Agricultural Resource Management Plan (2015)

Tribal code

Ask Donna

What actually matters in this document.

Text

Agricultural Resource Management Plan

for the Colville Reservation

Colville Confederated Tribes

Range Department

PO Box 150

Nespelem, WA 99155

1

North Wind Resource Consulting, LLC, 1425 Higham Street, Idaho Falls, ID 83402

Agricultural Management Plan

Colville Tribes

CONTENTS

1.0 INTRODUCTION ............................................................................................................................... 1

1.1 Purpose and Scope of the ARMP .............................................................................................. 1

1.2 Goals and Objectives of the ARMP .......................................................................................... 2

2.0 AGRICULTURAL CONDITIONS, VALUES, AND USE ................................................................ 3

2.1 General Description ................................................................................................................... 3

2.2 Regional Land Uses................................................................................................................... 4

2.3 Past Agricultural Practices and History ..................................................................................... 4

2.4 Current Agricultural Uses on the Reservation ........................................................................ 11

3.0 AGRICULTURAL PLANNING AND LEASING ........................................................................... 12

3.1 Proposed Agricultural Lease Conservation Plan Process ........................................................ 12

4.0 REFERENCES .................................................................................................................................. 26

5.0 APPENDIX A: Conservation Plan Considerations ........................................................................... 27

ii

June 2015

Agricultural Management Plan

Colville Tribes

ACRONYMS

AIARMA

American Indian Agricultural Resources Management Act

ARMP

Agricultural Resource Management Plan

ATV

All-terrain vehicle

BIA

Bureau of Indian Affairs

BMP

Best Management Practice

BOR

Bureau of Reclamation

CCT

Confederated Colville Tribes

CRCD

Colville Reservation Conservation District

CRP

Conservation Reserve Program

CTFC

Colville Tribal Federal Corporation

EA

Environmental Assessment

EIS

Environmental Impact Statement

FSA

Farm Services Agency

GIS

Geographic Information System

GMO

Genetically Modified Organism

GPS

Global Positioning System

IAC

Intertribal Agricultural Council

IDT

Interdisciplinary team

IRMP

Integrated Resource Management Plan

MLRA

Major Land Resource Area

NEPA

National Environmental Policy Act

NRCS

Natural Resources Conservation Service

NRI

National Resource Inventory

NWND

North West Native Development

PAG

Plant Association Group

RMU

Resource Management Units

ROW

Right-of-way

USDA

United States Department of Agriculture

USDI

United States Department of Interior

WMU

Watershed Management Units

iii

June 2015

Agricultural Management Plan

1.0

Colville Tribes

INTRODUCTION

The Bureau of Indian Affairs (BIA) Agricultural and Range Management Program administers federal

laws and regulations and tribal laws and policies pertaining to agricultural land development and

management, farmland leases, and rangeland permits on Indian Lands. In order to protect, conserve,

utilize, and manage Indian agricultural and grazing lands, BIA must inventory and monitor agricultural

resources; develop agricultural resources management and conservation plans for the trust Indian assets;

and conduct lease and permit administration, compliance, and enforcement. The American Indian

Agricultural Resources Management Act (AIARMA) and related regulations seek to balance BIA

responsibility as trustee of Indian land and resources with the need for Indian tribes and individual Indian

landowners to lease and permit their agricultural and range trust lands.

North Wind Resource Consulting, LLC (North Wind), an environmental consulting firm headquartered in

Idaho Falls, Idaho, was contracted by the Range Department of the Confederated Tribes of the Colville

Reservation (CCT) to prepare this Agricultural Resource Management Plan (ARMP) to help direct the

management and administration of tribal agricultural resources and agricultural lands by the BIA and the

CCT tribal government. The CCT do not have a formal Agriculture Department and thus rely on other

departments (e.g., Range Department, Planning, Realty/Leasing) to help administer this program. This

plan was developed in consultation with Tribal staff, BIA and other federal agencies working in

Nespelem, Washington.

1.1

Purpose and Scope of the ARMP

Indian agricultural lands are renewable and manageable resources which are important to lessees of the

Confederated Tribes of the Colville Reservation. While large private and commercial agricultural

operations do occur on the Reservation, especially on the western portions closer to the Columbia River

where irrigation can occur, the opportunity for smaller farms for interested tribal and non-tribal members

exists. The development and management of Indian agricultural lands in accordance with integrated

resource management plans will ensure proper management of Indian agricultural lands and will produce

increased economic returns, enhance Indian self-determination, promote employment opportunities, and

improve the social and economic well-being of Indian and surrounding communities.

The purpose of this ARMP is to briefly describe the conditions, values, and use of agricultural lands on

the Reservation and define the opportunities, limitations, and leasing process that need to be considered to

develop, manage, and improve existing and potential agricultural lands within the Colville Reservation.

The ARMP is needed to help establish a formal process for the development and management of Indian

agricultural lands on the Reservation; facilitate Indian access to Federal or private programs relating to

agriculture or related rural development programs generally available to the public at large; and increase

educational and training opportunities available to the tribal members to improve the experience and

abilities of the Confederated Tribes of the Colville Reservation and their members related agriculture and

land management.

This ARMP focuses primarily on crop and orchard production potential on trust land. There are

approximately 52,000 acres of land that is leased for mixed use of crop, livestock production/grazing, or

both. These lands are administered by the Realty Office and the management of these leases is addressed

in this document. In addition, approximately 900,000 acres of trust land is available across the

1

June 2015

Agricultural Management Plan

Colville Tribes

Reservation for seasonal livestock grazing through permits administered by the Range Program. A

separate 2015 Range Management Plan exists that provides direction on how these permitted grazing

lands are managed. The management of invasive species is an important component of all land

management activities, including agriculture, and a separate 2015 Invasive Species Management Plan has

been prepared to address this topic.

