TRIBAL HAZARD MITIGATION PLAN
Tribal code
Ask Donna
What actually matters in this document.
Text
3
TRIBAL HAZARD MITIGATION PLAN
4
2026 UPDATE
AF
5
T
2
BEAR RIVER BAND OF THE ROHNERVILLE
RANCHERIA
1
PREPARED FOR PUBLIC REVIEW
6
Prepared by the Office of Emergency Services
7
Bear River Band of the Rohnerville Rancheria • 266 Keisner Road, Loleta, CA 95551
Original Plan Adopted February 18, 2021 (Resolution No. 21-11) • FEMA Region IX Approved March 30,
8
9
2022
R
This update prepared pursuant to 44 CFR § 201.7 and the Disaster Mitigation Act of 2000
D
10
11
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page1of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PLAN OVERVIEW
12
Detail
Tribal Jurisdiction
ear River Band of the Rohnerville Rancheria (BRB), a federally recognized
B
sovereign Tribal nation
Plan Type
Tribal Hazard Mitigation Plan — Five-Year Update (44 CFR § 201.7)
Prior Plan
dopted February 18, 2021 (Resolution No. 21-11); revised October 2021 and
A
January 2022; FEMA approved March 30, 2022
Planning Period
2026–2031
Point of Contact
Amanda Gonzales, Office of Emergency Services Manager
Plan Support
Nicholas Anderson, Office of Emergency Services Logistics Coordinator
Address
266 Keisner Road, Loleta, CA 95551
Guiding Philosophy
“Healing the land heals the people.”
Community Pillars
Quality of Life • Self-Sufficiency • Sustainability • Cultural Awareness
Disaster History
Plan Status
2026 Tribal THIRA; 2025 SPR; BRB Emergency Operations Plan (July 2025)
EMA-4692-DR (December 20, 2022 M6.4 earthquake); December
F
earthquake trilogy 2021, 2022, 2024
onsolidated working draft for public review; placeholders marked in red
C
pending completion
D
R
13
AF
Companion Documents
T
Item
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page2of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
TABLE OF CONTENTS
14
15PLAN OVERVIEW
16TABLE OF CONTENTS
17EXECUTIVE SUMMARY
18PART ONE: INTRODUCTION
.1 Purpose and Background
1
20
1.2 Regulatory Basis
21
1.3 FEMA Mitigation Grant Programs
22
1.4 Tribal Mitigation Vision and Mission
23
Mitigation Vision
24
Mitigation Mission
25
1.5 The Four Community Pillars
26
1.6 Plan Goals
27
1.7 Plan Organization
28PART TWO: PLANNING PROCESS
29
2.1 Description of the Planning Process
30
2.2 Public Participation
31
Hazards Experienced by the Community
32
Critical Facilities and Infrastructure Priorities
33
What We Heard: Locations, Suggestions, and Readiness
34
2.3 Stakeholder and Intergovernmental Coordination
35
2.4 Integration with THIRA, SPR, and Other Tribal Planning
36
2.5 Review and Incorporation of Existing Plans, Studies, and Reports
37
2.6 Government-to-Government Relationship
38PART THREE: COMMUNITY AND LAND PROFILE
39
3.1 Overview
40
3.2 History and Connection to Land
41
The 1860 Coordinated Massacres and Aftermath
42
The Indian Boarding School Era
43
The 1958 Termination and the Tillie Hardwick Lawsuit
44
The Salmon Ceremony — Cultural Restoration and Ecological Stewardship
45
3.3 Governance
46
3.4 Tribal Lands
47
3.5 Population and Vulnerable Populations
48
3.6 Critical Facilities
49
3.7 Transportation and Access
50
3.8 Water Systems and Fire Protection Infrastructure
51
3.8.1 Tish Non Water System and February 2026 Hydrant Flow Test
52
3.8.2 Resort Reclaimed Water System
53
3.9 Public Safety Services
D
R
AF
T
19
2
3
4
5
5
5
5
6
6
6
6
6
6
8
8
9
9
10
10
12
12
12
13
15
15
17
17
17
17
18
18
18
20
20
21
24
24
25
25
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page3of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
.9.1 Law Enforcement
3
55
3.9.2 Fire Protection
56
3.10 Emergency Operations and Alerting
57
3.11 Cultural Resources
58PART FOUR: RISK ASSESSMENT
59
4.1 Methodology
60
4.2 Climate Change as a Force Multiplier
61
4.3 Hazard Summary and Priority Rankings
62
4.4 Earthquake
63
Hazard Profile — Type, Location, Extent
64
Previous Occurrences — The December Trilogy
65
Probability, Impacts, and Vulnerability
66
4.5 Pandemic / Public Health Emergency
67
4.6 Fire and Wildfire
68
Hazard Profile
69
Regional Wildfire History
70
Fire Flow Baseline
71
4.7 Flooding (Localized and Riverine)
72
Hazard Profile
73
4.8 Severe Weather and Climate Change
74
4.9 Drought and Water Shortage
75
4.10 Tsunami and Coastal Hazards
76
4.11 Transportation and Access Hazards
77
4.12 Cyberattack
78
4.13 Other Hazards
79
4.14 Tribal Capability Assessment
80
4.15 Overall Vulnerability Summary and Loss Estimation
81PART FIVE: MITIGATION STRATEGY AND ACTION PLAN
82
5.1 Strategy Framework
83
5.2 Regulatory Framework
84
5.3 Status of 2021 THMP Mitigation Actions
85
5.4 Prioritization Criteria
86
5.5 Goals and Objectives
87
5.6 Mitigation Actions — Detail Sheets
88
Action 5.6.1 — Tribal Fire Program — Phase 1 (Priority 1)
89
Action 5.6.2 — Bear River Police Department Reinstatement
90
Action 5.6.3 — Emergency Resilience Campus — Singley Hill Corridor
91
Action 5.6.4 — Singley Hill Corridor and Secondary Egress Program
92
Action 5.6.5 — Recreation Center Generator and 30-Day Fuel Capability
93
Action 5.6.6 — Resort Seismic Assessment (Active HMGP Project)
94
HMGP - 4692 - Seismic Retrofit and Slope Stabilization Project
5
2
25
25
26
27
27
27
28
29
29
30
31
34
34
34
34
35
37
37
38
39
39
42
43
43
43
44
45
45
45
45
46
47
47
47
47
48
48
49
49
49
D
R
AF
T
54
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page4of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
ction 5.6.7 — Mattole Beach Emergency Protocol
A
49
96
Action 5.6.8 — FEMA-4692-DR Public Assistance Contract Execution
50
97
5.7 Mitigation Actions 9 through 26
50
98
5.8 Master Priority Summary — All 26 Actions
53
99
5.9 Funding Strategy
54
100PART SIX: PLAN MAINTENANCE
55
101 6.1 Monitoring
55
102 6.2 Evaluation
55
103 6.3 Updating
55
104 6.4 Continued Public Participation
55
105 6.5 Integration into Other Planning Mechanisms
55
106 6.6 Project Closeout
55
107 6.7 Assurances
56
108APPENDIX A: PLANNING PROCESS DOCUMENTATION
57
109APPENDIX B: COMMUNITY HAZARD MITIGATION SURVEY
59
110APPENDIX C: TRIBAL STAKEHOLDER OUTREACH DOCUMENTATION
60
111APPENDIX D: MITIGATION ACTION COMPLETION REPORT (MACR) TEMPLATE
61
112APPENDIX E: TRIBAL COUNCIL ADOPTION RESOLUTION
62
113APPENDIX F: ENERGY EMERGENCY PLAN
63
114APPENDIX G: PET AND SERVICE ANIMAL EMERGENCY PLAN
64
115APPENDIX H: SEVERE WEATHER EMPLOYEE TRAINING MODULE
65
116APPENDIX I: PRE-STORM CULVERT AND DRAINAGE INSPECTION PROTOCOL
66
117APPENDIX J: FLOODING ENGINEERING DOCUMENTATION
67
118PRE-SUBMISSION CHECKLIST (INTERNAL — REMOVE BEFORE PUBLIC RELEASE AND
119FEMA SUBMISSION)
68
D
R
AF
T
95
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page5of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
EXECUTIVE SUMMARY
120
21The Bear River Band of the Rohnerville Rancheria (BRB or the Tribe) is a federally recognized
1
122sovereign Tribal nation located in Humboldt County, California. This Tribal Hazard Mitigation
123Plan (THMP) is the Tribe's five-year update to its original plan, adopted February 18, 2021 and
124approved by FEMA Region IX on March 30, 2022. The plan is prepared pursuant to 44 CFR §
125201.7 and the Disaster Mitigation Act of 2000, and its approval maintains the Tribe's eligibility for
126FEMA hazard mitigation assistance, including the Hazard Mitigation Grant Program (HMGP)
127and Building Resilient Infrastructure and Communities (BRIC).
T
28This plan is organized around four community pillars articulated by the Tribe: Quality of Life,
1
129Self-Sufficiency, Sustainability, and Cultural Awareness, anchored by the guiding philosophy that
130healing the land heals the people. These pillars are not decorative framing — they are the
131substantive organizing logic of the plan. Mitigation priorities reflect Tribal values and institutional
132goals, including workforce development and cultural healing, and not simply hazard frequency
133or severity.
AF
34The period since the 2021 plan has been eventful. On December 20, 2022, a magnitude 6.4
1
135earthquake struck offshore of Ferndale, causing documented damage across ten Tribal facilities
136and resulting in a Presidential Major Disaster Declaration (FEMA-4692-DR) — the Tribe's first
137direct declaration. December earthquakes in 2021, 2022, and 2024 form a three-event trilogy
138that has elevated seismic risk to the Tribe's highest hazard priority. In February 2026 the Tribe
139conducted its first-ever hydrant flow test of all 16 hydrants on the Tish Non water system per
140NFPA 291. Whitchurch Engineering documented six localized flooding sites in March 2024
141(Project BRB2401), identifying systemic infrastructure maintenance governance failure as the
142root cause, and the Bureau of Reclamation has funded infrastructure improvements under
143Agreement R25AP00342.
R
44This update identifies ten hazards, presents tribal-specific vulnerability data as primary (with
1
145regional data as supplemental context, per FEMA's 2022 review guidance), documents the
146status of all 15 mitigation actions from the 2021 plan, and establishes 26 mitigation actions for
147the 2026–2031 cycle. The highest priorities include establishment of a Tribal Fire Program
148(Priority 1 — framed as workforce development, cultural revitalization, and land healing),
149reinstatement of the Bear River Police Department, development of an Emergency Resilience
150Campus on the Singley Hill corridor adjacent to the Rancheria, secondary egress via Bowie
151Road to Echo Lane, and execution of the approved but unspent FEMA Public Assistance
152contract under FEMA-4692-DR.
D
53This plan is a public document. Operationally sensitive details are maintained in the BRB
1
154Emergency Operations Plan and are not reproduced here. Members of the Tribal community
155and the public are invited to review this draft and provide comment to the Office of Emergency
156Services before the plan is finalized for Tribal Council adoption and FEMA Region IX
157submission.
158
159 Released for Public Comment on: 8/4/2026
160 Closed for Review on: 9/14/2026
161
162
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page6of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PART ONE: INTRODUCTION
163
1641.1 Purpose and Background
65The purpose of this Tribal Hazard Mitigation Plan is to identify the natural and human-caused
1
166hazards that threaten the Bear River Band of the Rohnerville Rancheria, assess the Tribe's
167vulnerability to those hazards, and establish a prioritized strategy of mitigation actions that
168reduce long-term risk to life, property, the Tribal economy, and cultural resources. Hazard
169mitigation is sustained action taken to reduce or eliminate long-term risk — it is distinct from
170preparedness, response, and recovery, though it strengthens all three.
1771.2 Regulatory Basis
T
71This plan is an update to the Tribe's original THMP, adopted by Tribal Council on February 18,
1
1722021 under Resolution No. 21-11 and approved by FEMA Region IX on March 30, 2022
173following revisions in October 2021 and January 2022. As a plan update, this document
174addresses the additional requirements of 44 CFR § 201.7(d)(3): changes in development,
175progress on prior mitigation actions, and changes in priorities are documented throughout,
176principally in Part Five.
•
•
•
•
•
•
isaster Mitigation Act of 2000 (DMA 2000), amending the Robert T. Stafford Disaster
D
Relief and Emergency Assistance Act
44 CFR § 201.7 — Tribal Mitigation Plans, establishing the criteria for FEMA approval of
tribal plans
Sandy Recovery Improvement Act of 2013 (SRIA), which established federally
recognized tribes' authority to request Presidential disaster declarations directly,
affirming the government-to-government relationship
Robert T. Stafford Act §§ 203, 404, and 406 — pre-disaster mitigation, Hazard Mitigation
Grant Program, and Public Assistance mitigation
2 CFR Parts 200 and 3002 — uniform administrative requirements for federal awards
Executive Order 13175 — Consultation and Coordination with Indian Tribal
Governments
R
79
1
180
181
182
183
184
185
186
187
188
189
190
AF
178This plan is prepared under the following federal authorities:
D
91As a federally recognized sovereign nation, BRB engages with FEMA on a
1
192government-to-government basis. This plan is submitted directly to FEMA Region IX and does
193not require state review.
1941.3 FEMA Mitigation Grant Programs
95An approved THMP maintains the Tribe's eligibility for FEMA Hazard Mitigation Assistance,
1
196including the Hazard Mitigation Grant Program (HMGP), Building Resilient Infrastructure and
197Communities (BRIC), and Flood Mitigation Assistance (FMA), as well as mitigation opportunities
198within Public Assistance (PA Categories C–G). The Tribe has a Presidential Major Disaster
199Declaration (FEMA-4692-DR) establishing direct HMGP eligibility, an active HMGP-funded
200seismic assessment project, and an approved PA contract pending execution. BRB is actively
201pursuing both HMGP and BRIC funding opportunities as of the date of this plan update.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page7of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
2021.4 Tribal Mitigation Vision and Mission
203Mitigation Vision
04To create a vibrant Tribal community that promotes safety through preventative planning,
2
205training, and the implementation of strategies designed to avoid or mitigate potential risks to
206Tribal citizens, Rancheria visitors, and Tribal assets — including those on the main Rancheria,
207discontiguous Tribal lands, and ancestral territories where Tribal members gather.
208Mitigation Mission
2131.5 The Four Community Pillars
T
09To protect the Tribal community and its resources through the establishment of an integrated
2
210mitigation program that helps BRB prevent and reduce the incidence of injury and damage from
211hazards, assert Tribal authority over public safety on Tribal trust lands, and build long-term
212community resilience consistent with Tribal sovereignty and self-determination.
