Trinidad Area Freeway Master
Plan Study Report
Prepared for:
The Trinidad Rancheria
Prepared by:
Revised February 13, 2014
Revised February 13, 2014
MEMORANDUM
To:
Attn:
From:
Re:
SHN Consulting Engineers and
Geologists
Greg Williston
Kamesh Vedula, PE, TE
Russ Wenham, PE, TE, PTOE
Response to Caltrans Comments on
Trinidad Area Freeway Master Plan
Study Report
Date:
February 13, 2014
Project:
Trinidad Area Freeway Master Plan
Studuy
Job No.:
45-6108-01
File No.:
C1721MEM003.DOCX
CC:
Introduction
This memorandum has been prepared by OMNI-MEANS in response to the January 17, 2014
Memorandum and January 24, 2014 Memorandum from Troy Arseneau. (District 1, Chief, Office of
Traffic Operations) to Ralph Martinelli (District 1 – Advanced Planning).
OMNI-MEANS prepared a Trinidad Area Freeway Master Plan Study Report in June 2013. This
memorandum addresses the comments provided by Caltrans on the June 2013 report. Caltrans comments
are followed by OMNI-MEANS’ response to each item.
Comments within the January 17, 2014 memorandum from Caltrans
1. This memorandum from Caltrans District 1 Traffic Operations includes weaving analysis
for the Trinidad Rancheria Cher-Ae Lane (Scenic Drive) Interchange.
Response to Comment 1: OMNI-MEANS has incorporated the above weaving analysis
within the section titled – Weaving Analysis within the updated Trinidad Area Freeway
Master Plan Study Report
Comments within the January 24, 2014 memorandum from Caltrans
1. The proposed location of the Cher-Ae Lane Interchange appears to be closer to the
Trinidad interchange ramps than the stated 3,700 feet in the report. Rough measurements
show that the distances between the proposed northbound onramp and the existing
northbound onramp at Trinidad and the proposed southbound off-ramp and the existing
southbound on-ramp at Trinidad are approximately 2,500 ft and 2,600 ft, respectively.
The close proximity of the ramps between the two interchanges would require a weaving
analysis according to the 2010 edition of the Highway Capacity Manual (HCM). The
report failed to provide a weaving analysis, stating that the 3700 feet distance was beyond
the thresholds of weaving as per the Highway Capacity Manual (HCM). It appears that
the reference is to HCM 2000 which is not the current edition. Traffic Operations
conducted an independent analysis of the weaving sections between the existing and
proposed interchanges using the volume projections found in the report and concluded
1
943 Reserve Drive, Suite 100, Roseville, CA 95678 ~ (916) 782-8688 fax (916) 782-8689
February 13, 2014
that the freeway section between the two interchanges would operate with acceptable
levels of service with the project's full build out under future conditions and that auxiliary
lanes on the freeway between the interchanges would not be required if a new
interchange for the tribe is built. The results of the weaving analysis are provided to your
office via separate memo.
Response to Comment 1: Agree with Caltrans findings. The reference to the Weaving
Analysis section was indeed from 2000 HCM, an older version. There is no explicit
guidance with regards to weaving based on distance between the interchanges within the
2010 HCM, the current version.
OMNI-MEANS included the weaving analysis and results, provided by Caltrans District
1 Office of Traffic Operations, within the section titled – Weaving Analysis of the updated
Trinidad Area Freeway Master Plan Study Report
2. The report indicated that Main Street in Trinidad near Scenic Drive would need to be
signalized if no interchange is constructed (Figure 19) and the Trinidad Rancheria
Master Plan is fully implemented. The report does not provide any support
documentation for the Synchro analysis for the signalized option without construction
of the proposed interchange for the year 2020 or 2040. Additionally, the alternative
shows that more lanes are needed to support traffic volumes in 2020 if the Cher-Ae
Lane Interchange is not constructed. This report should be amended to include all
necessary support data and calculations that demonstrate the need for additional lanes
for both future scenarios (with and without project) at the Trinidad interchange (i.e.
Synchro/SimTraffic printouts).
Response to Comment 2: Table 5A and 6A within the June 2013 report documented the
results of intersection operations on the Main Street corridor which indicates that
improvements are required to the Main Street intersections to accommodate the
Rancheria Master Plan traffic volumes. The Synchro printouts for these conditions were
included in the June 2013 report. The June 2013 report also concludes that with the
Rancheria Master Plan Volumes signalization will be required on the Mains Street
corridor intersections.
The updated Trinidad Area Freeway Master Plan Study Report includes Table 9, which
summarizes intersection delay and LOS values associated with the proposed Main Street
corridor improvements in order to better communicate the year 2020 and 2040
conditions without the new interchange.
Regrettably, we failed to include the Synchro/Sim-Traffic printouts for year 2020 and
2040 conditions with the proposed Main Street corridor improvements and without the new
Cher-Ae Lane interchange. The updated Trinidad Area Freeway Master Plan Study Report
includes an Appendix section titled Main Street Corridor Improvements Worksheets that
contains all the documentation (Synchro/Sim-Traffic printout) for the delay and LOS
values provided in Table 9.
2
943 Reserve Drive, Suite 100, Roseville, CA 95678 ~ (916) 782-8688 fax (916) 782-8689
TRINIDAD AREA FREEWAY MASTER PLAN STUDY
PREPARED FOR:
THE TRINIDAD RANCHERIA
1 CHER-AE LANE
TRINIDAD, CA 95570
PREPARED JOINTLY BY:
OMNI-MEANS, LTD.
ENGINEERS & PLANNERS
943 RESERVE DRIVE
SACRAMENTO CA 95678
(916) 782-8688
AND
SHN CONSULTING ENGINEERS & GEOLOGISTS, INC
812 W. WABASH
EUREKA, CA 95501-2138
FEBRUARY 2014
45-6108-01
R1721RPT003.DOCX
TABLE OF CONTENTS
INTRODUCTION ........................................................................................................................................ 1
STUDY AREA ROADWAY ....................................................................................................................... 1
STUDY LOCATIONS.................................................................................................................................. 2
Intersections........................................................................................................................................ 2
US101 Mainline Segments ................................................................................................................. 2
US101 Merge/Diverge........................................................................................................................ 2
ANALYSIS METHODOLOGIES AND PARAMETERS ........................................................................... 3
Level-of-Service Methodologies ........................................................................................................ 3
LOS Policies ....................................................................................................................................... 3
LOS Threshold ................................................................................................................................... 3
Warrant Analysis ................................................................................................................................ 3
Technical Analysis Parameters - Intersections ................................................................................... 3
Technical Analysis Parameters – Mainline and Ramps ..................................................................... 4
EXISTING CONDITIONS ........................................................................................................................... 5
Intersections........................................................................................................................................ 5
Existing Freeway and Ramp Junction Operating Conditions ............................................................. 5
DESIGN YEAR CONDITIONS ................................................................................................................... 7
General ............................................................................................................................................... 7
Year 2040 Traffic Volumes ................................................................................................................ 7
Year 2020 Traffic Forecasts ............................................................................................................... 7
YEAR 2020 BASE TRAFFIC OPERATIONS ............................................................................................ 7
Intersections........................................................................................................................................ 7
Year 2020 Base Freeway and Ramp Junction Operating Conditions................................................. 8
YEAR 2040 BASE TRAFFIC OPERATIONS ............................................................................................ 9
Intersections........................................................................................................................................ 9
Year 2040 Base Freeway and Ramp Junction Operating Conditions............................................... 10
RANCHERIA MASTER PLAN DEVELOPMENT .................................................................................. 11
Rancheria Master Plan Development Trip Generation ..................................................................... 11
Rancheria Master Plan development Trip Distribution and Assignment ......................................... 13
YEAR 2020 RANCHERIA MASTER PLAN TRAFFIC OPERATIONS................................................. 13
Intersections...................................................................................................................................... 14
Year 2020 Rancheria Master Plan Freeway and Ramp Junction Operating Conditions .................. 14
YEAR 2040 RANCHERIA MASTER PLAN TRAFFIC OPERATIONS................................................. 15
Intersections...................................................................................................................................... 15
Year 2040 Rancheria Master Plan Freeway and Ramp Junction Operating Conditions .................. 16
CHER-AE LANE INTERCHANGE .......................................................................................................... 18
Weaving Analysis ............................................................................................................................. 18
Design Exceptions ............................................................................................................................ 19
YEAR 2020 RANCHERIA MASTER PLAN WITH CHER-AE LANE INTERCHANGE CONDITIONS
(Year 2020 Rancheria MP with IC conditions) .......................................................................................... 20
Intersections...................................................................................................................................... 20
Year 2020 Rancheria Master Plan Freeway and Ramp Junction Operating Conditions .................. 21
YEAR 2040 RANCHERIA MASTER PLAN WITH CHER-AE LANE INTERCHANGE CONDITIONS
(Year 2040 Rancheria Master Plan with IC conditions) ............................................................................. 21
Intersections...................................................................................................................................... 22
Year 2040 Rancheria Master Plan Freeway and Ramp Junction Operating Conditions .................. 22
MAIN STREET INTERCHANGE IMPROVEMENTS WITHOUT CHER-AE LANE INTERCHANGE
.................................................................................................................................................................... 24
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page i
R1721RPT003.docx
Main Street/Scenic Drive ....................................................................................................... 24
Main Street/US 101 SB Ramps .............................................................................................. 25
Main Street/US 101 NB Ramps ............................................................................................. 25
Westhaven Drive/Frontage Road ........................................................................................... 25
Scenic Drive/Cher-Ae Lane ................................................................................................... 25
CHER-AE LANE INTERCHANGE IMPROVEMENTS .......................................................................... 25
Cher-Ae Lane/US 101 NB Ramps ......................................................................................... 26
Cher-Ae Lane/US 101 SB Ramps .......................................................................................... 26
RECOMMENDATION .............................................................................................................................. 26
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page ii
R1721RPT003.docx
LIST OF TABLES
Table 1A Existing Conditions: Intersections Level of Service ..................................................................... 5
Table 1B Existing Conditions: US 101 Mainline and Ramp Junction Level of Service ............................. 6
Table 1B (Continued) Existing Conditions: US 101 Mainline and Ramp Junction Level of Service ......... 6
Table 2A year 2020 Base Conditions: Intersections Level of Service.......................................................... 8
Table 2B year 2020 Base Conditions: US 101 Mainline and Ramp Junction Level of Service .................. 8
Table 2B (Continued) year 2020 Base Conditions: US 101 Mainline and Ramp Junction Level of Service
......................................................................................................................................................... 9
Table 3A year 2040 Base Conditions: Intersections Level of Service.......................................................... 9
Table 3B year 2040 Base Conditions: US 101 Mainline and Ramp Junction Level of Service ................ 10
Table 3B (Continued) year 2040 Base Conditions: US 101 Mainline and Ramp Junction Level of Service
....................................................................................................................................................... 10
Table 4A Rancheria MASTER PLAN DEVELOPMENT - BUILT-OUT TRIP GENERATION ............ 12
Table 4b YEAR 2020 MASTER PLAN TRIP GENERATION ................................................................. 13
Table 5A year 2020 Rancheria Master Plan Conditions: Intersections Level of Service ........................... 14
Table 5B year 2020 Rancheria Master plan Conditions: US 101 Mainline and Ramp Junction Level of
Service ........................................................................................................................................... 15
Table 5B (Continued) year 2020 Rancheria Master plan Conditions: US 101 Mainline and Ramp
Junction Level of Service............................................................................................................... 15
Table 6A year 2040 Rancheria Master Plan Conditions: Intersections Level of Service ........................... 16
Table 6B year 2040 Rancheria Master plan Conditions: US 101 Mainline and Ramp Junction Level of
Service ........................................................................................................................................... 16
Table 6B (Continued) year 2040 Rancheria Master plan Conditions: US 101 Mainline and Ramp
Junction Level of Service............................................................................................................... 17
Table 7A Year 2020 Rancheria Master Plan with IC conditions: Intersections Level of Service .............. 20
Table 7B Year 2020 Rancheria Master Plan with IC conditions: US 101 Mainline and Ramp Junction
Level of Service ............................................................................................................................. 21
Table 7B (Continued) Year 2020 Rancheria Master Plan with IC conditions: US 101 Mainline and Ramp
Junction Level of Service............................................................................................................... 21
Table 8A Year 2040 Rancheria Master Plan with IC conditions: Intersections Level of Service .............. 22
Table 8B Year 2040 Rancheria Master Plan with IC conditions: US 101 Mainline and Ramp Junction
Level of Service ............................................................................................................................. 23
Table 8B (Continued) Year 2040 Rancheria Master Plan with IC conditions: US 101 Mainline and Ramp
Junction Level of Service............................................................................................................... 23
Table 9 Rancheria Master Plan with main street corridor improvements: Intersections Level of Service . 25
APPENDIX
FIGURES
SYNCHRO REPORTS
WARRANT WORKSHEETS
WEAVING CALCULATIONS
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page iii
R1721RPT003.docx
INTRODUCTION
The Trinidad Rancheria (Rancheria) retained the team of SHN Consulting Engineers & Geologist Inc,
(SHN) and OMNI-MEANS to complete a roadway improvement needs traffic study, in the vicinity of
City of Trinidad in Humboldt County. Figure 1 (in the appendix) shows the study area. With the
planned growth of the Rancheria (per the Master Plan), City of Trinidad (per the General Plan) and other
background growth in the County, planning an efficient transportation system is essential to support this
growth. The focus of this study is to determine the circulation improvements on US 101 and the
interchanges that provide access to the City of Trinidad and the Rancheria to support the future growth.
Traffic operations have been quantified based upon weekday peak month AM and PM peak hour traffic
operations at critical study intersections, and along US 101 freeway mainline segments, and at
mainline/ramp junctions.
STUDY AREA ROADWAY
Roadways that provide the primary vehicle circulation within the study area include US 101, Main Street,
Scenic Drive, and Westhaven Drive. Following is a brief description of the primary roadways within the
study area:
US 101 is a major north-south freeway facility that provides regional connections to the cities on the
north coast and Sacramento/ Los Angeles urban basin to the south. Within Humboldt County, US 101
serves as a vital north-south circulator, and is a general four lane divided freeway with a 65 mph posted
speed limit in the immediate vicinity of the study area. Just south of the Main Street interchange (@ PM
98.067), US 101 currently carries an Annual Average Daily Traffic (AADT) of 10,600 vehicles. (Source:
2011 Caltrans Traffic Volumes.) Truck traffic on US 101 in the project area (@ PM 98.067) represents
approximately 22% of the daily traffic. (Source: 2010 Caltrans Annual Average Daily Truck Traffic on
the California State Highway System.)
Main Street is an east-west two lane primary collector street that extends west of US 101 SB ramps and
continues through the City of Trinidad as Trinity Street and Edwards Street. Per the City of Trinidad
draft General Plan Circulation Element, the Average Daily Traffic (ADT) on Main Street is 3,170
vehicles.
Scenic Drive is a north-south two lane secondary collector street that extends south of Main Street and
provides access to the Rancheria. Per the City of Trinidad draft General Plan Circulation Element, the
ADT on Scenic Drive is 870 vehicles.
Westhaven Drive is a north-south two lane primary collector street that extends east of US 101 SB ramps
and provides a connection between the City of Trinidad and the unincorporated community of Westhaven
in the county. Per the City of Trinidad draft General Plan Circulation Element, the ADT on Westhaven
Drive east of US 101 is 865 vehicles.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 1
R1721RPT003.docx
STUDY LOCATIONS
Intersections
Based on consultation with Caltrans, weekday AM & PM traffic counts were collected for the following
study intersections:
1. 6th Avenue/Kay Avenue
2. 6th Avenue/Kahlstrom Avenue
3. Kay Avenue/US101 SB Ramps
4. Kahlstrom Avenue/7th Avenue
5. Main Street/Patricks Point Drive/Trinidad Scenic Drive
6. Main Street/US101 SB Ramps
7. Westhaven Drive/US101 NB Ramps
8. Westhaven Drive/Trinidad Frontage Road
9. Scenic Drive/Baker Ranch Road
10. Scenic Drive/Cher-Ae Heights Casino Driveway
11. Scenic Drive/Cher-Ae Lane
12. Scenic Drive/Lanford Road
The weekday AM and PM peak hour traffic counts were collected in May 2013. The AM peak hour is
defined as one-hour of peak traffic flow counted between 7:00 AM and 9:00 AM and the PM peak hour is
defined as one-hour of peak traffic flow counted between 4:00 PM and 6:00 PM.