1.2

Goals and Objectives of the ARMP

The AIARMA (available online at http://www.gpo.gov/fdsys/pkg/STATUTE-107/pdf/STATUTE-107Pg2011.pdf) requires agricultural resource plans to identify the "critical values" of the Confederated

Tribes of the Colville Reservation. The critical values of the Tribes are defined in the Integrated Resource

Management Plan that is currently in development. In addition, the AIARMA also requires agricultural

resource plans to identify Tribal agricultural resource goals and objectives that apply to Tribal range and

agricultural lands throughout the Reservation. These are defined below as they relate specifically to

agriculture. Rangeland resources including livestock operations are covered in the separate 2015

Integrated Range Management Plan that has been developed for the Reservation.

1.2.1

Goals of the ARMP

The goals of the ARMP are to:

•

•

1.2.2

Facilitate the creation of viable, sustainable agricultural practices that provide economic benefit

to the stakeholders while maintaining the integrity of the Reservation’s resources.

Provide individuals and commercial entities a clear, concise procedure that documents the steps

and leases required to commence agricultural operations.

Objectives of the ARMP

The overall objectives of the ARMP are to:

•

•

•

•

•

•

•

2

Encourage and designate areas for agricultural production, both commercial and private.

Protect and conserve resources while maintaining the highest productive potential on Indian

agricultural lands through the application of sound conservation practices and techniques.

Where appropriate, recommend restoring agricultural lands back into forest or native grasslands.

Increase production and expand the diversity and availability of agricultural products for

subsistence, income, and employment of tribal members through the development of agricultural

resources on Reservation lands.

Maintain or restore biological diversity throughout the landscape, including agricultural lands, by

establishing biodiversity corridors through already-developed areas that are linked with adjacent

natural areas.

Manage agricultural resources consistent with integrated resource management plans in order to

protect and maintain other values — such as forested areas, hunting and native plant gathering

areas, water resources, soils, wildlife, fisheries, traditional cultural plants, cultural resources,

recreation — and to regulate water runoff, minimize soil erosion, and maintain compliance with

applicable chemical application standards.

Enable tribal members to maximize the potential benefits available to them through their land by

providing agricultural technical assistance, training and education in resource conservation,

June 2015

Agricultural Management Plan

•

Colville Tribes

agricultural management and the use of credit and marketing of agricultural product and other

applicable subject areas.

Assist the Tribes and individual Indian landowners in leasing their agricultural lands for a

reasonable annual return, consistent with prudent management and conservation practices, and

community goals as expressed in the tribal management plans and appropriate tribal ordinances.

2.0

AGRICULTURAL CONDITIONS, VALUES, AND USE

2.1

General Description

The Colville Indian Reservation is located in northeastern Washington and is bounded on the east and

south by the Columbia River, on the west by the Okanogan River and on the north by the line separating

townships 34 and 35 of the Willamette Meridian (Figure 1). It is approximately 1.45 million acres in size.

The eastern half of the Reservation lies within Ferry County and the western half is located within

Okanogan County. The major towns on the Reservation include Inchelium in the eastern portion, East

Omak on the western boundary, and Nespelem, Keller, Elmer City and Coulee Dam in the central portion.

A large number of tribal members also live nearby in the communities of Malott, Omak, Okanogan,

Grand Coulee, Brewster, Bridgeport and Colville-Kettle Falls. Spokane and Wenatchee – approximately

100 miles to the southeast and 125 miles to the southwest of the Reservation, respectively – represent the

major service centers for the Reservation. The CCT headquarters, BIA, and other government and tribal

services are located at the Colville Agency near Nespelem. Major employers within the Reservation

include the CCT, Colville Tribal Federal Corporation (CTFC), BIA, and Indian Health Services.

Occupations related to agriculture, forestry, hunting and fishing account for about 400 jobs on the

Reservation.

The Reservation’s land ownership pattern is complex and dynamic. The two basic categories of land

ownership present are trust lands and fee patent lands (Figure 2). Trust lands represent approximately 90

percent of the 1.45 million acres and are held in trust by the U.S. Government. They include both tribal

lands owned collectively by the Tribes and allotted lands owned by Tribal members. It is common for

there to be joint ownership of an allotment by multiple heirs. Fee patent lands represent about 10 percent

of the lands and are owned by non-Indians, individual tribal members, and the tribes.

About 65 percent of the Colville Reservation is forested and about 48 percent of it is used for commercial

forestry. Another 33 percent of the Reservation is classified as rangeland and much of it (including much

of the fee land) is used to graze cattle. Currently, about 87,000 acres of the Reservation is used for

agriculture (farmland and orchard) with approximately 5,500 acres continuing to be irrigated (this does

not include land used for cattle grazing). The vast majority of this is in the western portions of the

Reservation where both irrigated (near the Columbian and Okanogan Rivers) and dryland farming occurs

and includes orchard crops, grains, and feed (Figure 3). Much of the current larger scale agriculture is

commercial in nature, although a number of smaller individual farmers are also active on the Reservation.

There is considerable opportunity to expand agricultural operations on the Reservation. Although upland

agricultural irrigation has decreased since the 1950s, the Tribes have an opportunity to expand agriculture

production on the Reservation. There are over 291,000 acres of Class 1 irrigable land on the Reservation

(Figure 4). The Bureau of Reclamation defines Class 1 irrigable land as that within a particular

agricultural economic setting that is productive enough to yield the highest level of suitability for

3

June 2015

Agricultural Management Plan

Colville Tribes

continuous, successful irrigation farming, and has the highest relative productive potential as measured in

net income per acre. Within these areas, approximately 50,000 acres of tribal trust land has been

identified that is most suitable for additional orchard or farming opportunities (Figures 5 and 6). These are

areas that should be considered first for expanded agricultural operations and made available through the

leasing program, described later in this document.

2.2

Regional Land Uses

Management of the Reservation’s natural resources has a major socioeconomic influence on and off the

Reservation within Ferry and Okanogan Counties. These counties are sparsely populated and their

economies are heavily reliant on the production and processing of forest and agricultural products.