Pillar
Meaning in This Plan
Quality of Life
rotecting the health, safety, housing, and daily well-being of Tribal citizens,
P
elders, children, and employees
Self-Sufficiency
uilding Tribal capability to respond to and recover from emergencies without
B
dependence on outside agencies whose response is delayed or uncertain
Sustainability
Investing in infrastructure, energy, and water systems that endure across
generations and changing climate conditions
rotecting ceremonial sites, cultural practices, language, and the Tribe's
P
relationship with ancestral lands — recognizing that cultural restoration is itself
mitigation
R
Cultural Awareness
217
AF
14Every mitigation action in this plan advances one or more of four community pillars established
2
215by the Tribe. Together with the guiding philosophy that healing the land heals the people, these
216pillars are the organizing logic of the plan:
D
2181.6 Plan Goals
19Goal 1:Preserve human life at BRB Rancheria and protectthe health, safety, and well-being of
2
220Tribal citizens, Tribal employees, and visitors to BRB Rancheria and Tribal lands.
21Goal 2:Protect and safeguard BRB property, includingbuildings, water, electrical and other
2
222utilities, equipment, land, cultural resources, and environmental resources.
23Goal 3:Preserve and protect Tribal government andeconomic enterprises from interruption and
2
224implement mitigation strategies that reduce the likelihood of long-term disruptions.
2251.7 Plan Organization
226Table 1-1: Plan Organization
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page8of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
Title
Description
Part One
Introduction
urpose, regulatory basis, grant programs, vision, mission,
P
and goals
Part Two
Planning Process
lan update process, committee membership, public
P
participation, and agency coordination
Part Three
Community and Land Profile
ribal history, lands, facilities, population, infrastructure, and
T
public services
Part Four
Risk Assessment
azard identification, profiling, vulnerability assessment, and
H
loss estimation
Part Five
itigation Strategy and
M
Action Plan
oals, objectives, and 26 mitigation actions with responsible
G
parties and timelines
Part Six
Plan Maintenance
Monitoring, evaluation, and update procedures
227
T
Part
228Supporting documentation is provided in the following appendices:
AF
•
•
•
•
•
•
•
•
•
ppendix A: Planning Process Documentation — meeting notes, sign-in sheets, and
A
planning timeline
Appendix B: Community Hazard Mitigation Survey — instrument and results
Appendix C: Tribal Stakeholder Outreach Documentation
Appendix D: Mitigation Action Completion Report (MACR) Template
Appendix E: Tribal Council Adoption Resolution
Appendix F: Energy Emergency Plan
Appendix G: Pet and Service Animal Emergency Plan
Appendix H: Severe Weather Employee Training Module
Appendix I: Pre-Storm Culvert and Drainage Inspection Protocol
Appendix J: Flooding Engineering Documentation
R
•
D
29
2
230
231
232
233
234
235
236
237
238
239
240
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page9of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PART TWO: PLANNING PROCESS
241
2422.1 Description of the Planning Process
43To update this THMP, the Bear River Band of the Rohnerville Rancheria reconvened its Hazard
2
244Mitigation Planning Committee and initiated a structured, phased planning process led by
245Amanda Gonzales, Office of Emergency Services Manager, with support from Nicholas
246Anderson, Office of Emergency Services Logistics Coordinator.
252Table 2-1: Hazard Mitigation Planning Committee
Role
Office of Emergency Services
Plan Lead / Coordinator
Tribal Administration
Committee Member
Information Technology
Grants Management
AF
Department
Human Resources
253
T
47The planning process was designed to meet the requirements of 44 CFR § 201.7(b) and (c),
2
248which require that the process: (1) include an opportunity for neighboring communities, local
249and regional agencies, businesses, and other organizations to be involved; (2) include the
250public; and (3) be conducted in a manner consistent with the government-to-government
251relationship between the Tribe and federal agencies.
Committee Member
Committee Member
Committee Member
Facilities and Maintenance
Committee Member
Finance
Committee Member
257
D
258
R
54Meeting notes and sign-in sheets are maintained on file at the BRB Office of Emergency
2
255Services ; the planning process, partner engagement, and schedule are documented in
256Appendix A.
259
260
261
262
263
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page10of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
2642.2 Public Participation
65As part of the public participation process for this plan update, the Office of Emergency Services
2
266distributedacommunityhazardsurveytoTribalcitizens,Tribalgovernmentemployees,andresidentsof
267the planning area. Respondents rated their level of concern for eight hazards on a five-point scale,
268identified hazards that have personally affected their households, ranked the community facilities and
269infrastructure they considered most critical to protect, and assessed householdpreparedness,warning
270system effectiveness, and evacuation readiness. Respondents were also invited to identify specific
271hazardous locations and to suggest mitigation actions in their own words. The survey instrument and
272complete response tabulation are provided in Appendix B.
T
73SurveyparticipationspannedenrolledTribalmemberslivingontrustland,Tribalgovernmentemployees,
2
274andnon-memberresidentsoftheplanningarea,withtenureintheplanningarearangingfromunderfive
275years to more than twenty. Results wereusedtovalidatethehazardrankingsdevelopedbytheTHMP
276Planning Team and directly informed the prioritization of mitigation actions in Part Five.
277Community Hazard Concerns
Average Concern
Rating (1–5)
R
Hazard
AF
78Earthquake registered the highest community concern of any hazard, consistent with theTribe'sdirect
2
279experienceoftheDecemberearthquakesequenceof2021,2022,and2024andthedamagessustained
280acrosstenTribalfacilitiesunderFEMA-4692-DR.Poweroutagerankedsecond—anotableresult,asit
281confirms thatthecommunityexperiencesenergydisruptionasahazardinitsownrightratherthanonly
282as a secondary effect, and it directly supports the priority placed on the Energy Emergency Plan
283(AppendixF)andbackuppoweractionsinPartFive.Severeweatherandlandslide/erosionrankedthird
284atequivalentlevels;elevatedconcernforlandslideanderosionalignswiththeslopeandbankinstability
285documented in the Whitchurch Engineering assessment (BRB2401). Concern for droughtandextreme
286heat was comparatively low, consistent with the Rancheria's coastal climate.
Typical Response
Range
Rank
3.7
Very / Extremely
1
Power Outage
3.2
Moderately / Very
2
evere Weather (Thunderstorms,
S
High Winds, Hail)
3.0
Moderately
3 (tie)
Landslide / Erosion
3.0
Moderately
3 (tie)
Wildfire
2.8
Moderately
5
Flooding
2.4
Slightly / Moderately
6
Drought / Water Shortage
1.8
Slightly
7 (tie)
Extreme Heat
1.8
Slightly
7 (tie)
D
Earthquake
87 Table 2-2. Community hazard concern ratings. Averages reflect all responses received for each
2
288
hazard; not every respondent rated every hazard.
289Hazards Experienced by the Community
90Respondentswereaskedwhichhazardshadpersonallyaffectedtheirhouseholdorpropertyinthepast,
2
291including loss of utilities, property damage, or evacuation. Earthquakes accounted for nearlyhalfofall
292reportedimpacts—everyhazardexperienceprofilebutoneincludedit—reinforcingitspositionasthe
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page11of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
93Tribe'sdefininghazard.Reportedimpactsfromsevereweather,flooding,anddrought/waterissueswere
2
294distributed evenly behind it. No respondent reported a past wildfire impact, consistent with wildfire's
295moderateconcernrating;wildfirenonethelessremainsfullyprofiledinPartFourgivenregionalfirehistory
296and the fuels conditions documented in the risk assessment.
Hazard
Reported Past Impacts
45%
Severe Weather (Wind / Storms)
18%
Flooding
18%
Drought / Water Issues
18%
T
Earthquake
Wildfire
0%
97 T
2
able 2-3. Hazards reported by respondents as having personally affected their household or
298 property, as a share of all reported impacts; respondents could select more than one hazard.
299Critical Facilities and Infrastructure Priorities
Facility / Infrastructure
Rank
Water / Wastewater Treatment Plants
22%
1
Power Lines / Power Distribution
19%
2
Major Roadways / Bridges
15%
3 (tie)
Daycare / Youth Development Center
15%
3 (tie)
Tribal Administrative Offices
7%
5 (tie)
Social Services Offices
7%
5 (tie)
Essential Businesses
7%
5 (tie)
Cultural / Historical Sites
4%
8 (tie)
Gaming Offices
4%
8 (tie)
R
Share of Selections
D
AF
00Asked which community buildings and infrastructure are most critical to protectduringahazardevent,
3
301respondentsconvergedstronglyonlifelinesystems:waterandwastewatertreatment,powerdistribution,
302andmajorroadwaysandbridgestogetheraccountedforoverhalfofallselections,withwater/wastewater
303treatment appearing in every respondent's priorities. The Daycare/Youth Development Center ranked
304alongside roadways — a clear community statement that protectionofchildrenandyouthfacilitiesisa
305first-orderpriority.Theseresultsreinforcetheinfrastructurefocusofthemitigationstrategyandalignwith
306the lifeline vulnerabilities identified in the FY 2025 Stakeholder Preparedness Review.
07Table 2-4. Community facilities and infrastructure identified as most critical to protect, as a share
3
308
of all selections.
309
310
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page12of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
311What We Heard: Locations, Suggestions, and Readiness
12The open-ended responses provided some of the most actionable input in the survey. Respondents
3
313identified specific hazardous locations: mature bull pine trees along Singley Hill Road across fromthe
314casino that shed large limbs in high winds; U.S. Highway 101 at Beatrice Hill; Fernbridge as a
315flood-vulnerablecrossing;andthesingle-access,one-way-in/one-way-outconfigurationofportionsofthe
316Rancheria.TheaccessconcerndirectlycorroboratesthesecondaryegressrouteactioninPartFive,and
317the tree hazard reports support the vegetation management actions in the mitigation strategy.
T
18Respondent suggestions for mitigation actions included tree-topping on Tribal home sites (with one
3
319respondent specifically proposing pursuit of Stafford Act Section 404 HazardMitigationGrantProgram
320funding); backup power, water, and connectivity for critical functions; department-level and household
321emergency plans and kits; designated protective location zones for use during disasters; sheltering
322capacity with food, power, heat, and water for displaced persons; and an annual full-scale community
323exercise pairedwithfieldmedicaltrainingandcertification,reflectingtheextendedemergencyresponse
324timescharacteristicofruralcommunities.EachofthesesuggestionswasreviewedbythePlanningTeam
325and is reflected in, or informed the prioritization of, the mitigation actions in Part Five.
D
R
AF
26On community readiness: most respondents rated the Tribe's warning systems(RAVEalerts,text,and
3
327email)aseffectiveorveryeffectiveinreachingthemduringemergencies,withonerespondentreporting
328thesystemsdonotreachthemeffectively—aresultthatsupportscontinuedenrollmentoutreachunder
329the severe weather training program (Appendix H). Household preparedness self-ratings averagedthe
330midpoint of the scale, indicating meaningful room for improvement in household-level readiness.
331Estimatedhouseholdevacuationtimesdividedevenlybetweenunderthirtyminutesandthirtyminutesto
332one hour. Text alerts and email were the most commonchannelsforreceivingemergencyinformation,
333followed by word of mouth and social media. Every respondent expressed willingness or conditional
334willingness to participate in future preparedness and mitigation training — a strong mandate for the
335training and exercise actions in Part Five.
36Figure 2-1: Average community concern rating by hazard, 2026 Community Hazard Mitigation Survey
3
337(five-point scale; see Appendix B for survey instrument and full results).
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page13of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
3382.3 Stakeholder and Intergovernmental Coordination
39Stakeholder coordination for this update ran through the integrated 2025–2026 Tribal
3
340emergency planning sequence. Development of the BRB Emergency Operations Plan (July
3412025) directly engaged regional emergency management entities—including the Humboldt
342County Office of Emergency Services, Loleta Fire Department, CAL FIRE / Fortuna Emergency
343Command Center, and adjacent Tribal nations. Collaborative input from these regional
344stakeholders is integrated across this THMP, alongside capability assessments from the 2025
345SPR and 2026 THIRA. In addition, each government and agency listed below was notified of
346this draft’s availability and invited to comment during the public review period (August 4 –
347September 4, 2026).
•
•
•
•
•
•
•
eighboring Tribal Nations— Wiyot Tribe, Blue LakeRancheria, Cher-Ae Heights
N
Indian Community of the Trinidad Rancheria, Yurok Tribe, Hoopa Valley Tribe, and Karuk
Tribe; regional intertribal cooperation concerning shared hazards and mutual assistance.
Humboldt County Office of Emergency Services— coordinationfor the operational
area, alerting systems, and mass care strategy; active EOP planning contributor.
Loleta Fire Department— structural fire protectionand current JHA; subject of
formalization and sovereignty documentation under Action 5.6.19.
CAL FIRE / Fortuna Emergency Command Center— regionalemergency dispatch
and command services; participant in the Tribal EOP cycle.
Bureau of Indian Affairs— standing coordination regardingfederal trust duties and
wildland fire protection on trust lands (Federal Responsibility Area).
Whitchurch Engineering, Inc.— flooding infrastructureengineering and site-specific
assessments under Project BRB2401.
Bureau of Reclamation— active infrastructure partnershipestablished via Agreement
No. R25AP00342.
U.S. Army Corps of Engineers— study and technicalassistance project focused on
the Mattole Beach area and the Salmon Ceremony; produced the mapping series used
throughout this plan; two-day site visit May 6–7, 2026.
AF
•
R
50
3
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
T
48The Tribe maintains coordination relationships with the following governments and partner
3
349agencies:
3682.4 Integration with THIRA, SPR, and Other Tribal Planning
D
69This THMP is one of three integrated documents in the Tribe's federal emergency planning
3
370framework. The 2026 Tribal Threat and Hazard Identification and Risk Assessment (THIRA)
371establishes capability targets across standardized scenarios; the 2025 Stakeholder
372Preparedness Review (SPR) measures current capability against those targets and identifies
373gaps; and this THMP establishes the mitigation actions that close them. Capability gaps
374identified in the SPR are cited directly in the mitigation action sheets in Part Five. The plan is
375also integrated with the BRB Emergency Operations Plan (July 2025), which contains
376operational detail intentionally excluded from this public document.
