKH,QWHULRU6DOLVKODQJXDJHVRIQ[D௧DPFtQDQGQVOԥxcín, though the

7

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

6DKDSWLDQODQJXDJHVRIWKH1H]3HUFH QtPtSX௧ DQG3DOXV SDO~V ZHUHDOVRVSRNHQ7KHODQJXDJH

of the s[ࡊ‫އ‬L\í‫ݦ‬áS is nslԥxcín.

This project includes various forest and fire management treatments for approximately 1,342 acres

within the Simpson Lakes boundary in the Inchelium Forestry District (IFD). The Simpson Lakes

project area encompasses approximately 20,000 acres. For the purposes of consultation with the

Tribal Historic Preservation Officer (THPO) under Section 106 of the National Historic

Preservation Act, the 2,260 acres of timber treatment areas, roads, and attendant landings shall be

considered the Area of Potential Effect (APE).

There have been five previous surveys within and immediately adjacent to the Simpson Lakes

Project area (Gough, 1990; Meyer, 2004, 2005a, Meyer, 2005b; Marchand, 2010). These inquiries

have resulted in documentation of ten archaeological sites and one cemetery within or immediately

adjacent to the Simpson Lakes project area. A review of the Colville Confederated Tribes

History/Archaeology (H/A) Program databases resulted in the documentation of twenty-one

Traditional Cultural Properties (TCPs).

A search of Bureau of Land Management/General Land Office (BLM/GLO) records indicates that

there are five historic land patents and multiple historic trails and roads within the project area.

Finally, an examination of Clair Hunt’s 1916 map of the South Half of the Colville Indian

Reservation determined there are one-hundred twenty-two historic Indian allotments in the project

area.

For the current project, a predictive model was used to select areas within the Simpson Lakes

Project area for a cultural resource survey that resulted in documentation of five archaeological

sites. They have been documented as 092525-1-ASH, 092525-2-ASH, 050125-1-MP, 111025-1ASH and 110625-1-ASH.

One hundred sixty-four resources have been documented within the Simpson Lakes project area.

Five previously documented archaeological sites, seven TCPs and thirty-five historic Indian

allotments identified within the project area are located within the APE for the current project. All

five of the newly documented archaeological sites are within proposed treatment blocks, all of

which will require mitigation to protect these resources. The remaining resources appear to be

eligible for the National Register of Historic Places (NRHP) but are outside of the project APE

and should not be affected by project implementation.

All TCPs and archaeological sites must meet at least one of the following criteria to be considered

eligible for evaluation to the National Register: A) they must be associated with events that have

made a significant contribution to the broad patterns of history. B) They must be associated with

the lives of persons significant to our past. C) They must embody the distinctive characteristics of

a type, period, or method of construction or they represent the work of a master, or that possess

high artistic values, or that represent a significant and distinguishable entity whose components

make individual distinction. D) They must have yielded, or be likely to yield, information

important in prehistory or history. Additionally, to be a “property” a TCP must have tangible

boundaries (36 CFR 60.4; Parker & King 1998).

Shannon and Moura (2007) have aptly observed that due to the unique nature of TCPs, the

standards identified above must also be evaluated with perception of Native American history.

When reviewing TCPs for continued use of at least 50 years, for instance, it must be recalled that

federal and state policies common in the 1800s restricted, regulated and denied access to property

8

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

to Tribal people which had previously been in their exclusive territory. Oftentimes, Indian people

may shift their area of use to adjacent or nearby locations if a previously utilized property suddenly

(and beyond Tribal control) became unavailable. Therefore, a location may still retain value and

continue to be a TCP when access is restored (Shannon & Moura, 2007).

In pre-contact and historic times, the knowledge of these TCPs and their locations and use provided

people with a means for subsistence and important cultural items for personal use or trade, cultural

practices which continue to this day. Additionally, the nature of these sites and their close

proximity to other documented cultural resources, including pre-contact, historic and additional

TCP sites increases their potential to yield information important to the CTCR.

Oral history accounts of the region identify the general areas of Cuba Canyon, Rainy Ridge, Ant

Mountain, Elbow Lake, Abraham Canyon, Barnaby Canyon and Simpson Lakes as possessing

traditional value in addition to those locations observed during the archaeological survey. It is the

position of the CTCR that “A place is significant due to its location and the meaning assigned to

it, not the language of the name by which it is known. While recording place names in the original

languages is of immeasurable value, the places will continue to have meaning and significance

regardless of the language used to describe them (George, 2011).

It is likely that cairns, rock alignments, talus pits and other rock features may be found throughout

the area. Pictographs are common in this region and have a high potential to be present on the flats

adjacent to streams and springs where people would have camped while taking advantage of

upland resources. Small pre-contact camps may be present on the upland areas adjacent to springs

or creeks, or in sheltered canyons. Evidence of early historic-period occupation, logging and

mining features and\or graves may be present within the project area, as suggested by the presence

of historic allotments. Picture trees (i.e., old growth pine trees with anthropomorphic figures

carved into them) are possible in this area, as well as more customary peeled pines.

The project area is located within the Hall Creek Watershed. Traditional religious use of

sweathouses perpetuate within the Hall Creek watershed, as do harvest of native culturally

significant plant species across the landscape. This area is the principle gathering location for at

least twenty-one different plant species for consumption, construction, weaving and religious

purposes. Two springs, which the CTCR attribute significant cultural value to, are documented

within this watershed. Fourteen locations within the watershed have been documented as important

areas for water-related resource use. Some of these are associated with Simpson Lakes, Lynx

Creek, Hall Creek, and the West Fork of Hall Creek.

The project area falls within portions of the watershed, which are documented as a principle

gathering location for at least twenty-two native plant species (Table 2) for consumption,

construction, weaving and religious purposes (Marker et al., 2012).

Table 2. Traditional Cultural Plants gathered within the Hall Creek and Twin Lakes Watersheds (Marker et

al. 2011).

Indian Carrots,

Wild Mushrooms,

Cottonwood,

Perideridia gairdneri

Multiple Species

Populus trichocarpa

Maple,

Tall Oregongrape,

Wild raspberry,

Acer circinatum

Berberis aquifolium

Rubus spp

9

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Foamberry,

Wild blackberry,

Indian potato,

Shepherdia canadensis

Rubus spp

Claytonia lanceolata

Wild thimbleberry,

Red Willow (Dogwood),

Fir,

Rubus spp

Conrus stolonifera

Multiple Species

Wild strawberry,

Cedar,

Lodgepole Pine,

Fragaria vesca

Thuja plicata

Pinus contorta

Western Larch,

Buckbrush,

Bunchgrass,

Larix occidentalis

Ceanothus

Reed Canary Grass,

Tule (aka bulrush),

Huckleberry,

Phalaris arundinacea

Schoenoplectus acutus

Vaccinium spp

Birch (including river birch),

Betulaceae

3.4 Range

The “Simpson Lake” project area intersects with parts of Range Unit 69. Range Unit 69 is a Range

Unit currently permitted for livestock grazing, however there are currently no livestock permitted

on the unit.

The Simpson Lake Forest project area receives on average 20”-36” of precipitation per year with

most in the form of winter snow. The change in precipitation values generally follow the change

in elevation values from near 2,100 ft at the South Tip of the project area near the Inchelium

Highway to near 3,500 ft on the ridge that runs through of the forest project area.

The NRCS database lists six forest habitat types in the blocks proposed for treatment. The most

occurring habitat types are listed in order below. The most notable shrub species listed is common

snowberry, mallow ninebark, oceanspray, and big huckleberry. Most common understory grass

species in this area is pinegrass with Idaho fescue, and blue wildrye also present.