2.3

Past Agricultural Practices and History

The Colville Tribes were nomadic prior to European contact in the late 1700s. Little to no evidence exists

of widespread agriculture practices within the area prior to this time (Western Resources Analysis, Inc.

2000). There is evidence that Indians practiced plant management prior to the arrival of Europeans.

Examples include selective harvest in camas grounds and the use of fire to propagate huckleberries and

other plant foods. Early in the post European period, agricultural technology was brought to the area by

European traders. From 1872 through the 1940s, Euro-American settlers considered cropland more

valuable than timber, thus a considerable amount of forestland was cleared for this use. Most crops were

grown for home consumption or for feeding livestock at this time because markets were far away and

transportation was limited.

Throughout portions of the Reservation, the fruit industry was an important employment source for tribal

members especially during the apple harvest. Many families traveled from the Reservation to the Yakima

valley, the Wenatchee area and the Okanogan valley to work during fruit harvest. The Timentwa plateau,

located in the southwest corner of the Reservation, contains a unique agriculture area used for grain

production. This area has been continuously farmed since the early 1900s by both Indian and non-Indian

farmers.

In the early 1900s, irrigation was limited to small diversion ditches in locations where construction was

easy or in some valley lands that were partially sub-irrigated. Seven projects were completed between

1915 and 1939 leading to the irrigation of over 11,000 acres. A 1939-40 study found that irrigated tracts

at the time ranged from less than 10 to 73 acres (Western Resources Analysis, Inc. 2000).

The limited amount of irrigation development on the Reservation resulted in agriculture being a minor

contributor to the economy during the 1970s. During this period, approximately 26,000 acres of the

Reservation was in agricultural production; of this about 5,500 acres were irrigated. Most farming that

was occurring was in conjunction with livestock operations and consisted mainly of marginal drylands

with only a few scattered irrigation systems.

4

June 2015

Agricultural Management Plan

Colville Tribes

Figure 1. Location of Colville Reservation

5

June 2015

Agricultural Management Plan

Colville Tribes

Figure 2. Distribution of Trust and Fee Lands on the Colville Reservation

6

June 2015

Agricultural Management Plan

Colville Tribes

Figure 3. Land Use on the Colville Reservation

7

June 2015

Agricultural Management Plan

Colville Tribes

Figure 4. Irrigable Lands on the Reservation

8

June 2015

Agricultural Management Plan

Colville Tribes

Figure 5. Potential Farming Land

9

June 2015

Agricultural Management Plan

Colville Tribes

Figure 6. Potential Orchard Land

10

June 2015

Agricultural Management Plan

Colville Tribes

Feasibility studies were conducted in the early 1970s as part of the Tribes Overall Economic

Development Plan. The objective was “to maximize the development and return on investment of the

Reservation’s 18,700 agricultural acres without sacrificing the Colville Indian culture and lifestyle”

(Clark 1996). A 1979 Appraisal Report identified 17 areas on the Reservation with arable land; irrigation

development plans were written for 11 of these areas (USDI BOR 1979). This report concluded that

30,000 acres of the previously identified 73,300 arable acres could be economically irrigated with an

$11.9 million return to the Tribes (Clark 1996). Studies conducted during this period indicated that

developing and irrigating orchard lands along the Columbia and Okanogan Rivers would result in the

greatest net return and employment for the Tribes (Western Resources Analysis, Inc. 2000).

The number of acres under irrigation in 1996 (approximately 4,400 to 5,500) was less than half of what it

was in the first half of the century and irrigation was more focused on individually owned systems rather

than cooperatives. The declining trend in irrigated acres has continued to present although the irrigation

expansion along the Columbia related to development of orchards, particularly on fee lands, has

somewhat stabilized that decline.

In 1996, the number of dryland farmed acres ranged from 16,600 to 20,500. Between 1982 and 1996, the

number of tribally owned acres increased by 50 percent and those that were individually owned increased

by 8 percent. During that time, the amount of acreage under tribal member operation decreased by 75

percent while the amount under non-tribal member operation increased 3 percent, and the amount of idle

acres increased 10 percent. The amount of acreage being dryland farmed by non-tribal members was

about 3.1 times greater than the amount being farmed by tribal members and roughly equal to the amount

of idle acres (Clark 1996). The decrease in amount of acreage operated by tribal members has continued

to present and there are about the same number of acres dryland farmed today as there was 20 years ago.

2.4

Current Agricultural Uses on the Reservation

Agriculture taking place on trust lands on the Colville Indian Reservation primarily occurs on tracts of

land that are leased through the Colville Tribes Realty Office. The leases are administered by the Colville

Tribes Realty Office and the BIA Land Operations Program provides support to the Realty Office through

the preparation of conservation plans. As of April 2015, there were 87 agricultural leases totaling 34,205

acres and 98 pasture leases totaling 18,142 acres. The primary crops being grown on these leases include

wheat, corn, oats, barley, canola, hay and alfalfa.

The Integrated Resource Management Plan 2000 – 2014 Final Environmental Impact Statement (IRMP

EIS) stated that, in general, both the interest and economic feasibility of traditional agricultural farming

on the Reservation appeared to be on the decline (Western Resources Analysis, Inc. 2000). Gross value

and levels of various agriculture commodities grown on the Reservation in the mid-1990s, as well as

distribution of agriculture land use, has been described by Clark (1996). Irrigation of orchards along the

Columbia and Okanogan Rivers continue to provide the greatest benefits from agriculture on the

Reservation and indeed over 1000 additional acres of irrigated orchards have been established in the

southwest portion of the Reservation in the last few years.