Based on the data obtained from Caltrans continuous count station located at PM 98.067 on US 101,
August counts were observed to be 25% higher than the May counts. Therefore, the May counts were
adjusted to reflect the peak August month counts. Although, it is unlikely that the local street
intersections will experience this same growth, for the purposes of this study, this growth was utilized to
reflect August peak month counts.
Figure 2 (in the Appendix) shows the existing lane geometrics and control at the study intersections.
Figure 3 (in the Appendix) shows the existing peak hour volumes at these locations and Figure 4 (in the
appendix) shows the existing ramp volumes.
US101 Mainline Segments
The following mainline segments have been analyzed in the study:
1. US101 Mainline NB – north of Main Street Interchange
2. US101 Mainline SB – north of Main Street Interchange
3. US101 Mainline NB – south of Main Street Interchange
4. US101 Mainline SB – south of Main Street Interchange
US101 Merge/Diverge
The following merge/diverge junctions have been analyzed in the study:
1) NB US101/Kahlstrom Avenue Ramp Diverge
2) SB US101/Kay Avenue Ramp Merge
3) NB US101/Kahlstrom Avenue Ramp Merge
4) SB US101/Kay Avenue Ramp Diverge
5) NB US101/Westhaven Drive Ramp Diverge
6) SB US101/Main Street Ramp Merge
7) NB US101/Westhaven Drive Ramp Merge
8) SB US101/Main Street Ramp Diverge
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 2
R1721RPT003.docx
ANALYSIS METHODOLOGIES AND PARAMETERS
Level-of-Service Methodologies
Traffic operations will be quantified through the determination of "Level of Service" (LOS). Level of
Service is a qualitative measure of traffic operating conditions, whereby a letter grade "A" through "F" is
assigned to an intersection or roadway segment representing progressively worsening traffic conditions.
Levels of Service have been calculated for all intersection control types using the methods documented in
the Transportation Research Board Publication Highway Capacity Manual, Fourth Edition, 2010 (HCM2010). For signalized intersections and all-way-stop-controlled (AWSC) intersections, the intersection
delays and levels of service are average values for all intersection movements. For two-way-stopcontrolled (TWSC) intersections, the intersection delays and levels of service are representative of those
for the worst-case movement.
LOS Policies
The Caltrans published Guide for the Preparation of Traffic Impact Studies (dated December 2002) states
the following:
“Caltrans endeavors to maintain a target LOS at the transition between LOS “C” and LOS “D”
on State highway facilities.”
LOS Threshold
Based on the above policy, LOS ‘C’ has been assumed as the minimum acceptable for all study
intersections, mainline segments and ramp merge diverge and weave junctions.
Warrant Analysis
A supplemental traffic signal “warrant” analysis has been completed on unsignalized intersections
determined to be operating at unacceptable LOS. The term “signal warrants” refers to the list of
established criteria used by Caltrans and other public agencies to quantitatively justify or ascertain the
need for installation of a traffic signal at an unsignalized intersection. The signal warrant criteria are
based upon several factors, including the volume of vehicular and pedestrian traffic, frequency of
accidents, and location of school areas. The criteria is published in the California Manual of Traffic
Control Devices (MUTCD).
This study utilizes the peak hour volume-based Warrant 3 as one representative type of traffic signal
warrant analysis. It should be noted that the Peak-Hour-Volume Warrant was only applied when the
intersection was found to be operating at unacceptable LOS. Therefore, there may be instances when the
unsignalized intersection operates at acceptable LOS conditions or better but still meets the Peak-HourVolume Warrant.
Technical Analysis Parameters - Intersections
The traffic study would generally provide a “preliminary operational level” evaluation of traffic operating
conditions, which is considered sufficient for California Environmental Quality Act (CEQA) and National
Environmental Quality Act (NEPA) purposes. The Synchro 8.0 (Trafficware) integrated computer
software program has been used to implement the HCM-2010 analysis methodologies at intersections.
The specific intersections related technical analysis parameters that have been used for this study are
presented below.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 3
R1721RPT003.docx
Parameters
Existing Conditions
Future Conditions
Peak Hour factor (PHF)
Heavy Vehicle Percentage
# of Conflicting Pedestrian/Hour
from data collection
5%
5
0.88
5%
5
1
Ideal Saturated Flow
1500 vphpl
1500 vphpl
1. Ideal Saturated Flow assumed as per Caltrans District 1 recommedation.
Technical Analysis Parameters – Mainline and Ramps
The Highway Capacity Software integrated computer software program has been used to implement the
HCM-2010 analysis methodologies at freeways and ramps. The specific mainline, ramp related technical
analysis parameters that have been used for this study are presented below.
Parameters
Existing Conditions
Future Conditions
Free Flow Speed
Mainline Peak Hour Factor (PHF)
Ramp Peak Hour Factor (PHF)
55 MPH
0.88
from existing counts
55 MPH
0.88
0.88
22%
5%
Level
0.86
22%
5%
Level
0.86
317 vph
1% growth rate
287 vph
1% growth rate
541 vph
1% growth rate
486 vph
from data collection
1% growth rate
1% growth rate
Mainline Heavy Vehicle Percentage
Ramp Heavy Vehicle Percentage
Terrain
Driver Population
1
Mainline AM peak Hour Volume (Northbound)
2
Mainline AM peak Hour Volume (Southbound)
2
Mainline PM peak Hour Volume (Northbound)
2
Mainline PM peak Hour Volume (Southbound)
Ramp Volumes
2
1. Mainline Heavy Vehicle Percentage obtained from Caltrans Published 2011 Data.
2. Data abtained from Caltrans' Performance Measurement System (PEMS) database for
Thursday in August 2012 (peak month and day).
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 4
R1721RPT003.docx
EXISTING CONDITIONS
This section provides a summary of intersection, mainline and ramp merge/diverge analysis for Existing
conditions. Figure 3 (in the appendix) depicts the intersection volumes and Figure 4 (in the appendix)
depicts the freeway mainline and ramp volumes.
Intersections
“Existing” peak-hour traffic operations were quantified for the study intersections. Table 1A summarizes
Existing AM and PM peak hour intersection LOS values with existing traffic volumes (shown on Figure
3) and lane geometrics and control (shown on Figure 2).
TABLE 1A
EXISTING CONDITIONS: INTERSECTIONS LEVEL OF SERVICE
Control
#
Intersection
1 6th Avenue & Kay Avenue
2 6th Avenue & Kahlstrom Avenue
3 Kay Avenue & US 101 SB Ramps
4 Kahlstrom Avenue & 7th Avenue
5 Scenic Drive & Main Street
6 Westhaven Drive & US 101 SB Ramps
7 Westhaven Drive & US 101 NB Ramps
8 Westhaven Drive & Frontage Road
9 Scenic Drive & Baker Ranch Drive
10 Scenic Drive & Cher-Ae Lane
11 Scenic Drive & Cher-Ae Heights Casino
Type
1,2
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
Target
LOS
C
C
C
C
C
C
C
C
C
C
C
C
12 Scenic Drive & Landford Road
Notes:
1. TWSC = Two Way Stop Control
2. LOS = Delay based on worst minor street approach for TWSC intersections
3. Warrant = Based on California MUTCD Warrant 3
AM Peak Hour
Warrant
3
PM Peak Hour
Warrant
LOS
A
Met?
-
Delay
8.9
-
8.8
A
-
A
-
9.1
A
-
9.0
A
-
0.4
A
-
12.4
B
-
13.6
B
-
9.6
A
-
10.0
A
-
Delay
LOS
Met?
8.9
A
9.0
A
9.5
3
-
10.7
B
-
11.2
B
-
9.2
A
-
9.0
A
-
0.7
A
-
8.5
A
-
8.6
A
-
9.1
A
-
8.6
A
-
8.6
A
-
8.7
A
-
8.9
A
-
As indicated in Table 1A, all of the study intersections are found to be operating at acceptable LOS under
Existing conditions based on the intersection delay and the corresponding LOS.
Existing Freeway and Ramp Junction Operating Conditions
US 101 freeway mainline and ramp junction peak-hour traffic operations were also quantified applying
methods documented in the HCM-2010 with the existing conditions LOS presented in Table 1B. As
shown in Table 1B, all freeway mainline segments and ramp junctions within the study area currently
operate at LOS “C” or better for “Existing” AM and PM peak hour periods.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 5
R1721RPT003.docx
TABLE 1B
EXISTING CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
Freeway Mainline Segment
US 101 NB north of Main Street
US 101 NB south of Main Street
US 101 SB north of Main Street
US 101 SB south of Main Street
AM Peak Hour
PM Peak Hour
No. Target
Density,
Density,
Lanes
LOS Volume (pc/mi/ln) LOS Volume (pc/mi/ln) LOS
2
C
204
2.7
A
368
4.9
A
2
C
343
5.1
A
539
7.2
A
2
C
164
2.2
A
366
4.9
A
2
C
282
3.8
A
496
6.6
A
TABLE 1B (CONTINUED)
EXISTING CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
AM Peak Hour
Density
(pc/mi/ln) LOS
PM Peak Hour
Density
(pc/mi/ln) LOS
Target
LOS
Junction
Type
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Main Street I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
7.8
6.1
7.4
5.8
A
A
A
A
9.9
9.2
9.8
8.8
A
A
A
A
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
C
C
C
C
Merge
Diverge
Merge
Diverge
5.9
6.8
7.0
4.1
A
A
A
A
7.8
9.3
9.6
7.2
A
A
A
A
Interchange Location
US 101 Ramps @ 6th Avenue I/C
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 6
R1721RPT003.docx
DESIGN YEAR CONDITIONS
General
The Highway Design Manual (HDM) states that the geometric design of new facilities and reconstruction
projects should normally be based on estimated traffic 20 years after completion of construction. As
such, Caltrans has established that the cumulative year of analysis should be 2040. This is consistent with
the Humboldt County Regional Planning efforts and the Humboldt County Regional Travel Demand
model.
Year 2040 Traffic Volumes
The following sources of data were reviewed to establish background annual growth rate that will be
applied to the study area facilities to derive Year 2040 Base traffic volumes:
1) Humboldt County Travel Demand Model Roadway volumes for Year 2010 and Year 2040 were
compared on US 101. In the vicinity of the study area, the model projects approximately 6,100
ADT for Year 2010 and 7,000 ADT for Year 2040. This yields an annual growth rate of
approximately 0.5% per year.
2) Historic ADT data available from Caltrans was reviewed for the Year 1992 and Year 2012. In
the vicinity of the study area, the 1992 ADT was found to be 8,000 and the peak ADT was found
to be 11,300. In 2012, the ADT was found to be 8,900 and the peak ADT was found to be
12,300. This yields an annual growth rate of approximately 0.6% per year.
3) California Department of Finance (DOF) projections for population in Humboldt County were
reviewed for Year 2010 and Year 2040 conditions. The DOF estimate for population in Year
2010 was 134,663 and Year 2040 is 147,873. This yields an annual growth rate of approximately
0.6% per year.
Per direction from Caltrans District 1 Long Range Planning, a background growth rate of 1.3% per year
has been utilized to derive Year 2040 Base traffic volumes.
Year 2020 Traffic Forecasts
Based on the planned development of the Rancheria and input from Caltrans, Year 2020 was established
as the interim analysis year. A background growth rate of 1.3% per year has been utilized to derive Year
2020 Base traffic volumes.
YEAR 2020 BASE TRAFFIC OPERATIONS
This section provides a summary of intersection, mainline and ramp merge/diverge analysis for Year
2020 Base conditions. Figure 5 (in the appendix) depicts the intersection volumes and Figure 6 (in the
appendix) depicts the freeway mainline and ramp volumes.
Intersections
Year 2020 Base peak-hour traffic operations were quantified for the study intersections. Table 2A
summarizes Year 2020 Base AM and PM peak hour intersection LOS values with Year 2020 volumes
(shown on Figure 5) and lane geometrics and control (shown on Figure 2).
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 7
R1721RPT003.docx
TABLE 2A
YEAR 2020 BASE CONDITIONS: INTERSECTIONS LEVEL OF SERVICE
Control
#
Intersection
Type
1 6th Avenue & Kay Avenue
2 6th Avenue & Kahlstrom Avenue
3 Kay Avenue & US 101 SB Ramps
4 Kahlstrom Avenue & 7th Avenue
5 Scenic Drive & Main Street
6 Westhaven Drive & US 101 SB Ramps
7 Westhaven Drive & US 101 NB Ramps
8 Westhaven Drive & Frontage Road
9 Scenic Drive & Baker Ranch Drive
10 Scenic Drive & Cher-Ae Heights Casino
11 Scenic Drive & Cher-Ae Lane
1,2
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
Target
LOS
C
C
C
C
C
C
C
C
C
C
C
C
12 Scenic Drive & Landford Road
Notes:
1. TWSC = Two Way Stop Control
2. LOS = Delay based on worst minor street approach for TWSC intersections
3. Warrant = Based on California MUTCD Warrant 3
AM Peak Hour
Warrant
3
PM Peak Hour
Warrant
LOS
A
Met?
-
Delay
9.2
-
8.9
A
-
A
-
9.2
A
-
9.4
A
-
1.9
A
-
14.5
B
-
16.0
C
-
9.8
A
-
10.8
B
-
Delay
LOS
Met?
9.1
A
9.3
A
9.7
3
-
11.2
B
-
12.1
B
-
9.7
A
-
9.5
A
-
2.5
A
-
8.6
A
-
8.7
A
-
9.0
A
-
8.7
A
-
9.5
A
-
9.2
A
-
9.5
A
-
As indicated in Table 2A, all of the study intersections are found to be operating at acceptable LOS under
Year 2020 Base conditions based on the intersection delay and the corresponding LOS.
Year 2020 Base Freeway and Ramp Junction Operating Conditions
US 101 freeway mainline and ramp junction peak-hour traffic operations were also quantified applying
methods documented in the HCM-2010 with the existing conditions LOS presented in Table 2B. As
shown in Table 2B, all freeway mainline segments and ramp junctions within the study area currently
operate at LOS “C” or better for Year 2020 Base AM and PM peak hour periods.
TABLE 2B
YEAR 2020 BASE CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
Freeway Mainline Segment
US 101 NB north of Main Street
US 101 NB south of Main Street
US 101 SB north of Main Street
US 101 SB south of Main Street
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
AM Peak Hour
PM Peak Hour
No. Target
Density,
Density,
Lanes
LOS Volume (pc/mi/ln) LOS Volume (pc/mi/ln) LOS
2
C
230
3.1
A
400
5.3
A
2
C
380
5.1
A
580
7.7
A
2
C
170
2.3
A
410
5.5
A
2
C
300
4.0
A
540
7.2
A
Page 8
R1721RPT003.docx
TABLE 2B (CONTINUED)
YEAR 2020 BASE CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
AM Peak Hour
Density
(pc/mi/ln) LOS
PM Peak Hour
Density
(pc/mi/ln) LOS
Target
LOS
Junction
Type
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Main Street I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
8.3
5.6
6.9
5.6
A
A
A
A
10.4
8.5
9.2
8.3
B
A
A
A
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
C
C
C
C
Merge
Diverge
Merge
Diverge
6.2
6.3
6.8
4.1
A
A
A
A
8.1
8.8
9.2
6.6
A
A
A
A
Interchange Location
US 101 Ramps @ 6th Avenue I/C
YEAR 2040 BASE TRAFFIC OPERATIONS
This section provides a summary of intersection, mainline and ramp merge/diverge analysis for Year
2040 Base conditions. Figure 7 (in the appendix) depicts the intersection volumes and Figure 8 (in the
appendix) depicts the freeway mainline and ramp volumes.