3772.5 Review and Incorporation of Existing Plans, Studies, and Reports
378The following documents were reviewed and incorporated into this update:
79
3
380
381
•
RB Tribal Hazard Mitigation Plan (2021, FEMA approved 2022) and FEMA Region IX
B
Plan Review Tool (March 30, 2022) — all Opportunities for Improvement from FEMA's
review are addressed in this update
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page14of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
82
3
383
384
385
386
387
388
389
390
•
•
•
•
•
•
•
026 BRB THIRA and 2025 BRB SPR executive summaries
2
BRB Emergency Operations Plan (July 2025)
Whitchurch Engineering Scoping Letter, Project No. BRB2401 (March 7, 2024) —
six-site flooding assessment
Bureau of Reclamation Agreement No. R25AP00342
FEMA-4692-DR Public Assistance damage documentation (ten facilities)
BRB Hydrant Flow Test Report (February 2026, NFPA 291)
County of Humboldt Hazard Mitigation Plan and CAL FIRE Fire Hazard Severity Zone
mapping (as supplemental regional context)
T
3912.6 Government-to-Government Relationship
92Consistent with the Sandy Recovery Improvement Act of 2013 and Executive Order 13175,
3
393BRB engages FEMA directly as a sovereign government. The Tribe's December 2022
394Presidential Major Disaster Declaration (FEMA-4692-DR) was received directly, and this plan
395will be submitted directly to FEMA Region IX for review and approval. This plan asserts and
396documents Tribal jurisdictional authority over public safety on Tribal trust lands.
399
400
401
402
403
404
405
406
407
408
D
409
R
398
AF
397
410
411
412
413
414
415
416
417
418
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page15of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PART THREE: COMMUNITY AND LAND PROFILE
419
420
AF
22This section provides a
4
423comprehensive profile of
424the Bear River Band of
425the Rohnerville
426Rancheria, including its
427history, governance,
428demographics, land
429holdings, critical
430facilities, infrastructure,
431and public services.
432This information forms
433the foundation for the
434risk assessment in Part
435Four and for the
436mitigation actions in Part
437Five.
T
4213.1 Overview
D
R
38Understanding the
4
439community profile in the
440context of BRB's history
441is essential to
442understanding why
443current vulnerabilities
444exist. The Tribe's history
445of dispossession,
446termination, and
447restoration is not
448background information
449— it is direct causal
450context for the
451infrastructure gaps,
452dispersed population,
453and institutional capacity
454constraints that define
455BRB's current hazard
456vulnerability.
57
4
458
459
460
461
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page16of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
4623.2 History and Connection to Land
T
63The Bear River Band of the Rohnerville Rancheria is a federation of Wiyot and Eel River, Bear
4
464River, and Mattole peoples whose ancestors have inhabited what is now Humboldt County since
465time immemorial. These peoples maintained — and continue to maintain — deep cultural,
466spiritual, and ecological relationships with the rivers, forests, coastline, and lands of the region.
467The Mattole River watershed, the Humboldt coast, and the territory surrounding the Eel River
468are not simply geographic references in this plan; they are ancestral homelands central to Tribal
469identity, ceremony, and the well-being of Tribal members today. The Tribe's present
470demographic profile, geographic dispersal, and hazard vulnerabilities are direct consequences
471of documented historical policies of violence, displacement, and cultural suppression. This
472history is not background context. It is the foundation of this plan.
473The 1860 Coordinated Massacres and Aftermath
AF
74Following the 1849 Gold Rush, settlers flooded the Humboldt Bay, Eel River, and Bear River
4
475basins, seizing hunting grounds and converting indigenous lands into private ranches. On
476February 26, 1860, a secret committee of settlers launched coordinated, simultaneous attacks
477on Native villages at Table Bluff, Eel River, Bear River, and the Mattole Valley. The Indian Island
478(Duluwat Island) massacre killed an estimated 80 to 250 Wiyot people — primarily women,
479children, and elders — during a traditional World Renewal Ceremony. Survivors were marched
480to Fort Humboldt, where nearly half died from starvation and disease. Approximately 450
481survivors were forcibly marched to the Klamath River Reservation; when that reservation was
482destroyed in the 1861–1862 floods, returning refugees were hunted and forcibly relocated to
483Hoopa Valley, Smith River, and Round Valley. The Wiyot population, estimated at 1,500 to 2,000
484in 1850, numbered only 100 by the 1900 U.S. Census.
485The Indian Boarding School Era
D
R
86From the late 1800s through the 1970s, the U.S. government institutionalized regional children
4
487at facilities including the Hoopa Valley Boarding School, the Round Valley Indian School, the
488Sherman Institute in Riverside, and the Chemawa Indian School in Salem, Oregon — hundreds
489of miles from their families. The boarding school era directly caused the loss of fluent Wiyot and
490Mattole language speakers and disrupted intergenerational cultural transmission. The forced
491separation of children from their families created patterns of dispersal and institutional
492involvement that continue to affect the Tribal community today, including the contemporary
493foster care vulnerability addressed in this plan. The Bear River Band dedicates substantial
494resources to cultural revitalization, Tribal language programs, and mental health initiatives to
495address these intergenerational impacts, including through the BIA Living Languages Grant
496Program.
497The 1958 Termination and the Tillie Hardwick Lawsuit
98In the 1950s, the U.S. government enacted the Termination Era policy, aiming to forcibly
4
499assimilate Native Americans by dissolving their tribal status. Under the California Rancheria Act
500of 1958, the government terminated 41 California Rancherias including the Rohnerville
501Rancheria. Tribal communal lands were converted into private parcels subject to state taxation,
502causing many impoverished families to lose their properties. Tribal members were stripped of
503their legal recognition as Indians and rendered ineligible for federal health, education, and
504housing services. Critically, the BIA terminated the Tribe without fulfilling mandatory promises to
505upgrade infrastructure, water systems, and roads — a failure that contributed to the
506infrastructure deficiencies that persist on the Rancheria today.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page17of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
07In 1979, Tillie Hardwick led a class-action lawsuit against the United States on behalf of 17
5
508terminated rancherias, arguing that the BIA had unlawfully terminated the tribes without meeting
509its infrastructure obligations. On July 19, 1983, the court approved a judgment restoring federal
510recognition to the Bear River Band, restoring Tribal sovereignty, re-establishing individual Tribal
511member rights to federal services, and enabling the rebuilding of the Tribal land base. The initial
51260 acres of what is referred to as “the Old Rancheria” in Rohnerville - Fortuna CA, were
513acquired in 1991 and taken into trust in 1994. An additional 113 acres were acquired in 2007
514through the Fearrien Property transfer. Subsequent acquisitions have expanded the main
515Rancheria to approximately 263 acres as of 2026, in Loleta CA.
516The Salmon Ceremony — Cultural Restoration and Ecological Stewardship
T
17The Bear River and Mattole peoples traditionally performed a Salmon Return Ceremony at the
5
518mouth of the Mattole River — a sacred practice marking the return of salmon and maintaining
519the spiritual and ecological relationship between the people and the watershed. The ceremony
520was last fully performed around 1902–1903, before forced displacement made physical access
521to the Mattole River estuary impossible, and its formal cultural framework dissolved in 1958
522when termination destroyed the structural support needed to coordinate intergenerational
523gatherings.
5323.3 Governance
AF
24The ceremony remained dormant for over a century. Beginning approximately 2020, the Bear
5
525River Band partnered with local conservationists from the Lost Coast League and the Mattole
526Salmon Group to revitalize the ceremony, with community members welcoming Bear River
527members back to the Mattole Beach area. The revived Salmon Ceremony is one of the most
528significant cultural restoration efforts in modern BRB history. When this plan documents tsunami
529and coastal risk at Mattole Beach, it is documenting risk to an irreplaceable cultural practice that
530took 120 years to restore — which is why Mattole Beach protective actions carry weight in this
531plan disproportionate to event frequency.
D
R
33BRB is governed by an elected Tribal Council. Tribal government departments include
5
534Administration, Education, Office of Emergency Services, Public Works and Facilities, Housing,
535Social Services, Renewable Energy Department, Environmental and Natural Resources, Grants
536Management, Finance, Human Resources, Information Technology, and cultural and language
537programs. The Tribe's principal economic enterprise is the Bear River Casino Resort, whose
538revenue funds Tribal government services — a structural fact reflected in the fuel rationing
539hierarchy and continuity priorities in this plan.
540
541
542
43
5
544
545
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page18of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
5463.4 Tribal Lands
567
568
569
570
571
572
573
574
575
D
576
R
566
AF
T
47The Tribal planning area consists of the main Rancheria of approximately 263 acres near
5
548Loleta, together with discontiguous Tribal lands including parcels in the Singley Hill corridor
549adjacent to the Rancheria, the Petrolia area parcel, and ancestral gathering areas including
550Mattole Beach where Tribal members regularly gather for ceremony which approximately 1.5
551hours drive over
552narrow, often
553single lane roads.
554Lands are held in a
555combination of
556federal trust and
557Tribal fee status,
558with active efforts
559to move additional
560fee parcels into
561trust. All figures in
562this plan label the
563planning area as
564the Rancheria
565Boundary.
577
578
579
580
581
582
583
584
85
5
586
PLACEHOLDER: Insert current parcel inventory table with acreage and trust/fee
▶
status for each parcel — Request sent to ENR 7/27/26
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page19of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
5873.5 Population and Vulnerable Populations
88The Rancheria is home to a small, close-knit community on California's North Coast (Census
5
589geography: Rohnerville (Rancheria) Trust Lands, CA; GEOID 2500000US3220). The Tribal
590government sustains housing, social services, child care, health programs, and emergency
591services, and operates one of the region's largest private employers.
T
92The Tribal community extends well beyond the Rancheria boundary. On-Rancheria residential
5
593population is concentrated in Tish Non Village, Basayo Village, and Bear Paws Lane, in
594neighborhoods that include multigenerational households, elders, and young children, with
595additional daily population at the Tribal Day Care, across the government campus, and among
596the workforce and visitors at the Bear River Casino Resort. Tribal citizens also live dispersed
597throughout Humboldt County — including Arcata, McKinleyville, and coastal tsunami hazard
598zones — and across the continental United States. This dispersal is not a neutral demographic
599fact: it is a direct legacy of the dispossession, termination, and displacement policies
600documented in Section 3.2, and the Tribe accordingly treats reaching and protecting its
601dispersed citizens as a matter of sovereignty and justice, not merely logistics.
AF
02Populations requiring specific planning consideration include: elders, including residents of elder
6
603housing; households with access and functional needs (AFN); children in foster care
604placements — a contemporary echo of the boarding school era, addressed in this plan through
605a foster care emergency protocol; limited English proficiency (LEP) employees and community
606members, a consideration reflected in the Tribe's alert and warning and workplace emergency
607communication practices; residents of Bear Paws Lane (seven remaining units in an area facing
608access constraints, with conversion and displacement planning underway); and day care and
609youth program enrollees.
D
R
10The community meets federal definitions of a disadvantaged population. The Rancheria and
6
611surrounding area are identified as disadvantaged under the federal Climate and Economic
612Justice Screening Tool, and the community experiences elevated social vulnerability across the
613indicators most relevant to disaster outcomes: income constraints, housing concentration,
614limited egress, and dependence on a small number of critical facilities. These conditions are not
615incidental — they are the direct legacy of the policies documented in Section 3.2, which stripped
616the Tribe of its land base and economic foundation for over a century. Mitigation investment on
617the Rancheria therefore carries disproportionate protective value: a single hardened facility,
618secured egress route, or resilient utility connection protects a far greater share of this
619community than the same investment would elsewhere. This is the practical meaning of the
620Tribe's guiding principle that healing the land heals the people.
21Specific population figures, facility occupancies, and functional and access needs registries are
6
622maintained by the responsible Tribal departments and in the BRB Emergency Operations Plan
623(July 2025), consistent with this plan's practice of retaining operationally sensitive detail outside
624the public document.
625
626
27
6
628
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page20of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
6293.6 Critical Facilities
630Table 3-1: Critical Tribal Facilities
Hazard Notes
ribal Administration
T
Office/Tish Non Community
Center
ontinuity of government,
C
Community services; gathering
R-4692-DR documented damage;
D
sprinklered
Recreation Center
esignated emergency shelter
D
(County MOU); animal
sheltering ballfields
R-4692-DR damage; generator and
D
30-day fuel identified as Priority action;
no-stake astroturf restriction during
Emergency use on Field
ear River Casino Resort
B
(incl. hotel tower)
rimary economic enterprise;
P
large assembly, non
congregate shelter -
warming/cooling/clean air
ulti-story; no ladder apparatus in
M
first-due area; reclaimed water fire system
uncharacterized; active HMGP seismic
assessment
The Venue / The Epicenter
Large-assembly event venues
ssembly occupancy; fire response gaps
A
apply
ater Treatment Facility /
W
Tish Non water system
Potable water
R-4692-DR damage; single tank; ~45
D
min sustained fire flow
astewater Treatment Plant
W
(upgraded)
astewater; reclaimed water
W
source
yberattack (SCADA) exposure identified
C
in THIRA
Pump and Play fuel station
Tribal fuel supply
riority resupply agreement identified as
P
mitigation action
Elders Village / Apartments
lder and vulnerable resident
E
housing
Served by hydrant H-10 (retest pending)
Basayo Village
Residential
Population figure pending
outh Development Center /
Y
Day Care
Children's services
eunification planning with school
R
districts
lectronic notification sign -
E
Deployable
Public alerting
ompleted"Pandemic Mitigation Action
C
#2 - FY21 THMP”
R
AF
T
Function
PLACEHOLDER: Update total insured replacement value of Tribal assets with current figures. Request
▶
sent to TA 7/26/26
D
631
Facility
32
6
633
634
635
636
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page21of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
637
6383.7 Transportation and Access
668
D
669
R
AF
T
39The main Rancheria is served by a single primary ingress/egress route via the Singley Hill
6
640corridor connecting to US-101. This single-access condition is among the Tribe's most
641consequential structural
642vulnerabilities: any event
643that blocks the route —
644collision, slide, flooding,
645wildfire, or seismic damage
646— isolates the entire
647community. The Singley Hill /
648US-101 corridor is a
649documented fatality corridor,
650with five or more fatalities
651per year in recent years. A
652secondary egress route from
653Bowie Road to Echo Lane
654has been identified and is
655developed as Mitigation
656Action 5.6.22; preliminary
657review indicates CEQA and
658Clean Water Act Section 404
659requirements given the
660sloped, vegetated, and
661seasonally wet terrain, with a
662drainage culvert passing
663beneath the highway. Bear
664Paws Lane presents its own
665access constraints for its
666seven remaining residential
667units
670
671
672
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page22of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
673
6743.8 Water Systems and Fire Protection Infrastructure
6753.8.1 Tish Non Water System and February 2026 Hydrant Flow Test
T
76In February 2026, the Tribe conducted its first-ever hydrant flow test of the Tish Non water
6
677system. Testing was conducted on 16 hydrants per NFPA 291 standards using a calibrated
678hydrant diffuser and single-hydrant methodology (one hydrant flowing, one capped with pitot
679gauge). All 16 hydrants were confirmed operational following corrections made during the
680testing process. Two hydrants — H-10 (Apartments area) and H-15 (265 Kiesner Road Parking
681Lot) — required maintenance corrections and are pending flow-rate confirmation retesting; both
682are confirmed flowing water.