11

June 2015

Agricultural Management Plan

3.0

Colville Tribes

AGRICULTURAL PLANNING AND LEASING

Additional agricultural development on the Reservation is not simply a matter of identifying areas that

can be farmed or irrigated. There are a number of other considerations that must be considered prior to a

lessee beginning the planning and leasing process to start agricultural operations. Physical constraints,

such as access roads, rainfall patterns across the Reservation, elevations, topography, soils, and distance

from water all need to be considered. Biological and cultural constraints, such as native vegetation,

wildlife habitat, sensitive or culturally important plant areas, and wetlands and riparian areas need to be

taken into consideration. Financial considerations also need to feature prominently including the ability of

the lessee to afford the cost of getting a farm up and running. This includes costs related to the lease or

purchase of land, the lease or purchase of equipment for planting and harvest, costs for irrigation if

required, maintenance costs, cost of seed, costs related to crop insurance, and cost of taking product to

market.

In addition to the physical, biological, cultural and financial consideration discussed above, a number of

other management considerations must also be considered by the lessee. These include land

use/ownership of the parcel being considered for agricultural use, other tribal department goals and

objectives that may impact land use or be impacted if the parcel is converted to agricultural use, and any

monitoring or evaluation activities that may need to occur to determine impact to resources or

effectiveness of planned activities.

The Colville Business Council wants to encourage agricultural practices within the bounds of the

Reservation. To promote agricultural development on Reservation lands, the Council has requested that

the formal conservation plan and leasing process be described in this document. This will help existing

and aspiring Indian and non-Indian farmers understand the requirements necessary to prepare the

conservation plan and obtain the required lease to undertake agricultural operations.

3.1

Proposed Agricultural Lease Conservation Plan Process

This section describes a proposed 6-step process for the development of leases on the Colville Indian

Reservation on lands where agricultural production could be expanded (see Figures 5 and 6). Many of

these processes are already in place but are not necessarily formalized or codified nor always understood

by the lessee. Therefore this document serves as a guide to understanding the resources available to the

lessee to successfully initiate, plan, execute and close an agricultural lease and monitoring that will be

required for the activity. Each of these steps is described in more detail on the following pages.

A conservation plan is part of an agricultural lease which is signed between the lessee and BIA. The

purpose of a conservation plan is to identify and prescribe specific management actions and conservation

practices that address current resource concerns and ensure sustainable agricultural production.

Conservation plans can also be developed for agricultural lands not currently leased or permitted (idle

lands) and not covered by another management plan (e.g., a forest plan). Conservation plans must be

consistent with the tribe’s Agricultural Resource Management Plan (ARMP) and/or Integrated Resource

Management Plan (IRMP). The development of the conservation plan is described below and is required

as part of the leasing process.

12

June 2015

Agricultural Management Plan

INITIATE

Colville Tribes

The first step to successful farming is also the shortest. In this step the overall

process is initiated when the project proponent conceives of the idea of what it is

they want to accomplish. What is it that he or she would like to do? This may be

fairly detailed but more often is a fairly general description of what they would

like to accomplish. This step answers the question of who wants to do what,

where and how would they like to do it, and when and for how long.

There are a number of questions an individual aspiring to farm may ask themselves to help them initiate

the overall process and to help formulate their thoughts. Answers to these questions will be important to

refine and provide detail that will be developed in the subsequent planning step.

A few general questions could include the following:

•

•

•

•

•

•

•

What size of farm or orchard do I wish to develop?

What type of crops or livestock do I want to raise?

What is the market for these crops/livestock?

What equipment will I need?

Do I plan on irrigating?

Can I afford to do this?

When would I like to start this endeavor and for how long?

While answers to all of these questions may not yet be well defined, or in some cases even known, having

a general idea of what one would like to do is important before proceeding to the next step. The end result

of this step is an “expression of interest” that can be made to the tribal Realty Office.

Conceive Idea

PLAN

Expression of

Interest

Once an expression of interest has been made, the Realty Office works with the

project proponent and other federal, state, and tribal resources to further define

the project description, complete a feasibility analysis, find acreage suitable for

the project, and bid on a lease. Careful and thoughtful planning significantly

increases the likelihood of a project being successful and will make the leasing

process much smoother. It also increases the likelihood that the lessee will

successfully execute their farm plan. This step can take a few days to several

weeks depending on the complexity of the project and what the project proponent

wishes to do.

Expression of Interest

Project

Descrip6on

Feasibility

Analysis

Bid on lease or

obtain consent

There are a number of tribal departments as well as federal and state programs and agencies available to

assist beginning farmers and ranchers with the agricultural planning process. These include the BIA, Farm

Service Agency, Natural Resources Conservation Service, North West Native Development (NWND),

13

June 2015

Agricultural Management Plan

Colville Tribes

Intertribal Agricultural Council (IAC), Colville Reservation Conservation District (CRCD), Washington

State University, Colville Tribal Realty Office, natural resource departments, and others.

Provided below is a brief overview of the types of assistance each of these organizations can provide and

how they can help answer some of the questions brought up in Step 1 above.

Bureau of Indian Affairs (BIA) – The BIA, FSA, and NRCS have common objectives of

communication, collaboration, cooperation, and consultation with agricultural producers, Indian

landowners, and Indian tribes for the development, conservation and sustainable use of natural resources.

The BIA provides oversight of the leasing program and can assist beginning farmers and ranchers with

the agricultural planning and leasing process. These agencies can help answer questions related to the size

and type of operation. In addition, the USDA’s Rural Development agencies – which includes Rural

Housing Service, Rural Utilities Service, and Rural Business Service – works with the BIA to help fund

projects that bring housing, community facilities, business guarantees, utilities, and other services to rural

lands including that held in trust by the United States for Indians.

Farm Service Agency (FSA) – The FSA makes and guarantees loans to beginning farmers who are

unable to obtain financing from commercial lenders. Each fiscal year, FSA targets a portion of its direct

and guaranteed farm ownership (FO) and operating loan (OL) funds to beginning farmers.