Intersections
Year 2040 Base peak-hour traffic operations were quantified for the study intersections. Table 3A
summarizes Year 2040 Base AM and PM peak hour intersection LOS values with Year 2040 traffic
volumes (shown on Figure 7) and lane geometrics and control (shown on Figure 2).
TABLE 3A
YEAR 2040 BASE CONDITIONS: INTERSECTIONS LEVEL OF SERVICE
Control
#
Intersection
1 6th Avenue & Kay Avenue
2 6th Avenue & Kahlstrom Avenue
3 Kay Avenue & US 101 SB Ramps
4 Kahlstrom Avenue & 7th Avenue
5 Scenic Drive & Main Street
6 Westhaven Drive & US 101 SB Ramps
7 Westhaven Drive & US 101 NB Ramps
8 Westhaven Drive & Frontage Road
9 Scenic Drive & Baker Ranch Drive
10 Scenic Drive & Cher-Ae Heights Casino
11 Scenic Drive & Cher-Ae Lane
Type
1,2
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
Target
LOS
C
C
C
C
C
C
C
C
C
C
C
C
12 Scenic Drive & Landford Road
Notes:
1. TWSC = Two Way Stop Control
2. LOS = Delay based on worst minor street approach for TWSC intersections
3. Warrant = Based on California MUTCD Warrant 3
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
AM Peak Hour
Warrant
3
PM Peak Hour
Warrant
LOS
A
Met?
-
Delay
9.1
-
8.9
A
-
A
-
9.3
A
-
9.1
A
-
1.9
A
-
17.1
C
-
21.1
C
-
11.3
B
-
11.8
B
-
12.8
B
-
14.5
B
-
10.0
A
-
9.6
A
-
2.5
A
-
8.6
A
-
8.7
A
-
8.9
A
-
8.7
A
-
9.4
A
-
9.1
A
-
9.6
A
-
Delay
LOS
Met?
9.1
A
9.1
A
9.8
3
-
Page 9
R1721RPT003.docx
As indicated in Table 3A, all of the study intersections are found to be operating at acceptable LOS under
Year 2040 Base conditions based on the intersection delay and the corresponding LOS.
Year 2040 Base Freeway and Ramp Junction Operating Conditions
US 101 freeway mainline and ramp junction peak-hour traffic operations were also quantified applying
methods documented in the HCM-2010 with the Year 2040 conditions LOS presented in Table 3B. As
shown in Table 3B, all freeway mainline segments and ramp junctions within the study area currently
operate at LOS “C” or better for Year 2040 Base AM and PM peak hour periods.
TABLE 3B
YEAR 2040 BASE CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
Freeway Mainline Segment
US 101 NB north of Main Street
US 101 NB south of Main Street
US 101 SB north of Main Street
US 101 SB south of Main Street
AM Peak Hour
PM Peak Hour
No. Target
Density,
Density,
Lanes
LOS Volume (pc/mi/ln) LOS Volume (pc/mi/ln) LOS
2
C
290
3.9
A
520
6.9
A
2
C
490
6.5
A
760
10.1
B
2
C
230
3.1
A
500
6.7
A
2
C
390
5.2
A
690
9.2
A
TABLE 3B (CONTINUED)
YEAR 2040 BASE CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
AM Peak Hour
Density
(pc/mi/ln) LOS
PM Peak Hour
Density
(pc/mi/ln) LOS
Target
LOS
Junction
Type
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Main Street I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
7.8
6.1
7.4
5.8
A
A
A
A
9.9
9.2
9.8
8.8
A
A
A
A
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
C
C
C
C
Merge
Diverge
Merge
Diverge
5.9
6.8
7.0
4.1
A
A
A
A
7.8
9.3
9.6
7.2
A
A
A
A
Interchange Location
US 101 Ramps @ 6th Avenue I/C
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 10
R1721RPT003.docx
RANCHERIA MASTER PLAN DEVELOPMENT
The Trinidad Rancheria provided long range plans for development of the Rancheria (Master Plan
Development). To assess the roadways improvements needs associated with the Master Plan
Development, trips expected from the Master Plan Development will be added to the Base year traffic
volumes. The general land use assumptions for the proposed Rancheria Master Plan development are
presented below:
Uses
Casino
RV Spaces
Hotel
Office Space
Retail
Community Space
Gas Station
Existing
50,000 sq.ft.
22
None
Minimal
None
Minimal
None
Master
Plan
150,000 sq.ft.
50
100 Rooms
100,000 sq.ft.
25,000 sq.ft.
50,000 sq.ft.
6 Pumps
Rancheria Master Plan Development Trip Generation
Table 4A provides the trip generation associated with the proposed Rancheria Master Plan development.
Trip Generation estimates for other uses were obtained from the data published in the 9th edition of
Institute of Transportation Engineers (ITE). Although the retail uses associated with the proposed
Rancheria Master Plan development are expected to be “Specialty Retail” (ITE Use Code 814), a
“Shopping Center” (ITE use code 820) was used to estimate trips for this land use. The data is limited for
the Specialty Retail type uses and therefore, Shopping Center was used.
Traffic counts conducted at the entrance to the existing Trinidad Rancheria indicated that the existing
Rancheria generates 67 trips during the AM peak period and 107 trips during the PM peak period. Based
on the 50,000 square feet existing casino establishment, these trips translate to 1.34 trips/1,000 sq.ft.
during the AM peak period and 2.14 trips/1,000 sq.ft. during the PM peak period. This data along with
data from other Casino/Rancheria’s was utilized in deriving trips for the proposed 150,000 square feet
casino expansion.
Table 4B provides the trip generation associated with the proposed Rancheria Master Plan development
for Year 2020 conditions.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 11
R1721RPT003.docx
TABLE 4A
RANCHERIA MASTER PLAN DEVELOPMENT - BUILT-OUT TRIP GENERATION
1
"Unadjusted" Project Trip Generation
Land Use Category
AM Pk Hr Trip Rate
(ITE Code)
Casino Trip Generation Rates
Hotel (310)
Total
In %
Out % Total
In %
Out %
per ksf
2.01
69%
31%
3.94
53%
47%
per room
0.56
61%
39%
0.59
53%
47%
per ksf
1.92
88%
12%
1.91
17%
83%
per ksf
0.96
62%
38%
3.71
48%
52%
per ksf
2.05
66%
34%
2.74
49%
51%
2
3
General Office (710)
3
Shopping Center (820)
3
Recreational Community Center (495)
3
Gas Station with Convenience Market (945)
3
per FS
10.16 50%
50%
AM Pk Hr Trips
Total
In
Out
Quantity
150.0 ksf
302
208
94
100 rooms 56
34
22
100 ksf
192
169
23
25 ksf
24
15
9
50 ksf
103
68
35
6 FS
61
31
30
Land Use Description
Proposed Casino Expansion
Hotel
Office
Retail
Recreational
Mini-Mart
PM Pk Hr Trip Rate
Rate Unit
TOTAL "UNADJUSTED" PROPOSED PROJECT TRIPS
738
525
213
13.51 50%
50%
PM Pk Hr Trips
Total
In
Out
591
313
278
59
31
28
191
32
159
93
45
48
137
67
70
82
41
41
1,153
529
624
Notes: k sf = 1,000 square feet, FS - Fueling Stations
1) Unadjusted Trips include Internal Trips.
2) Trip generation volumes estimated using other sources, which are attached.
3) Trip generation volumes estimated using the ITE Trip Generation (9th Edition) .
4) Based on professional engineering judgement.
Internal Trip Reductions
Land Use Description
Hotel
Office, Retail, Recreational and Mini-Mart
Land Use Description
100 Room Hotel
Office, Retail, Recreational and Mini-Mart
TOTAL PROPOSED PROJECT INTERNAL TRIPS
4
AM Peak Hour
Internal %
30%
20%
AM Peak Hour Trips
Total
In
Out
16
10
6
76
56
19
92
66
26
PM Peak Hour
Internal %
30%
20%
PM Pe ak Hour Trips
Total
17
100
117
In
9
37
46
Out
8
63
71
"Unadjusted" External Trip Generation
Land Use Description
TOTAL "UNADJUSTED" PROJECT TRIPS
- Internal trips
AM Peak Hour Trips
Total
In
Out
738
525
213
-92
-66
-26
Total
1,153
-117
In
529
-46
Out
624
-71
TOTAL "UNADJUSTED" PROPOSED PROJECT EXTERNAL TRIPS
646
1,036
483
553
459
187
PM Pe ak Hour Trips
Full development of the proposed Rancheria Master Plan development is expected to generate 646 AM
peak hour trips and 1,036 PM peak hour trips. Note that these are all net “new” trips that will be added to
the study intersection in the analysis under Year 2040 Master Plan conditions.
The study includes analysis of proposed Rancheria Master Plan development conditions under Year 2020
conditions. It is not expected that full build-out of the proposed Rancheria Master Plan development will
occur by Year 2020 conditions. Therefore, for trip generation purposes under Year 2020 conditions, it is
assumed that the 100 room hotel and the 150,000 square feet casino expansion will be constructed.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 12
R1721RPT003.docx
TABLE 4B
YEAR 2020 MASTER PLAN TRIP GENERATION
1
"Unadjusted" Project Trip Generation
Land Use Category
AM Pk Hr Trip Rate
(ITE Code)
Casino Trip Generation Rates
Hotel (310)
Total
In % Out % Total
In % Out %
per ksf
2.01
69%
53%
2
3
31%
per room
0.56
61%
39%
AM Pk Hr Trips
Total
In
Out
Quantity
150.0 ksf
302
208
94
100 rooms 56
34
22
Land Use Description
Proposed Casino Expansion
Hotel
PM Pk Hr Trip Rate
Rate Unit
TOTAL "UNADJUSTED" PROPOSED PROJECT TRIPS
358
242
116
3.94
47%
0.59
53%
47%
PM Pk Hr Trips
Total
In
Out
591
313
278
59
31
28
650
344
306
Notes: ksf = 1,000 square feet, FS - Fueling Stations
1) Unadjusted Trips include Internal Trips.
2) Trip generation volumes estimated using other sources, which are attached.
3) Trip generation volumes estimated using the ITE Trip Generation (9th Edition) .
4) Based on professional engineering judgement.
Internal Trip Reductions
Land Use Description
Hotel
Land Use Description
100 Room Hotel
TOTAL PROPOSED PROJECT INTERNAL TRIPS
4
AM Peak Hour
Internal %
30%
AM Peak Hour Trips
Total
In
Out
16
10
6
16
10
6
PM Peak Hour
Internal %
30%
PM Peak Hour Trips
Total
17
17
In
9
9
Out
8
8
"Unadjusted" External Trip Generation
Land Use Description
TOTAL "UNADJUSTED" PROJECT TRIPS
- Internal trips
AM Peak Hour Trips
Total
In
Out
358
242
116
-16
-10
-6
Total
650
-17
In
344
-9
Out
306
-8
TOTAL "UNADJUSTED" PROPOSED PROJECT EXTERNAL TRIPS
342
633
335
298
232
110
PM Peak Hour Trips
Year 2020 development of the proposed Rancheria Master Plan development is expected to generate 342
AM peak hour trips and 633 PM peak hour trips. Note that these are all net “new” trips that will be added
to the study intersection in the analysis under Year 2020 Master Plan conditions.
Rancheria Master Plan development Trip Distribution and Assignment
The directional trip distribution and assignment of proposed Rancheria Master Plan development trips
was largely based on the type of uses, demographics of the study area, travel patterns from the existing
Rancheria derived thru traffic counts. The directional trip distribution for the proposed Rancheria Master
Plan development is depicted graphically in Figure 9 (in the Appendix).
YEAR 2020 RANCHERIA MASTER PLAN TRAFFIC OPERATIONS
This section provides a summary of intersection, mainline and ramp merge/diverge analysis for Year
2020 Rancheria Master Plan conditions. Figure 10 (in the appendix) depicts the intersection volumes and
Figure 11 (in the appendix) depicts the freeway mainline and ramp volumes.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 13
R1721RPT003.docx
Intersections
2020 Rancheria Master Plan peak-hour traffic operations were quantified for the study intersections.
Table 5A summarizes Year 2020 Rancheria Master Plan AM and PM peak hour intersection LOS values
with Year 2020 traffic volumes (shown on Figure 10) and lane geometrics and control (shown on Figure
2).
TABLE 5A
YEAR 2020 RANCHERIA MASTER PLAN CONDITIONS: INTERSECTIONS LEVEL OF SERVICE
Control
#
Intersection
1 6th Avenue & Kay Avenue
2 6th Avenue & Kahlstrom Avenue
3 Kay Avenue & US 101 SB Ramps
4 Kahlstrom Avenue & 7th Avenue
5 Scenic Drive & Main Street
6 Westhaven Drive & US 101 SB Ramps
7 Westhaven Drive & US 101 NB Ramps
8 Westhaven Drive & Frontage Road
9 Scenic Drive & Baker Ranch Drive
10 Scenic Drive & Cher-Ae Heights Casino
11 Scenic Drive & Cher-Ae Lane
Type
1,2
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
Target
LOS
C
C
C
C
C
C
C
C
C
C
C
C
12 Scenic Drive & Landford Road
Notes:
1. TWSC = Two Way Stop Control
2. LOS = Delay based on worst minor street approach for TWSC intersections
3. Warrant = Based on California MUTCD Warrant 3
AM Peak Hour
Warrant
3
PM Peak Hour
Warrant
LOS
A
Met?
-
Delay
9.4
-
9.1
A
-
A
-
9.3
A
-
9.4
A
-
1.9
A
-
54.3
F
No
OVR
F
Yes
11.8
B
-
15.3
C
-
16.3
C
-
39.0
E
Yes
9.9
A
-
9.9
A
-
2.5
A
-
8.7
A
-
9.1
A
-
9.5
A
-
10.2
B
-
24.1
C
-
11.2
B
-
15.6
C
-
Delay
LOS
Met?
9.2
A
9.4
A
9.7
3
-
As indicated in Table 5A, all of the study intersections with the exception of Scenic Drive and Main
Street and Westhaven Drive and US 101 NB Ramps intersections are found to be operating at acceptable
LOS under Year 2020 Rancheria Master Plan conditions based on the intersection delay and the
corresponding LOS. Furthermore, the Scenic Drive/Main Street and Westhaven Drive/US 101 NB
Ramps intersections are projected to meet the peak hour warrant criteria during the PM peak period.
Year 2020 Rancheria Master Plan Freeway and Ramp Junction Operating Conditions
US 101 freeway mainline and ramp junction peak-hour traffic operations were also quantified applying
methods documented in the HCM-2010 with the existing conditions LOS presented in Table 5B. As
shown in Table 5B, all freeway mainline segments and ramp junctions within the study area currently
operate at LOS “C” or better for Year 2020 Rancheria Master Plan AM and PM peak hour periods.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 14
R1721RPT003.docx
TABLE 5B
YEAR 2020 RANCHERIA MASTER PLAN CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
Freeway Mainline Segment
US 101 NB north of Main Street
US 101 NB south of Main Street
US 101 SB north of Main Street
US 101 SB south of Main Street
AM Peak Hour
PM Peak Hour
No. Target
Density,
Density,
Lanes
LOS Volume (pc/mi/ln) LOS Volume (pc/mi/ln) LOS
2
C
254
3.4
A
464
6.2
A
2
C
515
6.9
A
774
10.3
A
2
C
221
2.9
A
484
6.5
A
2
C
364
4.9
A
713
9.5
A
TABLE 5B (CONTINUED)
YEAR 2020 RANCHERIA MASTER PLAN CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
AM Peak Hour
Density
(pc/mi/ln) LOS
PM Peak Hour
Density
(pc/mi/ln) LOS
Target
LOS
Junction
Type
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Main Street I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
9.9
7.5
8.0
6.6
A
A
A
A
12.6
11.3
11.5
11.0
B
B
B
B
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
C
C
C
C
Merge
Diverge
Merge
Diverge
6.4
8.5
7.6
4.8
A
A
A
A
8.7
11.8
11.3
8.1
A
B
B
A
Interchange Location
US 101 Ramps @ 6th Avenue I/C
YEAR 2040 RANCHERIA MASTER PLAN TRAFFIC OPERATIONS
This section provides a summary of intersection, mainline and ramp merge/diverge analysis for Year
2040 Rancheria Master Plan conditions. Figure 12 (in the appendix) depicts the intersection volumes and
Figure 13 (in the appendix) depicts the freeway mainline and ramp volumes.