Douglas fir/common snowberry

Ponderosa pine/Idaho fescue

Douglas fir/pinegrass

Douglas-fir/pinegrass, kinnikinnick phase

Ponderosa pine/common snowberry

subalpine fir/northern twinflower

10

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

4.0 Environmental Consequences

4.1 Forestry

Impacts to Forestry Resources Alternative A: No Action

x

x

x

x

x

x

No profits for Colville Tribe and this harvest would not contribute toward the AAC of 77.1

MMBF.

Forest management would not receive the forest management funds from this project.

No timber industry employment would be generated.

Forest health would likely decline, with an increase and spread of insects and disease/

Area would not be replanted and would likely take much longer to recover and be

productive in timber production, impacting the future tribal income.

Area would move farther away from the Desired Future Condition’s in the IRMP.

Under this alternative, no conifer trees would be harvested. No timber stumpage revenue would

be generated. No Forest Management Deduction funds would be generated. No logging industry

employment would be generated. No silvicultural treatments would be implemented. Forest health

issues and concerns could possibly worsen and move away from the Tribes’ desired future

conditions. Overstocking of forest stands; predominance of climax tree species, over mature trees,

tree mortality, competing vegetation, forest insects and diseases problems and other current forest

conditions would continue to affect the overall forest health. The potential forest site-productivity

may never be achieved in some locations.

“No Action” on Simpson Lake Project could put the pressure of achieving the projected stumpage

revenue onto other reservation-wide project areas and natural resources as these areas could take

longer to become productive. Specifically, the “No Action” alternative could be detrimental to the

health of the forest.

Burned trees would create a public safety concern for the tribal membership in this highly utilized

area.

Impacts to Forestry Resources Alternative B: Proposed Action

x

x

x

x

x

x

x

Approximately $727,666 profit for the Colville Tribe with a harvest of 10 MMBF.

2,260 acres will have treatments to improve stand conditions, 1,342 acres of harvest, 951

acres of stand culture including stand prep/slash removal

Forest health would improve, dead trees would be removed and disease-resistant species

would regenerate naturally and with planting.

Desired Future Condition’s outlined in the IRMP would be met over time.

3.62 miles new road construction would occur to facilitate logging and 18.22 miles of

existing road would be improved.

High hazard and out of balance stands would be treated.

All of these things cumulatively would potentially create a faster growing, disease resistant,

more productive forest landscape that would yield much higher volumes and value in the

future.

11

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

The implementation of Alternative B would improve forest health. The result of management

would be to: increase stand and individual tree vigor, increase insect and disease resistance, reduce

the fuel quantity, and provide more fire-resistant fuel arrangement in timber stands. The proposed

action would move a substantial portion of the vegetation in the project area toward the stand

structure distributions and size/age classes outlined as the desired condition CTCR Forest

Management Plan (CCT, 2023). This alternative would also achieve the goals for regulation of the

long-term timber supply, supply of wood to processing facilities, and stumpage return to the

Colville Tribe.

4.2 Hydrology

Impacts to Hydrology Resources Alternative A: No Action

The no action alternative would allow for the natural ecological process to continue. Stream

channel hydraulics and associated riparian vegetation would not be impacted by harvest related

activities. Effective ground cover and hydraulic roughness would remain, continuing to provide

overland flow attenuation and prevent nonpoint source pollutant delivery to downslope

watercourses. Retention of mature vegetation would continue to provide canopy interception and

reduced rain splash erosion. Infiltration would remain high, and rill and scour erosion would

remain minimal. Additionally, soil structure would be maintained in the current state. All methods

of timber harvest, ground- or cable-based, result in some amount of soil disturbance. Soil

compaction generally occurs in locations where machinery tracks have traveled (particularly in

wet conditions), while destruction of soil structure and subsequent sediment mobilization generally

occurs as a result of ground-based operation on steep slopes and a lack of traction. Transport of

trees by logging equipment also results in soil disturbance and transportation. These effects would

be avoided through the No Action Alternative, maintaining soil structure, density, and

productivity.

Road density would be maintained at the current level under the No Action Alternative. Existing

road density in all WMUs in the project area are higher than the desired condition outlined in the

IRMP (desired: 4.0 mi/mi2; current: Barnaby Creek: 6.92 mi/mi2, Columbia River 01: 4.16 mi/mi2,

Columbia River 02: 6.81 mi/mi2, Columbia River 03: 7.10 mi/mi2, Little Jim Creek: 7.58 mi/mi2),

but lower than the density that would be achieved as a result of the preferred alternative. The No

Action Alternative would also not involve reconstruction of any existing roads, allowing existing

vegetative cover and stability to be maintained. Maintaining the lowest road density (i.e. the

existing condition) would provide the closest approximation of natural hydrologic conditions,

between the two scenarios. High road densities are detrimental to watershed hydrology primarily

due to the interception and diversion of water from natural flow paths. When overland flow is

intercepted by a road prism, ditch, blocked or undersized culvert, or other infrastructure, that water

is generally diverted or lost to evaporation, rather than continuing as overland, shallow subsurface,

or groundwater flow. As climate change advances, it becomes increasingly important to retain

water on the landscape. High road density contributes to the loss of water on the landscape through

decreased infiltration and increased evaporation; each additional road increases these effects.

Existing roads in the Simpson Lakes project area are maintained to various levels of stability. 83

existing segments, with a total length of 35.88 miles, were identified for review; segments were

selected for review if they were within or adjacent to swales, draws, wetlands, streams, or other

aquatic resources. Additionally, some segments had previously received restoration treatment, and

12

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

were identified to prevent unauthorized use. Under the No Action Alternative, none of these

segments would be reconstructed, and use would not increase. However, segments that have not

been maintained may continue to be at risk of failure, and crossings obstructing flow and fish

passage would continue to do so.

Impacts to Hydrology Resources Alternative B: Proposed Action

•

•

•

•

3.62 miles of new road construction and 18.55 miles of road reconstruction

0.12 miles of new construction and 4.88 miles of reconstruction within 200 ft of

hydrologic features

Harvest activities within 200 ft of streams – 230.24 ac

Harvest activities within 200 ft of wetlands – 37.25 ac

The proposed action would involve 1,342 acres of timber harvest. Throughout the project area,

these activities overlap and abut streams and wetlands, with 243.98 acres of harvest activities

within 200 feet of wetlands and streams.

Harvest operations, including the use of heavy machinery to fell and skid timber, cause soil

compaction and erosion; additionally, as a result of decreased vegetation, interception, infiltration

and water uptake are decreased, and a greater volume of water occurs as overland flow. This can

result in great sediment transportation to downslope streams and wetlands, resulting in decreased

water quality. Additionally, harvest operations create linear features such as skid trails. If oriented

parallel to the slope, or located in swales and topographic low points, these linear features

channelize water, and lead to rill and gully erosion, sediment transportation, and road failure. These

effects can be minimized by locating skid trails perpendicular to slope direction, and through the

use of cable logging rather than ground based harvest systems, particularly on steeper slopes.

All road construction and use associated with proposed timber harvest activities will lead to soil

disturbance and loss as well as alteration of watershed hydrology (Hunner, 2014). Specifically,

road miles within 200 ft. of surface water are statistically likely to deliver sediment/erosion to

surface water (Dubé et al, 2004). Road reconstruction and new construction effects on water

quality, hydrologic processes, and aquatic habitat will be the longest-on-going, longest-lasting,

and highest-degree negative impacts resulting from the proposed action. The use of heavy

machinery to create and redo roads will result in immediate sediment delivery to adjacent

waterbodies. Additionally, reconstruction results in soil compaction and disturbance, both of

which are significant causes of decreased soil health, eventual runoff channelization and continued

erosive losses. Repeated improper reconstruction procedures that fail to reincorporate disturbed

material into the road prism create linear features that channel water away from natural water

features. When these features are created adjacent to streams, heavy flow events can cause the

relocation of the active channel into the road prism, creating a safety hazard, and drastically

altering the natural hydrology of the area.