A beginning farmer is an individual or entity who:

• Has not operated a farm for more than 10 years;

• Meets the loan eligibility requirements of the program to which he/she is applying;

• Substantially participates in the operation and;

• For FO purposes, does not own a farm greater than 30 percent of the average size farm in the

county.

The FSA can help a beginning farmer understand the financial options that exist to aid in farm

development. Further information about FSA programs is available from local FSA offices or on the FSA

website at www.fsa.usda.gov.

Natural Resources Conservation Service (NRCS) – The NRCS is a source of funding, primarily

through the EQIP program, for rangeland improvements including irrigation, crops, pest management,

fencing, and water developments. In addition, they provide information on soils and suitability of

ecological sites for agricultural production.

North West Native Development (NWND) – NWND can help the beginning farmer understand the

steps necessary to create a business plan, financial considerations, grant and other funding opportunities

to assist in setting up the lease, and other business related issues.

Colville Reservation Conservation District (CRCD) – The CRCD provides soil testing and also can

provide information related to conservation practices.

Washington State University (WSU) – The WSU extension office has a number of resources available

for the beginning farmer related to crop types, production, pest control, best management practices, and

other educational brochures.

Colville Tribal Realty Office – The Tribal Realty Office helps identify potential lease locations and

processes the lease as described in Step 3 below.

14

June 2015

Agricultural Management Plan

Colville Tribes

Natural Resource Departments – This includes the Land Operations / Range Program, Fish and

Wildlife, Forestry, History and Archaeology, and Environmental Trust. These departments are comprised

of professional staff that are knowledgeable about various resources and tribal policy and practices that

should be undertaken to protect those resources. Land Operations can provide assistance with weed

control and other practices to minimize loss of soil resources. Environmental Trust can provide assistance

with water availability and irrigation potential.

In the absence of a formal agricultural department, the natural resource departments mentioned above

commonly have areas of concern for and play a role in the conservation and protection of agricultural

resources. Natural resource specialists working with the Realty Office and with local landowners and

lessees develop and execute programs designed for sustainable utilization of soil, water, forage and

wildlife resources. Conservation goals are primarily achieved through the development of conservation

stipulations and provisions to be incorporated in leases and the monitoring of lessee activities relating to

such lease requirements.

Once an expression of interest has been made to the tribal Realty office, the first step is to refine the scope

of the project. This will build on the questions that the project proponent began formulating in Step 1. The

various tribal departments and federal and state agencies listed above are located on the Nespelem

Agency Campus and are available to help the project proponent prepare a more detailed description of

what it is they would like to accomplish. This can include identification of where the project could occur,

bidding on trust tracts that are available for leasing or obtaining consent from landowners of allotment

lands, beginning a feasibility analysis (cost or economic analysis), performing soil testing that may need

to occur on the property, and other tasks that will help the project proponent prepare for the lease

application in Step 3.

Once the project has been defined, the project proponent can identify suitable land for the project or work

with the Realty Office to find land available for lease. There are several questions that may occur

regarding leasing:

How does one find land that is available to lease?

15

•

The Colville Tribe Realty Office periodically advertises tracts that are available for leasing. The

tracts are advertised on the CCT website, through CCT broadcast email, and/or via U.S. mail to a

list of interested parties maintained by the Realty Office. Interested parties have to bid on tracts if

they have any desire to lease them. Normally these tracts are 100% Tribal trust. At the request of

allotment owners, allotment properties may also be put out for bid.

•

Interested parties can do some research to locate tracts that may be suitable. Often interested

parties come into the Realty Office and ask about the availability of specific tracts or tracts that

might be available in a specific area. In this case the Realty Office will look at the records and

determine if the tracts could potentially be available to be leased. If the tracts are potentially

available the Realty Office will advertise them for leasing if they are Tribal Trust or in the case of

allotments send out letters to allotment owners to inquire if they are willing to lease the land.

June 2015

Agricultural Management Plan

Colville Tribes

How does one find land that is suitable for the intended agricultural use?

•

The Land Operations Soil Conservationist can help identify areas that have soils that are suitable

for the project proponents planned operation and may be able to provide some information about

potential crop yields. A preliminary analysis for potential farming and orchard lands was

performed as part of this plan for trust lands and those areas are shown on Figures 5 and 6 above.

The Soil Conservationist can also arrange for soil testing and other feasibility analyses.

Other information about the bidding process

•

Tribal members and non-tribal members can submit bids on advertised tracts. The tract is

awarded to the highest bidder. The Tribe has adopted an Indian preference ordinance which

provides the opportunity for tribal members to match a non-tribal member bid price (when it is

the high bid) provided that the Indian bidder is present at the time of bid opening.

•

Allotments do not normally go out for bid but the majority of the owners have to consent to allow

the tract to be leased. The allotment owners have the option of requesting the tract be put out for

bid.

The end result of this step is for the project proponent to bid on and win a lease, or obtain consent from

the landowners for allotment lands. Then they must obtain a lease application from the Realty Office, fill

it out, and submit it to the Realty Office.

LEASE

The third step is the most critical step to obtaining the lease and takes the longest.

In this step the project proponent works with tribal entities to get necessary leases

and permits in place. It is not unusual for this step to take six to eight months or

longer to complete because of the number of internal processes that need to occur.

To proceed on this step one must be the successful bidder on a Tribal trust tract or

in the case of an allotment received the owner’s consent to lease the tract.

The next step is to complete a lease application form and a draft farm plan/questionnaire and submit it to

the Realty Office for processing. These documents start a number of processes, many of which involve

the applicant directly. The current lease application instructions are reproduced below on page 17 and the

application is found on pages 18 and 19.