683Table 3-2: Hydrant Flow Test Summary — Tish Non Side (February 2026)
Location
Test Flow (GPM)
Fire Flow @ 20 PSI
Status
H-1
Top of Carroll
1,179
1,236
OK
H-2
65 Carroll Rd
1,468
2,619
OK
H-3
258 Carroll Rd
1,264
1,426
OK
H-4
323 Carroll Rd
1,382
2,843
OK
H-5
235 Bernard Rd
1,444
4,337
OK
H-6
325 Bernard Rd
1,444
3,443
OK
H-7
Bernard/Bowie Rd
1,444
2,662
OK
H-8
189 Bowie Rd
1,444
1,970
OK — threads tightened
H-9
End of Bowie
1,291
1,677
OK
H-10
Apartments
—
—
OK pending GPM
Bernard/Keisner Rd
1,222
2,342
OK
260 Kiesner Rd
1,179
1,733
OK
263 Kiesner Rd
1,236
1,677
OK
265 Kiesner Rd Roadway
1,236
7,107
OK
H-15
265 Kiesner Rd Parking Lot
—
—
OK pending GPM
H-16
120 Bowie Rd (ENR)
1,318
1,846
OK
H-12
H-13
D
H-14
R
H-11
AF
Hydrant
84
6
685
686
ource: BRB Office of Emergency Services Hydrant Test Report, February 2026. Prepared by
S
Amanda Gonzales, OES Manager. Testing conducted per NFPA 291. Flow values represent
single-hydrant test conditions.
87Water system tank capacity testing conducted concurrent with hydrant testing indicated
6
688approximately 45 minutes of sustained flow time before significant tank depletion, with the tank
689level dropping from approximately ⅓ capacity during the test period. No backup water source
690has been identified for the Tish Non water system. Most major Tribal facilities, including the
691Community Center and residential buildings, are equipped with fire sprinkler systems, which
692reduce required suppression flow demand under normal conditions. Simultaneous multi-hydrant
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page23of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
93demand — which a major fire event would require — remains untested and could reveal
6
694pressure drop across the system.
6953.8.2 Resort Reclaimed Water System
96The Bear River Casino Resort and associated Resort enterprises are served by a separate
6
697reclaimed water system drawing from the upgraded WWTP. The specifications, storage
698capacity, and fire flow characteristics of the Resort water system have not been formally
699assessed as of the date of this plan. This is the Tribe's primary economic asset and operates on
700a fire suppression water system that has not been characterized is itself a finding of this plan,
701addressed as Mitigation Action 5.6.11.
PLACEHOLDER: Obtain WWTP reclaimed water system specifications (storage
▶
capacity, pump ratings, distribution pressure, Resort-side hydrant locations) from
Public Works and Resort Facilities Management. Insert WWTP upgraded treatment
capacity in GPD.
7063.9 Public Safety Services
7073.9.1 Law Enforcement
T
02
7
703
704
705
13
7
714
AF
08The Bear River Police Department is not currently active. Reinstatement of the department is a
7
709Priority mitigation action (5.6.2), supported by the 2025 SPR which documents
710law-enforcement-dependent capabilities at approximately 20 percent of target. Law enforcement
711response currently depends on the Humboldt County Sheriff, with response times and
712jurisdictional complexity on trust lands documented in Part Four.
PLACEHOLDER: Confirm whether PD dissolution occurred by Council action or
▶
administratively — Tribal Administration/Council
7153.9.2 Fire Protection
R
16Structural fire protection is provided by the Loleta Fire Department, a volunteer department that
7
717holds jurisdictional fire authority (JHA) for the Rancheria area without formal documented
718agreement with the Tribe. Dispatch is provided through the Fortuna Emergency Command
719Center, managed by CAL FIRE. Formalizing the JHA relationship, pursuing supplemental
720coverage for large-assembly venues, and — centrally — establishing a Tribal Fire Program
721(Action 5.6.1, Priority 1) address these gaps.
D
7223.10 Emergency Operations and Alerting
23The Tribe does not currently have a dedicated Emergency Operations Center; EOC functions
7
724have operated on an ad hoc, multi-use basis from shared facilities, a model documented in this
725update as unsustainable. The Emergency Resilience Campus (Action 5.6.3), planned for Tribal
726land adjacent to the Rancheria on the Singley Hill corridor, is the foundational response to this
727gap, with near-term secure connex-box supply storage (Action 5.6.3a) as a 90-day interim
728measure. Public alerting is provided through RAVE Mobile enrollment and the electronic
729notification sign at the Tish Non Village entrance (completed 2021 action). Alerting reach, LEP
730notification capability, and enrollment rates are addressed in Part Five.
7313.11 Cultural Resources
32Cultural resources requiring protection in this plan include the Mattole Beach ceremonial
7
733gathering area and the revived Salmon Ceremony; Tribal language programs; cultural and
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page24of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
34ceremonial materials and regalia; and ancestral and archaeological sites within Tribal lands and
7
735ancestral territory. Protection of cultural practice is treated in this plan as a mitigation outcome in
736its own right under the Cultural Awareness pillar.
D
R
AF
T
737
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page25of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PART FOUR: RISK ASSESSMENT
738
7394.1 Methodology
40This risk assessment identifies the hazards that can affect the Tribal planning area; describes
7
741the type, location, and extent of each hazard; documents previous occurrences and the
742probability of future events, including the effects of long-term changes in weather patterns; and
743assesses impacts and vulnerability. Consistent with FEMA Region IX's 2022 review guidance,
744tribal-specific data is presented as primary throughout this Part, with Humboldt County regional
745data as supplemental context.
T
7464.2 Climate Change as a Force Multiplier
AF
47Climate change is addressed in this plan not as a standalone hazard but as a force multiplier
7
748that increases the probability, intensity, or consequence of nearly every profiled hazard: more
749intense atmospheric river events driving flooding and severe weather; extended drought cycles
750stressing the well-dependent water supply and salmon habitat; elevated wildfire conditions; sea
751level rise and king tide interaction affecting coastal and low-lying areas; and increased
752frequency of utility Public Safety Power Shutoff (PSPS) events.
753PSPS Risk Designation and Utility Outage History
R
54The Rancheria is not located within a CPUC High Fire-Threat District Tier 2 (Elevated) or Tier 3
7
755(Extreme) area; local weather conditions at the Rancheria do not independently trigger Public
756Safety Power Shutoff events. The Tribe's PSPS exposure is instead transmission-driven:
757electricity reaches Humboldt County via transmission corridors along Highways 299 and 36 that
758traverse high fire-threat terrain, and de-energization of those lines can interrupt power
759countywide regardless of coastal conditions. This occurred twice in October 2019 (October 8–10
760and October 26–29), when countywide PSPS events left the Rancheria and approximately
76130,000 Humboldt County customers without power. In 2020, PG&E completed reconfiguration of
762the Humboldt Bay Generating Station to operate in "island mode," energizing portions of the
763county — including the Fortuna district serving the Rancheria — independently of the wider grid
764during transmission-level events. No PSPS de-energization has affected the Rancheria since
765the October 2019 events.
D
66Source: CPUC High Fire-Threat District Map, adopted January 19, 2018, pursuant to D.17-12-024
7
767(revised March 2021); verified July 2026. The Rancheria is not located within an HFTD Tier 2 (Elevated)
768or Tier 3 (Extreme) fire-threat area.
69PG&E outage records for the Eel River 1102 distribution circuit serving the Rancheria (January
7
7702022 – June 2026) document 11 sustained unplanned outages totaling approximately 4,109
771minutes (68.5 hours), none attributable to PSPS:
Date
Cause
Duration (min)
Customers Affected
1/3/2022
Third party
1,128
1,619
6/4/2022
Vegetation (transmission)
32
1,623
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page26of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
nvironmental — M6.4 earthquake
E
(FEMA-4692-DR)
2,002
1,455
1/4/2023
Vegetation
146
1,530
3/27/2023
Vegetation
109
1,623
3/24/2024
Third party
30
1,631
12/5/2024
Environmental/external
222
1,591
12/13/2024
Equipment failure
20
1,577
1/4/2025
Vegetation
8/5/2025
Equipment failure
6/25/2026
Animal
T
12/2/2022
199
1,635
70
1,624
151
1,627
AF
72The December 20, 2022 transmission-level outage began at 2:34 a.m., coinciding with the M6.4
7
773Ferndale earthquake mainshock, and lasted approximately 33 hours — the longest interruption
774in the record and a direct illustration of the earthquake–energy infrastructure cascade
775addressed in the Energy Emergency Plan (Appendix F). Vegetation contact is the leading
776recurring cause (4 of 11 events), consistent with the mitigation emphasis on vegetation
777management and utility coordination.
778Current Drought Status (U.S. Drought Monitor, July 2026)
R
79As of July 2026, the Rancheria lies within the D0 (Abnormally Dry) classification on the U.S.
7
780Drought Monitor. Approximately 34.9 percent of Humboldt County's population (46,935 people)
781is within a designated drought area, with D1 (Moderate Drought) conditions present in the
782county's northern coastal zone. January–June 2026 ranked as the 15th driest year-to-date
783period in 132 years of record, 14.07 inches below normal precipitation — underscoring that
784near-normal individual months (June 2026 ranked 49th wettest) can mask significant cumulative
785deficit.
D
86Source: U.S. Drought Monitor (National Drought Mitigation Center, USDA, and NOAA), Humboldt County
7
787conditions via drought.gov; precipitation rankings from NOAA National Centers for Environmental
788Information. Data as of July 2026.
7894.3 Hazard Summary and Priority Rankings
790Table 4-1: BRB Hazard Priority Rankings — 2026 Update
Priority
Hazard
Probability
Impact
Declared
Change from 2021
1
Earthquake
High
igh —
H
documented DR
es —
Y
levated: three-event
E
FEMA-4692- December trilogy; direct
DR
declaration
2
andemic /
P
Public Health
Moderate
igh — full
H
closure
ederal/Stat
F
e COVID
ustained: COVID-19
S
impacts fully documented
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page27of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
Hazard
Probability
Impact
Declared
Change from 2021
3
Fire / Wildfire
High
igh —
H
compounding
gaps
No
levated: significant new
E
vulnerabilities identified
4
looding
F
(Localized)
Moderate-High
oderate —
M
active failure
o (BOR
N
active)
levated: Whitchurch
E
engineering; six sites
documented
5
limate Change /
C
Severe Weather
igh
H
(increasing)
Moderate-High
No
ustained: atmospheric
S
river impacts
documented
6
rought / Water
D
Shortage
Moderate
Moderate
No
ustained: no current
S
impacts; well-only
dependency
7
Tsunami
ow-Moderate
L
(Mattole
Beach)
High if occurs
No
ew: Mattole Beach;
N
December 2024 tsunami
alert
8
ransportation /
T
Access
High — daily
igh — 5+
H
fatalities/year
No
ew: documented fatality
N
corridor; single access
route
9
Cyberattack
Moderate
igh — $3.65M
H
exposure
No
ew: THIRA
N
ransomware scenario;
WWTP at risk
10
Other Hazards
Low
Low-Moderate
No
Sustained
793
794
D
95
7
796
797
AF
792
R
791
T
Priority
798
799
00
8
801
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page28of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
8024.4 Earthquake
803Hazard Profile — Type, Location, Extent
04The Rancheria lies within one of the most seismically active regions in the continental United
8
805States, near the Mendocino Triple Junction where the Cascadia Subduction Zone, San Andreas
806system, and Mendocino Fault meet. The planning area is subject to strong ground shaking,
807liquefaction in susceptible soils, landslide triggering, and — for a Cascadia event — near-field
808tsunami affecting coastal areas where Tribal members live and gather. Extent is characterized
809using moment magnitude and the Modified Mercalli Intensity (MMI) scale; the December 20,
8102022 event produced strong to very strong shaking (MMI VII range) in the Rancheria area.
T
811Table 4-2: Modified Mercalli Intensity Scale (abridged)
Shaking
Typical Effects
IV
Light
Felt indoors by many; windows and dishes rattle
V
Moderate
Felt by nearly all; some dishes and windows broken
VI
Strong
Felt by all; some heavy furniture moved; slight damage
VII
Very strong
Considerable damage in poorly built structures; slight-to-moderate in well-built
VIII
Severe
IX+
Violent+
AF
MMI
Considerable damage in ordinary buildings; partial collapse
Significant damage even in well-designed structures
812
813Previous Occurrences — The December Trilogy
R
14The Tribe has experienced three significant December earthquakes in four years: December
8
8152021, December 20, 2022, and December 2024. The December 20, 2022 magnitude 6.4
816earthquake offshore of Ferndale caused documented damage across ten Tribal facilities —
817including the Tish Non Community Center, Recreation Center (the designated emergency
818shelter), Water Treatment Facility, and Resort facilities — and resulted in the Tribe's direct
819Presidential Major Disaster Declaration, FEMA-4692-DR. The December 2024 event
820additionally generated a tsunami alert affecting coastal areas where Tribal members live and
821gather.
D
822Table 4-3: FEMA-4692-DR Public Assistance Project Worksheets — Confirmed Facility Damages
PW
Facility
FEMA Project No. F EMA-Approved Damage
Estimate ($)
1
Parking Lot / RTW
714344
12,590.14
2
Water Treatment Facility
714343
13,287.42
3
Social Services Building
714426
31,660.86
4
Recreation Center (REC)
714425
11,572.37
5
Tobacco Traders
714434
15,000.00
6
Pump & Play
714433
20,343.03
7
Family Engagement Center (FEC)
714430
17,269.21
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page29of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
8
Gaming Office
714432
60,815.56
9
Tish Non Community Center
714429
70,703.19
10
Bear River Casino Resort
714342
323,842.95
S ubtotal — Facility Damages (PW
1–10)
11
ategory Z — Direct Administrative
C
Costs
577,084.73
826161
Total — FEMA-Approved Estimates
40,668.10
617,752.83
827
828
D
R
AF
29
8
830The December 20, 2022 M6.4
831earthquake resulted in the Tribe’s
832first Presidential disaster
833declaration, FEMA-4692-DR.