Water Resources

The proposed project would involve approximately 1,342 acres of treatment. Within the project

area, there are 61.85 miles of streams and 500.35 acres of wetland. Within treatment blocks, there

are 3.43 miles of streams. The proposed project plan includes 267.49 acres of planned harvest

activities within 200 ft. of hydrologic features. Harvest activities will occur on 230.24 acres within

200 ft. of streams, and 37.25 acres within 200 ft. of wetlands.

13

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Table 3. Hydrologic features within the Simpson Lake project area footprint.

Hydrologic Feature

Potentially Affected Size

Mapped Streams

61.85 mi

Mapped Wetlands

500.35 ac

The impacts from the proposed project to the affected environment are multi-faceted. Harvest

impacts include: alterations in flow paths due to skid trail creation and machinery operation;

reduced infiltration and increased erosion due to soil compaction from machinery operation;

increased sediment and nutrient delivery to surface waters; loss of wetland and riparian vegetation;

and potential delivery of herbicide to surface waters, among others.

Prior to initiation of harvest, calculation of exact miles of skid trails is not feasible. However,

impacts can be estimated through looking at the number of blocks and acreage of harvest impacts.

1,524 acres, across 59 blocks, are proposed for ground based (tractor and cable assist) harvest.

Blocks range from approximately 500 to 2,000 feet in width oriented perpendicularly to the

hillslope. Assuming an average block width of approximately 1,000 feet (a conservative

estimation), with average skid trail spacing of 100 feet (as required by Colville Tribal Code 4-7

Forest Practices), almost 600 skid trails will be created in blocks prescribed for ground-based

harvest. Using aerial imagery from late summer 2022, skid trail spacing in previous sales,

including Summit Trail salvage blocks in the Upper Lynx Creek WMU, was determined to be

closer to an average of 50 foot spacing. With this knowledge, we can assume that skid trail creation

could be as much as double what is estimated above in ground-based harvest blocks. Additionally,

206.47 acres of proposed ground-based harvest will occur within 200 feet of hydrologic features.

The potential for sediment and nutrient delivery to surface water via skid trail creation is elevated

in these acres.

Road development and use impacts include: alterations in flow paths due to the creation of linear

landscape features (roads) perpendicular to natural slopes; reduced infiltration and increased

erosion due to the creation of impervious surfaces; and increased transport of vehicle associated

pollutants (including 6PPD-q, hydrocarbons, carbon monoxide from exhaust, etc.), among others.

Proposed reconstruction and new construction in the Simpson Lakes project area will occur on

22.17 miles of road. The proposed haul route for logging vehicles to transport logs to the mills

includes an additional 18 miles of paved road between the town of Inchelium and the northern

boundary of the Reservation, primarily on Inchelium-Kettle Falls Road. 3.18 miles of

reconstruction and new construction will occur within 200 feet of surface water. High road

densities detrimentally affect water retention on the landscape, creating interception points that

redirect flow from reaching creeks, streams, and wetlands. Abandonment and revegetation of roads

can mitigate some of the effects of high road density, improving infiltration and decreasing

overland flow, but retention of road prisms, nonnative roadbed material, and artificial crossing

structures such as culverts will continue to alter hillslope hydrology regardless of vegetation

establishment. Additionally, studies have shown that the chemical 6PPD-quinone, used in the

manufacture of rubber tires, can cause acute mortality in salmonids, including rainbow trout

(Oncorhynchus mykiss), found in streams across the Colville Reservation. Roads in proximity to

salmonid bearing waters may result in 6PPD-q related effects.

14

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Therefore, the action in this area would have direct physical changes on the environment. The

Proposed Action Alternative approval would have cumulative effects resulting from road

construction and timber harvest. The associated effects are discussed in Section 4.7 of this EA.

Water Resources Impacts – Proposed Action

Surface Water:

The proposed alternative will generate sediment through the creation of skid trails, increase

overland flow through the removal of vegetation, and create interception points through the

construction and reconstruction of roads. A minimum of 13 culverts will likely be installed during

this project. Road miles and road density in the project area will increase due to the 3.62 miles of

new road construction.

Wetlands:

The proposed forestry activities will impact wetland ecosystems through soil disturbance,

hydrological alteration, and disruption of vegetative communities. 37.25 acres of harvest activities

occur within 200 feet of wetlands and forestry associated road work includes 1.82 miles of road

reconstruction within 200 feet of wetlands. An additional 0.28 Right of Way (ROW) road segments

are indicated within 200 feet of wetlands.

Floodplains:

NOAA mapping indicates a fairly extensive 100-year floodplain associated with Barnaby Creek,

as well as small, isolated areas of 100-year floodplain along Little Jim Creek. Additionally, several

type 3 tributaries, including Cedar Creek, have associated 100-year floodplains mapped. However,

blocks and roads proposed for this project do not encroach on the 100-year floodplain of Barnaby

or Little Jim Creek, except for existing road locations.

Direct Impacts – Short-Term

Surface Water:

Timber harvest activities are likely to result in short term impacts to surface water quality through

the generation of sediment. Individual instances of turbidity have previously exceeded water

quality standards in Barnaby Creek; this is likely to continue, potentially resulting in an overall

decrease in water quality leading to non-compliance with code standards, and detrimentally

affecting aquatic organisms. Additionally, turbidity is often associated with temperature, which

has also been a metric of concern at this Barnaby Creek sampling site. Increased heating of surface

water, particularly in headwaters and tributaries, is likely, due to removal of vegetative cover.

Degradation of temperature, dissolved oxygen, and turbidity metrics will likely be short term

impacts of timber sale activities. Water quantity in the main stem of Barnaby Creek may increase

in the short term, due to removal of vegetation and reduction of transpirative losses, though likely

not markedly due to the distribution of blocks. Additionally, much of this water will travel as

overland flow, becoming vulnerable to evaporation and interception from road prisms, skid trails,

and other anthropogenic alterations, and potentially not reaching Barnaby Creek at all. Water

distribution across the landscape is likely to change for this reason. Road construction and

reconstruction is responsible for interruption of natural landscape hydrology, creating diversion

points perpendicular to hillslopes. These diversions result in altered flow paths, increased

evaporation, and increased sedimentation. Short term water quality will likely decrease for these

15

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

reasons as well. These impacts will be sustained over the duration of the project, approximately

five years.

Wetlands:

There is no harvest indicated in mapped wetlands or wetland RMZ buffers. Unmapped wetlands

have been identified and must be buffered according to field verified extent. 20 individual

incidences of harvest activity within 200 feet of wetlands totals 37.25 acres. Extensive tree

removals, designated as Seed Tree prescriptions in COMP 447 BLOCK 718 within 200 feet of

Water Type III Freshwater Emergent Wetland E.HAL_056; In COMP 447 BLOCK 211 within

200 feet of Water Type II Freshwater Emergent Wetland E.HAL_055; In COMP 425 BLOCK 136

within 200 feet of Water Type II Freshwater Forested/Shrub Wetland E.HAL_239, Water Type

III Freshwater Emergent Wetland E.HAL_154, and Water Type III Freshwater Emergent Wetland

E.HAL_090; In COMP 426 BLOCK 155 within 200 feet of Water Type II freshwater Emergent

Wetland E.HAL_376 and Water Type III Freshwater Pond Wetland E.HAL_365; And in COMP

425 BLOCK 124 within 200 feet of Water Type III Freshwater Emergent Wetland E.HAL_096,

are predicted to contribute to short-term rise in local water tables which influence the timing and

seasonal persistence of surface water, interrupt pollutant processing capacity of the wetlands, and

disrupt growth habits of wetland vegetation.