16

Lease Applica6on

Dra> Farm

Plan

Site Visit

Dra>

Conserva6on

Plan

NEPA Review

CatEx or EA with

Mi6ga6ons /

S6pula6ons

Revised Farm

Plan

Final

Conserva6on

Plan

Applicant

Agreement

Final

Approvals

June 2015

Agricultural Management Plan

17

Colville Tribes

June 2015

Agricultural Management Plan

18

Colville Tribes

June 2015

Agricultural Management Plan

Colville Tribes

It should be noted on the form above (Question 10) that not all improvements can be removed at the end

of the lease. For instance, improvements made to the property such as fences, watering troughs, and

irrigation systems typically become the property of the landowner and stay with the property at the end of

the lease term unless the lease specifically states otherwise.

A draft farm plan must accompany the lease application. This may have been started as part of Step 2, but

is completed in this step. The Agency’s Soil Conservationist works with the applicant to develop the draft

farm plan, which is reproduced below on page 20. A site visit with the Soil Conservationist to the selected

project location is often required to identify any resource concerns (e.g., noxious weeds, wetland areas,

soil suitability) and to collect the information necessary to develop the draft Conservation Plan, as

described below.

19

June 2015

Agricultural Management Plan

20

Colville Tribes

June 2015

Agricultural Management Plan

Colville Tribes

Conservation Plan

Upon receipt of the completed application, farm plan and questionnaire, the Realty Office will send a

request to the Land Operations Soil Conservationist to prepare a Conservation Plan for the tract to be

leased. The Soil Conservationist reviews the farm plan and questionnaire submitted by the lessee and

schedules a site visit to the tract. After the site visit the Soil Conservationist completes an analysis of the

site factors and planned use then prepares the Conservation Plan. The Conservation Plan will likely

require that the lessee implement specific practices (best management practices) to address resource

concerns. Federal code requires agricultural use on leased tracts to be conducted in a sustainable manner.

If during the Soil Conservationists analysis they determine that the planned use is not sustainable they

will notify the Realty Office who will withdraw the tract from consideration or request that the planned

use be modified.

Best Management Practices

Best management practices (BMPs) are management practices that are implemented to reduce the

potentially negative impact of agricultural operations on water quality, soils, and other resources. These

practices are highly adaptable and reflect the individual conditions and capabilities of the farm where they

are applied. The Soil Conservationist and other Tribal Departments and Federal Agencies (e.g., NRCS)

can work with the lessee to identify BMPs to implement as part of the conservation plan. These will likely

involve some of the following types of activities:

21

•

Conservation Tillage – the practice of leaving harvested plant materials on the soil surface to

reduce runoff and soil erosion.

•

Crop Nutrient Management – managing all nutrient inputs helps ensure the nutrients are available

to meet crop needs while reducing nutrient runoff.

•

Pest Management – using various methods of managing pests while protecting soil and water

quality.

•

Conservation Buffers – using vegetation strips to provide additional barriers of protections which

prevent potential pollutants from running off into surface waters.

•

Irrigation Management – increasing irrigation efficiency to reduce non-point source pollution of

ground and surface water.

•

Grazing Management – managing livestock grazing to lessen water quality impacts, minimize

soil movement and promote plant health.

•

Animal Feeding Operation Management – using runoff control, proper waste storage, and nutrient

management to minimize impacts of animal feeding operations. Tracts utilized as feedlots where

vegetative ground cover cannot be maintained is not considered a sustainable practice and will

not be authorized on the Colville Reservation.

•

Erosion and Sediment Control – using practices to conserve and reduce the amount of sediment

reaching water bodies , overall protecting agricultural land and water quality.

June 2015

Agricultural Management Plan

Colville Tribes

Additional practices likely to be implemented as part of the Conservation Plan BMPs include:

•

Maintaining cover crop to prevent wind erosion.

•

Establish a system of crop rotation as part of nutrient management.

•

Base grazing carrying capacity on the take half / leave half forage utilization rule of thumb to

maintain healthy vegetation communities.

•

Establish system for grazing rotation to allow periods of rest for each pasture.

By regulation, all leases for agricultural lands are required to have a conservation plan to ensure the

sustained use of renewable natural agricultural resources. Determination of these conservation

requirements is the responsibility of the agency soil conservationists and technicians. Range

conservationists and technicians may also be involved with the development of other provisions such as

stocking rates for pasture/grazing leases. On large complex projects the conservation plan and the NEPA

document described below may be prepared by an outside entity and paid for by the potential lessee. The

BIA and Tribes would still review and approve the documents.

A conservation plan must consider the landowner’s and lessee’s management objectives, goals, and

capabilities, as well as prevailing economic conditions (commodity prices, production costs, etc.).

Resource manager’s work with the landowner and NRCS/FSA, as appropriate, to develop feasible

management options that yield acceptable economic returns and conservation benefits. The potential

lessee is also encouraged to be involved in the planning if the lease is negotiated.

There are a number of items to consider when developing a Conservation Plan (also called Exhibit B on

the lease application). A variety of these that may or may not apply to a particular tract of land or lease is

included in Appendix A. The Soil Conservationist works with the lessee and other tribal natural resource

departments to consider these items when developing the Conservation Plan.

NEPA and the Project Proposal Process

Once the Draft Farm Plan and Draft Conservation Plan are complete, they are attached to the completed

Lease Application and submitted to the Realty office. The Realty office completes a Project Proposal

form and attaches the Draft Farm Plan and Draft Conservation Plan and then submits the package to the

IRMP Coordinator. The IRMP Coordinator reviews the lease package and initiates the resource review

and NEPA process (commonly called the Project Proposal Process or “3P”). The lease package is

disseminated to the 3P team, which involves resource specialists from natural resource departments,

realty/leasing, planning and community infrastructure departments, and they provide a thorough review of

the application to identify any resource concerns that may need to be addressed through the NEPA

process. The 3P review ensures consistency with the goals and objectives of the IRMP and compliance

with Tribal Codes and Federal laws and regulations. It is at this phase of the process that additional

resource concerns may be identified. If resource concerns are identified additional restrictions or

requirements may be added to the lease or the proposed leased tract may be withdrawn from consideration

if concerns cannot be mitigated.