Intersections
Year 2040 Rancheria Master Plan peak-hour traffic operations were quantified for the study intersections.
Table 6A summarizes Year 2040 Rancheria Master Plan AM and PM peak hour intersection LOS values
with Year 2040 traffic volumes (shown on Figure 12) and lane geometrics and control (shown on Figure
2).
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 15
R1721RPT003.docx
TABLE 6A
YEAR 2040 RANCHERIA MASTER PLAN CONDITIONS: INTERSECTIONS LEVEL OF SERVICE
Control
#
Intersection
Type
1,2
Target
LOS
1 6th Avenue & Kay Avenue
TWSC
C
2 6th Avenue & Kahlstrom Avenue
TWSC
C
3 Kay Avenue & US 101 SB Ramps
TWSC
C
4 Kahlstrom Avenue & 7th Avenue
TWSC
C
5 Scenic Drive & Main Street
TWSC
C
6 Westhaven Drive & US 101 SB Ramps
TWSC
C
7 Westhaven Drive & US 101 NB Ramps
TWSC
C
8 Westhaven Drive & Frontage Road
TWSC
C
9 Scenic Drive & Baker Ranch Drive
TWSC
C
10 Scenic Drive & Cher-Ae Heights Casino
TWSC
C
11 Scenic Drive & Cher-Ae Lane
TWSC
C
12 Scenic Drive & Landford Road
TWSC
C
Notes:
1. TWSC = Two Way Stop Control
2. LOS = Delay based on worst minor street approach for TWSC intersections
3. Warrant = Based on California MUTCD Warrant 3
AM Peak Hour
Warrant
Delay
9.3
9.3
9.9
9.4
OVR
18.6
71.7
10.5
2.5
9.2
13.6
13.4
LOS
A
A
A
A
F
C
F
B
A
A
B
B
Met?
Yes
Yes
-
3
PM Peak Hour
Warrant
Delay
9.4
9.2
9.5
1.9
OVR
23.7
OVR
10.4
8.7
10.4
235.1
22.7
LOS
A
A
A
A
F
C
F
B
A
B
F
C
Met?
Yes
Yes
Yes
-
3
As indicated in Table 6A, the following study intersections are found to be operating at unacceptable
LOS D or worse conditions under Year 2040 Rancheria Master Plan conditions based on the intersection
delay and the corresponding LOS:
Scenic Drive and Main Street (meets the peak hour warrant criteria during both peak periods)
Westhaven Drive and US 101 NB Ramps (meets the peak hour warrant criteria during both peak
periods)
Scenic Drive and Cher-Ae Lane (meets the peak hour warrant criteria during the PM peak period)
Year 2040 Rancheria Master Plan Freeway and Ramp Junction Operating Conditions
US 101 freeway mainline and ramp junction peak-hour traffic operations were also quantified applying
methods documented in the HCM-2010 with the existing conditions LOS presented in Table 6B. As
shown in Table 6B, all freeway mainline segments and ramp junctions within the study area currently
operate at LOS “C” or better for Year 2040 Rancheria Master Plan AM and PM peak hour periods.
TABLE 6B
YEAR 2040 RANCHERIA MASTER PLAN CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
Freeway Mainline Segment
US 101 NB north of Main Street
US 101 NB south of Main Street
US 101 SB north of Main Street
US 101 SB south of Main Street
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
AM Peak Hour
PM Peak Hour
No. Target
Density,
Density,
Lanes
LOS Volume (pc/mi/ln) LOS Volume (pc/mi/ln) LOS
2
C
331
4.4
A
642
8.6
A
2
C
756
10.1
A
1,040
13.9
B
2
C
331
4.4
A
606
8.1
A
2
C
498
6.6
A
1,011
13.5
B
Page 16
R1721RPT003.docx
TABLE 6B (CONTINUED)
YEAR 2040 RANCHERIA MASTER PLAN CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
AM Peak Hour
Density
(pc/mi/ln) LOS
PM Peak Hour
Density
(pc/mi/ln) LOS
Target
LOS
Junction
Type
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Main Street I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
12.2
10.2
9.4
8.3
B
B
A
A
15.5
14.4
14.7
14.8
B
B
B
B
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
C
C
C
C
Merge
Diverge
Merge
Diverge
7.3
11.5
9.0
6.2
A
A
A
A
10.6
15.1
14.4
9.6
B
B
B
A
Interchange Location
US 101 Ramps @ 6th Avenue I/C
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 17
R1721RPT003.docx
CHER-AE LANE INTERCHANGE
As noted in the previous analysis, with the addition of trips associated with the Rancheria Master Plan,
the intersections on Main Street interchange are forecasted to operate at unacceptable LOS E or worse
conditions under both Year 2020 and Year 2040 conditions. Without the Rancheria Master Plan trips, all
of the study locations are projected to operate at acceptable LOS. Therefore, within this study, traffic
operations analysis is evaluated with an interchange that provides direct access to the Rancheria and
Westhaven Drive. This new interchange will be located approximately 0.7 miles south of the Main Street
interchange.
For the purposes of the analysis a tight diamond interchange is assumed at the new interchange, which is
referred to as the Cher-Ae Lane interchange. A two lane overcrossing is assumed with all-way stops at
the two ramp locations. Easterly extension of Cher-Ae Lane past the interchange to intersect at a “T”
intersection with Westhaven Drive is also assumed.
It should be noted that the spacing between the existing Main Street interchange and the proposed CherAe Lane interchange does not meet the spacing requirements and a design exception would be necessary.
However, the objective of this study is to analyze transportation operations associated with the new
interchange and the design details and exceptions will be prepared in a Project Study Report, which will
be prepared at a later time.
Weaving Analysis
Caltrans District 1 Traffic Operations performed a weaving analysis for the proposed Cher-Ae Lane
Interchange on U.S. 101, approximately 0.7 miles south of the Trinidad interchange. The Leisch Method,
referred to in Index 504.7 of the Caltrans Highway Design Manual (HDM), 6th Edition, was used in this
analysis. Figure 504.7A from the HDM, which demonstrates this method, is provided in the appendix.
The results of this analysis provided by Caltrans District 1 Traffic Operations are summarized below.
The overall conclusion from this analysis is that there is adequate distance on U.S. 101 between the
proposed interchange ramps and the existing Trinidad interchange ramps to accommodate the interaction
of entering and exiting traffic (current and projected) on U.S. 101 in both the north and south directions
while maintaining acceptable Level of Service (LOS) on the freeway. Auxiliary lanes will not be needed
on U.S. 101 if a new interchange is constructed near PM 100.2.
Using the post mile locations for the ramp connections of the Trinidad interchange and proposed Cher-Ae
Lane interchange, the on and off ramps would be separated by approximately 2,600 feet (0.49 miles) and
2,500 feet (0.47 miles) for the northbound and southbound portions of the freeway, respectively.
According to Index 504.5, Paragraph 2, of the HDM, "auxiliary lanes should be provided in all cases
when the weaving distance is less than 2000 feet." Under these criteria, auxiliary lanes would not be
required for northbound (NB) and southbound (SB) U.S. 101 between the Trinidad interchange and the
proposed interchange.
The weaving analysis prepared by Caltrans District 1 Traffic Operations was based on the Year 2020 and
2040 volume information presented in the appendix. The data used was in the units of vehicles per hour
(vph) and was taken from the afternoon PM peak hour. Year 2020 plus interchange northbound weaving
volumes was calculated at 233 vph (80 vph NB onramp + 153 vph NB off ramp). Southbound weaving
was calculated at 244 vph PM peak (151 vph SB onramp + 93 vph SB off ramp). Year 2040 plus
interchange northbound weaving volumes was calculated at 292 vph (139 NB onramp + 153 vph NB off
ramp). Southbound weaving was calculated at 339 vph (212 vph SB onramp + 127 vph SB off ramp).
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 18
R1721RPT003.docx
HDM Section 504.7, Paragraph 3, gives a rough approximation for length of a weaving section, "one foot
of length per weaving vehicle per hour (vph)." The largest weaving volume, 339 vph for Year 2040 in the
southbound direction, would only require a 339 foot weaving section, which is much less than the 2500
and 2600 feet distances that exist between on and off ramps in the NB and SB directions, respectively.
The distances between the ramps are more than adequate to accommodate the interaction of through
traffic, traffic entering the freeway, and traffic exiting the freeway between the proposed and existing
interchanges; therefore, auxiliary lanes would not be necessary.
The Leisch Method was used to determine Level of Service (LOS). The results from the method
nomograph (HDM Figure 504.7A, provided in the appendix) show that the Year 2040 southbound
weaving volume of 339 vph, or 401 passenger cars per hour (pcph), would result in LOS A. Being that
the Year 2040 northbound weaving volume and the Year 2020 volumes are all less than 339 vph (401
pcph), LOS A would exist in both directions for the weaving section lengths between the interchanges for
Year 2020 and 2040 conditions.
Design Exceptions
To promote uniform practice on a statewide basis, the Caltrans HDM identifies standards that shall be
considered during project planning. When design features or elements deviate from HDM mandatory
standards, approval from the appropriate Caltrans Design Coordinator shall be obtained. The authority to
approve exceptions to advisory standards rests with the District Director (District 1).
Design exception approval must be obtained prior to Caltrans approval of a Project Study Report (PSR).
When project development is initiated with approval of a Project Study Report – Project Development
Support (PSR-PDS) document, approval of applicable design exceptions can be deferred to the Project
Report (PR) phase.
Table 82.1A of the HDM lists mandatory standards subject to the above approval requirements. A
screening-level review of the standards resulted in development of the below list of potential exceptions
to mandatory standards for this project:
HDM Index
101.1
201.1
202.2
203.1
204.1
309.1
501.3
504.3
Standard
Selection of Design Speed
Sight Distance Standards
Superelevation
Horizontal Alignment
Local Facility Grades
Clear Recovery Zone
Interchange Spacing
Distance Between Ramp &
Frontage Roads
Comment
Local roads at interchanges may not meet standards.
Local roads at interchanges may not meet standards.
Local roads and ramp termini may not meet standards.
Local roads may not meet standards.
Local road grades may not meet standards.
Existing topographic features may not meet standards.
A new interchange will require an exception.
Not met at existing interchanges. May not be met
at new interchange.
Table 82.1B of the HDM lists advisory standards subject to the above approval requirements. A
screening-level review of the standards resulted in development of the below list of potential exceptions
to advisory standards for this project:
HDM Index
101.1
105.4
Standard
Selection of Design Speed
Two ADA Ramp Design
203.1
204.1
Horizontal Alignment
Local Facility Grades
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Comment
Local roads at interchanges may not meet standards.
One access ramp is often appropriate at signalized
freeway ramps.
Local roads may not meet standards.
Local road grades may not meet standards.
Page 19
R1721RPT003.docx
304.1
309.1
504.3
Side Slopes 1:4 or Flatter
Clear Recovery Zone
Distance Between Ramp &
Frontage Roads
Existing and proposed slopes may exceed 1:4.
Existing topographic features may not meet standards.
Not met at existing interchanges. May not be met
at new interchange.
YEAR 2020 RANCHERIA MASTER PLAN WITH CHER-AE LANE INTERCHANGE
CONDITIONS (YEAR 2020 RANCHERIA MP WITH IC CONDITIONS)
Year 2020 proposed Rancheria Master Plan development trips identified in Table 4B have been added to
Year 2020 Base traffic volumes based on the trip distribution presented in Figure 9 to derive Year 2020
Rancheria Master Plan with Cher-Ae Lane Interchange Conditions (Year 2020 Rancheria Master Plan
with IC conditions). Traffic volumes will be redistributed based on the addition of a new freeway
interchange at the Trinidad Rancheria. Figure 15 (in the appendix) depicts the intersection volumes and
Figure 16 (in the appendix) depicts the freeway mainline and ramp volumes.
Intersections
Year 2020 Rancheria MP with IC conditions peak-hour traffic operations were quantified for the study
intersections. Table 7A summarizes Year 2020 Rancheria Master Plan with IC conditions AM and PM
peak hour intersection LOS values with Year 2020 traffic volumes (shown on Figure 15) and lane
geometrics and control (shown on Figure 14).
TABLE 7A
YEAR 2020 RANCHERIA MASTER PLAN WITH IC CONDITIONS: INTERSECTIONS LEVEL OF SERVICE
Control
#
Intersection
1 6th Avenue & Kay Avenue
2 6th Avenue & Kahlstrom Avenue
3 Kay Avenue & US 101 SB Ramps
4 Kahlstrom Avenue & 7th Avenue
5 Scenic Drive & Main Street
6 Westhaven Drive & US 101 SB Ramps
7 Westhaven Drive & US 101 NB Ramps
8 Westhaven Drive & Frontage Road
9 Scenic Drive & Baker Ranch Drive
10 Scenic Drive & Cheer-Ae Hieght Casino
11 Scenic Drive & Cher-AE Lane
12 Scenic Drive & Landford Road
13 Cher AE Lane & US 101 NB Ramps
14 Cher AE Lane & US 101 SB Ramps
Type
1,2
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
AWSC
AWSC
TWSC
Target
LOS
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
15 Cher AE Lane & Westhaven Drive
Notes:
1. TWSC = Two Way Stop Control
2. LOS = Delay based on worst minor street approach for TWSC intersections
3. Warrant = Based on California MUTCD Warrant 3
AM Peak Hour
Warrant
Delay
LOS
Met?
9.2
A
9.6
A
9.8
3
PM Peak Hour
Warrant
LOS
A
Met?
-
Delay
9.5
-
9.1
A
-
A
-
9.3
A
-
9.6
A
-
1.9
A
-
13.2
B
-
14.4
B
-
9.7
A
-
9.8
A
-
3
-
10.9
B
-
11.5
B
-
9.8
A
-
9.7
A
-
2.1
A
-
8.7
A
-
9.1
A
-
8.8
A
-
9.1
A
-
9.5
A
-
8.9
A
-
9.3
A
-
8.4
A
-
9.5
A
-
8.2
A
-
10.1
B
-
9.0
A
-
9.2
A
-
As indicated in Table 7A, all of the following study intersections are found to be operating at acceptable
LOS C or better conditions under Year 2020 Rancheria MP with IC conditions based on the intersection
delay and the corresponding LOS.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 20
R1721RPT003.docx
Year 2020 Rancheria Master Plan Freeway and Ramp Junction Operating Conditions
US 101 freeway mainline and ramp junction peak-hour traffic operations were also quantified applying
methods documented in the HCM-2010 with the existing conditions LOS presented in Table 7B. As
shown in Table 7B, all freeway mainline segments and ramp junctions within the study area currently
operate at LOS “C” or better for Year 2020 Rancheria MP with IC conditions AM and PM peak hour
periods.