Floodplains:

Short term impacts to floodplains will be contained to the existing road locations, where sediment

delivery potential will be increased, and impacts to off-channel floodplain habitat may occur. With

the utilization of Best Management Practices, the area of impact should be minimized.

Direct Impacts – Long-Term

Surface Water:

Long term impacts on surface water will continue until vegetation is established and disturbed

areas are stabilized. As skid trails and roads are seeded with herbaceous vegetation, soils will

become more stable, and water quality will gradually return to pre-harvest conditions. As larger

vegetation and trees establish, surface water quantity will decrease with increased

evapotranspiration. Depending on the duration and severity of impacts to natural hillslope

hydrology, flow paths may be permanently altered by the creation of skid trails and roads.

Additionally, roads will not be deconstructed at the conclusion of the sale. Therefore, road density

impacts on interception and diversion will persist, and road use will continue into the foreseeable

future. Crossing structures will also not be removed, and impacts from improperly installed or

sized structures will continue to impact water quality in the long term. Additionally, any road use

over streams will continue to deliver sediment and contaminants to the surface water at the

crossing.

Wetlands:

There are 1.82 miles identified for road reconstruction and 0.28 miles indicated for the use of Right

of Way (ROW) within 200 feet of wetlands. Over the long-term the construction and use of

forestry-related roads contribute to sedimentation in wetlands, aiding in nutrient and pollutant

delivery as well as degrading wetland function, water quality, and habitat.

Floodplains:

16

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Existing roads in the floodplains will likely continue to be used following the timber sale, as they

are currently primary travel routes for local traffic. For this reason, impacts will continue in the

long term, though they will be reduced following the conclusion of the Simpson Lakes timber sale

when traffic from heavy machinery and logging trucks has ceased.

Water Resources – No Action Alternative

Under the No Action Alternative, there would be no predictable anthropogenic changes to surface

water, wetlands, or floodplains, and no significant avoidable direct, indirect, short-term, long-term,

or cumulative impacts to water resources anticipated.

Water Resources Impacts – Conclusions

Table 4. Water Resources Impact Summary from the Proposed Action.

Water

Resource

Surface Water

Wetlands

Floodplains

Short-Term Direct

Impacts

Yes

Yes

None

Long-Term Direct

Impacts

Yes

Yes

None

Cumulative

Impacts

None

Yes

None

The project will result in short-term impacts to soil and surface water, particularly within the top

12-24 inches. Long term impacts (after the conclusion of the project) will be minimal as vegetation

reestablishes and stabilizes slopes. The Proposed Action will result in significant short-term

impacts to water resources.

Resource Use Patterns

Transportation Networks

The existing transportation network on the Reservation consists of nearly 10,000 miles of road

managed under multiple jurisdictions, maintained to varying degrees of stability. Within the

Inchelium district, major travel corridors include Bridge Creek Road (Ferry County Public Works),

and Inchelium-Kettle Falls Highway (Ferry County Public Works), among others (Tribal DOT,

BIA DOT.). Additionally, the district contains multiple thousands of miles of forest roads, which

do not fall under any of the above jurisdictions, and therefore do not receive any maintenance.

These roads are primarily used for timber harvesting, fire suppression, and member access for

hunting, fishing, and gathering. In addition to this multi-jurisdictional network, there are over

3,300 stream crossings.

Direct Impacts – Short-Term

The Simpson Lakes timber sale project proposes the construction of 3.62 miles of new road, and

18.55 miles of reconstruction of existing forest roads. The use of these roads for timber sale

operations will result in short-term impacts to the existing transportation network through physical

degradation of roads. Large vehicles carrying heavy machinery and loads of logs cause road quality

to deteriorate. This will occur throughout the life of the project.

Direct Impacts – Long-Term

The existing roads network is not well maintained; creation of new roads and reconstruction of

existing roads will decrease the amount of maintenance that can be allocated to existing segments,

and cause road quality to deteriorate over time.

17

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Short- and long-term direct impacts to water resources have been identified with the proposed

Simpson Lakes Timber Sale project. Implementing the proposed action would result in new and

cumulative significant impacts to water quality and wetlands. Mitigation measures to attenuate

these impacts are outlined in Section 4.7.

4.3 Fish and Wildlife

Impacts to Fish and Wildlife Resources Alternative A: No Action

The “no action” alternative would not have adverse effects on fish and wildlife habitat in the

project area. Leaving the timber intact would allow the area to follow natural succession patterns

and would benefit wildlife species, both terrestrial and aquatic. Fires and/or insect/disease die-offs

could affect the project area, but the timing and severity of these disturbances are not known.

Natural disturbances may even benefit fish and wildlife species by increasing habitat values.

Overstocked and diseased stands may show a decline in value for some species of wildlife.

Impacts to Fish and Wildlife Resources Alternative B: Proposed Action

The Proposed Action would impact fish and wildlife species and habitat within the project area.

Removal of timber from 1,113.6 acres could negatively impact wildlife populations that use the

habitat in the project area to meet their life requirements. Impacts to the habitat within the project

area would include but are not limited to: an increase in soil compaction and ground disturbance,

a growth and introduction of noxious weeds, the creation of large openings, a decrease in water

quality, degradation of instream and riparian habitats, a reduction and loss of large diameter snags,

future snags and large diameter downed wood, a deterioration or loss of mature and old growth

coniferous forest, a loss of large diameter trees, a decline or loss of wildlife travel corridors, a

decrease in hiding, escape and thermal cover, and a reduction in canopy cover. However, when

timber management occurs, it opens the forest floor, increasing sunlight and precipitation for grass,

forb, and shrub species, thereby amplifying forage opportunities for several wildlife species.

These changes to the habitat structures and functions within the project area would have effects on

a variety of wildlife species. The implementation of this project would decrease effective

wintering, calving, and summer/fall range for resident and migrant big game species, reduce the

amount of suitable habitat for pileated and white-headed woodpeckers, reduce the quality and

quantity of instream and riparian habitat, and impact the ecological function of aspen stands,

wetlands, seeps, and springs.

Infrastructure (culverts) should allow for the passage of fish, flow, sediment, and debris.

Undersized culverts may lead to channel avulsion, head cutting, and/or complete failure of the

structure. Constricting flow through undersized culverts may contribute to velocity barriers

limiting the instream movement of resident fish at early or all life stages. The failure of inadequate

sized structures typically occurs long after work has been completed.

Fish

The Simpson Lake Project area is located on the east by the Columbia River (Lake Roosevelt) and

on the north by the Colville Reservation Boundary. This area encompasses Barnaby Creek, its

tributaries, Cuba Canyon Creek, Little Jim Creek, Cedar Creek, Lake Roosevelt, Elbow Lake and

Simpson Lake. The aquatic habitat within the affected area of the Simpson Lake Project supports

18

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

native redband rainbow trout Oncorhynchus mykiss gairdneri, (redband trout) a culturally

significant species to the CTCR tribal membership, brook trout Salvelinus fontinalis, native

minnows (Leucisidae), and sculpins (Cottidae).

Additionally, the Lake Roosevelt drainage area is included in the Northeast Washington Research

Needs Area of the Mid-Columbia Recovery Unit for bull trout (S. confluentus; USFWS 2002).

Bull trout Threatened and Endangered Species federal status is currently listed as “threatened”

while Washington State considers bull trout a candidate for listing. Bull trout in the Simpson Lake

Project Area and surrounding areas are extremely rare and believed to be extirpated. Historically,

populations likely occurred in several tributaries to the Columbia River above Grand Coulee Dam

(Lake Roosevelt). However, currently no spawning populations exist within the Northeast

Washington Research Needs Area. Since 2011, fewer than 25 bull trout have been documented in

the mouths of tributaries to Lake Roosevelt or in Lake Roosevelt/Columbia River itself. In 2012,

a single adult bull trout was documented in the lower Sanpoil River Arm of Lake Roosevelt. Bull

trout observation data within the Northeast Washington Research Needs Area is not well tracked,

is sporadic, and often anecdotal, although they are rarely encountered during large-scale

standardized fishery surveys. Bull trout present in the Northeast Washington Research Needs Area

likely derive from local populations in the Coeur d’Alene/Spokane River or Pend Oreille River

basins, or from tributaries to the Columbia River in Canada and have been entrained over dams.