There are three types of NEPA analysis and documentation. Most leased tracts can be processed as a

Categorical Exclusion. This is the shortest process and usually requires approximately one month. More

complex projects may require an Environmental Assessment or an Environmental Impact Statement

which will increase the processing time to months and possibly years. On large complex projects the

22

June 2015

Agricultural Management Plan

Colville Tribes

lessee has the option to pay for preparation of the NEPA analysis by an outside entity. The document

would still have to be reviewed and approved by the Tribes and BIA.

Mitigation measures identified to address resource concern and incorporated into the Conservation Plan

as lease requirement s are generally required to protect the tribe’s resources, these mitigation measures

and stipulations may sometimes be too onerous for the lessee to move forward with their proposal or may

require identifying a different location to carry out the activity.

If the applicant agrees with the mitigation measures and stipulations that have been identified, as well as

any monitoring requirements that may be necessary (see Step 5), then the Farm Plan and Conservation

Plan are finalized and final approvals for the lease are sought. The approval process involves a number of

different individuals besides agreement by the applicant themselves. It should be noted that the applicant

can opt out of the process at any time.

The NEPA document (CatEx , EA or EIS) is sent to the BIA regional office in Portland, Oregon for

approval. Approval of the proposed lease by the Colville Tribal Business Council is required whenever

the Tribes own a majority controlling interest in the tract. If the Tribe identifies a specific percentage, a

Tribal Council member may sign the needed consent. Allotments do not require Tribal Business Council

approval. Where applicable, a Colville Tribal Business Council resolution will be issued approving the

leasing of the tract.

Approvals

Upon receiving a resolution approving the lease, or in the case of an allotment, consent of the land

owners, the Tribal Realty Office will prepare the lease document. The Final Conservation Plan is attached

to and incorporated into the lease document as Exhibit B. The lessee then signs the document and the

Agency Superintendent approves the document.

The lease is then sent to the Land Titles and Records Office (LTRO) where it is recorded in the BIA’s

Trust Asset Accounting Management System (TAAMS) database as an encumbrance placed upon the

property. Bond may be required and has to be paid before project execution can begin. Any insurance

requirements and the leasing rates are determined and provided to the applicant as part of the lease. If

irrigating additional permits may be required for water withdrawal. If using pesticides a pesticide

applicator license may be required. A change in land use may require a permit from Planning Department.

Installing utilities or adding or changing access to the property will require appropriate permits. All

payments for leases unless authorized by a direct payment request are made to the TAAMS lockbox.

Additional Lease Information

23

•

The term of most agricultural leases is five years; however lease terms can be negotiated up to 25

years. This is often done when the lessee needs to invest money into the property in order to

operate.

•

Improvements made to the property such as fences, watering troughs, irrigation systems become

the property of the landowner and stay with the property at the end of the lease term unless the

lease specifically states otherwise.

•

Minimum bid amounts are established for each tract and are based on potential crop yield,

analysis of comparable property, or in the case of grazing leases estimated forage production.

June 2015

Agricultural Management Plan

Colville Tribes

•

The amount the lessee pays for the lease can be adjusted at any time during the lease by the

Realty Office based upon an analysis of fair market value.

•

Problems related to ingress and egress to the leased tract could arise if it is necessary to cross

tracts owned by others and there is no recorded easement across these properties.

•

Lease terms for some tracts include crop share where one third of the crop produced belongs to

the landowner. The lessee usually has the option of buying the landowners share for the current

crop price. The lessee is required to immediately notify the Realty Office of harvest. In the event

of bales a count needs to be made before any harvest can be moved. Other crops require third

party verification in the form of receipts for the pounds (or other unit of measure) of product

harvested. This usually involves certified weight slips for product delivered to grain elevators or

other crop storage facilities.

EXECUTE

Once the approved lease has been received, any additional permits obtained, and

all required payments (bonds, insurance) have been made, the lessee is free to

carry out the project as described in the farm plan / conservation plan and lease.

This process carries on for the life of the lease, typically 5 and up to 25 years, at

which time the lease is reapplied for as part of a lease renewal. If the lessee wants

to utilize the leased tract in a manner other than that specifically addressed in the

Conservation Plan, they must request to have the plan updated prior to

implementing any changes. If the lessee desires to end agricultural work prior to

the end of the lease period, then a formal closure of the lease with the Realty

Office needs to occur (see Step 6).

Tribal members qualify to have their lease agreements automatically renewed as long as any compliance

issues have been favorable resolved and lease payments have been timely. Individuals who have been

issued any show cause letter or otherwise fail to meet contractual requirements will not be considered “in

good standing” and may not qualify for lease renewal. Tracts leased by non-tribal members will be

advertised for bid when the term of the lease expires.

In some leases, the lessee enters into a contract with NRCS because of funding or other federal assistance

that is provided. If the lessee fails to fulfill the contract requirements with the NRCS, their eligibility for

future funding for practices or improvements on this land tract may be jeopardized. Additionally, any

future funding request made for that same tract of land by another party (future lessee) would also not be

funded. The lessee should provide notification to the Tribes if they cannot fulfill the terms of the contract.

The Superintendent will coordinate with the Tribes to determine if a program can complete the contract

requirements so as not to jeopardize future funding.

In cases where the lessee is paid to rest the tract (remove it from grazing use or put it in fallow), a portion

of the payment will be paid to the property owner based on the terms of the lease. When applying for

funding for trust lands through the NRCS or other agencies, the lessee will need the Superintendent’s

signature. In some cases outside agencies involved may not be aware of this requirement.

24

June 2015

Agricultural Management Plan

MONITOR

CLOSE

25

Colville Tribes

Monitoring for lease compliance occurs concurrently with project execution

(Step 4). This process involves the activities necessary to conduct an on-site

agricultural land inspection for lessee compliance with the terms of the lease and

conservation plan. Field notes and information collected is documented and made

part of the lease file. Lessee may also be required to provide records such as

fertilizer or pesticide applications, crop production and yield. Subsequent

determinations of lessee non-compliance may be made upon review of data

collected. If a determination of non-compliance is made, corrective actions are

taken to resolve or correct the issue. This process also involves conducting

necessary follow-up actions to correct lessee actions if not in compliance.