TABLE 7B
YEAR 2020 RANCHERIA MASTER PLAN WITH IC CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
Freeway Mainline Segment
US 101 NB north of Main Street
US 101 NB south of Main Street
US 101 SB north of Main Street
US 101 SB south of Main Street
US 101 NB south of Cher-Ae Lane
US 101 SB south of Cher-Ae Lane
AM Peak Hour
PM Peak Hour
No. Target
Density,
Density,
Lanes
LOS Volume (pc/mi/ln) LOS Volume (pc/mi/ln) LOS
A
464
6.2
A
2
C
254
3.4
2
C
379
5.1
A
618
8.2
A
A
484
6.5
A
2
C
221
2.9
2
C
348
4.6
A
600
8.0
A
2
C
518
6.9
A
779
10.4
B
2
C
372
5.0
A
715
9.5
A
TABLE 7B (CONTINUED)
YEAR 2020 RANCHERIA MASTER PLAN WITH IC CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
AM Peak Hour
Density
(pc/mi/ln) LOS
PM Peak Hour
Density
(pc/mi/ln) LOS
Target
LOS
Junction
Type
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Cher-Ae Lane I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
10.0
7.5
8.0
6.7
A
A
A
A
12.6
11.3
11.5
11.0
B
B
B
B
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Main Street I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
8.2
8.5
8.0
6.4
A
A
A
A
10.9
11.8
10.3
9.6
B
A
B
A
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
C
C
C
C
Merge
Diverge
Merge
Diverge
6.5
6.8
7.2
4.8
A
A
A
A
8.9
9.8
10.4
8.1
A
A
B
A
Interchange Location
US 101 Ramps @ 6th Avenue I/C
YEAR 2040 RANCHERIA MASTER PLAN WITH CHER-AE LANE INTERCHANGE
CONDITIONS (YEAR 2040 RANCHERIA MASTER PLAN WITH IC CONDITIONS)
Year 2040 proposed Rancheria Master Plan development trips identified in Table 4A have been added to
Year 2040 Base traffic volumes based on the trip distribution presented in Figure 9 (in the Appendix) to
derive Year 2040 Rancheria Master Plan with Cher-Ae Lane Interchange Conditions (Year 2040
Rancheria Master Plan with IC conditions). Traffic volumes will be redistributed based on the addition of
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 21
R1721RPT003.docx
a new freeway interchange at the Trinidad Rancheria. Figure 17 (in the appendix) depicts the
intersection volumes and Figure 18 (in the appendix) depicts the freeway mainline and ramp volumes.
Intersections
Year 2040 Rancheria MP with IC conditions peak-hour traffic operations were quantified for the study
intersections. Table 8A summarizes Year 2040 Rancheria MP with IC conditions AM and PM peak hour
intersection LOS values with Year 2040 traffic volumes (shown on Figure 17) and lane geometrics and
control (shown on Figure 14).
TABLE 8A
YEAR 2040 RANCHERIA MASTER PLAN WITH IC CONDITIONS: INTERSECTIONS LEVEL OF SERVICE
Control
#
Intersection
1 6th Avenue & Kay Avenue
2 6th Avenue & Kahlstrom Avenue
3 Kay Avenue & US 101 SB Ramps
4 Kahlstrom Avenue & 7th Avenue
5 Scenic Drive & Main Street
6 Westhaven Drive & US 101 SB Ramps
7 Westhaven Drive & US 101 NB Ramps
8 Westhaven Drive & Frontage Road
9 Scenic Drive & Baker Ranch Drive
10 Scenic Drive & Cheer-Ae Hieght Casino
11 Scenic Drive & Cher-AE Lane
12 Scenic Drive & Landford Road
13 Cher AE Lane & US 101 NB Ramps
14 Cher AE Lane & US 101 SB Ramps
Type
1,2
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
TWSC
AWSC
AWSC
TWSC
Target
LOS
C
C
C
C
C
C
C
C
C
C
C
C
C
C
C
15 Cher AE Lane & Westhaven Drive
Notes:
1. TWSC = Two Way Stop Control
2. LOS = Delay based on worst minor street approach for TWSC intersections
3. Warrant = Based on California MUTCD Warrant 3
AM Peak Hour
Warrant
3
PM Peak Hour
Warrant
LOS
A
Met?
-
Delay
9.5
-
9.2
A
-
A
-
9.6
A
-
9.4
A
-
1.9
A
-
16.7
C
-
18.7
C
-
10.1
B
-
10.4
B
-
12.6
B
-
13.2
B
-
10.2
B
-
10.1
B
-
2.1
A
-
8.8
A
-
9.1
A
-
8.9
A
-
9.5
A
-
10.0
A
-
9.0
A
-
9.5
A
-
Delay
LOS
Met?
9.3
A
9.3
A
9.9
3
-
10.3
B
-
11.6
B
-
9.5
A
-
10.1
B
-
9.3
A
-
9.5
A
-
As indicated in Table 8A, all of the study intersections are found to be operating at acceptable LOS C or
better conditions under Year 2040 Rancheria MP with IC conditions based on the intersection delay and
the corresponding LOS. :
Year 2040 Rancheria Master Plan Freeway and Ramp Junction Operating Conditions
US 101 freeway mainline and ramp junction peak-hour traffic operations were also quantified applying
methods documented in the HCM-2010 with the existing conditions LOS presented in Table 8B. As
shown in Table 8B, all freeway mainline segments and ramp junctions within the study area currently
operate at LOS “C” or better for Year 2040 Rancheria MP with IC conditions AM and PM peak hour
periods.
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 22
R1721RPT003.docx
TABLE 8B
YEAR 2040 RANCHERIA MASTER PLAN WITH IC CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
Freeway Mainline Segment
US 101 NB north of Main Street
US 101 NB south of Main Street
US 101 SB north of Main Street
US 101 SB south of Main Street
US 101 NB south of Cher-Ae Lane
US 101 SB south of Cher-Ae Lane
AM Peak Hour
PM Peak Hour
No. Target
Density,
Density,
Lanes
LOS Volume (pc/mi/ln) LOS Volume (pc/mi/ln) LOS
2
C
331
4.4
A
642
8.6
A
2
C
494
6.6
A
850
11.3
B
2
C
331
4.4
A
606
8.1
A
2
C
488
6.5
A
783
10.4
A
2
C
759
10.1
B
1,045
13.9
B
2
C
501
6.7
A
1,015
13.5
B
TABLE 8B (CONTINUED)
YEAR 2040 RANCHERIA MASTER PLAN WITH IC CONDITIONS:
US 101 MAINLINE AND RAMP JUNCTION LEVEL OF SERVICE
AM Peak Hour
Density
(pc/mi/ln) LOS
PM Peak Hour
Density
(pc/mi/ln) LOS
Target
LOS
Junction
Type
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Cher-Ae Lane I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
12.2
10.2
9.4
8.3
B
B
A
A
15.6
14.4
14.7
14.8
B
B
B
B
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
US 101 Ramps @ Main Street I/C
C
C
C
C
Merge
Diverge
Merge
Diverge
9.6
11.6
9.5
8.2
A
B
A
A
13.5
15.2
14.6
11.9
B
B
B
B
U.S. Route 101 Northbound On-Ramp
U.S. Route 101 Northbound Off-Ramp
U.S. Route 101 Southbound On-Ramp
U.S. Route 101 Southbound Off-Ramp
C
C
C
C
Merge
Diverge
Merge
Diverge
7.3
8.2
9.5
6.2
A
A
A
A
10.9
12.7
12.4
9.6
B
B
B
A
Interchange Location
US 101 Ramps @ 6th Avenue I/C
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 23
R1721RPT003.docx
MAIN STREET INTERCHANGE IMPROVEMENTS WITHOUT CHER-AE LANE
INTERCHANGE
As noted previously (Year 2020 and 2040 Rancheria Master Plan Conditions), with the addition of trips
from the proposed Rancheria Master Plan, intersections on the Main Street corridor and the project
entrance on Scenic Drive are forecasted to operate at unacceptable LOS. This section identifies
intersection improvements that will provide acceptable operations through Year 2040 Rancheria Master
Plan conditions.
While intersection delay, on which LOS is derived, is a valid measure of delay and congestion, the
proposed improvements are unique. Due to the closely spaced nature of the intersections and
signalization proposed on the Main Street Corridor intersections, operations at one intersection
significantly impacts operations at adjacent intersections. Furthermore, the close proximity of the
intersections within this area and short turn pocket lengths greatly increases the likelihood that a critical
movement at an intersection will block adjacent intersections. This behavior is not captured within the
isolated intersection analysis in Synchro and needs to be documented using microsimualtion analysis.
Synchro is bundled with microsimulation software, SimTraffic, which uses the Synchro network as the
direct input data. The intersection operations for Main Street corridor intersections was performed in
SimTraffic.
When compared to AM peak hour volumes, the PM peak hour volumes were significantly higher on the
Main Street Corridor. Therefore, the analysis was performed for PM peak hour conditions. The proposed
intersection improvements on the Main Street corridor are shown on Figure 19 and the intersection LOS
for Year 2020 and Year 2040 PM Peak hour conditions are provided in Table 9.
Figure 19 – Main Street Interchange Improvements to accommodate Year 2020 and 2040
Rancheria Master Plan Conditions Traffic Volumes
Main Street/Scenic Drive
Signalize and coordinate the intersection with other Main Street corridor intersections
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 24
R1721RPT003.docx
Provide dual northbound right turns and one shared left-thru lane
Provide left turn and right turn lanes and a shared left-thru lane in the southbound direction
Provide a shared left-thru lane and a thru-right lane in the eastbound direction
Provide dual left turn lanes and a thru-right lane in the westbound direction
Main Street/US 101 SB Ramps
Signalize and coordinate the intersection with other Main Street corridor intersections
Provide a left-right lane and right turn lanes in the southbound direction
Provide a thru lane ,a thru-right lane and an exclusive right turn lane in the eastbound direction
Provide a shared left-thru lane, and dual thru lanes westbound direction
Main Street/US 101 NB Ramps
Signalize and coordinate the intersection with other Main Street corridor intersections
Provide dual left lanes and a shared left-right lane in the southbound direction
Provide a left turn lane and a thru lane in the eastbound direction
Provide a thru lane and a shared thru-right lane in the westbound direction
Westhaven Drive/Frontage Road
Signalize and coordinate the intersection with other Main Street corridor intersections
Scenic Drive/Cher‐Ae Lane
Signalize the intersection
Provide a 350 feet left turn lane and a left-thru lane in the southbound direction
Provide a left turn and a right turn lane in the westbound direction
TABLE 9
RANCHERIA MASTER PLAN WITH MAIN STREET CORRIDOR IMPROVEMENTS: INTERSECTIONS
LEVEL OF SERVICE
Control
#
Intersection
5 Scenic Drive & Main Street
6 Westhaven Drive & US 101 SB Ramps
7 Westhaven Drive & US 101 NB Ramps
8 Westhaven Drive & Frontage Road
11 Scenic Drive & Cher-Ae Lane
Type
1,2
Signal
Signal
Signal
Signal
Signal
Target
LOS
C
C
C
C
C
2020 PM Peak Hour
Warrant
Delay
12.3
14.2
15.8
13.3
17.8
LOS
B
B
B
B
B
Met?
-
3
2040 PM Peak Hour
Warrant
Delay
21.8
15.7
18.6
13.6
29.9
LOS
C
B
B
B
C
Met?
-
3
As indicated in Table 9, all of the study intersections are found to be operating at acceptable LOS C or
better conditions with the proposed Main Street corridor improvements based on the intersection delay
and the corresponding LOS. All of the other intersections are projected to operate acceptable LOS under
both Year 2030 and 2040 conditions. Please refer to Tables 5A and 6A for the intersection delay and the
corresponding LOS for the other study intersections.
CHER-AE LANE INTERCHANGE IMPROVEMENTS
The analysis of Year 2020 and 2040 Rancheria Master Plan Conditions with the Cher-Ae Lane
interchange has been documented in Tables 7A, 7B, 8A and 8B. This section reiterates the intersection
improvements that were assumed for the Year 2020 and 2040 Rancheria Master Plan Conditions with the
Cher-Ae Lane interchange and Figure 20 provides a schematic of these improvements. A modern
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 25
R1721RPT003.docx
roundabout at these two locations will provide superior LOS compared to all-way stop. No additional
improvements beyond those identified in Figure 20 are required for Cher-Ae Lane.
Cher‐Ae Lane/US 101 NB Ramps
All-way Stop Control at the intersection
Cher‐Ae Lane/US 101 SB Ramps
All-way Stop Control at the intersection
Channelized eastbound right pocket
Figure 20 – Cher-Ae Lane Interchange Improvements to accommodate Year 2020 and 2040
Rancheria Master Plan Conditions Traffic Volumes
RECOMMENDATION
A Project Study Report - Project Development Support (PSR-PDS) should be prepared to define the cost,
schedule, scope, impacts and benefits of the alternatives identified in this study.