While bull trout are rarely encountered in Lake Roosevelt, multiple fish passage barriers on Hall

Creek, including an impassable culvert and a waterfall, further reduce the likelihood of their

presence in the project area and therefore bull trout are very unlikely to be impacted.

Federally Threatened or Endangered Species

Section 7 of the Endangered Species Act (ESA) (16 USC 1531 et seq.) of 1973 as amended and

its implementing regulations found at 50 CFR 402, require federal agencies to ensure that any

action authorized, funded, or carried out by such agency is not likely to jeopardize the continued

existence of any endangered species or threatened species or result in the destruction or adverse

modification of habitat. The CTCR Wildlife Biologist determined that the proposed actions and

associated activities would have ‘No Effect’ to threatened or endangered species, or candidate or

proposed species, or suitable or critical habitat within the action area. Documentation is found in

Appendix B.

Information for Planning and Conservation was acquired from the United States Department of

the Interior Fish and Wildlife Service (USDOI-FWS) for the Endangered Species Act Species List.

An Official Species List from the United States Department of the Interior Fish and Wildlife

Service (USDOI-FWS) is included as Appendix B.

Bald and Golden Eagle Protection Act and the Migratory Bird Treaty Act

The Bald and Golden Eagle Protection Act (16 U.S.C. 668-668c), of 1940, as amended, and the

Migratory Bird Treaty Act (16 U.S.C. 703-712), of 1918, as amended, prohibit anyone, without a

permit, from “Taking” eagles or any bird, including their parts, nests, or eggs. Within this Act,

eagles/nests/eggs/young are not to be “Disturbed”, including agitated or bothered. All known nests

are buffered and have seasonal restrictions.

Within the Simpson Lake project boundary, there are at least 3 known bald eagle (Haliaeetus

leucocephalus) nests that have been buffered appropriately. Per code 4-7-68, a minimum of two

reserve trees per acre, well distributed, shall be left standing (CTCR, 2006). Due to this being a

19

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

suitable habitat for eagle species, it is requested that these reserve trees consist of the largest

diameter and tallest living trees, especially in blocks near waterbodies. If, during harvest activities,

a bald or golden eagle nest is thought to have been found, please contact the 3P wildlife biologist

immediately.

Within the project area, there are no known active great gray owl or Northern goshawk territories.

If a great gray or goshawk nest is located, a no-harvest activity buffer would be put into place,

with a 0.5-mile seasonal (March 1- August 31) buffer to protect fledging activities. With the

timbered habitat bordering open habitat, there is the available structure to support both great gray

owls and goshawks. If at any time during harvest activities, goshawk or great gray owls are

observed, the 3P wildlife biologist should be contacted.

Protection Measures

In the Simpson Lake project area, there are approximately 978 acres of blocks that are adjacent to

streams; that is, of the 62 blocks in the Simpson Lake project area, 14 (27%) contain or are adjacent

to streams. These bodies of water include but are not limited to Barnaby Creek, Cedar Creek,

Nicholas Lake, Simpson Lake, Elbow Lake, Cuba Canyon Creek, Lake Roosevelt, Little Jim

Creek, and several unnamed type 3 and type 4 tributaries. Harvesting close to or near these bodies

of water would likely lead to increased sedimentation, temperature, decreased supply of woody

debris and an increase in turbidity, all of which would reduce fish habitat and water quality. These

streams and their riparian habitat have some of the highest fish and wildlife richness and diversity

and are extremely susceptible to environmental change.

The proposed action of the Simpson Lake project falls within five of the Reservation WMUs,

which are Barnaby Creek, Columbia River 01, Columbia River 02, Columbia River 03, and Little

Jim Creek. The CTCR IRMP states that total road density would be reduced to less than 3.5 mi/mi²,

with open road density to be reduced to less than 1.5 mi/mi² wherever feasible across the

Reservation. Road densities on the reservation are calculated using the WMU boundaries; Table 5

depicts the road density for the affected WMUs.

Table 5. Road Density by WMU.

WMU

Roads (mi) WMU (ac)

WMU (mi2) Road Density (mi/mi2)

Barnaby Creek

101.10

9,345.47

14.60

6.92

Columbia River 01

9.92

1,528.24

2.39

4.16

Columbia River 02

35.26

3,309.12

5.17

6.81

Columbia River 03

42.44

6,615.14

10.34

7.10

Little Jim Creek

34.57

2,918.91

4.56

7.58

20

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Currently, all of the WMUs exceed the IRMP target of 3.5 mi/mi2 total road density. Alternative

B proposes roughly 3.62 miles of new construction and 18.55 miles of reconstruction, which would

increase both open road and total road densities, further exceeding the Tribes' goal of 3.5 mi/mi².

It is to be noted that these numbers are inflated due to the lack of ground truthing of the CTCR

roads GIS layer(s); i.e., many open roads do not exist/are closed but are not verified. Further

analysis would be required to achieve an accurate road density per WMU, but these numbers reflect

the most up-to-date data on hand.

Table 6. Proposed road Density reduction by WMU for Alternative B. for the Wildlife Dept.

WMU

Roads

(mi)

Proposed Closures by

Wildlife Dept (mi)

WMU

(mi2)

Road density reduction (mi/mi2)

Barnaby

Creek

101.1

2.19

14.6

0.15

Columbia

River 01

9.92

2.79

2.39

Road density does not change. This

mileage being closed is new construction.

The Fish and Wildlife Department suggests that unnecessary segments and select reconstructed

roads should be closed to adhere to the IRMP goal of 3.5 mi/mi2 total road for WMU’s along with

1.5 mi/mi² of open tribal forest road densities (IRMP 2015). The department is proposing 5 double

tank traps to eliminate vehicle use (Appendix D). Table 6 depicts the CTCR Fish and Wildlife road

closure proposals for a total length of 4.98 mi. Forest road systems fragment wildlife habitat,

reduce available habitat, and create barriers to population movement. New construction and

reconstruction of roads also have the potential to affect the surrounding fish habitat and water

quality/quantity.

Resource Use Patterns

Hunting, Fishing, Gathering

“The Tribes regulate the harvest of wildlife resources within the aboriginal territory of the Colville

Tribes. In regulating wildlife and recreation resources of the Reservation, tribal members are

afforded the greatest possible freedom to use and enjoy these resources, consistent with the

preservation and improvement of these resources for future generations. Wildlife found on the

Reservation may be taken only at such times, in such places, and in such a manner as provided by

tribal law” (CTCR 2015).

4.4 Cultural Resources

Impacts to Cultural Resources Alternative A: No Action

Although there may be a number of direct and indirect effects to the Reservation’s resources from

the implementation of Alternative A, it is important to recognize that cultural resources are, for

the most part, non-renewable resources. The ‘No Action’ alternative would have a number of

various effects on the known cultural resources identified within the project area.

21

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

The historic exclusion of fire on the Reservation has resulted in an overabundance of vegetation.

Although Alternative A would leave the timber intact and allow for natural succession patterns;

overstocked and diseased stands have increased ladder fuels which must be addressed by current

management practices.

Potential impacts of Alternative A include vegetation encroachment to sites which exhibit surface

features. This encroachment may reduce visibility of the site, potentially affect its integrity and

increase the likelihood of adverse effects to it from wildland or prescribed fire. Invasive non-native

plant species within this area would likely perpetuate and increase, competing with native plant

species of traditional and cultural significance. The ‘No Action’ alternative may also cause

physical damage to sites from snags or trees falling upon them, dismantling, destroying or

otherwise impacting surface features. Fallen trees may also expose buried subsurface cultural

materials, which otherwise would have remained intact.