The final step in the agricultural leasing process is lease renewal or closure and

this occurs when the lease expires or project proponent ceases activity. If the

lessee desires to continue undertaking the same practices in the same location, a

lease renewal must be applied for. If the lessee desires to cease agricultural

activity, then the appropriate tribal departments need to ensure that the project

site meets the land management objectives necessary to go fallow, be restored to

some previous state, or preferably made available to a different lessee who

desires to continue agricultural production on that site. As stated earlier,

improvements made by the lessee (such as irrigation and fences) become the

property of the Tribes unless specifically exempted in the lease agreement.

June 2015

Agricultural Management Plan

4.0

Colville Tribes

REFERENCES

Clark, Myra. 1997. Agriculture. Integrated Resource Management Plan. Phase I: Inventory and Analysis

Reports. Colville Confederated Tribes.

U.S. Department of the Interior, Bureau of Reclamation (USDI BOR). 1979. Colville Indian Reservation

and Adjacent Areas. Chief Joseph Dam Project, Washington, Appraisal Report. Bridgeport: Chief

Joseph Dam Project. July.

Western Resources Analysis, Inc. 2000. Colville Indian Reservation Integrated Resource Management

Plan 2000 – 2014, Final Environmental Impact Statement.

26

June 2015

Agricultural Management Plan

5.0

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

27

Colville Tribes

APPENDIX A: CONSERVATION PLAN CONSIDERATIONS

Access – roads, trails, gates, bridges, water fords, right-of-ways (ROWs)

Aesthetics, view shed

Agricultural lands – amount and demand for farmland, hayland, pastureland, rangeland

Agricultural products storage – hay, grain, silage

Agricultural values, goals, and objectives

Air quality – standards, BMPs, PM-10, spray drift, feedlot odor

Base acres (FSA)

Best management practices and technical specifications

Bio-solids land applications

Carbon credits

Certified hay and other farm products

Conservation easements

Construction, future – schools, roads, housing, waste systems, public facilities

Crop diseases - prevention, detection, and control

Crop rotation

Crop yields and quality

Cultural sites, including culturally significant areas or resources – surveys, protection, and

management

Degree of use – farmed or fallowed vs. idle lands

Drought - monitoring and response

Dredge or sediment disposal or land applications

Economic development plans

Environmental issues

Equipment needs – trucks, trailers, radios, cell phones, computers, GSP units

Equipment, fuel, and chemical storage

Farm or ranch headquarters – location, maintenance

Farmland or rangeland improvements – plans, maps

Fences

Feral and wild animals (cattle, horses, burros, dogs, etc.)

Fertilizer and manure use and management

Financial assistance and credit availability

Fish and aquatic species - protection

Floodplain management - flood preparedness and response

Funding

Genetically Modified Organisms (GMOs) – tribal policies

Growing season, growing degree days, hardiness zone, evapotranspiration, soil moisture and

temperature

Historical use - stocking rates, cropping history, traditional use areas

Integrated Resource Management Plan (IRMP) or Comprehensive Resources Plan

Irrigation Operations & Maintenance

Irrigation project management

Irrigation water measurements

Land acquisitions

Land ownership status – tribal, allotted, government, fee, state

Land use conversion

June 2015

Agricultural Management Plan

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

•

28

Colville Tribes

Land use/management priorities

Land use zoning

Land users capabilities or limitations – management level, skills, time commitment, financial

constraints

Laws and regulations – federal, tribal

Marketing practices, facilities, and opportunities

Memorandums of Understanding/Agreement related to agriculture

Noxious weeds, invasive species, poisonous plants - prevention, detection, and control

Operating units – economically viable minimum farm or range unit size, maximum size limit

Pesticide use – tribal acceptance, pesticide use proposals, daily logs, spray drift, environmental

concerns/impacts

Planting and tillage operations, dates or window

Plants – cultural, ceremonial, medicinal, threatened and endangered

Pollution - non-point source

Prescribed fire – planning, approval, implementation, monitoring

Public safety

Quarantine policy and enforcement for livestock or agricultural products entering or leaving

Indian lands

Record-keeping and accountability

Recreation – uses, conflicts

Resource data needs – inventories, surveys, condition and trend assessments, basic and applied

research

Riparian and wetland areas – use and management

Roads – construction, closures, maintenance

Rodent, insect, and predator prevention, detection, and control

Season of use

Seasonal high water tables

Seeding – native, introduced species

Sensitive species – threatened and endangered, culturally significant

Socio-economic factors

Soil quality assessments (qualitative monitoring)

Soil testing

Soils – use and management (suitability, classifications, limitations, potentials, hazards)

Solid waste

Specialty products and markets

Storage tanks and underground storage tanks (USTs) - policies

Temperature, precipitation, wind and other climatic characteristics

Temporary and permanent closures – resource protection, species protection, hunting season,

celebrations/festivals

Trade organizations – affiliation, participation (e.g., Intertribal Agriculture Council, United

Native Agricultural Producers)

Trespass

Tribal farmland and rangeland policies and customs

Tribal or landowner interest and involvement in agriculture

Utility Rights-of-Way – electric, gas, water, sewer, communications

Water developments – existing and needs

Water quality – standards, BMPs

Water spreading

June 2015

Agricultural Management Plan

•

•

•

•

•

•

•

29

Colville Tribes

Water supplies – available surface water and groundwater

Watershed size, elevation, topography, relief, elevation, hydrologic characteristics

Waterways, ditches, terraces, and drains construction and maintenance

Wildlife species of management concern

Wildfire threats and preparedness

Wind and water erosion – soil surface protection

Windbreaks

June 2015

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.