Although improvements to Main Street corridor (as noted within the Main Street Interchange
Improvements Without Cher-Ae Lane Interchange section) provide acceptable operations with the
buildout of the area including the Rancheria Master Plan, we recommend the implementation of the CherAe Lane interchange improvements for the following reasons:
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 26
R1721RPT003.docx
(1) Improving the Main Street Interchange will require significant right of way acquisition and
change the character of the gateway to the coastal community of Trinidad
(2) Geometry (Close spacing) of intersections on Main Street is undesirable
(3) Cher-Ae Lane interchange improvements provide superior operations when compared to the
Main Street Interchange Improvements
(4) A new Cher-Ae Lane interchange will reduce travel times by providing a more efficient
connection between the Trinidad Rancheria and the US101 corridor
Trinidad Area Freeway Master Plan Study
The Trinidad Rancheria
Page 27
R1721RPT003.docx
APPENDIX
FIGURES
SYNCHRO REPORTS
WARRANT WORKSHEETS
WEAVING ANALYSIS
APPENDIX
Figures
Synchro Reports
Main Street Corridor Improvements Worksheets
Warrant Worksheets
HCS Reports
Weaving Analysis
FIGURES
SYNCHRO REPORTS
HCM Unsignalized Intersection Capacity Analysis
1: 6th Ave & Kay Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - AM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
4
8
Free
0%
0.81
10
5
12.0
3.5
0
7
Free
0%
0.81
9
5
12.0
3.5
0
23
18
Stop
0%
0.81
22
5
12.0
3.5
0
5
None
None
0.81
5
0.81
28
0.81
6
42
53
33
42
4.1
53
6.4
33
6.2
2.2
100
1540
3.5
98
936
3.3
99
1022
EB 1
15
5
0
1540
0.00
0
2.5
A
2.5
WB 1
37
0
28
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
28
22
6
954
0.03
2
8.9
A
8.9
A
3.6
16.6%
15
ICU Level of Service
A
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
2: 6th Ave & Kahlstrom Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - AM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
8
20
Free
0%
0.73
27
5
12.0
3.5
0
20
Free
0%
0.73
27
5
12.0
3.5
0
32
7
Stop
0%
0.73
10
5
12.0
3.5
0
8
None
None
0.73
11
0.73
44
0.73
11
76
109
59
76
4.1
109
6.4
59
6.2
2.2
99
1497
3.5
99
867
3.3
99
988
EB 1
38
11
0
1497
0.01
1
2.2
A
2.2
WB 1
71
0
44
1700
0.04
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
21
10
11
928
0.02
2
9.0
A
9.0
A
2.1
20.1%
15
ICU Level of Service
A
Synchro 8 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
3: Kay Ave & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
3
Stop
0%
0.81
4
5
12.0
3.5
0
0
0
0
0
0
0.81
0
0.81
0
0.81
32
0.81
0
24
Free
0%
0.81
30
5
12.0
3.5
0
0
0.81
0
0
Free
0%
0.81
0
5
12.0
3.5
0
26
0.81
0
0
Stop
0%
0.81
0
5
0.0
3.5
0
0.81
0
None
None
56
72
40
41
40
10
35
37
56
7.1
72
6.5
40
6.2
41
7.1
40
6.5
10
6.2
35
4.1
37
4.1
3.5
100
922
4.0
100
809
3.3
100
1014
3.5
100
943
4.0
100
843
3.3
100
1058
2.2
100
1550
2.2
100
1554
EB 1
4
0
0
809
0.00
0
9.5
A
9.5
A
NB 1
32
0
32
1700
0.02
0
0.0
SB 1
30
0
0
1700
0.02
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.5
16.4%
15
ICU Level of Service
0.81
0
A
Synchro 8 Report
Page 3
HCM Unsignalized Intersection Capacity Analysis
4: Kahlstrom Ave & 7th Avenue
Existing Condtions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
3
Stop
0%
0.58
5
5
12.0
3.5
0
2
37
Free
0%
0.58
64
5
12.0
3.5
0
3
1
0.58
5
0.58
2
12
Free
0%
0.58
21
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.58
3
None
None
101
76
74
101
6.4
76
6.2
74
4.1
3.5
99
881
3.3
100
967
2.2
100
1500
WB 1
9
5
3
914
0.01
1
9.0
A
9.0
A
NB 1
69
0
5
1700
0.04
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
22
2
0
1500
0.00
0
0.6
A
0.6
0.9
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 4
HCM Unsignalized Intersection Capacity Analysis
5: Scenic Drive/Patricks Point Drive & Main Street
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
17
104
Free
0%
0.85
122
5
12.0
3.5
0
13
35
11
14
32
0.85
13
0.85
16
0.85
24
0.85
38
2
Stop
0%
0.85
2
5
12.0
3.5
0
18
0.85
41
3
Stop
0%
0.85
4
5
12.0
3.5
0
20
0.85
15
149
Free
0%
0.85
175
5
12.0
3.5
0
0.85
20
None
0.85
21
None
193
143
466
451
140
469
452
192
193
4.1
143
4.1
466
7.1
451
6.5
140
6.2
469
7.1
452
6.5
192
6.2
2.2
99
1356
2.2
97
1415
3.5
96
463
4.0
99
473
3.3
97
892
3.5
92
460
4.0
100
473
3.3
97
834
EB 1
158
20
15
1356
0.01
1
1.1
A
1.1
WB 1
229
41
13
1415
0.03
2
1.6
A
1.6
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
44
16
24
627
0.07
6
11.2
B
11.2
B
3.6
34.0%
15
SB 1
61
38
21
545
0.11
9
12.4
B
12.4
B
ICU Level of Service
A
Synchro 8 Report
Page 5
HCM Unsignalized Intersection Capacity Analysis
6: Westhaven Drive & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
40
Free
0%
0.86
47
5
12.0
3.5
0
116
18
0
0
0
0.86
0
0.86
0
0.86
0
0.86
0
0
Stop
0%
0.86
0
5
12.0
3.5
0
16
0.86
21
0
Stop
0%
0.86
0
5
0.0
3.5
0
0
0.86
135
179
Free
0%
0.86
208
5
12.0
3.5
0
0.86
0
None
0.86
19
None
213
186
393
374
124
374
441
218
213
4.1
186
4.1
393
7.1
374
6.5
124
6.2
374
7.1
441
6.5
218
6.2
2.2
100
1333
2.2
98
1370
3.5
100
538
4.0
100
541
3.3
100
914
3.5
100
563
4.0
100
496
3.3
98
806
EB 1
181
0
135
1700
0.11
0
0.0
0.0
WB 1
229
21
0
1370
0.02
1
0.8
A
0.8
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
SB 1
19
0
19
806
0.02
2
9.6
A
9.6
A
0.9
40.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 6
HCM Unsignalized Intersection Capacity Analysis
7: Westhaven Drive & US 101 NB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
15
25
Free
0%
0.86
29
5
12.0
3.5
0
0
0
4
145
0
0.86
5
0.86
169
0.86
15
0.86
0
0
Stop
0%
0.86
0
5
0.0
3.5
0
0
0.86
0
0
Stop
0%
0.86
0
5
12.0
3.5
0
13
0.86
0
52
Free
0%
0.86
60
5
12.0
3.5
0
0.86
17
None
0.86
0
None
70
34
137
139
39
152
137
73
70
4.1
34
4.1
137
7.1
139
6.5
39
6.2
152
7.1
137
6.5
73
6.2
2.2
99
1512
2.2
100
1551
3.5
79
809
4.0
100
734
3.3
99
1014
3.5
100
783
4.0
100
736
3.3
100
976
EB 1
47
17
0
1512
0.01
1
2.8
A
2.8
WB 1
65
0
5
1700
0.04
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
NB 1
184
169
15
823
0.22
21
10.6
B
10.6
B
7.1
34.5%
15
ICU Level of Service
A
Synchro 8 Report
Page 7
HCM Unsignalized Intersection Capacity Analysis
8: Westhaven Drive/Trinadad Frontage Road
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - AM
7/19/2013
EBL
EBR
NBL
NBT
SBT
SBR
15
Free
0%
0.83
18
5
12.0
3.5
0
23
39
0.83
47
0
Stop
0%
0.83
0
5
12.0
3.5
0
17
0.83
28
2
Stop
0%
0.83
2
5
12.0
3.5
0
0.83
20
None
5
67
46
74
10
5
4.1
67
7.1
46
6.5
74
6.5
10
6.2
2.2
99
1589
3.5
95
879
4.0
100
822
4.0
100
794
3.3
98
1053
EB 1
46
18
28
1589
0.01
1
2.9
A
2.9
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
49
47
0
876
0.06
4
9.4
A
9.4
A
SB 1
20
0
20
1053
0.02
1
8.5
A
8.5
A
6.7
Err%
15
ICU Level of Service
H
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
9: Scenic Drive & Baker Ranch Drive
Existing Condtions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.72
0
5
12.0
3.5
0
0
18
Free
0%
0.72
25
5
12.0
3.5
0
1
1
0.72
1
0.72
1
11
Free
0%
0.72
15
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.72
0
None
None
54
36
31
54
6.4
36
6.2
31
4.1
3.5
100
937
3.3
100
1019
2.2
100
1554
WB 1
0
0
0
1700
0.00
0
0.0
A
0.0
A
NB 1
26
0
1
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
17
1
0
1554
0.00
0
0.6
A
0.6
0.2
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 9
HCM Unsignalized Intersection Capacity Analysis
10: Scenic Drive & Cher-Ae Height Casino Drive
Existing Condtions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.56
0
5
12.0
3.5
0
10
18
Free
0%
0.56
32
5
12.0
3.5
0
0
0
0.56
0
0.56
0
12
Free
0%
0.56
21
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.56
18
None
None
64
42
37
64
6.4
42
6.2
37
4.1
3.5
100
926
3.3
98
1010
2.2
100
1547
WB 1
18
0
18
1010
0.02
1
8.6
A
8.6
A
NB 1
32
0
0
1700
0.02
0
0.0
SB 1
21
0
0
1700
0.01
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
2.2
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 10
HCM Unsignalized Intersection Capacity Analysis
11: Cher-Ae Lane & Scenic Drive
Existing Condtions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.81
0
5
12.0
3.5
0
14
24
Free
0%
0.81
30
5
12.0
3.5
0
4
39
0.81
5
0.81
48
12
Free
0%
0.81
15
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.81
17
None
None
153
42
40
153
6.4
42
6.2
40
4.1
3.5
100
798
3.3
98
1010
2.2
97
1544
WB 1
17
0
17
1010
0.02
1
8.6
A
8.6
A
NB 1
35
0
5
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
63
48
0
1544
0.03
2
5.7
A
5.7
4.4
21.7%
15
ICU Level of Service
A
Synchro 8 Report
Page 11
HCM Unsignalized Intersection Capacity Analysis
12: Scenic Drive & Lanford Road
Existing Condtions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
1
Stop
0%
0.80
1
5
12.0
3.5
0
4
33
Free
0%
0.80
41
5
12.0
3.5
0
0
0
0.80
0
0.80
0
50
Free
0%
0.80
62
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.80
5
None
None
114
51
46
114
6.4
51
6.2
46
4.1
3.5
100
867
3.3
99
999
2.2
100
1535
WB 1
6
1
5
969
0.01
0
8.7
A
8.7
A
NB 1
41
0
0
1700
0.02
0
0.0
SB 1
62
0
0
1535
0.00
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.5
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 12
HCM Unsignalized Intersection Capacity Analysis
1: 6th Ave & Kay Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - PM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
3
1
Free
0%
0.67
1
5
12.0
3.5
0
3
Free
0%
0.67
4
5
12.0
3.5
0
15
27
Stop
0%
0.67
40
5
12.0
3.5
0
2
None
None
0.67
4
0.67
22
0.67
3
32
36
26
32
4.1
36
6.4
26
6.2
2.2
100
1554
3.5
96
957
3.3
100
1032
EB 1
6
4
0
1554
0.00
0
5.5
A
5.5
WB 1
27
0
22
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
43
40
3
962
0.05
4
8.9
A
8.9
A
5.5
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
2: 6th Ave & Kahlstrom Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - PM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
4
24
Free
0%
0.76
32
5
12.0
3.5
0
9
Free
0%
0.76
12
5
12.0
3.5
0
13
7
Stop
0%
0.76
9
5
12.0
3.5
0
10
None
None
0.76
5
0.76
17
0.76
13
34
72
30
34
4.1
72
6.4
30
6.2
2.2
100
1551
3.5
99
912
3.3
99
1026
EB 1
37
5
0
1551
0.00
0
1.1
A
1.1
WB 1
29
0
17
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
22
9
13
976
0.02
2
8.8
A
8.8
A
2.7
17.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
3: Kay Ave & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - PM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
2
Stop
0%
0.90
2
5
12.0
3.5
0
1
0
0
0
0
0.90
0
0.90
0
0.90
18
0.90
0
26
Free
0%
0.90
29
5
12.0
3.5
0
2
0.90
0
0
Free
0%
0.90
0
5
12.0
3.5
0
16
0.90
1
0
Stop
0%
0.90
0
5
0.0
3.5
0
0.90
0
None
None
49
58
40
42
41
10
36
23
49
7.1
58
6.5
40
6.2
42
7.1
41
6.5
10
6.2
36
4.1
23
4.1
3.5
100
932
4.0
100
824
3.3
100
1013
3.5
100
942
4.0
100
841
3.3
100
1058
2.2
100
1548
2.2
100
1573
EB 1
3
0
1
878
0.00
0
9.1
A
9.1
A
NB 1
18
0
18
1700
0.01
0
0.0
SB 1
31
0
2
1700
0.02
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.6
16.4%
15
ICU Level of Service
0.90
2
A
Synchro 8 Report
Page 3
HCM Unsignalized Intersection Capacity Analysis
4: Kahlstrom Ave & 7th Avenue
Existing Condtions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.80
0
5
12.0
3.5
0
0
16
Free
0%
0.80
20
5
12.0
3.5
0
1
1
0.80
1
0.80
1
17
Free
0%
0.80
21
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.80
0
None
None
54
31
26
54
6.4
31
6.2
26
4.1
3.5
100
936
3.3
100
1025
2.2
100
1561
WB 1
0
0
0
1700
0.00
0
0.0
A
0.0
A
NB 1
21
0
1
1700
0.01
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
22
1
0
1561
0.00
0
0.4
A
0.4
0.2
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 4
HCM Unsignalized Intersection Capacity Analysis
5: Scenic Drive/Patricks Point Drive & Main Street
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - PM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
21
135
Free
0%
0.93
145
5
12.0
3.5
0
13
62
40
10
33
0.93
43
0.93
11
0.93
42
0.93
35
11
Stop
0%
0.93
12
5
12.0
3.5
0
24
0.93
67
6
Stop
0%
0.93
6
5
12.0
3.5
0
39
0.93
14
129
Free
0%
0.93
139
5
12.0
3.5
0
0.93
23
None
0.93
26
None
187
164
533
522
162
546
508
170
187
4.1
164
4.1
533
7.1
522
6.5
162
6.2
546
7.1
508
6.5
170
6.2
2.2
98
1363
2.2
95
1390
3.5
97
403
4.0
98
422
3.3
95
867
3.5
91
391
4.0
97
430
3.3
97
858
EB 1
182
23
14
1363
0.02
1
1.1
A
1.1
WB 1
248
67
43
1390
0.05
4
2.4
A
2.4
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
59
11
42
654
0.09
7
11.0
B
11.0
B
4.3
47.9%
15
SB 1
73
35
26
493
0.15
13
13.6
B
13.6
B
ICU Level of Service
A
Synchro 8 Report
Page 5
HCM Unsignalized Intersection Capacity Analysis
6: Westhaven Drive & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - PM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
64
Free
0%
0.89
72
5
12.0
3.5
0
143
17
0
0
2
0.89
0
0.89
0
0.89
0
0.89
2
0
Stop
0%
0.89
0
5
12.0
3.5
0
28
0.89
19
0
Stop
0%
0.89
0
5
0.0
3.5
0
0
0.89
161
203
Free
0%
0.89
228
5
12.0
3.5
0
0.89
0
None
0.89
31
None
233
238
460
429
162
429
509
238
233
4.1
238
4.1
460
7.1
429
6.5
162
6.2
429
7.1
509
6.5
238
6.2
2.2
100
1311
2.2
99
1312
3.5
100
477
4.0
100
504
3.3
100
871
3.5
100
519
4.0
100
454
3.3
96
786
EB 1
233
0
161
1700
0.14
0
0.0
0.0
WB 1
247
19
0
1312
0.01
1
0.7
A
0.7
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
SB 1
34
2
31
760
0.04
3
10.0
A
10.0
A
1.0
44.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 6
HCM Unsignalized Intersection Capacity Analysis
7: Westhaven Drive & US 101 NB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - PM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
21
45
Free
0%
0.92
49
5
12.0
3.5
0
0
0
3
177
0
0.92
3
0.92
192
0.92
20
0.92
0
0
Stop
0%
0.92
0
5
0.0
3.5
0
0
0.92
0
0
Stop
0%
0.92
0
5
12.0
3.5
0
18
0.92
0
43