Impacts to Cultural Resources Alternative B: Proposed Action

There are currently ten archaeological sites, twenty-one TCPs and thirty-five historic Indian

allotments recorded in the Simpson Lakes APE. Seven archaeological sites will require mitigation

for protection.

These sites may be considered eligible for the National Register of Historic Place, as described in

36 CFR Part 60.4. The implementation of Alternative B would result in adverse or significant

effects on the seven archaeological sites eligible for the National or Colville Registers identified

within the APE unless mitigation measures are taken to protect these sites. These mitigations are

in section 4.7. The other resources within and adjacent to the Simpson Lakes Project area are

outside the APE and will not be affected by the proposed project.

4.5 Range

Impacts to Range Resources Alternative A: No Action

This alternative would have no disturbance impact on the current plant community condition. No

action, being a management decision, would also not address the forest health concerns identified

in the proposal. Degraded forest plant communities would remain in a degraded state.

Impacts to Range Resources Alternative B: Proposed Action

Note: This evaluation includes all blocks identified for treatment in the forest project area

including those designated for pre commercial thinning.

Harvest disturbance within forested plant communities often benefits plant community health by

reducing potential for disease, insects, and wildfire effects. Reducing canopy densities can also

release understory plants that have been suppressed by overstocked conditions. Desirable natural

understory plants are usually adept at recovery with the type of soil disturbance that normally

occurs with harvest. Areas of concern may be landings, skid trails, roads, and pile burning sites,

all areas where activity may create highly disturbed soil conditions or a change in soil fertility

properties. The potential of increased soil disturbance in these areas may hinder the recovery of

desirable understory plants and increase the possibility of establishing new invasive and noxious

weed populations.

22

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

The annual precipitation for the blocks in this proposal is 20” to 36” annually. This broad range of

average annual precipitation can cause variable potential for the rapid recovery of forest native

understory species. Areas of high soil disturbance in the lower end of the precipitation range can

be slow in recovering naturally allowing more competitive invasive noxious weed populations the

opportunity to become established. Once established many invasive and noxious weeds can

outcompete the natural vegetation. If highly competitive undesirable plants become established,

they are often hard to eliminate. New patches of persistent competitive invasive weeds also provide

a future seed source for further spread in the area.

The most common forest habitat represented in the project blocks is Douglas-fir/common

snowberry with pinegrass as a major component understory grass species. Pinegrass is also very

common in the other habitat types represented in the treatment blocks. Pinegrass is a resilient

species and should naturally recover except where the soil profile has been highly mixed. Also

common in this area is, Idaho fescue, Columbia brome, and blue wildrye. If seeding should be

determined to be needed to assist in recovery Idaho fescue, and Columbia brome should be

considered for a seed mix depending on the forest habitat type targeted.

Post treatment monitoring of understory recovery should occur. If monitoring determines a need,

inputs in the form of native plant seeding and/or herbicide treatment should be considered to assist

in the recovery. Intermediate wheatgrass and Siberian wheatgrass should not be used for ground

cover as they are nonnative, persistent, and highly competitive. These nonnative species although

classified as forage plants seem to be less preferred to wildlife and livestock. Grazing animals will

go to the preferred native plants first increasing the grazing pressure on those plants. If something

is needed to quickly provide ground cover, there are alternatives to consider that are less

competitive and do not persist for more than a couple years. These alternatives may also provide

a nurse crop benefit to native plants that germinate from native seed planted. If the project manager

determines a need for herbicide treatment and/or seeding the Land Operations department can offer

suggestions for herbicide treatment and seed mix if assistance is needed.

Range Program Operations

Within forest project areas grazing is a secondary land use but is important to CTCR livestock

owners for success in their economic venture. Grazing can also provide positive impacts by

reducing accumulated fuel and reinvigorating grasses. Rangeland structural resources such as

fences, watering facilities, and cattle guards are an important component to the sustainable

stewardship of land designated for grazing and are very expensive to replace. The proposed

treatment blocks for this project are located within Range Unit 69. The Range Programs

infrastructure GIS layer indicates quite a few structural assets associated with RU 69 that will

likely be encountered during this project. Fences and cattle guards are of particular concern. CTCR

Range Program asks that when range infrastructure is encountered such as cattle guards, watering

facilities, and fences they be avoided as much as possible. If range infrastructure is damaged during

project activity the project proponent will be responsible for notifying the Range Program and

seeing that damage is repaired in a timely manner. If cattle guards are located on roads that need

to be used for heavy traffic, they should be assessed for the ability to handle the weight of large

trucks and equipment. The Range Program can assist with that if contacted in a timely manner. If

it is determined the cattle guard does not meet specifications for the anticipated weight of the

traffic, and there is no way to bypass it, the cattle guard may need to be temporarily removed. If

this is the case it is essential the Range Program be notified 48 hours prior to the removal. The

23

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

removed cattle guard will be reinstalled by the proponent of the project unless other arrangements

are made with the CTCR Range Program.

The impacted Range Unit 69 does not currently have livestock permitted on them. However, Range

Unit fences need to remain functional, with any gates closed and damage to fences quickly

repaired. The Range Program needs to be notified if an infrastructure problem becomes apparent.

4.6 Cumulative Impacts

Surface Water:

As discussed above, four other timber sales have occurred in the Hall Creek RMU in the past 5

years. However, these timber sales have occurred outside of the Simpson Lakes project area and

therefore influence separate sub watersheds before flowing into the Columbia River. Additionally,

although portions of the Simpson Lakes project area burned in the Inchelium Complex and Summit

Trail fires, salvage harvest was excluded from these areas. For these reasons, cumulative impacts

to the Simpson Lakes project area from activities on the Reservation are minimal, and difficult to

meaningfully quantify.

Wetlands:

Increased runoff and sedimentation associated with ground-based harvest systems and road

construction, reconstruction, and forestry related road use are expected to have cumulative

systemic impacts to the wetlands adjacent to harvest blocks as well as the downstream wetlands

associated with Elbow Lake, Simson Lake, Barnaby Creek, Little Jim Creek, and other Columbia

River tributaries. The Simpson Lakes 2026 Forestry Harvest Project will occur simultaneously

with BIA Land Operations grazing permits in Range Unit 69. There are grazing controls identified

for range practices along Barnaby Creek and Simpson Lake, but not over the majority of riverine

and isolated wetlands in the project area. Cattle impacts including wetland soil disruption and

biological impacts will be exacerbated by forest practices contributing to excess sedimentation and

nutrient inputs.

Floodplains:

No additional impacts to the Barnaby Creek and Little Jim Creek floodplains have been

documented prior to this project. Therefore, there are no likely cumulative impacts from the

proposed action.

4.7 Mitigations

Mitigations for Soil and Water Resources:

Operators must ensure that all Best Management Practices (BMP) and standards for timber harvest

as required in Colville Tribal Code (CTC) Chapter 4-7: Forest Practices are followed in order to

minimize hydrologic disturbance resulting from actions taken under this alternative. During road

construction and reconstruction Planners and Operators must ensure that new/re-constructed roads

meet the BMPs and standards for roads identified in CTC Chapter 4-7: Forest Practices, and CTC

Chapter 4-9 Hydraulic Projects if doing any culvert/bridge work. By meeting these BMPs Planners

and Operators will minimize the water quality, hydrologic process, and aquatic habitat degradation

associated with roads as a result of the actions taken under this alternative. The transportation plan

developed by the Inchelium Forest Roads Engineer incorporated input from the Environmental

24

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Trust Department regarding stream adjacent roads, new road locations, and culvert sizing and

placement. The Forest Roads Engineer should continue to work with the Watershed Restoration

Program to remove any unnecessary road construction and determine where roads can be closed

or decommissioned to reduce road density.