834Confirmed damages were
835documented across ten Tribal
836facilities through the FEMA Public
837Assistance program, with
838FEMA-approved estimates totaling
839$577,084.73 in facility damages
840and $617,752.83 including direct
841administrative costs (Table 4-3).
842Damages ranged from parking and
843site infrastructure to the Water
844Treatment Facility, Tish Non
845Community Center, and the Bear
846River Casino Resort — the facility
847whose revenues sustain Tribal
848government operations —
849demonstrating that even moderate
850structural damage distributed
851across the government campus
852carries compounding operational
853and economic consequences for
854the Tribe.
T
23Source: FEMA-4692-DR Public Assistance grant files, Bear River Band OES / Grants Administration. Amounts reflect
8
824FEMA-approved damage estimates; project period of performance extends through March 8, 2027. An additional completed
825Project Worksheet (Basayo Apartments, $3,888.00) has been closed out. Cost-share detail is maintained in the Tribe’s Public
826Assistance grant records.
855
856
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page30of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
857
858
robability, Impacts, and
P
Vulnerability
61
8
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
robability of damaging seismic
P
events is high; a full-margin
Cascadia Subduction Zone
rupture is the region's
catastrophic planning scenario.
Tribal vulnerability includes
unreinforced and pre-code
structures identified for
assessment under the active
HMGP-funded seismic
assessment project, the
multi-story Resort hotel tower
(assessment in progress), water
system components, and the
compounding effect of
single-route access if the Singley
Hill corridor is damaged. The
2026 THIRA earthquake
scenario establishes capability
targets that current capabilities
do not fully meet, per the 2025
SPR.
885
886
887
D
888
AF
884
R
883
T
59
8
860
889
890
91ACTIVE VULNERABILITY: The approved $200,000 in FEMA Public Assistance funding
8
892for facilities damaged in DR-4692-DR remains unspent pending contract execution as
893of the date of this plan. Several facilities with documented earthquake damage have
894not been fully repaired, including the designated emergency shelter (Recreation
895Center). Contract execution is identified as Action 5.6.8 in Part Five.
96
8
897
898
899
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page31of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
9004.5 Pandemic / Public Health Emergency
01The COVID-19 pandemic caused full closure of Tribal government and enterprise operations,
9
902documented revenue interruption to the enterprise that funds Tribal government services, and
903sustained public health protective operations. The Tribe developed a Pandemic Response Plan
904(completed 2021 mitigation action) which is carried forward for maintenance and update as
905Action 5.6.23. Probability of future pandemic or public health emergency is moderate; impact
906severity is high, given the Tribe's dependence on a single large-assembly enterprise for
907government revenue.
PLACEHOLDER: Insert COVID-19 closure dates, duration, and federal assistance
▶
amounts (Finance / Resort).
9104.6 Fire and Wildfire
T
08
9
909
911Hazard Profile — Type, Location, and Extent
AF
12Under CAL FIRE's updated 2026 Fire Hazard Severity Zone (FHSZ) maps, lands immediately
9
913surrounding and adjoining the Rancheria are classified as Moderate. The Rancheria itself
914carries no FHSZ designation — not because hazard is absent, but because trust lands are
915Federal Responsibility Area, outside the State and Local Responsibility Areas that CAL FIRE's
916FHSZ program maps. Because fuels, topography, and weather are continuous across the trust
917land boundary, the Tribe treats the surrounding Moderate classification as the effective fire
918hazard baseline for planning purposes. The mapping gap is itself a planning consideration:
919hazard designations that drive building standards, defensible space enforcement, and mitigation
920funding eligibility do not automatically extend to trust lands — reinforcing the importance of
921Tribally led wildfire mitigation, including the Tribal Fire Program (Action 5.6.1).
D
R
22The fire environment surrounding the Rancheria is mixed: grassy hillsides and brush, on and
9
923adjacent to Tribal land, transitioning to continuous timber to the east and south — the terrain
924carrying the Moderate classification that surrounds the Rancheria on three sides. Mature bull
925pines along the Singley Hill corridor, identified by survey respondents as an existing hazard,
926stand within reach of structures and the Tribe's single access road. Critically, the Rancheria lies
927directly adjacent to U.S. Highway 101, one of the most heavily trafficked corridors on the North
928Coast. Roadside ignition — vehicle fires, dragging chains and equipment, hot catalytic
929converters over dry grass, and discarded smoking materials — is a well-documented wildfire
930cause along major highways, and the 101 corridor places a continuous ignition source at the
931base of the grassy slopes below Tribal homes and facilities. Extent is best expressed by fire
932behavior potential: a wind-driven grass or brush fire starting at the highway shoulder or in the
933Singley Hill corridor could reach structures and sever the sole egress route within the first
934burning period, well inside the Loleta Fire Department's documented 20-plus-minute response
935time. The Rancheria's exposure is therefore characterized less by acreage at risk than by the
936coincidence of fuels, slope, a continuous roadside ignition source, and the single-access
937configuration at the same location.
38While no wildfires have directly impacted the Rancheria since the last plan cycle, the Tribe has
9
939identified a set of compounding structural fire protection vulnerabilities that collectively represent
940a significant life safety concern, particularly given recent facility expansions and increased
941occupancy.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page32of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
942COMPOUNDING VULNERABILITY:
43The following fire protection gaps exist simultaneously at BRB Rancheria: (1) 20+ minute
9
944documented response times; (2) no ladder apparatus for the multi-story Resort hotel; (3)
945approximately 45 minutes of sustained fire flow before tank depletion; (4) Resort water system
946fire flow uncharacterized; (5) JHA held by a volunteer department without formal agreement; (6)
947no Tribal fire program; (7) single ingress/egress route. A major fire event at The Venue or Resort
948during a large event would activate all of these vulnerabilities simultaneously.
AF
D
R
50According to CAL
9
951FIRE data, 634
952wildfires burned in
953Humboldt County
954between 1910 and
9552017, averaging
956approximately two
957fires per year with a
958historical range of 0
959to 17 fires annually.
960Approximately 63
961percent of wildfires in
962Humboldt County
963are caused by
964human activity, with
965electrical equipment
966including power lines
967and transformers a
968frequent ignition
969source. The 2020
970August Complex fire
971burned over
9721,000,000 acres
973including portions of
974Humboldt County;
975while the main
976Rancheria was not
977directly threatened,
978smoke impacts and
979the potential for
980power infrastructure
981ignition were
982significant concerns.
T
949Previous Occurrences and Regional Wildfire History
83The 2020 fire season
9
984also directly
985engaged Tribal
986resources: beginning
987September 11, 2020, the Tribe operated an evacuation shelter at the Bear River Recreation
988Center for regional fire evacuees, without regard to tribal affiliation (see Section 4.14).
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page33of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
989Probability
999Impacts and Vulnerability
T
90Probability of a wildfire directly affecting the Rancheria is moderate and rising. Humboldt
9
991County's human-caused ignition share — approximately 63 percent — must be read against the
992Rancheria's setting: a continuously trafficked federal highway at its doorstep, overhead electrical
993infrastructure serving the Rancheria and Resort, and seasonal grass cure on adjacent slopes
994each summer and fall. The absence of a wildfire on Rancheria lands during the planning period
995reflects favorable coastal conditions, not the absence of exposure — the ignition sources are
996permanent; only the receptive fuel conditions vary by season and year. Climate projections
997increase probability over the planning period through extended dry seasons and deepening fuel
998moisture stress, conditions that reach even the coastal zone in drought years (Section 4.9).
1009Fire Flow Baseline
AF
000Impacts of a wildfire event would extend well beyond structure loss. Smoke is the demonstrated
1
1001impact pathway: the 2020 fire season brought sustained hazardous air quality to the region,
1002affecting elders, children, and residents with respiratory conditions. A fire in the Singley Hill or
1003Highway 101 corridor would simultaneously threaten homes, compromise the only egress route,
1004and endanger the Resort — the enterprise funding Tribal government operations — while
1005cultural sites and gathering places on and near Tribal land are irreplaceable in a way structure
1006valuation cannot capture. Vulnerability concentrates in the same singularities identified in
1007Section 4.15: one road out, one water tank, approximately 45 minutes of fire flow, and no Tribal
1008fire program — precisely the gaps Actions 5.6.1, 5.6.4, and 5.6.22 address.
R
010The February 2026 hydrant flow test (Section 3.8.1) established the fire suppression baseline:
1
1011approximately 45 minutes of sustained flow before significant tank depletion, no identified
1012backup water source for the Tish Non system, and an uncharacterized Resort reclaimed water
1013system. Sprinkler coverage in major facilities reduces demand for single-structure fires; a major
1014or multi-structure event would exceed the documented capacity, particularly if Loleta FD
1015response is delayed beyond its documented 20-minute time.
D
016The Tribal Fire Program (Action 5.6.1) is this plan's Priority 1 mitigation action. Its priority
1
1017reflects not only suppression capability but the pillars themselves: workforce development for
1018Tribal members, cultural fire practice and land stewardship, and assertion of Tribal authority
1019over public safety on trust lands. Healing the land heals the people — and returning fire to its
1020proper cultural and ecological role on Tribal land is central to that healing.
1021
1022
1023
1024
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page34of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
10254.7 Flooding (Localized and Riverine)
1026Hazard Profile
027Flood risk at BRB has two distinct components. Regional riverine flooding is associated with the
1
1028Eel River system and atmospheric river events, with king tide interaction affecting low-lying
1029areas. Localized flooding on the Rancheria itself is now engineering-documented: Whitchurch
1030Engineering, Inc. (Jeffrey Laikam, PE, RCE #68586) conducted initial flooding inspections under
1031Project No. BRB2401, documented in a scoping letter dated March 7, 2024, identifying six
1032distinct flooding sites on Tribal lands.
T
033Critically, the Whitchurch assessment identified systemic infrastructure maintenance
1
1034governance failure — the absence of an assigned owner and inspection cycle for culverts and
1035drainage infrastructure — as a root cause common to the six sites. This plan corrects that
1036governance gap directly: the Pre-Storm Culvert and Drainage Inspection Protocol (Appendix I)
1037assigns annual September inspection responsibility to Public Works and Facilities, with OES
1038receiving the annual report and holding escalation authority for deferred maintenance.
1039Table 4-3: Whitchurch Engineering BRB2401 — Documented Flooding Sites (March 2024)
Condition Documented
Site 1
ravel access road floods where a headwall (with a
G
likely buried culvert, inlet inaccessible) receives runoff
from a degraded uphill stone-lined swale. The poorly
infiltrating hillside adds runoff; uphill soils become
saturated or under standing water
OR R25AP00342 - Under
B
Design. Construction FY 26.
$200,000 change order requiring
funding
Site 2
he gaming office, southeast of the casino, predates the
T
uphill parking lot to the northeast; runoff from the lot's
asphalt now sheets across the lawn and ponds against
the building's foundation and siding.
OR R25AP00342 - Under
B
Design. Construction FY 26.
$200,000 change order requiring
funding
Site 3
ownhome runoff between Highway 101 and Bowie
T
Road drains via curb cuts and three swales to a rear
retention area. Two swales are overgrown and likely
unlined; grading to the swale inlets is poorly sloped and
doesn't drain positively.
OR R25AP00342 - Under
B
Design. Construction FY 26.
$200,000 change order requiring
funding
bermed wetland east of the parcel pushes outflow
A
toward the buildings; the existing French drain diverts it
but runs constantly, and soils behind it stay saturated.
Downspouts add significant non-infiltrating water.
OR R25AP00342 - Under
B
Design. Construction FY 26.
$200,000 change order requiring
funding
Site 5
he residence at 352 Brenard Way sits downhill of its
T
driveway and hillside, flooding the garage; the existing
drain line hasn't prevented saturation around the
building, which is flat-graded to the foundation.
OR R25AP00342 - Under
B
Design. Construction FY 26.
$200,000 change order requiring
funding
Site 6
he alley's drainage system between the east and west
T
ends of Carroll Road has broadly failed: the swale is
overgrown and soil-filled, all culverts are silted in, and
south-side building drain pipes are silted, possibly
broken, undersized and not installed per plans.
OR R25AP00342 - Under
B
Design. Construction FY 26.
$200,000 change order requiring
funding
R
D
Site 4
Status
AF
Site
1040
1041
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page35of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
D
R
AF
T
042Previous occurrences include recurring seasonal flooding at the six documented sites, culvert
1
1043overflow events, and flooding of the gaming office (a former Tribal residential structure). The
1044probability of continued localized flooding is moderate-to-high until infrastructure improvements
1045and the inspection governance protocol are fully implemented; atmospheric river intensification
1046increases both probability and consequence over the planning period. Infrastructure
1047improvements at the documented sites are funded under Bureau of Reclamation Agreement No.
1048R25AP00342 and are in design development (see Part 5, Mitigation Action #11).
1049
050
1
Access and functional needs (AFN) households are present in the localized flood-affected
1051
area, including subgrade residential structures. Flooding at these sites is a life-safety issue,
1052
not only a property issue.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page36of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
1053
10544.8 Severe Weather and Climate Change
10624.9 Drought and Water Shortage
T
055Atmospheric river storms deliver some of the highest rainfall totals in California to the region,
1
1056producing high wind, sustained heavy rain, flooding, slides, and extended power outages,
1057including PG&E Public Safety Power Shutoff events. Severe weather is a high-probability
1058annual occurrence with moderate-to-high impact, and climate change is increasing both
1059frequency and intensity. Mitigation is addressed through the Energy Emergency Plan (Appendix
1060F), generator and fuel actions (5.6.5, 5.6.15), the severe weather training module (Appendix H),
1061and the culvert inspection protocol (Appendix I).
1070
1071
1072
1073
074
1
1075
1076
D
1077
R
1069
AF
063Drought classification follows the U.S. Drought Monitor scale from None through D0
1
1064(Abnormally Dry), D1 (Moderate), D2 (Severe), D3 (Extreme), and D4 (Exceptional Drought).
1065The Tribal water supply is entirely groundwater-well dependent with no identified backup source,
1066making extended drought a direct water security threat even absent current impacts. Drought
1067also directly threatens Mattole River salmon habitat — and with it the cultural practice the
1068Salmon Ceremony restored. A Drought Contingency Plan is carried forward as Action 5.6.21.