Free
0%
0.92
47
5
12.0
3.5
0
0.92
23
None
0.92
0
None
55
54
153
155
59
172
153
58
55
4.1
54
4.1
153
7.1
155
6.5
59
6.2
172
7.1
153
6.5
58
6.2
2.2
99
1531
2.2
100
1525
3.5
76
788
4.0
100
717
3.3
98
989
3.5
100
753
4.0
100
719
3.3
100
994
EB 1
72
23
0
1531
0.01
1
2.4
A
2.4
WB 1
50
0
3
1700
0.03
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
NB 1
212
192
20
803
0.26
27
11.1
B
11.1
B
7.6
38.7%
15
ICU Level of Service
A
Synchro 8 Report
Page 7
HCM Unsignalized Intersection Capacity Analysis
8: Westhaven Drive/Trinadad Frontage Road
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Existing Condtions - PM
7/19/2013
EBL
EBR
NBL
NBT
SBT
SBR
14
Free
0%
0.92
15
5
12.0
3.5
0
49
35
0.92
38
2
Stop
0%
0.92
2
5
12.0
3.5
0
11
0.92
53
0
Stop
0%
0.92
0
5
12.0
3.5
0
0.92
12
None
5
53
40
94
10
5
4.1
53
7.1
40
6.5
94
6.5
10
6.2
2.2
99
1589
3.5
96
903
4.0
100
830
4.0
100
776
3.3
99
1053
EB 1
68
15
53
1589
0.01
1
1.7
A
1.7
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
38
38
0
903
0.04
3
9.2
A
9.2
A
SB 1
14
0
12
998
0.01
1
8.7
A
8.7
A
4.9
Err%
15
ICU Level of Service
H
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
9: Scenic Drive & Baker Ranch Drive
Existing Condtions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.82
0
5
12.0
3.5
0
1
19
Free
0%
0.82
23
5
12.0
3.5
0
0
2
0.82
0
0.82
2
30
Free
0%
0.82
37
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.82
1
None
None
75
33
28
75
6.4
33
6.2
28
4.1
3.5
100
911
3.3
100
1022
2.2
100
1559
WB 1
1
0
1
1022
0.00
0
8.5
A
8.5
A
NB 1
23
0
0
1700
0.01
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
39
2
0
1559
0.00
0
0.5
A
0.5
0.5
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 9
HCM Unsignalized Intersection Capacity Analysis
10: Scenic Drive & Cher-Ae Height Casino Drive
Existing Condtions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
1
Stop
0%
0.82
1
5
12.0
3.5
0
14
20
Free
0%
0.82
24
5
12.0
3.5
0
0
0
0.82
0
0.82
0
31
Free
0%
0.82
38
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.82
17
None
None
72
34
29
72
6.4
34
6.2
29
4.1
3.5
100
916
3.3
98
1020
2.2
100
1557
WB 1
18
1
17
1013
0.02
1
8.6
A
8.6
A
NB 1
24
0
0
1700
0.01
0
0.0
SB 1
38
0
0
1700
0.02
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
2.0
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 10
HCM Unsignalized Intersection Capacity Analysis
11: Cher-Ae Lane & Scenic Drive
Existing Condtions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
6
Stop
0%
0.77
8
5
12.0
3.5
0
23
30
Free
0%
0.77
39
5
12.0
3.5
0
4
59
0.77
5
0.77
77
25
Free
0%
0.77
32
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.77
30
None
None
237
52
49
237
6.4
52
6.2
49
4.1
3.5
99
700
3.3
97
998
2.2
95
1531
WB 1
38
8
30
918
0.04
3
9.1
A
9.1
A
NB 1
44
0
5
1700
0.03
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
109
77
0
1531
0.05
4
5.4
A
5.4
4.9
24.0%
15
ICU Level of Service
A
Synchro 8 Report
Page 11
HCM Unsignalized Intersection Capacity Analysis
12: Scenic Drive & Lanford Road
Existing Condtions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
1
Stop
0%
0.80
1
5
12.0
3.5
0
2
53
Free
0%
0.80
66
5
12.0
3.5
0
0
3
0.80
0
0.80
4
83
Free
0%
0.80
104
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.80
2
None
None
188
76
71
188
6.4
76
6.2
71
4.1
3.5
100
785
3.3
100
967
2.2
100
1503
WB 1
4
1
2
898
0.00
0
9.0
A
9.0
A
NB 1
66
0
0
1700
0.04
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
108
4
0
1503
0.00
0
0.3
A
0.3
0.4
20.1%
15
ICU Level of Service
A
Synchro 8 Report
Page 12
HCM Unsignalized Intersection Capacity Analysis
1: 6th Ave & Kay Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - AM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
10
20
Free
0%
0.81
25
5
12.0
3.5
0
15
Free
0%
0.81
19
5
12.0
3.5
0
30
20
Stop
0%
0.81
25
5
12.0
3.5
0
10
None
None
0.81
12
0.81
37
0.81
12
61
96
47
61
4.1
96
6.4
47
6.2
2.2
99
1517
3.5
97
880
3.3
99
1004
EB 1
37
12
0
1517
0.01
1
2.5
A
2.5
WB 1
56
0
37
1700
0.03
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
37
25
12
918
0.04
3
9.1
A
9.1
A
3.3
20.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
2: 6th Ave & Kahlstrom Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - AM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
10
30
Free
0%
0.73
41
5
12.0
3.5
0
30
Free
0%
0.73
41
5
12.0
3.5
0
50
15
Stop
0%
0.73
21
5
12.0
3.5
0
15
None
None
0.73
14
0.73
68
0.73
21
115
154
85
115
4.1
154
6.4
85
6.2
2.2
99
1449
3.5
97
815
3.3
98
956
EB 1
55
14
0
1449
0.01
1
1.9
A
1.9
WB 1
110
0
68
1700
0.06
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
41
21
21
880
0.05
4
9.3
A
9.3
A
2.4
20.9%
15
ICU Level of Service
A
Synchro 8 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
3: Kay Ave & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
10
Stop
0%
0.81
12
5
12.0
3.5
0
0
0
0
0
0
0.81
0
0.81
0
0.81
49
0.81
0
30
Free
0%
0.81
37
5
12.0
3.5
0
0
0.81
0
0
Free
0%
0.81
0
5
12.0
3.5
0
40
0.81
0
0
Stop
0%
0.81
0
5
0.0
3.5
0
0.81
0
None
None
72
96
47
53
47
10
42
54
72
7.1
96
6.5
47
6.2
53
7.1
47
6.5
10
6.2
42
4.1
54
4.1
3.5
100
900
4.0
98
784
3.3
100
1004
3.5
100
919
4.0
100
835
3.3
100
1058
2.2
100
1540
2.2
100
1532
EB 1
12
0
0
784
0.02
1
9.7
A
9.7
A
NB 1
49
0
49
1700
0.03
0
0.0
SB 1
37
0
0
1700
0.02
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
1.2
16.7%
15
ICU Level of Service
0.81
0
A
Synchro 8 Report
Page 3
HCM Unsignalized Intersection Capacity Analysis
4: Kahlstrom Ave & 7th Avenue
Year 2020 Base Conditions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
10
Stop
0%
0.58
17
5
12.0
3.5
0
10
50
Free
0%
0.58
86
5
12.0
3.5
0
10
10
0.58
17
0.58
17
20
Free
0%
0.58
34
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.58
17
None
None
174
105
108
174
6.4
105
6.2
108
4.1
3.5
98
792
3.3
98
933
2.2
99
1457
WB 1
34
17
17
857
0.04
3
9.4
A
9.4
A
NB 1
103
0
17
1700
0.06
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
52
17
0
1457
0.01
1
2.6
A
2.6
2.4
20.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 4
HCM Unsignalized Intersection Capacity Analysis
5: Scenic Drive/Patricks Point Drive & Main Street
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20
120
Free
0%
0.85
141
5
12.0
3.5
0
20
40
20
20
40
0.85
24
0.85
24
0.85
35
0.85
47
10
Stop
0%
0.85
12
5
12.0
3.5
0
20
0.85
47
10
Stop
0%
0.85
12
5
12.0
3.5
0
30
0.85
24
170
Free
0%
0.85
200
5
12.0
3.5
0
0.85
24
None
0.85
24
None
229
170
545
528
163
557
528
222
229
4.1
170
4.1
545
7.1
528
6.5
163
6.2
557
7.1
528
6.5
222
6.2
2.2
98
1316
2.2
97
1383
3.5
94
399
4.0
97
424
3.3
96
866
3.5
88
387
4.0
97
424
3.3
97
803
EB 1
188
24
24
1316
0.02
1
1.1
A
1.1
WB 1
271
47
24
1383
0.03
3
1.6
A
1.6
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
71
24
35
554
0.13
11
12.4
B
12.4
B
4.4
39.5%
15
SB 1
82
47
24
461
0.18
16
14.5
B
14.5
B
ICU Level of Service
A
Synchro 8 Report
Page 5
HCM Unsignalized Intersection Capacity Analysis
6: Westhaven Drive & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
50
Free
0%
0.86
58
5
12.0
3.5
0
140
20
0
0
0
0.86
0
0.86
0
0.86
0
0.86
0
0
Stop
0%
0.86
0
5
12.0
3.5
0
30
0.86
23
0
Stop
0%
0.86
0
5
0.0
3.5
0
0
0.86
163
200
Free
0%
0.86
233
5
12.0
3.5
0
0.86
0
None
0.86
35
None
238
226
463
429
150
429
510
243
238
4.1
226
4.1
463
7.1
429
6.5
150
6.2
429
7.1
510
6.5
243
6.2
2.2
100
1306
2.2
98
1325
3.5
100
471
4.0
100
503
3.3
100
885
3.5
100
517
4.0
100
452
3.3
96
781
EB 1
221
0
163
1700
0.13
0
0.0
0.0
WB 1
256
23
0
1325
0.02
1
0.8
A
0.8
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
SB 1
35
0
35
781
0.04
3
9.8
A
9.8
A
1.1
44.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 6
HCM Unsignalized Intersection Capacity Analysis
7: Westhaven Drive & US 101 NB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
20
30
Free
0%
0.86
35
5
12.0
3.5
0
0
0
10
160
0
0.86
12
0.86
186
0.86
23
0.86
0
0
Stop
0%
0.86
0
5
0.0
3.5
0
0
0.86
0
0
Stop
0%
0.86
0
5
12.0
3.5
0
20
0.86
0
60
Free
0%
0.86
70
5
12.0
3.5
0
0.86
23
None
0.86
0
None
86
40
167
173
45
190
167
86
86
4.1
40
4.1
167
7.1
173
6.5
45
6.2
190
7.1
167
6.5
86
6.2
2.2
98
1491
2.2
100
1543
3.5
76
771
4.0
100
701
3.3
98
1007
3.5
100
731
4.0
100
706
3.3
100
960
EB 1
58
23
0
1491
0.02
1
3.1
A
3.1
WB 1
81
0
12
1700
0.05
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
NB 1
209
186
23
791
0.26
27
11.2
B
11.2
B
7.2
36.7%
15
ICU Level of Service
A
Synchro 8 Report
Page 7
HCM Unsignalized Intersection Capacity Analysis
8: Westhaven Drive/Trinadad Frontage Road
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - AM
7/19/2013
EBL
EBR
NBL
NBT
SBT
SBR
20
Free
0%
0.83
24
5
12.0
3.5
0
30
50
0.83
60
0
Stop
0%
0.83
0
5
12.0
3.5
0
20
0.83
36
10
Stop
0%
0.83
12
5
12.0
3.5
0
0.83
24
None
5
82
58
94
10
5
4.1
82
7.1
58
6.5
94
6.5
10
6.2
2.2
98
1589
3.5
93
853
4.0
99
807
4.0
100
771
3.3
98
1053
EB 1
60
24
36
1589
0.02
1
3.0
A
3.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
72
60
0
845
0.09
7
9.7
A
9.7
A
SB 1
24
0
24
1053
0.02
2
8.5
A
8.5
A
6.9
Err%
15
ICU Level of Service
H
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
9: Scenic Drive & Baker Ranch Drive
Year 2020 Base Conditions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.72
0
5
12.0
3.5
0
0
20
Free
0%
0.72
28
5
12.0
3.5
0
10
10
0.72
14
0.72
14
20
Free
0%
0.72
28
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.72
0
None
None
100
45
47
100
6.4
45
6.2
47
4.1
3.5
100
875
3.3
100
1007
2.2
99
1534
WB 1
0
0
0
1700
0.00
0
0.0
A
0.0
A
NB 1
42
0
14
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
42
14
0
1534
0.01
1
2.5
A
2.5
1.3
20.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 9
HCM Unsignalized Intersection Capacity Analysis
10: Scenic Drive & Cher-Ae Height Casino Drive
Year 2020 Base Conditions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.56
0
5
12.0
3.5
0
20
20
Free
0%
0.56
36
5
12.0
3.5
0
0
0
0.56
0
0.56
0
30
Free
0%
0.56
54
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.56
36
None
None
99
46
41
99
6.4
46
6.2
41
4.1
3.5
100
884
3.3
96
1006
2.2
100
1542
WB 1
36
0
36
1006
0.04
3
8.7
A
8.7
A
NB 1
36
0
0
1700
0.02
0
0.0
SB 1
54
0
0
1700
0.03
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
2.5
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 10
HCM Unsignalized Intersection Capacity Analysis
11: Cher-Ae Lane & Scenic Drive
Year 2020 Base Conditions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.81
0
5
12.0
3.5
0
20
30
Free
0%
0.81
37
5
12.0
3.5
0
10
50
0.81
12
0.81
62
30
Free
0%
0.81
37
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.81
25
None
None
214
53
54
214
6.4
53
6.2
54
4.1
3.5
100
730
3.3
98
996
2.2
96
1525
WB 1
25
0
25
996
0.02
2
8.7
A
8.7
A
NB 1
49
0
12
1700
0.03
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
99
62
0
1525
0.04
3
4.8
A
4.8
4.0
23.7%
15
ICU Level of Service
A
Synchro 8 Report
Page 11
HCM Unsignalized Intersection Capacity Analysis
12: Scenic Drive & Lanford Road
Year 2020 Base Conditions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
10
Stop
0%
0.80
12
5
12.0
3.5
0
10
50
Free
0%
0.80
62
5
12.0
3.5
0
0
0
0.80
0
0.80
0
70
Free
0%
0.80
88
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.80
12
None
None
160
72
68
160
6.4
72
6.2
68
4.1
3.5
98
816
3.3
99
972
2.2
100
1508
WB 1
25
12
12
887
0.03
2
9.2
A
9.2
A
NB 1
62
0
0
1700
0.04
0
0.0
SB 1
88
0
0
1508
0.00
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
1.3
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 12
HCM Unsignalized Intersection Capacity Analysis
1: 6th Ave & Kay Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - PM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
10
10
Free
0%
0.67
15
5
12.0
3.5
0
10
Free
0%
0.67
15
5
12.0
3.5
0
20
30
Stop
0%
0.67
45
5
12.0
3.5
0
10
None
None
0.67
15
0.67
30
0.67
15
50
85
40
50
4.1
85
6.4
40
6.2
2.2
99
1530
3.5
95
892
3.3
99
1013
EB 1
30
15
0
1530
0.01
1
3.7
A
3.7
WB 1
45
0
30
1700
0.03
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
60
45
15
920
0.06
5
9.2
A
9.2
A
4.9
19.6%
15
ICU Level of Service
A
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
2: 6th Ave & Kahlstrom Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - PM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
10
30
Free
0%
0.76
39
5
12.0
3.5
0
10
Free
0%
0.76
13
5
12.0
3.5
0
20
10
Stop
0%
0.76
13
5
12.0
3.5
0
20
None
None
0.76
13
0.76
26
0.76
26
44
102
36
44
4.1
102
6.4
36
6.2
2.2
99
1537
3.5
98
873
3.3
97
1018
EB 1
53
13
0
1537
0.01
1
1.9
A
1.9
WB 1
39
0
26
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
39
13
26
965
0.04
3
8.9
A
8.9
A
3.4
20.9%
15
ICU Level of Service
A
Synchro 8 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
3: Kay Ave & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - PM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
10
Stop
0%
0.90
11
5
12.0
3.5
0
10
0
0
0
0
0.90
0
0.90
0
0.90
33
0.90
0
30
Free
0%
0.90
33
5
12.0
3.5
0
10
0.90
0
0
Free
0%
0.90
0
5
12.0
3.5
0
30
0.90
11
0
Stop
0%
0.90
0
5
0.0
3.5
0
0.90
0
None
None
66
82
49
66
54
10
49
38
66
7.1
82
6.5
49
6.2
66
7.1
54
6.5
10
6.2
49
4.1
38
4.1
3.5
100
909
4.0
99
798
3.3
99
1002
3.5
100
893
4.0
100
827
3.3
100
1058
2.2
100
1531
2.2
100
1553
EB 1
22
0
11
889
0.03
2
9.2
A
9.2
A
NB 1
33
0
33
1700
0.02
0
0.0
SB 1
44
0
11
1700
0.03
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
2.0
16.4%
15
ICU Level of Service
0.90
11
A
Synchro 8 Report
Page 3
HCM Unsignalized Intersection Capacity Analysis
4: Kahlstrom Ave & 7th Avenue
Year 2020 Base Conditions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.80
0
5
12.0
3.5
0
0
20
Free
0%
0.80
25
5
12.0
3.5
0
10
10
0.80