A preliminary transportation memo was distributed on 3/11/25 identifying roads that should not

be used due to stream or wetland adjacency. These segments were then field verified, and

adjustments were made accordingly. Several segments identified for review overlapped with roads

proposed for use in the sale; after field assessment and coordination with the Inchelium

Transportation Planner, one of these segments will be utilized for the sale before being closed. The

other overlapping proposed segments were relocated away from the previously restored segments

or determined to not pose a risk to aquatic resources.

A layer was also provided of all restored roads within the project area, including decommissioning,

closure, and permanent abandonment. In the original preliminary transportation memo, the

following was stated: “The Restoration Program has completed restoration work in and around

this timber sale area, including as part of the 2017 Barnaby and Jim Creeks Watershed Restoration

project. 20 road segments included in the 2017 project are within or directly adjacent to the

Simpson Lakes sale area; these roads have been decommissioned or permanently abandoned and

are not available for use.” Road segment FID3795 (“simpson roads” shapefile) overlaps with a

road that was decommissioned by the Environmental Trust Department in 2017, which was

identified on this original layer. This road was reopened during the Summit Trail Fire. After

discussion with the Transportation Planner, this road will be utilized for sale, then tank trapped.

This will prevent the creation of two parallel, drivable roads, and an additional crossing location.

The road segment will be fully decommissioned again by ETD at a later date.

The provided culvert shapefile was incomplete. During field work, multiple additional undersized

or failed culverts were identified. A layer titled “Simpson Culverts” has been provided to the

Transportation Planner. The following table identifies those crossings and the necessary

treatments.

Table 7. Undersized or failing culverts in the Simpson Lake project area requiring treatment.

ETDID Existing

Proposed

C1

Ford

36" CMP

C2

None

36" CMP

C3

?

24" CMP

C4

Plastic 24" pipe

36" CMP

C5

None

Unsure -- below beaver dam. Discuss

C6

None

24" CMP

C7

None

24" CMP

C8

None

24" CMP

25

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Table 8. Simpson Lake harvest blocks requiring mitigation for water resource protection.

Comp Block Acres Rx

Mitigation

426

9

35.06 SW Use Barnaby Creek Road as block boundary

448

10

19.44 SW Road within buffer allowable for use

448

39

47.24 REH Unmapped stream and wetland

425

76

Functionally close road immediately following completion of harvest

42.76 SW Winter harvest preferred

425

136

27.08 ST

Culvert replacement necessary

Unmapped wetland

No heavy equipment

415

263

7.95

Sal

415

282

73.04 SAN Don't use bottom-most road

419

332

9.31

PCT Type 2 stream can be buffered as Type 4

Table 9. Blocks adjacent to Lake Roosevelt requiring a 200 ft buffer, per CCT 4-15 Shoreline Management.

Comp

Block Acres Rx

Notes

425

710 10.16 CT

Buffer Lake Roosevelt 200 ft.

447

710 44.45 OR

Buffer Lake Roosevelt 200 ft.

426

714 30.65 ST

Buffer Lake Roosevelt 200 ft.

426

715 19.79 ST

Buffer Lake Roosevelt 200 ft.

447

718 97.33 OR

Buffer Lake Roosevelt 200 ft.

448

995 10.46 REH

Buffer Lake Roosevelt 200 ft.

Planners and Operators should develop practices that will effectively mitigate for increased road

surface erosion. Such practices should include a plan for permanent road decommissioning to meet

the IRMP objectives and comply with CCT Forest Practices Code.

Upon completion of harvest or haul operations the following maintenance & monitoring actions

shall be performed:

Ɣ Clear all drainage improvements of obstructions

Ɣ Stabilize or remove unstable material and forest debris with potential to block drainage

improvements

Ɣ Repair or replace all damaged drainage improvements to fully restore their function

Ɣ Leave road surface in a condition that will prevent subsequent erosion, and keep runoff

within natural drainages, by outsloping, removing berms from the outside of roads,

providing drain dips, waterbars, rolling grade or other methods

Per Colville Confederated Tribes Law and Order Code [CCT 4-7-67(e)] Riparian Management

Zone buffers are required for wetlands. No harvest activities, movement of equipment or vehicles,

nor staging of materials or waste, should occur within the wetland or wetland RMZ buffer. Wetland

ecosystem presence and extent have been derived from National Wetlands Inventory (NWI) data.

NWI mapping is a service of the U.S. Fish and Wildlife Service and is conducted via remote

26

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

sensing techniques which require field verification for jurisdictional purposes. Though harvest

activities have been excluded from NWI mapped wetlands, the project proponent is responsible

for assuring all wetlands are properly buffered based on ground conditions.

Mitigations for Fish and Wildlife:

Several significant impacts have been identified for the proposed action, and thus mitigation is

required, or degradation in wildlife habitat is anticipated to affect a variety of species, and

therefore, the following mitigation measures apply:

Table 10. Harvest Blocks Fish and Wildlife protection measures.

Comp-Block

Action required

415-281

Clip block boundary to mapped wetland.

415-053

Clip block boundary to mapped wetland.

416-038

Clip block boundary to stream buffer of Barnaby Creek

416-576

Clip block boundary to mapped stream.

419-332

Clip block boundary to mapped Barnaby Creek tributary.

425-104

Buffered for 660ft due to eagle nest. Harvest restriction from March 1st to August 31st.

425-136

Clip block boundary to mapped wetland and stream.

425-710

Clip block boundary to Little Jim Creek and wetland.

425-076

Clip block boundary to mapped wetland and creek.

426-009

Clip block boundary to Barnaby Creek Road.

426-155

Clip block boundary to mapped wetland and stream.

426-714

Buffer appropriately for eagle nest. 660 ft no harvest zone with a 0.5 mi seasonal buffer from

March 1st - August 31st.

Clip block boundary to Cuba Canyon Creek.

447-501

Buffer appropriately for eagle nest. 660 ft no harvest zone with a 0.5 mi seasonal buffer from

March 1st - August 31st.

447-533

Buffer appropriately for eagle nest. 660 ft no harvest zone with a 0.5 mi seasonal buffer from

March 1st - August 31st.

447-718

Clip block boundary to mapped wetland and stream.

448-010

Clip block to stream buffer

Mitigating for the loss and reduction of habitat structures and functions discussed above would

minimize the negative impacts to fish and wildlife habitats and species in the Simpson Lake project

27

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

area. The following mitigation efforts are requested by Fish and Wildlife for any alternative that

is chosen and implemented:

x

x

x

x

x

x

x

x

x

x

x

x

x

In order to reduce disturbance, harassment, and increased hunting pressure, all roads

that are not considered main access routes should be closed following the project.

Multilayered cover should be left along all access roads that have high vehicular use.

Minimize the amount of use on stream adjacent roads and prioritize them for

permanent or seasonal closure.

Leaving more than the required 2 snags per acre would help mitigate some of the

losses of large woody debris and recruitment trees.

Wildlife corridors should be set up to allow for natural movement between seasonal

and daily habitats.

Snags in harvest units would be retained in clumps with their associated understory

vegetation intact to ensure their retention after site preparation.

Green leave trees would be identified and retained as future snags in all areas. The

majority of large-diameter trees should be left standing. Blocks that would be treated

under the RRT prescription should have more than 2 trees per acre after the harvest.

All large-diameter woody debris should be left on the ground to ensure habitat for a

wide range of species.

All wetlands should be protected with maximum RMZ lengths and should all be

protected from equipment entry.

Implementation of bank stabilization, sediment traps, and road surface improvements

to decrease the risk of sediment delivery and runoff into surrounding watersheds.