078
1
1079
1080
1081
1082
1083
1084
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page37of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
10854.10 Tsunami and Coastal Hazards
D
R
AF
T
086The Mattole Beach ceremonial gathering area is directly exposed to both distant-source and
1
1087near-field tsunami. A near-field Cascadia event could provide only minutes of natural warning
1088(strong ground
1089shaking) before
1090wave arrival,
1091with no
1092engineered
1093warning
1094infrastructure at
1095the beach. The
1096December 2024
1097earthquake
1098generated a
1099tsunami alert
1100affecting the
1101coastal zone.
1102Tribal members
1103also reside in
1104mapped coastal
1105tsunami zones
1106off-Rancheria.
1107Because the
1108revived Salmon
1109Ceremony
1110gathers the
1111community at
1112the shoreline,
1113this hazard
1114directly
1115threatens both
1116lives and an
1117irreplaceable
1118cultural practice;
1119the Mattole
1120Beach
1121Emergency
1122Protocol is
1123Action 5.6.7,
1124with the
1125ceremonial site
1126evacuation and
1127warning plan as
1128Action 5.6.20.
1129The biannual
1130frequency of
1131gatherings
1132places Mattole Beach actions below daily-exposure actions in priority order, while their cultural
1133stakes keep them within the plan's core priorities.
1134
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page38of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
1135
11364.11 Transportation and Access Hazards
1165
1166
D
1167
R
AF
T
137The Singley Hill / US-101 corridor is a documented fatality corridor with five or more fatalities
1
1138per year, and it is the
1139Rancheria's only
1140ingress/egress route.
1141Daily probability of
1142disruptive incidents is
1143high. A single event —
1144major collision, slide,
1145flood, fire, or seismic
1146damage — can
1147simultaneously isolate
1148the community and
1149block emergency
1150response in both
1151directions. This
1152hazard interacts with
1153nearly every other
1154hazard in this Part.
1155Mitigation actions:
1156Singley Hill corridor
1157and secondary egress
1158development (5.6.4),
1159Bowie Road to Echo
1160Lane secondary
1161egress (5.6.22), and
1162US-101 interchange
1163safety improvements
1164(5.6.4 component).
1168
1169
1170
1171
1172
1173
1174
1175
1176
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page39of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
11774.12 Cyberattack
178The 2026 THIRA ransomware scenario documents an estimated $3.65 million exposure across
1
1179Tribal government and enterprise systems. Specific vulnerabilities include the casino gaming
1180network, Tribal administrative IT, dependence on RAVE Mobile for public alerting, and industrial
1181control (SCADA) systems at the upgraded Wastewater Treatment Plant. A successful attack on
1182the WWTP would convert a cyber incident into a public health and environmental incident.
1183Formalization of the Cybersecurity Incident Response Plan is Action 5.6.16. Operational
1184security detail is maintained in the EOP and excluded from this public document.
11854.13 Other Hazards
AF
11924.14 Tribal Capability Assessment
T
186Additional hazards profiled at lower priority include: landslide and slope erosion (Bear Creek
1
1187bank erosion documented under the Whitchurch scope; slope hazards adjacent to the
1188Rancheria); hazardous materials incidents along the US-101 corridor; civil unrest or active
1189threat associated with large-assembly enterprise operations (Action 5.6.26 maintains annual
1190exercises); and energy shortage / extended utility outage (addressed by Appendix F and the
1191microgrid pathway, Action 5.6.24).
193Pursuant to 44 CFR § 201.7(c)(3), this section evaluates the Tribe's pre- and post-disaster
1
1194hazard management capabilities. Existing capabilities include: the Office of Emergency Services
1195with dedicated Manager and Logistics Coordinator; the Emergency Operations Plan (July 2025);
1196the THIRA/SPR assessment cycle; a Grants Management office administering federal awards
1197under 2 CFR 200; the Recreation Center shelter MOU with Humboldt County; RAVE Mobile
1198alerting; completed Pandemic Response Plan; Great ShakeOut participation two consecutive
1199years; the Renewable Energy Coordinator position; and demonstrated direct federal disaster
1200management under FEMA-4692-DR.
D
R
201Demonstrated sheltering capability. The Tribe’s sheltering capability is proven, not theoretical.
1
1202On September 11, 2020, during California’s historic wildfire season, the Tribe opened the Bear
1203River Recreation Center as an evacuation shelter for community members displaced by regional
1204fires, without regard to tribal affiliation. The operation provided four separated areas for larger
1205families and socially distanced individual accommodations for up to 45 people, with adjacent
1206outdoor space for tent camping and vehicle parking. The Tribe supplied hot and cold meals,
1207cots, bedding, water, restrooms, showers, and COVID-19 protective measures — a congregate
1208sheltering operation run under active pandemic protocols, demonstrating the capability to
1209manage compounding hazards simultaneously. (Source: Bear River Band press release,
1210September 11, 2020, via Lost Coast Outpost.)
211Capability gaps documented in the 2025 SPR and addressed by this plan include:
1
1212law-enforcement-dependent capabilities at approximately 20 percent of target (no active PD); no
1213Tribal fire program and no formalized JHA; no dedicated EOC; supply storage vulnerability
1214(shared warehouse with theft and pest exposure); animal sheltering capability at 20 animals
1215against a THIRA target of 50–200; foster care roster access protocol unresolved with Social
1216Services; and the unexecuted PA contract. Tribal development regulation on trust lands includes
1217CBC seismic standards for new construction (contractually required since January 1, 2022, with
1218The Venue constructed to current code), with a BRIC code plus-up application extending
1219land-use and code capabilities.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page40of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
12204.15 Overall Vulnerability Summary and Loss Estimation
221Across all hazards, the Tribe's defining vulnerability pattern is concentration and singularity: a
1
1222single access road, a single water tank, a single revenue enterprise, a single shared shelter
1223facility, and singular cultural sites. Mitigation strategy in Part Five is accordingly organized
1224around redundancy, Tribal self-sufficiency, and governance clarity. Structure-level loss
1225estimation is anchored by documented DR-4692-DR damages and insured replacement values.
226
1
1227
1228
PLACEHOLDER: Insert updated total insured asset value and per-hazard loss
▶
estimation table once Finance provides current replacement values. Request sent to
TA Office 7/27/26
D
R
AF
T
1229
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page41of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PART FIVE: MITIGATION STRATEGY AND ACTION PLAN
1230
12315.1 Strategy Framework
232The mitigation strategy is built on the four community pillars — Quality of Life, Self-Sufficiency,
1
1233Sustainability, and Cultural Awareness — and the guiding philosophy that healing the land heals
1234the people. The mitigation actions in this plan are conceived not as isolated projects, but as
1235components of a unified vision for a Tribal community that is prepared, self-determined, and
1236whole. Prioritization reflects Tribal values and institutional goals — workforce development and
1237cultural healing are legitimate priority drivers — in addition to hazard probability and severity.
T
12385.2 Regulatory Framework
Application in This Plan
44 CFR § 201.7
Tribal plan criteria; update requirements at § 201.7(d)(3)
DMA 2000 / Stafford Act § 203
Pre-disaster mitigation authority
Stafford Act § 404 (HMGP)
ost-declaration mitigation funding; active seismic assessment
P
project
AF
Authority
Stafford Act § 406 (PA C–G)
itigation within Public Assistance repairs; DR-4692-DR contract
M
(Action 5.6.8)
andy Recovery Improvement Act
S
2013
irect tribal declaration authority; government-to-government
D
submission
2 CFR Parts 200 / 3002
Federal award administration standards; assurances in Part Six
Executive Order 13175
R
1239
Tribal consultation and coordination
12405.3 Status of 2021 THMP Mitigation Actions
D
24144 CFR § 201.7(d)(3) requires the updated plan to document the status of actions from the
1
1242previous plan, describe progress in mitigation efforts, and reflect changes in priorities. The
1243following table summarizes each of the 15 actions from the 2021 THMP and its disposition in
1244this update.
1245Table 5-1: Status of 2021 THMP Mitigation Actions
#
2021 Action
Status
Disposition in This Plan
1
evelop Pandemic
D
Response Plan
Completed
Plan on file; carried forward for update as Action 5.6.23
2
Install electronic emergency Completed
notification sign at Tish Non
Village entrance
ocumented as completed; RAVE integration under
D
Action 5.6.9; see 5.6.18
3
ew buildings meet CBC
N
seismic standards
ngoing contractual requirement; The Venue built to
O
current code; BRIC code plus-up; carried forward under
Actions 5.6.1 / 5.6.6
In Progress
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page42of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
2021 Action
Status
Disposition in This Plan
4
eview/retrofit critical
R
buildings for earthquake
safety
In Progress
R-4692-DR documented damages; BRIC and PA
D
addressing; carried forward as Actions 5.6.6 and 5.6.8
5
arthquake preparedness
E
in employee training
Ongoing
reat ShakeOut participation two consecutive years;
G
carried forward as Action 5.6.17
6
ire/wildfire preparedness
F
in employee training
Ongoing
R completed; cultural fire being pursued; JHA
P
complications noted; carried forward as Actions 5.6.1
and 5.6.19
7
esort/Community Center
R
as evacuation/command
center
In Progress
ulti-use model not sustainable; independent EOC
M
identified as priority; carried forward as Action 5.6.3
(Emergency Resilience Campus)
8
oluntary safety personnel
V
evaluated/trained
Partial
raining occurred; volunteer availability gap (family/work
T
obligations) documented; carried forward as Action
5.6.17
9
unding applied for
F
microgrid/electrical
resilience
In Progress
enewable Energy Coordinator established; carried
R
forward as Action 5.6.24
10
unding applied for Drought In Progress
F
Contingency Plan
Funding being pursued; carried forward as Action 5.6.21
11
re-Flood Hazard
P
Reduction Plan developed
ot
N
Developed
OR R25AP00342 addresses primary vulnerability;
B
carried forward as Action 5.6.12
12
evere weather
S
preparedness in employee
training
ot
N
Developed
arried forward as Action 5.6.17; training module
C
drafted (Appendix H)
13
isaster supply kits
D
purchased
Partial
urchased multiple times; storage vulnerability (shared
P
warehouse, theft/pest risk); carried forward as Action
5.6.3a (dedicated secure storage)
14
unding applied for Energy
F
Emergency Plan
ot
N
Developed
o application submitted; carried forward as Actions
N
5.6.3 and 5.6.5; Energy Emergency Plan drafted
(Appendix F)
15
et and Service Animal
P
Emergency Plan developed
ot
N
Developed
ed Cross now requires animal shelter accounting; SPR
R
shows 10% capability; carried forward as Action 5.6.13;
plan drafted (Appendix G)
D
R
AF
T
#
1246
247
1
1248
er FEMA 2022 review note (Element C-4): responsible parties are identified for every action in this
P
update, including the two 2021 actions previously lacking assignment.
12495.4 Prioritization Criteria
250Actions are prioritized using three weighted criteria: (1) life safety and hazard consequence
1
1251reduction; (2) advancement of the four community pillars, including workforce development,
1252sovereignty, and cultural healing; and (3) implementation feasibility, including funding availability
1253and shovel-readiness. Consistent with FEMA guidance, timelines are expressed in general
1254terms (anticipated start year and duration) rather than fixed dates.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page43of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
12555.5 Goals and Objectives
256The three plan goals (Section 1.6) are implemented through objectives spanning: life safety and
1
1257alerting; fire protection and Tribal fire capability; law enforcement reinstatement; emergency
1258facility and supply infrastructure; access and egress redundancy; water security and fire flow;
1259energy resilience; flood infrastructure and maintenance governance; cultural site protection;
1260vulnerable population protocols (AFN, foster care, LEP, animals); cyber resilience; and
1261continuity of government and enterprise.
12625.6 Mitigation Actions — Detail Sheets
1263Action 5.6.1 — Tribal Fire Program — Phase 1 (Priority 1)
Field
AF
T
264Establish a Bear River Band Tribal Fire Program. Phase 1 encompasses program design, initial
1
1265workforce recruitment and training of Tribal members, equipment planning, cultural fire practice
1266integration, and formalization of relationships with surrounding departments. This action is
1267Priority 1 not because fire is the most frequent hazard, but because the program simultaneously
1268closes the plan's most dangerous compounding vulnerability set (Section 4.6), creates career
1269pathways for Tribal members, restores cultural fire to Tribal land stewardship, and asserts Tribal
1270authority over public safety on trust lands. Workforce development and cultural healing are the
1271point, not side effects: healing the land heals the people.
Detail
Priority
1 — Highest priority action in this plan
Hazards Addressed
Pillars
Fire/wildfire; severe weather; earthquake (response); all-hazards capability
All four — Self-Sufficiency and Cultural Awareness lead
Lead
Office of Emergency Services / Tribal Administration
Loleta FD; CAL FIRE; Fortuna Fire; BIA; neighboring tribal fire programs
R
Partners
Timeline
nticipated start within one year of plan approval; Phase 1 duration approx. 2
A
years
Est. Cost / Funding
hase 1 planning and initial capability — HMGP/BRIC planning and
P
capacity-building eligible; BIA
D
1272
1273Action 5.6.2 — Bear River Police Department Reinstatement
274Reinstate the Bear River Police Department. The 2025 SPR documents
1
1275law-enforcement-dependent capabilities at approximately 20 percent of target. Reinstatement
1276restores Tribal jurisdiction over public safety on trust lands, reduces dependence on county
1277response times, and supports every response-phase capability in the THIRA.
Field
Detail
Priority
1
Hazards Addressed
All-hazards response; civil unrest/active threat; access control
Pillars
Self-Sufficiency; Quality of Life
Lead
Tribal Administration / Tribal Council
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page44of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
Field
Detail
Partners
Humboldt County Sheriff; BIA Office of Justice Services
Timeline
Anticipated start within planning cycle; duration 2–3 years
Est. Cost / Funding
BIA; DOJ tribal justice programs; Tribal funds
1278
1279Action 5.6.3 — Emergency Resilience Campus — Singley Hill Corridor
Detail
Priority
AF
Field
T
280Develop a dedicated Emergency Resilience Campus on Tribal land adjacent to the Rancheria
1
1281on the Singley Hill corridor, providing: a dedicated Emergency Operations Center (correcting the
1282ad hoc multi-use model documented as unsustainable), secure emergency supply storage,
1283staging and logistics space, training facilities for the Tribal Fire Program and volunteers, and
1284backup power. The campus is this plan's foundational response to the
1285concentration-and-singularity vulnerability pattern identified in Section 4.15. The need is not
1286hypothetical: the Tribe’s only proven mass care facility, the Bear River Recreation Center,
1287sustained damage in the December 2022 earthquake (FEMA-4692-DR PW #714425) —
1288purpose-built, seismically resilient capacity on the Singley Hill corridor closes that exposure.