12
0.80
12
30
Free
0%
0.80
38
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.80
0
None
None
104
41
42
104
6.4
41
6.2
42
4.1
3.5
100
871
3.3
100
1011
2.2
99
1540
WB 1
0
0
0
1700
0.00
0
0.0
A
0.0
A
NB 1
38
0
12
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
50
12
0
1540
0.01
1
1.9
A
1.9
1.1
20.9%
15
ICU Level of Service
A
Synchro 8 Report
Page 4
HCM Unsignalized Intersection Capacity Analysis
5: Scenic Drive/Patricks Point Drive & Main Street
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - PM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30
150
Free
0%
0.93
161
5
12.0
3.5
0
20
70
50
20
40
0.93
54
0.93
22
0.93
54
0.93
43
20
Stop
0%
0.93
22
5
12.0
3.5
0
30
0.93
75
10
Stop
0%
0.93
11
5
12.0
3.5
0
50
0.93
22
150
Free
0%
0.93
161
5
12.0
3.5
0
0.93
32
None
0.93
32
None
220
188
628
612
182
644
596
198
220
4.1
188
4.1
628
7.1
612
6.5
182
6.2
644
7.1
596
6.5
198
6.2
2.2
98
1325
2.2
94
1362
3.5
94
332
4.0
97
369
3.3
94
845
3.5
87
323
4.0
94
377
3.3
96
827
EB 1
215
32
22
1325
0.02
2
1.3
A
1.3
WB 1
290
75
54
1362
0.06
4
2.4
A
2.4
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
86
22
54
546
0.16
14
12.8
B
12.8
B
5.3
49.8%
15
SB 1
97
43
32
422
0.23
22
16.0
C
16.0
C
ICU Level of Service
A
Synchro 8 Report
Page 5
HCM Unsignalized Intersection Capacity Analysis
6: Westhaven Drive & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - PM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
80
Free
0%
0.89
90
5
12.0
3.5
0
160
20
0
0
10
0.89
0
0.89
0
0.89
0
0.89
11
0
Stop
0%
0.89
0
5
12.0
3.5
0
40
0.89
22
0
Stop
0%
0.89
0
5
0.0
3.5
0
0
0.89
180
230
Free
0%
0.89
258
5
12.0
3.5
0
0.89
0
None
0.89
45
None
263
275
538
493
190
493
583
268
263
4.1
275
4.1
538
7.1
493
6.5
190
6.2
493
7.1
583
6.5
268
6.2
2.2
100
1277
2.2
98
1271
3.5
100
413
4.0
100
462
3.3
100
840
3.5
98
469
4.0
100
411
3.3
94
756
EB 1
270
0
180
1700
0.16
0
0.0
0.0
WB 1
281
22
0
1271
0.02
1
0.8
A
0.8
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
SB 1
56
11
45
673
0.08
7
10.8
B
10.8
B
1.4
54.3%
15
ICU Level of Service
A
Synchro 8 Report
Page 6
HCM Unsignalized Intersection Capacity Analysis
7: Westhaven Drive & US 101 NB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - PM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30
60
Free
0%
0.92
65
5
12.0
3.5
0
0
0
10
200
0
0.92
11
0.92
217
0.92
22
0.92
0
0
Stop
0%
0.92
0
5
0.0
3.5
0
0
0.92
0
0
Stop
0%
0.92
0
5
12.0
3.5
0
20
0.92
0
50
Free
0%
0.92
54
5
12.0
3.5
0
0.92
33
None
0.92
0
None
70
70
200
206
75
222
200
70
70
4.1
70
4.1
200
7.1
206
6.5
75
6.2
222
7.1
200
6.5
70
6.2
2.2
98
1511
2.2
100
1504
3.5
70
730
4.0
100
668
3.3
98
969
3.5
100
694
4.0
100
672
3.3
100
980
EB 1
98
33
0
1511
0.02
2
2.6
A
2.6
WB 1
65
0
11
1700
0.04
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
NB 1
239
217
22
746
0.32
35
12.1
B
12.1
B
7.8
41.8%
15
ICU Level of Service
A
Synchro 8 Report
Page 7
HCM Unsignalized Intersection Capacity Analysis
8: Westhaven Drive/Trinadad Frontage Road
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2020 Base Conditions - PM
7/19/2013
EBL
EBR
NBL
NBT
SBT
SBR
20
Free
0%
0.92
22
5
12.0
3.5
0
60
40
0.92
43
10
Stop
0%
0.92
11
5
12.0
3.5
0
20
0.92
65
0
Stop
0%
0.92
0
5
12.0
3.5
0
0.92
22
None
5
81
53
119
10
5
4.1
81
7.1
53
6.5
119
6.5
10
6.2
2.2
99
1589
3.5
95
848
4.0
100
813
4.0
99
748
3.3
98
1053
EB 1
87
22
65
1589
0.01
1
1.9
A
1.9
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
43
43
0
848
0.05
4
9.5
A
9.5
A
SB 1
33
0
22
927
0.04
3
9.0
A
9.0
A
5.3
Err%
15
ICU Level of Service
H
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
9: Scenic Drive & Baker Ranch Drive
Year 2020 Base Conditions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.82
0
5
12.0
3.5
0
10
30
Free
0%
0.82
37
5
12.0
3.5
0
0
10
0.82
0
0.82
12
40
Free
0%
0.82
49
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.82
12
None
None
120
47
42
120
6.4
47
6.2
42
4.1
3.5
100
854
3.3
99
1005
2.2
99
1541
WB 1
12
0
12
1005
0.01
1
8.6
A
8.6
A
NB 1
37
0
0
1700
0.02
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
61
12
0
1541
0.01
1
1.5
A
1.5
1.8
21.6%
15
ICU Level of Service
A
Synchro 8 Report
Page 9
HCM Unsignalized Intersection Capacity Analysis
10: Scenic Drive & Cher-Ae Height Casino Drive
Year 2020 Base Conditions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
10
Stop
0%
0.82
12
5
12.0
3.5
0
20
40
Free
0%
0.82
49
5
12.0
3.5
0
0
0
0.82
0
0.82
0
40
Free
0%
0.82
49
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.82
24
None
None
108
59
54
108
6.4
59
6.2
54
4.1
3.5
99
874
3.3
98
989
2.2
100
1525
WB 1
37
12
24
948
0.04
3
9.0
A
9.0
A
NB 1
49
0
0
1700
0.03
0
0.0
SB 1
49
0
0
1700
0.03
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
2.4
16.4%
15
ICU Level of Service
A
Synchro 8 Report
Page 10
HCM Unsignalized Intersection Capacity Analysis
11: Cher-Ae Lane & Scenic Drive
Year 2020 Base Conditions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
10
Stop
0%
0.77
13
5
12.0
3.5
0
30
50
Free
0%
0.77
65
5
12.0
3.5
0
10
70
0.77
13
0.77
91
30
Free
0%
0.77
39
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.77
39
None
None
302
81
83
302
6.4
81
6.2
83
4.1
3.5
98
635
3.3
96
961
2.2
94
1488
WB 1
52
13
39
852
0.06
5
9.5
A
9.5
A
NB 1
78
0
13
1700
0.05
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
130
91
0
1488
0.06
5
5.4
A
5.4
4.6
25.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 11
HCM Unsignalized Intersection Capacity Analysis
12: Scenic Drive & Lanford Road
Year 2020 Base Conditions - PM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
10
Stop
0%
0.80
12
5
12.0
3.5
0
10
70
Free
0%
0.80
88
5
12.0
3.5
0
0
10
0.80
0
0.80
12
100
Free
0%
0.80
125
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.80
12
None
None
248
98
92
248
6.4
98
6.2
92
4.1
3.5
98
721
3.3
99
941
2.2
99
1476
WB 1
25
12
12
817
0.03
2
9.5
A
9.5
A
NB 1
88
0
0
1700
0.05
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
138
12
0
1476
0.01
1
0.7
A
0.7
1.4
25.6%
15
ICU Level of Service
A
Synchro 8 Report
Page 12
HCM Unsignalized Intersection Capacity Analysis
1: 6th Ave & Kay Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2040 Base Conditions - AM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
10
20
Free
0%
0.88
23
5
12.0
3.5
0
10
Free
0%
0.88
11
5
12.0
3.5
0
40
30
Stop
0%
0.88
34
5
12.0
3.5
0
10
None
None
0.88
11
0.88
45
0.88
11
62
90
44
62
4.1
90
6.4
44
6.2
2.2
99
1515
3.5
96
888
3.3
99
1008
EB 1
34
11
0
1515
0.01
1
2.5
A
2.5
WB 1
57
0
45
1700
0.03
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
45
34
11
916
0.05
4
9.1
A
9.1
A
3.7
20.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
2: 6th Ave & Kahlstrom Ave
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2040 Base Conditions - AM
7/19/2013
EBL
EBT
WBT
WBR
SBL
SBR
20
30
Free
0%
0.88
34
5
12.0
3.5
0
30
Free
0%
0.88
34
5
12.0
3.5
0
50
10
Stop
0%
0.88
11
5
12.0
3.5
0
20
None
None
0.88
23
0.88
57
0.88
23
96
152
72
96
4.1
152
6.4
72
6.2
2.2
98
1472
3.5
99
812
3.3
98
972
EB 1
57
23
0
1472
0.02
1
3.1
A
3.1
WB 1
91
0
57
1700
0.05
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
34
11
23
912
0.04
3
9.1
A
9.1
A
2.7
21.6%
15
ICU Level of Service
A
Synchro 8 Report
Page 2
HCM Unsignalized Intersection Capacity Analysis
3: Kay Ave & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2040 Base Conditions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
10
Stop
0%
0.88
11
5
12.0
3.5
0
0
0
0
0
0
0.88
0
0.88
0
0.88
57
0.88
0
40
Free
0%
0.88
45
5
12.0
3.5
0
0
0.88
0
0
Free
0%
0.88
0
5
12.0
3.5
0
50
0.88
0
0
Stop
0%
0.88
0
5
0.0
3.5
0
0.88
0
None
None
84
112
55
61
55
10
50
62
84
7.1
112
6.5
55
6.2
61
7.1
55
6.5
10
6.2
50
4.1
62
4.1
3.5
100
884
4.0
99
769
3.3
100
993
3.5
100
909
4.0
100
826
3.3
100
1058
2.2
100
1530
2.2
100
1522
EB 1
11
0
0
769
0.01
1
9.8
A
9.8
A
NB 1
57
0
57
1700
0.03
0
0.0
SB 1
45
0
0
1700
0.03
0
0.0
0.0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
1.0
17.4%
15
ICU Level of Service
0.88
0
A
Synchro 8 Report
Page 3
HCM Unsignalized Intersection Capacity Analysis
4: Kahlstrom Ave & 7th Avenue
Year 2040 Base Conditions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
10
Stop
0%
0.88
11
5
12.0
3.5
0
10
60
Free
0%
0.88
68
5
12.0
3.5
0
10
10
0.88
11
0.88
11
20
Free
0%
0.88
23
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.88
11
None
None
129
84
85
129
6.4
84
6.2
85
4.1
3.5
99
843
3.3
99
958
2.2
99
1486
WB 1
23
11
11
897
0.03
2
9.1
A
9.1
A
NB 1
80
0
11
1700
0.05
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
34
11
0
1486
0.01
1
2.5
A
2.5
2.1
20.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 4
HCM Unsignalized Intersection Capacity Analysis
5: Scenic Drive/Patricks Point Drive & Main Street
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2040 Base Conditions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30
150
Free
0%
0.88
170
5
12.0
3.5
0
20
50
20
20
50
0.88
23
0.88
23
0.88
34
0.88
57
10
Stop
0%
0.88
11
5
12.0
3.5
0
30
0.88
57
10
Stop
0%
0.88
11
5
12.0
3.5
0
30
0.88
23
220
Free
0%
0.88
250
5
12.0
3.5
0
0.88
34
None
0.88
34
None
278
198
675
646
192
675
646
271
278
4.1
198
4.1
675
7.1
646
6.5
192
6.2
675
7.1
646
6.5
271
6.2
2.2
97
1262
2.2
96
1350
3.5
93
316
4.0
97
357
3.3
96
834
3.5
82
318
4.0
97
357
3.3
95
753
EB 1
227
34
23
1262
0.03
2
1.4
A
1.4
WB 1
330
57
23
1350
0.04
3
1.7
A
1.7
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
68
23
34
471
0.14
13
13.9
B
13.9
B
4.9
45.7%
15
SB 1
102
57
34
399
0.26
25
17.1
C
17.1
C
ICU Level of Service
A
Synchro 8 Report
Page 5
HCM Unsignalized Intersection Capacity Analysis
6: Westhaven Drive & US 101 SB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2040 Base Conditions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
0
60
Free
0%
0.88
68
5
12.0
3.5
0
170
30
0
0
10
0.88
0
0.88
0
0.88
0
0.88
11
0
Stop
0%
0.88
0
5
12.0
3.5
0
30
0.88
34
0
Stop
0%
0.88
0
5
0.0
3.5
0
0
0.88
193
260
Free
0%
0.88
295
5
12.0
3.5
0
0.88
0
None
0.88
34
None
300
266
572
538
175
538
635
305
300
4.1
266
4.1
572
7.1
538
6.5
175
6.2
538
7.1
635
6.5
305
6.2
2.2
100
1238
2.2
97
1280
3.5
100
394
4.0
100
431
3.3
100
857
3.5
97
434
4.0
100
380
3.3
95
720
EB 1
261
0
193
1700
0.15
0
0.0
0.0
WB 1
330
34
0
1280
0.03
2
1.0
A
1.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
SB 1
45
11
34
619
0.07
6
11.3
B
11.3
B
1.3
57.7%
15
ICU Level of Service
B
Synchro 8 Report
Page 6
HCM Unsignalized Intersection Capacity Analysis
7: Westhaven Drive & US 101 NB Ramps
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2040 Base Conditions - AM
7/19/2013
EBL
EBT
EBR
WBL
WBT
WBR
NBL
NBT
NBR
SBL
SBT
SBR
30
40
Free
0%
0.88
45
5
12.0
3.5
0
0
0
10
210
0
0.88
11
0.88
239
0.88
34
0.88
0
0
Stop
0%
0.88
0
5
0.0
3.5
0
0
0.88
0
0
Stop
0%
0.88
0
5
12.0
3.5
0
30
0.88
0
80
Free
0%
0.88
91
5
12.0
3.5
0
0.88
34
None
0.88
0
None
107
50
220
226
55
254
220
107
107
4.1
50
4.1
220
7.1
226
6.5
55
6.2
254
7.1
220
6.5
107
6.2
2.2
98
1465
2.2
100
1530
3.5
66
707
4.0
100
649
3.3
97
993
3.5
100
652
4.0
100
654
3.3
100
935
EB 1
80
34
0
1465
0.02
2
3.3
A
3.3
WB 1
102
0
11
1700
0.06
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
NB 1
273
239
34
733
0.37
43
12.8
B
12.8
B
8.3
42.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 7
HCM Unsignalized Intersection Capacity Analysis
8: Westhaven Drive/Trinadad Frontage Road
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
Year 2040 Base Conditions - AM
7/19/2013
EBL
EBR
NBL
NBT
SBT
SBR
30
Free
0%
0.88
34
5
12.0
3.5
0
40
60
0.88
68
0
Stop
0%
0.88
0
5
12.0
3.5
0
30
0.88
45
10
Stop
0%
0.88
11
5
12.0
3.5
0
0.88
34
None
5
112
78
124
10
5
4.1
112
7.1
78
6.5
124
6.5
10
6.2
2.2
98
1589
3.5
92
803
4.0
99
782
4.0
100
738
3.3
97
1053
EB 1
80
34
45
1589
0.02
2
3.2
A
3.2
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
NB 1
80
68
0
800
0.10
8
10.0
A
10.0
A
SB 1
34
0
34
1053
0.03
3
8.5
A
8.5
A
7.0
Err%
15
ICU Level of Service
H
Synchro 8 Report
Page 1
HCM Unsignalized Intersection Capacity Analysis
9: Scenic Drive & Baker Ranch Drive
Year 2040 Base Conditions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.88
0
5
12.0
3.5
0
0
30
Free
0%
0.88
34
5
12.0
3.5
0
10
10
0.88
11
0.88
11
20
Free
0%
0.88
23
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.88
0
None
None
95
50
50
95
6.4
50
6.2
50
4.1
3.5
100
882
3.3
100
1001
2.2
99
1530
WB 1
0
0
0
1700
0.00
0
0.0
A
0.0
A
NB 1
45
0
11
1700
0.03
0
0.0
Intersection Summary
Average Delay
Intersection Capacity Utilization
Analysis Period (min)
Trinidad Area Freeway Masterplan Study
Omni-Means
0.0
SB 1
34
11
0
1530
0.01
1
2.5
A
2.5
1.1
20.2%
15
ICU Level of Service
A
Synchro 8 Report
Page 9
HCM Unsignalized Intersection Capacity Analysis
10: Scenic Drive & Cher-Ae Height Casino Drive
Year 2040 Base Conditions - AM
7/19/2013
Movement
Lane Configurations
Volume (veh/h)
Sign Control
Grade
Peak Hour Factor
Hourly flow rate (vph)
Pedestrians
Lane Width (ft)
Walking Speed (ft/s)
Percent Blockage
Right turn flare (veh)
Median type
Median storage veh)
Upstream signal (ft)
pX, platoon unblocked
vC, conflicting volume
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
tC, single (s)
tC, 2 stage (s)
tF (s)
p0 queue free %
cM capacity (veh/h)
WBL
WBR
NBT
NBR
SBL
SBT
0
Stop
0%
0.88
0
5
12.0
3.5
0
20
30
Free
0%
0.88
34
5
12.0
3.5
0
0
0
0.88
0
0.88
0
30
Free
0%
0.88
34
5
12.0
3.5
0
Direction, Lane #
Volume Total
Volume Left
Volume Right
cSH
Volume to Capacity
Queue Length 95th (ft)
Control Delay (s)
Lane LOS
Approach Delay (s)
Approach LOS
0.88
23
None
None
78
44
39
78
6.4
44
6.2
39
4.1
3.5
100