Areas where there is considerable soil disturbance should be planted to reduce

encroachment and establishment of noxious weeds.

If at any time during harvest a bald or golden eagle nest is found, cease work within

.25 miles of the nest and contact the 3P wildlife biologist; all timber harvest is

prohibited within 660 feet of active bald eagle nests.

If at any time during harvest a Northern Goshawk or Great Gray nest and/or territory

is thought to have been found, cease work within 750 feet and please contact the 3P

wildlife biologist.

Infrastructure (culverts/bridges) should allow for the passage of all life stages of fish,

and for water, sediment, and wood/debris during Q100 flow events. Culverts should be

1.2 times the bankfull width for proper installation, to allow fish passage.

Mitigation for Cultural Resources:

The Tribal Archaeologist will work with IFD to mitigate the effects of Alternative B and will

coordinate with the Timber Sales Officer (TSO) and others working in the Simpson Lakes project

area to insure that the proper steps are taken to protect these significant cultural resources. In the

event that additional cultural resources are found, the TSO shall insure that all work stops in the

vicinity of the find, that steps are taken to protect the find, and that the Tribal Archaeologist is

called immediately. No work shall resume until the Tribal Historic Preservation Officer (THPO)

has approved a management plan. Mitigation measures proposed for the protection of cultural

resources identified within the project area include, but are not limited to, the following:

28

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

1) Great care is taken to not destroy or damage components of archeological sites 45FE993;

092525-1-ASH; 092525-2-ASH; 092515-3-ASH and 050125-1-MP. A small buffer may

be implemented to facilitate these measures.

2) The culturally modified trees in sites 111025-1-ASH and 110625-1-ASH will not be

damaged or removed during timber harvest efforts.

3) All other resources are not expected to be negatively impacted by project

implementation.

Mitigation for Range Resources:

Invasive Plants

Logging and related activities can introduce new invasive species to a site via uncleaned equipment

and soil disturbing activities or cause currently present invasive species to spread more rapidly.

The surrounding project area contains the following weed species: diffuse and spotted knapweed,

scotch thistle, common St. Johnswort, hoary alyssum, longspine sandbur, and likely others that

haven't been recorded. Land Operations recommends the following: cleaning equipment prior to

using on site, washing equipment in a centralized area, re-seeding heavily disturbed sites such as

skid trails and stacking sites, the use of biological controls on large weed infestations and

herbicides as needed primarily along roadsides. If borrow pits or fill material are used from offsite,

it is recommended that these materials be weed free to reduce the spread of invasive species. The

Land Operations Program recommends that loggers, Forestry and Land Operations/Range staff

work together to reduce the amount of weed infestations and treat disturbed areas post harvests.

Seeding is recommended in highly disturbed areas to reduce the amount of invasive species

regrowth following road closures. Recommend use of an approved seed mix that would be highly

competitive with currently present invasive species.

x

x

x

Allocate funding to develop an Integrated Invasive Species Plan to include herbicide,

mechanical and biological treatments, if possible.

Seed all disturbed areas using an appropriate native seed mix designed for the sites

abiotic conditions.

Impacts of weeds within the project area minimized by ensuring that the under-carriage

of vehicles is free of seed heads and plant residues.

5.0 List of Preparers

Name

Barry Coles

Charlotte Axthelm

Stacy King

Tiffany Nappi

Elizabeth Odell

Amanda Hoke

Guy Moura

Jessica Utt, Brandton Harvey

Chasity Swan

Contributions

Forestry

Hydrology

Fish and Wildlife

History/Archaeology

THPO

Range

Editing

29

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

6.0 Literature Cited

Axthelm, Charlotte. 2024. Water Quality Assessment Report for the Confederated Tribes of the

Colville Reservation 2018-2023. Technical. Nespelem, WA. CTCR.

Bureau of Land Management (BLM). 2018. General Land Office Patent Records. Available

online at http://www.glorecords.blm.gov/.

Center for Applied Research, Inc (CAR). 2018. Final Programmatic Environmental Impact

Statement. Confederated Tribes of the Colville Reservation, 2015 Integrated Resource

Management Plan.

Center for Applied Research, Inc (CAR). 2015. Integrated Resource Management Plan.

Confederated Tribes of the Colville Reservation. Nespelem, WA.

Coles, Barry. March 25, 2025. Project Proposal Form: Simpson Lakes Timber Sale 2026 PPF.

Nespelem, WA. BIA

Colville Confederated Tribes. 2023. Forest Practices Handbook. Colville Tribal Code

Chapter 4-7 Forest Practices. Nespelem, WA. 89 pp.

Colville Confederated Tribes. 2023. Forest Management Plan. Confederated Tribes of the

Colville Reservation. Nespelem, WA.

Colville Confederated Tribes (CCT). 2007. Cultural Resource Management Plan of the

Confederated Tribes of the Colville Reservation. Prepared by the CCT

History/Archaeology Program. Nespelem, WA.

Dubé, K., Megahan, W., McCalmon, M. (2004) Washington road surface erosion model

prepared for the Washington Department of Natural Resources. Olympia, WA.

Gough, Stan (ed.). 1990. A Cultural Resources Overview, Sampling Survey, and Management

Plan, Colville Indian Reservation, Okanogan and Ferry Counties, Washington. Eastern

Washington University Reports in Archaeology and History 100-74. Archaeological and

Historical Services.

Hunner, Walt. 2014. Hydrology Report. Technical. Nespelem, WA: CTCR.

Hunt, Clair. 1916. Diminished Colville Indian Reservation (map). General Land Office,

Department of the Interior.

Marchand, Amelia. 2010. Cultural Resources Survey Form of the Simpson Lakes Natural

Resource Project, Inchelium Forestry District. On file at the Colville Tribes

History/Archaeology Program. Nespelem, WA.

Marker, David, R. Thomon, T. Bosworth, T. Li and C. Tornow. 2012. Upper Columbia River

Site Remedial Investigation and Feasibility Study Tribal Consumption and Resource Use

Survey. Final Draft Report. Prepared for the US Environmental Protection Agency,

Region 10. Westat. Rockville, MD.

Meyer, Jon. 2004. Cultural Resources Survey Report for Allotment 1547. On file at the Colville

Tribes History/Archaeology Program. Nespelem, WA.

Meyer, Jon. 2005a. Cultural Resources Survey Report for Hall Creek Forest Management

Project. Undertaking Number U05-057. On file at the Colville Tribes

History/Archaeology Program. Nespelem, WA.

30

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Meyer, Jon. 2005b. Cultural Resources Assessment for the Hemming’s Flat OSR Environmental

Assessment. On file at the Colville Tribes History/Archaeology Program. Nespelem, WA.

Shannon. D. and G. Moura. 2007. Chief Joseph Dam and Rufus Woods Lake Traditional

Cultural Property Research 2006 Technical Report. Prepared for the United States Army

Corps of Engineers, Seattle District. Prepared by CCT History/Archaeology Program.

Nespelem, WA.

31

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

7.0 Appendixes

7.1 Project Maps and Activity Table

32

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

33

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

7.2 Consultation THPO and ESA

34

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

35

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

36

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

37

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

38

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

39

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

40

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

41

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

42

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

43

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

7.3 F&W Road Closures and ETD Preliminary Transportation

Analysis

44

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

45

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

46

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

Consultation was initiated by the Watershed Analyst on March 11, 2025 when the preliminary

transportation analysis memo was distributed. To supplement the consultation the following

resources and individuals were consulted during the preparation of this document:

Stacy King, CTCR Wetlands Specialist, Nespelem, WA.

Joseph Ezell, CTCR Restoration Program Manager, Nespelem, WA.

47

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

7.4 Army Corp of Engineers Road BMPs

48

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

49

Simpson Lake 2025 Forest Management Project NOA-FONSI-EA-26-01

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.