1 — Foundational infrastructure gap
Hazards Addressed
Pillars
All hazards — EOC, sheltering support, supply logistics, training
Self-Sufficiency; Sustainability; Quality of Life; Cultural Awareness
Lead
Office of Emergency Services / Tribal Administration
Partners
Grants Management; Public Works and Facilities; Tribal Council
Phased; site planning start within 1–2 years; multi-year build-out
R
Timeline
Est. Cost / Funding
HMGP; BRIC; BIA; EDA; Tribal capital
1289Action 5.6.4 — Singley Hill Corridor and Secondary Egress Program
D
290Address the single-access vulnerability and the documented US-101/Singley Hill fatality corridor
1
1291(five or more fatalities per year) through interchange safety improvements, corridor advocacy
1292with Caltrans, and development of secondary egress capability. Companion detail on the Bowie
1293Road to Echo Lane route is in Action 5.6.22.
Field
Detail
Priority
1
Hazards Addressed
Transportation/access; all hazards (evacuation and response access)
Pillars
Quality of Life; Self-Sufficiency
Lead
Public Works and Facilities / OES
Partners
Caltrans; Humboldt County; BIA Roads
Timeline
Corridor safety advocacy immediate; egress engineering multi-year
Est. Cost / Funding
HMGP; BRIC; BIA Roads; Caltrans safety programs
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page45of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
1294Action 5.6.5 — Recreation Center Generator and 30-Day Fuel Capability
295Equip the Recreation Center — the designated County-MOU emergency shelter — with
1
1296permanent standby generation and fuel capability supporting extended operations. The 2026
1297THIRA establishes a 7-day outage capability threshold; this action builds toward the 30-day
1298scenario addressed in the Energy Emergency Plan (Appendix F).
Detail
Priority
1
Hazards Addressed
Severe weather/PSPS; earthquake; all hazards (sheltering)
Pillars
Self-Sufficiency; Quality of Life
Lead
Office of Emergency Services / Office of Energy Services
Partners
Humboldt County (shelter MOU); PG&E
Timeline
Start within 1 year; approx. 1–2 years
Est. Cost / Funding
HMGP 5% initiative / BRIC; generator grant
T
Field
AF
1299Action 5.6.6 — Resort Seismic Assessment (Active HMGP Project)
300Complete the active HMGP-funded seismic assessment of Resort and critical Tribal structures,
1
1301producing prioritized retrofit recommendations that will feed the next round of BRIC/HMGP
1302construction applications.
Field
Detail
Priority
1 — In progress
Hazards Addressed
Lead
Self-Sufficiency; Sustainability
R
Pillars
Earthquake
Grants Management / Facilities
FEMA HMGP; engineering consultant
Timeline
Active; per HMGP period of performance
Est. Cost / Funding
HMGP (active award)
D
Partners
1303HMGP - 4692 - Seismic Retrofit and Slope Stabilization Project
1304Action 5.6.7 — Mattole Beach Emergency Protocol
305Establish an emergency protocol for Tribal gatherings at Mattole Beach, including pre-gathering
1
1306hazard briefing, natural-warning evacuation trigger (ground shaking = immediate move to high
1307ground), designated evacuation routes and assembly point, and communications procedures for
1308a location with limited coverage. The THIRA tsunami scenario informs capability targets.
1309Frequency of gatherings is biannual, which places this below daily-exposure actions in
1310sequence — but the ceremony's cultural stakes, documented in Section 3.2, make its protection
1311a core commitment of this plan. Companion action 5.6.20 develops the full ceremonial site
1312evacuation and warning plan. A U.S. Army Corps of Engineers study and technical assistance
1313project focused on the Mattole Beach area and the Salmon Ceremony is underway, engaging
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page46of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
314the Mattole Restoration Council and Mattole Salmon Group on watershed restoration relevant to
1
1315the site.
Detail
Priority
2
Hazards Addressed
Tsunami; coastal hazards; earthquake (near-field)
Pillars
Cultural Awareness; Quality of Life
Lead
Office of Emergency Services / Cultural Programs
Partners
umboldt County OES; NOAA/NWS; U.S. Army Corps of Engineers (Mattole
H
Beach study and technical assistance project); Mattole Restoration Council;
Mattole Salmon Group; Lost Coast League
Timeline
Protocol within 1 year; drills at gatherings thereafter
Est. Cost / Funding
Minimal — planning; HMGP/BRIC planning eligible
T
Field
1316
AF
1317Action 5.6.8 — FEMA-4692-DR Public Assistance Contract Execution
318Execute the approved but unexecuted Public Assistance contract under FEMA-4692-DR and
1
1319complete repairs to earthquake-damaged facilities, including the designated emergency shelter.
1320Approved federal funding left unspent while damaged facilities remain unrepaired is both a risk
1321and a compliance exposure; this action closes it.
Field
Detail
Priority
1 — Administrative urgency
Hazards Addressed
Lead
Self-Sufficiency
R
Pillars
Earthquake (repair of documented damage)
Grants Management / Tribal Administration
FEMA Region IX PA
Timeline
Immediate
Est. Cost / Funding
pproved PA funding — FEMA share $476,092.04 across 11 Project
A
Worksheets (Section 4.4) — unobligated
D
Partners
1322
13235.7 Mitigation Actions 9 through 26
324The following actions complete the 26-action portfolio. Each is developed with lead
1
1325responsibility, pillar alignment, and funding pathway; full implementation detail follows the same
1326structure as Actions 1–8.
1327Table 5-2: Mitigation Actions 9–26 — Summary Detail
#
Action
Pillar(s)
Priority
Lead
Scope
9
AVE Mobile Enrollment
R
Drive
uality of
Q
Life
2
OES
ommunity-wide alerting enrollment
C
campaign; integration with electronic
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page47of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
#
Action
Pillar(s)
Priority
Lead
Scope
ign; annual enrollment events
s
including live enrollment during training
(Appendix H).
oster Care Emergency
F
Protocol
uality of
Q
Life
2
ocial
S
Service
s / OES
stablish emergency accountability
E
and reunification protocol for Tribal
children in foster placements — a
direct answer to the
boarding-school-era legacy
documented in Section 3.2.
11
esort Water System Fire
R
Flow Assessment
elf-Sufficien 2
S
cy
ublic
P
Works /
Resort
Facilitie
s
haracterize the reclaimed water
C
system serving the Resort: storage,
pumps, pressure, hydrants; establish
fire flow baseline and backup storage
need.
12
tormwater Infrastructure
S
and Maintenance
Governance
Sustainability 1
ublic
P
Works
and
Facilitie
s
Implement BOR R25AP00342
improvements at Whitchurch sites;
adopt Appendix I inspection protocol;
BRIC code plus-up land-use
provisions; Bear Paws Lane conversion
protocol.
13
et and Service Animal
P
Emergency Plan
Implementation
14
EP Emergency
L
Notification Capability
15
ump and Play Priority
P
Fuel Resupply Agreement
elf-Sufficien 2
S
cy
ES /
O
ormal priority resupply agreement
F
Enterpri with fuel distributor; implements the
se
fuel rationing hierarchy (Appendix F) —
gaming within Priority 1 because
gaming revenue funds all government
services.
16
ybersecurity Incident
C
Response Plan
Formalization
elf-Sufficien 3
S
cy
Informa
tion
Technol
ogy
ormalize incident response for
F
government, gaming, and WWTP
SCADA environments; THIRA $3.65M
scenario is the planning basis; detail
retained in EOP.
17
omprehensive
C
All-Hazards Training
Program
uality of
Q
Life
ES /
O
HR
nified annual training consolidating
U
2021 Actions 5, 6, 8, and 12:
earthquake (Great ShakeOut), fire,
severe weather (Appendix H),
volunteer development — with the
documented volunteer availability gap
addressed through paid-time and
incentive design.
AF
T
10
3
OES
Implement Appendix G: ballfield
sheltering with weighted no-stake
fencing, 50-animal initial capacity,
county Animal Control coordination,
reunification.
uality of
Q
Life
2
ES /
O
HR
ultilingual alerting and materials for
M
LEP employees and community
members; Title VI obligation noted.
D
R
uality of
Q
Life
2
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page48of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
Action
Pillar(s)
Priority
Lead
Scope
18
lectronic Notification Sign
E
— Sustainment
uality of
Q
Life
3
OES
ompleted 2021 action; sustain,
C
maintain, and integrate with RAVE
alerting.
19
J HA Review,
Formalization, and
Sovereignty
Documentation
elf-Sufficien 1
S
cy / Cultural
Awareness
ribal
T
Adminis
tration /
OES
ormalize the Loleta FD JHA in written
F
agreement; document Tribal
jurisdictional authority on trust lands;
pursue supplemental coverage
agreement with Fortuna Fire for the
hotel tower and large-assembly
venues.
20
attole Beach Ceremonial
M
Site Evacuation and
Warning Plan
ultural
C
Awareness /
Quality of
Life
ES /
O
Cultural
Progra
ms
ull evacuation route survey, assembly
F
point designation, signage/warning
approach appropriate to the site, and
drill integration with gatherings.
21
Drought Contingency Plan
Sustainability 2
ublic
P
Works /
ENR
evelop plan addressing
D
well-dependent supply, conservation
triggers keyed to Drought Monitor
stages, and salmon habitat
coordination.
22
owie Road to Echo Lane
B
Secondary Egress
uality of
Q
Life
2
ublic
P
Works
and
Facilitie
s
ngineer and permit the identified
E
secondary egress route. Terrain is
sloped, vegetated, and seasonally wet
with a culvert passing beneath the
highway; CEQA and CWA §404
compliance anticipated — a cost and
schedule factor, not a bar. Animal
underpass co-benefit identified.
23
andemic Response Plan
P
— Maintenance and
Update
uality of
Q
Life
3
OES
pdate the completed plan with
U
COVID-19 lessons learned; annual
review cycle.
24
Tribal Microgrid — Phase 1 Sustainability 3
D
R
AF
2
T
#
enew L
R
ong-term (5+ year) energy
able
sovereignty pathway; Phase 1
Energy feasibility and funding development.
Coordin
ator
25
etrolia Parcel Hazard
P
Assessment
Sustainability 3
ES /
O
ENR
26
ctive Threat / Civil Unrest
A
Plan — Annual Exercise
uality of
Q
Life
ES /
O
aintain and exercise annually for
M
Enterpri large-assembly enterprise operations;
se
operational detail in EOP.
Security
3
aseline hazard assessment of the
B
discontiguous Petrolia parcel.
1328
13295.8 Master Priority Summary — All 26 Actions
1330Table 5-3: Master Mitigation Action Priority Summary
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page49of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
#
Action
Priority
Lead
Funding Pathway
5.6.1
Tribal Fire Program — Phase 1
1
OES / Admin
MGP/BRIC planning;
H
BIA
5.6.2
Bear River PD Reinstatement
1
Admin / Council
BIA; DOJ
5.6.3
mergency Resilience Campus —
E
Singley Hill
1
OES / Admin
HMGP; BRIC; EDA
5.6.3a
Near-Term Connex Supply Storage
1 (90-day) OES
5.6.4
ingley Hill Corridor / Secondary
S
Egress Program
1
Public Works / OES H
MGP; BIA Roads;
Caltrans
5.6.5
ecreation Center Generator +
R
30-Day Fuel
1
OES / Facilities
HMGP/BRIC
5.6.6
Resort Seismic Assessment
1 (active)
Grants / Facilities
HMGP (awarded)
5.6.7
Mattole Beach Emergency Protocol
2
OES / Cultural
Planning funds
5.6.8
DR-4692 PA Contract Execution
1 (admin)
Grants / Admin
PA (approved)
5.6.9
RAVE Mobile Enrollment Drive
2
OES
Tribal; THSGP
5.6.10
Foster Care Emergency Protocol
2
ocial Services /
S
OES
Planning funds
5.6.11
esort Water System Fire Flow
R
Assessment
2
ublic Works /
P
Resort
BRIC; Tribal
5.6.12
tormwater Infrastructure +
S
Maintenance Governance
1
Public Works
OR R25AP00342;
B
BRIC
5.6.13
nimal Emergency Plan
A
Implementation
3
OES
Tribal; Red Cross coord.
5.6.14
LEP Notification Capability
R
2
OES / HR
Tribal
ump and Play Priority Fuel
P
Resupply
2
OES / Enterprise
Tribal
Cybersecurity IR Plan Formalization
3
IT
THSGP; Tribal
Comprehensive Training Program
2
OES / HR
Tribal; EMPG-like
5.6.18
Electronic Sign Sustainment
3
OES
Tribal
5.6.19
J HA Review + Sovereignty
Documentation
1
Admin / OES
Planning funds
5.6.20
attole Beach Evacuation +
M
Warning Plan
2
OES / Cultural
Planning funds
5.6.21
Drought Contingency Plan
2
Public Works / ENR BOR; BRIC
5.6.22
owie Road to Echo Lane
B
Secondary Egress
2
Public Works
HMGP; BIA Roads
5.6.23
Pandemic Plan Update
3
OES
Tribal
5.6.15
5.6.16
T
AF
D
5.6.17
Tribal
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page50of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
#
Action
Priority
Lead
Funding Pathway
5.6.24
Tribal Microgrid Phase 1
3
enewable Energy
R
Coord.
DOE; HMGP
5.6.25
Petrolia Parcel Hazard Assessment
3
OES / ENR
Planning funds
5.6.26
Active Threat Plan Annual Exercise
3
OES / Security
Tribal
1331
13325.9 Funding Strategy
D
R
AF
T
333The Tribe pursues a layered funding strategy pairing FEMA Hazard Mitigation Assistance
1
1334(HMGP — declaration-based eligibility under FEMA-4692-DR; BRIC; FMA) with Public
1335Assistance mitigation (§406), Bureau of Reclamation infrastructure agreements (R25AP00342
1336active), BIA programs (roads, justice services, Living Languages), Department of Energy tribal
1337energy programs, Department of Justice tribal justice funding, Caltrans safety programs, EDA,
1338and Tribal enterprise capital. Grants Management administers all federal awards under 2 CFR
1339200. Actions in this plan are drafted with an emphasis on narrow, shovel-ready scopes to
1340maximize implementation likelihood, per FEMA's 2022 review guidance.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page51of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PART SIX: PLAN MAINTENANCE
1341
13426.1 Monitoring
343The Office of Emergency Services is responsible for monitoring implementation of this plan.
1
1344Monitoring occurs on an annual cycle: each September — aligned with pre-storm-season
1345activities including the culvert inspection protocol (Appendix I) and severe weather training
1346(Appendix H) — OES collects a Mitigation Action Completion Report (MACR, Appendix D) from
1347the lead department for each active action. The MACR standardizes the information collected
1348across departments, per FEMA's 2022 review recommendation (Element A-1). OES compiles
1349the MACRs into an Annual Mitigation Report to Tribal Council.
T
13506.2 Evaluation
13576.3 Updating
AF
351The Hazard Mitigation Planning Committee convenes at least annually to evaluate the plan's
1
1352effectiveness against its stated goals: whether actions are progressing on their general
1353timelines, whether hazard conditions or Tribal priorities have changed, whether new
1354development or acquisitions have changed the risk profile, and whether the plan remains
1355integrated with the THIRA/SPR cycle and EOP. Evaluation findings are documented in the
1356Annual Mitigation Report.
358The plan will be updated and resubmitted to FEMA Region IX within the five-year cycle required
1
1359by 44 CFR § 201.7(d)(3). The update process will begin no later than year four of the cycle,
1360drawing on the accumulated MACRs and Annual Mitigation Reports — which together provide
1361the 2021-to-2026-style status documentation (Table 5-1) that this update required substantial
1362effort to reconstruct. Amendments between cycles may be adopted by Tribal Council resolution
1363when necessary to reflect changes in Tribal or federal law.
R
13646.4 Continued Public Participation
D
365Public participation continues throughout the plan cycle: the Annual Mitigation Report is
1
1366available to the Tribal community; mitigation is a standing topic at community gatherings; the
1367Community Hazard Mitigation Survey is refreshed during the next update; and the public (as
1368defined in Section 2.2) is invited to comment on any proposed amendment.
13696.5 Integration into Other Planning Mechanisms
370Hazard mitigation requirements are integrated into other Tribal planning mechanisms at the front
1
1371end of project development, not after construction approval — per FEMA's 2022 review
1372recommendation (Element C-5). Mechanisms include: capital project development and Council
1373presentation packages (mitigation screening before Council review); the THIRA/SPR annual
1374cycle; the EOP revision cycle; grant application development by Grants Management; land
1375acquisition and trust conversion review; and enterprise facility planning.
13766.6 Project Closeout
377Upon completion of any mitigation action, the lead department submits a final MACR
1
1378documenting completion, final cost, funding sources, and outcome against intent. For federally
1379funded projects, Grants Management completes closeout — including financial reconciliation —
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page52of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
380within 90 days of the end of the period of performance, per 2 CFR §§ 200.300–200.309 and
1
1381200.344.
13826.7 Assurances
383The Bear River Band of the Rohnerville Rancheria assures that it will comply with all applicable
1
1384federal statutes and regulations in effect with respect to the periods for which it receives grant
1385funding, including 2 CFR Parts 200 and 3002, and will amend this plan whenever necessary to
1386reflect changes in Tribal or federal laws and statutes, as required by 44 CFR § 201.7(c)(6).
D
R
AF
T
1387
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page53of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
APPENDIX A: PLANNING PROCESS DOCUMENTATION
1388
389The THMP Planning Committee convened at project kickoff on March 3, 2026 and met regularly
1
1390through Phase 1 (Weeks 1–4, March 2026) to organize the update, confirm the planning
1391committee, issue departmental data requests, and validate the critical facilities list and
1392community profile. Beginning in Phase 2, the process shifted to a department-and-partner
1393engagement model: OES worked directly with individual Tribal departments and external
1394partners on their subject areas, an approach that produced deeper technical input than
1395continued full-committee meetings. Department mitigation workshops were held in July 2026
1396(Phase 4) to review prior actions and develop the updated mitigation strategy.
AF
T
397External partner engagement during the drafting period included sustained coordination with the
1
1398U.S. Army Corps of Engineers, which is conducting a study and technical assistance project
1399focused on the Mattole Beach area and the Tribe's revitalized Salmon Ceremony, and which
1400produced the mapping series used throughout this plan. Coordination included video
1401conferences on April 9, April 14, July 7, and July 14, 2026, and a two-day site visit to the
1402Rancheria on May 6–7, 2026. Through this project, USACE is also engaging the Mattole
1403Restoration Council and Mattole Salmon Group on watershed restoration relevant to the Tribe's
1404interests.
D
R
405Meeting records, including agendas and sign-in sheets, are retained on file at the Office of
1
1406Emergency Services and are available for review; consistent with this plan's practice, they are
1407not reproduced in the public document to protect personal information. The planning schedule is
1408summarized in Figure A-1 below.
1409
410Figure A-1: THMP 2026 planning process timeline — six phases from March 2026 kickoff
1
1411through FEMA Region IX review.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page54of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
APPENDIX B: COMMUNITY HAZARD MITIGATION SURVEY
1412
413
1
1414
PLACEHOLDER: Insert survey instrument and full response tabulation (survey
▶
closed; results summarized in Section 2.2).
D
R
AF
T
1415
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page55of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PPENDIX C: TRIBAL STAKEHOLDER OUTREACH
A
1417DOCUMENTATION
1416
418Stakeholder outreach was extended to the, Blue Lake Rancheria, Cher-Ae Heights Indian
1
1419Community of the Trinidad Rancheria, Yurok Tribe, Hoopa Valley Tribe, Humboldt County OES,
1420BIA, Loleta Fire Department, CAL FIRE / Fortuna ECC, Whitchurch Engineering, and the
1421Bureau of Reclamation.
422
1
1423
PLACEHOLDER: Insert copies of draft-plan notification correspondence to the
▶
entities above (public review period August 4 – September 4, 2026).
D
R
AF
T
1424
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page56of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PPENDIX D: MITIGATION ACTION COMPLETION REPORT
A
1426(MACR) TEMPLATE
1425
427The MACR standardizes annual reporting for every mitigation action. Lead departments
1
1428complete one MACR per assigned action each September.
Field
Entry
Action number and title
Reporting department / preparer
T
Reporting period
tatus (Not Started / In Progress / Completed / Deferred /
S
Removed)
Progress this period
Obstacles or changes in scope
AF
Funding status (applications, awards, expenditures)
Anticipated activity next period
or completed actions: final cost, funding sources,
F
outcome vs. intent
Signature / date
D
R
1429
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page57of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
APPENDIX E: TRIBAL COUNCIL ADOPTION RESOLUTION
1430
431
1
1432
1433
PLACEHOLDER: Insert adopted resolution following Tribal Council action. FEMA
▶
reviews the plan as Approvable Pending Adoption; the executed resolution completes
approval.
D
R
AF
T
1434
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page58of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
APPENDIX F: ENERGY EMERGENCY PLAN
1435
436The Energy Emergency Plan addresses PSPS monitoring and notification, generator activation
1
1437procedures, and extended outage coordination through a 30-day scenario. Its core is the Tribal
1438fuel rationing hierarchy:
Category
Priority 1
mergency operations and continuity of government, including gaming operations —
E
gaming revenue funds all Tribal government services
Priority 2
Critical services: water system, WWTP, Pump and Play fuel infrastructure
Priority 3
Resort operations
Priority 4
Tribal residential — AFN households first
Priority 5
All other uses
1439
D
R
1442
PLACEHOLDER: Merge full Energy Emergency Plan text into this appendix before
▶
submission.
AF
440
1
1441
T
Priority
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page59of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PPENDIX G: PET AND SERVICE ANIMAL EMERGENCY
A
1444PLAN
1443
T
445The plan establishes animal sheltering at the Recreation Center ballfields with an initial
1
144650-animal capacity target (expanding toward 100 by end of cycle, against THIRA scenario
1447demand of 50–200 and a current capability of 20), intake and documentation procedures,
1448Humboldt County Animal Control coordination, and reunification procedures. Red Cross
1449congregate shelter standards now require animal accounting, making this plan a prerequisite for
1450full shelter capability. The need is documented in the Tribe’s own operational history: during the
1451September 2020 evacuation shelter operation at the Recreation Center, pets could not be
1452accommodated within the facility — a recognized barrier to evacuation compliance that this plan
1453closes.
O STAKES IN ASTROTURF. All fencing on Recreation Center ballfields must use
N
weighted or free-standing systems. No stakes, ground anchors, or any penetration
of the artificial turf surface is permitted.
457
1
1458
PLACEHOLDER: Merge full Pet and Service Animal Emergency Plan text into this
▶
appendix before submission.
D
R
1459
AF
454
1
1455
1456
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page60of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PPENDIX H: SEVERE WEATHER EMPLOYEE TRAINING
A
1461MODULE
1460
462A 60–90 minute annual all-staff training curriculum covering: atmospheric river and PSPS
1
1463hazards; live RAVE Mobile enrollment during the session; shelter-in-place versus evacuation
1464decision-making; department roles; and the fuel rationing hierarchy. Recommended delivery:
1465September each year, before storm season, alongside the Appendix I inspection cycle.
466
1
1467
PLACEHOLDER: Merge full training module (8-section curriculum with department
▶
supplements) into this appendix before submission.
D
R
AF
T
1468
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page61of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
PPENDIX I: PRE-STORM CULVERT AND DRAINAGE
A
1470INSPECTION PROTOCOL
1469
471Annual September inspection protocol covering all six Whitchurch Engineering BRB2401 sites.
1
1472Responsible party: Public Works and Facilities — not OES. OES receives the annual inspection
1473report and holds escalation authority for deferred maintenance. This governance assignment
1474corrects the institutional gap documented by Whitchurch Engineering as a primary contributing
1475cause of flooding at all six identified sites: infrastructure that belonged to no one was maintained
1476by no one. The protocol connects to the BRIC code plus-up land-use provisions under Action
14775.6.12.
T
PLACEHOLDER: Merge full inspection protocol into this appendix before
▶
submission
D
R
AF
478
1
1479
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page62of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
APPENDIX J: FLOODING ENGINEERING DOCUMENTATION
1480
1481The following documents are incorporated by reference and maintained on file at BRB OES:
•
•
•
hitchurch Engineering, Inc. — Bear River Band Rancheria Initial Flooding Inspections,
W
Project No. BRB2401, March 7, 2024. Jeffrey Laikam, PE (RCE #68586). Six-site
engineering assessment.
Bear River Band Flood Control Project Map, 2025. Aerial map showing six flooding sites
with Trust Land (pink border) and Tribal-owned Fee Land (green border) boundaries.
Bureau of Reclamation Agreement No. R25AP00342. Active infrastructure improvement
project. On file with Grants Management.
D
R
AF
T
482
1
1483
1484
1485
1486
1487
1488
1489
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page63of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
RE-SUBMISSION CHECKLIST (INTERNAL — REMOVE
P
1491BEFORE PUBLIC RELEASE AND FEMA SUBMISSION)
1490
Item
Owner
Status
1
ublic comment period dates and instructions
P
(Executive Summary / Part Two)
OES
omplete —
C
dates in
Executive
Summary
2
Planning timeline figure (Part Two / Appendix A)
OES
omplete —
C
Figure A-1
3
Survey results summary (Part Two / Appendix B)
OES
urvey closed
S
— summarized
in 2.2;
instrument to
Appendix B
4
ribal stakeholder survey distribution + responses OES
T
(Appendix C)
uperseded —
S
send
draft-notificatio
n emails at
release; file in
Appendix C
5
arcel inventory table with trust/fee status (Part
P
Three 3.4)
ENR
Pending
6
opulation figures: enrollment, Tish Non, Basayo
P
Village, Day Care, LEP count (Part Three 3.5)
ocial Services / Housing
S
/ HR
Pending
7
Total insured asset value (Parts Three and Four)
Finance / HR
Pending
8
H-10 and H-15 hydrant retest GPM (Table 3-2)
OES / Facilities
Retest pending
9
WTP capacity in GPD; Resort reclaimed
W
system specs (Part Three 3.8.2)
Public Works
Pending
10
D dissolution — Council action or administrative
P
(Part Three 3.9.1)
Tribal Administration
Pending
11
EMA-4692-DR damage table: 10 PWs,
F
amounts, total (Part Four 4.4)
Grants team
omplete —
C
Section 4.4
12
OVID closure dates and federal assistance
C
amounts (Part Four 4.5)
Finance / Resort
Pending
13
Whitchurch site-specific descriptions (Table 4-3)
ES — from BRB2401
O
letter
omplete —
C
Table 4-3
14
SPS events since 2019; PSPS risk tier (Part
P
Four 4.2/4.8)
OES / PG&E
omplete —
C
Section 4.2
15
urrent Drought Monitor classification (Part Four
C
4.9)
ES — check before
O
submission
omplete —
C
re-verify date at
submission
D
AF
T
#
R
his
T
1492
checklist is an internal working tool. Delete this section from the public review copy and
from
1493
the final FEMA submission.
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page64of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
Status
16
ecreation Center generator grant reference
R
(Action 5.6.5)
OES
Pending
17
HMGP project number (Action 5.6.6)
Grants Manager
Pending
18
mergency Resilience Campus name in Tribal
E
language (Action 5.6.3)
anguage program /
L
Elders / Council
ending
P
direction
19
oster care roster access protocol with Social
F
Services (Action 5.6.10)
Social Services
Pending reply
20
ear Paws Lane displacement plan timeline — 7
B
units confirmed (Part Three 3.5)
Housing / Facilities
imeline
T
pending
21
Loss estimation table (Part Four 4.15)
22
erge full Appendix F–I texts from supplemental
M
drafts
23
Insert all maps at MAP PLACEHOLDER boxes — OES / GIS
Army Corps set + BOR flood map
Maps in hand
24
Council adoption resolution (Appendix E)
fter public
A
review
25
pdate TOC page numbers (right-click → Update OES
U
Field)
At each edit
26
emove this checklist from public and FEMA
R
copies
Final step
T
Owner
OES / Finance
After item 7
OES
Pending
Tribal Council
AF
495
1
1496
Item
OES
END OF DRAFT PUBLIC REVIEW— BRB TRIBAL HAZARD MITIGATION PLAN
2026 UPDATE
R
1494
#
D
497Bear River Band of the Rohnerville Rancheria • Office of Emergency Services • 266 Keisner Road, Loleta,
1
1498
CA 95551
BRB Tribal Hazard Mitigation Plan — 2026 Update — Page65of65
https://docs.google.com/document/d/1Xw7sH3gbNi92JyaE3OVzu6g78W7cCPzp/edit
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.